Loading...
HomeMy WebLinkAbout2017-05-23; City Council; ; Adopt a Resolution approving plans and specifications and authorizing the City Clerk to advertise for bids for the Carlsbad Blvd Bridge improvements over the Encina Power Station discharge channel Project Nos. 6014 and 6053Page 91 CAReview ~ ~ CITY COUNCIL ~ Staff Report Meeting Date: To: From: Staff Contact: Subject: May 23,2017 Mayor and City Council vJ' Kevin Crawford, City Manage~ Brandon Miles, Associate Engineer Brandon.Miles@carlsbadca.gov or 760-602-2745 Adopt a Resolution approving the plans and specifications and authorizing the City Clerk to advertise for bids for the Carlsbad Boulevard Bridge . improvements over the Encina Power Station discharge channel, Project Nos. 6014 and 6053. Recommended Action Adopt a Resolution approving the plans and specifications and authorizing the city clerk to advertise for bids for the Carlsbad Boulevard Bridge improvements over the Encina Power Station discharge channel, Project Nos. 6014 and 6053. Executive Summary Bridge railing improvements are needed for the Carlsbad Boulevard Bridge over the Encina Power Station discharge channel, approximately one half-mile north of Cannon Road. Currently there are no bridge railings on either side of the roadway. The construction of bridge railings will increase the safety across the bridge for vehicles, bicyclists, and pedestrians. The railings will complement the aesthetic characteristics of the existing sea wall along the west side of Carlsbad Boulevard to the north and south of the bridge. Discussion The Carlsbad Boulevard Bridge was constructed in 1954 and is a 2-span reinforced concrete culvert. The bridge consists of sidewalks, bike lanes, and two vehicle travel lanes in each direction with a raised concrete median. Currently, chain-link fences located behind the sidewalk on both the west and east sides of the bridge are the barriers at the edge of the structure. In addition to the bridge railing construction, the project will replace the water pipeline attached to the east side of the bridge. The construction documents prepared for the project include performance standards and specifications which govern construction as well as a one year warranty period. On Nov. 12, 2012, City Council authorized a Professional Services Agreement to design the west side bridge railing (Resolution No. 2012-251). At that time, Poseidon Resources was planning to proceed with the design and construction of the easterly bridge railing. On March 12, 2014, the city accepted a payment of $338,454.67 from Kiewit Shea Desalination (KSD) for design and construction of the barrier rail on the east side of the bridge. The design agreement was subsequently amended to include the easterly bridge railing, and City Council authorized another amendment to extend that agreement (Resolution No. 2015-267). Page 92 Fiscal Analysis Sufficient funds are available to complete the project, from Federal Highway Bridge Program (HBP) funds, TransNet-Local funds and a payment from KSD to satisfy project conditions. The available funds and the estimated construction costs for the project are shown in the following table: CARLSBAD BOULEVARD BRIDGE OVER THE ENCINA POWER STATION DISCHARGE CHANNEL, PROJECT NOS. 6014 AND 6053 Federal Highway Bridge Program (HBP, CaiTrans Local Assistance) $1,030,268 TransNet-Local $133,482 KSD Payment $338,455 TOTAL ESTIMATED FUNDS AVAILABLE $1,502,205 TASK DESCRIPTIONS Construction Contract (Engineer's Estimate) $760,000 Construction Contingency {20%) $152,000 Construction Management (Staff), Resident Engineer {Consultant), $175,000 and Inspection (Consultant) TOTAL ESTIMATED CONSTRUCTION COSTS $1,087,000 REMAINING BALANCE AFTER PROJECT NOS. 6014 AND 6053 $415,205 ADDITIONAL APPROPRIATION NEEDED $0 Next Steps A construction contract Request for Bids will be advertised. Responses will be evaluated and the lowest responsive and responsible bidder will be identified by city staff. Staff will then return to City Council with a recommendation to award the contract to the identified bidder. Environmental Evaluation (CEQA/NEPA) This project is exempt from California Environmental Quality Act {CEQA) review pursuant to CEQA Guidelines Section 15301(d)-Existing Facilities-restoration or rehabilitation of existing facilities that are deteriorated or damaged and are required to meet current standards of public health and safety involving negligible or no expansion of use. This project is also exempt from the National Environmental Policy Act (NEPA) review pursuant to NEPA Regulations 23 CFR 771.117(c): activity (c)(28)-Bridge rehabilitation, reconstruction, or replacement or the construction of grade separation to replace existing at grade railing crossing, if the actions meet the constraints in paragraph (e) of this section. CaiTrans made a NEPA determination on Jan. 6, 2015, which indicates the project is exempt and has no significant impacts or unusual circumstances. Public Notification This item was noticed in accordance with the Ralph M. Brown Act and was posted and distributed at least 72 hours prior to the meeting date. Page 93 Exhibits 1. Resolution approving the plans and specifications and authorizing the city clerk to advertise for bids for the Carlsbad Boulevard Bridge improvements over the Encina Power Station discharge channet Project Nos. 6014 and 6053. 2. Location Map. 3. Project plans, specifications and contract documents are on file at the city's Public Works Department. RESOLUTION NO. 2017-089 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE BIDS FOR THE CARLSBAD BOULEVARD BRIDGE IMPROVEMENTS OVER THE ENCINA POWER STATION DISCHARGE CHANNEL, PROJECT NOS. 6014 AND 6053. WHEREAS, the City Council of the City of Carlsbad, California has determined it necessary, desirable and in the public interest to improve the Carlsbad Boulevard Bridge over the Encina Power Station discharge channel; and WHEREAS, the plans, specifications and contract documents for the Carlsbad Boulevard Bridge improvements over the Encina Power Station discharge channel, Project Nos. 6014 and 6053, have been prepared and are on file in the Public Works Department of the City of Carlsbad and are incorporated herein by reference; and WHEREAS, Federal Highway Bridge Program funds, TransNet-Local funds and a payment from Kiewit Shea Desalination for Project Nos. 6014 and 6053 have been appropriated and are sufficient. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications, and contract documents for the Carlsbad Boulevard Bridge improvements over the Encina Power Station discharge channel, Project Nos. 6014 and 6053, are hereby approved. 3. The city clerk of the City of Carlsbad is hereby authorized and directed to publish in accordance with State law, a Notice to Contractors Inviting Bids for the construction of the Carlsbad Boulevard Bridge improvements over the Encina Power Station discharge channel, Project Nos. 6014 and 6053, in accordance with the plans, specifications, and contract documents referred to herein. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 23rd day of May, 2017, by the following vote, to wit: AYES: M. Hall, K. Blackburn, M. Schumacher, C. Schumacher, M. Packard. NOES: None. ABSENT: None. M~ (SEAL) Page 96 PACIFIC OCEAN NOT TO SCALE PROJECT NAME CITY OF OCEANSIDE 78 PACIFIC OCEAN CARLSBAD BLVD. BRIDGE OVER THE POWER PLANT DISCHARGE CHANNEL PLOTTED BY: SCOTT EVANS PLOT DATE: I 1/7/12 PA TH:D: \TRANSPORTATION DEPARTMENT\LOCA noN MAPS\AUTOCA0\6014.DWG PROJECT EXHIBIT NUMBERS 2 6014 & 6053