Loading...
HomeMy WebLinkAbout2018-03-27; City Council; ; Adopt a Resolution approving plans and specifications and authorizing city clerk to advertise for bids for the La Costa Avenue Storm Drain Replacement Program - Storm DraMeeting Date: To: From: Staff Contact: Subject: March 27, 2018 Mayor and City Council Kevin Crawford, City Manager Daniel Zimny, Assistant Engineer Daniel.Zimny@carlsbadca.gov or 760-602-7551 CA Review Jfs. Adopt a Resolution approving the plans and specifications and authorizing the city clerk to advertise for bids for the La Costa Avenue Storm Drain Replacement Program -Storm Drain Improvements East of Piraeus Street, Project No. 6602. Recommended Action Adopt a Resolution approving the plans and specifications and authorizing the city clerk to advertise for bids for the La Costa Avenue Storm Drain Replacement Program -Storm Drain Improvements East of Piraeus Street, Project No. 6602 (Project). Executive Summary This Project will install a new storm drain pipeline across La Costa Avenue and upsize existing drainage infrastructure to prevent ponding of water on the street at a location approximately 600 feet east of the intersection with Piraeus Street. The Project is a component of the La Costa Avenue Storm Drain Replacement Program which addresses storm drains along the La Costa Avenue corridor and is funded by the Infrastructure Replacement Fund. The Carlsbad Municipal Code requires the City Council to adopt plans and specifications for all construction projects that are to be formally bid when the value exceeds the limits established by the Public Contract Code including the alternative provisions of the Uniform Public Construction Cost Accounting Act. The limit is $175,000 and therefore this project is subject to this requirement. Discussion The La Costa Storm Drain Replacement Program was established to improve drainage conditions along the La Costa Avenue corridor. There is a location on East Bound La Costa Avenue, approximately 600 feet east of the intersection of Piraeus Street, which has historically experienced surface ponding. The Project will replace two existing curb inlets with larger structures that will be connected by an 18 inch reinforced concrete pipe. The new system will convey the storm runoff under the west and east bound lanes of La Costa Avenue and flow north into Batiquitos Lagoon. In addition, the new structures will contain trash capture devices to improve the downstream water quality. March 27, 2018 Item #5 Page 1 of 6 Fiscal Analysis There are sufficient Infrastructure Replacement Funds available in the La Costa Avenue Storm Drain Replacement Program to complete the Project. A summary of estimated construction costs and available funds is shown in the table below: LA COSTA AVENUE STORM DRAIN REPLACEMENT PROGRAM, CIP NO. 6602 Current Year Appropriation -La Costa Avenue Storm Drain Replacement $642,806 Program, CIP No. 6602 Current Year Expenditures/Encumbrances -La Costa Avenue Storm Drain $321,060 Replacement Program, CIP No. 6602 TOTAL AVAILABLE LA COSTA AVENUE STORM DRAIN REPLACEMENT $321,746 PROGRAM, CIP NO. 6602 STORM DRAIN IMPROVEMENTS EAST OF PIRAEUS STREET, PROJECT NO. 6602 Construction Contract (Engineer's Estimate) $200,000 Construction Contingency (Estimated) $20,000 Construction Management, Inspection and Material Testing (Estimated) $60,000 TOTAL ESTIMATED CONSTRUCTION COSTS $280,000 REMAINING BALANCE AFTER PROJECT N0.6602 $41,746 ADDITIONAL APPROPRIATION NEEDED $0 Next Steps A Request for Bids to construct the Project will be advertised. Responses will be evaluated and the lowest responsive and responsible bidder will be identified by city staff. Staff will then return to City Council with a recommendation to award the contract to the identified bidder. Environmental Evaluation (CEQA) The Project is exempt from environmental review per CEQA Guidelines Section 15303(d), concerning new construction of small structures such as utility extensions and street improvements, Section 15302(c) concerning replacement or reconstruction of existing utility systems involving negligible or no expansion of capacity and Section 15304(f) minor trenching and backfilling where the surface is restored. A Notice of Exemption was filed in the office of the San Diego County Clerk on Jan. 8, 2018 for a 30 day public review. Public Notification This item was noticed in accordance with the Ralph M. Brown Act and was available for public viewing and review at least 72 hours prior to the scheduled meeting date. The public will be notified in advance of the construction activities using multiple media methods such as sign age, email, website, and other city communication channels. The construction contractor will also be required to notify the public of construction activities. March 27, 2018 Item #5 Page 2 of 6 Exhibits 1. Resolution approving the plans and specifications and authorizing tl;le city clerk to advertise for bids for the La Costa Avenue Storm Drain Replacement Program -Storm Drain Improvements East of Piraeus Street, Project No. 6602. 2. Location Map. 3. Contract documents, including plans and specifications, are on file at the Public Works Department of the City of Carlsbad. March 27, 2018 Item #5 Page 3 of 6 RESOLUTION NO. 2018-043 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE LA COSTA AVENUE STORM DRAIN REPLACEMENT PROGRAM -STORM DRAIN IMPROVEMENTS EAST OF PIRAEUS STREET, PROJECT NO. 6602. EXHIBIT I WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable, and in the public interest to construct the La Costa Avenue Storm Drain Replacement Program -Storm Drain Improvements East of Piraeus Street, Project No. 6602 (Project); and WHEREAS, the plans and specifications for the Project are on file in the Public Works Department of the City of Carlsbad and are incorporated by reference herein; and WHEREAS, the Project is exempt from CEQA per State CEQA Guidelines Sections 15303(d) (new construction of small structures, such as utility systems, and street improvements); 15302(c) (replacement or reconstruction of existing utility systems involving negligible or no expansion of capacity); and 15304(f) (minor trenching and backfilling where the surface is restored). NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans and specifications for the La Costa Avenue Storm Drain Replacement Program -Storm Drain Improvements East of Piraeus Street, Project No. 6602, are hereby approved. 3. The city clerk of the City of Carlsbad is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of the La Costa Avenue Storm Drain Replacement Program -Storm Drain Improvements East of Piraeus Street, Project No. 6602, in accordance with the plans, specifications, and contract documents referred to herein. March 27, 2018 Item #5 Page 4 of 6 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 27th day of March, 2018, by the following vote, to wit: AYES: NOES: ABSENT: M. Hall, K. Blackburn, C. Schumacher, M. Packard. None. M. Schumacher. (SEAL) March 27, 2018 Item #5 Page 5 of 6 LOCATION MAP BA T/QU/TOS LAGOON CITY OF SITE NOT TO SCALE PROJECT NAME La Costa Avenue Storm Drain Replacement Program Storm Drain Improvements East of Piraeus Street LA COSTA PROJECT NUMBER 6602 PLOTTED BY: SCOIT EVANS PLOT DATE:2/6/18 PATH:D: \TRANSPORTATION DEPARTl,/ENT\DESIGN DMSION\DAN/Q ZIMNY\6602-LA COSTA A\IEOIIC EXHIBIT 2 AVE. EXHIBIT 2 March 27, 2018 Item #5 Page 6 of 6