Loading...
HomeMy WebLinkAbout2017-05-09; City Council; ; Item Continued to 07/11/2017: Adopt a Resolution accepting bids and awarding a contract to ATP General Engineering Contractors for construction of the 2017 Pavement Overlay Project Project No. 6001- 170LCA Review PK c.CAF' Co'Co CITY COUNCIL 4-0 Staff Report•„pg. Meeting Date:May 9, 2017 To:Mayor and City Council From:Kevin Crawford, City Manager Staff Contact:Emad Elias, Assistant Engineer emad.elias@carlsbadca.gov or 760-602-7558 Subject:Adopt a Resolution accepting bids and awarding a contract to ATP General Engineering Contractors for an amount not to exceed $1,797,777 for construction of the 2017 Pavement Overlay Project, Project No. 6001- 170L. Recommended Action Adopt a Resolution accepting bids and awarding a contract to ATP General Engineering Contractors for an amount not to exceed $1,797,777 for construction of the 2017 Pavement Overlay Project, Project No. 6001-170L. Executive Summary On Feb. 14, 2017, City Council approved Resolution No. 2017-024 approving the plans and specifications and authorizing advertising the 2017 Pavement Overlay Project, Project No. 6001- 170L for construction bids.The documents were posted on PlanetBids for at least 30 days. Bids were received on March 23, 2017, and the lowest responsive and responsible bidder was ATP General Engineering Contractors, with a bid in the amount of $1,797,777.Staff recommends award of the construction contract to ATP General Engineering Contractors. Discussion The 2017 Pavement Overlay Project, Project No. 6001-170L is part of the city's ongoing Pavement Management Program.Staff typically execute two resurfacing projects annually from the Pavement Management Program; one pavement overlay, and one slurry seal.The roadways to be resurfaced are determined by staff's professional expertise, pavement management software, and field analysis.This road maintenance project will resurface the following streets:El Camino Real from Gateway Road to Arena! Road, Anillo Way from Rocio Street to La Gran Via, and La Gran Via from Anillo Way to Madrilena Way.Resurfacing will be accomplished by grinding off two inches of the existing asphalt concrete pavement and replacing it with a rubberized asphalt concrete layer. The roadways,as listed in Exhibit 2,were selected based on their current conditions and need for maintenance. On March 23, 2017,12 sealed bids were received for the construction of this project as shown on the following table: Item 83 May 9, 2017 Page 1 of 7 CONTRACTOR TOTAL BID ATP General Engineering Contractors $1,797,777 Coffman Specialties, Inc.$1,885,000 All American Asphalt $1,911,770 PAL General Engineering $1,944,114 TC Construction $1,962,974 Hazard Construction $1,984,624 Calmex Engineering $1,992,179 SRM Contracting & Paving $2,062,756 Granite Construction $2,159,903 R.1 Noble company $2,219,942 Hardy & Harper Company $2,345,000 George Weir Asphalt Construction $2,616,124 Staff has completed its review of the contract documents and determined that ATP General Engineering Contractors is the lowest responsive and responsible bidder.ATP General Engineering Contractors' bid is responsive as it meets the requirements of the bidding documents.The bidder is also deemed responsible as they submitted a list of similar projects to show their capability and qualification to perform the specified work.Some of the listed similar projects were for the City of Carlsbad in recent years, and the projects were performed to the City's satisfaction.The construction contract contains general performance standards and references technical specifications, which if not met, allow the City to withhold payment, and includes a 1 year warranty period. Fiscal Analysis There are sufficient funds available in the Pavement Management Program,CIP No. 6001 fund to complete the 2017 Pavement Overlay Project. Funding for the Pavement Management Program consists of non-jurisdictional fees (generated from trash haulers),Gas Tax Funds, and TransNet-Local Funds available for drawdown from SANDAG.Remaining Pavement Management Program funds will be used on future pavement rehabilitation and resurfacing projects. The available funds and estimated construction costs for the project are shown in the following table: Item R3 May 9,2017 Page 2 of 7 PAVEMENT MANAGEMENT PROGRAM, OP NO. 6001 Current Appropriation $9,646,221 Current Year Expenditures/Encumbrances $2,613,075 TOTAL PAVEMENT MANAGEMENT PROGRAM FUNDING AVAILABLE $7,033,146 POPAVEMEAT CARLO PROJECT,...e EcT NO.60014701 Construction Contract $1,797,777 Construction Contingency $180,000 Construction Management, Inspection, and Material Testing $180,000 TOTAL ESTIMATED CONSTRUCTION COSTS $2,157,777 REMAINING BALANCE AFTER PROJECT NO. 6001-1701.$4,875,369 ADDITIONAL APPROPRIATION NEEDED $0 Next Steps Once contract documents are fully executed and a purchase order is issued,staff will schedule a pre-construction meeting with the contractor, and issue a notice to proceed with the construction of the project. Environmental Evaluation (CEQA1 The project is exempt from the California Environmental Quality Act (CEQA)per State CEQA Guidelines Section 15301(c)—minor alteration of existing facilities including streets, sidewalks, gutters, and similar facilities involving negligible or no expansion. Public Notification While no public notice is required to award the contract, the public will be notified in advance of the construction activities using multiple media methods such as signage, email, website, and/or other city communication channels. The construction contractor will also be required to notify the public of construction activities via changeable message signs, door hangers, letters to residents, and/or "NO PARKING" signs, as applicable. Exhibits 1.Resolution accepting bids and awarding a contract to ATP General Engineering Contractors for an amount not to exceed $1,797,777 for the construction of the 2017 Pavement Overlay Project, Project No. 6001-170L. 2.Street List for the 2017 Pavement Overlay Project, Project No. 6001-170L. 3.Location Map. Item #3 May 9, 2017 Page 3 of 7 Exhibit 1 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA,ACCEPTING BIDS AND AWARDING A CONTRACT TO ATP GENERAL ENGINEERING CONTRACTORS FOR AN AMOUNT NOT TO EXCEED $1,797,777 FOR CONSTRUCTION OF THE 2017 PAVEMENT OVERLAY PROJECT, PROJECT NO. 6001-170L WHEREAS,the City Council of the City of Carlsbad, California has determined that it is necessary, desirable, and in the public's best interest to construct the 2017 Pavement Overlay Project, Project No. 6001-170L; and WHEREAS,on Feb.14,2017, the City Council of the City of Carlsbad adopted Resolution No. 2017-024 approving plans and specifications for the construction of the 2017 Pavement Overlay Project, Project No. 6001-170L; and WHEREAS,the City of Carlsbad received 12 sealed bids on March 23, 2017 for the construction of the 2017 Pavement Overlay Project, Project No. 6001-170L; and WHEREAS,ATP General Engineering Contractors submitted the lowest responsive and responsible bid to construct the project in the amount of $1,797,777; and WHEREAS,there are sufficient funds available in the Pavement Management Program to complete the project; and WHEREAS,subsections 3.28.040(C)(5)and 3.28.090(B)of the Carlsbad Municipal Code authorize the City Manager or designee to approve change orders in the amount equal to the contingency set at the time of project award. NOW, THEREFORE,BE IT RESOLVED by the City Council of the City of Carlsbad, California,as follows: 1.That the above recitations are true and correct. 2.That the bid of $1,797,777 submitted by ATP General Engineering Contractors for the construction of the 2017 Pavement Overlay Project, Project No. 6001-170L is accepted and the Mayor is hereby authorized to execute a contract for this project. 3.That the city manager or designee is hereby authorized to approve construction change orders up to $180,000. 4.That the award of this contract is contingent upon the bidder submitting the lowest responsible bid executing the required contract and submitting the required bonds and Item #3 May 9, 2017 Page 4 of 7 insurance policies within 20 days of adoption of this Resolution.The city manager may grant reasonable extensions of time. PASSED,APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the day of 2017, by the following vote, to wit: AYES: NOES: ABSENT: MATT HALL, Mayor BARBARA ENGLESON, City Clerk (SEAL) Item #3 May 9, 2017 Page 5 of 7 Exhibit 2 Exhibit 2 -Street List 2017 Pavement Overlay Project Project No. 6001-1701 Street Name From To El Camino Real Gateway Road Arenal Road Anillo Way Rocio Street La Gran Via La Gran Via Anillo Way Madrilena Way Item #3 May 9, 2017 Page 6 of 7 Exhibit 3 LOCATION MAP ,,BUEN't '.‘-\±.§00(-_4.6.imil:- Tha 4 --1.4•1 ., W II.' :20..litt.ilr owvis,,G'.0 is.:,,,n,.,,,,,...,,,,,,,,,\WM'‘3 ‘Ni. •••/4 -.---ti 4 o *0-#•v ..100.0 At %...t. : ,,,_\ \to..„...* ---_,4. -- i 'ill ri(7 c'W0. ... - ..T,L... )1I1 _.-/i 47;! 1 c..liii AGUA .1 . .irgiolik iii0.ye 01i) HEDIOND 4oINLAGOON'`l -slim*i :Ifiltriormi le ..'74._____ain,.A..0A./... ... iv - _:41110.06 ‘ - P440...,,,\i‘R 4407 P 111 .RD.kilm......_11r1Flatea ii71.. .g. rji!.4 ' -'334.iia.•_.........v...-_ il•7.....-.w a ..„ e 1 LaIlirrsllVP•_,,,,,,e‘..ar' .,,in ‘\''',4111"'LN.r1;*..°:.41:*-- ?°\14 .Lf',\ L. ---...\a=MA \7 n\cil tc..1 ......ex Ojo : S:\\*'41111......6 gig roli.....1. -- 4044..." 1171111 ,-1 .nri .„,„,,005„„vo.. . 7.\-.:;•"rat 1 V Vox_dff t .4 i -----04 ii)imir.----- --.,r _cif ,-;-*al"",'' *,*'''''A •P •1114.:ob.1 I rior7i. ler • ''i '..'‘,'..t. ts BATIQUITOS LAGOON'' •-COSTA •a'iV.' ..s'''''- •0 Ike es 0000"*.0.-.<4.'mid& et.eveto.v/r -k, titia t ( -- 44444.--,STREETS TO BE OVERLAYED ....'I * ,....01........... PROJECT NAME PROJECT EXHIBIT 2017 PAVEMENT OVERLAY PROJECT NUMBER 6001-170L 3 PLOTTED BY 9661'ENS PLOT DA1e3/8/16 PAIH:fk VRANSPORTATION DEPARBIENIVESIGN DIVISIONWMAD WAS\2017 OVItkailO1 nav AmPatie UI I