Loading...
HomeMy WebLinkAbout2017-05-23; City Council; ; Adopt a Resolution approving the plans and specifications and authorizing the city clerk to advertise for bids for the Corrugated Metal Pipe Replacement Program Project - Carlsbad Blvd North of Island Way Project No. 6607CA Review ~5 9 CITY COUNCIL Staff Report Meeting Date: To: From: Staff Contact: Subject: May 23, 2017 Mayor and City Council • / Kevin Crawford, City Manage~ Daniel Zimny, Assistant Engineer Daniel.Zimny@carlsbadca.gov or 760-602-7551 Adopt a Resolution approving the plans and specifications and authorizing the city clerk to advertise for bids for the Corrugated Metal Pipe Replacement Program Project -Carlsbad Boulevard North of Island Way, Project No. 6607. Recommended Action Adopt a Resolution approving the plans and specifications and authorizing the city clerk to advertise for bids for the Corrugated Metal Pipe Replacement Program Project -Carlsbad Boulevard North of Island Way, Project No. 6607. Executive Summary This project, which is part of the city's ongoing Corrugated Metal Pipe (CMP) Replacement Program, will replace the storm drain system servicing north bound Carlsbad Boulevard just north of Island Way. Staff recommends approval of the project plans and specifications, and authorization to advertise for construction bids. Discussion The CMP Replacement Program was established to replace, repair, or remediate deteriorated CMP storm drain systems throughout the city. The pipelines included in the program were identified after city staff inspected and assessed the condition of the CMP storm drain pipelines. The storm drain system crossing north bound Carlsbad Boulevard, just north of Island Way, was inspected in March 2016 using closed circuit television (CCTV) technology. The inspection revealed that the pipe structure is compromised at several locations. Staff then prioritized this system for removal, replacement and repair. The project will remove 300 feet of CMP pipe and replace it with reinforced concrete pipe (RCP). The remaining 390 feet of CMP pipe is structurally intact, but has deteriorated, and will be lined with a cured-in-place pipe lining. In addition, a curb inlet and 240 feet of asphalt berm along the roadway shoulder will be installed to improve street drainage conditions. Fiscal Analysis There are sufficient Infrastructure Replacement Funds available in the CMP Replacement Program to complete the Carlsbad Boulevard CMP Replacement Project. A summary of estimated construction costs and available funds is shown below: Page 97 CORRUGATED METAL PIPE REPLACEMENT PROGRAM, PROJECT NO. 6607 Total Appropriation -CMP Replacement Program, Project No. 6607 $469,151 Current Year Expenditures/Encumbrances -Project No. 6607 $30,000 TOTAL FUNDS AVAILABLE-CMP REPLACEMENT PROGRAM, PROJECT NO. 6607 $439,151 CARLSBAD BOULEVARD CMP REPLACMENT, PROJECT NO. 6607 Construction Contract (Engineer's Estimate) $280,663 Construction Contingency (10%) $28,000 Construction Management, Inspection, and Material Testing (15%) $42,000 TOTAL ESTIMATED CONSTRUCTION COSTS $350,663 Engineering Support During Construction and Contingency, Staff and Consultant $10,000 Community Outreach $5,000 TOTAL PROJECT COST $365,663 REMAINING BALANCE AFTER CARLSBAD BOULEVARD CMP REPLACEMENT, $73,488 PROJECT NO. 6607 ADDITIONAL APPROPRIATION NEEDED $0 Next Steps A Request for Bids to construct the project will be advertised. Responses will be evaluated and the lowest responsive and responsible bidder will be identified by city staff. Staff will then return to City Council with a recommendation to award the contract to the identified bidder. Environmental Evaluation (CEQA) The project is exempt from environmental review per CEQA Guidelines Section 15303(d), concerning new construction of small structures such as utility extensions and street improvements and Section 15302(c) concerning replacement or reconstruction of existing utility systems involving negligible or no expansion of capacity. Public Notification While no public notice is required to authorize bidding, the public will be notified in advance of the construction activities using multiple media methods such as signage, email, website, and other city communication channels. The construction contractor will also be required to notify the public of construction activities. Exhibits 1. Resolution approving the plans and specifications and authorizing the city clerk to advertise for bids for the Corrugated Metal Pipe Replacement Program Project -Carlsbad Boulevard North of Island Way, Project No. 6607. 2. Location Map. 3. Project plans, specifications and contract documents are on file at the city's Public Works Department. Page 98 RESOLUTION NO. 2017-090 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE CORRUGATED METAL PIPE REPLACEMENT PROGRAM PROJECT-CARLSBAD BOULEVARD NORTH OF ISLAND WAY, PROJECT NO. 6607. EXHIBIT 1 WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable, and in the public interest to construct the Corrugated Metal Pipe (CMP) Replacement Program Project-Carlsbad Boulevard North of Island Way, Project No. 6607; and WHEREAS, the plans, specifications and contract documents for said project have been prepared and are on file in the Public Works Department ofthe City of Carlsbad and are incorporated by reference herein; and WHEREAS, there are sufficient CMP Replacement Program funds available to complete the Carlsbad Boulevard North of Island Way, Project No. 6607; and WHEREAS, the project is exempt from CEQA per State CEQA Guidelines Section 15303{d), concerning new construction of small structures such as utility extensions and street improvements and Section 15302{c) concerning replacement or reconstruction of existing utility systems involving negligible or no expansion of capacity; and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications and contract documents for the CMP Replacement Program Project-Carlsbad Boulevard North of Island Way, Project No. 6607, are hereby approved. 3. The city clerk of the City of Carlsbad is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of the CMP Replacement Program Project -Carlsbad Boulevard North of Island Way, Project No. 6607, in accordance with the plans, specifications and contract documents referred to herein. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 23rd day of May, 2017, by the following vote, to wit: AYES: M. Hall, K. Blackburn, M. Schumacher, C. Schumacher, M. Packard. NOES: None. ABSENT: None. .~CoR'!!~ i5f4 BARB ENGLESON, City Cler (SEAL) LOCATION PALOMAR NOT TO SCALE PROJECT NAME PROJECT EXHIBIT CORRUGATED METAL PIPE REPLACEMENT PROGRAM-NUMBER CARLSBAD BOULEVARD NORTH OF ISLAND WAY 6607 2 PLOT7ED BY: SCOTT EVANS PLOT DAIE:4/11/17 PA7H:D: \7RANSP0RTA110N DEPARTMENT\LOCA110N MAPS\AUTOCAD\6607_CARLSBAD BLW.DWG Page 101 THIS PAGE WAS INTENTIONALLY LEFT BLANK Page 102