HomeMy WebLinkAbout2017-07-11; City Council; ; Adopt a Resolution accepting bids and awarding a contract to ATP General Engineering Contractors for an amount not to exceed $1,797,777 for construction of the 2017 Pavement Overlay Project, Project No. 6001- 17OLCA Review ~
CITY COUNCIL
Staff Report
Meeting Date:
To:
From:
Staff Contact:
Subject:
July 11, 2017
Mayor and City Council
Kevin Crawford, City Manager
Emad Elias, Assistant Engineer
emad.elias@carlsbadca.gov or 760-602-7558
Adopt a Resolution accepting bids and awarding a contract to ATP
General Engineering Contractors for an amount not to exceed $1,797,777
for construction of the 2017 Pavement Overlay Project, Project No. 6001-
170L.
Recommended Action
Adopt a Resolution accepting bids and awarding a contract to ATP General Engineering
Contractors for an amount not to exceed $1,797,777 for construction of the 2017 Pavement
Overlay Project, Project No. 6001-170L.
Executive Summary
On Feb. 14, 2017, City Council approved Resolution No. 2017-024 approving the plans and
specifications and authorizing advertising the 2017 Pavement Overlay Project, Project No. 6001-
170L for construction bids. The documents were posted on PlanetBids for at least 30 days.
Bids were received on March 23, 2017, and the lowest responsive and responsible bidder was
ATP General Engineering Contractors, with a bid in the amount of $1,797,777. Staff
recommends award of the construction contract to ATP General Engineering Contractors.
Discussion
The 2017 Pavement Overlay Project, Project No. 6001-170L is part of the city's ongoing
Pavement Management Program. Staff typically execute two resurfacing projects annually
from the Pavement Management Program; one pavement overlay, and one slurry seal. The
roadways to be resurfaced are determined by staff's professional expertise, pavement
management software, and field analysis. This road maintenance project will resurface the
following streets: El Camino Real from Gateway Road to Arena I Road, Anillo Way from Rocio
Street to La Gran Via, and La Gran Via from Anillo Way to Madrilena Way. Resurfacing will be
accomplished by grinding off two inches of the existing asphalt concrete pavement and
replacing it with a rubberized asphalt concrete layer. The roadways, as listed in Exhibit 2, were
selected based on their current conditions and need for maintenance.
On March 23, 2017, 12 sealed bids were received for the construction of this project as shown
on the following table:
CONTRACTOR TOTAL BID
,·
ATP General Engineering Contractors $1,797,777
Coffman Specialties, Inc. $1,885,000
All American Asphalt $1,911,770
PAL General Engineering $1,944,114
TC Construction $1,962,974
Hazard Construction $1,984,624
Calmex Engineering $1,992,179
SRM Contracting & Paving $2,062,756
Granite Construction $2,159,903
R.J Noble company $2,219,942
Hardy & Harper Company $2,345,000
George Weir Asphalt Construction $2,616,124
Staff has completed its review of the contract documents and determined that ATP General
Engineering Contractors is the lowest responsive and responsible bidder. ATP General
Engineering Contractors' bid is responsive as it meets the requirements of the bidding
documents. The bidder is also deemed responsible as they submitted a list of similar projects
to show their capability and qualification to perform the specified work. Some of the listed
similar projects were for the City of Carlsbad in recent years, and the projects were performed
to the City's satisfaction. The construction contract contains general performance standards
and references technical specifications, which if not met, allow the City to withhold payment,
and includes a 1 year warranty period.
Fiscal Analysis
There are sufficient funds available in the Pavement Management Program, CIP No. 6001 fund
to complete the 2017 Pavement Overlay Project. Funding for the Pavement Management
Program consists of non-jurisdictional fees (generated from trash haulers), Gas Tax Funds, and
TransNet-Local Funds available for drawdown from SAN DAG. Remaining Pavement
Management Program funds will be used on future pavement rehabilitation and resurfacing
projects. The available funds and estimated construction costs for the project are shown in the
following table:
PAVEMENT MANAGEMENT PROGRAM, CIP NO. 6001
Current Appropriation $9,646,221
Current Year Expenditures/Encumbrances $2,613,075
TOTAL PAVEMENT MANAGEMENT PROGRAM FUNDING AVAILABLE $7,033,146
2017 PAVEMENT OVERLAY PROJECT, PROJECT NO. 6001-170L
Construction Contract $1,797,777
Construction Contingency $180,000
Construction Management, Inspection, and Material Testing $180,000
TOTAL ESTIMATED CONSTRUCTION COSTS $2,157,777
REMAINING BALANCE AFTER PROJECT NO. 6001-170L $4,875,369
"
ADDITIONAL APPROPRIATION NEEDED $0
Next Steps
Once contract documents are fully executed and a purchase order is issued, staff will schedule a
pre-construction meeting with the contractor, and issue a notice to proceed with the
construction of the project.
Environmental Evaluation (CEQA)
The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA
Guidelines Section 15301{c) -minor alteration of existing facilities including streets, sidewalks,
gutters, and similar facilities involving negligible or no expansion.
Public Notification
While no public notice is required to award the contract, the public will be notified in advance
of the construction activities using multiple media methods such as sign age, email, website,
and/or other city communication channels. The construction contractor will also be required to
notify the public of construction activities via changeable message signs, door hangers, letters
to residents, and/or "NO PARKING" signs, as applicable.
Exhibits
1. Resolution accepting bids and awarding a contract to ATP General Engineering Contractors
for an amount not to exceed $1,797,777 for the construction of the 2017 Pavement Overlay
Project, Project No. 6001-170L.
2. Street List for the 2017 Pavement Overlay Project, Project No. 6001-170L.
3. Location Map.
RESOLUTION NO. 2017-132
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, ACCEPTING BIDS AND AWARDING A CONTRACT TO ATP
GENERAL ENGINEERING CONTRACTORS FOR AN AMOUNT NOT TO EXCEED
$1,797,777 FOR CONSTRUCTION OF THE 2017 PAVEMENT OVERLAY
PROJECT, PROJECT NO. 6001-17OL
EXHIBIT 1
WHEREAS, the City Council of the City of Carlsbad, California has determined that it is necessary,
desirable, and in the public's best interest to construct the 2017 Pavement Overlay Project, Project No.
6001-17OL; and
WHEREAS, on Feb. 14, 2017, the City Council of the City of Carlsbad adopted Resolution No.
2017-024 approving plans and specifications for the construction of the 2017 Pavement Overlay
Project, Project No. 6001-17OL; and
WHEREAS, the City of Carlsbad received 12 sealed bids on March 23, 2017 for the construction
of the 2017 Pavement Overlay Project, Project No. 6001-17OL; and
WHEREAS, ATP General Engineering Contractors submitted the lowest responsive and
responsible bid to construct the project in the amount of $1,797,777; and
WHEREAS, there are sufficient funds available in the Pavement Management Program to
complete the project; and
WHEREAS, subsections 3.28.040{C)(S) and 3.28.090(B) of the Carlsbad Municipal Code
authorize the City Manager or designee to approve change orders in the amount equal to the
contingency set at the time of project award.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as
follows:
1. That the above recitations are true and correct.
2. That the bid of $1,797,777 submitted by ATP General Engineering Contractors for the
construction of the 2017 Pavement Overlay Project, Project No. 6001-17OL is accepted
and the Mayor is hereby authorized to execute a contract for this project.
3. That the city manager or designee is hereby authorized to approve construction change
orders up to $180,000.
4. That the award of this contract is contingent upon the bidder submitting the lowest
responsible bid executing the required contract and submitting the required bonds and
EXHIBIT 1
insurance policies within 20 days of adoption of this Resolution. The city manager may
grant reasonable extensions of time.
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of
Carlsbad on the 11th day of :!.!!IY, 2017, by the following vote, to wit:
AYES:
NOES:
ABSENT:
M. Hall, K. Blackburn, M. Schumacher, C. Schumacher, M. Packard.
None.
None.
(SEAL)
Street Name
El Camino Real
Anillo Way
La Gran Via
Exhibit 2 -Street List
2017 Pavement Overlay Project
Project No. 6001-170L
From To
Gateway Road Arenal Road
Rocio Street La Gran Via
Anillo Way Madrilena Way
Exhibit 2
LOCATION MAP
STREETS TO BE OVERLA YEO
PROJECT NAME
2017 PAVEMENT OVERLAY PROJECT
Exhibit 3
PROJECT NUMBER
6001-170L
EXHIBIT
3
PLOTTro BY: SCOTT EVANS PLOT DATE:J/8/16 PA1H:D: \TRANSPORTATION DEPAR1MENT\DE5/GN DMSION\EMAD £LJAS\2017 OVERLAY\20170LLOCAllON MAP.DWG