HomeMy WebLinkAbout2019-08-27; City Council; ; A Minor Site Development Plan and Conditional Use Permit for a brewery and tasting room and payment of parking in-lieu fee for 1 parking space at 2825 State St. Pure ProjCAReview {2v(_ � CITY COUNCIL W Staff Report Meeting Date: To: From: Staff Contact: Subject: Project Name: Project No.: August 27, 2019 Mayor and City Council Scott Chadwick, City Manager Shannon Harker, Associate Planner shannon.harker@carlsbadca.gov or 760-602-4621 A Minor Site Development Plan and Conditional Use Permit for a 2,206- square-foot brewery and tasting room and the payment of the parking in­ lieu fee for one (1) parking space at 2825 State Street to satisfy the parking requirement. Pure Project Brewery and Tasting Room SOP 2019-0002/CUP 2018-0021 (DEV2018-0196) Recommended Action That the City Council hold a public hearing and 1) adopt a resolution approving a Minor Site Development Plan and Conditional Use Permit for a 2,206-square-foot brewery and tasting room at 2825 State Street; and 2) adopt a resolution approving the payment of the parking in­ lieu fee for one (1) parking space and participation in the Village Parking In-Lieu Fee Program. Executive Summary The applicant is seeking approval of a Minor Site Development Plan and Conditional Use Permit to convert 2,206 square feet of a single-story retail building located at 2825 State Street (APN 203-294-01) into a craft brewery with a tasting room and an outdoor patio. To satisfy the requirement to provide one (1) parking space, the applicant proposes to pay the parking in-lieu fee through the Village Parking In-Lieu Fee Program for the offsite parking space. On June 19, 2019, the Planning Commission conducted a public hearing and recommended approval of the project to the City Council (5-1-1, Commissioner Anderson absent, Commissioner Lafferty No). Discussion Project Description and Background: The 0.11-acre site is located on the corner of State Street and Christiansen Way and adjacent to the State Street alley to the west. The property is developed with a 3,725-square-foot retail building, the rear portion of which is currently vacant. The front or eastern portion of the building is occupied by the Handel's Ice Cream shop. The project is located outside of the Coastal Zone and within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). August 27, 2019 Item #9 Page 1 of 140 The project applicant, Pure Project Brewing, is requesting approval to convert 2,206 square feet of a single-story retail building into a craft brewery with a tasting room. The uses in the brewery include a 1,482-square-foot retail, storage and production area, as well as a 724- square-foot tasting area, which includes a 335-square-foot outdoor patio. The initial stages of the manufacturing process to produce unfermented beer will be completed offsite at Pure Project's primary production facility located in San Diego. The conversion of the vacant retail space into a brewery with a tasting room is an intensification in use which results in the requirement for one additional parking space. However, the site is fully developed, there are two (2) parking stalls at the rear of the property, and there is no ability to add additional parking onsite. Therefore, the applicant proposes to participate in the Village Parking In-Lieu Fee Program for one (1) parking space to satisfy the parking requirements. Based on the most recent parking study completed in August 2018, the average occupancy of the off-street public parking spaces located within a quarter-mile radius of the property is 78.9 percent, which is less than 85 percent maximum utilization established pursuant to the Parking In-Lieu Fee Program. The findings for support related to the request for the parking in-lieu fee are discussed in Planning Commission Resolution No. 7335 (Attachment 4) and the Planning Commission Staff Report (Attachment 5). As detailed in the Planning Commission Staff Report and Planning Commission Resolution, the proposed project is consistent with the development standards and design guidelines of the VBMP. Planning Commission Hearing: The Planning Commission considered the project on June 19, 2019. The Planning Commission asked clarifying questions regarding the sale of alcohol, emergency access and public access around the outdoor patio, screening of the rooftop equipment and the existing transformer located at the northwest corner of the property. Staff confirmed the Police and Fire Department approved the proposal for the new brewery and tasting room. Commissioner Lafferty expressed concern regarding the aesthetics and location of the existing transformer since it is located on a prominent alley corner and visible from the train station. Commissioner Lafferty inquired about the feasibility to relocate the utility box or locate it underground. Staff clarified that the transformer was recently installed and required for the operation of Handel's. Three members of the public spoke in support of the item. The Planning Commission recommended approval of the project to the City Council (5-1-1, Commissioner Anderson absent, Commissioner Lafferty No). Several letters of support for the project were received after the Planning Commission staff report was completed. Although the letters were not included in the final Planning Commission staff report packet, the correspondence was forwarded to the Plann ing Commission. The letters are included as Attachment 7. Fiscal Analysis If approved, all required improvements to serve this project will be funded and/or constructed by the developer. The $11,240.00 parking in-lieu fee to be paid by the applicant prior to issuance of the building permit will be deposited into an interest-bearing fund designated for the construction of new, or maintenance of existing, public parking facilities within the Village Area. August 27, 2019 Item #9 Page 2 of 140 Next Steps The City Council's action on this item is final. Environmental Evaluation (CEQA) The City Planner has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment; therefore, it is categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15303 (New Construction or Conversion of Small Structures) Categorical Exemption of the State CEQA Guidelines. The project entails the conversion of an existing small structure not exceeding 2,500 square feet in floor area from one use to another where only minor modifications are made to the exterior of the structure. In making this determination, the city planner has found that the exceptions listed in Section 15300.2 of the state CEQA Guidelines do not apply to this project. A Notice of Exemption will be filed by the city planner upon final project approval. Public Notification and Outreach The project is subject to City Council Policy No. 84 -Development Project Public Involvement Policy. The policy requires applicants of certain development projects, such as the proposed Conditional Use Permit, to provide an opportunity for, and to consider input from interested and affected stakeholders prior to project consideration by city decision-makers. On November 21, 2018, the applicant mailed an early public notice and an invitation to a stakeholder outreach meeting to property owners within 600 feet of the project site. On December 13, 2018, an informational meeting was held onsite with the surrounding community. Approximately 25-30 individuals attended the meeting, a majority of which comprised the applicant's project team. Project renderings as well as the site and floor plans were posted for the public to review. Comment cards were available; however, no comments were received. Verbal feedback received from the public was positive. The early public notice and the informational meeting described above satisfy the requirements of City Council Policy No. 84. In addition, information regarding public notification of this item such as mailings, public hearing notices posted in the newspaper and on the city website are available in the Office of the City Clerk. Exhibits 1. City Council Resolution for Minor Site Development Plan and Conditional Use Permit 2. City Council Resolution for Parking In-Lieu Fee 3. Location Map 4. Planning Commission Resolution No. 7335 5. Planning Commission Staff Report dated June 19, 2019 (without Planning Commission Resolution) 6. Planning Commission minutes for Pure Project Brewery and Tasting Room project dated June 19, 2019 7. Correspondence received in support of project August 27, 2019 Item #9 Page 3 of 140 RESOLUTION NO. 2019-151 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A MINOR SITE DEVELOPMENT PLAN AND CONDITIONAL USE PERMIT FOR A 2,206-SQUARE-FOOT BREWERY AND TASTING ROOM LOCATED AT 2825 STATE STREET IN THE VILLAGE CENTER DISTRICT OF THE VILLAGE AND BARRIO MASTER PLAN AND WITHIN LOCAL FACILITIES MANAGEMENT ZONE 1. CASE NAME: PURE PROJECT BREWERY AND TASTING ROOM CASE NO.: SOP 2019-0002/CUP 2018-0021 (DEV2018-0196) WHEREAS, the City Council of the City of Carlsbad, California has determined that pursuant to the provisions of the Carlsbad Municipal Code, the Planning Commission did, on June 19, 2019, hold a duly noticed public hearing as prescribed by law to consider Minor Site Development Plan SDP 2019- 0002 and Conditional Use Permit No. CUP 2018-0021, as referenced in Planning Commission Resolution No. 7335; and the Planning Commission adopted Planning Commission Resolution No. 7335 recommending to the City Council that it be approved; and WHEREAS, the City Council of the City of Carlsbad held a duly noticed public hearing to consider said Conditional Use Permit; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, the City Council considered all factors relating to the Conditional Use Permit. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the recommendation of the Planning Commission for the approval of Minor Site Development Plan SOP 2019-0002 and Conditional Use Permit No. CUP 2018-0021, is approved, and that the findings and conditions of the Planning Commission contained in Planning Commission Resolution No. 7335 on file with the city clerk and incorporated herein by reference, are the findings and conditions of the City Council. 3. This action is final the date this resolution is adopted by the City Council. The Provisions of Chapter 1.16 of the Carlsbad Municipal Code, "Time Limits for Judicial Review" shall apply: August 27, 2019 Item #9 Page 4 of 140 "NOTICE" The time within which judicial review of this decision must be sought is governed by Code of Civil Procedure, Section 1094.6, which has been made applicable in the City of Carlsbad by Carlsbad Municipal Code Chapter 1.16. Any petition or other paper seeking review must be filed in the appropriate court not later than the ninetieth day following the date on which this decision becomes final; however, if within ten days after the decision becomes final a request for the record is filed with a deposit in an amount sufficient to cover the estimated cost or preparation of such record, the time within which such petition may be filed in court is extended to not later than the thirtieth day following the date on which the record is either personally delivered or mailed to the party, or his attorney of record, if he has one. A written request for the preparation of the record of the proceedings shall be filed with the City Clerk, City of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, CA 92008. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 27th day of August 2019, by the following vote, to wit: AYES: Hall, Blackburn, Schumacher, Hamilton. NAYS: None. ABSENT: Bhat-Patel ~ J-/ec-1« Go"11!z ..f,r BARBARA ENGLESON, City Clerk D /. e~ Ci!) (SEAL) Cleo{ ,,,11111111111,,,,,, ,.~'''o~,,~ CAIIJ'''/1~ ~ ,,..~,.ft~ 1~ ... ·····~···•.~~ l~f~Y~\ \ \~,~/ j ~ •· ... ,,.. ..... •· ;:: ~"··' ..... * ~'-.,;,,1·· ........... ~ ......... ,$! ~ :-'f' •--.'1"6' ,s:, ~,,,,1u,,':!'"""' ,,,,,,, ... •••IIUIIII\\\\ August 27, 2019 Item #9 Page 5 of 140 RESOLUTION NO. 2019-152 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A PARKING IN-LIEU FEE PROGRAM PARTICIPATION AGREEMENT BETWEEN THE CITY OF CARLSBASD AND RUSSELL SATTERLY, SUSAN SATTERLY AND LINDA MINO, PROPERTY OWNERS, FOR THE PROJECT KNOWN AS PURE PROJECT BREWERY AND TASTING ROOM LOCATED AT 2825 STATE STREET IN THE VILLAGE CENTER DISTRICT OF THE VILLAGE AND BARRIO MASTER PLAN AND WITHIN LOCAL FACILITIES MANAGEMENT ZONE 1. CASE NAME: CASE NO.: PURE PROJECT BREWERY AND TASTING ROOM SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) WHEREAS, pursuant to Planning Commission Resolution No. 7335, as a condition of approval of Minor Site Development Plan SDP 2019-0002 and Conditional Use Permit CUP 2018-0021, the Property Owner is required to enter into an agreement with the City Council to allow the Property Owner to participate in the Village Parking In-Lieu Fee Program to satisfy the on-site parking requirements for the subject project; and WHEREAS, the Property Owner has agreed, by acceptance of the conditions of said approval, to pay the established Parking In-Lieu Fee for a total of one (1) commercial parking space to satisfy the on-site parking requirements for the 2,206-square-foot brewery and tasting room project located at 2825 State Street within the Village Center District of the Village and Barrio Master Plan; and WHEREAS, the City Council finds that the subject property and project has qualified to participate in the Village Parking In-Lieu Fee Program and participation in the program will satisfy the required parking for the subject project located at 2825 State Street; and WHEREAS, the City Council on August 20, 2019 determined that the proposed project is consistent with the goals and objectives of the Village and Barrio Master Plan; and WHEREAS, the City Council has determined that there is adequate public parking available within the Village Area to accommodate the subject project's parking demands and that the average utilization rate for all public parking lots according to the most recent parking study (August 2018) is 78.9 percent, which is below the full utilization rate of 85 percent; and WHEREAS, the Parking In-Lieu Fee Program is in full force and effect as of the date ofthis Parking In-Lieu Fee Participation Agreement. NOW, THEREFORE, BE IT HEREBY RESOLVED by the City Council ofthe City of Carlsbad, California as follows: August 27, 2019 Item #9 Page 6 of 140 1. That the foregoing recitations are true and correct. 2. That the City Council hereby approves the Village Parking In-Lieu Fee Participation Agreement between the City Council, on behalf of the City of Carlsbad, and Russell Satterly, Susan Satterly and Linda Mino, property owners of the project known as Pure Project Brewery and Tasting Room which is located at 2825 State Street, in Village Center District of the Village and Barrio Master Plan of the City of Carlsbad (Attachment A). 3. That the Mayor of the City of Carlsbad is hereby authorized to execute said Agreement, and the city clerk is requested to forward the executed Agreement to the County Recorder for recordation against the subject property. "NOTICE" The time within which judicial review of this decision must be sought is governed by Code of Civil Procedure, Section 1094.6, which has been made applicable in the City of Carlsbad by Carlsbad Municipal Code Chapter 1.16. Any petition or other paper seeking review must be filed in the appropriate court not later than the ninetieth day following the date on which this decision becomes final; however, if within ten days after the decision becomes final a request for the record is filed with a deposit in an amount sufficient to cover the estimated cost or preparation of such record, the time within which such petition may be filed in court is extended to not later than the thirtieth day following the date on which the record is either personally delivered or mailed to the party, or his attorney of record, if he has one. A written request for the preparation of the record of the proceedings shall be filed with the City Clerk, City of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, CA 92008. August 27, 2019 Item #9 Page 7 of 140 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 27th day of August 2019, by the following vote, to wit: AYES: Hall, Blackburn, Schumacher, Hamilton. NAYS: None. ABSENT: Bhat-Patel MM/J ~ /lec;-hr {ilfme z,, {.,-BARBARA ENGLESON, City Clerk ~ Ct_!j (SEAL) C /er K August 27, 2019 Item #9 Page 8 of 140 DOC# 2020-0087845 111111111111 lllll 11111111111111111111 lllll lllll 11111111111111111111111 Feb 21, 2020 09:56 AM OFFICIAL RECORDS Ernes.t J. Dronen burg, Jr , SAN DIEGO COUNTY RECORDER FEES $41.00 (SB2 Atkins $0 00) RECORDING REQUESTED BY AND) WHEN RECORDED MAIL TO: ) PAGES 10 City Clerk CITY OF CARLSBAD 1200 Carlsbad Village Drive Carlsbad, California 92008-1989 ) ) ) ) ) Space above this line for Recorder's use Assessor's Parcel Number 203-294-01-00 -------------Project Number and Name SOP 2019-0002/CUP 2018-0021 Pure Project Brewery and Tasting Room CITY OF CARLSBAD PARKING IN-LIEU FEE PROGRAM PARTICIPATION AGREEMENT A THIS PARTICIPATION AGREEMENT ("Agreement") is entered into this ;jqlh day of ugusl , 2019, by and between the CITY OF CARLSBAD, a municipal corporation of the State of California ("City"), and Russell Satterly, Susan Satterly and Linda Mino, ("Program Participant"), is made with reference to the following: RECITALS A Program Participant is the owner of certain real property located at 2825 State Street (APN: 203-294-01-00) in the City of Carlsbad, County of San Diego, State of California, described in "Exhibit A", attached hereto and incorporated herein by this reference, and is proposing a project which requires a Minor Site Development Plan (SDP 2019-0002) and Conditional Use Permit (CUP 2018-0021), which provides conditional approval for a 2,206- square-foot brewery and tasting room and participation in the Parking In-Lieu Fee Program for .1 parking space to satisfy the on-site parking requirements ("Project"). B. Condition No. 13 of Planning Commission Resolution No. 7335 states that this Parking In-Lieu Fee Program Participation Agreement shall be entered into between the City and the Program Participant following approval of Minor Site Development Plan SDP 2019-0002 and Conditional Use Permit CUP 2018-0021 for the Project and provides that the Program Participant pay a Parking In-Lieu Fee for a total of .1 parking space. The Program Participant shall pay the approved Parking In-Lieu Fee (per parking space) in effect following approval of Minor Site Development Plan SDP 2019-0002 and Conditional Use Permit CUP 2018-0021 to satisfy the parking requirement for the Project according to the requirements set forth in this Agreement. 1 CA 11/5/2014 August 27, 2019 Item #9 Page 9 of 140 . ~ APN: 203-294-01-00 PROJECT NO. & NUMBER: SOP 2019-0002/CUP 2018-0021 -PURE PROJECT BREWERY AND TASTING ROOM NOW, THEREFORE, incorporating the foregoing Recitals and in consideration of the mutual covenants contained herein, the parties agree as follows: 1. 2. THE RECITALS ARE TRUE AND CORRECT. THE ON-SITE PARKING REQUIREMENTS WILL BE SATISFIED THROUGH THE PAYMENT OF A PARKING IN-LIEU FEE. (a) Performance under this Agreement satisfies the Program Participant's obligation for providing .1 on-site parking space for the Project covered by Minor Site Development Plan SDP 2019-0002 and Conditional Use Permit CUP 2018-0021 by reason of Planning Commission approval of Minor Site Development Plan SDP 2019-0002 and Conditional Use Permit CUP 2018-0021, including Condition No. 13 listed in Planning Commission Resolution No. 7335. (b) The Program Participant shall pay the Parking In-Lieu Fee for a total of .1 parking spaces as established by the City Council, and, as required by Condition No. 13 of Planning Commission Resolution No. 7335. The fee shall be paid following approval for the subject project and prior to issuance of a building permit. The fee shall be the sum total of the fee per parking space needed to satisfy the Project's parking requirement. (c) The Program Participant shall have no right to designated parking spaces within the public parking lots located within the Village Review zone, or at any other location within the City of Carlsbad, nor shall the Program Participant have exclusive use of any public parking space. Through participation in the subject Parking In-Lieu Fee Program, the Program Participant agrees to assist the City of Carlsbad in funding the provision of existing, and/or the provision of new, off-street public parking spaces within the Village Area of the City of Carlsbad. The City Council has approved Minor Site Development Plan SDP 2019-0002 and Conditional Use Permit CUP 2018-0021 conditioned upon the Program Participant's payment of a Parking In-Lieu Fee for a total of .1_parking space. 3. REMEDIES Failure by the Program Participant to perform in accordance with this Agreement will constitute failure to satisfy the requirements of Chapter 21.35 of the Carlsbad Municipal Code, the Village Master Plan and Design Manual, and Condition No. 13 of Planning Commission Resolution No. 7335. Such failure will allow the City to exercise any and all remedies available to it including but not limited to withholding the issuance of building permits for the Project. 4. HOLD HARMLESS Program Participant will indemnify and hold harmless (without limit as to amount) the City of Carlsbad and its elected officials, officers, employees and agents in their official capacity (hereinafter collectively referred to as "lndemnitees"), and any of them, from and against all loss, all risk of loss and all damage, including attorneys' fees and expenses, sustained or incurred because of or by reason of any and all claims, demands, suits, or actions obtained, allegedly caused by, arising out of or relating in any manner to Program Participant's actions or defaults pursuant to this Agreement, and shall protect and defend lndemnitees, and any of them with respect thereto. 2 CA 11/5/2014 August 27, 2019 Item #9 Page 10 of 140 APN: 203-294-01-00 PROJECT NO. & NUMBER: SOP 2019-0002/CUP 2018-0021 -PURE PROJECT BREWERY AND TASTING ROOM 9. JURISDICTION Program Participant agrees and hereby stipulates that the proper venue and jurisdiction for any resolution of disputes between the parties arising out of this Agreement is San Diego County, California. 10. SEVERABILITY In the event any provision contained in this Agreement is to be held invalid, void or unenforceable by any court of competent jurisdiction, the remaining provisions of this Agreement shall nevertheless, be and remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be signed as of the day and year first above written. PROGRAM PARTICIPANT Dated: (Print NamefTitle) Dated: 6 \ \0\ \g (Chairman, president or vice-president and secretary, assistant secretary, CFO or assistant treasurer must sign for corporations. Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the office(s) signing to bind the corporation.) (If signed by an individual partner, the partnership must attach a statement of partnership authorizing the partner to execute this instrument.) (Proper notarial acknowledgment of execution by Program Participant must be attached.) 4 CA 11/5/2014 August 27, 2019 Item #9 Page 11 of 140 APN: 203-294-01-00 PROJECT NO. & NUMBER: SDP 2019-0002/CUP 2018-0021 -PURE PROJECT BREWERY AND TASTING ROOM 5. NOTICES All notices required pursuant to this Agreement shall be in writing and may be given by personal delivery or by registered or certified mail, return receipt requested to the party to receive such notice at the address set forth below: TO THE CITY: Community & Economic Development Department Planning Division Attn: City Planner 1635 Faraday Avenue Carlsbad, California 92008 TO THE PROGRAM PARTICIPANT: Russell Satterly 909 Rosemary Avenue Carlsbad, CA 92011 Susan Satterly 3863 Cambridge Court Oceanside, CA 93056 Linda Mino 1437 Machado Street Oceanside, CA 92054 Any party may change the address to which notices are to be sent by notifying the other parties of the new address, in the manner set forth above. 6. ENTIRE AGREEMENT This Agreement constitutes the entire agreement between the parties and no modification hereof shall be binding unless reduced to writing and signed by the parties hereto. 7. DURATION OF AGREEMENT Except for the provisions of Paragraph 4, which shall survive the term of this Agreement, upon payment of the parking in-lieu fee for the 1 parking space for the Project, the Program Participant shall have no further obligations under this Agreement. 8. SUCCESSORS This Agreement shall benefit and bind the Program Participant and any successive owners of the Project as described in Exhibit A to this Agreement. 3 CA 11/5/2014 August 27, 2019 Item #9 Page 12 of 140 ·/ / APN: 203-294-01-00 PROJECT NO. & NUMBER: SOP 2019-0002/CUP 2018-0021 -PURE PROJECT BREWERY AND TASTING ROOM APPROVED AS TO FORM: Dated: 5 CA 11/5/2014 August 27, 2019 Item #9 Page 13 of 140 APN: 203-294-01-00 PROJECT NO. & NUMBER: SOP 2019-0002/CUP 2018-0021 -PURE PROJECT BREWERY AND TASTING ROOM Address: 2825 State Street Assessor Parcel No.: 203-294-01-00 EXHIBIT A LEGAL DESCRIPTION OF PROPERTY Lot 7 and Lot 8 in Block J of town of Carlsbad, in the City of Carlsbad, according to Map thereof No. 535, filed in the Office of the County Recorder of San Diego County, May 2, 1888 6 CA 11/5/2014 August 27, 2019 Item #9 Page 14 of 140 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Sao Di c3o beforeme, Madi.son Wilc:novsk?1 Notac~ 8,bl!"e, (insert name and title o the office personally appeared 8: VE:, s.c 11 J'at+ecl y , who proved to me on the basis of satisfactory evidence to be the personN whose name~)@'~ subscribed to the within instrument and acknowle~ed to me thatQ:ie/st,e~ey executed the same in ~her/their authorized capacity(tes), and that by!b.i,$/har/th.eir signature~) on the instrument the person('s,), or the entity upon behalf of which the person~) acted, executed the instrument. I certify under PENAL TY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. rr==i • COMM.12289014 ! : .. ~=~t = My ExpirNOSl18/202S = ...................................... (Seal) August 27, 2019 Item #9 Page 15 of 140 .. ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of o'ao Di~ a before me, M adj,rnn WilmoysK~. No+a~ Pub Ii e, (insert name and title f the offi r) personally appeared ___._~=A ........ _.,,_......,.....,_.."'-'-~----------------.......,..-- who proved to me on the basis of satisfact ry evidence to be the personts) whose name · ~e subscribed to the within instrument and acknowledged to me that l\e,&Be/they executed the same in 'hls@lth'eir authorized capacity(las), and that by Ns~/t~ir signature($.) on the instrument the person(\), or the entity upon behalf of which the person~ acted, executed the instrument. I certify under PENAL TY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. ................................... ,91 i@UADICC::.=:'" i I NOIMY PUBUC • CrAI..FOIIM ! •· SAN DIEGO COUNTY • : My'Commlellon Explrae 05118'20IS : ...................................... (Seal) August 27, 2019 Item #9 Page 16 of 140 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of tSaa Qi e3o On lwgv.::d 10, 2019 before me, Mcadi.sao Wj I movi>ey. No±afrit Pv blir. (insert name and title of the o er) personally appeared __....._......,......___,_-LJ.. .......... '----------------------=--- who proved to me on the basis of satisfactory evidence to be the personW whose name~ · ~e subscribed to the within instrument and acknowledged to me that ~/they executed the same in ~~/their authorized capacity~). and that by hts~/t~ir signature'(-&) on the instrument the person(~. or the entity upon behalf of which the person('s,)_ acted, executed the instrument. I certify under PENAL TY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. ................................... i~ MMJIIONWILMOVaY -l2288014 I WITNESS my hand and official seal. I . ""=C:::-1 iMr _.....,..,..; ..................................... Signature ~½2 (Seal) August 27, 2019 Item #9 Page 17 of 140 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of ___ ..... S'--=a=a.,______.D=-a..,,,i~'-=1--"'"'------ 0n ~A~{JQ..,...u ...... s ...... -t ____ :J=---.&--q...__.f/L'-"'--_ before me, ___,Hf--L-""'t ..... C_,_,70.__t'--=-Go-'-m---=-e_7-__,,'-------'--'-N_11"--=Ca_i[j__,____.._P. ...... @ ...... t.L....,i C...___ V (insert name and title of the offl'cer) personally appeared M atf Hal I who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies}, and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENAL TY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature~ (Seal) August 27, 2019 Item #9 Page 18 of 140 EXHIBIT 3 NOT TO SCALE SITE MAP Pure Project Brewery and Tasting Room SOP 2019-0002 / CUP 2018-0021 August 27, 2019 Item #9 Page 19 of 140 EXHIBIT 4 PLANNING COMMISSION RESOLUTION NO. 7335 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF A MINOR SITE DEVELOPMENT PLAN AND CONDITIONAL USE PERMIT FOR A 2,206- SQUARE-FOOT BREWERY AND TASTING ROOM AND THE PURCHASE OF ONE (1) PARKING IN-LIEU FEE LOCATED AT 2825 STATE STREET IN THE. VILLAGE CENTER (VC) DISTRICT OF THE VILLAGE AND BARRIO MASTER PLAN AND WITHIN LOCAL FACILITIES MANAGEMENT ZONE 1. CASE NAME: PURE PROJECT BREWERY AND TASTING ROOM CASE NO.: SOP 2019-0002/CUP 2018-0021 (DEV2018-0196) WHEREAS, Satterly Properties, 110wner'' and Pure Project, LLC, 11Applicant," has filed a verified application with the City of Carlsbad regarding property described as Lot 7 and Lot 8 in Block J of town of Carlsbad, in the City of Carlsbad, according to Map thereof No. 535, filed in the Office of the County Recorder of San Diego County, May 2, 1888 (11the Property''); and WHEREAS, said verified application constitutes a request for a Minor Site Development Plan and Conditional Use Permit as shown on Exhibit(s) "A" -"F" dated June 19, 2019, on file in the Planning Division SDP 2019-0002/CUP 2018-0021-PURE PROJECT BREWERY AND TASTING ROOM, as provided by Chapters 21.06, 21.35 and 21.42 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did, on June 19, 2019, hold a duly noticed public hearing as prescribed by law to consider said request; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of persons desiring to be heard, said Commission considered all factors relating to the Minor Site Development Plan and Conditional Use Permit. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as follows: A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the public hearing, the Commission RECOMMENDS APPROVAL of SDP 2019-0002/CUP 2018-0021 -PURE PROJECT BREWERY AND TASTING ROOM, based on the following findings and subject to the following conditions: August 27, 2019 Item #9 Page 20 of 140 Findings: Minor Site Development Plan SDP 2019-0002 1. That the proposed development or use is consistent with the General Plan and any applicable master plan or specific plan, complies with all applicable provisions of Chapter 21.06 of the Carlsbad Municipal Code (CMC), and all other applicable provisions of this code, in that the proposed 2,206-square-foot brewery and tasting room is consistent with the General Plan and satisfies the minimum requirements of the Village and Barrio Master Plan (VBMP) and Title 21 of the CMC as it relates to the use, parking, access, public facilities and design, as discussed below and in the project staff report dated June 19, 2019. 2. That the requested development or use is properly related to the site, surroundings and environmental settings, will not be detrimental to existing· development or uses or to development or uses specifically permitted in the area in which the proposed development or use is to be located, and will not adversely impact the site, surroundings or traffic circulation, in that the project proposes to convert 2,206 square feet of an. existing building located on the corner of Christiansen Way and State Street into a brewery and tasting room in the Village Center (VC) District of the VBMP. Pursuant to the project description provided by the applicant, the production of the beer onsite will be limited to fermentation in wooden tanks. The initial stages of the manufacturing process to brew the unfermented beer will be completed offsite. Therefore, the potential for odors and the need to dispose of solid waste created by spent- grains will be eliminated. In addition, exhaust porting to the exterior of the building will not be required. The properties to the north, south and west are also located within the VC District of the VBMP and include uses such as a theater, restaurant, commercial retail and an ice cream shop. In addition, several multi-family residential developments are located within a quarter mile radius of the property. Given the variety of the surrounding land uses, as well as the fact that the most intensive component of the brewing process is completed offsite, the proposed brewery and tasting room will not adversely impact the surrounding land uses. The net increase in average daily trips (ADTs) associated with the change in use from retail to a brewery with a tasting room is 52 ADTs. The surrounding streets have adequate capacity to accommodate the ADTs generated by the project. 3. That the site for the intended development or use is adequate in size and shape to accommodate the use, in that the proposed brewery and tasting room will operate in an existing building previously occupied with a retail use. No additions to the building are proposed to accommodate the use. In fact, a portion of the building will be removed to create an outdoor patio. 4. That all yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested development or use to existing or permitted future development or use in the neighborhood will be provided and maintained, in that the proposed brewery and tasting room will operate in an existing building previously occupied with a retail use. A 3.5-foot-tall open horizontal wood fence is proposed around the perimeter of the outdoor patio which complies with the standards of the VBMP and complements the materials of the existing building and the proposed brewery use. 5. ,hat the street systems serving the proposed development or use is adequate to properly handle all traffic generated by the proposed use, in that the surrounding streets have adequate capacity to accommodate the 52 Average Daily Trips (ADTs) generated by the project. In addition, State Street and Christiansen Way are improved with pavement, curb, gutter and sidewalks. PC RESO NO. 7335 -2- August 27, 2019 Item #9 Page 21 of 140 Conditional Use Permit CUP 2018-0021 6. That the requested use_ is necessary or desirable for the development of the community, and is in harmony with the various elements and objectives of the General Plan, including the Village and Barrio Master Plan, in that the proposal to convert 2,206-square feet of a 3,725-square~foot retail building to a brewery with an accessory tasting room and outdoor patio contributes toward the goal of providing a lively, interesting social environment in the Village. The addition of a craft brewery complements the surrounding mix of land uses. In addition, the proposed project is located adjacent to the Carlsbad Village train station, which provides rail and bus service throughout the day. The project supports walkability and mobility by locating near residential and commercial land uses. 7. That the requested use is not detrimental to existing uses or to uses specifically permitted in the zone in which the propose_d use is to be located in that pursuant to the project description provided by the applicant, the production of the beer onsite will be limited to fermentation in wooden tanks. The initial stages of the manufacturing process to brew the unfermented beer will be completed offsite. Therefore, the potential for odors and the need to dispose of solid . waste created by spent-grains will be eliminated. In addition, exhaust porting to the exterior of the building will not be required. The surrounding properties are also located within the VC District of the VBMP and include uses such a"s a theater, restaurant, commercial retail and an ice cream shop. In addition, several multi-family residential developments are located within a quarter-mile radius of the property. Given the variety of the surrounding land uses, as well as the fact that the most intensive component of the brewing process is completed offsite, the proposed brewery and tasting room will not be detrimental to existing uses or uses permitted · in the VC District of the VBMP. 8. That the site for the proposed conditional use is adequate in size and shape to accommodate the yards, setbacks, walls, fences, parking, loading facilities, buffer areas, landscaping and other development features prescribed in this code and required by the City Planner, planning commission or city council, in order to integrate the use with other uses in the neighborhood, in that the project proposes to convert 2,206 square feet of an existing building located on the corner of Christiansen Way and State Street into a brewery and tasting room in the Village Center {VC) District of the VBMP. The remodel is proposed within the existing building footprint. A portion of the building will be demolished to accommodate the 335 square-foot outdoor patio. Two parking spaces are existing at the rear of the building, including one accessible parking stall. One (1) parking in-lieu fee is proposed to be purchased to satisfy the parking requirement for the intensification in use. A 3.5-foot-tall open horizontal wood fence is proposed around the perimeter of the outdoor patio which complies with the standards of the VBMP and complements the materials of the existing building and the proposed brewery use. 9. That the street system serving the proposed use is adequate to properly handle all traffic generated by the proposed use; in that the surrounding streets have adequate capacity to accommodate the 52 Average Daily Trips (ADT) generated by the project. In addition, State Street and Christiansen Way are improved with pavement, curb, gutter and sidewalks. Parking 10. The Developer/Property owner qualifies to participate in the Parking In-Lieu Fee Program and participation in the program will satisfy the parking requirements for the project. Justification for participation in the Parking In-Lieu Fee Program is contained in the following requirements and findings: PC RESO NO. 7335 -3- August 27, 2019 Item #9 Page 22 of 140 General a. That the Parking In-Lieu Fee Program shall be applicable only to non-residential uses in specific areas east of the railroad corridor in that the brewery use is non-residential and the property is located east of the railroad tracks and within the VC District. b. Only non-residential uses in the VC District {east of the railroad tracks only) and in the VG, FC and PT districts are eligible to participate in Parking In-Lieu Fee Program in that the proposed brewery use is non-residential and is located east of the railroad tracks in the VC District. c. The average occupancy of off-street public parking spaces within a quarter mile radius of the property boundaries of use requesting to pay the In-Lieu Fee shall be under 85 percent based on the most recent city-authorized parking study or other information determined acceptable by the city planner in that based on the most recent data available, which includes the results of the parking study completed in August 2018 (weekday and weekend), the maximum average occupancy of the lots located within a quarter mile radius was 78.9 percent (weekday average, 9 AM -9 PM, August 2018). d. The In-Lieu payment shall always be made for a whole parking space in that the applicant proposes to purchase one {1) parking in-lieu fee. e. Fee payment shall not result in a reserved parking space or spaces in that no spaces are proposed to be reserved. f. That the use complies with the program's participation restrictions in that it complies with the above-noted participation requirements. g. That adequate off-street public parking is available to accommodate the project's parking demand, based on the city's most recent city-authorized parking study or other information in that a total of five (5) public parking lots and 274 parking spaces are located within a quarter mile radius of the property. Based on the most recent data available, which includes the results of the parking study completed in August 2018 {weekday and weekend), the maximum average occupancy of the lots located within a quarter mile radius was 78.9 percent (weekday average, 9 AM -9PM, August 2018). This maximum average occupancy allows for the continued implementation of the parking in-lieu fee program because it is less than the average 85% threshold for maximum utilization set by the City Council. Therefore, adequate parking is available within the Village to accommodate the project's parking demands. h. That the In-Lieu Fee Program has not been suspended or terminated by the City Council in that the In-Lieu Fee Program remains in effect. 11. The Planning Commission finds that the project, as conditioned herein, is in conformance with the Elements of the city's General Plan, and the development standards of the Village and Barrio Master Plan, based on the facts set forth in the staff report dated June 19, 2019 including, but not limited to the following: a. Land Use & Community Design -The proposal to convert 2,206 square feet of a 3,725- square-foot retail building to a brewery with an accessory tasting room and outdoor patio contributes toward the goal of providing a lively, interesting social environment PC RESO NO. 7335 -4- August 27, 2019 Item #9 Page 23 of 140 in the Village. The addition of a craft brewery complements the surrounding mix of land uses, which includes multi-family residential units, a theater, retail stores, restaurants and an ice cream shop. b. Mobility -The applicant is required to pay traffic impact fees for the intensification in use prior to the issuance of building permits that would go toward future road improvements. The proposed project is located adjacent to the Carlsbad Village train station, which provides rail and bus service throughout the day. The project supports walkability and mobility by locating near residential and commercial land uses. Bicycle racks are proposed as a component of the proposed project. In addition, street trees are existing in the sidewalk adjacent to Christiansen Way. c. Public Safety -The proposed structural improvements would be required to meet all seismic design standards. The Fire Department approved the project and indicated that fire sprinklers are not required for an occupant load less than 100. Therefore, the proposed project is consistent with the applicable fire safety req~irements. In addition, the Police Department has approved the proposed brewery use. The project would be required to develop and implement a program of "best management practices" for the elimination and reduction of pollutants which enter and/or are transported within storm drainage facilities. The project has been conditioned to pay all applicable public facilities fees for Zone 1. d. Village Center (VC) District Standards -The project as designed is consistent with the · development standards for the VC District, the VBMP Design Guidelines and all other applicable regulations set forth in the VBMP as di.scussed in the project staff report and Attachment 4. The project is not requesting any deviations to the development standards and the purchase of one (1) parking in-lieu fee satisfies the parking requirement. 12. The project is consistent wi.th the Citywide Facilities and Improvements Plan, the Local Facilities Management Plan for Zone 1 and all city public facility policies and ordinances. The project includes elements or has been conditioned to construct or provide funding to ensure that all facilities and improvements regarding sewer collection and treatment; water; drainage; circulation; fire; schools; parks and other recreational facilities; libraries; government administrative facilities; and open space, related to the project will be installed to serve new development prior to or concurrent with need. Specifically, a. The Public Facility fee is required to be paid by Council Policy No. 17 and will be collected prior to the issuance of building permit. b. The Local Facilities Management fee for Zone 1 is required by Carlsbad Municipal Code Section 21.90.050 and will be collected prior to issuance of building permit. 13. The project has been conditioned to pay any increase in public facility fee, or new construction tax, or development fees, and has agreed to abide by any additional requirements established by a Local Facilities Management Plan prepared pursuant to Chapter 21.90 of the Carlsbad Municipal Code. This will ensure continued availability of public facilities and will mitigate any cumulative impacts created by the project. 14. This project has been conditioned to comply with any requirement approved as part of the Local Facilities Management Plan for Zone 1. PC RESO NO. 7335 -5- August 27, 2019 Item #9 Page 24 of 140 15. That all necessary public facilities required by the Growth Management Ordinance will be constructed or are guaranteed to be constructed concurrently with the need for them created by this project and in compliance with adopted city standards. 16. That the City Planner has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and it is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15303, New Construction or Conversion of Small Structures, of the State CEQA Guidelines. In making this determination, the City Planner has found that the exceptions listed in Section 15300.2 of the State CEQA Guidelines do not apply to this project. 17. The Planning Commission has reviewed each of the exactions imposed on the Developer contained in this resolution, and hereby finds, in this case, that the exactions are imposed to mitigate impacts caused by or reasonably related to the project, and the extent and the degree of the exaction is in rough proportionality to the impact caused by the project. Conditions: NOTE: Unless otherwise specified herein, all conditions shall be satisfied prior to the issuance of the building permit. 1. If any of the following conditions fail to occur, or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the city shall have the right to revoke or modify all approvals herein granted; deny or further condition issuance of all future building permits; deny, revoke, or further condition all certificates of occupancy issued under the authority of approvals herein granted; record a notice of violation on the property title; institute and prosecute litigation to compel their compliance with said conditions or seek damages for their violation. No vested rights are gained by Developer or a successor in interest by the city's approval of this Minor Site Development Plan and Conditional Use Permit. 2. Staff is authorized and directed to make, or require the Developer to make, all corrections and modifications to the Minor Site Development Plan and Conditional Use Permit documents, as necessary to make them internally consistent and in conformity with the final action on the project. Development shall occur substantially as shown on the approved Exhibits. Any proposed development, different from this approval, shall require an amendment to this approval. 3. Developer shall comply with all applicable provisions of federal, state, and local laws and regulations in effect at the time of building permit issuance. 4. If any condition for construction of any public improvements or facilities, or the payment of any fees in-lieu thereof, imposed by this approval· or imposed by law on this Project are challenged, this approval shall be suspended as provided in Government Code Section 66020. If any such condition is determined to be invalid, this approval shall be invalid unless the City Council determines that the project without the condition complies with all requirements of law. 5. Developer/Operator shall and does hereby agree to indemnify, protect, defend, and hold harmless the City of Carlsbad, its Council members, officers, employees, agents, and representatives, from and against any and all liabilities, losses, damages, demands, claims and costs, including court costs and attorney's fees incurred by the city arising, directly or indirectly, from (a) city's approval and issuance of this Minor Site Development Plan and Conditional Use PC RESO NO. n3s -6- August 27, 2019 Item #9 Page 25 of 140 Permit, (b) city's approval or issuance of any permit or action, whether discretionary or nondiscretionary, in connection with the use contemplated herein, and (c) Developer/Operator's installation and operation of the facility permitted hereby, including without limitation, any and all liabilities arising from the emission by the facility of electromagnetic fields or other energy waves or emissions. This obligation survives until all legal proceedings have been concluded and continues even if the city's approval is not validated. 6. This project shall comply with all conditions and mitigation measures which are required as part of the Zone 1 Local Facilities Management Plan and any amendments made to that Plan prior to the issuance of building permits. 7. This approval shall become null and void if building permits are not issued for this project within 24 months from the date of project approval. 8. Building permits will not be issued for this project unless the local agency providing water and sewer services to the project provides written certification to the city that adequate water service and sewer facilities, respectively, are available to the project at the time of the application for the building permit, and that water and sewer capacity and facilities will continue to be available until the time of occupancy. 9. Developer shall pay the Citywide Public Facilities Fee imposed by City Council Policy #17, the License Tax on new construction imposed by Carlsbad Municipal Code Section 5.09.030, and CFO #1 special tax (if applicable), subject to any credits authorized by Carlsbad Municipal Code Section 5.09.040. Developer shall also pay any applicable Lcical Facilities Management Plan fee for Zone 1, pursuant to Chapter 21.90. All such taxes/fees shall be paid at issuance of building permit. If the taxes/fees are not paid, this approval will not be consistent with the General Plan and shall become void. 10. Prior to the issuance of the approval of the building permit, Developer shall submit to the city a Notice of Restriction executed by the owner of the real property to be developed. Said notice is to be filed in the office of the County Recorder, subject to the satisfaction of the City Planner, notifying all interested parties and successors in interest that the City of Carlsbad has issued a(n) Minor Site Development Plan and Conditional Use Permit by Resolution(s) No. 7335 on the property. Said Notice of Restriction shall note the property description, location of the file containing complete project details and all conditions of approval as well as any conditions or restrictions specified for inclusion in the Notice of Restriction. The City Planner has the authority to execute and record an amendment to the notice which modifies or terminates said notice upon a showing of good cause by the Developer or successor in interest. 11. All roof appurtenances, including air conditioners, shall be architecturally integrated and concealed from view and the sound buffered from adjacent properties and streets, in substance as provided in Building Department Policy No. 80-6, to the satisfaction of the Directors of Community Development and Planning. 12. No outdoor storage of materials shall occur onsite unless required by the Fire Chief. When so required, the Developer shall submit and obtain approval of the Fire Chief and the City Planner of an Outdoor Storage Plan, and thereafter comply with the approved plan. 13. Prior to issuance of building permits, the Developer shall enter into a Parking In-Lieu Fee Participation Agreement and pay the established Parking In-Lieu Fee for! parking space. The fee shall be the total of the fee per parking space in effect at the time of the building permit PC RESO NO. 7335 -7- August 27, 2019 Item #9 Page 26 of 140 issuance times the number of parking spaces needed to satisfy the project's parking requirement (1 space total). Engineering General 14. Prior to hauling dirt or construction materials to or from any proposed construction site within this project, developer shall apply for and obtain approval from, the city engineer for the proposed haul route. 15. This project is approved upon the express condition that building permits will not be issued for the development of the subject property, unless the district engineer has determined that adequate water and sewer facilities are available at the time of permit issuance and will continue to be available until time of occupancy. 16. Prior to issuance of the building permit, the developer shall complete the processing of a lot line adjustment between Lot 7 and Lot 8 of Map No. 535. Storm Water Quality 17. Developer shall comply with the city's Stormwater Regulations, latest version, and shall implement best management practices at all times. Best management practices include but are not limited to pollution control practices or devices, erosion control to prevent silt runoff during construction, general housekeeping practices, pollution prevention and educational practices, maintenance procedures, and other management practices or devices to prevent or reduce the discharge of pollutants to stormwater, receiving water or stormwater conveyance system to the maximum extent practicable. Developer shall notify prospective owners and tenants of the above requirements. 18. Developer shall complete and submit to the city engineer a Determination of Project's SWPPP Tier Level and Construction Threat Level Form pursuant to City Engineering Standards. Developer shall also submit the appropriate Tier level Storm Water Compliance form and appropriate Tier level Storm Water 'Pollution Prevention Plan {SWPPP) to the satisfaction of the city engineer. Developer shall pay all applicable SWPPP plan review and inspection fees per the city's latest fee schedule. 19. Developer is responsible to ensure that all final design plans (grading plans, improvement plans, landscape plans, building plans, etc.) incorporate.all source control, site design, pollutant control BMP and applicable hydromodification measures. Dedications/Improvements 20. Prior to any work or equipment staging in city right-of-way or public easements, Developer shall apply for and obtain a right-of-way permit to the satisfaction of the city engineer. Utilities 21. Developer shall meet with the fire marshal to determine if fire protection measures (fire flows, fire hydrant locations, building sprinklers) are required to serve the project. Fire hydrants, if PC RESO NO. 7335 -8- August 27, 2019 Item #9 Page 27 of 140 proposed, shall be considered public improvements and shall be served by public water mains to the satisfaction of the district engineer. 22. Sizes and locations of water service, water meter, and backflow preventer shall be shown on the building plans and shall be provided and justified to the satisfaction of the district engineer and city engineer. The locations and sizes of said services shall be reflected on public improvement plans. 23. Sizes and locations of sewer laterals shall be shown on the building plans and shall be provided and justified to the satisfaction of the district engineer and city engineer. The locations and sizes of the sewer laterals shall be reflected on public improvement plans. Code Reminders 24. Developer shall pay planned local area drainage fees in accordance with Section 15.08.020 of the City of Carlsbad Municipal Code to the satisfaction of the city engineer. 25. Developer shall pay traffic impact and sewer impact fees based on Section 18.42 and Section 13.10 of the City of Carlsbad Municipal Code, respectively. The Average Daily Trips (ADT) and floor area contained in the staff report and shown on the tentative map are for planning purposes only. 26. . Prior to the issuance of a building permit, Developer shall pay a Public Facility fee as required by Council Policy No. 17. 27. Prior to the issuance of a building permit, Developer shall pay the Local Facilities Management fee for Zone 1 as required by Carlsbad Municipal Code Section 21.90.050. 28. Approval of this request shall not excuse compliance with all applicable sections of the Zoning Ordinance and all other applicable city ordinances in effect at time of building permit issuance, except as otherwise specifically provided herein. 29. Premise identification (addresses) shall be provided consistent with Carlsbad Municipal Code Section 18.04.320. 30. Any signs proposed for this development shall at a minimum be designed in conformance with the Village and Barrio Master Plan and shall require review and approval of the City Planner prior to installation of such signs. · 31. Developer acknowledges new forthcoming requirements related to the city's Climate Action Plan · (CAP) will likely impact development requirements of this project and may be different than what is proposed on the project plans or in the project's CAP Checklist. Developer acknowledges the new CAP requirements are related to energy efficiency, photovoltaic, electric vehicle charging, water heating and traffic demand management requirements, as set forth in City Council Ordinance Nos. CS-347, CS-348, CS-349 and CS-350 and City Council Resolution No. 2019-024, are available on the city's website. CAP requirements may impact, but are not limited to, site design and local building code requirements. If incorporating new CAP requirements results in substantial modifications to the project, then prior to issuance of development permits, Developer may be required to submit and receive approval of a Consistency Determination or Amendment for this project through the Planning Division. Once adopted as part of Title 18 and in effect, compliance with the new CAP requirements must be demonstrated on or with the construction plans prior to issuance of the applicable development permits. PC RESO NO. 7335 -9- August 27, 2019 Item #9 Page 28 of 140 NOTICE Please take NOTICE that approval of your project includes the "imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to for convenience as "fees/exactions." You have 90 days from date of approval to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedure set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading, or other similar application processing or service fees in connection with this project; NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on June 19, 2019, by the following vote, to wit: AYES: Chair Luna, Commissioners Geidner, Meenes, Merz, and Stine NOES: Commissioner Lafferty ABSENT: Commissioner Anderson ABSTAIN: CAROLYN LUNA, airperson CARLSBAD PLANNING COMMISSION ATTEST: TERI DELCAMP Principal Planner PC RESO NO. 7335 -10- August 27, 2019 Item #9 Page 29 of 140 EXHIBIT 5 ltemNo. 0 P.C. AGENDA OF: June 19, 2019 Application complete date: April 15, 2019 Project Planner: Shannon Harker Project Engineer: Jennifer Horodyski SUBJECT: SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) -PURE PROJECT BREWERY AND TASTING ROOM -Request for a recommendation of approval of a Minor Site Development Plan and Conditional Use Permit for a 2,206-square-foot brewery and tasting room and the purchase of one (1) parking in-lieu fee. The site is located at 2825 State Street in the Village Center (VC) District of the Village and Barrio Master Plan and within Local Facilities Management Zone 1. The City Planner has determined that this project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment and is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to section 15303 (New Construction or Conversion of Small Structures) of the State CEQA guidelines. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7335 RECOMMENDING APPROVAL of Site Development Plan SDP 2019-0002 and Conditional Use Permit CUP 2018-0021 to the City Council based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND Project Setting: The 0.11-acre site is located on the corner of State Street and Christiansen Way and adjacent to the State · Street alley to the west. The property is developed with a 3,725-square-foot retail building, the rear portion of which is currently vacant. The front or eastern portion of the building is occupied by the Handel's Ice Cream shop. The project is located outside of the Coastal Zone and within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). Table A below includes the General Plan designations, zoning and current land uses of the project site and surrounding properties. TABLE A-SITE AND SURROUNDING LAND USE Location General Plan Designation Zoning Current Land Use Village/Barrio (VB) Village/Barrio (V-B) -Retail-Handel's Ice Cream Site Village Center (VC) District Village/Barrio (VB) Village/Barrio (V-B) -New Village Arts Theater North Village Center (VC) District August 27, 2019 Item #9 Page 30 of 140 SOP 2019-0002/CUP 2018-0021 (DEV2018-0196) -PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Pa e 2 Village/Barrio (VB) Village/Barrio (V-B) -Shorehouse Kitchen South Village Center (VC) District Village/Barrio (VB) Village/Barrio (V-B) -Retail and Theater East Village Center (VC) District Village/Barrio (VB) Village/Barrio (V-B) -Carlsbad Village Train West Village Center (VC) Station District Project Description: The project applicant, Pure Project Brewing, is requesting approval of a Minor Site Development Plan and Conditional Use Permit to convert 2,206 square feet of a single-story retail building located at 2825 State Street (APN 203-294-01) into a craft brewery with a tasting room. The uses in the brewery include a 1,482- square-foot retail, storage and production area, as well as 724-square-foot tasting area, whii:;h includes a 335-square-foot patio. The northwest corner of the building is proposed to be demolished to create the outdoor patio. Additional minor modifications to the exterior of the structure are proposed to accommodate the use, including the addition of windows and the replacement of an existing metal roll- up door on the north elevation with a new glass and aluminum roll-up door which will serve as the public entrance to the brewery. A 3.5-foot-tall horizontal wood fence is proposed around the perimeter of the outdoor patio. Based on information provided by the applicant, the initial stages of the manufacturing process to brew beer will be completed offsite at Pure Project's primary production facility located in San Diego. The applicant has described the process as follows: a. Unfermented beer will be produced at a brewing facility offsite. Once the unfermented beer is created, it will be transferred to the proposed brewery where yeast will be added to produce beer. Once the yeast has been added, the liquid will mature in fermentation tanks proposed to be located within the building. Upon maturation, the beer will be packaged into stainless steel kegs and stored in a walk-in cooler onsite. The fermentation tanks are comprised of large wooden tanks with the following approximate dimensions: 78.7" high, 57.9" wide, and 72.8" long. Each tank holds approximately 1,600 gallons of beer. Smaller wooden barrels would also be used for further storage and beer maturation as needed. The fermentation tanks will be fitted with air locks to prevent odors from escaping. A residential-sized water heater will be used on site for cleaning and pasteurization of parts, hoses, and other equipment. b. The production of the unfermented beer offsite will eliminate the need to dispose of the solid refuse made by spent-grains used in the process. It will also eliminate the need for steam and gas exhaust porting to the exterior of the building. The fermentation of the beer onsite will generate a liquid by-product that can be disposed through the local sewer system. c. The weekly output of beer produced onsite will be dependent upon the demands of the tasting room. The production levels will comply with the minimum requirements per the Type 23 (i.e., Small Beer Manufacturer License) Alcohol Beverage Control (ABC) license and will not exceed the maximum levels as specified in the license. d. The bottling of beer onsite is not proposed. Beer will be packaged into stainless steel kegs or growlers sold onsite. August 27, 2019 Item #9 Page 31 of 140 SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) -PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Pa e 3 The conversion of the vacant retail space into a brewery with a tasting room is an intensification which results in the requirement for one additional parking space. Since the site is fully developed and the existing stalls at the rear of the site existed as parking for the retail use, the applicant proposes to purchase one (1) parking in-lieu fee through the Village Parking In-Lieu Fee Program to satisfy the parking requirements. The findings related to the request for the parking in-lieu fee are discussed in Section B of the staff report, as well as in Planning Commission Resolution No. 7335. Pursuant to the land use matrix for the Village and Barrio Master Plan, a brewery is a conditionally- permitted use and is subject to special regulations which are required to be analyzed as part of the Conditional Use Permit (CUP). A Minor Site Development Plan (SDP) is required for the intensification in use which results in additional parking. While the Minor SDP is typically an administrative-level decision, because the CUP requires City Council approval, the SDP also requires City Council approval. Ill. ANALYSIS The proposed project is subject to the following ordinances, standards, and policies: A. Village-Barrio (VB) General Plan Land Use Designation; B. Village-Barrio (V-B) Zone (CMC Chapter 21.35), Village Center (VC) District of the Village and Barrio Master Plan; and C. Growth Management Ordinance (CMC Chapter 21.90), Local Facilities Management Plan Zone 1. The recommendation for approval of this project was developed by analyzing the project's consistency with the applicable regulations and policies. The project's compliance with each ofthe above regulations and policies is discussed in the sections below. A. Village-Barrio (VB) General Plan Land Use Designation The subject property has a General Plan Land Use designation of Village-Barrio (VB} and is within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). As discussed in Table B below, the project complies with the Elements of the General Plan. TABLE B-GENERAL PLAN COMPLIANCE Element Use, Classification, Goal, Objective, or Proposed Uses & Improvements Comply? Program Land Use & Goal 2-G.29 The proposal to convert 2,206 Yes Community Maintain and enhance the Village as a square feet of a 3,725-square-foot Design center for residents and visitors with retail building to a brewery with commercial, residential, dining, civic, an accessory tasting room and cultural and entertainment activities. outdoor patio contributes toward the goal of providing a lively, Goal 2-G .30 interesting social environment in Develop a distinct identity for the the Village. The addition of a craft Village by encouraging a variety of brewery complements the uses and activities, such as a mix of surrounding mix of land uses, residential, commercial office, which includes multi-family restaurants and specialty retail shops, residential units, a theater, retail which traditionally locate in a stores, restaurants and an ice pedestrian-oriented downtown area cream shop. August 27, 2019 Item #9 Page 32 of 140 SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) -PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Pa e4 Element Use, Classification, Goal, Objective, or Proposed Uses & Improvements Comply? Program and attract visitors and residents from across the community by creating a lively, interesting social environment. Mobility Policy 3-P.5 The applicant is required to pay Yes Require developers to construct or traffic impact fees for the pay their fair share toward intensification in use prior to the improvements for all travel. modes issuance of building permits that consistent with the Mobility Element, would go toward future road the Growth Management Plan, and improvements. specific impacts associated with their development. The proposed project is located adjacent to the Carlsbad Village Policy 3-P.29 train station, which provides rail Evaluate incorporating pedestrian and and bus service throughout the bicycle infrastructure within the city as day. The project supports part of any private development or walkability and mobility by capital project. locating near residential and commercial land uses. Goal 3-G.3 Provide inviting streetscapes that Bicycle racks are proposed as a encourage walking and promote component of the proposed livable streets. project. In addition, street trees are existing in the sidewalk adjacent to Christiansen Way. Public Safety Goal 6-G.l The proposed structural Yes Minimize injury, loss of life, and improvements would be required damage to property resulting from to meet all seismic design fire, flood, hazardous material release, standards. The Fire Department or seismic disasters. approved the project and ' indicated that fire sprinklers are Policy 6-P.6 not required for an occupant load Enforce the requirements of Titles 18, less than 100. Therefore, the 20, and 21 pertaining to drainage and proposed project is consistent flood control when reviewing with the applicable fire safety applications for building permits and requirements. In addition, the subdivisions. Police Department has approved the proposed brewery use. Policy 6-P.34 Enforce the Uniform Building and Fire The project would be requi red to codes, adopted by the city, to provide develop and implement a program fire protection standards for all of "best management practices" existing and proposed structures. for the elimination and reduction of pollutants which enter and/or Policy 6-P.39 are transported within storm Ensure all new development complies drainage facilities. with all applicable regulations August 27, 2019 Item #9 Page 33 of 140 SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) -PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Pa e 5 Element Use, Classification, Goal, Objective, or Proposed Uses & Improvements Comply? Program regarding the provision of public The project has been conditioned utilities and facilities. to pay all applicable public facilities fees for Zone 1. B. Village-Barrio Zone (CMC Chapter 21.35) and Village Center District The subject property is located within the Village Center (VC) District of the Village and Barrio Master Plan (VBMP). Breweries are conditionally-permitted and are required to comply with special regulations. No variances or standards modifications are being requested for the project. The project's compliance with the development standards specific to the VC District, as well as the area-wide standards within the VBMP, are provided in Tables C and D below. The project's compliance with the conditional use permit regulations of the VBMP are provided in Table E below. Please see Attachment 4 for an analysis of the project's compliance with the Design Guidelines of the VBMP. Standard Front Yard Setback Side Yard Setback Rear Yard Setback Lot Coverage Service and Delivery Areas Building Height TABLE C -COMPLIANCE WITH THE VILLAGE AND BARRIO MASTER PLAN VILLAGE CENTER (VC) DISTRICT Required/ Allowed Proposed Minimum of O feet; maximum of 5 feet to building at Zero setback; the the ground floor. existing building is located on the Additional depth permitted where area includes a property line. The plaza, courtyard, or outdoor dining. Additional depth proposed outdoor is also permitted to accommodate electrical patio will also be transformers, utility connection, meter pedestals, and located on the similar equipment only if other locations are infeasible north property as determined by the decision-maker. line, facing Christiansen Way. Awnings, canopies, upper floor balconies, plazas, courtyards, and outdoor dining are permitted to encroach within the setback up to the property line. Minimum ten-foot landscape setback where surface parking areas are located adjacent to a public street. No minimum setback Zero; building is located on the property line. No minimum setback 39' No maximum 75 percent Service and loading areas shall be conducted using All service and alley access where the condition exists. loading activities will occur off the State Street alley to the west. Maximum 45 feet, 4 stories 12' -13', one story Comply? Yes Yes Yes Yes Yes Yes August 27, 2019 Item #9 Page 34 of 140 SOP 2019-0002/CUP 2018-0021 (DEV2018-0196) -PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Pa e 6 Standard Building Massing Parking Ground Floor Street Frontage Uses Required/ Allowed Maximum wall plane and roofline variation: No building fac;:ade visible from any public street shall extend more than 40 feet in length without a 5-foot minimum variation in the wall plane, as well as a change in roofline. Brewery/Distillery/Winery: One space per 150 square feet of the tasting room and one space per 415 square feet for all other uses (e.g. production, storage, and retail sales). Converting uses (buildings existing as of Master Plan adoption date): Building space may be converted from one use to another without additional parking, provided both uses have the same parking requirements set forth within Section 2.6.6. If the new use has a higher parking requirement than the existing use, 50 percent of the additional parking based on the higher parking requirement shall be provided. Existing gross floor area: 2206 SF Parking calculation for prior retail use: 2,206 SF+ 415 SF = 5.3 spaces for retail use Parking calculation for proposed brewery use, including outdoor patio: Tasting room: 725 SF+ 150 SF= 4.8 spaces Retail/storage: 1,481 SF+ 415 SF= 3.5 spaces 4.8 + 3.5 = 8.3 spaces for brewery 8.3 spaces -5.3 spaces = 3 additional spaces 3 spaces x 0.50 = 1.5 spaces; round down to 1; **1 parking in-lieu fee required to be purchased New ground floor street frontage uses permitted within the boundaries of the use restriction area identified on Figure 2-2 shall occupy more than one- half of the habitable space developed on the ground floor and shall span at least 80 percent of the building frontage. Proposed The north fac;:ade of the existing building is 75 feet in length. The demolition of 335 square feet at the northwest corner of the building to create an outdoor patio will bring the north fac;:ade into compliance with this requirement. Comply? Yes One parking in-lieu Yes fee is proposed to be purchased. Please see discussion below and Planning Commission Resolution No. 7335 for findings for approval. The proposed Yes brewery and existing Handel's ice cream shop are uses which are permitted on the ground floor and August 27, 2019 Item #9 Page 35 of 140 SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) -PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Pa e 7 Standard Standard Ingress and Egress Property Line Walls/Fences Building Orientation Building Entrances Roof Protrusions Window Glazing Required/ Allowed Proposed Up to 20 percent of the building frontage may be used occupy 100 for a lobby or entryway to uses above or behind percent of the ground floor street frontage uses. building frontage. TABLED -COMPLIANCE WITH THE VILLAGE AND BARRIO MASTER PLAN AREA-WIDE STANDARDS Required/ Allowed Proposed Development shall be permitted a maximum of one An existing access point from the public street. driveway off the State Street alley A driveway curb cut shall not exceed 20 feet in width provides access to and shall maintain a free line of sight. the existing parking stalls at the rear of the building. Maximum height in front yard setback: 3.5' A 3.5' horizontal Maximum height in side/rear yard setback: 6' wood fence is proposed around Wall/fence height shall be measured from the lowest the perimeter of side of finished grade. the outdoor patio. Buildings shall be oriented toward primary street The existing frontage. building has a zero setback along State Street and Christiansen Way and is therefore oriented toward the street frontages. The primary entrance of a ground floor commercial The entrance to use shall be oriented toward the primary street the brewery is frontage. oriented toward Christiansen Way. Roof-mounted mechanical equipment and The project is freestanding screening that is not architecturally conditioned to integrated shall be set back from the building face at require screening least equivalent to the height of the screening. for any roof- mounted mechanical equipment that will be visible. The bottom of any window or product display window All proposed shall not be more than 3.5 feet above the adjacent windows are less sidewalk. than 3.5 feet above the Transparent or translucent glazing is required on the sidewalk. In ground-floor fa!;ade of a commercial or retail use addition, the windows and Comply? Comply? Yes Yes Yes Yes Yes Yes August 27, 2019 Item #9 Page 36 of 140 SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) -PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Pa e 8 Standard Required/ Allowed Proposed facing a public street. Opaque, reflective or dark · doors will have tinted glass is not permitted. transparent glazing. TABLE E -COMPLIANCE WITH THE CONDITIONAL USE PERMIT SPECIAL REGULATIONS FOR BREWERIES STANDARD ANALYSIS Deliveries of materials and supplies As the proposed project is not located adjacent shall not occur during hours that would to any residential land uses, no impacts related negatively impact residents within the to the delivery of materials and supplies are vicinity of the brewery's location. anticipated. By-products or waste from production The applicant proposes to produce unfermented shall be removed within 24 hours and beer at a brewing facility offsite. The production properly disposed of off the property. of the unfermented beer generates the bulk of the by-products since it entails extracting liquid from ground malt, hops or other grains. The production of the unfermented beer offsite will eliminate the solid refuse made by spent- grains. used in the process and would also eliminate the need for steam and gas exhaust porting to the exterior of the building. The fermentation of the beer onsite will generate a liquid by-product that can be disposed through the local sewer system. Fermentation tanks shall be located The fermentation tanks are proposed to be indoors and installed with a filter to located inside the brewery and will be fitted with reduce the odor emanating from the air locks to prevent odors from escaping indoors. brewery site. Parking In-Lieu Fee Program Comply? Comply? Yes Yes Yes As discussed in Table C above, the project proposes to the satisfy the requirement to provide one (1) parking space by participating in the Parking In-Lieu Fee Program of the VBMP. The fees collected from the Parking In-Lieu Fee Program are deposited into an earmarked, interest-bearing fund to be used for construction of new, or maintenance of existing, public parking facilities within the Village Area . Pursuant to the VBMP, participation in the Parking In-Lieu Fee Program is subject to the following requirements: a. The Parking In-Lieu Fee Program shall be applicable only to non-residential uses in specific areas east of the railroad corridor. b. Only non-residential uses in the Village Center (VC) district (east of the railroad tracks only) and in the Village General (VG), Freeway Commercial (FC) and Pine-Tyler Mixed-Use (PT) districts are eligible to participate in the Parking In-Lieu Fee Program. c. The average occupancy of off-street public parking spaces within a quarter mile radius of the property boundaries of the use requesting to pay the In-Lieu Fee shall be under 85 percent based on the most recent city-authorized parking study or other information determined acceptable by the city planner. August 27, 2019 Item #9 Page 37 of 140 SDP 2019-0002/CUP 2018-0021 (DEV2018-0196} -PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Pa e 9 d. The In-Lieu payment shall always be made for a whole parking space. e. Fee payment shall not result in a reserved parking space or spaces. In addition, the following findings must be made by the appropriate decision-making authority: a. The use complies with the program's participation restrictions; b. Adequate off-street public parking is available to accommodate the project's parking demand, based on the city's most recent city-authorized parking study or other information; and c. The In-Lieu Fee Program has not been suspended or terminated by the City Council. The subject property is located east of the railroad tracks and within the VC District. In addition, the proposed brewery is a non-residential use. A total of five (5) public parking lots and 274 parking spaces are located within a quarter mile radius of the property. Based on the most recent data available, which includes the results of the parking study completed August 2018 (weekday and weekend), the maximum average occupancy of the lots located within a quarter mile radius was 78.9 percent (weekday average, 9 AM -9 PM, August 2018), which is less than the threshold of an average of 85 percent. Based on these findings, it is staffs recommendation that the proposed project warrants granting participation in the Parking In-Lieu Fee Program and the purchase of one (1) parking in-lieu fee. If the City Council grants participation in the Parking In-Lieu Fee Program, the project will satisfy its parking requirement as set forth in the Village and Barrio Master Plan. As a condition of project approval, the applicant shall be required to enter into an agreement to pay the parking in-lieu fee prior to the issuance of building permits for the project. The current fee is $11,240 per required parking space. C. Growth Management The proposed project is located within Local Facilities Management Zone 1 in the Northwest Quadrant of the city. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table F below. TABLE F -GROWTH MANAGEMENT COMPLIANCE Standard Impacts Compliance City Administration N/A N/A Library N/A N/A Waste Water Treatment 1 EDU Yes Parks N/A N/A Drainage Basin A; N/A Yes Circulation 52ADT Yes Fire Station 1 Yes Open Space N/A N/A Schools N/A N/A Sewer Collection System 1 EDU Yes Water 400 GPD Yes IV. ENVIRONMENTAL REVIEW The City Planner has determined that the project belongs to a class of projects that the State Secretary for Resou rces has found do not have a significant impact on the environment, and it is therefore August 27, 2019 Item #9 Page 38 of 140 SOP 2019-0002/CUP 2018-0021 (DEV2018-0196) -PURE PROJECT BREWERY AND TASTING ROOM June 19, 2019 Pa e 10 categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15303 (New Construction or Conversion of Small Structures) Class 3 Categorical Exemption of the State CEQA Guidelines. The project entails the conversion of an existing small structure not exceeding 2,500 square feet in floor area from one use to another where only minor modifications are made to the exterior of the structure. In addition, the project does not involve the use of hazardous substances. In making this determination, the City Planner has found that the exceptions listed in Section 15300.2 of the state CEQA Guidelines do not apply to this project. A Notice of Exemption will be filed by the City Planner upon final project approval. The project's compliance with the recently-adopted Climate Action Plan Ordinances, if deemed applicable, will be verified prior to issuance of the building permit. V. DEVELOPMENT PROJECT PUBLIC INVOLVEMENT POLICY The proposed project is subject to the Early Public Notice and the Enhanced Stakeholder Outreach processes outlined in City Council Policy No. 84 -Development Project Public Involvement Policy. The policy requires applicants of certain development projects, such as the proposed Conditional Use Permit, to provide an opportunity for, and to consider input from interested and affected stakeholders prior to project consideration by city decision-makers. On November 21, 2018, the applicant mailed an early public notice and an invitation to a stakeholder outreach meeting to property owners within 600 feet of the project site. On December 13, 2018, an informational meeting was held onsite with the surrounding community. Approximately 25-30 individuals attended the meeting, a majority of which comprised the applicant's project team. Project renderings as well as the site and floor plans were posted for the public to review. Comment cards were available; however, no comments were received. Verbal feedback received from the public was positive. The early public notice and the informational meeting described above satisfy the requirements of City Council Policy No. 84. ATTACHMENTS: 1. Planning Commission Resolution No. 7335 2. Location Map 3. Disclosure Statement 4. Village and Barrio Master Plan Design Guidelines Analysis 5. Reduced Exhibits 6. Full Size Exhibits "A" -"F" dated June 19, 2019 August 27, 2019 Item #9 Page 39 of 140 NOT TO SCALE SITE MAP Pure Project Brewery and Tasting Room SOP 2019-0002 / CUP 2018-0021 August 27, 2019 Item #9 Page 40 of 140 Cti_v (Jl / ',·· ... i.;;.b-·1 -f _ dJ ,_, uCt D1SCLOSURE S ATE ENT Pti -J (A) Planning Division 163.5 Farada'/ Ave,iue /760) 602-4610 www.carlsbadc;;.gm1 Applicanfs statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Com117ission or Committee. The following information MUST be disclosed at the time of application submittal. Your proJect cannot be reviewed unti! this information is completed. Piease pi-int. Note: Person is definad as "Any individual, firm. co-partnership. Joint venture. association, social club, fraterna: organization, corporation, esiate , trust, receiver, syndicate, in this and any other county, city and cou nty city rm micipality, district or other political subdivision or any other group or combination acting as a unit." Agents may sign this document however. the legal name and entity of the applicant and properly owner must be provided below APPLICANT (Not the applicant's agent) Provide the COMPLETE, LEGAL names and addresses of ALL persons having a rinanctal interest ln the application. Jf the applicant inclLides a corporation or partnersl1!p, ,nclude the names, titles, addresses of all individuals owning more than "10% of the shares_ IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles. and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Jesse Pine Corp/Part Pure Project. LLC Title ____________ _ Title ______________ _ ,~.ddress 9o;m Kenamar Dr. ;t30il Sar. Dione. CA 9212 1 Ad dress 9030 Kenamar Dr #308 San Diego CA .92i2 ' .2. OWNER (Not tl1e owner's agent) Provide the COMPLETE1 LEGAL names and addresses of ALL persons having any ::;wnership interest in the property involved. Also, provide the nature of the legal ,)wnership (i.e., partnership, tenants in common. non-profit. corporation, etc.). If the ownership includes a corporation or oartnersl1ip. include the names, titles, addresses of all indivi duals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES. PLEASE INDICATE NON-APPLICABLE (NIA} IN THE SPACE BELOW If a publicly-owned corporation, include the names, titles. and addresses of the corporate officers. (A separate page may be attached if necessary.) Person I .,(u1JL, ff")1no Co_rp/PartSAJ3,i\ZL\.J Prticeme<; c -I I Title C. t• C• \.:.)¥\f !i':_ Title ______________ _ Address ____________ _ Page ·1 ci '.l Re11isecl 0'11 10 August 27, 2019 Item #9 Page 41 of 140 3 NON-PROFIT ORG NIZATION Of< t RUSl If any pe1·son id6n!ified pursuant to ('l) or ('.2 ) above is a nonprnfit organization or a rrust lisi the names and addresses of ANY pe rson ser1ing as an officer or director of tl,e noi-,- profit organization or as trustee or beneficiary of the Non Profit/Trust Non Proflt/Trus~---------- l,!!e ____________ _ Title _____________ _ Address __________ _ A,Jd1·ess ____________ _ -!. Have you had more than $500 worth of business transacted with any member of City staff. Boards, Commissions. Committees and/or Council within the past twelve ( 12) months? D Yes I I I No l'f yes, please indicate person(s): ___________ _ NOTE: Attach additional sheets if nec:;essary l certify that al l the above information is true and correct to the best of my knowledge. ~k\ ... ~\.Li,a_~V\ (,'-Q..u_,_> 1 D \ \. c\ 1); .. ~.---_>--------; ~ _( .,. --.. - ·-... ;.,, . - Signature of owner/date _,,.,Sig11ature of applicant/date / Print or type name of owner Pri1i or type name of applicant pplicanfs agent if applicable/date BI LL HOFMAN. HOFMAN PLANNING A.ND ENGIMEER!t'>JG Print or type naine of owner/applicant's agent P-11AJ Page 2 of ~ Rev1,ed 0711 G August 27, 2019 Item #9 Page 42 of 140 ATTACHMENT 4 VILLAGE AND BARRIO MASTER PLAN DESIGN GUIDELINES ANALYSIS SDP 2019-0002/CUP 2018-0021(DEV2018-0196) -PURE PROJECT BREWERY AND TASTING ROOM INTENT The Design Guidelines (guidelines) intend to implement and enhance the existing character within the Village and Barrio as new development and property improvements occur. Together, the Village and Barrio are a unique, mixed-use environment. They serve as both a shopping and entertainment destination as well as a place to live and work. The guidelines aim to improve the character of the Village and Barrio while improving livability. Guidelines address many components of building style and orientation, including site layout, building massing, roof form, building fa~ades, and appurtenances. Images are intended to provide a visual example of a targeted topic described in the caption and may not represent all aspects and direction provided within this document. Through these areas of focus, the guidelines strive to foster authentic designs with straightforward and functional construction. All development should align with the spirit and intent of the design guidelines presented in this chapter. Designers and developers should consider at a minimum that these guidelines are a starting point for quality development, and do not comprise every possible strategy for achieving high quality design. Therefore, it is prudent that designers use their own techniques for achieving authentic, high quality design. The following guidelines apply to all new and remodeled development within the entire Master Plan Area unless exempt as determined by Section 6.3.2. 2.8.2 SITE PLANNING GUIDELINES A. 1. 2. 3. 4. 5. 6. 7. Site layout Place buildings adjacent to, and oriented towards, the street. Locate prominent architectural features near corners and intersections. Orient storefronts and major building entries towards major streets, courtyards, or plazas. Minimize gaps between buildings in order to create a continuous, pedestrian- oriented environment. Place parking lots so as not to interrupt commercial street frontages. Incorporate functional and aesthetic vehicular and pedestrian connections to adjacent sites. Creates mall pedestrian plazasalongthestreet wall through the use of recesses in building form. Provide easily identifiable pedestrian access from the street and/or sidewalk to key areas within the site. 8. Incorporate plazas, landscaped areas, fountains, public art, textured pavement, and vertical building features to create focal points that enhance a pedestrian's experience. 9. Utilize atriums and outdoor courtyards to increase the variety and number of views and to bring additional sunlight into large developments. 10. Give careful design consideration to corner lots, as they are typically a focal point in the urban fabric. 11. Utilize courtyards or other methods to break up the building mass and provide natural ventilation, wherever possible. B. 1. 2. 3. 4. Parking and access Locate parking behind buildings and away from the street, wherever possible. Use pervious paving materials, whenever possible. Buffer residential uses from commerci.al parking lots by landscaping, fencing, and/or walls. When walls or fences are utilized to screen parking, provide breaks to allow for pedestrian circulation and limit height for safety and security purposes. 5. Divide large parking lots into smaller areas with landscaping and clearly marked pedestrian paths. 1 CONSISTENCY STATEMENT The brewery and tasting room are proposed in an existing building which is located on the front and street-side property lines. The building does not have any gaps and provides a continuous, pedestrian- oriented environment. The addition of the outdoor patio further enhances the pedestrian and customer experience. Two existing parking spaces are located to the rear of the building, off the State Street alley. Bicycle racks are proposed to be installed adjacent to the outdoor patio and adjacent to the existing transformer. August 27, 2019 Item #9 Page 43 of 140 6. Highlight primary pedestrian access paths within parking areas with decorative paving, trellises, canopies, lighting, and similar improvements. 7. Create pedestrian paseos to parking lots of buildings. 8. Locate parking below grade or in structures, where feasible. 9. Design parking structures so their height and bulk are consistent with adjacent buildings. 10. Provide bicycle parking at convenient locations such as entrances or other visible and accessible areas. 11. Provide electric vehicle charging stations and equipment where feasible and as otherwise required. C. Plazas and open space As the brewery is proposed in an 1. Provide private or common open space and pedestrian connections to such existing building, there is not an spaces to enhance the living environment and contribute to a walkable opportunity to add plazas or open neighborhood character. space. Bike racks are proposed to be 2. Semi-public outdoor spaces, such as small plazas and courtyards are added to the rear of the building, encouraged between private and public spaces to support pedestrian activity adjacent to the outdoor patio and and connectivity. public sidewalk. 3. Design plazas and building entries to maximize circulation opportunities between adjacent uses. 4. Provide landscaping and high-quality paving materials, such as stone, concrete or tile, for plazas and open spaces. 5. Place outdoor furniture, such as seating, low walls, tra.sh receptacles, bike racks and other elements, in outdoor pedestrian spaces. 6. Site buildings to define open space areas. Ensure that outdoor areas are visible from public streets and accessible from buildings, as well as, streets and . pedestrian and bicycle networks. D. Outdoor Seating An outdoor patio with moveable 1. Incorporate seating into well-trafficked outdoor areas, to maximize seats is proposed in conjunction with opportunities for people to interact. the proposed brewery and tasting 2. Consider movable seating so that people can accommodate their own room which will encourage preferences and respond to the weather or time of day. pedestrian interaction along the Christiansen Way frontage. Lighting 3. Provide lighting to ensure that outdoor seating areas are safe places at night. will be provided for the outdoor patio to ensure safety for the customers and pedestrians. E. Connectivity The existing building is located on 1. Connect all commercial buildings to the public sidewalk via a publicly accessible path the north property line, adjacent to or walkway. the public sidewalk. Therefore, the 2. Provide attractive, well-marked pedestrian links that create a clear path of travel entry to the brewery will be visible between parking, buildings and sidewalks. to the public. An existing roll-up 3. Ensure that alleys are well lit, open, and visible to passersby. door at the rear (west) elevation 4. Enhance existing walkways or paseosto become more inviting. provides private secondary access 5. Provide secondary entries to alleys. off the State Street alley. The roll-up door is intended to be used for deliveries. F. Mechanical Equipment and Service Areas An existing transformer is located at 1. Carefully design, locate, and integrate service, utility, and loading areas into the the rear of the property, with site plan. These critical functional elements should not detract from the public visibility from Christiansen Way and view shed area or create a nuisance for adjacent property owners, pedestrian the State Street alley. The applicant circulation, or vehicle traffic. proposes to add landscaping around 2 August 27, 2019 Item #9 Page 44 of 140 2. Locate loading areas in the rear of a site where possible. the transformer, where feasible, to 3. Locate mechanical equipment and service areas along and accessed from alleys soften the view. If additional roof- or the rear of properties, wherever possible. mounted equipment is needed for 4. Place public utility equipment, meter pedestals, and transformers underground the operation of the brewery, it will or away from sidewalks and pedestrian areas, where feasible. be required to be screened, pursuant to the project conditions. 5. Screen all mechanical equipment from public view. Compliance will be verified prior to 6. Ensure roof mounted mechanical equipment and screening do not interfere issuance of the building permit. with required solar zones or installed solar photovoltaic or solar water heating systems. 7. Design trash and recycling enclosures to be consistent with the project and building architecture, and site and screen them to minimize visual impact. G. Landscaping Street trees and above-ground Landscaping shall meet the policies and requirements set forth in the City of Carlsbad conc~ete planters currently exist in Landscape Manual. the sidewalk adjacent to 1. Utilize landscaping to define building entrances, parking lots, and the edge of Christiansen Way. The applicant various land uses. proposes to add landscaping around the existing transformer to screen it 2. Utilize landscaping to buffer and screen properties. to the maximum extent feasible. In 3. Consider safety, environmental impacts, and accent elements when selecting addition, a tree is proposed in the and locating landscaping elements. outdoor patio area which will 4. Landscaping, between the front property line and the building creates a visually enhance the streetscape and interesting transitional space. Select and place plants to enhance and soften customer experience. architectural elevations, screen undesirable building features and contribute to the overall quality of the streetscape. 5. Select species that are compatible with Carlsbad's semi-arid Mediterranean climate, and that will grow to an appropriate size at maturity. 6. When there are minimal landscape areas between the building and the street, incorporate planters onto porches, recessed building entrances, and planters on decks and balconies. 7. Minimize paved vehicle areas such as driveways and parking areas. Design driveways to be no wider than necessary to provide access. Incorporate permeable surfaces, such as interlocking pavers, porous asphalt, power blocks, and lattice blocks/ grass-crete or ribbon driveways where feasible. 8. Utilize planting to screen less desirable areas from public view, i.e., trash, enclosures, parking areas, storage areas, loading areas, and public utilities. 9. Provide landscaping between any parking lot and adjacent sidewalks or other paved pedestrian areas, as well as, within surface parking lots. 10. Incorporate riative and drought tolerant vegetation whenever possible. Avoid use of invasive or noxious plants. 11. Incorporate lattice work and landscaping onto existing blank walls to support flowering vines growing out of planters placed at their base. 12. Plant trees and fast growing and flowering vines along fences and walls to soften the appearance of the fencing and screen views tofunctional on-site work and storage areas. 13. Utilize vines, espaliers, and potted plants to provide wall, column, and post texture and color and to accentuate entryways, courtyards, and sidewalks. 14. Incorporate large planters into seating areas. Planters should be open to the soil below and should incorporate permanent irrigation systems. 15. Maintain landscaping and yard areas regularly to keep a desirable, healthy 3 August 27, 2019 Item #9 Page 45 of 140 appearance, eliminate trash, and control vermin. 16. Incorporate Low Impact Development (LID) strategies, site design, and source control measures into projects. Examples include rain gardens, rain barrels, grassy swales, soil amendments, and native plants. 17. Utilize seasonal shading from trees and shrubs when developing planting schemes for courtyards and streetscapes on south and west facing facades. H. Fences and walls 1. Construct fences of quality and durable materials, such as, wood, vinyl or wrought iron. 2. Architecturally treat all site walls to complement the building design. 3. Chain link fences and other "see-through" fences are not appropriate for screening. 4. Fences and walls directly adjacent to sidewalks and pedestrian plazas in commercial and mixed-use areas should be avoided unless designed as a pedestrian amenity or a low wall landscape feature. 2.8.3 BUILDING FORM AND MASSING GUIDELINES A. Building Form and Articulation 1. Reduce the imposing appearance of tall buildings by stepping back from street level on elevations above the ground floor. 2. Utilize horizontal and vertical articulation to break up monolithic street walls and facades. 3. Utilize techniques to reduce massing, such as variation in wall plane and height and variation in roof form and levels. 4. Surface detailing may be used, but does not serve as a substitute for distinctive massing. 5. Consider adjacent low density uses when designing and orienting a building. For example, avoid balconies overlooking rear yards. 6. Minimize the vertical emphasis of architectural design elements by incorporating features such as horizontal bands, reveals, trims, awnings, eaves, and overhangs or other ornamentation, along different levels of the wall surface. 7. Minimize blank walls by: a. Adding window openings and/or entrances and other relief. b. Providing recessed glazing and storefronts. c. Adding vertical pilasters which may reflect internal building structure. d. Changing color and texture along the wall surface. e. Varying the planes of the exterior walls in depth and/or direction. f. Adding trims, p"rojections, and reveals along different wall surfaces. 8. Articulate the building fa~ade by varying building elements to create contrast. Integrate all architectural elements into the building design to avoid the look of "tacked on" architectural features. 9. Utilize facade projections and recesses such as bay windows, planter boxes, roof overhangs, and entry way recesses. 10. Arrange columns such that they appear to support the weight of the building or feature above and are balanced in height, weight, and depth. Spindly columns can appear out of proportion with the element it is supporting. 11. Size shutters appropriately, when used to cover the window opening. 12. Avoid exterior sliding or fixed security grilles over windows along street 4 A 3.5'-tall wood fence with horizontal slats is proposed around the perimeter of outdoor patio. The design and material of the fencing complements the existing building and proposed brewery use. CONSISTENCY STATEMENT The brewery proposes to locate in an existing vacant retail suite. The northwest corner of the building will be demolished to create an outdoor patio which will break up the mass, building planes and roof structure of the building as viewed from Christiansen Way and the State Street Alley. Additional minor modifications to the exterior of the structure are proposed to accommodate the use, including the addition .of windows and the replacement of an existing metal roll- up door on the north elevation with a new glass and aluminum roll-up door which will serve .as the public entrance to the brewery. August 27, 2019 Item #9 Page 46 of 140 frontages. 13. Disc_ourage and avoid "chain" corporate architecture and generic designs. Each project should strive to achieve the unique architectural style or character. 14. Design roofs to accommodate a solar photo-voltaic system and/or solar water heating system, as required by California Building Code. 15. Utilize details such as wall surfaces constructed with patterns, changes in materials, building pop-outs, columns, and recessed areas to create shadow patterns and depth on the wall surfaces. 16. Ensure that proportions are consistent with selected architectural styles. 17. Incorporate the characteristic proportions of traditional facades in new infill development. 18. Balance the ratio of height, width, and depth of arches and columns to emphasize strength and balance. 19. Ensure consistency between the height of a column and its mass or thickness with the weight of the overhead structure the column supports. 20. Infill buildings that are much wider than the existing facades should be broken down into a series of appropriately proportioned structural bays or components. 21. Consider transitions between the height of new development and the height of adjacent existing development. 22. Utilize vertical building focal elements. Towers, spires, or domes may foster community identity and serve as landmarks. 23. Utilize windows and open wrought iron balconies to provide opportunities for residents to passively observe and report suspicious activity. 24. Utilize accent materials to highlight building features and provide visual interest. Accent materials may include any of the following: a. Wood b. Glass c. Glass block (transom) d. Tile e. Brick f. Concrete g. Stone h. Awnings i. Plaster (smooth or textured) 25. Use building materials and finishes that are true to the structure's architectural style. 26. Windows, doors, and entries should be designed to capture the desired architectural style of the building. 27. Generally, use no more than three different materials on exterior wall surfaces. While certain styles may successfully incorporate multiple surface materials, caution must be used as too many materials can result in a less than aesthetically pleasing building. 28. Ensure material changes occur at intersecting planes, preferably at inside corners of changing wall planes or where architectural elements intersect, such as a chimney, pilaster, or projection. 29. Utilize light and neutral base colors. Generally muted color schemes will 5 August 27, 2019 Item #9 Page 47 of 140 promote visual unity and allow awnings, window displays, signs and landscaping to be given proper emphasis. 30. Ensure lighting is architecturally compatible with the building. 31. Articulate storefronts with carefully arranged doors, windows, arches, trellises, or awnings, rather than blank walls. 32. Ensure that the main entrance to a building is clearly identifiable and unique, as it is the primary point of arrival and should be treated with significance. 33. Window type, material, shape, and proportion should complement the architectural style of the building. 34. Utilize recessed windows where appropriate to the architectural style, to provide depth. B. Awnings 1. Use awnings made of commercial grade canvas or metal and that are either fixed or retractable. 2. Avoid plasticized and/or vinyl fabrics and back-lit awnings. 3. Maintain a minimum of six (6) inch clearance from second floor features such as windows. 4. Avoid wrapping awnings around buildings in continuous bands. 5. Place awnings only on top of doors, on top of windows, or within vertical elements when the fai;:ade of a building is divided into distinct structural bays. C. Balconies 6. Place balconies adjacent to operable doorways. Faux balconies or those that do not appear usable are discouraged. 7. Visually support all balconies, either from below by decorative beams and/or brackets, from above by cables, or by other parts of the building. 8. On corners, balconies may wrap around the side of the building. 0. Roof Forms 1. Ensure that roof materials and colors are consistent with the desired architecture or style of the building. 2. Utilize multi-roof forms, hips, gables, shed roof combinations, and sufficiently articulated flat roofs to create interesting and varying roof forms that will reduce building mass, add visual appeal, and enhance existing Village and Barrio character and massing. 3. Avoid long, unbroken, horizontal roof lines. 4. Avoid flat roofs unless sufficient articulation of detail is provided, such as precast treatments, continuous banding or projecting cornices, lentils, caps, corner details, or variety in pitch (sculpted), height, and roofline. 5. Avoid the "tacked on" appearance of parapets, and ensure their appearance conveys a sense of permanence. If the interior side of a parapet is visible from the pedestrian and/or motorist area of the project, utilize appropriate detail and properly apply materials. E. Lighting 1. Provide exterior building lighting, particularly in commercial and high- pedestrian areas. 2. Design or select light fixtures that are architecturally compatible with the building. 3. Integrate light fixtures that are downcast or low cut-off fixtures to prevent 6 N/A. No awnings are proposed. N/A. No balconies are proposed. The brewery proposes to operate in an existing building. The addition of the outdoor patio will help break up the flat roof facing the north and west. Exterior lighting will be provided and reviewed as part of the building plan check. August 27, 2019 Item #9 Page 48 of 140 glare and light pollution. 4. Design lighting in such a way as to prevent the direct view of the light source from adjacent properties or uses, particularly residential properties or uses. 5. Utilize lighting on architectural details, focal points, and parking areas to increase safety, help with orientation, and highlight site attributes and the identity of an area. 6. Use energy-efficient lamps such as LED lights for all exterior lighting along with adaptive lighting controls to contribute to energy conservation and potentially reduce long-term costs. 7 August 27, 2019 Item #9 Page 49 of 140 PURE PROJECT CARLSBAD SDP 2019-0002 / CUJ=i 2018-0021 GENERAL NOTES 1. SJ~~~t~!~~~:itr:~~=l(~~i 2. All lM)ffl(AM) MATEIIIALS sw.tl BE JN ACCORDANCE WITH APPLICA8l£ REOURENENTS Of' TiiE LOC\l. ARE AW'61WJ., Tt£ CTY OF SAN OEOO IIUILOIHO :i~~~~~~~=ii:~~~~~~ UUVl0fll(INCLUOE,IUTAAEHOTU""TS,lOTHE FOll.(M!HO; •THE 2'01&~ IIUUJIHG{CICJIS IASEDONTt£2t11518C, 8UT INCUJDES NUNEIIOUS SJ.UE OF CA.UFORIIIA ,t.MEl«lfilEHJS. -THE~~~~MciRr:1-~~:BloSEDONTHE2015NEC •nE:~H~=~~~.ISS,,SEDONTm:20\Su.tC -THE2!111CAUFOIINAl'\.Uo.lelNQCXlOEJCPCJJSB,t,S8)0HTIElll15UPC 'MnlSIATEOFCAa<lll/.aAAMODIEH'TS. •THE2D1flCAIJF<lfttaAENERGYCODE. •THE2011~JIIARECOIJIEl<IC> -201flCAl.F0f!MIA.ui.eNDMMS,t..',I_ERIC\NSV\CTH~SIICf ICAUl'Olll<M~COOE-CHAPTER11) llESt:PIANSN«>ALLNEW'l.oRKSIWJ.~Y'MTHTIECAU'O!l.tM~ STANONIOSCOOE ,OUNDINTI« 51ATEOf' CWF~-TITLE24CCAAS MIENDEOMIO,t.00PfEOIIVTIEaTYOFCAAl.S8AO. l'IECMI\EMENTSOf'C00ESANDREGUlATIDNS5W.U.IECOHSIOE!lEDAS Mft,llt.U,I,. v.HEIIE CON'IAACT DOCIJl,IENTS 0:ClEDWOW)LATIMG CODE M<ID REGllAllON REQUIREMEHTS,a»,fff!ACTDOCWENJSSIWJ..TAKEl'RE<:EOENCE.!MERE COOUCXINfUCT, UtENORESlRIMGENTstw.lAPPLY. ...U llt:01.MEO P£RMITS StW.L IE 08TAINED FROlil THE BULDINGOFFICW.S AND TlELOCALflREou.Fl&HALIEFORt:Th!Elllal»IOISOCCU'IED.FIRl:DEPT, APPROYAI. SKIJ..l.111; REQUESTED PRIOR TO FRAIIIIMO INSPECTION 1. OOHTAACTORSSSU8CON'TRACTOIISSIW.t FIB.DVERIFY AU. LOCATIONS. DIMENSIONS, ANDCOMllllONS Ol'-U.S. DOORS, PLUMB100, MECHo\l«:AI. ~~f~=5W::~~~=~:::=-~~ A. AU.Ell.lTSSHALl.!EPRCMOEOINACCOftQ!«.lOC~PfER 10.ClfltEC8C ~~=~=~Eiit~'Ef::JlKEY ILAlLOV.SS$1-W..l.00MPI..Y'MTHTHER£0UIREJ,lENTS<SCHo>.Pl£A:Z•OFTI-ECIIC. TRAFFIC & UTILITIES INFO F\.OOJIAREA .O.OTGENERATlOW jlNSFJ RATE W,,,.TER& $EWER DISTRICT SEIMNO TI-£ PROJECT! QlYOFCARtseAOW,,,.STEMTEROMSION SOtOOI..OISTRICTSER\ll!«lTHEPROJECT: CARl.SBAOUNlflEOSCHOOLDSTfllCT PROPOSEDWAfERDE~RESut.TIHGRIOMTHEPflOJECT! .. AXIM\/MWATE11:Rc,N■1•GPM PIWPOSEOS&.£RGOIEAATIOHRESU..lN3nt0MnlEPROJECT· 3.lOF\1•1£DU VICINITY MAP 1~1111191 ~ 1111111111 l~§[]Il] SITE STATE ST ti /=-ID~ NOTlOSCALE Q PROJECT DATA ~ OROS.5fl.OOffAREA: ~~::::EM: 2&2l!STATESTREET C-'RlSBJ,O.CA92009 V-R,V/\.LAGERE\IIEW r::,:~ci~~~l(g/~~DVll~~~C~Vl.~i~ M...STERPLANJ 374lSF I STORY O,q TYPEV~ IIOCCUPAHCY NOtl-5PRNCl.ERED PflOP05EQTDWfffMPflO\/EMEHT 2206SFCTENA.NTSPACENETAREAOFw:>RKJ !STORY{OOcw.NGE) 13"-0-(NOCl-iANOEI r~.z:g,.ClimGEI Not,H;PRINKLEREO!NOCH,l,NGE) P-'RKINOCALCULATIONFORPRIORRETAILUSE: Z206SF/◄15SF•S.35PACESFORRETAILUSE 72◄SF l1PER!50SF I ◄.8SPACES 5~= I 1,a:zSF 1,,ER,15SFIJ.561'ACEs U•l.tl•USPACES USPACES•ILlSPACES•lSPACES 3 SPACElh Q,S• USPACES; ROUHOOOMHO I TOTAi.SPACE SCOPE OF WORK ~::=t~=f~~~i;.~~~~::~T~~M PORTION OF EXISTING BUILDING TO BE OEOOUSHEO FOR NEWOUTOOOR PATJO(SE.E SHEET AO.O FOIi LOCATION~ TENANTIMPROVEMENTOFBOCCUPANCYSPACE •NEWINTERIOR N~BEARINO MRTITIONWAll FAAl,HNO -NEWUOHTINOANOPO'M:R ==~=~t::::IBlITIONiFROM EXISTINOHVACUNTT PROJECT DIRECTORY SHEET INDEX AI.O FLOOR PLAN A2.0 ROOl'PLAN Al.0 EXTERIOR ELEVATIONS EXISTlt.'QEXTERIOREl£VAllONS PROJ18012 10,26.18 CUPSUBMTTL 01.23.19 CUP RESBMTTL 03.12.19 CUPRESBMTTL TITLE SHEET T1.0 August 27, 2019Item #9 Page 50 of 140 ) EJIISTINO BUIUllNG jNOT PART OF SCOPE! EXISTING AOJo\CENT BUILOING _I ,..0 PROJECT DATA SOP71l11MXl2/CUPl'D18-0021 £1(1S11NGBUII..DIOO sou.>.IIEFOOTAGE !MO CHANGE~ 21,2:;STA,TESTREl:T CAAI.S8A.O,CAIJ200II UNDACAROI.MIOO RUSSElLSATTERlY SUSf<NSATTERLY 2a2SSTil.TESTREET r:~:1~~:i1~Dl[J)I 0.11~ACRES(~SF/ SITEAAEA: OOOOSF B\ALDINGMEA: 37435F 374315000• D.75 (75'11, COVER-'GE) PARKING TABLE PARKINOCALCULATION FOR PRIOR RETAA. USE: 22IMI SF 1415 SF• S,JSPACES FOR RE'IAIL USE SClh\RE FOOTAGE U•15•9,3SPACES l.l SPACES-S.3 SPACES • l SPACES """"° SPACES REOUIRED JSPACESxO.S• USPACES; flOUNDO()W,j TO I TOTAi.SPACE VICINITY MAP ~ 1111 I g; ~ 11111111111 i ~TE STATEST q~filllill 111 I I I I CARLSBAOVILU.GE. II STATION L__J t«>TTOSCl.l..E 0 10.26.18 CUPSUBMTTL 01.23.18 CUP RESBMTTL 03.12.19 CUP RESBMTTL SITE PLAN AO.O August 27, 2019Item #9 Page 51 of 140 FLOOR PLAN Ci)1(4"z1'..Q" PROJECTAOORESS CONSTRUCTION TYPE· OCCIJF'At-lCY; TYPEV-8 BOCCUPIWCY FLOOR PLAN A1.0 August 27, 2019 Item #9 Page 52 of 140 • Q f----------------------------------7+·z,·•=•~·~•~n~.-3,,~,E·~•·=·~.-~,~.;..,;~~""";,:;;:"========s=z::z=':"2Z:::a;:,;r,:;;:3.=,3,~,.L,=•=~~~=.~~~·;~..,.,::I;:;;:;:::::;:~cz;::i I I I I I I I I I I I I I r-' tl)PAIIAPET I I I I I I I I I I '" :~ ,. I I I I I I I I I : ----0,ISINGROOftfGTOREIMII ---t ,----UlSIINOAOOFMllOIIDMJ!,I---..• .,_ . ..,,,,,· •• \_'.,.,.,.,,.,,,,,,.,. ,.,,,,,,,, ., .•• , •'<' .,,., ---£IISTIHGROOFK;lOR8WM ----CD ROOF PLAN 1/4"=1'-0" 0 2' 4' ~-PROJECT DATA 80f'2019-0J.2/CUP201&-0021 212'5ST,t.TESTREET ~8.-.0,C,,,9200& DOOR & WINDOW NOTES All NEW'MNOO'N!! ..,_ND DOORS SHALL i-i,,,ve 111.ANSPAAENTORTR.&.NSLUCENTGWING PROJ 18012 0 ca (/) ...J c::: (3 f-u w -, O~N c:::NO 00 Cl,_00 d, d, w~~ c:::~~ ::i a. a. c..13@ 10.26.18 CUPSUBMTTL 01.23.19 CUPRESBMTTL 03.12.19 CUPRESBMTTL ROOF PLAN A2.0 August 27, 2019Item #9 Page 53 of 140 't'~:.OOL.EVELATS\CEW,,1,LK 't':AOELEVEL"TSICEWAlK I I I RCI.U .. DOOfl101!EPlACE UISTtlGS<lllJROU-U>DOO~ AREA OF SCOPE I NEIGHBORING TENANT I I -ITltWOODMlJIGAT P!IOPOSEOOVTOOORPAIIO G)~.?!;ToH EXTERIOR ELEVATION ®~~=~~EXTERIOR ELEVATION 0 ~~~ 1 :_ti EXTERIOR ELEVATION (NO CHANGE PROPOSED) 0 EAST EXTERIOR ELEVATION (NO CHANGE PROPOSED)~ ,. 1/4":1'-0" - •. PROJECT DATA SOP2ll19-002/CIJ!'2Dle-ciD21 212SST"TESTREl!'T CIJltSIIAD.CAl10Dl!I DOOR & WINDOW NOTES 41.l NEWWNOOWSANO DOORS SHAllt-lAVE TMNSPAAENTORTRANSLUCENTGLAZING PROJ18012 10.26.18 CUP SUBMTTL 01.23.19 CUP RESBMTTL 03.12.19 CUP RESBMTTL EXTERIOR ELEVATIONS A3.0 August 27, 2019 Item #9 Page 54 of 140 ~ ~!CHEVELAT SIOEWALK I I NEIGHBORING TENANT : AREA OF SCOPE I CD ~.?~~~ EXTERIOR ELEVATION ® ;%~.~~er EXTERIOR ELEVATION 0 2' 4' -- PROJECT DATA SOP2019"0)2/Qlf'201&0021 282!,STATESTREET CARLSSAO,C\92008 DOOR & WINDOW NOTES "lLNEW'NHDOWs.O.NOOOORSSf,iO,Lltt,WE TRANSPARENTORTl!ANSlUCENTGlAZING PROJ 18012 10.26.18 CUPSUBMTTL 01.23.18 CUPRESBMTTL 03.12.19 CUP RESBMTTL EXISTING EXTERIOR ELEVATIONS A3.1 August 27, 2019 Item #9 Page 55 of 140 Planning Commission Minutes June 19, 2019 EXHIBIT 6 Page 2 2. RP 2018-0013/CDP 2018-0050 (DEV2017-0020) -FRESCO RESTAURANT -Request for a recommendation of approval of a Minor Review Permit and Coastal Development Permit to allow a second-story addition to an existing restaurant consisting of a 1,620-square-foot outdoor dining area and a 467-square-foot enclosed area containing restrooms, storage and food prepa ration areas. The existing restaurant is located at 264 Carlsbad Village Drive in Land Use District 9 of the Village Master Plan and Design Manual, the Village Segment of the Local Costal Program, and within Local Facilities Management Zone 1. The City Planner has determined that this project is exempt from the requirements of the California Environmental Quality Act (CEQA) pursuant to Section 15301-Existing Facilities of the State CEQA Guidelines and will not have any adverse significant impact on the environment. MOTION: ACTION: Motion by Chair Luna and duly seconded by Commissioner Meenes to Adopt Planning Commission Resolution No. 7336 RECOMMENDING APPROVAL of a Minor Review Permit and Coastal Development Permit, based upon the findings and subject to the conditions contained therein. VOTE: 6-0-1 AYES: Chair Luna, Commissioners Geidner, Meenes, Merz, Lafferty, and Stine NOES: ABSENT: Commissioner Anderson PLANNING COMMISSION PUBLIC HEARING: Chair Luna opened the public hearing for Item 1. 1. SOP 2019-0002/CUP 2018-0021 (DEV2018-0196)-PURE PROJECT BREWERY AND TASTING ROOM -Request for a recommendation of approval of a Minor Site Development Plan and Conditional Use Permit for a 2,206-square-foot brewery and tasting room and the purchase of one (1) parking in- lieu fee. The site is located at 2825 State Street in the Village Center (VC) District of the Village and Barrio Master Plan and within Local Facilities Management Zone 1. The City Planner has determined that this project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment and is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to section 15303 (New Construction or Conversion of Small Structures) of the State CEQA guidelines. Principal Planner Delcamp introduced Agenda Item 1 and stated Associate Planner Harker would make the staff presentation (on file in the Planning Division). DISCLOSURES: Commissioner Stine stated he walked by the site. Commissioner Meenes stated he walked by the site. Commissioner Merz stated he drove by the site. Commissioner Lafferty stated she walked by the site. August 27, 2019 Item #9 Page 56 of 140 Planning Commission Minutes June 19, 2019 Page 3 Commissioner Geidner stated she walked by the site a number of times and drove by again this afternoon. Chair Luna stated she walked by the site. Associate Planner Harker gave the staff presentation. Chair Luna asked if any letters were received in relation to the project. Associate Pl;:inner Harker stated yes, she has received a number of letters of support for the project that have been circulated to the Planning Commission. Commissioner Stine asked if the Police Department has reviewed the project and did they have any comm~nts. Associate Planner Harker stated yes, the Police Department reviewed the project and approved it. She stated they had no concerns with respect to the project. Commissioner Meenes asked if the Fire Department reviewed the project and will there be ingress/egress in the outdoor patio area. Associate Planner Harker stated yes, the Fire _ Department did review the project and stated she would need to review the floor plan to answer the question about the ingress/egress on the patio. Chair Luna asked if there were additional questions of staff. Seeing none, she asked if the applicant would like to make a presentation. Bill Hofman, Hofman Planning and Engineering made the presentation and stated he woul9 be available to answer questions. He stated there will be ingress/egress gate in the fencing around the outdoor patio. Matt Robar, co-owner of Pure Project, made a presentation and stated he would be available to answer questions. Commissioner Meenes asked what kind of outreach was conducted in the area where the project will be located. Mr. Robar stated they reached out to local business owners to walk them through their process and how the project will benefit the area. Commissioner Stine asked what the process and procedure is to prevent people from walking outside the business with alcohol. Mr. Robar stated the outdoor patio is fenced in and they place staff near the exits. He stated they have · had success at their current location in San Diego using this procedure. Commissioner Lafferty asked if rooftop equipment will be screened since it was not showing up on the drawing. Andy McCabe, architect, stated they will indeed screen any new rooftop equipment. August 27, 2019 Item #9 Page 57 of 140 Planning Commission Minutes June 19, 2019 Page4 Commissioner Lafferty stated the presentation is white but the building is black. She asked what the reason for that was. Mr. Robar stated white is one of their colorways, the other is black. He stated he feels black is a high end • color and makes things pop out against it. Commissioner Lafferty stated she is concerned with the color and thinks it is too dark. She asked if the applicant has considered placing the transformer underground to open up the corner facing the transit station to engage with the station more. Mr. Robar stated he would defer the transformer question to the contractor. He stated they plan to open up the back of the building to create an open look to the corner and will place landscaping around the transformer in addition to bike parking. Nathan Sharpe, contractor, stated the transformer is part of a new electrical service that his company installed for Handel's Ice Cream shop next door. He stated an underground vault would take up quite a bit more space and logistically, it would not fit there. He stated that it is the only feasible location to provide power to the building. Commissioner: Lafferty stated it is disappointing and she would like to see the corner more animated as it faces the transit station and is the first thing people see when coming into the city from the train. Chair Luna asked if there were additional questions for the applicant. Seeing none, she asked if there were any members of the public who wished to speak on the project. Principal Planner Delcamp stated she had three speakers who would like to speak on the project. PUBLIC COMMENTS John Resnick, owner of two restaurants in Carlsbad, stated he was here tonight'to express his support for Pure Project. Christine Davis, Carlsbad Village Association, Carlsbad Ca, stated she thinks the project is exactly what the Village needs. She stated she supports the project. Chancelor Shay, Carlsbad Ca, stated he thinks Pure Project is utilizing the space nicely and strongly encourages the Planning Commission to recommend approval to the City Council. Chair Luna· asked if there was anyone else who would like to speak on the project. Seeing none she closed public testimony. PLANNING COMMISSION DISCUSSION: Mr. Hofman stated they don't like the transformer location either, however that is where SDG&E dictated that it be located. He stated they can do landscape and/or a decorative wrap or painting to improve the appearance. Commissioner Lafferty asked for additional information on the SDG&E process. She asked if there is any other way to mitigate some of the parking and the location of the transformer to make the area more of a gateway into the city. She stated she is concerned that shielding the transformer does not make the area pedestrian friendly. August 27, 2019 Item #9 Page 58 of 140 Planning Commission Minutes June 19, 2019 Page 5 Associate Planner Harker stated from the perspective of staff, the applicant is proposing to do as much as can be done. She stated staff is not supportive bfthe removal of an existing parking stall and the relocation of a transformer that has very recently been installed at a significant cost. Commissioner Merz stated he is impressed with the design and supports the project. Commissioner Geidner stated she thinks the project is nicely designed and supports the project. Commissioner Stine stated his concern was the potential impacts of people drinking. Those concerns have been addressed and he supports the project. Commissioner Meenes asked Associate Planner Harker to discuss the ingress/egress in the patio area with the Fire Department. Chair Luna stated the applicant has done a commendable job and supports the project. MOTION: ACTION: Motion by Commissioner Meenes and duly seconded by Commissioner Stine to Adopt Planning Commission Resolution No. 7335 RECOMMENDING APPROVAL of a Minor Site Development Plan and Conditional Use Perm it, based upon the findings and subject to the conditions contained therein. VOTE: 5-1-1 AYES: Chair Luna, Commissioners Geidner, Meenes, Merz, and Stine NOES: Commissioner Lafferty ABSENT: Commissioner Anderson Chair Luna closed the public hearing on Agenda Item 1. Chair Luna opened the public hearing on Agenda Item 3. 3. GPA 15-02/ZC 15-03/LCPA 15-05/CT 15-07/PUD 15-15/CDP 15-53/HDP 15-03/HMP 15-05 (DEV15043)-OCEAN VIEW POINT-Request for a recommendation of adoption of a Mitigated Negative Declaration, Mitigation Monitoring and Reporting Program and Addendum; a recommendation of approval for a General Plan Amendment, Zone Change, and Local Coastal Program Amendment to change the land use on a 5.4-acre portion of a 21.9-acre property from R-1.5 Residential to R-4 Residential and to change the zoning from One-Family Residential (R-1-30,000) to One-Family Residential (R-1); and a recommendation of approval for a Tentative tract Map, Planned Development Permit, Coastal Development Permit, Hillside Development Permit and Habitat Management Plan Permit for the subdivision and development of 18 lots (13 single-family residential, one private street, and four open space) on a 21.9-acre previously subdivided property generally located south of the terminus ofTwain Avenue within the Mello II Segment of the Local Coastal Program and Local Facilities Management Zone 8. The project is not located within the appealable area of the California Coastal Commission. Principal Planner Delcamp introduced Agenda Item 3 and stated Senior Planner Goff would make the staff presentation (on file in the Planning Division). August 27, 2019 Item #9 Page 59 of 140 EXHIBIT 7 Carl1bad Vil lay' e AtM»ciation Zachary Markham Chairman Darcy Clevenger Vice Chair Samantha Dean Fauce Secretary Fumi Matsubara Boord Member Heidi Willes Board Member Mark Coulombe Board Member Jake Stipp Board Member Bryce Brigham Board Member Leading the continual improvement of Carlsbad Village, making it the preeminent place to shop, dine and play in North San Diego County. 300 Carlsbad Village Dr. Suite 108A #135 Carlsbad, CA 92008 760.453-7076 www.carlsbad-village.com info@carls.bad-11illage.com June 10, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, On behalf of the Carlsbad Village Association (CVA), I am writing to you today in support of the Pure Project CUP at 2825 State Street. Pure Project is ideal for Carlsbad Village. To begin with, the owners have very thoughtfully envisioned a space that fits with the downtown architecture and vibe. It is classy and unassuming at the same time. It uses the space very well. Its open architecture is a perfect fit for our beach community, and it will help promote area businesses such as New Village Arts and Handel's Ice Cream, to name just two, while also increasing the visibility of the Coaster Station. CVA is appreciative of the fact that Pure Project is a high-end tasting room; it is not a bar. And, to that end, it will also not be competing with restaurants in the Village. As a high- end tasting room, it will fill a void. There is nothing like Pure Project in Carlsbad Village. Knowing that "community" is important to the owners and staff of Pure Project is important. The Village businesses have become more cohesive in the past few years and having community-minded businesses join us in our efforts will go a long way towards elevating the Village as a whole. CVA feels strongly that Pure Project will be an exceptional addition to Carlsbad Village and we strongly encourage you to support the Pure Project CUP. nstine Oavi'!Z- Executive Director August 27, 2019 Item #9 Page 60 of 140 NEW VILLAGE ARTS l<ristianne Kurner Executive Arris tic Director Aleit Goodman ,V.onaginy Director Robert I Lin President Sue Loftin Vice-President Mark Coulombe Secretory Gary Bob Dawson Treasurer Board Members at Large Gary L. Dawson Kristiarme Kurner Saundra Moton Dave Povall Mark Tanner Scott L. White. Past President NVA Advisory Board Rosemary Eshelman, Chair Ariel Bedell Mark Caruana Kathy Deering Fred Deutsch Mea Hall Walt Hambly Pat Hansen Bobbie Hoder Pat Hurley Emma Jadhav Chelsea Kaufman Richard Kur3nda Cassie Langan Dr. Richard Lederer Linda Led esma Gina McBride Julie Nygaard Dr. Bob Ogle Christine lleto Pangan Justin Peek Shari Roberts Debbie ~ossi Jay Sarno Alice Sievertsen NVA ,s a 501(cl{3J r.Jcn-Pr-ofir Organi=ariott Tax i'D t!52-2320930 New VilJage Arts, Inc. 27!7 State St. carlsbad, CA 9200B 760.433.3Z45 info@newvillagearts.org www.newvillagearts.org Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street. 6/10/2019 I am the Managing Director of New Village Arts, a non-profit theatre and arts company in Carlsbad Village located at 2787 State Street, across the street from the location of this proposed project. We are intersted in enhancing the Village with vibrant and exciting offerings for the community to enjoy. We believe that this project will both be good for the surrounding businesses such as ours, but also benefit the community in general as it will bring a high end clientele into our core downtown area and offer young, social patrons an attractive product and place the visit and enjoy. We are in favor of Pure Project because they are more than just a brewery. They have a proven track record of building community through their brewing, agriculture and by giving back through their local non profit partners. Of the friends and family I have discussed this project with who are intimately connected with the San Diego brewing community, this company has a strong reputation. I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, / . ----. I. b -..-r--------. &··· / ,._./ (_.,,- Alex Goodman Managing Director New Village Arts, Inc. 2787 State St. Carlsbad, CA 92008 760.433.3245 alexgoodman@newvillagearts.org August 27, 2019 Item #9 Page 61 of 140 ,,. . l/i5IT carlsbad June 11, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE : Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you in support of the Pure Project CUP at 2825 State Street. I am the Executive Director of Visit Carlsbad, the destination marketing organization for the City of Carlsbad, CA. Our role is to promote and market Carlsbad as a leisure and meetings destination. I believe this project will both be good for the surrounding businesses by attracting more visitors to Carlsbad and to the north end of State Street in the Village, as well as a new location to host private functions for groups and events coming to Carlsbad in the off-season. Pure Project will be another excellent partner in the promotion of Carlsbad tourism. Visit Carlsbad is in favor of Pure Project because they are more than just a brewery. They have a proven track record of building community through their brewing, agriculture and by giving back through their local non-profit partners. Pure Project will add another dynamic experience to the culinary and craft brew scene in the Village. We look forward to seeing them grow as part of the continued expansion of offerings in the Village of Carlsbad . I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, Sam Ross Executive Director Visit Carlsbad 400 Carlsbad Village Drive Carlsbad,CA 92008 (760) 547-6341 samr@visitcarlsbad.com 400 C.:irlsbad Village Drive Carlsbc1d. California 92008 Vi5ltcarlsbad.com August 27, 2019 Item #9 Page 62 of 140 June 11 , 2019 Dear Planning Commissioners, Planning Commission Citv of Carlsbad l 635 Faraday Ave. Carlsbad, CA 9'2003 I am writing to you today in support of the Pure Project CUP at 2825 State Street. My name is John Resnick. I am the m,vner and proprietor of Campfire andJeune etjolie, two restaurants located on State St. in Carlsbad Village. I am incredibly lucky to have found such an amazing community for my restaurants to call home. There is literally nowhere in the entire county I would rather have my businesses. Carlsbad is an incredibly vibrant and close knit community; and one that I care tremendously about . . But when it comes to State St. north of Grand Ave., I am particularly passionate ... as well as a bit protective. I love this street, I truly do, and I am very optimistic, and quite pick-y, about the other businesses that are sure to occupy this street in the near foture. vVhich is why I am excited about Pure Project, and willing to support them. I believe in what they arc doing. I believe in individuals who live here in San Diego and arc trying to have a positive impact on our communities and our hospitality and social landscape. Mat and the team at Pure Project are passionate about what they do, and they do it well. They are interested in doing something that the neighborhood will enjoy, contemplate and appreciate. I think we need more of these types of businesses ... businesses with intention. The intention of doing good and, however humbly, improving the daily lives of the folks who live in the neighborhood. Carlsbad Village is full of people who care about quality products, about responsibly sourced ingredients, and about supporting local economies. Pure Proj ect is a natural fit for this ever-evolving co mmunity, and I believe we will all be better for their presence. Sincerely yours, ~ John Re-snick Campfire //Jeune ctjolie August 27, 2019 Item #9 Page 63 of 140 JunelL2019 Planning Commission City of Carlsbad 1635 Faraday Avenue Carlsbad. CA 91.008 To \\/horn It May Concern: Re: Planning Commission Agenda Item -Pure Project ~ , .I .' ENGEL & VOLKERS. We are writing to you today in support of the Pure Project CUP at 2825 State Street. We are the owners of Engel & Volkers Carlsbad, a premium real estate shop located in the heart of the Village on Roosevelt Street. We take pride in helping our clients not only buy and sell homes but discover the fullness of life as they settle into our beautiful community. We believe bringing a first-class venue like Pure Project to the Village will help draw the kind of clientele all of us in the Village hope to attract-people who appreciate quality and are willing to invest accordingly. That translates to not only mannerly patrons but also increased revenue for neighboring businesses and services as well as additional tax revenue to support our city. Furthermore, Pure Project's proposed design is aesthetically beautiful and will greatly improve an othervvise bland corner, which is especially valuable since it is one of the first things seen by visitors arriving via train. Its open layout communicates a welcoming, social atmosphere and encourages relationship building, fostering the connectedness we all seek in this digitally divided world. While we have a variety of restaurants and bars in the Village. we do not yet have a high end tasting room like Pure Project. When our clients ask us for referrals to choice establishments, we would love to have a unique place like this to recommend. Please sincerely consider a vote in favor of the Pure Project CUP. Trevor Smith Co-0-wner ~ifnJmd/( Lindsey~ Co-Owner Engel & Volkers Carlsbad 2965 Roosevelt Street. Suite C Carlsbad. CA 9200B DRE 02002559 442.500.8888 carlsbad.evrealestate.com August 27, 2019 Item #9 Page 64 of 140 defy June 10th, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street. I am a Carlsbad resident of 12 years, parent of two young children, a fellow Carlsbad business owner on State Street since 2015, and also serve the community as a volunteer board member at Carlsbad Village Association. As a fellow community member, I believe that Pure Project moving into the Carlsbad Village on State Street will have a positive impact for the community in general, and also for the surrounding businesses due to the clientele that it will bring into the downtown area. As craft beer has grown, the total population of folks who enjoy craft drinks has undoubtedly improved, and craft is now onboarding both men and women into the category. Furthermore, the economic impact of the craft brewery industry in the greater San Diego area has been tremendous. Beyond the direct effects of brewery tourists, the region has witnessed an increase in full-time jobs, labor income, and taxes paid to the city. The project is likely to create new jobs for the locals at the brewery/tasting room. I am in favor of Pure Project opening in Carlsbad Village, and I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, Fumi Matsubara Defy Digital Marketing August 27, 2019 Item #9 Page 65 of 140 June 10, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE : Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, As a fellow business owner in Carlsbad Village, I am writing to you today in support of the Pure Project CUP at 2825 State Street. My husband and I own Coffee Express directly across from the future Pure Project location. We serve the entire Village with brewed coffee, specialty coffee drinks, sandwiches, hot foods, grab-and-go, and more. We are very much in favor of having a high-end tasting room in the Village to help activate foot traffic, further brand our Village as a contemporary place to visit, and because we do not have a similar type business downtown. We have seen the architectural drawings for the location and.feel that it is a nice fit for the Village and will add to the ambiance. Their vision for how it will look is important and they obviously have chosen a look and feel that will work for our downtown. Their open-air patio, that looks out towards the Coast Station, will also help elevate the Coaster Station location and the concept of travelling to our downtown via public transportation rather than a car. While I have not been to their other facility, I understand from many that they have a proven track record of building community through their brewing, agriculture and by giving back through their local non-profit partners. I understand that they have already partnered with our downtown merchant's association, the Carlsbad village Association, to help them with a Summer event. I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, Maureen Thomas Coffee Express August 27, 2019 Item #9 Page 66 of 140 6/10/2019 Planning Commissioners City of Carlsbad 1635 Faraday Ave Carlsbad, CA 92008 RE: Plan Commission Agenda-Pure Project Dear Planning Commissioners, HANt:lEL:S -I 't I'./' •·~ • The purpose of this letter to show support for the Pure Project CUP at 2825 State St. My husband and I are co-owners of Handel's Homemade Ice Cream in Carlsbad Village. My family and I have been visiting the Village for years and are so happy to be part this great community. We are parents to three sons who all will be working at our store one day! I feel very confident that bringing Pure Project to the Village will be a huge asset for the community. They will be a great compliment to the other businesses in the area and help to drive traffic to other shops and restaurants. I am in favor of Pure Project coming to Carlsbad Village because it will help to bring new visitors to the village. They get many customers driving from Orange County and Los Angeles to their current store and all ofthose customers will now come to Carlsbad! Pure Project also does a lot in the community and are active in giving back through local non-profits. Their plans for the building our beautiful and I think it will really bring a nice feel that this corner of State St. I fully support and encourage you to vote for in favor of the Pure Project CUP'. Sincerely, Tarah Campbell .,,.-----------,-•. \ • .. ..... ,;~~;,,,. ✓-.---, ---_:;;:,-···c-~----------~.:-_~-!.'...,;;:•::...." ----===--"---------- August 27, 2019 Item #9 Page 67 of 140 6/9/2019 Planning Commissioners City of Carlsbad 1635 Faraday Ave Carlsbad, CA 92008 RE: Plan Commission Agenda-Pure Project Dear Planning Commissioners, HANDEL:S -.1 ·l..·: ,;_ i' -~ -~ i . I The purpose of this letter to show support for the Pure Project CUP at 2825 State St. I am one of the co-owners of Handel's Homemade Ice Cream in Carlsbad Village. My family and I have been visiting the Village for years and are so happy to be part this great comrhunity. I am very confident that bringing Pure Project to the Village will be a huge adet for the community. I have visited their current location and they are a first-class establishment. It i~ not your typical beer seen but they bring a different type of consumer to the area that is very refreshing. They drive a ton of I traffic and take an active role in the community. i Even as the owner of a family ice cream store, I have no concerns about theirlcrowds and consumers interacting with our guests. I am in favor of Pure Project coming to Carlsbad ~illage because it wifl•bring a great vibe and a ton of new visitors to the village. They will build upon the goal of revitalizing that section of North State Street and really help to bring more positive energy to 1the this area. I fully support and encourage you to vote for in favor of the Pure Project CUP. Sincerely, /-;) ~~ _..,/ ~-'--------- Travis Campbell August 27, 2019 Item #9 Page 68 of 140 6/11 /19 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project CUP Dear Planning Commissioners, I am writing to you today in support of the Pure Project located at 2825 State Street. I believe this project is going to be a tremendous addition to our Village. As a business owner (Humble Olive Oils 2922 State Street) and Chairman of the Carlsbad Village Association I always hope that new businesses opening up in our Village will help elevate our Downtown and brings our Village closer to becoming the premier gathering place in North County, and I think this project fits that mold perfectly. I look forward to being able to visit the tasting room with my wife while my two kids are enjoying ice cream at nearby Handel's, or stopping by for a tasting before taking in a show across the street at New Village Arts. I feel this project is a great use of t11is space that has been under utilized for a very long time and could be a key asset to our Village for years to come. I strongly encourage you to vote in favor of the Pure Project CUP. Zac Markham Owner Humble Olive Oils Chairman Carlsbad Village Assocation Carlsbad Ca 92008 August 27, 2019 Item #9 Page 69 of 140 Date 6/10/19 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you today to support the Pure Project permitting for 2825 State Street. My name is Len Geiger and a co-owner of Steady State Roasting. We are a high-end, third-wave coffee shop located right on State Street in Carlsbad. I have personally been a long-time customer of Pure Project and would love to be able to see their product here in Carlsbad so I won't have to drive so far anymore. Pure Project and Steady State Roasting are link-minded brands, and given our success, I firmly believe that Pure Project would be a great success here as well. I am in favor of Pure Project coming to Carlsbad Village due to their outstanding beverages and focus on high-quality sourcing to make them. I have witnessed their commitment to the community in San Diego, and know they would .do the same here. State Street needs a Pure Project. My business partner and I would strongly encourage you to vote in favor of the Pure Project CUP. Leonard ,eiger Steady State Roasting, LLC August 27, 2019 Item #9 Page 70 of 140 Date: June, 11, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street. My name is Reagan West, I live in South Carlsbad and have for the past 6 years. I grew up in Sa:n Clemente and this part of North County has played a huge part in my life, from the beaches and hills to the restaurants and bars. I am a Regional Sales Manager for a large medical company who also has a research facility in San Diego and I work from home 2-3 days per week. I am writing on behalf of Pure Project. My wife and I believe this project will be great for our community because we are always looking for solid places to go with our neighbors, families, and work clientele. Having a place like Pure would bring high end clientele and a lot of friends and family to the downtown Carlsbad area which would be great for all the businesses in downtown Carlsbad and also the city as a whole. We are in favor of Pure Project because they are more than just a brewery. They have a proven track record of building community through their brewing, agriculture, and by giving back through their local non profit partners. They are truly a "family business" that will bring the whole community together through their non profit efforts and are a model of how sustainable business should be run. I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, Reagan West August 27, 2019 Item #9 Page 71 of 140 6/7/19 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street. I am one of the owners of Burgeon Beer Company in Carlsbad. We have been brewing here for three years now and absolutely love Carlsbad. We all grew up here so opening our brewery here is a dream come true. Being a brewery in Carlsbad we want to put Carlsbad on the map for craft beer. To do that we need exceptional beer and people who know how to run a brewery successfully. Pure Project is just that. They have fantastic beer and we have already brewed several collaboration beers together. Their ownership and staff have a proven track record running and operating an influential craft brewery. They have a great team and would be a perfect fit for the Carlsbad area. They work with several non-profits and believe in giving back to their local community. I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, ,..,r ... C Matthew Zirpolo Co-Owner'Burgeon Beer Co. President-San Diego Brewers Guild Carlsbad CA 92011 August 27, 2019 Item #9 Page 72 of 140 June 6, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 Re: Planning Commission Agenda Item-Pure Project Planning Commissioners: As residents of Carlsbad Village since 2008, we are writing to express our support of the Pure Project CUP at 2825 State Street We have enjoyed the evolution that has taken place over the last 10 years in the Village and the businesses that have opened their doors and created community through food, products, and services. Living just a short walk from the property, we are certain that Pure Project is a great addition to the neighborhood and a compliment to the existing community. Pure Project is more than just a brewery and tasting rooms. We have had the opportunity to get to know the owners Jesse and Mat and have seen how they have created a supportive community through their brewing, agriculture and giving back through their local non- profit partnerships. They have proven through their other properties their commitment to invest in creating well designed and well thought out places for a neighborhood to gather. , We strongly urge you to vote in favor of a Conditional Use Permit for Pure Project. Sincerely, Kimberly and Ryan Herrell Carlsbad, CA 92008 August 27, 2019 Item #9 Page 73 of 140 6-09-2019 Planning Commissioners City Of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 · RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing in support of the Pure Project CUP at 2825 State Street. I am a Carlsbad home owner and resident. I believe that Pure Project would bring value to the local businesses and more high end traffic to the Village. Pure Project is a brand that has a following of loyal customers from all over North County. As a high end tasting room, Pure Project attracts quality consumers who respect the community and the ethics that align with Pure Project. Pure Project has a track record of bringing about positive results as they are community focused, incorporate local agriculture in their brewing and build further impact through their giving to their non profit partners. I encourage you to vote in favor of the Pure Project CUP. /~_/ _______ ;;-- /':oshua Valentine Carlsbad, CA 92010 -----··--·-,.,_, -·---------August 27, 2019 Item #9 Page 74 of 140 June 11, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners: I am writing to you today in support of the Pure Project CUP at 2825 State Street in Carlsbad Village. I have been an Olde Carlsbad resident for 18 years and I am in Carlsbad Village on a daily basis. I am currently the Director of Development for Carlsbad Village Association (CVA) and have served as a Board Member and Secretary on the New Village Arts (NVA) Board of Directors for the past five years. As someone who comes to the Village on a regular basis, I am very supportive of a high-end tasting room here for a number of reasons. I think it's important that this type of business doesn't currently exist in the Village and I believe that it would attract higher end residents and visitors. I feel that it would naturally have a positive impact on the surrounding businesses like New Village Arts which is directly across the street. Many NVA patrons are looking for a unique, high-end experience like this before or after attending one of its mainstage productions. With easy access from the train station, it seems an ideal destination for visitors who come to Carlsbad Village via train. I am also in favor of Pure Project because it is more than just a brewery. The owners have a proven track record of building community through their brewing and agriculture, and by engaging and giving back to local non-profit community partners. I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, ,\ \ ! { ,/ f \j .I\/\ ... ,·' t. ____ _ ,· Mark Coulombe Carlsbad, CA 92008 August 27, 2019 Item #9 Page 75 of 140 June l 0, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, It is a pleasure writing to you today in support of the Pure Project CUP at 2825 State Street. I am a current Resident here in Carlsbad and have lived here with my family for 9 years. We all enjoy being a part of the Carlsbad community and being able to go to local hiking spots, visiting the beach, eating delicious food at local restaurants and drinking quality beer with friends at breweries. My family and I are frequent visitors of Pure Project in Miramar, knowing that Pure Project could be a brewery in our community we can't wait. We all feel that Pure Project would be a great addition to Carlsbad. Since 2013, Pure Project has been dedicated to producing the best quality beer (with the best natural and organic ingredients) as well as taking on outside projects such as helping build communities, and giving back. The brewery gives back by becoming involved with an organization, l % For The Planet Company, and donates l % of sales every year. Pure Projects believes in protecting the natural lands we all love. My family and I all love helping make a difference by supporting them. We believe by having Pure Project's tasting room in Carlsbad other people will want to be more involved with them and therefore will help strengthen the city's economy for employment, help promote business diversity, and will increase tourism in Carlsbad. For all of these reasons we are in favor of having Pure Project become involved and apart of Carlsbad. They are more than just a brewery, they go above and beyond outside of their business to be more involved with local groups, international conservation groups, and donating sales to help protect open lands. The Carlsbad community will absolutely benefit from having such a wonderful business involved. I . I strongly encourage you to vote in favor of the Pure Project CUP. Best Regards, Candace Erie Carlsbad, CA August 27, 2019 Item #9 Page 76 of 140 6/4/19 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 BLOC RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, As a business owner in Carlsbad Village I am writing to you today in support of the Pure Project CUP at 2825 State Street. I am one of the owners of BLOC (hibloc.com), a semi-recent new business to the Village at 2659 St. Street with 2 other locations in North County. Seeing the growth of other high end tasting rooms in Encinitas, Solana Beach, etc. I feel like this would not only (selfishly) be great for my business and members, but for the community and other businesses that could use a higher end clientele (i.e. Jeune et Joie). Bringing a diverse group(s) of people can only help our downtown area and their patronage would be welcomed. I believe that these tasting rooms are more than just places to grab a quick drink or bite, but social areas that foster relationships, birth new ideas, create bonds to the community, and become a space that is bigger than what they serve ... and I have no doubt that Pure Project would be just that. I would encourage you to vote in favor of the Pure Project CUP. Sincerely, Grant Nyquist BLOC Coworking Carlsbad, CA. 92008 August 27, 2019 Item #9 Page 77 of 140 Date 6/9/2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street. My name is Tom Burns and I am a Carlsbad resident and business owner in the area. My business focuses on financial planning for small businesses, so I have the opportunity to work closely with local business and non-profit organizations in Carlsbad. I believe that the continued improvement and updating of downtown Carlsbad and specifically this project are good for the surrounding businesses and will be a benefit to the community in general as it will bring a high end clientele into our core downtown area which will be beneficial to all growth and success of all businesses in the area. I am in favor of Pure Project because they are more than just a brewery. They have a proven track record of building community through their brewing, agriculture and by giving back through their local non pro,fit partners. I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, Tom Burns Premier Plan Consultants August 27, 2019 Item #9 Page 78 of 140 June 10, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street I grew up in Carlsbad and am now raising a family of my own here. I've watched the city grow and change for the better over the years, gaining new residents and businesses that make the area an even better place to live. I believe the addition of Pure Project's new tasting room would be a great asset to the area. It would be a place for community to gather whether they be friends, a business meeting, or family visiting from out of town. I am in favor of Pure Project because their company fits the values and character of the City of Carlsbad. They place importance on building community through their brewing and they give back through their local nonprofit partners. They also value the environment and go to great lengths to ensure they're promoting environmentally-friendly business practices which aligns with the values of our coastal community. I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, / / ; , ' I { I ,! I ~! " ,,,,....; 9-"l<-, ) ,,. . ~✓t·- Sean ~llkenny {) Carlsbad, CA 92008 August 27, 2019 Item #9 Page 79 of 140 ~OUTDOOR ~ OUTREACH June 7, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, It is my pleasure to write to you today in support of the Pure Project CUP at 2825 State Street. Outdoor Outreach is a San Diego-based nonprofit that serves young people from underserved communities all over the county, including programming in Carlsbad. Our mission is to help young people build resilience in the face of challenges by connecting them with the transformative power of the outdoors, and Pure Project's support has been vital in the implementation of our work. Pure Project is more than just a brewery. Since the beginning of our partnership in 2017, Pure Project has not only provided us with financial support to run adventure-based programming, including outings at Carlsbad State Beach, but has also served as a connector and true ally for our important work. They have helped us make connections with like-minded organizations, collaborated with fellow community partners to support our outreach efforts, offered their space and product for events, and proudly shared their partnership in our work. Pure Project is committed to having a positive impact in the communities they serve, and we are proud to be one of the organizations they support. I believe that the introduction of a high end tasting room will be a great benefit to the City of Carlsbad, and encourage you to vote in favor of the Pure Project CUP. Sincerely, Ben Mccue Executive Director Outdoor Outreach outdooroutreach.org 5275 Mark.;I Stred, Suitt: 21 · S;in Diego, CA 9211-1 · T,01 Gl9.23fl.5790 Fil:-: 6l9.237.7GJ2 August 27, 2019 Item #9 Page 80 of 140 Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street. My name is John Tondreau and I live in Carlsbad. I believe having Pure Project in Carlsbad will be great for the community. personally, I know that it will influence our family's decision(s) as to where.we go when we dine out. For example, today, my family typically decides to head into Encinitas to grab a drink at one of the many tasting rooms/breweries on the 101 prior to eating dinner. Having an establishment that produces a high quality product will definitely drive us into downtown Carlsbad more frequently. We've been a big fan of Pure Project since they opened in San Diego and will often make the drive down for their bottle and can's releases. They make a high-quality product that is very desirable, which attracts people from long distances into the community. One of the things that I've learned about the Company is that they don't only make a great product but care about the environment. I've been inspired by their dedication to give back through their 1 % for the planet membership. We need more businesses like this in our community! I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, ~k ToM1reau John Tondreau Carlsbad,CA,92009 August 27, 2019 Item #9 Page 81 of 140 June 7'h, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street. I hope that this letter serves as a tool for positive discussion amongst the council on moving forward with Pure Projecr. I have a unique perspective on the matter that I am hoping you find valuable in your decision. As an owner with Bener Business Funding, LLC. [ have provided small business loans for Restaurants and other industries for the last IO years. In fact, we have provided loans to prominent businesses in Carlsbad and specifically in the heart of Carlsbad Village so 1 have a good grasp of its ecpnomic state. My family and I are homeowners in Olde Carlsbad and we take FULL advantage of this beautiful neighborhood with our weekend walks down to the Village and of course our Wednesday Farmers Market tradition! Two years ago we moved from Cardiff by the Sea where we resided for 8 years to Olde Carlsbad. The chann and proximity to the Village is what attracted us to the area. I was not expecting the culture differences. however, rhat are a direct correlation to the amount of dependency on the many tourist in the Village. Tourism in the Village is a blessing-ifs nice to own a business where people want to visit, obviously. However. the reliance on tourism is and has been the main issue with the restaurants I have worked with in the Village. The seasonality associated with increased gross sales during the '·busy·• months and having to weather the slower months make any business difficult to run profitably. How do we solve the reliance on tourism and create demand from our local residents': We need to create an influx of locally owned and culturallv aQP.licable businesses such as Pure Project. Currently the Village primarily attracts tourist at a much older median age with most of our affluent young professional local families choosing to visit Encinitas, or nearby Oceanside with their plethora of new food and drink options. Additions to the Village such as Campfire and Pa:rk I 01 have helped drastically however. and specifically myself. bring my friends and family to the Village to spend money! The new and exciting· businesses are what keep the demand high for the local residents. The Village has the most potential out of any of our local beach towns to be truly influential in its development. Pure Project brings with it a high-end young professional clientele that are extremely loyal to the brand and more importantly, local. The increase in revenue for nearby restaurants and retail stores brought by the existence of Pure Project will be a start to help offset our reliance on tourism in the Village and as well display what caliber of business is necessary to be located in the heart of the Village. Culturally, Pure Project is a showcase of what Carlsbad residents would want in their local brewery. Being a I %i for the planet member and supporting Non Profits such as the Surfrider Foundation and San Diego CoastKeeper prove they are more than just another brewery. Pure Project truly is one of those special San Diego companies that not only increases happiness among its patrons, but also defines the local culture. In this case, the amalgamation of culrures benveen the o~ners of Pure Project and Carlsbad residents are a perfect fit. Due to the reasqns outlined above, I encourage the council in voting YES on Pure Project. Sincerely.-----~✓ _, -~-~-_z __ _ David Beckman Betterbusinessfunding.com 201 Lomas Santa Fe Dr Ste 520 Solana Beach, CA 92075 August 27, 2019 Item #9 Page 82 of 140 * The Conservation •Alliance tllJt J,10: BLu,inc•~ Gi,·ilL~ D.l•:k -:i:• ~h~• O utJ111.,1;. June 5, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street. Pure Project is a valued member ofThe Conservation Alliance. The Conservation Alliance is a coalition of businesses that pool resources to protect wild places across North America for their habitat and recreation values. Our Alliance includes 250 companies from the outdoor and craft brew industries. Together, we fund grassroots organizations working to permanently protect our shared wild lar:ids and waters. Since we were founded in 1989, our funding has helped protect 51 million acres, 3,107 river miles, removed or halted 34 dams, purchased 14 climbing areas & designated five marine reserves in North America. Pure Project joined The Conservation Alliance in 2018. They are one of the few member companies that donate significantly more money than is required to be a member ofThe Conservation Alliance. We recognize Pure Project as a 1% for the Planet member, and commend them for choosing to donate a substantial portion of their annual revenue to support environmental non-profits. Pure Project does more than donate money to our organization. They have demonstrated a commitment to creating a true partnership. The Pure Project staff participates in our grant-making process, and they consistently invite our staff and board to participate in events at their current tasting room. Pure Project has rl;!ached out to me on several occasions with ideas about how they would like to do more to support The Conservation Alliance, such as increase their donation or host an event to benefit us on Earth Day. We really value this type of support. . Companies join The Conservation Alliance if they truly believe that businesses have a responsibility to create positive change in the world. Pure Project is the type of business that leads by example, and I am confident they will inspire neighboring businesses and consumers to take action to support causes that align with their values . I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, ~0~ Josie Norris Program Manager PO Box 1275, Bend, OR 97709 I (541)389-2424 I www.conservationalliance.com August 27, 2019 Item #9 Page 83 of 140 June 5, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to ask you to support the Pure Project CUP at 2825 State Street. I've lived in Carlsbad for five years. Carlsbad is where I married my wife. It's where my son was born and is going to school. Carlsbad is home. Having Pure Project join our community will enhance the quality of life for our residents as it will provide a meeting place for friends and family. It will also contribute to an increasingly vibrant Village area. Not only will it grow the amount of time Village visitors ( whether locals or guests) spend in the area, it will also prove to be a destination for those who may otherwise pass by -whether on the train, their bicycles, on the free.way, etc. -and never make it a point to experience the energy of Carlsbad Village. I stumbled across the community open house for the proposed project over the winter. Having seen the plans for the space, two things are blatantly clear -a lot of thought went into how best to utilize the space so that it syncs with the character of the area and that the site is a perfect location for this project. Beyond the tangible quality of life and economic benefits this Pure Project tasting room will bring to community members, the City and surrounding businesses, the folks at Pure Project -and the ethos for the ' brand itself-.directly align with the values of our community. They value sustainability and minimizing our impact on the world we live in, supporting your fellow community member and small business, and giving back to make the world a better place. They are a 1 % fnr the Planet company and have donated time and money to causes ranging from helping fire victims to protecting our waterways. Their track record has shown that they seek to enhance the communities they join, not exploit them. In short, Carlsbad could not ask for a more considerate and ethical business to join our community than Pure Project. Please support the continued prosperity of our city and the Village area by voting in favor of the Pure Project CUP. Sincerely, ,, Carlsbad, CA 92011 August 27, 2019 Item #9 Page 84 of 140 6/8119 Pfanriing Commissione.rt; City of GarlsM 1635 foraday Avonue Garis.Md. CA 92005 RE: Planning Commission Agenda ttorr, -:Pure Project Dear Planning Commissioners. I am writing to you today ifl support of the :Pure Project CUP at 2825 State Street. My family ;;,nd I have ln,,ed in Carfs.b3d for 3 years. As we were searching for a home. Carls~d was at the top of our lis.!: because of the schoof s~tern. the family frie<ldly environment aoo the entertainment options. We ~Y enjoy going out fo new busi~. restaurants. ~nd tasting rooms in Cart.i;~d Villa~. Providing another great p~ce f-OI pco~ to enjoy tlme off is always a good idea. Good busi~-ses wm help im;:re.ase the desire to live in Carlsbad. We should be locking for ways to t>oosl our loca.i economy in a responsible way. Attracting more tour1Sts to the area will benefit all local residents as well as visitors. We are in favor of Pure Proiecl They tiave proven to ~ a b-\.Jsiiness that gives wek. to their community :as wcll as their non-profit pa.-tner.s. I strongly ~.ncourage you to vote in favor of the Pure Project CUP. Sinrercl~r, Case'.,' Ingram C,3rlst,.)(J. Ca 92009 August 27, 2019 Item #9 Page 85 of 140 June 10, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue CArlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street. My family and I have lived in Carlsbad since 2001 and have loved seeing the growth and diversity in the community. We enjoy summers in the Village and at the beaches. We love being able to show our friends and family who visit what Carlsbad has to offer. However, we do travel down to Pure Project in Miramar because we believe that while supporting local businesses is important in Carlsbad, we love knowing that our time and money spent at Pure Project will go back to our San Diego beaches and even further through their commitment of being a 1 % for the Planet business. The energy you feel when you visit the current Pure Project facility is warm, caring and no detail is ever skipped. The staff is friendly, welcoming and can always put a smile on you face and make you feel like family. I think this culture would be an amazing fit for the City of Carlsbad and strengthen the economy through craft beer tourism. I feel having a craft brewery of such high quality and connection in Carlsbad would elevate the appeal to the Village. A brewery who supports our local San Diego agriculture and family farms by using organic ingredients is a perfect fit for our city. We'd love to see a craft brewery who not only makes a superior product but that also cares about their impact and takes responsibility and action to minimize it through their business. Pure Project's actions speak volumes and I believe they can raise the bar of awareness for sustainable business in Carlsbad. I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, Carlsbad CA, 92009 August 27, 2019 Item #9 Page 86 of 140 June 10111, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street. My name is Chris Farris and I am the Sr. Manager of NA Distribution for Nixon Inc., located at 2091 Rutherford Road. Pure Project is by far one of the best breweries in all of San Diego and would be such a benefit to our Carlsbad Community. They bring foot traffic from all over the world including Russia, Japan, UK, as well as all over southern California. People travel from Anaheim, Orange County, and the greater Los · Angeles on the weekly to stock up on product. If you look at reviews online they are always in the top three based on service and product i.e. Yelp, Google, Untapped. They have top of the line product, and care about how they acquire it. They only use the best ingredients, the more local the better. They refuse to strip the land of its nutrients so they go with the seasons finding fruits, spices, and product in excess. Their love for the environment shows through their taproom and the steps they take as a business. They are aware, and try to help their guests be aware of what they consume too. They would fit right in with the local businesses in the village, so I hope to see Pure Project open up in Carlsbad soon! Pure Project is an up and coming business leading the way in sustainable practices for a brewery. I would love to see them represent the community I work and live in. Thank you for your time and I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, Chris Farris Nixon Inc. Carlsbad, CA 92009 August 27, 2019 Item #9 Page 87 of 140 June 10th, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item - Pure Project Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street. My name is Steve Maneotis and I am the Receiving and Special Projects Coordinator for Nixon Inc., located at 2091 Rutherford Road. I spend a good majority of my professional and personal time in the city of Carlsbad, whether it be: at work, surfing, eating out, enjoying farmers markets, street fairs, etc. I KNOW bringing in an innovative, community-based, eco-conscious company like Pure Project would be a benefit for all involved and living near any of Pure's locations. First and foremost they are a 1% for the Planet Company. They give back 1% of their total sales to environmental organizations local and national, this includes our local Surfrider Foundation and San Diego Coastkeeper. Their brewery tasting room is very well done with a natural look that makes you feel at home. They keep a calm environment and educate guests about their beers, the process, how to make amazing flavors through care, why it's important to support local farms and businesses that also care about the footprint we leave behind, etc. Any city would be lucky to have a leading craft brewery like Pure Project represent them and bring knowledge/examples of how to make a difference in our changing world, while making top of the line product, while thriving into the future. Pure Project is a great fit for the village in Carlsbad. It's modern and mother nature is their number one priority, it shows throughout their tasting room(s). Their success and following will also bring support to the community they are located in. I strongly encourage you to vote in favor of the Pure Project CUP. pecial Projects Coordi_nator at Nixon Inc. Carlsbad, CA 92008 August 27, 2019 Item #9 Page 88 of 140 FORTHE PLANET June 5, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, 47 Maple Street, Suite 103 Burlington, VT 05401 802.861.0460 onepercentfortheplanet.org I am writing to you today in support of the Pure Project CUP at 2825 State Street. I have the privilege of working closely with the team at Pure Project Brewing, through my role at 1% for the Planet. Pure Proj ect is a business member of my organization, which means they give 1% of their topline revenue directly to environmental nonprofits. Pure Projects supports local organizations like San Diego Coastkeeper, the San Diego chapter of Surfrider, and Outdoor Outreach as well as national and international nonprofits like The Conservation Alliance and Protect Our Winters. As a part of the 1% for the Planet global network, they are actively driving more support to environmental solutions, and are bringing their community along with them on that journey. Having Pure Project in your city will not only bring more business to Carlsbad's core downtown area, but will also offer an opportunity to engage both residents and visitors in the important efforts of their nonprofit partners, which benefit the entire community above and beyond simply selling beer. As a business committed to local environmental stewardship, Pure Project is exactly the type of high-end, responsible business well-suited to a community like Carlsbad. Pure Project is more than just a successful brewery making great beers. They have a proven track record of building community and directly supporting local organizations working to protect the amazing natural resources of San Diego Country. I strongly encourage you to vote in favor of the Pure Project CUP. Sincerely, ~-~ Liz~hiteley 1% for the Planet California Membership Manager August 27, 2019 Item #9 Page 89 of 140 Planning O:lmm.is~oners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 9120'08 RE: Planning Commission Agenda Item -Pb.r,,e·iP'r.ojeet Dear Planning Commissioners, I am writing to you today in support of the Pure Project COP at 2825 State Street. nttps :r rmau.goog1e.com1mfill/utU My name is Taylor Letourneau and I am employed by Islands Restaurant located in Carlsbad on Palomar Airport Road. I've lived around this area my whole life and the village is one of my favorite places t.o bang out! I love to check out all the new breweries, restaurants, hang out spots, etc, with my friends and family. l personally spend quite a bit of time in the village and Pure Project Brewery would be such a beneficial business to have a part of our community. Their beer uses the highest quality ingredients and tastes the best. Their values as a company align with the same I try to live by. They are extremely conscious of the impact they are leaving on the environment and actually make the effort to reduce and give back. They don't give bags away, don't print receipts, reuse grain bags as trash bags, give back to multiple non-profits based on environmental conservation, and more. Why wouldn't you want a business that is this cco-awarc? Our beautiful community needs to stay that way so lets' bring in businesses that support those ideals. I am in full support of Pure Project opening a tasting room in the village, and look forward to them becoming a part of our community. Ibey would bring a positive impact to our village and complement our fellow local businesses. · T strongiy encourage you to vote in favor of the Pure Project CUP. Sincerely, TOvy)~-Juve1v1c,v-- Tay1or Letourneau Server at Islands Restaurant Carlsbad, CA 92011 6/11/2019. 10:14 A August 27, 2019 Item #9 Page 90 of 140 -------j I -~.G. F~NTON CO;MJ>ANY I June 11, 2019 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, My name is Bill Hooper, Commercial Portfolio Leader at HG Fenton Companies which owns and operates over 4MM SF of commercial real estate in San Diego county. 650K SF is in the City of Carlsbad and includes the Brewery lgnitor program at Carlsbad Corporate Center located at 5818 -5870 El Camino Real. Pure Project has been an HG Fenton customer in our Miramar Brewery Ignitor since irs inception in 2014. They have been an exemplary customer, operating their business in a professional manner, and with integrity. As such, we are encouraged to see their business grow. Thank you. WJL~ WiJliam Hooper Commercial Portfolio Leader August 27, 2019 Item #9 Page 91 of 140 PONBB PROTECT OUR WINTERS 6/5/19 Planning Commissioners City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: Planning Commission Agenda Item -Pure Project Dear Planning Commissioners, I am writing to you today in support of the Pure Project CUP at 2825 State Street. I believe that this project will both be good for the surrounding businesses, but also a benefit to the community in general as well as will bring a high end clientele into the core downtown area. I am in favor of Pure Project because they are more than just a brewery. They have a proven track record of building community through their brewing, agriculture and by giving back through their local non profit partners. I strongly encourage you to vote in favor of the Pure Project CUP . Sincerely, 7 tf/._?( Torrey Udall Director of Development & Operations Protect Our Winters August 27, 2019 Item #9 Page 92 of 140 All Receive -Agenda Item # / 0 For the Information of th;- CITY COUNCIL Date ~ CA i----CC - CM ~00 ... :::::::DCM (3) ....,,:;;;;- {city of Carlsbad Memo ID# 2019094 Council Memorandum Aug.20,2019 To: From: Re: Honorable Mayor Hall and Members of t~pty souncil Elaine Lu key, Chief Operations Officer ytJ'-----J Responses to Questions from the Aug. 19, 2019, Council Briefings Agenda Item No. 10 -Pure Project Brewery and Tasting Room Question 1: Does the Fire Department have any issues with the ingress/egress of the project? Is a gate required at the outdoor patio for emergency purposes? Answer: Staff has confirmed that the Fire Department does not have any concerns related to ingress or egress. Based on the occupant load and proximity of the nearest building exit, a gate is not required to be installed at the outdoor patio. Question 2: What is the cumulative traffic count for Shorehouse Kitchen, Handel's and the Pure Project Brewery? Answer: 643 total average daily trips (ADTs) for Shorehouse Kitchen, Handel's and Pure Project Brewery. Shorehouse Kitchen: 2,776 square feet, 278 ADTs Handel's: 1,499 square feet, 225 ADTs Pure Project Brewery and Tasting Room: 2,206 square feet, 140 ADTs Question 3: In the August 2018 Parking Study, what was the average weekend occupancy (from 9 a.m. to 9 p.m.) of the off-street public parking lots located within a quarter mile radius of the project site? Answer: The average occupancy on the weekends in August 2018 was 76%. cc: Scott Chadwick, City Manager Celia Brewer, City Attorney Michael Calderwood, Fire Chief Gary Barberio, Deputy City Manager, Community Services Sheila Cobian, City Clerk City Manager's Office 1200 Carlsbad Village Drive I Carlsbad, CA 92008 I 760-434-2820 t August 27, 2019 Item #9 Page 93 of 140 Mia De Marzo From: Sent: To: Subject: Attachments: For #9. Manager Internet Email Monday, August 26, 2019 10:00 AM City Clerk Item #9 -FW: Support for Pure Project Letter of Support Pure Project.pdf From: Bret Schanzenbach [mailto:Bret@carlsbad.org] Sent: Thursday, August 22, 2019 4:36 PM To: Matthew Hall <Matt.Hall@carlsbadca.gov> All Receive -Agenda Item # _g_ For the lnform.ition of the: ~!TY ~UNtlL Date >rz, A ~ CC _:t . CM ~00 _EocM(3) .:e_ Cc: Manager Internet Email <Manager@CarlsbadCA.gov>; Cori Schumacher <Cori.Schumacher@CarlsbadCA.gov>; Barbara Hamilton <Barbara.Hamilton@CarlsbadCA.gov>; Priya Bhat-Patel <Priya.Bhat-Patel@CarlsbadCA.gov>; Keith Blackburn <Keith.Blackburn@carlsbadca.gov> Subject: Support for Pure Project Honorable Mayor Hall, Please find attached the Chamber of Commerce's support for Pure Project. Sincerely, <Bret Sclianzen6acli President & CEO Carlsbad Chamber of Commerce 760-931-8400 Office bret@ca rlsbad .org www.Carlsbad.org "i State of the*= Cl)ll1111lll]lt\l LUNCHEON ./ 1 August 27, 2019 Item #9 Page 94 of 140 August 22, 2019 The Honorable Mayor Matt Hall City of Carlsbad Dear Mayor Hall: .....,.. -,,,- CARLSBAD CHAMBER OF COMMERCE I am writing in support of Pure Project Brewery and Tasting Room, a new boutique brewery that is proposing to go into the Village at 2825 State Street. We specifically ask that the council approve the City Manager's Recommendation to adopt the Resolutions necessary to approve their development plan and conditional use permit. This particular amenity is one that is lacking in our Village. While we have many great restaurants, we don't have any craft tasting rooms. Our only other craft brewer in the Village is Pizza Port. This type of tasting room is particularly attractive to young professionals that Carlsbad is blessed to have in abundance. Currently they predominantly seek this type of passion in neighboring communities. Pure Project will also be a great compliment to New Village Arts Theater, who is located directly across the street. Their proximity to Public Transit is also a bonus. As workers come home and empty the parking lot at the train station, patrons or Pure Project will be pulling in to enjoy their evening. This overall upgrade and activation of Christiansen Way will be very positive addition to our thriving Village. Therefore, the Board of Directors of the Carlsbad Chamber of Commerce respectfully requests that you approve their development plan and their conditional use permit. ~--------~ -----Bret Schanzenbach President and CEO Cc: Mayor Pro Tern Bhat-Patel Council Member Blackburn Council Member Schumacher Council Member Hamilton City Manager Scott Chadwick 5934 Priestly Drive I Carlsbad, CA 92008 I 760.931.8400 T I 760.931.9153 F www.carfsbad.org August 27, 2019 Item #9 Page 95 of 140 NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN to you, because your interest may be affected, that the City Council of the City of Carlsbad will hold a public hearing at the Council Chamber, 1200 Carlsbad Village Drive, Carlsbad, California, at 6:00 p.m. on Tuesday, August 20, 2019 to consider approving a Minor Site Development Plan and Conditional Use Permit for a 2,206-square-foot brewery and tasting room and the payment of one (1) parking in-lieu fee. The site is located at 2825 State Street in the Village Center (VC) District of the Village and Barrio Master Plan and within Local Facilities Management Zone 1, and more particularly described as: Lot 7 and Lot 8 in Block J of town of Carlsbad, in the City of Carlsbad, according to Map thereof No. 535, filed in the Office of the County Recorder of San Diego County, May 2, 1888 Whereas, on June 19, 2019 the City of Carlsbad Planning Commission voted 5-1-1 to approve of a Minor Site Development Plan and Conditional Use Permit for a 2,206-square-foot brewery and tasting room and the payment of one (1) parking in-lieu fee. The site is located at 2825 State Street in the Village Center (VC) District of the Village and Barrio Master Plan and within Local Facilities Management Zone 1. The City Planner has determined that this project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment and is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to section 15303 (New Construction or Conversion of Small Structures) of the State CEQA guidelines. Those persons wishing to speak on this proposal are cordially invited to attend the public hearing. Copies of the staff report will be available on and after August 15, 2019. If you have any questions, please contact Shannon Harker in the Planning Division at (760) 602-4621 or shannon.harker@carlsbadca.gov. If you challenge the Minor Site Development Plan and Conditional Use Permit in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice or in written correspondence delivered to the City of Carlsbad, Attn: City Clerk’s Office, 1200 Carlsbad Village Drive, Carlsbad, CA 92008, at or prior to the public hearing. CASE FILE: SDP 2019-0002/CUP 2018-0021 (DEV2018-0196) CASE NAME: PURE PROJECT BREWERY AND TASTING ROOM PUBLISH: Friday, August 9, 2019 CITY OF CARLSBAD CITY COUNCIL August 27, 2019 Item #9 Page 96 of 140 S T A T E S T S T A T E S T R O O S E V E L T S T R O O S E V E L T S T CCAARRLLSSBBAADDVVIILLLLAAGGEEDDRRGGRRAANNDDAAVVM A D I S O N S T M A D I S O N S T C A R L S B A D B L C A R L S B A D B L CHRISTIANSEN WYCHRISTIANSEN WY W A S H I N G T O N S T W A S H I N G T O N S TBEECH AVBEECH AVSDP 2019-0002 / CUP 2018-0021Pure Project Brewery and Tasting Room SITE MAP JPALOMARAIRPORTRD E L CAMREALEL CAMINOREAL LA CO STAAV C A R L S B A D B L MELROS E DRCOLLEGEBLA VIARAPY RANCHO SANTAFERDSITE August 27, 2019 Item #9 Page 97 of 140 PEACOCK AND PEACOCK 403 PARKWOOD LN ENCINITAS CA 92024 ONE RAILYARD LOFTS LLC PO BOX 7050 RANCHO SANTA FE CA 92067 WEINBERGER LAWRANCE AND LAURIE 211 MAPLE A VE SEA CLIFF NY 11579 NORTH S}\N DIEGO COUNTY TRANSIT D PUBLIC .7',GENCY CARLSBAD CA 92008 OWNER NAME UNAVAILABLE 2747 ROOSEVELT ST CARLSBAD CA 92008 PATERSON KENT R 5315 AVENIDA ENCINAS STE 130 CARLSBAD CA 92008 TOMARO LIVING TRUST 385 BEECH AVE CARLSBAD CA 92008 CONDOMITTI MATTHEW J 2778 CARLSBAD BLVD UNIT 202 CARLSBAD CA 92008 WRIGHT PATRICIA C 2778 CARLSBAD BLVD UNIT 208 CARLSBAD CA 92008 09L8/09L!:.® AJ8/\\f:l8/\ll 81Q!llldWO:J WW L9 X WW g;: lllWJOJ op auanb!l~ 09 L8/09 L!:.® A.1811\f lll!M 81Q!llldwo::i u8/9 l X "L az1s 1aqe1 QUONSET DEVELOPMENT LLC 125 MOZART AVE CARDIFF BY THE SEA CA 92007. WHITAKER DON CDP JR 2685 STATE ST CARLSBAD CA 92008 CARLSBAD STATE STREET LLC 2739 STATE ST CARLSBAD CA 92008 BLACKBURN 2000 TRUST 202 RAINBOW LN OCEANSIDE CA 92054 BEECHTREE OFFICE BUILDING PARTNE 2653 ROOSEVELT ST STE D CARLSBAD CA 92008 WELCH FAMILY TRUST 351 BEECH AVE CARLSBAD CA 92008 FAGRELL FAMILY TRUST 4114 TIERRA VIS BONSALL CA 92003 FERNANDEZ LOURDES 2778 CARLSBAD BLVD UNIT 204 CARLSBAD CA 92008 AUSMAN WALTER A 2778 CARLSBAD BLVD UNIT 210 CARLSBAD CA 92008 SAN DIEGO G}\S .'HlD ELECTRIC CO PUBLIC AGENCY CARLSBAD CA 92008 . BRASHER BLAKE E AND DEBBIE G 883 W GOODRICH PL .PALATINE IL 60067 SCHROEDER THOMAS S LIVING TRUST 3518 CALLE GAVANZO CARLSBAD CA 92009 STRAESSER RALPH A AND -c J FIELDS R 1518 AVOCADO RD OCEANSIDE CA 92054 EISLER FAMILY SURVIVORS TRUST 6631 LITTLER DR SAN DIEGO CA 92119 WHITMER CHRIS E AND TERRIE Y REVOC PO BOX 675685 RANCHO SANTA FE CA 92067 KIRKHAM REMY 351 ACACIA AVE APT 35 CARLSBAD CA 92008 WEBBER CRAIG 2778 CARLSBAD BLVD UNIT 206 CARLSBAD CA 92008 HICKS GREGORY C AND KARRI J 2778 CARLSBAD BLVD UNIT 201 CARLSBAD CA 92008 PORTER RANDALL K AND MARTHA M KNOWLEDGE MANAGEMENT TRUST WIELAND RICHARD C AND DIANE L 2177 N GRANDVIEW RD 5405 ALTON PKWY FAMILY ORANGE CA 92867 STE A-204 2778 CARLSBAD BLVD IRVINE CA 92604 UNIT 207 CARLSBAD CA 92008 label size 1" x 2 5/8" compatible with Avery ®5160/8160 aL.1.!-.. -.l.1..-..I-6.----.1.l'loP'" --.. ,...., ________ .J.!LI-_____ a _____ ,_,-_.,..,..,,.._. ........ August 27, 2019 Item #9 Page 98 of 140 '1170 09L8/09L9® fuaA'tf'JBAP. BJQ!lP.dWO'J WW L9 x WW gz lP.WJOJ op auanb!l~ 09 L8/09 L9® fua11v l!l!M BJQ!lP.dWO'J .. 8/9 Z X "L azis JBQP.J ®S3ildVlS CLARK TIMOTHY J AND TRACY E 1161 W SUNRISE PL CHANDLER AZ 85248 DREW PATRICIA TRUST 2778 CARLSBAD BLVD UNIT 215 CARLSBAD CA 92008 WARSHAWSKY FAMILY TRUST 72211 BARBARA DR RANCHO MIRAGE CA 92270 GAUDREAU-RICHTER LIVING TRUST 2756 CARLSBAD BLVD UNIT 100 CARLSBAD CA 92008 HALL ELENA B 7102 DAFFODIL PL CARLSBAD CA 92011 SANGEORGE FAMILY TRUST 6964 AMMONITE PL CARLSBAD CA 92009 PRIETTO JOHN G REVOC LIVING TRUS 3071 JEFFERSON ST CARLSBAD CA 92008 OESTERLE FAMILY TRUST 152 WITHAM RD ENCINITAS CA 92024 JONES BARBARA H REVOC LIVING TRUST 2778 CARLSBAD BLVD UNIT 302 CARLSBAD CA 92008 FORD NANCY E TRUST 81415 THUNDER GULCH WAY LA QUINTA CA 92253 OCKELS THEODORE L 456 HIGH TIARA CT GRAND JUNCTION CO 81507 RAHHAL FIRAS MAND DIANNA S 4249 TARZANA ESTATES DR TARZANA CA 91356 NELSON CHRISTINE M REVOC TRUST 3021 E SHAKESPEARE PL SALT LAKE CITY UT 84108 PASHA SABIHA TRUST 2756 CARLSBAD BLVD UNIT 101 CARLSBAD CA 92008 SK J FAMILY INVESTMENTS LLC 100 48TH AVE NORMAN OK 73072 ONTIVEROS MICHAEL A AND ELENA 2776 CARLSBAD BLVD UNIT 101 CARLSBAD CA 92008 FORD JOHN E FAMILY TRUST 2445 OCEAN ST CARLSBAD CA 92008 FLORES CHRISTOPHER AND CARLOTHA 2778 CARLSBAD BLVD UNIT 300 CARLSBAD CA 92008 HICKS ANGELA 2778 CARLSBAD BLVD UNIT 303 CARLSBAD CA 92008 LILLFORS JOHN E 2764 CARLSBAD BLVD UNIT 101 CARLSBAD CA 92008 label size 1 " x 2 5/8" compatible with Avery ®5160/8160 HOLT HOMER AND LUCY 2241 E CHRISTY DR PHOENIX AZ 85028 BUTH DWAYNE AND LISA 3114 DEL REY AVE CARLSBAD CA 92009 LARKIN RICHARD LAND DEBORAH C 2037 W FLETCHER ST CHICAGO IL 60618 BOLLAR STEVEN AND DEBRA 1226 HILL CIR COLORADO SPRINGS CO 80904 D L K SERVICES LLC 100 SPORTFISHER DR UNIT 303 OCEANSIDE CA 92054 NICHOLS CELESTE 6022 N 64TH PL PARADISE VALLEY AZ 85253 HANIFAN JANDL TRUST 1575 DELUCCHI LN STE 115 RENO NV 89502 GONZALEZ MIGUEL A AND MARIA S 2778 CARLSBAD BLVD UNIT 301 CARLSBAD CA 92008 SCHILLING JILL D 2778 CARLSBAD BLVD UNIT 304 CARLSBAD CA 92008 NIXON PAULE AND KIMBERL 2764 CARLSBAD BLVD UNIT 102 CARLSBAD CA 92008 ~T4Pl'I=~® ftin11.o.tta rfn fnrm._,t ')i:;: mm v f:7 mm ,..nlT\nl'.lfihlo rJiuo.,,-Auo.n, /6\h.1C:n/o1an August 27, 2019Item #9 Page 99 of 140 VtO LIBERIO ROCCO J AND KATHLEEN M FAMILY 155 S EL MOLINO AVE STE 202 PASADENA CA 91101 SMITH BRETT LAND LAURA E 2748 CARLSBAD BLVD UNIT 101 CARLSBAD CA 92008 MORRA FAMILY TRUST 2601 OLD SPANISH TRL ESCONDIDO CA 92025 HARRIS JAMES M REVOC TRUST 2768 CARLSBAD BLVD UNIT 101 CARLSBAD CA 92008 AARONSON FAMILY TRUST 2422 S YOSEMITE DR PALM SPRINGS CA 92264 LIVING BEACH VILLAGE LIFE 1 LLC 2 STRAUSS TER RANCHO MIRAGE CA 92270 SVF LLC 1231 STATE ST STE B SANTA BARBARA CA 93101 BURNETTE RALPH F JR TRUST 390 GRAND AVE CARLSBAD CA 92008 RPG 2822 STATE STREET LLC 111 C ST STE 200 ENCINITAS CA 92024 OWNER NAME UNAVAILABLE 3425 SEACREST DR CARLSBAD CA 92008 09L8/09L9@ f..Ja/l'rj'J8/l'B a1q1iedwo:i WW L9 x WW 9l l'BWJOJ op auanbii~ 09 LB/09 L9@ f..Jall'rf lfi!M a1q1iedwoo .8/9 l x "L azis 1aqe1 ®S3ildVlS JIM AND JAN TRUST 2764 CARLSBAD BLVD UNIT 104 CARLSBAD CA 92008 KAYVON FAMILY TRUST 2748 CARLSBAD BLVD UNIT 102 CARLSBAD CA 92008 BENSON FAMILY TRUST 2768 CARLSBAD BLVD UNIT 103 CARLSBAD CA 92008 COSTELLO FAMILY TRUST PO BOX 1570 RANCHO SANTA FE CA 92067 POTTER THOMAS A 3679 CAMINO MARGLESA ESCONDIDO CA 92025 BURNETTE JUSTIN B TRUST 3315 MCKINLEY ST CARLSBAD CA 92008 OREXCIV LLC LF BURNETTE RALPH F 1231 STATE ST STE B SANTA BARBARA CA 93101 OWNER NAME UNAVAILABLE 2780 STATE ST CARLSBAD CA 92008 OWNER NAME UNAVAILABLE 208 ROOSEVELT CARLSBAD CA 92008 BENCHMARK PACIFIC LTD II 550 LAGUNA DR STE B CARLSBAD CA 92008 label size 1" x 2 5/8" compatible with Avery ®5160/8160 FALLONE RF TRUST 328 VISTA VILLAGE DR STE D VISTA CA 92083 GUGINO JAMES E TRUST 3105 RANCHO MONTANA CARLSBAD CA 92009 DORAZI DAVID F TRUST 4717 HAMPTON RD LA CANADA CA 91011 LANDES FAMILY TRUST 2752 CARLSBAD BLVD UNIT 102 CARLSBAD CA 92008 GRIGORAS LUDVIK AND 2802 CARLSBAD BLVD CARLSBAD CA 92008 VERONICA BURNETTE RALPH F TRUST 390 GRAND AVE CARLSBAD CA 92008 GERICOS 158 N COAST HIGHWAY 101 ENCINITAS CA 92024 OWNER NAME UNAVAILABLE 2788 STATE ST CARLSBAD CA 92008 HOWARD-JONES MARITAL TRUST 4825 ARGOSY LN CARLSBAD CA 92008 WARD FAMILY TRUST 2300 WALKER RD SHELBURNE FALLS MA 1370 ~TAPPI=~® C:-1-: .... ,, ... .u. ............ , .............. ,.,c ........... U' C.7 ................... ..,, ...... +:hi ...... , .... ,,. A,,"'"' /S\C"IC.n/O-IC:n August 27, 2019 Item #9 Page 100 of 140 VtO 09~8/09~S@ /i.JaA',J'J8A'B 81Q!l'BdWO'J WW L9 X WW gz l'BWJO! op auanb!l~ 09~8/09~S@ /i.Ja11v l!l!M 81Q!l'BdWO'J .. 8/S Z X -~ azis 1aqe1 OSTRIE FAMILY INC PO BOX 8 RANCHO SANTA FE CA 92067 AHRONEE ESTER REVOC TRUST 4139 ILLINOIS ST SAN DIEGO CA 92104 GARCIA ABEL C LIVING TRUST 1502 ROLLING HILLS DR OCEANSIDE CA 92056 STATE STREET CBAD LLC 4649 GRANGER ST SAN DIEGO CA 92107 2921 ROOSEVELT LTD CALIFORNIA 2921 ROOSEVELT ST CARLSBAD CA 92008 LA CIENEGA PROPERTY GROUP LLC PO BOX 5723 BEVERLY HILLS CA 90209 ALL AMERICAN ENGINEERING TRADI 721 MCGAVRAN DR VISTA CA 92081 CITY OF CARLSBAD 2829 STATE ST CARLSBAD CA 92008 CITY OF CARLSBAD 2897 STATE ST CARLSBAD CA 92008 MURPHY MICHAEL K TR 630 GRAND AVE STE I CARLSBAD CA 92008 AND ROOSEVELT TAMARACK INVESTMENTS 6 VENTURE STE 215 IRVINE CA 92618 MACDONALD PROPERTIES 99% 208 FOREST SERVICE RD 315 CAREYWOOD ID 83809 PACHECO LEO AND DIANNA J 2100 CHESTNUT AVE CARLSBAD CA 92008 CLARKE FAMILY DECEDENTS TRUST 2665 JEFFERSON ST CARLSBAD CA 92008 KNAPP CLARK R 2889 OCEAN FRONT WALK APT C SAN DIEGO CA 92109 GARCIA PAUL J 300 CARLSBAD VILLAGE DR STE 108 CARLSBAD CA 92008 LAKRITZ FAMILY PARTNERSHIP 75% 8502 E CHAPMAN AVE PMB 614 ORANGE CA 92869 CITY OF CARLSBAD 2833 STATE ST CARLSBAD CA 92008 CITY OF CARLSBAD 2787 STATE ST CARLSBAD CA 92008 GSD VERMILYEA 11620 KISMET RD SAN DIEGO CA 92128 label size 1" x 2 5/8" compatible with Avery ®5160/8160 BEAZLEY BRENT AND DENISE FAMILY TR 16633 VENTURA BLVD STE 1030 ENCINO CA 91436 VILLAGE CORNER LLC 2978 STATE ST CARLSBAD CA 92008 AVIS DOUGLAS MAND LORI TRUST 550 LAGUNA DR STE B CARLSBAD CA 92008 GUNTER FAMILY TRUST PO BOX 749 SAN PEDRO CA 90733 HYLEN-CARLSBAD LLC 5146 CHELTERHAM TER SAN DIEGO CA 92130 GONZALES BELYNN R TRUST ETAL 2728 CHESTNUT AVE CARLSBAD CA 92010 SATTERLY RUSSELL LAND SUSAN L 909 ROSEMARY AVE CARLSBAD CA 92011 GI!!!¥ 8F GA:RbSB,D,g Pl:JBI:,IG .'',GEHG¥ G~RLSB~B GA 92QQ8 NORTH SAN DIEGO COUNTY TRANSIT D 399 CARLSBAD VILLAGE DR CARLSBAD CA 92008 CITY OF CARLSBAD 2922 ROOSEVELT ST CARLSBAD CA 92008 S:tin1 rctta. tin fnrm!lt ,,i:;, mm v i:;;7 mm rnmn'!ltihla ~uor Au.on, 16'\l:;_1 &:n/01 an August 27, 2019 Item #9 Page 101 of 140 'o'tO 09 L8/09 L9@ f..Ja11v :l8flll BIQ!llldWO:l WW L9 x WW 9l ll!WJOJ op aiianb!l~ 09 L8/09 L9@ Ala11v 4l!M 8JQ!llldWO:l .8/9 l X "L az,s J8Qlll ®S3ild'1lS NORTH COUNTY TR..7',NSIT DISTRICT PUBLIC AGENCY CARLSBAD CA 92008 SHOREHOUSE KITCHEN CARLSBAD LLC 249 S HIGHWAY 101 PMB 514 SOLANA BEACH CA 92075 VINE CHURCH 7040 AVENIDA ENCINAS STE 104-3 CARLSBAD CA 92011 CITY OF CARLSBAD 2787 STATE ST STE A CARLSBAD CA 92008 label size 1" x 2 5/8" compatible with Avery ®5160/8160 NEW VILLAGE ARTS 2787 STATE ST STE B CARLSBAD CA 92008 -125 PRINTED -* DUPLICATE OWNERS REMOVED ~TAPl'S:~® ~,1.:_,,,...,1.1.,... ...1 .... ,:..._ .. _,..,1. l"'IC' --u• ~"7 --_____ ,1.a .. 1-............. A,, .... _, ~C'◄~ntn◄ ~n August 27, 2019Item #9 Page 102 of 140 SDP 2019-0002/CUP 2018-0021 Pure Project Brewery and Tasting Room 1 August 27, 2019 Item #9 Page 103 of 140 Pure Project Brewery and Tasting Room 1.Minor Site Development Plan 2.Conditional Use Permit 3.Payment of one parking in-lieu fee for one parking space Planning Commission recommended approval of the project on June 19, 2019 August 27, 2019 Item #9 Page 104 of 140 Location Map 3 Barrio Center (BC) Village~Barrk> Other IVBO) August 27, 2019 Item #9 Page 105 of 140 State Street facade 4 August 27, 2019 Item #9 Page 106 of 140 Christiansen Way facade Pure BreweryHandel’s 5 August 27, 2019 Item #9 Page 107 of 140 State Street alley facade 6 August 27, 2019 Item #9 Page 108 of 140 Site Plan Pure Project Brewery Handel’s Christiansen Way State Street Shorehouse Kitchen 7 I ~ ,. I ' j ~ ' ~ I ' r ~i § Iii FWSE .. ' CEU'HB. STOPS ... .(I' ' ~~ u ~ "'" IEJ a.EC.Truex. "'-"'" ,, / .,, (>al>UJ ' I I I I •Jii:~ro , ___________ , SCOPE OF TelANT IMPROVEM~T '""""' N.I.C August 27, 2019 Item #9 Page 109 of 140 Floor PlanRetail Tasting Room Patio/Tasting Area Storage/restrooms 8 August 27, 2019 Item #9 Page 110 of 140 North Elevation Handel’s 9 August 27, 2019 Item #9 Page 111 of 140 Outdoor Patio 10 August 27, 2019 Item #9 Page 112 of 140 West Elevation 11 August 27, 2019 Item #9 Page 113 of 140 Conditional Use Permit Deliveries will not occur during hours that would impact residents. By-products/waste from production of beer will be removed within 24 hours and properly disposed via sewer system. Fermentation tanks are located indoors and installed with a filter to reduce odor created from brewery process. 12 August 27, 2019 Item #9 Page 114 of 140 Parking In-Lieu Fee Program Non-residential uses in VC, VG, FC and PT districts east of railroad tracks. Average occupancy of off- street public spaces within ¼ mile of site shall be under 85% based on most recent parking study. 13 Lot ID Spaces A 57 B 52 C/D 113 E 39 I 13 Total 274 ---===iF~t 0 ,<IQ August 27, 2019 Item #9 Page 115 of 140 Parking In-Lieu Fee Findings August 2018 Parking Study Average occupancy on weekend: 76% Weekday: 78.9% Less than 85% threshold Complies with program’s participation restrictions $11,240/parking in-lieu fee 14 Lot ID Spaces A 57 B 52 C/D 113 E 39 I 13 Total 274 --===fml 0 500 August 27, 2019 Item #9 Page 116 of 140 Project Consistency General Plan Village & Barrio Master Plan Development standards Design guidelines Parking In-Lieu Fee Program CEQA 15 August 27, 2019 Item #9 Page 117 of 140 Recommendation That the City Council: 1.ADOPT the Resolution APPROVING the Minor Site Development Plan and Conditional Use Permit. 2.ADOPT the Resolution APPROVING the payment of the parking in-lieu fee for one (1)parking space and the participation in the Village Parking In-Lieu Fee Program. 16 August 27, 2019 Item #9 Page 118 of 140 r o • I e C t tecscae~ August 27, 2019 Item #9 Page 119 of 140 tecscae~ August 27, 2019 Item #9 Page 120 of 140 What Is Pure Project •High-end Craft Brewery and Tasting Room With a Focus On: •Organic, local and seasonal ingredients •Exceptional customer experience through education and storytelling•1 of only 122 Advanced Cicerones in the world on staff •Creating community through agriculture •Sustainability and giving back tecscae~ August 27, 2019 Item #9 Page 121 of 140 tecscae~ August 27, 2019 Item #9 Page 122 of 140 Who We Are •Founded in 2015 by Jesse Pine & Mat Robar •Started Operations in 2016 •Named to 4 Best New Breweries Lists (2016) •Named #3 Best Local Brewery in the US (2017)•by Yelp and featured in Travel + Leisure •National & International Award Winning Beer with a strong local, regional and national following.TRAVEL+ LEISURE ::te=csc=ae=-~~-----------------(1)1?~(~ ........ August 27, 2019 Item #9 Page 123 of 140 tecscae~ August 27, 2019 Item #9 Page 124 of 140 What Makes Us Different •Boutique Customer Experience•Background, story and ingredients•Attention to detail •Brewing w/ The Seasons•Seasonal beers, Strawberry Fest •Sustainability•Ingredients: grains, adjuncts, water•Packaging: no plastic, reused materials…etc •Giving Back•1% For The Planet (over $20,000 donated in 2018)•Local and national non-profit partners tecscae~ August 27, 2019 Item #9 Page 125 of 140 Organizations We Support OU AT ON PROT CTOURWINTERS FORTHE PLANET The Co servat· on Al ·ance Our oor Business iving B:ac' co the Outdoors OUTDOOR OUTREACH L--------------------(1)1?~(~ tecscae~ August 27, 2019 Item #9 Page 126 of 140 Pure Project + San Diego Surfrider tecscae~ August 27, 2019 Item #9 Page 127 of 140 SITE PLAN I I I I I I 11 \\ II \ I ! // // I \ \ \ \\ (E) LANDSCAPE teCSCOf;?~ >-w -' -' <( w Cl ,j; C? b N 29'-11" LU z ::; = >-01-_, 0:: ~~ 0 0:: c.. (E) A CESSIBLE CU BRAMP _/ r------- 1 ~/---- /~(E) LANDSCAPE ( I I I I I CURB MP CHRISTIANSEN WAY f (E) 6' HIGH CONCRETE CURB I J I E) ~ISED (E) SIDEWALK TO REMAIN (E) TRASH CAN 25'-3" PROPOSED LANDSCAPE AREA TO SCREEN TRANSFORMER 24'-0" ;'/ I (E) WHEEL STOPS --I. \ \ \, / '\ 24'-0" o::- PLANTER 100'-0" PROl"ERTY LINE PROPOSED IN-GROUND -TREE AT NEW PATIO ~ I I I AREA OF _J DEMO FOR OUTDOOR PATIO (335 SF) SCOPE OF TENANT IMPROVEMENT (2206 SF) 74'-10" (E) 5/8" WATE " METER / N LC ~ ~~ I~ fu C') <.'.)~ ~ % ~~ 1// (E) ELECTRICAL_} -:i..,_ _____ T~-------UL.LLL..~::.LLLLL.~~~LL~~~~L L~~~:L:1/~ ~~/ METER EXISTING ADJACENT BUILDING E)RAISE PLANTER w .-,____.___~ -/ "',/ -\-<!- ~ :::, u w tu 0:: u z 0 u I (!) I' 1o g \ ... E-)-RA--1-SE ... !1 I PLANTER (E)LAND~E , 38'-4" "" ii a. w II &, "I I I I 1-w w 0:: t;:; w ~ Cf) I I I I @1?,~(~----- August 27, 2019 Item #9 Page 128 of 140 NORTH ELEVATION (CHRISTIANSEN WAY) ~t;e:c:s~c~a~e=~~~N -------------------------------------/7;\ nure ' -.... \il.,.J l~r o j e c t August 27, 2019 Item #9 Page 129 of 140 NORTH ELEVATION (CHRISTIANSEN WAY) ~t=e~c;sc~a~e~D~~~-N ---------------------------------/7;\ nure '-... \il.,.J l ~r o j e c t August 27, 2019 Item #9 Page 130 of 140 ~t=e~c:sc~a~e:~~~-N ---------------------------------/7;\ nure ........ \il.,.J l ~r o j e c t August 27, 2019 Item #9 Page 131 of 140 NORTH ELEVATION (CHRISTIANSEN WAY) ~t=e~c:sc~a~e:~~~-N ---------------------------------/7;\ nure '-... \il.,.J l ~r o j e c t August 27, 2019 Item #9 Page 132 of 140 ~t;e:c:s~c~a~e=~~N -------------------------------------/7;\ n ur e-.. \il.,.J l~r o I e c t August 27, 2019 Item #9 Page 133 of 140 tecscae~ August 27, 2019 Item #9 Page 134 of 140 ~t;e:c:s~c~a~e=~~~N -------------------------------------/7;\ nure -.. \il.,.J l~r o j e c t August 27, 2019 Item #9 Page 135 of 140 Why Carlsbad •Thriving culture, food and beverage scene•Our concept is a compliment to this scene and will bring in more people to experience the growing village. We have a large number of fans who come to visit us from all over San Diego county, Southern California, US and internationally. •Upscale Demographic•Our brand fits this demographic very well. There is only 1 other brewery in the Village and it is a different concept•Environmentally Conscious & Community Driven•We make a very concerted effort to operate as environmentally consciously as possible and help create community through local events.•Already supported : Carlsbad Music Festival, Carlsbad Art Walk and upcoming Taste of Carlsbad & Carlsbad Brewfest tecscae~ August 27, 2019 Item #9 Page 136 of 140 tecscae~ August 27, 2019 Item #9 Page 137 of 140 Thank You. tecscae~ August 27, 2019 Item #9 Page 138 of 140 tecscae~ August 27, 2019 Item #9 Page 139 of 140 r o • I e C t tecscae~ August 27, 2019 Item #9 Page 140 of 140