Loading...
HomeMy WebLinkAbout2020-06-09; City Council; ; Fiscal Year 2020-21 Preliminary Engineer's Report for the Annual Levy of Assessments within Lighting and Landscaping District No. 1, a Special Assessment DistrictCA Review CKM  Meeting Date: June 9, 2020  To: Mayor and City Council  From: Scott Chadwick, City Manager   Staff Contact: Jason Rosado, Assistant to the Treasurer  jason.rosado@carlsbadca.gov, 760‐602‐2473  Subject: Fiscal Year 2020‐21 Preliminary Engineer's Report for the Annual Levy of  Assessments within Lighting and Landscaping District No. 1, a Special  Assessment District  Recommended Action  Adopt a resolution to approve the Preliminary Engineer's Report for fiscal year 2020‐21 and set  July 14, 2020, as the date for the public hearing for the annual levy of assessments within Street  Lighting and Landscaping District No. 1, a special assessment district.  Executive Summary  The City Council's approval is needed to begin the processing of the annual levy of assessments  within the city's Street Lighting and Landscaping District No. 1 for fy 2020‐21 in compliance with  the procedures in California Streets and Highways Code Sections 22620‐22641.  Discussion    Background  In 1983, the City of Carlsbad Street Lighting and Landscaping District No. 1 (“District No. 1”) was  formed as a citywide district according to the provisions of California Streets and Highways  Code Section 22500 et seq., known as the Landscaping and Lighting Act of 1972. Since District  No. 1's formation, the cost of operating and maintaining the city's street lighting system has  been funded through assessments from each parcel in the city based on special benefit. The  Street Lighting Improvement Zone is identified as a citywide zone formed with the intent for all  assessable parcels within the city to pay benefiting assessments as the parcels are developed  and streetlights are added.  On June 6, 1989, the City Council approved the addition of two landscaping zones to the  original District No. 1, a Street Tree Improvement Zone and a Median Landscaping  Improvement Zone. The Street Tree Improvement Zone is not a citywide zone. This  improvement zone includes only the properties within the city in which street trees exist within  the public right of way areas. The maintenance program provides a programmed schedule of  tree trimming, treatment of damaged trees and emergency response to fallen trees within the  public right of way. The Median Improvement Zone funds the cost of maintaining the street  June 9, 2020 Item #4 Page 1 of 27 medians located throughout the city. This improvement zone is a citywide zone and includes  plant and tree maintenance care and structural replacement of the medians when necessary.    California’s Streets and Highways Code Section 22622 requires the City Council to have an  engineer prepare and file a report each fiscal year for which assessments are to be levied.   Proposed assessments   As shown in the table below, a single‐family residential parcel that benefits from the Street  Lighting Improvement Zone, the Street Tree Improvement Zone and the Median Landscaping  Improvement Zone would have an anticipated assessment of $70.44 for fy 2020‐21. The rates  have remained the same for the last 24 fiscal years because District No. 1 was formed without  an allowable rate inflator. Proposition 2181 requires a notice and ballot be sent to each  property owner assessed, followed by a public hearing, before assessment rates can be  increased.  Lighting and Landscaping District No. 1  Proposed assessments for average single‐family parcel  Improvement zone Average assessments  fy 2020‐21  Street lighting $26.00  Street tree  $36.10  Median landscaping $8.34  Total $70.44  Staff recommends the City Council approve the Preliminary Engineer's Report for fiscal year  2020‐21 and set a date for the public hearing for the annual levy of assessments. Staff will also  present a summarized report on the maintenance and operations of District No. 1, as  introduced in the attached Preliminary Engineer's Report, at the public hearing scheduled for  July 14, 2020.  Fiscal Analysis  The actual total to be collected from property assessments is $1,568,285. A further funding  breakdown of the three zones follows:  Funding sources Street  lighting Street trees Medians Total  Assessment collection $740,242 $468,644 $359,399 $1,568,285  General benefit (General Fund) 119,766  0 0 119,766  Contributions from District #2 93,435 82,945 186,504 362,884  Misc. revenue & interest earnings 56,000 0 0 56,000  Transfer from the General Fund 0 0 700,000 700,000  Amount from/(to) fund reserves 275,672 408,010 160,183 843,865  Total funding sources $1,285,115 $959,599 $1,406,086 $3,650,800  Total cost estimate $1,285,115 $959,599 $1,406,086 $3,650,800  June 9, 2020 Item #4 Page 2 of 27 The fy 2020‐21 Street Lighting and Landscaping District No. 1 total budget for the three zones is  projected to be $3,650,800. It is anticipated that these budgets will be approved by the City  Council with the city’s Fiscal Year 2020‐21 Operating Budget on June 23, 2020.   The Street Lighting Improvement Fund is projected to receive $197,377 in miscellaneous  revenue and interest earnings. This amount includes the city's General Fund contribution of  $28,000 to cover the operations and maintenance costs for the city street lights adjacent to city  properties, since city‐owned parcels are non‐assessable on the County of San Diego tax rolls. It  also includes loss recovery revenue of $5,000 and interest earned on cash reserves of $23,000.   The city’s Street Lighting and Landscaping District No. 2 (“District No. 2”) will contribute  $93,435 to the Street Lighting Improvement Fund, $82,945 to the Street Trees Improvement  Fund and $186,504 to the Median Landscaping Improvement Fund to cover the cost of  maintaining the improvements within that district. These contributions from District No. 2 are  made because all costs for the city street lights, street trees and medians are charged through  District No. 1. The contribution from District No. 2 is made to reimburse District No. 1 for those  street light, street tree and median landscaping costs attributable to District No. 2.  The city's General Fund will also contribute $119,766 to the Street Lighting Improvement Fund  as "General Benefit" assessments, as further described in the Preliminary Engineer's Report.  Any share of benefits received from an improvement that does not provide a special benefit to  the assessed properties is considered a general benefit provided by the improvements. The cost  of the general benefit is contributed by the city from the General Fund. The city has determined  that there is no general benefit in the Street Tree Improvement Fund and the Median  Landscaping Improvement Fund.  Total revenues and accumulated fund reserves in the Median Landscaping Improvement Fund  and will not be sufficient to cover anticipated costs for the upcoming fiscal year. Beginning in fy  2004‐05, the General Fund began transferring funds to the Median Landscaping Improvement  Fund to cover the fund’s annual deficit. Another transfer from the General Fund to the Median  Landscaping Improvement Fund is proposed in the Fiscal Year 2020‐21 Operating Budget in the  amount of $700,000.   Next Steps  City staff will work with the assessment engineer to complete the Final Engineer’s Report for fy  2020‐21 for Lighting and Landscaping District No. 1. A public hearing will be held on July 14,  2020 followed by a request to the City Council to adopt the proposed annual levy of  assessments.  Environmental Evaluation (CEQA)  In keeping with Public Resources Code Section 21065, this action does not constitute a  “project” within the meaning of the California Environmental Quality Act in that it has no  potential to cause either a direct physical change in the environment, or a reasonably  foreseeable indirect physical change in the environment, and therefore does not require  environmental review.  June 9, 2020 Item #4 Page 3 of 27 Public Notification  Public notice of this item was made in accordance with the Ralph M. Brown Act and it was  made available for viewing at least 72 hours prior to the meeting date.  Exhibits  1.City Council resolution 1 Proposition 218 is a 1996 state constitutional initiative that requires that all taxes and most charges on property  owners are subject to voter approval and includes restrictions on the use of assessments and property‐related fees to pay for general governmental services rather than property‐related services. June 9, 2020 Item #4 Page 4 of 27 RESOLUTION NO. 2020-102 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, INITIATING THE PROCEEDINGS, APPROVING THE PRELIMINARY ENGINEER'S REPORT FOR FISCAL YEAR 2020-21 AND SETTING A PUBLIC HEARING FOR JULY 14, 2020 FOR THE ANNUAL LEVY OF ASSESSMENTS WITHIN LIGHTING AND LANDSCAPING DISTRICT NO. 1, A SPECIAL ASSESSMENT DISTRICT WHEREAS, the City Council of the City of Carlsbad, California previously formed a special assessment district pursuant to the terms of the Landscaping and Lighting Act of 1972 (Division 15, Part 2 of the State Streets and Highways Code, commencing with Section 22500), known and designated as City of Carlsbad Street Lighting and Landscaping District No. 1 ("Assessment District"); and WHEREAS, the Assessment District is an existing assessment district in which assessments are not proposed to be increased as defined by Article XIIID of the California Constitution (Proposition 218) and the Proposition 218 Omnibus Implementation Act (California Government Code Section 53750 et seq.), and is therefore exempt from the procedures and requirements pursuant to California Constitution Article XIIID § 5, subdivision (a); and WHEREAS, the City Council wishes to initiate proceedings to provide for the annual levy of assessments for the next ensuing fiscal year to provide for the annual costs for maintenance of improvements, defined as existing street lighting, median landscaping and street trees ("Improvements"), within the Assessment District; and WHEREAS, a preliminary Engineer's Report (the "Report") has been prepared and is presented to the City Council and is attached as Attachment A, as required by law, and the City Council is desirous of continuing with the proceedings for the annual levy; and WHEREAS, the improvements to be maintained shall consist of all originally designated and authorized improvements, as well as certain new and additional improvements; and June 9, 2020 Item #4 Page 5 of 27 WHEREAS, the City Council has carefully examined and reviewed the Report as presented, and is satisfied with each and all of the items and documents as set forth within it, and is satisfied that the assessments, on a preliminary basis, have been distributed in accordance with the benefits received from the improvements to be maintained, as set forth in the Report. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. 2. That the above recitations are true and correct. That the public interest and convenience requires, and it is the intention of this legislative body to levy and collect assessments to pay the annual costs and expenses for the maintenance and/or servicing of the Improvements for the Assessment District, with the Improvements generally described as follows: the maintenance of certain street lighting improvements, street trees, and median landscaping improvements, as set forth and described in the Report. The proposed new improvements to be maintained and serviced caused generally by new development within the Assessment District are described as follows: the maintenance of certain additional street lighting improvements and additional landscaping improvements, including replacement of street trees and median landscaping improvements, all as set forth and described in the Report. 3. That said improvements are of direct benefit to the properties within the boundaries of the Assessment District, which the legislative body previously declared to be the area benefited by the improvement, as identified and referenced in the boundary map previously approved by the City Council, a copy of which is on file in the office of the City Clerk and open for public inspection, and which is designated by the name of this Assessment District. 4. That the Improvements are referred to Harris & Associates, who is directed to make and file the Report generally containing the following: June 9, 2020 Item #4 Page 6 of 27 A. Plans and specifications describing the general nature, location and extent of the Improvements within the Assessment District; B. A diagram for the Assessment District, showing the area and properties proposed to be assessed; C. An estimate of the cost of the maintenance and/or servicing of the Improvements for the Assessment District for the Fiscal Year commencing July 1, 2020 and ending June 30, 2021; and D. An assessment of the estimated costs of the maintenance and/or servicing, assessing the net amount upon all assessable lots and/or parcels within the Assessment District in proportion to the benefits received. 5. That the Report, as presented, is approved on a preliminary basis, and is ordered to be filed in the office of the City Clerk as a permanent record and to remain open to public inspection. Reference is made to the Report for a full and detailed description of the improvements to be maintained, the boundaries of the Assessment District and any zones therein, and the proposed assessments upon assessable lots and parcels of land within the Assessment District. All Street Lighting Improvement Zone, Street Tree Improvement Zone and Median Landscaping Improvement Zone assessments are to remain the same as the previous year and all new assessments added to the tax roll will be calculated at the same unit rates as the previous year. 6. Notice is hereby given that a public hearing is scheduled in the regular meeting place of the City Council on the following date: Tuesday, July 14, 2020 At that time the City Council will hear protests or objections in reference to the annual levy of assessments and to any other matters contained in this resolution. Any persons June 9, 2020 Item #4 Page 7 of 27 who wish to object to the proceedings or the annual levy should file a written protest with the City Clerk prior to the time set for the public hearing. If there is a majority protest against the levy of an annual assessment that is increased from the previous year, the proposed increase in the assessments shall be abandoned. A majority protest exists if, upon the conclusion of the hearing, written protests filed and not withdrawn, represent property owners owning more than 50% of the assessable area of land within the Assessment District. 7. That the City Clerk is authorized and directed to give notice as required by law by causing a copy of this Resolution to be published in a newspaper of general circulation within the City of Carlsbad not less than 10 days prior to the date set for the public hearing. 8. For any and all information relating to these proceedings, including information relating to protest procedure, your attention is directed to the persons designated below: and CITY OF CARLSBAD, CITY CLERK 1200 CARLSBAD VILLAGE DRIVE, CARLSBAD, CA 92008 ANNA TAN-GATUE, PROJECT ENGINEER HARRIS & ASSOCIATES TELEPHONE: {800) 827-4901 EXT. 2344 Owners of property within the Assessment District may mail written protests to the following address: CITY OF CARLSBAD, CITY CLERK 1200 CARLSBAD VILLAGE DRIVE, CARLSBAD, CA 92008 June 9, 2020 Item #4 Page 8 of 27 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council ofthe City of Carlsbad on the 9th day of June 2020, by the following vote, to wit: AYES: NAYS: ABSENT: Hall, Blackburn, Bhat-Patel, Schumacher. None. None. MATT HALL, Mayor -r;~ /-lecf17r Go/Yin tJepvf.1/ 11 BARBARA ENGLESON, City Clerk / Cli)J (SEAL) C)er✓ June 9, 2020 Item #4 Page 9 of 27 CITY OF CARLSBAD  PRELIMINARY ENGINEER’S REPORT  FISCAL YEAR 2020‐21  STREET LIGHTING AND LANDSCAPING  DISTRICT NO. 1  May 29, 2020  PREPARED BY  K.Dennis Klingelhofer, P.E. RCE 50255  Exp. 06/30/21 www.WeAreHarris.com Attachment A June 9, 2020 Item #4 Page 10 of 27 Preliminary Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21  ii    TABLE OF CONTENTS  Introduction ........................................................................................................................................................ 1  Part 1 – Street Lighting Improvement Zone ....................................................................................................... 3  Part 2 – Street Tree Improvement Zone ............................................................................................................. 8  Part 3 – Median Landscaping Improvement Zone ........................................................................................... 12  Exhibit A – Parcels no longer in LLD No. 1 ........................................................................................................ 16    June 9, 2020 Item #4 Page 11 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    1  INTRODUCTION  This report constitutes the Engineer’s Report for City of Carlsbad Street Lighting and Landscaping District  No. 1 (“Assessment District”) and was prepared at the Direction of the Carlsbad City Council pursuant to the  requirements of the Landscaping and Lighting Act of 1972, being Division 15, Part 2 of the Streets and  Highways Code of the State of California, commencing with Section 22500 ("Act").   The report applies to Fiscal Year 2020‐21 commencing July 1, 2020 and ending on June 30, 2021 (“Fiscal  Year”). The report has been prepared in three parts corresponding to the three special improvement zones  within the Assessment District; Street Lighting, Street Trees and Median Landscaping. Pursuant to the  requirements of the Act, each part contains the following four components:  1. PLANS AND SPECIFICATIONS FOR THE IMPROVEMENTS. The plans and specifications describe the  general nature, location and extent of the improvements to be maintained.   2. A DIAGRAM FOR THE ASSESSMENT DISTRICT. The diagram shows the exterior boundaries of the  Assessment District, the boundaries of the specified improvement zone within the Assessment District,  and the lines and dimensions of each lot or parcel within the District. Each lot or parcel is identified by a  distinctive number or letter. The lines and dimensions of each lot conform to those shown on the San  Diego County Assessor's maps. For purposes of clarity, only a generalized diagram is included within the  report. The detailed assessment diagram is on file at the city’s Public Works Department.  3. AN ESTIMATE OF THE COSTS OF THE IMPROVEMENTS. The estimate of costs of the improvements  contains estimates for the following:  a. The total cost of maintaining and servicing the improvements for the specified improvement  zone including all incidental expenses for the fiscal year.  b. The amount of any surplus or deficit in the improvement fund to be carried over from the  preceding fiscal year.  c. The amount of any contributions to be made from sources other than assessments levied  pursuant to the Assessment District.  d. The amount, if any, of the annual installment for the fiscal year where the City Council has  ordered an assessment for the estimated cost of any improvements to be levied and collected  in annual installments.  e. The net amount to be assessed upon assessable lands within the Assessment District, being the  total improvement costs referred to in sub‐section a, increased or decreased, as the case may  be, by any of the amounts referred to in sub‐sections b, c or d.  4. AN ASSESSMENT OF THE ESTIMATED COSTS OF THE IMPROVEMENTS. The assessment shall refer to the  new fiscal year and shall do all of the following:  a. State the net amount to be assessed upon the assessable lands within the Assessment District.  June 9, 2020 Item #4 Page 12 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    2  b. Describe each assessable lot or parcel of land within the Assessment District. Due to the large  number of parcels within the Assessment District, the city uses the assessor’s parcel number  from San Diego County records assessment rolls for a description of the lots. A copy of the  assessment roll including such description is kept on file at the city’s Finance Department.  c. Assess the net amount upon all assessable lots or parcels of land within the Assessment District  by apportioning that amount among the several lots or parcels in proportion to the estimated  benefits to be received by each lot or parcel from the improvements.    June 9, 2020 Item #4 Page 13 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    3  PART 1 – STREET LIGHTING IMPROVEMENT ZONE  PLANS AND SPECIFICATIONS  The improvement work consists of maintenance and servicing of the 7,363 street lights within the  boundaries of the Assessment District including all supporting poles, mast arms, pull boxes, wiring, conduits  and other appurtenances. The total number of street lights maintained and serviced includes approximately  208 streetlights that were repaired during the previous Fiscal Year. The general location of the street light  improvements are as shown on the city’s full‐scale map titled “Street Lighting Improvement Zone and  Lighting Facilities Location Diagram for Fiscal Year 2020‐21” on file at the city’s Public Works Department. A  reduced copy of the map is included as Figure 1 in this report.  DIAGRAM OF THE ASSESSMENT DISTRICT  The diagram of the Assessment District is as shown on the city’s full scale map titled “Street Lighting  Improvement Zone and Lighting Facilities Location Diagram for Fiscal Year 2020‐21” on file at the city’s  Public Works Department. A reduced copy of the map is included as Figure 1 in this report.  The lines and  dimensions of each lot or parcel within the Street Lighting Improvement Zone and the distinctive assessor’s  parcel number are shown on the San Diego County Assessor's map which is also on file at the city’s Public  Works Department.  ESTIMATED COST OF THE IMPROVEMENTS  The estimated total cost of maintaining and servicing the city’s inventory of public street lighting  improvements is $1,285,115.   The estimated total cost includes the furnishing of all services and materials for the ordinary and usual  operation, maintenance and servicing of installed streetlights and the provision of electric current. For  budgetary purposes, the costs are segregated into two categories of Personnel, and Maintenance and  Operations. These two categories include the following services and expenditures:  City staff assigned to Street Lighting services, city administration (updating expenditures and  segregation of the assessments), engineering and legal expenses, coordination between residents  and city staff for the maintenance of city street lights, providing expertise to city inspectors during  inspection of lighting systems, coordinating underground service alert mark‐outs for various city  departments, performing mark‐outs for street light systems, maintaining as‐built records of city  street light system for future maintenance, updating of the street lighting mapping and inventory  database, performing routine night surveillance, checking proposed improvement plans for  conformance with city standards regarding street lights, coordinating with Planning,  Transportation, Traffic and Engineer's of Work to ensure that departmental needs are met, the  provision of electrical current and the cost for purchase of capital equipment and new street light  facilities.  The following table shows the breakdown of the estimated total costs into the two budgetary categories.  June 9, 2020 Item #4 Page 14 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    4  TOTAL ESTIMATED FY 2020‐21  STREET LIGHTING MAINTENANCE & SERVICE COSTS      The net assessable amount to be levied upon the assessable lands within the Assessment District is  $740,242. This amount is derived by subtracting the amounts of the current improvement fund surplus and  contributions from other funding sources from the total cost estimate. The following table shows how the  net assessable amount is derived:  FY 2020‐21  NET ASSESSABLE AMOUNT – STREET LIGHTING MAINTENANCE      The contribution for services to public parcels has been estimated at $28,000.  This contribution is made  since public parcels are non‐assessable on the County tax rolls. The city's General Fund will contribute  $119,766.  Any share of the benefits received from an improvement that does not provide a special benefit to the  assessed properties is considered to be a general benefit provided by the improvements. The cost of such  general benefit is not to be assessed to the properties in the Assessment District, but instead is contributed  by the city from the city’s General Fund. For street lighting the city has determined that general benefit is  derived exclusively along the city’s arterial roads. The amount of general benefit is established by  multiplying the number of arterial street lights by the difference between the average annual cost to  maintain a light on an arterial street and a local street. The table on the following page shows the  calculation of the cost estimate for general benefit for Street Lights.     Personnel $236,625 Maintenance & Operations $1,048,490 Total Cost Estimate $1,285,115 Total Cost Estimate $1,285,115 Less: Contribution for Services to Public Parcels $28,000 Contribution from LLD No. 2 $93,435 General Benefit Contribution $119,766 Interest Earned $23,000 Misc Revenues $28,000 Projected Fund Balance from Previous Fiscal Year $2,822,564 Plus: Estimated Fund Reserve at end of Fiscal Year 2,569,892$ Net Assessable Amount 740,242$ June 9, 2020 Item #4 Page 15 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    5  COST ESTIMATE FOR GENERAL BENEFIT  STREET LIGHT SUMMARY PER SAN DIEGO GAS & ELECTRIC CO.      AN ASSESSMENT OF THE ESTIMATED COSTS OF THE IMPROVEMENTS  The lighting and the orderly circulation of traffic directly benefit the developments within the District.  The  improvements and annexation into the Street Lighting Zone are required for the approval of, and as a  consequence of, new development, and thus benefit the respective developments. The lighting is of benefit  to abutting parcels as it provides increased property protection, personal safety, visibility, traffic safety, and  enhances those areas fronting upon the illuminated street.  All of the parcels within the Assessment District are located within the City of Carlsbad and are approved  developments or are in the final stages of obtaining approval for a proposed development.  As a condition  of approval, the developer is required by the city to provide certain standard street lighting for the entire  area within the development and pay the energy costs for the initial 18‐month period. The units in a  development are assessed the following fiscal year after the street lights are energized.     Lamp Size Number Monthly Monthly Annual Annual General (Watts) Lights Rate Amount Amount Cost per Benefit Low wattage lights for collector streets: 40 4,847 $2.18 $10,566.46 $126,797.52 $26.16 $0.00 Subtotal-1 4,847 $126,797.52 $0.00 High wattage lights for arterial streets: 70 103 $3.75 $386.25 $4,635.00 $45.00 $1,940.52 85 41 $4.58 $187.78 $2,253.36 $54.96 $1,180.80 100 1,671 $5.45 $9,106.95 $109,283.40 $65.40 $65,570.04 150 688 $8.15 $5,607.20 $67,286.40 $97.80 $49,288.32 200 0 $10.89 $0.00 $0.00 $130.68 $0.00 250 13 $13.63 $177.19 $2,126.28 $163.56 $1,786.20 Subtotal-2 2,516 $185,584.44 $119,765.88 Total 7,363 $312,381.96 $119,765.88 General Benefit = $119,765.88 FY 2020-21 Lighting Budget Amount $1,285,115 FY 2020-21 Public Parcel Contribution $28,000 Total Est. Cost Less Public Parcel Contribution*$1,257,115 General Benefit Percentage 9.53% * Based on preliminary budget estimates June 9, 2020 Item #4 Page 16 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    6  Two Zones of benefit have been created within the citywide Street Lighting Zone as follows:   Zone 1 – City owned and maintained street lights  Zone 2 – Undeveloped property – non‐benefiting, not assessed  Zone 1 consists of the following eight sub‐codes.    CODE A1* Street lights at intersections only (residential)  CODE B1* Street lights at intersections and mid‐block (residential)  CODE C1* Street light spacing at current city engineering standards (residential)  CODE D1* City owned street lights on surrounding streets, private lighting within the  development (single‐family residential, only adjacent city lights will be calculated  for code assessment cost)  CODE E2** Street light spacing at current city standard, condos and apartment buildings, ten  units and above  CODE F2** Street light spacing at current city standard, commercial and industrial parcels  CODE G2** Special lighting and spacing standard, downtown redevelopment area  CODE H1*** Street light spacing at current city standard, time shares only  * The unit rate of assessment for these codes was based on equal shares of cost of maintenance and  operation of the total lights within each code at the time of formation.  ** The unit rate of assessment for these codes at the time of formation was based on the share of cost of  maintenance and operation of total lights as determined by front footage percentage of each parcel in  relation to total footage within each code.  *** The unit rate of assessment for this code at the time of formation was based on a flat rate per unit.  The method of assessment for codes within Zone 1 is based on units as shown in the following table. In the  case of codes A1, B1, C1, and D1, a residential dwelling is equal to one benefit unit. In Code E2  condominium dwelling units or apartment buildings with ten units and above are assigned units based on  the front footage of these developments. In Code F2 commercial and industrial parcels are assigned units  based on the front footage of these developments. Code G2 includes the downtown redevelopment area  and units in this code are also based on front footage. Code H1 only includes time share units, which are all  assigned the same cost per unit.     June 9, 2020 Item #4 Page 17 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    7  METHOD OF ASSESSMENT FOR STREET LIGHTING    Street Lighting Code Benefit Unit A1, B1, C1, D1 Residential dwelling unit = one benefit unit E2, F2, G2 Commercial, residential and redevelopment area = one front foot of street frontage = one benefit unit H1 Time shares = $0.20 per weekly unit   The Street Lighting Zone assessments will not increase in Fiscal Year 2020‐21, and will remain at the same  unit rates as assessed in the last 24 fiscal years. All new assessors’ parcels, which by petition of the property  owner(s) have been added to the Street Lighting Zone, will be calculated at the same unit rates as used in  the last 24 fiscal years.  The rate per assessment unit for Fiscal Year 2020‐21 in each of the eight codes is shown in the following  table.   STREET LIGHTING ASSESSMENT UNIT RATES       For specific assessment on each parcel, reference is made to the Assessment Roll on file in the city’s  Finance Department, which is incorporated herein by this reference as though set forth in full.    Street Lighting Code A1 $14.84 / Unit B1 $23.94 / Unit C1 $26.00 / Unit D1 $6.90 / Unit H1 $0.20 / Unit E2 $0.372765 / Foot F2 $0.580858 / Foot G2 $2.690464 / Foot Rate per Unit June 9, 2020 Item #4 Page 18 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    8  PART 2 – STREET TREE IMPROVEMENT ZONE  PLANS AND SPECIFICATIONS  The existing number of trees within the public right of way that the city has maintenance responsibility for  is approximately 6,336 trees. The work consists of maintenance to all the city accepted and inventoried  trees within the public right‐of‐ways. Tree maintenance includes planting, canopy pruning, root pruning,  removing and replacing.  The district annually responds to approximately 600 street tree requests/work  orders and provides storm or other emergency assistance as necessary. The district also funds a Block  Pruning Program where every tree within the district is inspected/pruned on a 4 – 4 ½ year cycle and  selective genus (e.g. Eucalyptus, Ficus, Podocarpus, Pyrus, Washingtonia) are also pruned on a  supplemental 2 ‐ 2 ¼ year cycle. The general location of the street tree improvements are as shown on the  city’s full‐scale map titled “Street Tree Improvement Zone Location Diagram for Fiscal Year 2020‐21” on file  at the city’s Public Works Department. A reduced copy of the map is included as Figure 2 in this report.  DIAGRAM OF THE ASSESSMENT DISTRICT  The diagram of the Assessment District is as shown on the city’s full‐scale map titled “Street Tree  Improvement Zone Location Diagram for Fiscal Year 2020‐21” on file at the city’s Public Works Department.  A reduced copy of the map is included as Figure 2 in this report.  The lines and dimensions of each lot or  parcel within the Street Tree Improvement Zone and the distinctive assessor’s parcel number are shown on  the San Diego County Assessor's map which is also on file at the city’s Public Works Department.    ESTIMATE OF THE COST OF THE IMPROVEMENTS  The estimated total cost of maintaining and servicing the city’s inventory of public street tree  improvements is $959,599.  The estimated total cost includes the furnishing of all services and materials for the ordinary and usual  maintenance and servicing of street trees.  For budgetary purposes, the costs are segregated into two  categories of Personnel and Maintenance and Operations.  These two categories include the following  services and expenditures:  City staff assigned to Street Tree services, city administration (updating expenditures and segregation of the  assessments), engineering and legal expenses, coordination between citizens and city staff for the  maintenance of city street trees, providing expertise to city inspectors during inspection of the trees,  maintaining as‐built records of city street tree system for future maintenance, updating of the street tree  mapping and inventory database, checking proposed improvement plans for conformance with city  standards regarding street trees, coordinating with Planning, Transportation, Traffic, Park Maintenance and  Engineer's of Work to ensure that departmental needs are met, the provision of supplies such as pesticides,  fertilizer, and water, and the cost for purchase of capital equipment and new/replacement street trees.  The following table shows the breakdown of the estimated total costs into the two budgetary categories.     June 9, 2020 Item #4 Page 19 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    9  TOTAL ESTIMATED FY 2020‐21   STREET TREE MAINTENANCE & SERVICE COSTS      The net assessable amount to be levied upon the assessable lands within the Assessment District is  $468,644. This amount is derived by subtracting the amounts of the current improvement fund surplus and  contributions from other funding sources from the total cost estimate. The following table shows how the  net assessable amount is derived:  FY 2020‐21  NET ASSESSABLE AMOUNT – STREET TREE MAINTENANCE      Any share of the benefits received from an improvement that does not provide a special benefit to the  assessed properties is considered to be a general benefit provided by the improvements. The cost of such  general benefit is not to be assessed to the properties in the Assessment District, but instead is contributed  by the city from the city’s General Fund. For street trees, the city has determined that there is no general  benefit.  AN ASSESSMENT OF THE ESTIMATED COSTS OF THE IMPROVEMENTS  The existing number of trees within the public right of way that the city only has maintenance responsibility  for is approximately 6,336 trees.   Street trees that are in the street right‐of‐way are generally located between the curb and sidewalk and/or  property line in the areas of the city as shown in Figure 2. Each property within the Street Tree  Improvement Zone receives approximately the same degree of benefit to their property. Therefore, staff  established a benefit formula in which each zoned parcel is given an equivalent dwelling unit (EDU) based  on the average size of a single‐family residential lot in the City of Carlsbad (7,500 square feet or 0.17 acres).  Thus, each single‐family parcel is given an EDU of 1.0, while most other parcels, as shown on the following  table, are given assessments based on acreage to establish an EDU value based on the following formula:   Acreage of parcel divided by 0.17 acres = EDUs.  This formula was approved by City Council at the June 6,  1989 regular meeting.  Personnel $303,213 Maintenance & Operations $656,386 Total Cost Estimate $959,599 Total Cost Estimate $959,599 Less: Contribution from LLD No. 2 $82,945 Projected Fund Balance from Previous Fiscal Year $627,072 General Fund Transfer $0 Plus: Estimated Fund Reserve at end of Fiscal Year $219,061 Net Assessable Amount $468,644 June 9, 2020 Item #4 Page 20 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    10  STREET TREE BENEFIT UNITS AND LAND USE CODES  BEN.  UNITS  L.U.  CODE    LAND USE DESCRIPTION  BEN.  UNITS  L.U.  CODE    LAND USE DESCRIPTION  Formula 00 Unzoned 1.0 50 Vacant irrigated     1.0 51 Citrus  .1/DU 07 Timeshare 1.0 52 Avocados  .1/DU 09 Mobile home 1.0 53 Vines  1.0 10 Vacant residential 1.0 54 Misc. trees  1.0 11 Single‐family residence 1.0 55 Livestock  .5/DU 12 Duplex or double 1.0 56 Poultry  .1/DU 13 Res. 2‐4 units/2 houses 1.0 57 Misc. irrigated crops  .1/DU 14 Res. 5‐15 units 1.0 58 Growing houses  .1/DU 15 Res. 16‐60 units 1.0 59 Special/misc. irrigated  .1/DU 16 Res. 61 units and up     .1/DU 17 Condominium 1.0 61 Non‐irrigated 1‐10 AC  .1/DU 18 Co‐op 1.0 62 Non‐irrigated 11‐40 AC  .1/DU 19 Misc. residential 1.0 63 Non‐irrigated 41‐160 AC     1.0 64 Non‐irrigated 161‐360 AC  Formula 20 Vacant commercial 1.0 65 Non‐irrigated 361 & up AC  Formula 21 1‐3 story misc. store bldgs.     Formula 22 4 story & up office/store 0.0 70 Vacant institutional  Formula 23 Regional shopping ctr. 0.0 71 Church  Formula 24 Community shopping ctr. 0.0 72 Church parking/related  Formula 25 Neighborhood shopping ctr. 0.0 73 Cemetery  Formula 26 Hotel, motel 0.0 74 Mausoleum  Formula 27 Service station 0.0 75 Mortuary  Formula 28 Med., dental, animal hospital     Formula 29 Con. Hospital, rest home Formula 77 Hospital     Formula 79 Spec./misc. institutional  Formula 30 Office condominiums     Formula 31 Parking lot, garage, used cars Formula 80 Vacant recreational  Formula 32 Trailer park Formula 81 Meeting hall, gym  Formula 33 Theater Formula 82 Golf course  Formula 34 Bowling alley Formula 83 Marine, dock  Formula 35 Restaurant Formula 84 Recreational camps  Formula 36 Car wash 0.0 85 Non‐tax recreational  Formula 37 Large chain grocery/drug 0.0 86 Open space easements  Formula 38 Auto sales/service agency 0.0 87 Agr. Preserve (no contract)  Formula 39 Misc. comm., radio stn., bank 0.0 88 Agr. Preserve (contract)     Formula 89 Spec./misc. recreational  Formula 40 Vacant industrial     Formula 41 Factory – light manufacturer 0.0 90 Vacant tax. Govt. property  Formula 42 Factory – heavy manufacturer     Formula 43 Warehouse – proc. Or stor.     Formula 44 Bulk storage (tanks, etc.)     Formula 45 Extractive & mining     Formula 46 Small automotive garage     Formula 47 Industrial condos     Formula 49 Spec./misc. industrial     Formula:  If acres < .20, then Benefit Units (BU) = 1.0, otherwise BU = 5.9 x Acres (i.e. Acres/0.17)  June 9, 2020 Item #4 Page 21 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    11  The Street Tree Improvement Zone assessments will not increase in Fiscal Year 2020‐21, and will remain at  the same unit rate of $36.10 per EDU as assessed in the last 24 fiscal years. All new assessor's parcels, that  by petition of the property owner(s) have been added to the Street Tree Improvement Zone, will be  calculated at the same unit rate as used in the last 24 fiscal years.  This unit assessment is applied to 14,498 parcels in the Street Tree Improvement Zone. The total number of  EDUs for these parcels amounts to approximately 12,983.07 EDUs.  The revenue generated by these parcels  amounts to $468,643.50.  For the specific assessment on each parcel, reference is made to the Assessment  Roll at the city’s Finance Department, which is incorporated herein by this reference as though set forth in  full.    June 9, 2020 Item #4 Page 22 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    12  PART 3 – MEDIAN LANDSCAPING IMPROVEMENT ZONE  PLANS AND SPECIFICATIONS  The Street Median program provides landscape maintenance and litter collection to all city‐controlled  medians, parkways and downtown village landscaped areas. It includes maintenance on approximately 68  acres of landscaped medians and 9 acres of parkways, flower baskets, planter boxes and other landscaped  pockets. Maintenance includes trash pick‐up, weed control, pruning, planting, pesticide/fertilizer  application, removals, replanting, irrigation‐including repairs and adjustments, and hardscape cleaning.  Contractual operations provide for the routine maintenance of each of the described areas.  The general  location of the median landscaping improvements are as shown on the city’s full scale map titled “Street  Median Improvement Zone and Median Facilities Location Diagram for Fiscal Year 2020‐21” on file at the  city’s Public Works Department.  A reduced copy of the map is included as Figure 3 in this report.    DIAGRAM OF THE ASSESSMENT DISTRICT  The diagram of the Assessment District is as shown on the city’s full scale map titled “Street Median  Improvement Zone and Median Facilities Location Diagram for Fiscal Year 2020‐21” on file at the city’s  Public Works Department. A reduced copy of the map is included as Figure 3 in this report.  The lines and  dimensions of each lot or parcel within Median Landscaping Improvement Zone and the distinctive  assessor’s parcel number are shown on the San Diego County Assessor's map which is also on file at the  city’s Public Works Department.    ESTIMATE OF THE COST OF THE IMPROVEMENTS:   The estimated total cost of maintaining and servicing the city’s inventory of public street median  improvements is $1,406,086.   The estimated total cost includes the furnishing of all services and materials for the ordinary and usual  maintenance and servicing of the median landscaping.  For budgetary purposes, the costs are segregated  into two categories of Personnel and Maintenance and Operations.  These two categories include the  following services and expenditures:  City staff assigned to Median Landscaping services, city administration (updating expenditures and  segregation of the assessments), engineering and legal expenses, coordination between citizens and city  staff for the maintenance of city medians, providing expertise to city inspectors during inspection of the  medians, maintaining as‐built records of city street median system for future maintenance, updating of the  median mapping and inventory database, checking proposed improvement plans for conformance with city  standards regarding medians, coordinating with Planning, Transportation, Traffic, Parks Maintenance and  Engineer's of Work to ensure that departmental needs are met, the provision of supplies such as pesticides,  fertilizer, and water, and the cost for purchase of capital equipment and refurbishment of the medians.  The following table shows the breakdown of the estimated total costs into the two budgetary categories.    June 9, 2020 Item #4 Page 23 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    13  TOTAL ESTIMATED FY 2020‐21   MEDIAN LANDSCAPING MAINTENANCE & SERVICE COSTS      The net assessable amount to be levied upon the assessable lands within the Assessment District is  $359,399. This amount is derived by subtracting the amounts of the current improvement fund surplus and  contributions from other funding sources from the total cost estimate. The following table shows how the  net assessable amount is derived:  FY 2020‐21  NET ASSESSABLE AMOUNT – MEDIAN MAINTENANCE      Any share of the benefits received from an improvement that does not provide a special benefit to the  assessed properties is considered to be a general benefit provided by the improvements. The cost of such  general benefit is not to be assessed to the properties in the Assessment District, but instead is contributed  by the city from the city’s General Fund. For median landscaping, the city has determined that there is no  general benefit.   AN ASSESSMENT OF THE ESTIMATED COSTS OF THE IMPROVEMENTS  This service generally benefits all parcels and residents within the city boundaries. Thus, all parcels in the  city boundary share in the cost of median maintenance using the same EDU formula as in effect for the  Street Tree Improvement Zone.  City staff established the benefit formula in which each zoned parcel is  given an equivalent dwelling unit (EDU) based on the average size of a single‐family residential lot in the  City of Carlsbad (7,500 square feet or 0.17 acres). Thus, each single‐family parcel is given an EDU of 1.0,  while most other parcels, as shown on the following table, are given assessments based on acreage to  establish an EDU value based on the following formula:  Acreage of parcel divided by 0.17 acres = EDUs.   This formula was approved by City Council at the June 6, 1989 regular meeting.     Personnel $293,541 Maintenance & Operations $1,112,545 Total Cost Estimate $1,406,086 Total Cost Estimate $1,406,086 Less: LLD #2 Contribution $186,504 Projected Fund Balance from Previous Fiscal Year $265,955 General Fund Transfer $700,000 Plus: Estimated Fund Reserve at end of Fiscal Year $105,772 Net Assessable Amount $359,399 June 9, 2020 Item #4 Page 24 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    14  LANDSCAPE MAINTENANCE BENEFIT UNITS AND LAND USE CODES  BEN.  UNITS  L.U.  CODE    LAND USE DESCRIPTION  BEN.  UNITS  L.U.  CODE    LAND USE DESCRIPTION  Formula 00 Unzoned 1.0 50 Vacant irrigated     1.0 51 Citrus  .1/DU 07 Timeshare 1.0 52 Avocados  .1/DU 09 Mobile home 1.0 53 Vines  1.0 10 Vacant residential 1.0 54 Misc. trees  1.0 11 Single‐family residence 1.0 55 Livestock  .5/DU 12 Duplex or double 1.0 56 Poultry  .1/DU 13 Res. 2‐4 units/2 houses 1.0 57 Misc. irrigated crops  .1/DU 14 Res. 5‐15 units 1.0 58 Growing houses  .1/DU 15 Res. 16‐60 units 1.0 59 Special/misc. irrigated  .1/DU 16 Res. 61 units and up     .1/DU 17 Condominium 1.0 61 Non‐irrigated 1‐10 AC  .1/DU 18 Co‐op 1.0 62 Non‐irrigated 11‐40 AC  .1/DU 19 Misc. residential 1.0 63 Non‐irrigated 41‐160 AC     1.0 64 Non‐irrigated 161‐360 AC  Formula 20 Vacant commercial 1.0 65 Non‐irrigated 361 & up AC  Formula 21 1‐3 story misc. store bldgs.     Formula 22 4 story & up office/store 0.0 70 Vacant institutional  Formula 23 Regional shopping ctr. 0.0 71 Church  Formula 24 Community shopping ctr. 0.0 72 Church parking/related  Formula 25 Neighborhood shopping ctr. 0.0 73 Cemetery  Formula 26 Hotel, motel 0.0 74 Mausoleum  Formula 27 Service station 0.0 75 Mortuary  Formula 28 Med., dental, animal hospital     Formula 29 Con. Hospital, rest home Formula 77 Hospital     Formula 79 Spec./misc. institutional  Formula 30 Office condominiums     Formula 31 Parking lot, garage, used cars Formula 80 Vacant recreational  Formula 32 Trailer park Formula 81 Meeting hall, gym  Formula 33 Theater Formula 82 Golf course  Formula 34 Bowling alley Formula 83 Marine, dock  Formula 35 Restaurant Formula 84 Recreational camps  Formula 36 Car wash 0.0 85 Non‐tax recreational  Formula 37 Large chain grocery/drug 0.0 86 Open space easements  Formula 38 Auto sales/service agency 0.0 87 Agr. Preserve (no contract)  Formula 39 Misc. comm., radio stn., bank 0.0 88 Agr. Preserve (contract)     Formula 89 Spec./misc. recreational  Formula 40 Vacant industrial     Formula 41 Factory – light manufacturer 0.0 90 Vacant tax. Govt. property  Formula 42 Factory – heavy manufacturer     Formula 43 Warehouse – proc. Or stor.     Formula 44 Bulk storage (tanks, etc.)     Formula 45 Extractive & mining     Formula 46 Small automotive garage     Formula 47 Industrial condos     Formula 49 Spec./misc. industrial     Formula:  If acres < .20, then Benefit Units (BU) = 1.0, otherwise BU = 5.9 x Acres (i.e. Acres/0.17)  June 9, 2020 Item #4 Page 25 of 27 Final Engineer’s Report  Street Lighting and Landscaping District No. 1  City of Carlsbad  Fiscal Year 2020‐21    15  The Median Landscaping Improvement Zone assessments will not increase in Fiscal Year 2020‐21, and will  remain at the same unit rate of $8.34 per EDU as assessed in the last 24 fiscal years. All new assessors’  parcels that have been added within the city boundaries are automatically added to the Median  Landscaping Improvement Zone and will be calculated at the same unit rate as used in the last 24 fiscal  years.  This unit assessment is applied to 50,461 parcels in the Median Landscaping Improvement Zone. The total  number of EDUs for these parcels amounts to approximately 43,137.74 EDUs.  The revenue generated by  these parcels amounts to $359,398.80.  For the specific assessment on each parcel, reference is made to  the Assessment Roll on file at the city’s Finance Department, which is incorporated herein by this reference  as though set forth in full.    June 9, 2020 Item #4 Page 26 of 27   16  EXHIBIT A – PARCELS NO LONGER IN LLD NO. 1  Exhibit A contains a list the parcels that were incorporated into Street Lighting and Landscaping District No.  2 and are therefore being exempted from this Street Lighting and Landscaping District No. 1. These parcels  were previously assessed for median benefit.                                              www.WeAreHarris.com  Anna Tan‐Gatue, PE  Project Manager  Anna.Tan‐Gatue@WeAreHarris.com  P: 949‐536‐2507    June 9, 2020 Item #4 Page 27 of 27