HomeMy WebLinkAbout2019-10-22; City Council; ; Construction contract for the Stagecoach Community Park Synthetic Turf Replacement Project.CA Review A LE,-
@ S~~fi R~port
Meeting Date:
To:
From:
Staff Contact:
Subject:
Oct. 22, 2019
Mayor and City Council
Scott Chadwick, City Manager
Kyle Lancaster, Parks & Recreation Director
kyle.lancaster@carlsbadca.gov, 760-434-2941
Construction contract for the Stagecoach Community Park Synthetic Turf
Replacement Project.
Recommended Action
Adopt a Resolution awarding a construction contract to Ohno Construction Company, for the
Stagecoach Community Park Synthetic Turf Replacement Project (CIP No. 47421), in an amount
not-to-exceed $1,504,240.
Executive Summary
The existing synthetic turf on the two multi-purpose fields at Stagecoach Community Park is
nearly 14 years old and is in need of replacement due to age and wear. The existing synthetic
turf has surpassed its eight-year warranty period and its expected useful life. The significant
use of these multi-purpose fields over the nearly 14-year period has resulted in corresponding
splits/tears and diminished overall quality of the synthetic turf.
Staff has completed a Request for Bids process for the Stagecoach Community Park Synthetic
Turf Replacement Project. On Sept. 12, 2019, a total of five bids were received. The apparent
low bid, from Byrom-Davey, Inc., was determined to be non-responsive due to (a) its proposal
to subcontract more than 50 percent of the work, and (b) its mathematical error in the sum of
the line items which was not waivable. The next lowest bid, from Ohno Construction Company,
was determined to be responsive, with a bid total of $1,504,237. Sufficient funds are available
for the construction contract, construction administration, and project contingency in the
Capital Improvement Program Project Budget Replacement Project. Staff recommends the
award of a construction contract to Ohno Construction Company, in an amount not-to-exceed
$1,504,240. The City Council's action is required because the construction contract exceeds
$200,000 (C.M.C. Section 3.28.080(C)).
Discussion
Background
On July 23, 2019, the City Council adopted a resolution approving the contract documents,
plans and specifications for the Stagecoach Community Park Synthetic Turf Replacement
Project and authorizing the City Clerk to advertise the project for public bids (Resolution No.
2019-132). The replacement project includes removal of the existing synthetic turf with a sand
and non-coated crumb rubber granulate infill from the multi-purpose fields; minor re-grading
and re-compaction of the subsurface; and installation of high-quality synthetic turf with a sand
Oct. 22, 2019 Item #4 Page 1 of 5
and coated crumb rubber granulate infill. Both the specified synthetic turf and infill material
are to be warrantied for a period of eight years and are intended to meet the community's
usage demand at this park for a full decade.
Bid Analysis
The Engineer's estimate for the project was $1,500,000 -$1,600,000. On September 12, 2019,
five bids for the project were received and opened by staff. Those bids are listed below.
CONTRACTOR BASE BID
Byrom-Davey, Inc. $1,373.,027.00
Ohno Construction Company $1,504,237.50
Asphalt Fabric & Engineering, Inc. $1,510,536.15
SprinTurf, LLC. $1,655.000.00
Kya Services, LLC $1,755,936.00
The apparent low bidder, Byrom-Davey, Inc. submitted a bid that was subsequently determined
to be non-responsive. Byrom-Davey, lnc.'s bid proposed to subcontract nearly 69 percent of
the work. Per the documents included in the Notice Inviting Bids, "Any bid that proposes
performance of more than 50 percent of the work by subcontractors or otherwise to be
performed by forces other than the Bidder's own organization will be rejected as non-
responsive. Additionally, Byrom-Davey lnc.'s bid contained a miscalculation of the sum of the
line items (i.e., $1,373,027, instead of $1,356,972). That error would entitle Byrom-Davey, Inc.
to withdraw the bid without forfeiting the bid bond under California Public Contract Code
Section 5103, and is therefore not a waivable error, as it would confer a competitive advantage.
The next lowest bid, from Ohno Constructi_on Company, was determined to be responsive, with
a bid total of $1,504,237.
Fiscal Analysis
The total funding appropriated for this Capital Improvement Program Project is $2,200,000. To
date, $35,000 has been encumbered for the project's design and monitoring costs. The total
estimated construction costs for this project are reflected in the following table.
STAGECOACH COMMUNITY PARK SYNTHETIC TURF REPLACEMENT PROJECT-CIP NO. 47421
TOTAL PROJECT FUNDS AVAILABLE $2,165,000
Construction Contract $1,504,240
Construction Contingency (Estimated) $150,425
Construction Management and Inspection (Estimated) $60,000
TOTAL PROJECT COSTS {ESTIMATED) $1,714,665
TOTAL PROJECT FUNDS REMAINING AFTER CONSTRUCTION (ESTIMATED) $450,335
Maintenance costs for these fields are expected to decrease slightly with the installation of the
new synthetic turf, due to the repair of most splits/tears being covered under a normal use
eight-year warranty.
Oct. 22, 2019 Item #4 Page 2 of 5
Next Steps
Staff anticipates this project's construction to commence in early to mid-December 2019 and to
be complete by early to mid-March 2020.
Environmental Evaluation (CEQA)
This project has been determined to be exempt from environmental review per CEQA
Guidelines Section 15301, minor alteration of existing facilities.
Public Notification
This item was noticed in accordance with the Ralph M. Brown Act and was available for public
viewing and review at least 72 hours prior to the scheduled meeting date. Staff also included
the athletic groups that ordinarily play on these multi-purpose fields in the review/revision of
the project plans. Staff also advised those groups ~f the fields' scheduled closure during
construction. Additionally, staff will provide general public notification of the fields' scheduled
closure via the placement of sign age on site, and the posting of bulletins on the Parks &
Recreation Department webpage.
Exhibits
1. City Council Resolution
Oct. 22, 2019 Item #4 Page 3 of 5
RESOLUTION NO. 2019-212
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, AWARDING A CONSTRUCTION CONTRACT TO OHNO
CONSTRUCTION, FOR THE STAGECOACH COMMUNITY PARK SYNTHETIC
TURF REPLACEMENT PROJECT (CIP NO. 47421), IN AN AMOUNT NOT-
TO-EXCEED $1,504,240.
WHEREAS, the contract documents, plans, provisions, and specifications necessary to perform
the replacement of the synthetic turf at the Stagecoach Community Park multi-purpose fields are on
file in the City Clerk's Office, and are incorporated by reference herein; and
WHEREAS, the existing synthetic turf multi-purpose fields at Stagecoach Community Park is
nearly 14 years old and is in need of replacement due to age and wear; and
WHEREAS, the heavy use of this field over time has resulted in splits/tears, and a diminished
overall quality of the synthetic turf; and
WHEREAS, on July 23, 2019, the City Council adopted a resolution approving the contract
documents, plans, provisions and specifications, and authorizing the City Clerk to advertise for bid the
Stagecoach Community Park Synthetic Field Replacement Project -CIP No. 47421; and
WHEREAS, on Sep. 12, 2019, five bids for the project were received and opened by staff; and
WHEREAS, the engineer's estimate for the project was $1,500,000 to $1,600,000; and
WHEREAS, the apparent low bid, from Byrom-Davey, Inc., was determined to be non-responsive
due to (a) its proposal to subcontract more than 50 percent of the work, and (b) its mathematical error
in the sum of the line items which was not waivable; and
WHEREAS, the next lowest bid, from Ohno Construction Company, was determined to be
responsive, with a bid total of $1,504,237; and
WHEREAS, sufficient funds are available for the construction contract, construction
administration, and project contingency in the Capital Improvement Program Project Budget.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as
follows:
1. That the above recitations are true and correct.
2. That the Mayor is hereby authorized and directed to execute a construction contract
with Ohno Construction Company for the Stagecoach Community Park Synthetic Turf
Replacement Project (CIP No. 47421), in an amount not-to-exceed $1,504,240.
3. That the City Manager or designee is hereby authorized to approve construction change
orders, singly or in aggregate, up to $150,425, for the project.
4. That the award of this contract is contingent upon Ohno Construction Company
executing the required contract and submitting the required bonds and insurance
policies, as described in the contract, within 20 working days of adoption of this
resolution. The City Manager may grant reasonable extensions of time.
5. That the City Clerk is authorized to return to the respective bidders all bid bonds.
Oct. 22, 2019 Item #4 Page 4 of 5
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of
Carlsbad on the 22nd day of October 2019, by the following vote, to wit:
AYES: Hall, Blackburn, Bhat-Patel, Schumacher.
NAYS:
ABSENT:
\ jt((\o¼At~<J
1,e-RBARA ENGLESON, City Clerk
(SEAL) 11111111111111,,,,1 ~,,,,,tf! CA ,.;.''1,,,✓•
~0"" ~✓~ ,f'A .. ···~·~-% ~ J....,, .•• ~· • •• V' ~ g .... /~\~~ \Ot~w~)CJ
~~----.~-----· § ¾~, ···········e..\\'i-.~ ~,,,,,;-IFOf\'~•\,,,,~
'"111,111111111111'
Oct. 22, 2019 Item #4 Page 5 of 5