Loading...
HomeMy WebLinkAbout2020-02-11; City Council; ; Continued to 04/07/2020-Update the city's floodplain management regulations to ensure consistency with federal guidelinesFebruary 11, 2020 4. UPDATE CITY'S FLOODPLAIN MANAGEMENT REGULATIONS TO ENSURE CONSISTENCY WITH FEDERAL GUIDELINES-Introduction of an ordinance approving a Zone Code Amendment and Local Coastal Program amendment to ensure consistency with federal guidelines related to Floodplain Management Regulations. Case Name: Floodplain Management Regulations Amendments. Case No. ZCA 2019-0001/LCPA 2019-0004 (PUB2019-0010); and, Adoption of a resolution approving a Zone Code Amendment and a Local Coastal Program Amendment to update the City's Floodplain Management Regulations to ensure consistency with federal guidelines related to Floodplain Management Regulations. (Staff contact: Melanie Saucier, Community Development) THIS ITEM WAS CONTINUED TO THE APRIL 7, 2020 CITY COUNCIL MEETING. ~ CITY COUNCIL ~ Staff Report Meeting Date: To: From: Staff Contact: Feb. 11,2020 Mayor and City Council Scott Chadwick, City Manager Melanie Saucier, Associate Planner melanie.saucier@carlsbadca.gov, 760-602-4605 CAReview '/?!(___ Subject: Update the city's floodplain management regulations to ensure consistency with federal guidelines. Project Name: Floodplain Management Regulations Amendments / Project No.: ZCA 2019-0001/LCPA 2019-0004 (PUB 2019-0010) Recommended Action That the City Council hold a Public Hearing and (1) introduce an ordinance approving an amendment to the Zoning Ordinance ZCA 2019-0001; and (2) adopt a resolution approving a Local Coastal Program Amendment LCPA 2019-0004 to amend Title 21 of the Carlsbad Municipal Code (CMC) to update the city's Floodplain Management Regulations to ensure consistency with federal guidelines, as recommended for approval by the Planning Commission. Executive Summary This project is a city-initiated Zone Code Amendment and Local Coastal Program Amendment to amend the text of the Floodplain Management Regulations (CMC Section 21.110). The proposed amendments have been drafted in cooperation with the Federal Emergency Management Agency (FEMA) and are intended to ensure the city's floodplain management regulations are consistent with FEMA requirements. To remain a National Flood Insurance Program (NFIP) community, the city must regulate development in our flood hazard areas per the requirements of the FEMA Floodplain Management Ordinance along with other various technical documents published by FEMA. These changes are being brought to the City Council for consideration as only'the City Council can adopt changes to the Carlsbad Municipal Code. Discussion The proposed amendments to the Zoning Ordinance are necessary to implement new guidance and regulations from Title 44 Code of Federal Regulations Sections 59.1 and 60.3 and the California Model Floodplain Management Ordinance for Coastal Communities (December 2006). The proposed amendments to the Zoning Ordinance are provided in strikethrough/underline format (Exhibit 3) and are summarized below. A detailed summary of the changes and background are contained in the Planning Commission Staff Report (Exhibit 5). Feb. 11, 2020 Item #4 Page 1 of 60 A summary of the main changes is listed below: • The definitions Section 21.110.050 has been updated based on FEMA requirements • Change term "100-year flood event" to a "1-percent-annual-chance flood" throughout the ordinance • Clean up and addition of FEMA requirements in Section 21.110.130 on Special Use Permits • Updates to floodplain administrator designation and duties and responsibilities of floodplain administrator • Updates made to Standards of construction Section 21.110.160 stating that elevation to base flood level is now required to be elevated two feet above the base flood elevation • New FEMA requirements for garages and accessory structures were added to Section 21.110.160 • New FEMA standards updated for Manufactured Homes and Recreational Vehicles • Updates to Coastal high hazard areas stating that no fill, new basements, expansion of basements, or improvements to basements shall be permitted • Previous section on Appeals is now titled Variances General Plan The proposed amendments to the Floodplain Management Regulations are consistent with the General Plan and directly implement General Plan, in that Public Safety Flooding and Coastal Hazards Policy 6-P.1 directs the city to enforce the Cobey-Alquist Floodplain Management Act and the city's Floodplain Management Regulations to prohibit construction of structures in a designated floodway where such development would endanger life or significantly restrict the carrying capacity of the designated floodway; and to regulate development within other areas of special flood hazard, flood related erosion hazard and mudslide hazard to ensure such development does not adversely affect public health and safety due to water and erosion hazards, or result in damaging increases in erosion, flood height or velocities. The amendments are also consistent with the General Plan in that the proposed amendments implement the General Plan Public Safety Flooding and Coastal Hazards Policy 6-P.8, which requires the city to comply with Federal Emergency Management Agency requirements to identify flood hazard areas and control development within these areas in order for residents to qualify for federal flood insurance. Planning Commission Meeting On Dec. 4, 2019, the Planning Commission conducted a Public Hearing and recommended approval (6-0-1 with Commissioner Luna absent) of the Zoning Ordinance Amendment and Local Coastal Program Amendment. No public comments were received. See Planning Commission Resolution in Exhibit 4 and Planning Commission minutes in Exhibit 6. Fiscal Analysis There is no anticipated fiscal impact from this item. Next Steps The City Council's next action would be the second reading ofthe Ordinance. Following this action, amendments to Title 21 will become effective outside of the coastal zone immediately Feb. 11, 2020 Item #4 Page 2 of 60 and amendments inside the coastal zone will become effective when the California Coastal Commission approves the Local Coastal Program Amendment. Staff will submit an application for a Local Coastal Program Amendment to the California Coastal Commission following City Council approval of the Amendments. Environmental Evaluation (CEQA) The city planner has determined that the project is a minor zone code and general plan amendment that retires or clarifies existing land use standards and would have no significant effect on the environment. Therefore, the project is exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15061(b)(3) and Carlsbad Municipal Code Section 19.04.070 A.1.c.i. Public Notification Information regarding public notifications of this item such as mailings, Public Hearing notices posted in the newspaper and on the city website are available in the Office of the City Clerk. Exhibits 1. City Council Ordinance 2. City Council Resolution 3. Proposed Text Changes in the Zone Code shown in strikeout-underline format 4. Planning Commission Resolution 5. Planning Commission Staff Report dated Dec. 4, 2019 6. Planning Commission Minutes dated Dec. 4, 2019 Feb. 11, 2020 Item #4 Page 3 of 60 ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A ZONE CODE AMENDMENT AND LOCAL COASTAL PROGRAM AMENDMENT TO ENSURE CONSISTENCY WITH FEDERAL GUIDELINES RELATED TO FLOODPLAIN MANAGEMENT REGULATIONS. CASE NAME: FLOODPLAIN MANAGEMENT REGULATIONS AMENDMENTS CASE NO.: ZCA 2019-0001/LCPA 2019-0004 (PUB2019-0010) EXHIBIT 1 WHEREAS, the city planner has prepared a Zone Code Amendment (ZCA 2019-0001)/Local Coastal Program Amendment (LCPA 2019-0004) pursuant to Chapter 21.52 of the Carlsbad Municipal Code, Section 30514 of the Public Resources Code, and Section 13551 of California Code of Regulations Title 14, Division 5.5; and WHEREAS, the Carlsbad Zone Code is the implementing ordinance of the Carlsbad Local Coastal Program, and therefore, an amendment to the Zone Code also constitutes an amendment to the Local Coastal Program; and WHEREAS, pursuant to California Coastal Commission Regulations, a six-week public review period for the Local Coastal Program Amendment began on Nov. 22, 2019 and ended on Jan. 3, 2020; and WHEREAS, on Dec. 4, 2019, the Planning Commission held a duly noticed public hearing as prescribed by law to consider ZCA 2019-0001/LCPA 2019-0004; and WHEREAS, the Planning Commission adopted Planning Commission Resolution No. 7353 recommending to the City Council that ZCA 2019-0001/LCPA 2019-0004 be approved; and WHEREAS, the City Council of the City of Carlsbad held a duly noticed Public Hearing as prescribed by law to consider ZCA 2019-0001/LCPA 2019-0004; and Feb. 11, 2020 Item #4 Page 4 of 60 WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, the City Council considered all factors, including written public comments, if any, related to ZCA 2019-0001/LCPA 2019-0004; and WHEREAS, the findings of the Planning Commission in Resolution No. 7353 constitute the findings of the City Council in this matter. NOW THEREFORE, the City Council of the City of Carlsbad, California, ordains as follows that: 1. The above recitations are true and correct. 2. The findings of the Planning Commission in Planning Commission Resolution No. 7353 shall also constitute the findings of the City Council. 3. Carlsbad Municipal Code Section 21.110 is amended to read as follows: 21.110.010 Statutory authorization. This chapter is adopted pursuant to the legislative authority set forth in Government Code Sections 65302, 65560 and 65800 which conferred upon local government units authority to adopt regulations designed to promote the public health, safety and general welfare of its citizenry. (Ord. NS-39 § 1, 1988) 21.110.030 Statement of purpose. (a) The floodplain management regulations are necessary due to the following facts: (1) The flood hazard areas of the city are subject to periodic inundation that may result in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare. (2) These flood losses are caused by the cumulative effect of obstructions in areas of special flood hazards that increase flood heights and velocities, and when inadequately anchored, damage uses in other areas. Uses that are inadequately flood-proofed, elevated or otherwise protected from flood damage also contribute to the flood loss. (b) It is the purpose of this chapter to promote the public health, safety and general welfare, and to minimize public and private losses due to flood conditions in specific areas by provisions designed: (1) To protect human life and health; (2) To minimize expenditure of public money for costly flood-control projects; Feb. 11, 2020 Item #4 Page 5 of 60 (3) To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public; (4) To minimize prolonged business interruptions; (5) To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in areas of special flood hazard; {6) To help maintain a stable tax base by providing for the second use and development of areas of special flood hazard so as to minimize future flood blight areas; (7) To ensure that potential buyers are notified that property is in an area of special flood hazard; {8) To ensure that those who occupy the areas of special flood hazard assume responsibility for their actions; and {9) Recognize floodplain areas as potential open space resources and encourage compatible open space uses wherever possible. (Ord. CS-102 § CXXIII, 2010; Ord. NS-39 § 1, 1988) 21.110.040 Methods of reducing flood losses. In order to accomplish its purposes, this chapter includes methods and provisions for: {1) Restricting or prohibiting uses which are dangerous to health, safety and property due to water or erosion hazards, or which result in damaging increases in erosion or flood heights or velocities; (2) Requiring that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction; {3) Controlling the alteration of natural floodplains, stream channels and natural protective barriers, which help accommodate or channel floodwaters; (4) Controlling filling, grading, dredging and other development which may increase flood damage; and (5) Preventing or regulating the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards in other areas. {Ord. NS-39 § 1, 1988) 21.110.050 Definitions. For the purposes of this chapter, the following words and phrases have the meaning respectively ascribed to them by this section: {1) "1-percent-annual-chance flood" means the flood having one chance in 100 of being equaled or exceeded in any one-year period (also known as the 100-year flood or base flood). (2) "Appeal" means a request for a review of the floodplain administrator's interpretation of any provision of this chapter or a request for a variance. {3) "Area of shallow flooding" means a designated A, AO, AH or VE zone on the Flood Insurance Rate Map {FIRM). The base flood depths range from one to three feet; a clearly defined channel does not exist; the path of flooding is unpredictable and indeterminate; and velocity flow may be evident. Feb. 11, 2020 Item #4 Page 6 of 60 (4) "Area of special flood-related erosion hazard" means the area subject to severe flood related erosion losses. The area is designated as zone Eon the Flood Insurance Rate Map (FIRM). (5) "Area of special mudslide (i.e., mudflow) hazard" means the area subject to severe mudslides (i.e., mudflows). The area is designated as zone Mon the Flood Insurance Rate Map (FIRM). (6) "Base flood" means the flood having a one percent chance of being equaled or exceeded in any given year (also called the 1-percent-annual-chance or 100-year flood). (7) "Basement" means any area of the building having its floor subgrade (below ground level) on all sides. (8) "Breakaway walls" means any type of walls, whether solid or lattice, and whether constructed of concrete, masonry, wood, metal, plastic or any other suitable building material which is not part of the structural support of the building and which is designed to break away under abnormally high tides or wave action without causing any damage to the structural integrity of the building on which they are used or any buildings to which they might be carried by floodwaters. A breakaway wall shall have a safe design loading resistance of not less than ten and no more than twenty pounds per square foot. Use of breakaway walls must be certified by a registered engineer or architect and shall meet the following conditions: (A) Breakaway wall collapse shall result from a water load less than that which would occur during the base flood; and (B) The elevated portion of the building shall not incur any structural damage due to the effects of wind and water loads acting simultaneously in the event of the base flood. (9) "Coastal high hazard area" means the area subject to high velocity waters, including coastal and tidal inundation or tsunamis. The area is designated on a Flood Insurance Rate Map (FIRM) as zone Vl-30, VE or V. (10) "Development" means any man made change to improved or unimproved real estate including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials. (11) "Encroachment" means the advance or infringement of uses, plant growth, fill, excavation, buildings, permanent structure.s or development into a floodplain which may impede or alter the flow capacity of a floodplain. (12) "Existing manufactured home park or subdivision" means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets and either final site grading or the pouring of concrete pads) was completed before October 11, 1988. (13) · "Expansion to an existing manufactured home park or subdivision" means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets and either final site grading or the pouring of concrete pads). (14) "Flood" or "flooding" means a general and temporary condition of partial or complete inundation of normally dry land areas due to: Feb. 11, 2020 Item #4 Page 7 of 60 (A) The overflow of floodwaters (B) The unusual and rapid accumulation or runoff of surface waters from any source (C) The collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature, such as flash flood or an abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in flooding as defined in this definition. (15) "Flood Boundary and Floodway Map" means the official map on which the Federal Emergency Management Agency or the Federal Insurance Administration has delineated both the areas of flood hazard and the floodway. (16) "Flood Insurance Rate Map (FIRM)" means the official map on which the Federal Emergency Management Agency or the Federal Insurance Administration has delineated both the areas of special flood hazards and the risk premium zones applicable to the community. (17) "Flood Insurance Study" means the official report provided by the Federal Insurance Administration that includes flood profiles, the FIRM, the Flood Boundary and Floodway Map, and the water surface elevation of the base flood. (18) "Floodplain" or "flood-prone area" means any land area susceptible to being inundated by water from any source. (See definition of flood above). (19) "Floodplain management" means the operation of an overall program of corrective and preventive measures of reducing flood damage including, but not limited to, emergency preparedness plans, flood control works and floodplain management regulations. (20) "Floodplain management regulations" means zoning chapters, subdivision regulations, building codes, health regulations, special purpose chapters (such as floodplain chapter, grading chapter and erosion control chapter) and other applications of police power. The term describes such state or local regulations in any combination thereof, which provide standards for the purpose of flood damage prevention and reduction. (21) "Floodproofing" means any combination of structural and nonstructural additions, changes or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents. (22) "Floodway" means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. Also referred to as "regulatory floodway." {23) "Functionally dependent use" means a use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, but does not include long-term storage or related manufacturing facilities. (24) "Highest adjacent grade" means the highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure. Feb. 11, 2020 Item #4 Page 8 of 60 (25) "Historic structure" means any structure that is: 1. Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; 2. Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; 3. Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of Interior; or 4. Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either by an approved state program as determined by the Secretary of the Interior or directly by the Secretary of the Interior in states without approved programs. (26) "Lowest floor" means the lowest floor of the lowest enclosed area, including basement (see "Basement" definition). (A) An unfinished or flood-resistant enclosure below the lowest floor that is usable solely for parking of vehicles, building access or storage in an area other than a basement area, is not considered a building's lowest floor provided it conforms to applicable non-elevation design requirements, induding, but not limited to: (i) The anchoring standards in Section 21.110.160(1); (ii) The construction materials and methods standards in Section 21.110.160(2); (iii) The wet flood proofing standard in Section 21.110.160(3); and (iv) The standards for utilities in Section 21.110.170. (27) "Manufactured home" means a structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes, the term "manufactured home" does not include park trailers, travel trailers and other similar vehicles placed on a site for greater than one hundred eighty consecutive days. (28) "Manufactured home park or subdivision" means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for sale or rent. (29) "Mean sea level" means the average level of the surface of the ocean from which heights such as elevation may be measured based on, the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum to which base flood elevations shown on a community's Flood Insurance Rate Map are referenced. (30) "New construction" shall mean, solely for the purposes of FEMA determining National Flood Insurance Program insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after October 11, 1988, whichever is later, and includes any subsequent improvements to such structures. (31) "New manufactured home park or subdivision" means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the Feb. 11, 2020 Item #4 Page 9 of 60 construction of streets and either final site grading or the pouring of concrete pads) is completed on or after October 11, 1988. {32) "Obstruction" includes, but is not limited to, any dam, wall, wharf, embankment, levee, dike, pile, abutment, protection, excavation, channelization, bridge, conduit, culvert, building, wire, fence, rock, gravel, refuse, fill, structure, vegetation or other material in, along, across or projecting into any watercourse which may alter, impede, retard or change the direction and/or velocity of the flow of water, or due to its location, its propensity to snare or collect debris carried by the flow of water, or its likelihood of being carried downstream. {33} "Recreational vehicle" means a vehicle which is: a. Built on a single chassis b. Four hundred square feet or less when measured at the largest horizontal projection c. Designed to be self-propelled or permanently towable by a light-duty truck; and d. Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. (34) "Remedy a violation" means to bring the structure or other development into compliance with state or local floodplain management regulations, or, if this is not possible, to reduce the impacts of its noncompliance. Ways that impacts may be reduced include protecting the structure or other affected development from flood damages, implementing the enforcement provisions of the ordinance or otherwise deterring future similar violations, or reducing state or federal financial exposure with regard to the structure or other development. (35) "Riverine" means relating to, formed by, or resembling a river (including tributaries), stream, brook; etc. {36) "Sand dunes" means naturally occurring accumulations of sand in ridges or mounds landward of the beach. (37) "Special flood hazard area (SFHA)" means an area having special flood or flood-related erosion hazards, and shown on a FIRM as Zones A, AO, AH, Al-30, AE, A99, AR, AR/Al-30, AR/AE, AR/ AO, AR/ AH, AR/ A, VO, Vl-30, VE, and V. (38) "Start of construction" means and includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, placement or other improvement was within one hundred eighty days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installations of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footing, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that Feb. 11, 2020 Item #4 Page 10 of 60 alteration affects the external dimensions of the building. For a structure (other than a mobile home) without a basement or poured footings, the "start of construction" includes the first permanent framing or assembly of the structure or any part thereof on its piling or foundation. For mobile homes not within a mobile home park or mobile home subdivisions, "start of construction" means the affixing of the mobile home to its permanent site. For mobile homes within mobile home parks or mobile home subdivisions, "start of construction" is the date on which the construction of facilities for servicing the site on which the mobile home is to be affixed (including, at a minimum, the construction of streets, either final site grading or the pouring of concrete pads, and installation of utilities) is completed. (39) "Structure" means a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home. (40) "Substantial damage" means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed fifty percent of the market value of the structure before the damage occurred. (41) "Substantial improvement" means any reconstruction, rehabilitation, addition, or other proposed new development of a structure, the cost of which equals or exceeds fifty percent of the market value of the structure before the "start of construction" of the improvement. This term includes structures, which have incurred "substantial damage," regardless of the actual repair work performed. The term does not, however, include either: (A) Any project for improvement of a structure to correct existing violations or state or local health, sanitary or safety code specifications which have been identified by the applicable code enforcement officials and which are the minimum necessary to assure safe living conditions; or (B) Any alteration of a "historic structure," provided that the alteration will not preclude the structure's continued designation as a "historic structure." (42) "Variance" means a grant of relief from the requirements of this chapter which permits construction in a manner that would otherwise be prohibited by this chapter. (43) "Violation" means the failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in this chapter is presumed to be in violation until such time as that documentation is provided. (Ord. NS-664 §§ 1, 2, 2003; Ord. NS-39 § 1, 1988) 21.110.060 Applicability. This chapter shall apply to all areas of special flood hazard areas, areas of flood-related erosion hazards, areas of mudslide (i.e., mudflow) hazards and any areas identified by the city subject to a 1- percent-annual-chance-flood within the jurisdiction of the city. When only a portion of a parcel of land lies within the areas of special flood hazards, the provisions of this chapter shall apply only to that portion lying within those areas. (Ord. NS-39 § 1, 1988) Feb. 11, 2020 Item #4 Page 11 of 60 21.110.070 Basis for establishing the areas of special flood hazard. The special flood hazard area (SFHA) identified by the Federal Insurance Administration (FIA) of the Federal Emergency Management Agency (FEMA) in the San Diego County and incorporated areas Flood Insurance Study (FIS), dated December 20, 2019, and accompanying Flood Insurance Rate Map (FIRM), dated December 20, 2019 and all subsequent amendments and/or revisions are hereby adopted by reference and declared to be a part of this chapter. SFHA include Zones A, AO, AH, Al-30, AE, A99, AR, AR/Al-30, AR/AE, AR/AO, AR/AH, AR/A, VO, Vl-30, VE, and V. The FIS and attendant mapping is the minimum area of applicability of this chapter and may be supplemented by studies for other areas that allow implementation of this chapter and are recommended to the city council by the floodplain administrator. The FIS and FIRM are on file in the office of the city engineer in Carlsbad, California, 92008. (Ord. NS-664 § 3, 2003; Ord. NS-39 § 1, 1988) 21.110.080 Compliance. No structure or land shall hereafter be constructed, located, extended, converted or altered without full compliance with the terms of this chapter and other applicable regulations. Violations of the provisions of this chapter by failure to comply with any of its requirements (including violations of conditions and safeguards established in connection with conditions) shall constitute a misdemeanor. Nothing in this chapter shall prevent the city from taking such lawful action as is necessary to prevent, enjoin or remedy any violation. (Ord. NS-39 § 1, 1988) 21.110.090 Abrogation and greater regulations. This chapter is not intended to repeal, abrogate or impair any existing easements, covenants or deed restrictions. However, where this chapter and other chapter, easement, covenant or deed restriction conflict or overlap, whichever imposes the more stringent restrictions shall prevail. (Ord. NS-39 § 1, 1988) 21.110.100 Interpretation. In the interpretation and application of this chapter, all provisions shall be: A. Considered as minimum requirements; B. Liberally construed in favor of the governing body; and C. Deemed neither to limit nor repeal any other powers granted under state statutes. (Ord. NS- 39 § 1, 1988) 21.110.110 Warning and disclaimer of liability. The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare occasions. Flood heights may be increased by manmade or natural causes. This chapter does not imply that land outside the areas of special flood hazards, areas of flood-related erosion hazards and areas of mudslide (i.e., mudflow) hazards or uses permitted within such areas will be free from flooding or flood damages. This chapter shall not create liability on the part of the city, any officer or employee thereof, or the Federal Insurance Administration, for any flood damages that result from Feb. 11, 2020 Item #4 Page 12 of 60 reliance on this chapter or any administrative decision lawfully made thereunder. (Ord. NS-39 § 1, 1988) 21.110.130 Special use permit. A. Special Use Permit Required. A special use permit shall be obtained in addition to any other . required permits or entitlements before construction or development begins within any special flood hazard areas, areas of flood-related erosion hazards or areas of mudslide (Le., mudflow) hazards established in Section 21.110:070. 1. Exception. The maintenance, repair or replacement of existing previously-permitted boat docks is not subject to the requirement to obtain a special use permit, provided that the boat dock pilings will remain in place as part of the proposed work. B. Permit procedures. Procedures for special use permit shall be subject to the development permit procedures in Chapter 21.54 and 2L58, including the following: 1. Applications and fees, 2. Decision making authority, 3. Expiration, extensions, and amendments C. Special application requirements. An application for a special use permit shall: 1. Be accompanied by plans showing the nature, location, dimensions and elevation of the project site; existing or proposed structures, fill, storage of materials, drainage facilities; and all other materials as specified by the city planner. Specifically, the following information must be provided: a. Proposed elevation in relation to mean sea level, of the lowest floor (including basement) of all structures; in zone AO or VO, elevation of highest adjacent grade and proposed elevation of lowest floor of all structures; b. Proposed elevation in relation to mean sea level to which any structure will be flood proofed; c. All appropriate certifications listed in Section 21.110.150(D) of this chapter; d. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development; e. Environmental impact assessment f. Environmental impact report, if required; and g. Certification by a registered professional engineer/architect that all design and methods of construction meet elevation and anchoring standards per the code of federal regulations (Title 44 Section 60.3). (Ord. CS-164 § 10, 2011; Ord. CS-102 § CXXIV, 2010; Ord. NS-39 § 1, 1988) D. Administration. Administrative procedures related to the processing of a minor nonresidential planned development permit and nonresidential planned development permit shall be subject to Chapters 21.54.060 and 21.54.061, including the following: 1. Notices and hearings, Feb. 11, 2020 Item #4 Page 13 of 60 2. Announcement of decision, 3. Effective date and appeals. E. Findings for approval of a Special Use Permit. A special use permit required by this chapter may be approved or conditionally approved by the city planner, upon the advice of the floodplain administrator and only if the following findings are made: (1) The project is consistent with the general plan, local coastal program, the requirements of this chapter, and any other applicable requirement of this code. (2) The site is reasonably safe from flooding. (3) The project is designed to minimize the flood hazard to the habitable portions of the proposed structure. (4) The proposed project does not create a hazard for adjacent or upstream properties or structures. (5) The proposed project does not create any additional hazard or cause adverse impacts to downstream properties or structures. (6) The proposed project does not reduce the ability of the site to convey or handle a base flood of a 1-percent-annual-chance flood. (7) The cumulative effect of the proposed project when combined with all the other existing, proposed, and anticipated development will not increase the water surface elevation of the base flood more than one foot at any point. (8) The project is contingent upon compliance with other federal and state regulations as required. (Ord. CS-164 § 10, 2011; Ord. CS-102 § CXXV, 2010) 21.110.140 Designation of floodplain administrator. The city engineer is appointed as the floodplain administrator. (Ord. CS-102 § CXXVI, 2010; Ord. NS- 39 § 1, 1988) 21.110.150 Duties and responsibilities of the floodplain administrator. The duties and responsibilities ofthe floodplain administrator shall include, but not be limited to: A. Permit Review. The floodplain administrator shall review all development permits to determine: 1. The permit requirements of this chapter have been satisfied, including determination of substantial improvement and substantial damage of existing structures; 2. All other required state and federal permits have been obtained; 3. The site is reasonably safe from flooding; Feb. 11, 2020 Item #4 Page 14 of 60 4. The proposed development does not adversely affect the carrying capacity of areas where base flood elevations have been determined but a floodway has not been designated. This means that the cumulative effect of the proposed development when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood more than 1 foot at any point within the City of Carlsbad; and 5. Where base flood elevations are changed due to physical alterations: a. Within 6 months of information becoming available or project completion, whichever comes first, the floodplain administrator shall submit or assure that the permit applicant submits technical or scientific data to FEMA for a Letter of Map Revision (LOMR). b. All Letters of Map Revision (LOMR's) for flood control projects are approved prior to the issuance of building permits. Building Permits must not be issued based on Conditional Letters of Map Revision (CLOMR's). Approved CLOMR's allow construction of the proposed flood control project and land preparation as specified in the "start of construction" definition. B. Advise Decision-Making Authority. The floodplain administrator shall advise the decision-making authority specified in Section 21.110.150 regarding the proposed development. C. Review, Use and Development of Other Base Flood Data. When base flood elevation data has n·ot been provided in accordance with Section 21.110.070, the floodplain administrator shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source, in order to administer Sections 21.110.160 through 21.110.230 of this chapter. Any such information shall be submitted to the city council for adoption. D. Notification of Other Agencies. Whenever a watercourse is to be altered or relocated: (A) Notify adjacent communities and the California Department of Water Resources prior to the alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Insurance Administration; (B) Require that the flood-carrying capacity of the altered or relocated portion of such watercourse is maintained. E. Documentation of Floodplain Development. Obtain and maintain for public inspection and make available as needed: (A) The certification required in Section 21.110.160{3)(A), floor elevations; (B) The certification required in Section 21.110.160(3)(8), elevations in areas of shallow flooding; (C) The certification required in Section 21.110.160(3)((), elevations or floodproofing of nonresidential structures; (D) The certification required in Section 21.110.160{3)(D), wet floodproofing standard; (E) The certified elevation required in Section 21.110.180(b), subdivision standards; Feb. 11, 2020 Item #4 Page 15 of 60 (F) The certification required in Section 21.110.200(1), floodway encroachments; (G) The information required in Section 21.110.210(6), coastal construction; and (H) The reports required in Section 21.110.220(d), mudflow standards. F. · Map Determinations. Make interpretations where needed, as to the exact location of the boundaries of the areas of special flood hazards, areas of special flood-related erosion hazards or areas of mudslide (i.e., mudflow) hazards, for example, where there appears to be a conflict between a mapped boundary and actual field conditions. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in Section21.110.240 of this chapter. G. Remedy Action. Take action to remedy violations of this chapter as specified in Section 21.110.080 of this chapter. (Ord. CS-102 § CXXVII, 2010; Ord. NS-39 § 1, 1988) H. Biennial Report. Complete and submit Biennial Report to FEMA. I. Planning. Assure the General Plan is consistent with the floodplain management objectives herein. 21.110.160 Standards of construction. In all areas of special flood hazards the following standards are required: (1) Anchoring. (A) All new construction and substantial improvements, including manufactured homes, shall be anchored to prevent flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. (B) All manufactured homes shall meet the anchoring standards of Section 21.110.190. (2) Construction Materials and Methods. (A) All new construction .and substantial improvements, including manufactured homes, shall be constructed with materials and utility equipment resistant to flood damage for areas below the base flood elevation plus two feet of freeboard. (B) All new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage for areas below the base flood elevation plus two feet of free board. (C) All new construction and substantial improvements, including manufactured homes, shall be constructed with electrical, heating, ventilation, plumbing and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. (D) Require within zones AH, AO or VE, adequate drainage paths around structures on slopes to guide floodwaters around and away from proposed structures. Feb. 11, 2020 Item #4 Page 16 of 60 (3) Elevation and Floodproofing. (A) New construction and substantial improvement of any structure shall have the lowest floor, including basement, elevated two feet above the base flood elevation. Nonresidential structures may meet the standards in subsection (3)(C) of this section. Upon the completion of the structure the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor, or verified by the city building inspector to be properly elevated. Such certification or verification shall be provided to the floodplain administrator. (B) New construction and substantial improvement of any structure in Zone AO and AE shall have the lowest floor, including basement, elevated above the highest adjacent grade or two feet above the base flood elevation. Nonresidential structures may meet the standards in subsection {3)(C) of this section. Upon completion of the structure the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor, or verified by the city building inspector to be properly elevated. Such certification or verification shall be provided to the floodplain administrator. (C) In a Zone VE, the lowest horizontal support member shall be elevated at least two feet above the base flood elevation. Upon completion of the structure the elevation shall be certified by a registered professional engineer or surveyor or verified by the city building inspector to be properly elevated. Such certification or verification shall be provided to the floodplain administrator. (D) In an A (Unnumbered/Approximate A Zone) Zone, without base flood elevations specified on the FIRM, elevated at least two feet above the base flood elevation. Upon completion of the structure the elevation shall be certified by a registered professional engineer or surveyor or verified by the city building inspector to be properly elevated. Such certification or verification shall be provided to the floodplain administrator. (E) Nonresidential construction, including substantial improvements, shall either be elevated in conformance with subsection (3)(A) or (3)(B) of this section or together with attendant utility arid sanitary facilities: (i) Be flood proofed so that below the base flood level the structure is watertight with walls substantially impermeable to the passage of water; (ii) Have structural components capable of resisting hydrostatic and hydrodynamic loads and effects of buoyancy; and (iii) Be certified by a registered professional engineer or architect that the standards of this subsection are satisfied. Such certifications shall be provided to the floodplain administrator. "' (F) Require, for all new construction and substantial improvements, that fully enclosed areas below the lowest floor that are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or meet or exceed the following minimum criteria: Feb. 11, 2020 Item #4 Page 17 of 60 (i) Either a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of all openings shall be no higher than one foot above grade. Openings may be equipped with screens, louvers, valves or other coverings or devices; provided, that they permit the automatic entry and exit of floodwaters; or (ii) Be certified to comply with a local flood proofing standard approved by the Federal Insurance Administration. (G) Manufactured homes shall also meet the standards in Section 21.110.190 of this chapter. (H) Garages and low cost accessory structures a. Attached garages. 1. A garage attached to a residential structure, constructed with the garage floor slab below the base flood elevation must be designed to allow for the automatic entry of flood waters. Areas of the garage below the base flood elevation must be constructed with flood resistant materials. 2. A garage attached to a nonresidential structure must meet the above requirements or be dry flood proofed. For guidance on below grade parking areas, see FEMA Technical Bulletin TB-6. b. Detached garages and accessory structures. 1. "Accessory structures" used solely for parking (2 car detached garages or smaller) or limited storage (small, low-cost sheds) may be constructed such that its floor is below the base flood elevation provided the structure is designed and constructed in accordance with the following requirements: a. Use of the accessory structure must be limited to parking or limited storage; b. The portions of the accessory structure located below the base flood elevation must be built using flood-resistant materials; c. The accessory structure must be adequately anchored to prevent flotation, collapse and lateral movement; d. Any mechanical and utility equipment in the accessory structure must be elevated or flood proofed to or above the base flood elevation plus two feet freeboard; and e. The accessory structure must be designed to allow for the automatic entry of flood waters. (Ord. NS-39 § 1, 1988) 21.110.170 Standards for utilities. (a) All new and replacement water supply and sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the system and discharge from systems into floodwaters. (b) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. (Ord. NS-39 § 1, 1988) Feb. 11, 2020 Item #4 Page 18 of 60 21.110.180 Standards for subdivisions. (a) All preliminary subdivision proposals, including proposals for manufactured home parks and subdivisions, greater than 50 lots or 5 acres, whichever is less, shall identify the flood hazard area and the elevation ofthe base flood. (b) All final subdivision plans will provide the elevation of proposed structure(s) and pads. If the site is filled above the base flood, the final pad elevation shall be certified by a registered professional engineer or surveyor and provided to the floodplain administrator. (c) All subdivision proposals shall be consistent with the need to minimize flood damage. (d) All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage. (e) All subdivisions shall provide adequate drainage to reduce exposure to flood hazards. (Ord. NS-39 § 1, 1988) 21.110.190 Standards for manufactured homes. A. Elevated Above Flood Elevation. All manufactured homes that are placed or substantially improved, on sites located: 1. Outside of a manufactured home park or subdivision; 2. In a new manufactured home park or subdivision; 3. In an expansion to an existing manufactured home park or subdivision; or 4. In an existing manufactured home park or subdivision upon which a manufactured home has incurred "substantial damage" as the result of a flood, shall: a. Within Zones Al-30, AH, and AE on the community's Flood Insurance Rate Map, be elevated on a permanent foundation such that the lowest floor of the manufactured home is elevated two feet above the base flood elevation and be securely fastened to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. b. Within Zones Vl-30, V, and VE on the community's Flood Insurance Rate Map, meet the requirements of Section 21.110.210. B. Elevated Above Flood Elevation or Reinforced Piers. All manufactured homes to be placed or substantially improved on sites in an existing manufactured home park or subdivision within Zones Al-30, AH, AE, Vl-30, V, and VE on the community's Flood Insurance Rate Map that are not subject to the provisions of Section 21.110.190.A above will be securely fastened to an adequately anchored foundation system to resist flotation, collapse, and lateral movement, and be elevated so that either the: 1. Lowest floor of the manufactured home is elevated two feet above the base flood elevation; or 2. Manufactured home chassis is supported by reinforced piers or other foundation elements of at least equivalent strength that are no less than 36 inches in height above grade. C. Certification of Proper Elevation. Upon the completion of the structure, the elevation of the lowest floor including basement shall be certified by a registered civil engineer or licensed land surveyor and verified by the community building inspector to be properly elevated. Such certification and verification shall be provided to the Floodplain Administrator. (Ord. NS-39 § 1, 1988) Feb. 11, 2020 Item #4 Page 19 of 60 21.110.195 Standards for Recreational Vehicles. A. All recreational vehicles placed in Zones Al-30, AH, AE, Vl-30 and VE will either: 1. Be on the site for fewer than 180 consecutive days; or 2. Be fully licensed and ready for highway use. A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached additions; or 3. Meet the permit requirements of Section 21.110.130 of this ordinance and the elevation and anchoring requirements for manufactured homes in Section 21.110.190. B. Recreational vehicles placed on sites within Zones Vl-30, V, and VE on the community's Flood Insurance Rate Map will meet the requirements of Section 21.110.195.A and Section 21.110.210. 21.110.200 Floodways. Located within the special flood hazard area established in Section 21.110.070 are areas designated as floodways. Since the floodway is an extremely hazardous area due to the velocity of floodwaters which carry debris, potential projectiles, and erosion potential, the following provisions apply: (1) Until a regulatory floodway is adopted in Zone A Areas, no new construction, substantial development, or other development (including fill) shall be permitted within Zones Al-30 and AE, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other development, will not increase the water surface elevation of the base flood more than 1 foot at any point within the City of Carlsbad. (2) Within an adopted regulatory floodway, the city shall prohibit encroachments, including fill, new construction, substantial improvements and other development unless certification by a registered professional engineer or architect is provided demonstrating that encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge. (3) If subsection 1 and 2 of this section is satisfied, all new construction and substantial. improvements shall comply with all other applicable flood hazard reduction provisions of Sections 21.110.160 through 21.110.230 of this chapter. (Ord. NS-39 § 1, 1988) 21.110.210 Coastal high hazard areas. Within coastal high hazard areas, Zones V, Vl-30 and VE, as established in Section 21.110.070, the following standards shall apply: (1) All new construction and substantial improvements shall be elevated on adequately anchored pilings or columns and securely anchored to such pilings or columns so that the lowest horizontal portion of the structural members ofthe lowest floor (excluding the pilings or columns) is elevated two feet above the base flood elevation. All critical infrastructure shall be elevated three feet above the base flood elevation. (2) All new construction shall be located on the landward side of the reach of mean high tide and shall remain consistent with all requirements of the Local Coastal Program as the mean high tide line rises as a result of sea level rise. (3) . All new construction and substantial improvements shall have the space below the lowest floor free of obstructions or constructed with breakaway walls. Such temporarily enclosed space shall not be used for human habitation and useable only for parking of vehicles, building access, or storage. Feb. 11, 2020 Item #4 Page 20 of 60 (4) No new basements, expansion of existing basements, or improvements to existing basements shall be allowed in the AE or VE zones. (5) No fill shall be permitted in coastal high hazard areas. (6) Man made alte~ations of sand dunes which would increase potential flood damage is prohibited. (7) The floodplain administrator shall obtain and maintain the following records: (A) Certification by a registered engineer or architect that a proposed structure complies with Section 21.110.210(1). (B) The elevation (in relation to mean sea level) ofthe bottom of the lowest structural member of the lowest floor (excluding pilings or columns) of all new and substantially improved structures, and whether such structures contain a basement. (Ord. NS-39 § 1, 1988) 21.110.220 Mudslide (i.e., mudflow) prone areas. · (a) The floodplain administrator shall review permits for proposed construction or other development to determine if it is proposed within a mudslide area. (b) Permits shall. be reviewed to determine that the proposed development is reasonably safe from mudslide hazards. Factors to be considered in making this determination include, but are not limited to: (1) The type and quality of soils; (2) Evidence of groundwater or surface water problems; (3) The depth and quality of any fill; (4) The overall slope of the site; and (5) The weight that any proposed development will impose on the slope. (c) Within areas that have mudslide hazards, the following requirements apply: (1) A site investigation and further review shall be made by a person qualified in geology and soils engineering; (2) The proposed grading, excavation, new construction and substantial improvements shall be adequately designed and protected against mudslide damages; (3) The proposed grading, excavations, new construction and substantial improvements do not aggravate the existing hazard by creating either on-site or off-site disturbances; and (4) Drainage, planting, watering and maintenance shall not endanger slope stability. (d) When the Federal Insurance Administrator has delineated zone M (special mudslide hazard area) on the Flood Insurance Rate Map, the community shall adopt and enforce a grading ordinance or regulation in accordance with data supplied by the Federal Insurance Administrator at least complies with the standards of Appendix J -Grading of the most recent amendment of the 2019 California Building Code, Title 24, Part 2, Volume 2: (1) Regulates the location of foundation and utility systems of new construction and substantial improvements; Feb. 11, 2020 Item #4 Page 21 of 60 (2) Regulates the location, drainage and maintenance of all excavations, cuts and fills and planted slopes; (3) Provides special requirements for protective measures including, but not limited to, retaining walls, buttress fills, subdrains, diverter terraces, benchings, etc.; and (4) Requires engineering drawings and specifications to be submitted for all corrective measures, accompanied by supporting soils engineering and geology reports. (Ord. NS-39 § 1, 1988) 21.110.230 Flood-related erosion-prone areas. (a) The floodplain administrator shall require permits for proposed construction and other development within all flood-related erosion-prone areas as known to the community. (b) Such permits shall be reviewed to determine whether the proposed site alterations and improvements will be reasonably safe from flood-related erosion and will not cause flood- related erosion hazards or otherwise aggravate the existing hazard . (c) If a proposed improvement is found to be in the path of flood-related erosion or would increase the erosion hazard, such improvement shall be relocated or adequate protective measures shall be taken to avoid aggravating the existing erosion hazard .. (d) Within Zones AE, AO and VE on the effective Flood Insurance Rate Map, a setback is required for all new development from the ocean, lake, bay, riverfront or other body of water to create a safety buffer consisting of a natural vegetative or contour strip. This buffer shall be designated according to the flood-related erosion hazard and erosion rate, in relation to the anticipated useful life of structures, and depending upon the geologic, hydrologic, topographic and climatic characteristics of the land. The buffer may be used for suitable open space purposes, such as for agricultural, forestry, outdoor recreation and wildlife habitat areas, and for other activities using temporary and portable structures only. (Ord. NS-39 § 1, 1988) 21.110.240 Variances. A. Variances from the requirements of this chapter may be granted pursuant to the provisions of this section and Chapter 21.50 of this title. B. Subject to the findings specified in Chapter 21.50 and subsection D of this section, variances may be granted for: 1. New construction, substantial improvement, and other proposed new development to be erected on a lot of one half acre or less in size contiguous to and surrounded by lots with. existing structures constructed below the base flood level. As the lot size increases beyond one half acre, the technical justification required for issuing a variance increases. 2. Repair or rehabilitation of historic structures, as defined in Chapter 21.110.050, upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the exception is the minimum necessary to preserve the historic character and design of the structure. C. Variance considerations. When making decisions on requests for variances, the decision-making authority shall consider all technical evaluations, all relevant factors, standards specified in other sections of this chapter, and: (1) The danger that materials may be swept onto other lands to the injury of others; Feb. 11, 2020 Item #4 Page 22 of 60 (2) The danger of life and property due to flooding or erosion damage; (3) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; (4) The importance of the services provided by the proposed facility to the community; (5) The necessity to the facility of a waterfront location, where applicable; (6) The availability of alternative locations for the proposed use which are not subject to flooding or erosion damage; (7) The compatibility of the proposed use with existing and anticipated development; (8) The relationship of the proposed use to the comprehensive plan and floodplain management program for that area; (9) The safety of access to the property in time of flood for ordinary and emergency vehicles; (10) The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters expected at the site; and (11) The costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, and streets and bridges. D. Variance findings. In addition to the findings specified in Chapter 21.50, no variance from the requirements of this chapter may be granted unless the decision-making authority finds: 1. That the variance is for floodplain management purposes only. 2. That there is a showing of good and sufficient cause; 3. That the variance is the minimum necessary considering the flood hazard, to afford relief. a. "Minimum necessary" as related to this section, means to afford relief with a minimum of deviation from the requirements of this chapter. For example, in the case of a variance from an elevation requirement, the decision-making authority need not grant permission for the applicant to build to the elevation the applicant proposes, but only to that elevation which the decision-making authority believes will both provide relief and preserve the intent of this chapter. 4. That the physical characteristics of the subject property are so unusual that complying with the requirements of this ordinance would create an exceptional hardship to the applicant. a. "Hardship" as related to this section, means the exceptional hardship that would result from a failure to grant the requested variance. Mere economic or financial hardship alone is not exceptional. Inconvenience, aesthetic considerations, physical handicaps, personal preferences, or the disapproval of one's neighbors likewise cannot, as a rule, qualify as an exceptional hardship. All of these problems can be resolved through other means without granting a variance, even if the alternative is more expensive, or requires the property owner to build elsewhere or put the parcel to a different use than originally intended. 5. That the subject property's physical characteristics are unique to the property and not shared by adjacent parcels, and pertain to the land itself, not to the structure, its inhabitants, or the property owners. 6. That the granting of a variance will not result in increased flood heights, additional threats to public safety, or extraordinary public expense, create a nuisance, cause "fraud and · victimization" of the public, or conflict with existing local laws or ordinances. Feb. 11, 2020 Item #4 Page 23 of 60 a. "Public safety" and "nuisance" as related to this section, means that the granting of a variance must not result in anything which is injurious to safety or health of an entire community or neighborhood, or any considerable number of persons, or unlawfully obstructs the free passage or use, in the customary manner, of any navigable lake, or river, bay, stream, canal, or basin. b. "Fraud and victimization" as related to this section, means that the variance granted must not cause fraud on or victimization of the public. In examining this requirement, the decision-making body shall consider the fact that every newly constructed building adds to government responsibilities and remains a part of the community for fifty to one hundred years. Buildings that are permitted to be constructed below the base flood elevation are subject during all those years to increased risk of damage from floods, while future owners of the property and the community as a whole are subject to all the costs, inconvenience, danger, and suffering that those increased flood damages bring. In addition, future owners may purchase the property, unaware that it is subject to potential flood damage, and can be insured only at very high flood insurance rates. 7. If applicable, that the proposed repair or rehabilitation of a historic structure will not preclude the structure's continued designation as an historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure. E. Variance conditions. The decision-making authority may require conditions to the granting of variances as it deems necessary to further the purposes of this chapter. F. Applicant Notice. 1. Pursuant to Title 44 Part 60.G(a)(S) of the Code of Federal Regulations, following the granting of a variance, the city shall provide written notice to the applicant stating that: a. The issuance of a variance to construct a structure below the base flood level will result in increased premium rates for flood insurance up to amounts as high as $25 for $100 of insurance coverage, and b. Such construction below the base flood level increases risks to life and property. 2. The written notice required by this subsection shall be recorded in a manner so that it appears in the chain of title of the affected parcel of land. G. Record of Variances. The Floodplain Administrator shall maintain a record of all variances, including justification for their issuance, and report such variances in its biennial report submitted to FEMA. EFFECTIVE DATE OF THIS ORDINANCE APPLICABLE TO PROPERTIES OUSTIDE THE COASTAL ZONE: This ordinance shall be effective thirty days after its adoption; and the City Clerk shall certify the adoption of this ordinance and cause the full text of the ordinance or a summary of the ordinance prepared by the City Attorney to be published at least once in a newspaper of general circulation in the City of Carlsbad within fifteen days after its adoption. Feb. 11, 2020 Item #4 Page 24 of 60 EFFECTIVE DATE OF THIS ORDINANCE APPLICABLE TO PROPERTIES INSIDE THE COASTAL ZONE: This ordinance shall be effective thirty days after its adoption or upon Coastal Commission approval of LCPA 2019-0004, whichever occurs later; and the City Clerk shall certify the adoption of this ordinance and cause the full text of the ordinance or a summary of the ordinance prepared by the City Attorney to be published at least once in a newspaper of general circulation in the City of Carlsbad within fifteen days after its adoption. INTRODUCED AND FIRST READ at a Regular Meeting of the Carlsbad City Council on the __ _ day of ___ � 2020, and thereafter PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the_ day of ___ � 2020, by the following vote, to wit: AYES: NAYS: ABSENT: APPROVED AS TO FORM AND LEGALITY: CELIA A. BREWER, City Attorney MATT HALL, Mayor BARBARA ENGLESON, City Clerk (SEAL) Feb. 11, 2020 Item #4 Page 25 of 60 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A ZONE CODE AMENDMENT AND A LOCAL COASTAL PROGRAM AMENDMENT TO UPDATE THE CITY'S FLOODPLAIN MANAGEMENT REGULATIONS TO ENSURE CONSISTENCY WITH FEDERAL GUIDELINES RELATED TO FLOODPLAIN MANGEMENT REGULATIONS. EXHIBIT 2 WHEREAS, the city planner, has prepared a proposed amendment to the Zone Code and Local Coastal Program pursuant to Chapter 21.52 of the Carlsbad Municipal Code to ensure consistency with federal guidelines related to floodplain management regulations; and WHEREAS, the City Council of the City of Carlsbad, California has determined that the Planning Commission did, on Dec. 4, 2019, hold a duly noticed Public Hearing as prescribed by law to recommend to the City Council approving an amendment to the Floodplain Management Regulations Zoning Ordinance; and WHEREAS, the City Council of the City of Carlsbad, held a duly noticed Public Hearing to consider said Zone Code Amendment and Local Coastal Program Amendment; and WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, the City Council considered all factors relating to the Zone Code Amendment and Local Coastal Program Amendment. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the recommendation of the Planning Commission for the approval of Zone Code Amendment ZCA 2019-0001 and Local Coastal Program Amendment LCPA 2019-0004 are adopted and approved, and that the findings and conditions of the Planning Commission contained in Planning Commission Resolution No. 7353 on file with the city clerk and incorporated herein by reference, are the findings and conditions of the City Council. 3. This action is final the date this Resolution is adopted by the City Council. The provisions of Chapter 1.16 of the Carlsbad Municipal Code, "Time Limits for Judicial Review" shall apply: Feb. 11, 2020 Item #4 Page 26 of 60 "NOTICE" The time within which judicial review of this decision must be sought is governed by Code of Civil Procedure, Section 1094.6, which has been made applicable in the City of Carlsbad by Carlsbad Municipal Code Chapter 1.16. Any petition or other paper seeking review must be filed in the appropriate court not later than the ninetieth day following the date on which this decision becomes final; however, if within ten days after the decision becomes final a request for the record is filed with a deposit in an amount sufficient to cover the estimated cost or preparation of such record, the time within which such petition may be filed in court is extended to not later than the thirtieth day following the date on which the record is either personally delivered or mailed to the party, or his attorney of record, if he has one. A written request for the preparation of the record of the proceedings shall be filed with the City Clerk, City of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, CA 92008. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the_ day of ___ ~ 2020, by the following vote, to wit: AYES: NAYS: ABSENT: MATT HALL, Mayor BARBARA ENGLESON, City Clerk (SEAL) Feb. 11, 2020 Item #4 Page 27 of 60 FLOODPLAIN MANGEMENT REGULATIONS AMENDMENT ZCA 2019-0001/LCPA 2019-0004 (PUB2019-0010) PROPOSED TEXT CHANGES TO THE ZONING ORDINANCE (TITLE 21) SHOWN IN STRIKETHROUGH/UNDERLINE FORMAT EXHIBIT 3 AMENDMENTS TO CHAPTER 21.110 FLOODPLAIN MANAGEMENT REGULATIONS Chapter 21.110 FLOODPLAIN MANAGEMENT REGULATIONS 21.110.010 Statutory authorization. 21.110. 03 0 Statement of purpose. 21.110.040 Methods ofreducing flood losses. 21.110.050 Definitions. 21 .110.060 Applicability.Lands to 1Nhich this chapter applies. 21.110.070 Basis for establishing the areas of ~special E_:flood Hhazard Area. 21.110.080 Compliance. 21.110.090 Abrogation and greater regulations. 21 .110 .100 Interpretation. 21.110.110 Warning and disclaimer ofliability. 21.110.120 Severability. 21.11 0 .13 0 Special use permit. 21.110 .13 5 Findings for approval. 2 L 110.140 Designation of floodplain administrator. 21 .110.150 Duties and responsibilities of the floodplain administrator. 21.110 .160 Standards of construction. 21.110.170 Standards for utilities. 21.110.180 Standards for subdivisions. 21.110.190 Standards for manufactured homes. 21.110.195 Standards for recreational vehicles. 21.110 .200 Flood ways. 21.110.210 Coastal high hazard areas. 21.110.220 Mudslide (i.e., mudflow) prone areas. 21.110 .230 Flood-related erosion-prone areas. 21.110.240 Variances.Appeals. 21.110.250 Conditions for variances. 21.110.010 Statutory authorization. This chapter is adopted pursuant to the legislative authority set forth in Government Code Sections 65302, 65560 and 65800 which conferred upon local government units authority to adopt regulations designed to promote the public health, safety and general welfare of its citizenry. (Ord. NS-39 § 1, 1988) 21.110.030 Statement of purpose. (a) The floodplain management regulations are necessary due to the following facts: Feb. 11, 2020 Item #4 Page 28 of 60 EXH IBIT 3 (1) The flood hazard areas of the city are subject to periodic inundation that may result in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare. (2) These flood losses are caused by the cumulative effect of obstructions in areas of special flood hazards that increase flood heights and velocities, and when inadequately anchored, damage uses in other areas. Uses that are inadequately flood-proofed, elevated or otherwise protected from flood damage also contribute to the flood loss. (b) It is the purpose of this chapter to promote the public health, safety and general welfare, and to minimize public and private losses due to flood conditions in specific areas by provisions designed: (1) To protect human life and health; (2) To minimize expenditure of public money for costly flood-control projects; (3) To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public; (4) To minimize prolonged business interruptions; (5) To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in areas of special flood hazard; (6) To help maintain a stable tax base by providing for the second use and development of areas of special flood hazard so as to minimize future flood blight areas; (7) To ~-insure that potential buyers are notified that property is in an area of special flood hazard; (8) To ~-insure that those who occupy the areas of special flood hazard assume responsibility. for their actions; and (9) Recognize floodplain areas as potential open space resources and encourage compatible open space uses wherever possible. (Ord. CS-102 § CXXIlI, 2010; Ord. NS-39 § 1, 1988) 21.110.040 Methods of reducing flood losses. In order to accomplish its purposes, this chapter includes methods and provisions for: ( 1) Restricting or prohibiting uses which are dangerous to health, safety and property due to water or erosion hazards, or which result in damaging increases in erosion or flood heights or velocities; (2) Requiring that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction; (3) Controlling the alteration of natural floodplains, stream channels and natural protective barriers, which help accommodate or channel floodwaters; (4) Controlling filling, grading, dredging and other development which may increase flood damage; and ( 5) Preventing or regulating the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards in other areas. (Ord. NS-39 § 1, 1988) Feb. 11, 2020 Item #4 Page 29 of 60 EXHIBIT 3 21.110.050 Definitions. For the purposes of this chapter, the following words and phrases have the meaning respectively ascribed to them by this section: (1) "I-percent-annual-chance flood" means the flood having one chance in 100 of being equaled or exceeded in any one-year period (also known as the 100-year flood or base flood). (2) "Appeal" means a request for a review of the floodplain administrator's interpretation of any provision of this chapter or a request for a variance. ' (1l ) "Area of shallow flooding" means a designated A,__AO, AH or VEG zone on the Flood Insurance Rate Map (FIRM). The base flood depths range from one to three feet; a clearly defined channel does not exist; the path of flooding is unpredictable and indeterminate; and velocity flow . may be evident. (±J) "Area of special flood-related erosion hazard" means the area subject to severe flood related erosion losses. The area is designated as zone E on the Flood Insurance Rate Map (FIRM). (4) Area of Special Flood Hazard. See "Special flood hazard area." (5) "Area of special mudslide (i.e., mudflow) hazard" means the area subject to severe mudslides (i.e., mudflows). The area is designated as zone Mon the Flood Insurance Rate Map (FIRM). ( 6) "Base flood" means the flood having a one percent chance of being equaled or exceeded in any given year (also called the I-percent-annual-chance or 100 one hundred year flood). (7) "Basement" means any area of the building having its floor sub grade (below ground level) on all sides. (8) "Breakaway walls" means any type of walls, whether solid or lattice, and whether constructed of concrete, masonry, wood, metal, plastic or any other suitable building material which is not part of the structural support of the building and which is designed to break away under abnormally high tides or wave action without causing any damage to the structural integrity of the building on which they are used or any buildings to which they might be carried by floodwaters. A breakaway wall shall have a safe design loading resistance of not less than ten and no more than twenty pounds per square foot. Use of breakaway walls must be certified by a registered engineer or architect and shall meet the following conditions: (A) Breakaway wall collapse shall result from a water load less than that which would occur during the base flood; and (B) The elevated portion of the building shall not incur any structural damage due to the effects of wind and water loads acting simultaneously in the event of the base flood. (9) "Coastal high hazard area" means the area subject to high velocity waters, including coastal and tidal inundation or tsunamis. The area is designated on a Flood Insurance Rate Map (FIRM) as zone Vl-30, VE or V. (10) "Development" means any manmade change to improved or unimproved real estate including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials. Feb. 11, 2020 Item #4 Page 30 of 60 EXHIBIT 3 ( 11) "Encroachment" means the advance or infringement of uses, plant growth, fill, excavation, buildings, permanent structures or development into a floodplain which may impede or alter the flow capacity of a floodplain. (12). "Existing manufactured home park or subdivision" means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets and either final site grading or the pouring of concrete pads) was completed before October 11, 1988. (13) "Expansion to an existing manufactured home park or subdivision" means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of uti lities, the construction of streets and either final site grading or the pouring of concrete pads). (l.1-±) "Flood" or "flooding" means a general and temporary condition of partial or complete inundation of normally dry land areas due to: (A) The overflow of floodwaters; (B) The unusual and rapid accumulation or runoff of surface waters from any source; and/or (C) The collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature, such as flash flood or an abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in flooding as defined in this definition. (1 2.l) "Flood Boundary and Floodway Map" means the official map on which the Federal Emergency Management Agency or the Federal Insurance Administration has. delineated both the areas of flood hazard and the floodway. (lB ) "Flood Insurance Rate Map (FIRM)" means the official map on which the Federal Emergency Management Agency or the Federal Insurance Administration has delineated both the areas of special flood hazards and the risk premium zones applicable to the community. (114) "Flood Insurance Study" means the official report provided by the Federal Insurance Administration that includes flood profiles, the FIRM, the Flood Boundary and Floodway Map, and the water surface elevation of the base flood. (l~~) "Floodplain" or "flood-prone area" means any land area susceptible to being inundated by water from any source. {See definition of flood above)ittg. (1.26) "Floodplain management" means the operation of an overall program of corrective and preventive measures of reducing flood damage including, but not limited to, emergency preparedness plans, flood control works and floodplain management regulations. (20++) "Floodplain management regulations" means zoning chapters~ subdivision regulations, building codes, health regulations, special purpose chapters (such as floodplain chapter, grading chapter and erosion control chapter) and other applications of police power. The term describes such state or local regulations in any combination thereof, which provide standards for the purpose of flood damage prevention and reduction. Feb. 11, 2020 Item #4 Page 31 of 60 EXHIBIT 3 (2..l-l-8) "Floodproofing" means any combination of structural and nonstructural additions, changes or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents. (22+9) "Floodway" m.eans the channel of a river or other watercourse and the adjacent land .areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. Also referred to as "regulatory floodway." (210) "Functionally dependent use" means a use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, but does not include long-term storage or related manufacturing facilities. (2:l-l-) "Highest adjacent grade" means the highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure. (25) "Historic structure" means any structure that is: · I. Listed individually in the National Register of Historic Places (a listing maintained by the Department oflnterior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; 2. Ce1iified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; 3. Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of Interior; or +A. Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either by an approved state program as determined by the Secretary of the Interior or directly by the Secretary of the Interior in states without approved programs. (2.Q±) "Lowest floor" means the lowest floor of the lowest enclosed area, including basement (see "Basement" definition). (A) An unfinished or flood-resistant enclosure below the lowest floor that is usable solely for parking of vehicles, building access or storage in an area other than a basement area, is not considered a building's lowest floor provided it conforms to applicable non-elevation design requirements, including, but not limited to: (i) The anchoring standards in Section 2Ll 10.160(1); (ii) The construction materials and methods standards in Section 21.110.160(2); (iii) The wet flood proofing standard in Section 21.110.160(3 ); and (iv) The standards for utilities in Section 21.110.170. (21J) "Manufactured home" means a structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when Feb. 11, 2020 Item #4 Page 32 of 60 EXHIBIT 3 connected to the required utilities. For floodplain management purposes, the term "manufactured home" does notalse includes park trailers, travel trailers and other similar vehicles placed on a site for greater than one hundred eighty consecutive days. (2.8_4) "Manufactured home park or subdivision" means a parcel ( or contiguous parcels) of land divided into two or more manufactured home lots for sale or rent. (22.~) "Mean sea level" means the average level of the surface of the ocean from which heights such as elevation may be measured based on, for purposes of the National Flood Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, to which base flood elevations shown on a community's Flood Insurance Rate Map are referenced. (30) "New construction" shall mean, solely for the purposes of FEMA determining National Flood Insurance Program insurance rates, structures for which the "stat1 of construction" commenced on or after the effective date of an initial FIRM or after October 11, 1988, whichever is later, and includes any subsequent improvements to such structures. (31) "New manufactured home park or subdivision" means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets and either final site grading or the pouring of concrete pads) is completed on or after October 11, 1988. _(26) ''l'fow construction" means, for floodplain management purposes, structures for which the start of construction c01mnenced on or after the effective date of a floodplain management regulation adopted by the community. (27) "One hundred year flood" or "100 year flood" means a flood v,<hich has a one percent annual probability of being equalled or eKceeded. It is identical to the base flood, which v,rill be the term used throughout this chapter. (28) "Person" means an individual or his/her agent, firra, partnership, association or corporation, or agent of the aforementioned groups, or this state or its agencies or political subdivisions. (32) "Obstruction" includes, but is not limited to, any dam, wall, wha1f, embankment, levee, dike, pile, abutment protection, excavation, channelization, bridge, conduit, culvert, building, wire, fence, rock, gravel. refuse, fill, structure, vegetation or other material in, along, across or projecting into any watercourse which may alter, impede, retard or change the direction and/or velocity of the flow of water, or due to its location, its propensity to snare or collect debris carried by the flow of water, or its likelihood of being canied downstream. (33) "Recreational vehicle" means a vehicle which is: a. Built on a single chassis b. Four hundred square feet or less when measured at the largest horizontal projection c. Designed to be self-propelled or permanently towable by a light-duty truck; and Feb. 11, 2020 Item #4 Page 33 of 60 EXHIBIT 3 d. Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. (34;19) "Remedy a violation" means to bring the structure or other development into compliance with state or local floodplain management regulations, or, if this is not possible, to reduce the impacts of its noncompliance. Ways that impacts may be reduced include protecting the structure or other affected development from flood damages, implementing the enforcement provisions of the ordinance or otherwise deterring future similar violations, or reducing state or federal financial exposure with regard to the structure or other development. "Riverine" means relating to, formed by, or resembling a river (including tributaries), stream, brook, etc. (3 2+) "Sand dunes" means naturally occurring accumulations of sand in ridges or mounds landward of the beach. (312) "Special flood hazard area (SFHA)'' means an area having special flood or flood-related erosion hazards, and shown on a_n FHBM or FIRM as Zones A, AO, AH, A 1-30, AE, A99, AR, AR/Al-30, AR/AE, AR/AO, AR/AR AR/A, VO. Vl-30. VE, and V.zorie A, AO, Al 30, AE, A99, AH, VO, Vl 30, VE or V. (3 ~J.) "Start of construction" means and includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, placement or other improvement was within one hundred eighty days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installations of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footing, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the frrst alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building. For a structure (other than a mobile home) without a basement or poured footings, the "start of construction" includes the first permanent framing or assembly of the structure or any part thereof on its piling or foundation. For mobile homes not within a mobile home park or mobile home subdivisions, "start of construction" means the affixing of the mobile home to its permanent site. For mobile homes within mobile home parks or mobile home subdivisions, "start of construction" is the date on which the construction of facilities for servicing the site on which the mobile home is to be affixed (including, at a minimum, the construction of streets, either final site grading or the pouring of concrete pads, and installation of utilities) is completed. (3.24) "Structure" means a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home. ( 40) "Substantial damage" means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed fifty percent of the market value of the structure before the damage occuned. Feb. 11, 2020 Item #4 Page 34 of 60 EXHIBIT 3 (±1~) "Substantial improvement" means any reconstruction, rehabilitation, addition, or other proposed new development of a structure, the cost of which equals or exceeds fifty percent of the market value of the structure before the "start of construction" of the improvement. This term includes structures, which have incurred "substantial damage," regardless of the actual repair work performed. The term does not, however, include either: (A) Any project for improvement of a structure to correct existing violations or state or local health, sanitary or safety code specifications which have been identified by the applicable code enforcement officials and which are the minimum necessary to assure safe living conditions; or (B) Any alteration of a "historic structure," provided that the alteration will not preclude the structure's continued designation as a "historic structure." ( 4 2¼) "Variance" means a grant of relief from the requirements of this chapter which permits construction in a manner that would otherwise be prohibited by this chapter. ( 43;+) "Violation" means the failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in this chapter is presumed to be in violation until such time as that documentation is provided. (Ord. NS-664 §§ 1, 2, 2003; Ord. NS-39 § 1, 1988) 21.110.060 Applicability.Lanc:ts te • .,.,hich this chapteF applies. This chapter shall apply to all areas of special flood hazard areas, areas of flood-related erosion hazards, ~areas of mudslide (i.e., mudflow) hazards and any areas identified by the city subject to a 1-percent- annual-chance-flood within the jurisdiction of the city. When only a portion of a parcel of land lies within the areas of special flood hazards, the provisions of this chapter shall apply only to that portion lying within those areas. (Ord. NS-39 § 1, 1988) 21.110.070 Basis for establishing the areas of special flood hazard. The areas of special flood hazard area (SFHA) identified by the Federal Insurance Administration (FIA) of the Federal Emergency Management Agency (FEMA) in the San Diego County and incorporated areas Flood Insurance Study (FIS), dated June 19, 1997December 20, 2019, and accompanying Flood Insurance Rate Map (FIRM), dated December 20, 2019 June 19, 1997, and all subsequent amendments and/or revisions are hereby adopted by reference and declared to be a part of this chapter. SFHA incl ude Zones A. AO, AH. Al -30, AE, A99, AR, AR/Al-30, AR/AE, AR/AO, AR/AH, AR/A, VO, Vl-30, VE, and V . . Thfis FIS and attendant mapping is the minimum area of applicability of this chapter and may be supplemented by studies for other areas that allow implementation of this chapter and are recommended to the city council by the floodplain administrator. The FIS and FIRM are on file in the office of the city engineer in Carlsbad, California, 92008. (Ord. NS-664 § 3, 2003; Ord. NS-39 § 1, 1988) 21.110.080 Compliance. No structure or land shall hereafter be constructed, located, extended, converted or altered without full compliance with the terms of this chapter and other applicable regulations. Violations of the provisions of this chapter by failure to comply with any of its requirements (including violations of conditions and safeguards established in connection with conditions) shall constitute a misdemeanor. Nothing in this Feb. 11, 2020 Item #4 Page 35 of 60 EXHIBIT 3 chapter shall prevent the city from taking such lawful action as is necessary to prevent, enjoin or remedy any violation. (Ord. NS-39 § 1, 1988) 21.110.090 Abrogation and greater regulations. This chapter is not intended to repeal, abrogate or impair any existing easements, covenants or deed restrictions. However, where this chapter and other chapter, easement, covenant or deed restriction conflict or overlap, whichever imposes the more stringent restrictions shall prevail. (Ord. NS-39 § 1, 1988) 21.110.100 Interpretation. In the interpretation and application of this chapter, all provisions shall be: A. Considered as minimum requirements; B. Liberally construed in favor of the governing body; and C Deemed neither to limit nor repeal any other powers granted under state statutes. (Ord. NS-39 § 1, 1988) 21.110.110 Warning and disclaimer of liability. The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare occasions: Flood heights may be increased by manmade or natural causes. This chapter does not imply that land outside the areas of special flood hazards, areas of flood-related erosion hazards and areas of mudslide (i.e., mudflow) hazards or uses permitted within such areas will be free from flooding or flood damages. This chapter shall not create liability on the part of the city, any officer or employee thereof, or the Federal Insurance Administration, for any flood damages that result from reliance on this chapter or any administrative decision lawfully made thereunder. (Ord. NS-39 § 1, 1988) 21.118.128 5e'lerability. This chapter and the various parts thereof are declared to be severable. Should any section of this chapter be declared by the courts to be unconstitutional or invalid, such decision shall not affect the Yalidity of the ordinance as a whole, or any portion thereof other than the section so declared to be unconstitutional or invalid. (Ord. NS 39 § 1, 1988) 21.110.130 Special use permit. A. Special Use Permit Required. A special use permit shall be obtained in addition to any other required permits or entitlements before construction or development begins within any area-Bf special flood hazard areas, areas of flood-related erosion hazards or areas of mudslide (i.e., mudflow) hazards established in Section 21.110.070. Feb. 11, 2020 Item #4 Page 36 of 60 EXHIBIT 3 1. Exception. The maintenance. repair or replacement of existing previously-permitted boat docks is not subject to the requirement to obtain a special use permit, provided that the boat dock pilings will remain in place as pa1t of the proposed work. B. Permit procedures. Procedures for special use permit shall be subject to the development permit procedures in Chapter 21.54 and 21.58. including the following: 1. Applications and fees, 2. Decision making authority. 3. Expiration. extensions, and amendments C. Special application requirements. An application for a special use pennit shall: 1. The filif1g fees for a special use permit shall be in an amount as the city council may by resolution establish. Applications for a special use permit shall be made 011 forms furnished by the city planner and may include, but not be limited to, Be accompanied by plans in duplicate drawn to scale showing the nature, location, dimensions and elevation of the project sitearea in question; existing or proposed structures, fill, storage of materials, drainage facilities; and the location of the foregoinall other materials as specified by the city plannerg. Specifically, the following information is requiredmust be provided: a. flt-Proposed elevation in ·relation to mean sea level, of the lowest floor (including basement) of all structures; in zone AO or VO, elevation of highest adjacent grade and proposed elevation of lowest floor of all structures; b. ~Proposed elevation in relation to mean sea level to which any structure will be flood proofed; c. f½-All appropriate certifications listed in Section 21.110.150(D) of this chapter; d. ~Description of the extent to which any watercourse will be altered or relocated as a result of proposed development; e. f§t-Environmental impact assessment (one copy only); and f__f6j-Environmental impact report.,__ (twenty copies), if required; and f.g. Certification by a registered professional engineer/architect that all design and methods of construction meet elevation and anchoring standards per the code of federal regulations (Title 44 Section 60.3).~ (Ord. CS-164 § 10, 2011; Ord. CS-102 § CXXIV, 2010; Ord. NS-39 § 1, 1988) D. Administration. Administrative procedures related to the processing of a minor nonresidential planned development permit and nonresidential planned development pennit shall be subject to Chapters 21.54.060 and 21.54.06 L including the following: 1. Notices and hearings, 2. Announcement of decision. 3. Effective date and appeals. Feb. 11, 2020 Item #4 Page 37 of 60 EXHIBIT 3 21.118.135 h findings for approval of a Special Use Permit. (a) A special use permit required by this chapter may be approved or conditionally approved by the city planner, upon the advice of the floodplain administrator and only if the following findings are made: (1) The project is consistent with the general plan, local coastal program, the requirements of this chapter, and any other applicable requirement of this code. (2) The site is reasonably safe from flooding. (3) The project is designed to minimize the flood hazard to the habitable portions of the proposed structure. ( 4) The proposed project does not create a hazard for adjacent or upstream properties or structures. (5) The proposed project does not create any additional hazard or cause adverse impacts to downstream properties or structures. (6) The proposed project does not reduce the ability of the site to convey-pass or handle a base flood of a I-percent-annual-chance flood l 00 year frequency. (7) The cumulative effect of the proposed project when combined with all the other existing, proposed, and anticipated development will not increase the water surface elevation of the base flood more than one foot at any point. (8) The project is contingent upon compliance with other federal and state regulations as required. (Ord. CS-164 § 10, 2011; Ord. CS-102 § CXXV, 2010) 21.110.140 Designation of floodplain administrator. The city engineer Planning Commission is appointed as the floodplain administrator. (Ord. CS-102 § CXXVI, 2010; Ord. NS-39 § 1, 1988) 21.110.150 Duties and responsibilities of the floodplain administrator. The duties and responsibilities of the floodplain administrator shall include, but not be limited to: A. Permit Review Authority. The floodplain administrator shall review all development permits to determine: 1. The pe1mit requirements of this chapter have been satisfied, including determination of substantial improvement and substantial damage of existing structures; 2. All other required state and federal permits have been obtained; 3. The site is reasonably safe from flooding; Feb. 11, 2020 Item #4 Page 38 of 60 I EXHIBIT 3 4. The proposed development does not adversely affect the carrying capacity of areas where base flood elevations have been determined but a floodway has not been designated. This means that the cumulative effect of the proposed development when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood more than 1 foot at any point within the City of Carlsbad: and 5. Where base flood elevations are changed due to physical alterations: a. Within 6 months of information becoming available or project completion, whichever comes first. the floodplain administrator shall submit or assure that the permit applicant submits technical or scientific data to FEMA for a Letter of Map Revision (LOMR). b. All Letters of Map Revision (LOMR's) for flood control projects are approved prior to the issuance of building permits. Building Permits must not be issued based on Conditional Letters of Map Revision (CLOMR's). Approved CLOMR's allow construction of the proposed flood control project and land preparation as specified in the "start of construction" definition. B. Advise Decision-Making Authority. The floodplain administrator shall advise the decision-making authority specified in Section 21 .110.150 regarding the proposed development. The floodplain administrator may approve, conditionally approve or deny a special use permit required by this chapter upon the advice of the city engineer. Lf±t-Review, Use and Development of Other Base Flood Data. When base flood elevation data has not been provided in accordance with Section 21.110.070, the floodplain administrator shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source, in order to administer Sections 21.110 .160 through 21.110 .23 0 of this chapter. Any such information shall be submitted to the city council for adoption. B--:r1__(3) Notification of Other Agencies. Whenever a watercourse is to be altered or relocated: (A) Notify adjacent communities and the California Department of Water Resources prior to the alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Insurance Administration; (B) Require that the flood-carrying capacity of the altered or relocated portion of such watercourse is maintained. G-:-L_(4) Documentation of Floodplain Development. Obtain and maintain for public inspection and make available as needed: (A) The certification required in Section 21.110.160(3)(A), floor elevations; (B) The certification required in Section 21 .110.160(3)(B), elevations in areas of shallow flooding; Feb. 11, 2020 Item #4 Page 39 of 60 EXHIBIT 3 ( C) The certification required in Section 21 .110 .160(3 )( C), elevations or flood proofing of nonresidential structures; (D) The certification required in Section 21.11 O. l 60(3)(D), wet floodproofing standard; (E) The certified elevation required in Section 21.110.180(b ), subdivision standards; (F) The certification required in Section 21.110.200(1), floodway encroachments; (G) The information required in Section 21.110.210(6), coastal construction; and (H) The reports required in Section 21.110.220( d), mudflow standards. E_JB---Map Detem,inations. Make interpretations where needed, as to the exact location of the boundaries of the areas of special flood hazards, areas of special flood-related erosion hazards or areas of mudslide (i.e., mudfl9w) hazards, for example, where there appears to be a conflict between a mapped boundary and actual field conditions. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in Sections 21.110.240 and 21.110.250 of this chapter. Q,__f6)-Remedy Action. Take action to remedy violations of this chapter as specified in Section 21.110.080 of this chapter. (Ord. CS-102 § CXXVII, 2010; Ord. NS-39 § 1, 1988) H. Biennial Repo1t. Complete and submit Biennial Report to FEMA. f).;J.Planning. Assure the General Plan is consistent with the floodplain management objectives herein. 21.110.160 Standards of construction. In all areas of special flood hazards the following standards are required: (1) Anchoring. (A) All new construction and substantial improvements, including manufactured homes, shall be anchored to prevent flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. (B) All manufactured homes shall meet the anchoring standards of Section 21.110 .190. (2) Construction Materials and Methods. (A) All new construction and substantial improvements, including manufactured homes, shall be constructed with materials and utility equipment resistant to flood damage for areas below the base flood elevation plus two feet of freeboard.~ (B) All new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage for areas below the base flood elevation plus two feet of free board. (C) All new construction arid substantial improvements. including manufactured homes, shall be constructed with electrical, heating, ventilation, plumbing and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. Feb. 11, 2020 Item #4 Page 40 of 60 EXHIBIT 3 (D) Require within zones AH, AO or Vf;G, adequate drainage paths around structures on slopes to guide floodwaters around and away from proposed structures. (3) Elevation and Floodproofing. (A) New construction and substantial improvement of any structure shall have the lowest floor, including basement, elevated two feete-eF above the base flood elevation. Nonresidential structures may meet the standards in subsection (3)(C) of this section. Upon the completion of the structure the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor, or verified by the city building inspector to be properly elevated. Such certification or verification shall be provided to the floodplain administrator. (B) New construction and substantial improvement of any structure in Zone AO and AE et= ¥G shall have the lowest floor, including basement, elevated above the highest adjacent grade at least as high as the depth number specified in feet on the fllU,4, or at !east two feet above the base flood elevation. ifno depth number is specified. Nonresidential structures may meet the standards in subsection (3)(C) of this section. Upon completion of the structure the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor, or verified by the city building inspector to be properly elevated. Such certification or verification shall be provided to the floodplain administrator. (C) In a Zone VE, the lowest horizontal support member shall be elevated at least two feet above the base flood elevation. Upon completion of the structure the elevation shall be certified by a registered professional engineer or surveyor or verified by the city building inspector to be properly elevated. Such ce1tification or verification shall be provided to the floodplain administrator. (D) In an A (Unnumbered/Approximate A Zone) Zone, without base flood elevations specified on the FIRM, elevated at least two feet above the base flood elevation. Upon completion of the structure the elevation shall be ce1tified by a registered professional engineer or surveyor or verified by the city building inspector to be properly elevated. Such ce,tification or verification shall be provided to the floodplain administrator. _(fil_Nonresidential construction, including substantial improvements, -shall either be elevated in conformance with subsection (3)(A) or (3)(B) of this section or together with attendant utility and sanitary facilities: (i) Be floodproofed so that below the base flood level the structure is watertight with walls substantially impermeable to the passage of water; (ii) Have structural components capable ofresisting hydrostatic and hydrodynamic loads and effects of buoyancy; and (iii) Be certified by a registered professional engineer or architect that the standards of this subsection are satisfied. Such certifications shall be provided to the floodplain administrator. Feb. 11, 2020 Item #4 Page 41 of 60 EXHIBIT 3 (ff)) Require, for all new construction and substantial improvements, that fully enclosed areas below the lowest floor that are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry arid exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or meet or exceed the following minimum criteria: (i) Either a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of all openings shall be no higher than one foot above grade. Openings may be equipped with screens, louvers, valves or other coverings or devices; provided, that they permit the automatic entry and exit of floodwaters; or (ii) Be certified to comply with a local floodproofing standard approved by the Federal Insurance Administration. (GB) Manufactured homes shall also meet the standards in Section 21.110.190 of this chapter. (H) Garages and low cost accessory structures a. Attached garages. 1. A garage attached to a residential structure, constructed with the garage floor slab below the base flood elevation must be designed to allow for the automatic entry of flood waters. Areas of the garage below the base flood elevation must be constructed with flood resistant materials. 2. A garage attached to a nonresidential structure must meet the above requirements or be dry floodproofed. For guidance on below grade parking areas. see FEMA Technical Bulletin TB-6. b. Detached garages and accessory structures. 1. "Accessoty structures" used solely for parking (2 car detached garages or smaller) or limited storage (small, low-cost sheds) may be constructed such that its floor is below the base flood elevation provided the structure is designed and constructed in accordance with the following requirements: a. Use of the accessory structure must be limited to parking or limited storage; b. The portions of the accessory structure located below the base flood elevation must be built using flood-resistant materials; c. The accessmy structure must be adequately anchored to prevent flotation, collapse and lateral movement; d. Any mechanical and utility equipment in the accessory structure must be elevated or floodproofed to or above the base flood elevation plus two feet freeboard; and e. The accessory structure must be designed to allow for the automatic entry of flood waters. (Ord. NS-39 § 1, 1988) Feb. 11, 2020 Item #4 Page 42 of 60 EXHIBIT 3 21.110.170 Standards for utilities. (a) All new and replacement water supply and sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the system and discharge from systems into floodwaters. (b) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. (Ord. NS-39 § 1, 1988) 21.110.180 Standards for subdivisions. (a) All preliminary subdivision proposals, including proposals for manufactured home parks and subdivisions, greater than 50 lots or 5 acres, whichever is less. -shall identify the flood hazard area and the elevation of the base flood. (b) All final subdivision plans will provide the elevation of proposed structure(s) and pads. If the site is filled above the base flood, the final pad elevation shall be certified by a registered professional engineer or surveyor and provided to the floodplain administrator. ( c) All subdivision proposals shall be consistent with the need to minimize flood damage. ( d) All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage. ( e) All subdivisions shall provide adequate drainage to reduce exposure to flood hazards. (Ord. NS-39 § 1, 1988) 21.110.190 Standards for manufactured homes. All flev,r afld replacement maflufactured homes afld additiofls to manufactured homes shall: (1) Be elevated so that the lowest floor is at or above the base flood elevation; and (2) Be seclli'ely anchored to a permanent foundatiofl system to resist flotation, collapse or lateral movement. (Ord. NS 39 § 1, 1988) A. Elevated Above Flood Elevation. All manufactured homes that are placed or substantially improved, on sites located: 1. Outside of a manufactured home park or subdivision; 2. In a new manufactured home park or subdivision; 3. In an expansion to an existing manufactured home park or subdivision; or 4. In an existing manufactured home park or subdivision upon which a manufactured home has incuned "substantial damage" as the result of a flood, shall: a. Within Zones A 1-30, AH, and AE on the community's Flood Insurance Rate Map, be elevated on a permanent foundation such that the lowest floor of the manufactured Feb. 11, 2020 Item #4 Page 43 of 60 B. EXHIBIT 3 home is elevated two feet above the base flood elevation and be securely fastened to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. b. Within Zones Vl-30, V. and VE on the community's Flood Insurance Rate Map, meet the requirements of Section 21.110.210. Elevated Above Flood Elevation or Reinforced Piers. All manufactured homes to be placed or substantially improved on sites in an existing manufactured home park or subdivision within Zones Al- 30, AH, AE, V 1-30, V, and VE on the community's Flood Insurance Rate Map that are not subject to the provisions of Section 21.110.190.A above will be securely fastened to an adequately anchored foundation system to resist flotation. collapse, and lateral movement, and be elevated so that either the: 1. Lowest floor of the manufactmed home is elevated two feet above the base flood elevation; or 2. Manufactured home chassis is supported by reinforced piers or other foundation elements of at least equivalent strength that are no less than 36 inches in height above grade. C. Certification of Proper Elevation. Upon the completion of the structure, the elevation of the lowest floor including basement shall be ce11ified by a registered civil engineer or licensed land surveyor and verified by the community building inspector to be properly elevated. Such certification and verification shall be provided to the Floodplain Administrator. (Ord. NS-39 § L 1988) 21.110.195 -Standards for Recreational Vehicles. A. All recreational vehicles placed in Zones Al-30, AH, AE, Vl-30 and VE will either: 1. Be on the site for fewer than 180 consecutive days; or 2. Be fully licensed and ready for highway use. A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices, and has no pennanently attached additions; or 3. Meet the permit requirements of Section 21.110.130 of this ordinance and the elevation and anchoring requirements for manufactured homes in Section 21.110.190. ~B. Recreational vehicles placed on sites within Zones Vl -30, V, and VE on the community's Flood Insurance Rate Map will meet the requirements of Section 21.110.195 .A and Section 21 .110.210. 21.110.200 Floodways. Located within the areas of special flood hazard area established in Section 21.110.070 are areas designated as floodways. Since the floodway is an extremely hazardous area due to the velocity of Feb. 11, 2020 Item #4 Page 44 of 60 EXHIBIT 3 floodwaters which carry debris, potential projectiles, and erosion potential, the following provisions apply: (1) Until a regulatory floodway is adopted in Zone AAreas, no new construction, substantial development, or other development (including fill) shall be pennitted within Zones Al-30 and AE, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other development, will not increase the water surface elevation of the base flood more than 1 foot at any point within the City of Carlsbad. (2) Within an adopted regulatory floodway, the city shall pProhibit encroachments, including fill, new construction, substantial improvements and other development unless certification by a registered professional engineer or architect is provided demonstrating that encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge. (3) If subsection 1 and 2 of this section is satisfied, all new construction and substantial improvements shall comply with all other applicable flood hazard reduction provisions of Sections 21.110.160 through 21.110.230 of this chapter. (Ord. NS-39 § 1, 1988) 21.110.210 Coastal high hazard areas. Within coastal high hazard areas, Zones V, Vl-30 and VE, as established in Section 21.110.070, the following standards shall apply: ( 1) All new construction and substantial improvements shall be elevated on adequately anchored pilings or columns and securely anchored to such pilings or columns so that the lowest horizontal portion of the structural members of the lowest floor (excluding the pilings or columns) is elevated two feet te-Br-above the base flood elevation. All critical infrastructure shall be elevated three feet above the base flood elevation. (2) All new construction shall be located on the landward side of the reach of mean high tide and shall remain consistent with all requirements of the Local Coastal Program as the mean high tide line rises as a result of sea level rise. (3) All new construction and substantial improvements shall have the space below the lowest floor free of obstructions or constructed with breakaway walls. Such temporarily enclosed space shall not be used for human habitation and useable only for parking of vehicles, building access, or storage. ( 4) No new basements. expansion of existing basements. or improvements to existing basements shall be allowed in the AE or VE zones. (5) No fill shall be pennitted in coastal high hazard areas. Fill shall not be 1:1Sed for structural supp011 of buildings. (2.§.) Manmade alterations of sand dunes which would increase potential flood damage is prohibited. (16) The floodplain administrator shall obtain and maintain the following records: (A) Certification by a registered engineer or architect that a proposed structure complies with Section 21.110.210(1). Feb. 11, 2020 Item #4 Page 45 of 60 EXHIBIT 3 (B) The elevation (in relation to mean sea level) of the bottom of the lowest structural member of the lowest floor ( excluding pilings or columns) of all new and substantially improved structures, and whether such structures contain a basement. (Ord. NS-39 § 1, 1988) 21.110.220 Mudslide {i.e., mudflow) prone areas. (a) The floodplain administrator shall review permits for proposed construction or other development to determine if it is proposed within a mudslide area. (b) Pennits shall be reviewed to determine that the proposed development is reasonably safe from mudslide hazards. Factors to be considered in making this determination include, but are not limited to: (1) The type and quality of soils; (2) Evidence of groundwater or surface water problems; . (3) The depth and quality of any fill; ( 4) The overall slope of the site; and (5) The weight that any proposed development will impose on the slope. ( c) Within areas that have mudslide hazards, the following requirements apply: (1) A site investigation and further review shall be made by a person qualified in geology and soils engineering; (2) The proposed grading, excavation, new construction and substantial improvements shall be adequately designed and protected against mudslide damages; (3) The proposed grading, excavations, new construction and substantial improvements do not aggravate the existing hazard by creating either on-site or off-site disturbances; and (4) Drainage, planting, watering and maintenance shall not endanger slope stability. (d) When the Federal Insurance Administrator has delineated+tJ:i-ifl zone M (special mudslide hazard area) on the Flood Insurance Rate Map, the community shall adopt and enforce a grading ordinance or regulation in accordance with data supplied by the Federal Insurance Administrator drainage chapter which at least complies with the standards of Section 7001 thrnugh 7006 and Sections 7008 through 7015Appendix J -Grading of the most recent amendment of the 2019~ CaliforniaUniform Building Code, Title 24, Part 2, Volume 2: (1) Regulates t+he location of foundation and utility systems of new construction and substantial improvements; (2) Regulates t+he location, drainage and maintenance of all excavations, cuts and fills and planted slopes; (3) Provides special requirements for protective measures including, but not limited to, retaining walls, buttress fills, subdrains, diverter terraces, benchings, etc.; ~d ( 4) Requires eengineering drawings and specifications to be submitted for all corrective measures, accompanied by supporting soils engineering and geology reports. (Ord. NS-39 § 1, 1988) Feb. 11, 2020 Item #4 Page 46 of 60 EXHIBIT 3 21.110.230 Flood-related erosion-prone areas. (a) The floodplain administrator shall require permits for proposed construction and other development within all flood-related erosion-prone areas as known to the community. (b) Such pennits shall be reviewed to determine whether the proposed site alterations and improvements will be reasonably safe from flood-related erosion and will not cause flood-related erosion hazards or otherwise aggravate the existing hazard. ( c) If a proposed improvement is found to be in the path of flood-related erosion or would increase the erosion hazard, such improvement shall be relocated or adequate protective measures shall be taken to avoid aggravating the existing erosion hazard. (d) Within z~one~ AE, AO and VEE on the effective Flood Insurance Rate Map, a setback is required for all new development from the ocean, lake, bay, riverfront or other body of water to create a safety buffer consisting of a natural vegetative or contour strip. This buffer shall be designated according to the flood-related erosion hazard and erosion rate, in relation to the anticipated useful life of structures, and depending upon the geologic, hydrologic, topographic and climatic characteristics of the land. The buffer may be used for suitable open space purposes, such as for agricultural, forestry, outdoor recreation and wildlife habitat areas, and for other activities using temporary and portable structures only. ~Ord. NS-39 § 1, 1988) 21.110.240 VariancesAppeals. A. B. (a) The floodplain administrator shall announce its decision and findings by resolution to the applicant and the resolution shall recite, among other things, the facts and reasons which, in the opinion of the floodplain administrator, make the granting or denial of a special use permit, variance or other entitlement under this chapter necessary to carry out the provisions and general purposes of this title and shall order that the special use pennit, variaace or other entitlement be graated or denied, and if such resolution orders that the special use permit, variance or other entitlement be granted, it shall also notice such conditions and limitations as the floodplain administrator may impose. (b) The effective date of order of the floodplain administrator granting or denying a special use permit, variaace or other entitlement and the method for appeal of such order shall be governed by Section 21.54 .150 of this code. In passing upon Variances from the requirements of this chapter may be granted pursuant to the prnvisions of this section and Chapter 21 .50 of this title. Subject to the findings specified in Chapter 21.50 and subsection D of this section, variances may be granted for: 1. New construction, substantial improvement, and other proposed new development to be erected on a lot of one half acre or less in size contiguous to and surrounded by lots with existing structures constructed below the base flood level. As the lot size increases beyond one half acre. the technical justification required for issuing a variance increases. Feb. 11, 2020 Item #4 Page 47 of 60 EXHIBIT 3 2. · Repair or rehabilitation of historic structures. as defined in Chapter 21.110.050, upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the exception is the minimum necessa1y to preserve the historic character and design of the structure. C. Variance considerations. When making decisions on appeals and requests for variances from the requirements of this chapter, the cjty councildecision-making authority shall consider all technical evaluations, all relevant factors, standards specified in other sections of this chapter, and: · ( 1) The danger that materials may be swept onto other lands to the injury of others; (2) The danger of life and property due to flooding or erosion damage; (3) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; ( 4) The importance of the services provided by the proposed facility to the community; (5) The necessity to the facility of a waterfront location, where applicable; (6) The availability of alternative locations for the proposed use which are not subject to .flooding or erosion damage; (7) The compatibility of the proposed use with existing and anticipated development; (8) The relationship of the proposed use to the comprehensive plan and floodplain management program for that area; (9) The safety of access to the property in time of flood for ordinary and emergency vehicles; (10) The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters expected at the site; and ( 11) The costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, and streets and bridges. D. Variance findings. In addition to the findings specified in Chapter 21.50, no variance from the requirements of this chapter may be granted unless the decision-making authority finds: 1. That the variance is for floodplain management purposes only. 2. That there is a showing of good and sufficient cause; 3. That the variance is the minimum necessaiy considering the flood hazard, to afford relief. a. "Minimum necessary" as related to this section, means to afford relief with a minimum of deviation from the requirements of this chapter. For example, in the case of a variance from an elevation requirement the decision-making authority need not grant permission for the applicant to build to the elevation the applicant proposes, but only to that elevation which the decision-making authority believes will both provide relief and preserve the intent of this chapter. Feb. 11, 2020 Item #4 Page 48 of 60 EXHIBIT 3 4. That the physical characteristics of the subject property are so unusual that complying with the requirements of this ordinance would create an exceptional hardship to the applicant. a. "Hardship" as related to this section, means the exceptional hardship that would result from a failure to grant the requested variance. Mere economic or financial hardship alone is not exceptional. Inconvenience, aesthetic considerations, physical handicaps, personal preferences, or the disapproval of one's neighbors likewise cannot, as a rule, qualify as an exceptional hardship. All of these problems can be resolved through other means without granting a variance, even if the alternative is more expensive, or requires the prope1ty owner to build elsewhere or put the pa.reel to a different use than originally intended. 5. That the subject property's physical characteristics, are unique to the property and not shared by · adjacent parcels, and pertain to the land itself, not to the structure, its inhabitants, or the property owners. 6. That the granting of a variance will not result in increased flood heights. additional threats to public safety, or extraordina1y public expense, create a nuisance, cause "fraud and victimization" of the public, or conflict with existing local laws or ordinances. a. "Public safety" and "nuisance" as related to this section. means that the granting of a variance must not result in anything which is injurious to safety or health of an entire community or neighborhood, or any considerable number of persons, or unlawfully obstructs the free passage or use, in the customary manner, of any navigable lake, or river, bay, stream, canal, or basin. b. "Fraud and victimization" as related to this section, means that the variance granted must not cause fraud on or victimization of the public. In examining this requirement, the decision-making body shall consider the fact that every newly constructed building adds to government responsibilities and remains a pa.rt of the community for fifty to one hundred years. Buildings that are pennitted to be constructed below the base flood elevation are subject during all those years to increased risk of damage from floods, while future owners of the property and the community as a whole a.re subject to all the costs. inconvenience, danger. and suffering that those increased flood damages bring. In addition, future owners may purchase the property, unaware that it is subject to potential flood damage, and can be insured only at ve1y high flood insurance rares. 7. If applicable, that the proposed repair or rehabilitation of a historic structure will not preclude the structure's continued designation as an historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure. E. Variance conditions. The decision-making authority may require conditions to the granting of variances as it deems necessary to fu11her the purposes of this chapter. Feb. 11, 2020 Item #4 Page 49 of 60 F. EXHIBIT 3 Applicant Notice. I. Pursuant to Title44 Part 60.6(a)(5) of the Code of Federal Regulations, following the granting of a variance, the city shall provide written notice to the applicant stating that: a. The issuance of a variance to construct a structure below the base flood level will result in increased premium rates for flood insurance up to amounts as high as $25 for $100 of insurance coverage, and b. Such construction below the base flood level increases risks to life and property. 2. The written notice required by this subsection shall be recorded in a manner so that it appears in the chain of title of the affected parcel of land. G. Record of Variances. The Floodplain Administrator shall maintain a record of all variances, including justification for their issuance. and report such variances in its biennial report submitted to FEMA. (Ord. NS-675 § 72, 2003; Ord. NS-664 § 4, 2003; Ord. NS-39 § L 1988) (c) Generally, variances may be issued for new construction and substantial improvements to be erected on a lot of one half acre or less in size contiguous to and surrounded by lots with e)dsting structures constructed below the base flood level, providing subsections (b)(l) tm-ough (b)(l 1) of th is section have been fully considered. As the lot size ill creases beyond one half acre, the technical justification required for issuing the variance mcreases. (d) Upon consideration of the factors of subsection (b) of this section and the purposes of this chapter, the city council may attach such conditions to the granting of variances as it deems necessary to further the purposes of this chapter. (e) The floodplain administrator will maintain a record of all variance actions, including justification for their issuance, and report such variances issued in its biennial report submitted to the Federal Insurance Administration, Federal Emergency Management Agency. 21.118.258 CenElitiens f.er ,,..ariances. (a) VariaRces may be issued for the reconstruotioR, rehabilitation or restoration of structures listed in the National Register of Historic Places or the State Inveatof)' of Historic Places, 1.vithout regard to the procedures set forth in the remainder of this section. (b) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result. (c) Variances shall oaly be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief. (d) (1) Variances shall oaly be issued upon: l\ showing of good and sufficieRt cause; (2) A determiaation that failure to grant the variance would result in exceptional hardship to the applicant; m1d Feb. 11, 2020 Item #4 Page 50 of 60 EXHIBIT 3 (3) A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, mctraordii1al)' public expense, create nuisances, cause fraud on or victimization of, the public or conflict with existing local 18:\vs or chapters. (e) Variances may be issued for new construction aHd substantial improvements and for other develop1i1ent necessary for the conduct of a functionally dependent use; provided, that the provisions of subsections (a) through (d) of this section are satisfied and that the structure or other de>.1elopment is protected by methods that minimize flood damages during the base flood and create no additional threats to public safety. (f)Any applicant to 1Nhom a variance is granted shall be given written notice over the signature of the community and economic development director that the issuance of a variance to construct a structure belo\v the base flood level will result in increased premium rates for flood insurance up to amounts as high as twenty five dollars for two hundred dolla1·s of insurance coverage •,vith the i.ncreased risk resulting from the reduced lowest floor elevatioH. A copy of the notice shall be recorded by the floodplain administrator in the office of the San Diego County recorder and shall be recorded in a manner so that it appears in the charn of title of the affected parcel of land. Feb. 11, 2020 Item #4 Page 51 of 60 NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as follows: A) That the foregoing recitations are true and correct. B) At the end of the state-mandated six-week review period for the Local Coastal Program Amendment, starting on November 22, 2019 and ending on January 3, 2020 staff shall present to the City Council a summary of the comments received. C) That based on the evidence presented at the Public Hearing, the Commission RECOMMENDS APPROVAL of FLOODPLAIN MANGEMENT REGULATIONS AMENDMENTS -ZCA 2019-0001/LCPA 2019-0004 (PUB2019-0010), based on the following findings: Findings: 1. ZCA 2019-0001 is consistent with the General Plan in that Public Safety Flooding and Coastal Hazards Policy 6-P.1 directs the city to enforce the Cobey-Alquist Floodplain Management Act and the city's Floodplain Management Regulations to prohibit construction of structures in a designated floodway where such development would endanger life or significantly restrict the carrying capacity of the designated floodway; and to regulate development within other areas of special flood hazard, flood related erosion hazard and mudslide hazard to ensure such development does not adversely affect public health and safety due to water and erosion hazards, or result in damaging increases in erosion, flood height or velocities. 2. ZCA 2019-0001 is consistent with the General Plan in that the proposed amendments implement the General Plan Public Safety Flooding and Coastal Hazards Policy 6-P.8, which requires the city to comply with Federal Emergency Management Agency requirements to identify flood hazard areas and control development within these areas in order for residents to qualify for federal flood insurance. 3. LCPA 2019-0004 ensures the Carlsbad Local Coastal Program and the Zone Code are consistent. 4. LCPA 2019-0004 meets the requirements of, and is in conformity with, the policies of Chapter 3 of the Coastal Act and all applicable policies of the Carlsbad Local Coastal Program not being amended by this amendment, in that the amendment ensures consistency with the Zone Code, federal floodplain management regulations and does not conflict with . any Coastal Zone regulations, land use designations or policies, with which development must comply. PC RESO NO. 7353 -2-Feb. 11, 2020 Item #4 Page 53 of 60 ZCA 2019-0001/LCPA 2019-0004-FLOODPLAIN MANAGEMENT REGULATIONS AMENDMENTS Date December 4, 2019 Pa e 2 are projected to be subject to flooding in the event of the 1% or greater chance of flooding in any given year (or the 100-year) flood event and are subject to the city's Floodplain Management Regulations {Carlsbad Municipal Code Chapter 21.110). Floodplains are areas of land located adjacent to rivers or streams that are subject to recurring inundation, or flooding. Preserving or restoring natural floodplains helps with flood loss reduction benefits and improves water quality and habitat. Floods are typically described in terms of their statistical frequency. For example, a 100-year floodplain describes an area within which there is a one percent probability of a flood occurring in any given year. FEMA prepares Flood Insurance Rate Maps (FIRMs) that identify 100- year and 500-year flood zones. As shown in Attachment 3, the potential flood hazard areas identified on the FIRM maps in Carlsbad include the entire coastline and the following major drainage basins: • Buena Vista Creek and Buena Vista Lagoon • Agua Hedionda Creek, its northern tributary, and the Agua Hedionda Lagoon • San Marcos Creek and its northern tributary • Batiquitos Lagoon • Encinitas Creek The extent of areas at risk from flooding may increase with future sea level rise. The initial impetus for the city's revisions to the floodplain management ordinance started in 2011 when FEMA initiated the California Coastal Analysis and Mapping Project/Open Pacific Coast Study, which involved over 1,200 miles of new coastal flood hazard mapping and base flood elevation determinations. Under this initiative, many coastal communities, including Carlsbad, were provided with new coastal flood data and mapping. This was the first time in over 20 years that the city's floodplain maps were updated. This study improved the quality of the coastal data used for both floodplain management and planning purposes. The Flood Insurance Study has been completed and a Letter of Final Determination has been issued to the city. The map appeal process has concluded, and no appeals were received by FEMA. The Flood Insurance Study and FIRMs become effective, for FEMA purposes, on December 20, 2019. The city met with FEMA staff on February 12 and 13, 2019 to review the city's participation in the National Flood Insurance Program and conducted a field inspection as part of their biennial review. (Every two years there is a review of the city's compliance with their requirements.) The State's follow-up report, which resulted from that meeting, found the city to be in general compliance with the required floodplain enforcement requirements, but did note that the city's Floodplain Management Ordinance needed to be updated to comply with the latest Federal Standards. On September 9, the city was informed that FEMA had completed a review of the current floodplain management ordinance and had mandatory and suggested revisions. FEMA required that the city's floodplain management ordinance be updated to remain eligible for federal flood insurance. All NFIP communities that receive new/updated FIR Ms have up to six months from the date of the Letter of Final Determination to officially amend via City Council Resolution, their current floodplain management regulations (i.e., ordinance, building code, other) and incorporate NFIP regulations pertaining to newly mapped flood zones on the FIRM as well incorporate missing development and programmatic requirements of the NFIP. The draft ordinance has been revised to be in compliance with the latest NFIP and state standards. These new standards include a,ccounting for sea level rise, coastal high hazard (Zone VE) development, attached and detached garage development, updates to manufactured homes and recreational vehicles, incorporating new definitions relevant to floodplain management, and notification requirements to FEMA. Feb. 11, 2020 Item #4 Page 56 of 60 ZCA 2019-0001/LCPA 2019-0004-FLOODPLAIN MANAGEMENT REGULATIONS AMENDMENTS Date December 4, 2019 Pa e 3 Ill. ANALYSIS The amendments are necessary to implement new guidance and regulations from Title 44 Code of Federal Regulations Sections 59.1 and 60.3 and the California Model Floodplain Management Ordinance for Coastal Communities (December 2006). The proposed amendments to the Zone Code and Local Coastal Program are provided in strikethrough/underline format (Attachment 2) and are summarized below. A summary of the main changes is listed below: • The definitions Section 21.110.050 has been updated based on FEMA requirements • Change term 100-year flood event to a 1-percent-annual-chance flood throughout the ordinance • Clean up and addition of FEMA requirements on Section 21.110.130 on Special Use Permits • Updates to floodplain .administrator designation and duties and responsibilities of floodplain administrator • Updates made to Standards of construction Section 21.110.160 that elevation to base flood level now says -elevated two feet above the base flood elevation and adding FEMA requirements on garages and accessory structures • New FEMA standards updated for Manufactured Homes and Recreational Vehicles • Updates to Coastal high hazard areas that no fill, new basements, expansion of basements, or improvements to basements shall be permitted • Previous section on Appeals is now titled Variances Changes reflected in the proposed ordinance are based on input from FEMA and some cleanup of text by staff. A short summary of several key changes is described below. For example, several new definitions are proposed to be added. Proposed new or edited definitions include: 1-percent-annual-chance flood, development; encroachment; manufactured home park or subdivision (definitions are proposed for existing, expanded, and new); historic structure; mean sea level; new construction; obstruction; recreational vehicle; special flood hazard area; start of construction; and substantial damage. Definitions are found in Section 21.110.050. The proposed ordinance would add a requirement for certification by a registered civil engineer or licensed land surveyor that the required lowest floor elevation for residential development, including manufactured homes, complies with the requirements of the flood ordinance (Section 21.110.160). Also, the proposed flood ordinance will increase the lowest floor elevation requirement. The currently certified flood ordinance requires that all new construction or substantial improvements of residential structures, including manufactured homes, are required to have the lowest floor, including basement, to be elevated to or above the base flood elevation. The proposed ordinance would increase that to be two feet above the base flood elevation. In Coastal High Hazard areas (V zones), the lowest floor elevation would be required to be elevated two feet above the base flood elevation and critical infrastructure shall be elevated three feet above the base flood e.levation. These changes are found in Section 21.110.210. In addition, the section on Standards of construction (Section 21.110.160) is proposed to be expanded to better describe construction methods to be employed to reduce flood hazard. For example, new sections are proposed describing flood hazard reduction measures for flood openings and garages and low cost accessory structures. Newly proposed is Section 21.110.195 establishing "Standards for Recreational Vehicles" which would require that, within Zones Al-30, AH, AE, Vl-30 and VE, if a recreational vehicle is on site more than 180 consecutive days or is not licensed and ready for highway use it must meet the elevation and anchoring requirements for manufactured homes in Section 21.110.190 of the ordinance. Feb. 11, 2020 Item #4 Page 57 of 60 ZCA 2019-0001/LCPA 2019-0004-FLOODPLAIN MANAGEMENT REGULATIONS AMENDMENTS Date December 4, 2019 Pa e 4 IV. ENVIRONMENTAL REVIEW The city planner has determined that the project is a minor zone code amendment that refines or clarifies existing land use standards and would have no significant effect on the environment. Therefore, the project is exempt from the California Environmental Quality Act {CEQA) pursuant to CEQA Guidelines Section 15061(b)(3) and Carlsbad Municipal Code Section 19.04.070 A.1.c.i. ATTACHMENTS: 1. Planning Commission Resolution No. 7353 a. Exhibit 1 -Draft City Council Ordinance adopting Floodplain Management Regulations Amendment ZCA 2019-0001 and LCPA 2019-0004 2. Proposed text changes to the Zone Code shown in strikeout/underline format 3. City of Carlsbad Floodplain Map Feb. 11, 2020 Item #4 Page 58 of 60 All Receive -Agenda Item It .!:I_ For the Information of the: CITY COUNCIL Date#-CA~ CCX CM~C00 )( DCM(3).X. Feb. 11,2020 Council Memorandum To: From: Honorable Mayor Hall and Members of the City Council Melanie Saucier, Associate Planner Via: Gary Barberio, Deputy City Manager }; --1 Elaine Lu key, Chief Operations Officer, - {city of Carlsbad Re: Additional Materials Related to Staff Report Item No. 4-Update City's Floodplain Management Regulations to Ensure Consistency with Federal Guidelines This memorandum provides an update to Agenda Item No. 4 for the City Council Meeting on Feb. 11, 2020. Additional content on where to find FEMA flood maps for the City of Carlsbad is included below. Current hard copies of the FEMA flood maps are available at City Hall in the City Clerk's office for public review until close of business on Thursday, Feb. 13th• After that time, they will be available at the Faraday Building Planning Counter (1635 Faraday Ave, Carlsbad, CA 92008). Also, below is a web link to download the maps directly from the FEMA Flood Map Service Center. FEMA Flood Maps to download -https://msc.fema.gov/portal/home cc: Scott Chadwick, City Manager Celia Brewer, City Attorney Jeff Murphy, Community Development Director Don Neu, City Planner Jason Geldert, City Engineer Community Services Branch Planning Division 1635 Faraday Ave I Carlsbad, CA 92008 I 760-602-4605