HomeMy WebLinkAbout2020-08-25; City Council; ; Plans and specifications approval and authorization to advertise for bids for the Carlsbad City Library parking lot renovation projectMeeting Date: Aug. 25, 2020
To: Mayor and City Council
From: Scott Chadwick, City Manager
Staff Contact: Steven Stewart, Municipal Projects Manager
steven.stewart@carlsbadca.gov, 760-602-7543
Suzanne Smithson, Library & Cultural Arts Director
suzanne.smithson@carlsbadca.gov, 760-424-2876
Subject: Plans and specifications approval and authorization to advertise for bids
for the Carlsbad City Library parking lot renovation project
Recommended Action
Adopt a resolution approving the plans and specifications and authorizing the city clerk to
advertise for bids for the Carlsbad City Library parking lot renovation, Capital Improvement
Program Project No. 4744.
Executive Summary
Staff is seeking City Council approval of completed plans and specifications for a project to
renovate the parking lot at the Carlsbad City Library on Dove Lane along with the authorization
to advertise for construction bids.
Carlsbad Municipal Code Section 3.28.080(E) requires City Council approval for all plans and
specifications for all construction projects that are to be formally bid when the value exceeds
the limits established by the Public Contract Code, including the alternative provisions of the
Uniform Public Construction Cost Accounting Act. The Public Contract Code limit is $200,000
and the estimated construction cost for this Project is $346,950, so the project is subject to this
requirement.
Staff recommends approval of the project plans and specifications and requests authorization
for the city clerk to advertise for construction bids for the project.
Discussion
On Aug. 26, 2019, staff executed Task Order No. 3 to Professional Services Agreement PSA19-
544CA for DomusStudio Architecture to evaluate and design the Carlsbad City Library parking
lot renovation. The purpose of the project is to provide Americans with Disabilities Act-
compliant parking stalls closer to the front entrance to the library. There are currently ADA-
compliant parking stalls in the northern portion of the parking lot, but these will become
inaccessible when the temporary Fire Station No. 2 is constructed in this area. Once the new
Fire Station No. 2 is in use and the temporary fire station has been removed, the library will
Aug. 25, 2020 Item #1 Page 1 of 6
again have use of these existing ADA-compliant parking stalls and together with the new ones
will have almost twice as many on site for patrons.
On Dec. 10, 2019, staff executed Task Order No. 6 to PSA19-544CA for DomusStudio to prepare
plans and specifications so the project could be advertised for bidding.
The plans and specifications were completed, reviewed by staff and submitted for permitting. A
permit has been obtained from the building division and it is currently on file for the successful
bidder to pick up.
The renovation work scope includes:
•Leveling a portion of the existing parking lot and restriping it to accommodate seven
ADA-compliant parking stalls
•Modifying a landscape planter by creating a walkway through it
•Creating a lighted crosswalk across the existing drive lane toward the library entrance
•Repairing damaged pavement in the drive lane
•Sealing and restriping the newly created parking lot area in front of the library entrance.
Staff requests City Council approval of these completed plans and specifications so the city clerk
can advertise them as part of a request for bids from prospective contractors under Carlsbad
Municipal Code Section 3.28.080(C).
Fiscal Analysis
The project was funded in fiscal year 2019-20 with $50,000 from the General Capital
Construction Fund for design. In FY 2020-21, an additional $425,000 from the General Capital
Construction Fund was funded for the other project related costs. The estimated cost for
construction is $346,950. This amount plus an additional 10% for contingency ($34,695) has
been set aside to cover any potential bid variations from the estimated value and any changes
that may arise during the work. General Capital Construction funds have been appropriated for
this project as shown in the table below:
CARLSBAD CITY LIBRARY PARKING LOT RENOVATION, CIP PROJECT NO. 4744
Current appropriation $475,000
Current expenditures/encumbrances ($47,080)
TOTAL AVAILABLE $427,920
Construction contract (engineer’s estimate) $346,950
Construction contingency (estimated) $34,695
Construction management, inspection and material testing (estimated) $43,355
TOTAL ESTIMATED CONSTRUCTION COSTS $425,000
REMAINING BALANCE AFTER CIP PROJECT NO. 4744 $2,920
ADDITIONAL APPROPRIATION NEEDED $0
Aug. 25, 2020 Item #1 Page 2 of 6
Next Steps
With the council’s approval, a request for bids to construct the project will be advertised.
Responses will be evaluated, and staff will identify the lowest responsive and responsible
bidder.
Staff expects to return to the City Council in fall 2020 with a recommendation to award the
contract to the identified bidder. Staff estimates project construction will last four months.
Environmental Evaluation (CEQA)
The Project is exempt from the California Environmental Quality Act under State CEQA
Guidelines Section 15301(f) – addition of safety or health protection devices for use during
construction of, or in conjunction with existing structures, facilities, or mechanical equipment,
or topographical features including navigation devices.
Public Notification and Outreach
This item was noticed in accordance with the Ralph M. Brown Act and was available for public
viewing and review at least 72 hours prior to the scheduled meeting date.
Exhibits
1.Resolution
2.Location map
3.Plans and Specifications (on file in the Office of the City Clerk)
Aug. 25, 2020 Item #1 Page 3 of 6
RESOLUTION NO. 2020-175
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, APPROVING THE PLANS AND SPECIFICATIONS AND
AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE CARLSBAD
CITY LIBRARY PARKING LOT RENOVATION, CAPITAL IMPROVEMENT
PROGRAM (CIP) PROJECT NO. 4744 (PROJECT).
WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary,
desirable and in the public interest to renovate the parking lot of the Carlsbad City Library on Dove
Lane; and
WHEREAS, the plans, specifications and contract documents for the Project have been
prepared, are on file in the city clerk's office and are incorporated herein by reference; and
WHEREAS, the Carlsbad Municipal Code (CMC) Section 3.28.080(E) requires City Council to
adopt plans and specifications for all construction projects that are to be formally bid when the value
exceeds the limits established by the Public Contract Code including the alternative provisions of the
Uniform Public Construction Cost Accounting Act, which is $200,000, and the estimated construction
cost for this Project is $346,950; and
WHEREAS, on May 28, 2020, the city approved a Conditional Use Permit Consistency
Determination, and issued a building permit for the designed work; and
WHEREAS, sufficient funds are available to complete the Project; and
WHEREAS, the City Planner has determined that the Carlsbad City Library parking lot
renovations are categorically exempt from the California Environmental Quality Act (CEQA) pursuant to
CEQA Guidelines Section 15301W and that no exception to the exemption as set forth in CEQA Guidelines
Section 15300.2 applies.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as
follows that:
1. The above recitations are true and correct.
2. That the City Planner has determined that the Carlsbad City Library parking lot
renovation Project designated herein to provide safety and Americans with Disabilities
Act improvements is categorically exempt from CEQA pursuant to CEQA Guidelines
Section 15301(f) and that no exception to the exemption as set forth in CEQA Guidelines
Section 15300.2 applies.
Aug. 25, 2020 Item #1 Page 4 of 6
3. The plans and specifications for the Project are hereby approved and on file in the city
clerk's office.
4. The city clerk of the City of Carlsbad is hereby authorized and directed to publish, in
accordance with State law, a notice to contractors inviting bids for the construction of
the Project, in accordance with the plans, specifications and contract documents
referred to herein.
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of
Carlsbad on the 25th day of August, 2020, by the following vote, to wit:
AYES:
NAYS:
ABSENT:
Hall, Blackburn, Bhat-Patel, Schumacher.
None.
None.
MATT HALL, Mayor
~~fr;r
BARBARA ENGLESON, C~lerk
(SEAL)
Aug. 25, 2020 Item #1 Page 5 of 6
2DOVE LIBRARY
DOVE LIBRARY
SITE
DOVE LIBRARY
SITE
EXHIBIT 2
Aug. 25, 2020 Item #1 Page 6 of 6
CONSISTENCY DETERMINATION EXHIBITFOR ORIGINAL PROJECT NO.Date:Don Neu, City PlannerRECOMMENDED BY:DATE:CD NO.CRADESNo. C12113YAS EA TTLWNECIA ORCFOFILAINNAIHHENTLOTCET REN 9.30.21D:\DRAWING FILES\TITLE SHEETS\IMPROVEMENT TITLE SHEET.DWG REVISED: 2/23/17REVISION DESCRIPTIONCITY APPROVALINITIALDATEENGINEER OF WORKINITIALDATEENGINEERING DEPARTMENTDRAWING NO.PROJECT NO.CHKD BY:DWN BY:APPROVED:SHEETSSHEETDATE INITIALOTHER APPROVALRVWD BY:CITY OF CARLSBAD"AS BUILT"DATEINSPECTORDATEREVIEWED BY:IMPROVEMENT PLANS FOR:P.E.EXP.1JOHN MAASHOFFTYPEDESCRIPTIONOWNERSHIPAGREEMENTSHEET NO.FREQUENCYMAINTENANCESTRUCTURAL (POST-CONSTRUCTION) BMP TABLEMAINTENANCESTORMWATER REQUIREMENTS THAT APPLY:STANDARD STORMWATER REQUIREMENTSPRIORITY PROJECT REQUIREMENTSYES (SEE SWMP FOR DOCUMENTATION)NOEXEMPT FROM HYDROMODIFICATION?domusstudio architectureCity of Carlsbad Dove Library Parking Relocation320-7ECITY ENGINEER DATEEXPIRES 20200044744T1.04744Title Sheet1775 Dove Lane Carlsbad, CA 92011City of Carlsbad Dove Library Parking1775 Dove LnCarlsbad, CA 92011Project TeamOwner: City of Carlsbad1635 Faraday AvenueCarlsbad, CA 92008Architect:domusstudio architecture2150 W Washington, Suite 303San Diego, CA 92110619.692.9393 x15Contact: Wayne HoltanCivil Engineer:Snypes-Dye Associates8348 Center Drive, Suite GLa Mesa, CA 91942619-697-9234Contact: Matt KurtzLandscape Architect:Deneen Powell Ateleir, Inc.2305 El Cajon Blved.San Diego, CA 92104619.294.9042 x115Contact: Jon PowellSheet Index12 Total SheetsProject DataProject Description:The relocation of 6 standard accessible parking spaces and 1 van accessible parking space to be closer to the entrance of the library.Owner:City of CarlsbadProject Address:1775 Dove Ln.Carlsbad, CA 92011Assessor's Parcel No.:2150507000Legal Description:PM16044 PAR 2Existing Use:Library ParkingProposed Use:Library ParkingLot Site:6.1 Acres / 265,716 SFZoning:Zone:C-L Shopping CenterCoastal OverlayParking:Required:Relocation of Existing Accessible SpacesSummary:Existing:223 standard7 accessible1 van acccessibleTo be Demolished:-12 standardTo be Added:+6 accessible+1 van accessibleTotal Provided:211 standard13 accessible2 van accessibleT1.0Title SheetT2.0General Notes, Legend and AbbreviationsC1.0Grading PlanC2.0Enlarged Grading PlanC3.0Detail SheetC4.0Detail SheetA1.0Site PlanA1.1 Site DetailsL1.0Landscape Construction PlanL2.0Irrigation & Planting PlanL3.0 Landscape Construction DetailsL4.0Irrigation DetailsRelocation of Existing Accessible SpacesAdd Alternate:Drive lane paver restoration, with like-color grout -approximate area of restoration, up to 20 SFParking lot slurry coat and restriping, and colored curb repainting.112DocuSign Envelope ID: 63E11941-716E-486B-B78B-F9FB0A707DE47/22/202009/30/21RCE61909
1.2.3.4.5.6.7.8.9.Do not scale drawings, dimensions prevail.Contractor shall field verify all existing conditions prior to bidding and construction.Contractor shall report in writing all conflicts, discrepancies, and defects promptly to the Architect and prior to proceeding with any subsequent work.Where details are not shown or referenced for part of the work, the details shall be the same as for other similar areas of work and the Architect shall be promptly notified of all such discrepancies.All products purchased for incorporation into the Work shall consist of items that have not previously been incorporated into another project or facility, or otherwise recycled, except that products consisting of recycled-content materials are allowed. All products shall be new at the time of construction unless explicitly stated otherwise.To prevent galvanic corrosion, provide separation between all items made of dissimilar metals and between metals and corrosive substrates, substances, or adhesives.Waste Management Plan Required. (CGBSC 5.408.1)A minimum of 65 percent of the non-hazardous construction and demolition waste shall be recycled and/or salvaged for reuse. Contractor shall provide and coordinate a "Waste Management Plan" on site in accordance with the local jurisdiction's requirements and/or applicable building codes. To promote clear communication in the field, all questions and clarifications shall be submitted, in writing, to the City in a timely manner. Official resolutions to these issues shall be issued in writing only.All work shall be performed in strict accordance with the highest standards of practice related to the trades involved, and shall be complete and properly coordinated with all adjacent or related work.General NotesCONSISTENCY DETERMINATION EXHIBITFOR ORIGINAL PROJECT NO.Date:Don Neu, City PlannerRECOMMENDED BY:DATE:CD NO.CRADESNo. C12113YAS EA TTLWNECIA ORCFOFILAINNAIHHENTLOTCET REN 9.30.21D:\DRAWING FILES\TITLE SHEETS\IMPROVEMENT TITLE SHEET.DWG REVISED: 2/23/17REVISION DESCRIPTIONCITY APPROVALINITIALDATEENGINEER OF WORKINITIALDATEENGINEERING DEPARTMENTDRAWING NO.PROJECT NO.CHKD BY:DWN BY:SHEETSSHEETDATE INITIALOTHER APPROVALRVWD BY:CITY OF CARLSBADIMPROVEMENT PLANS FOR:1TYPEDESCRIPTIONOWNERSHIPAGREEMENTSHEET NO.FREQUENCYMAINTENANCESTRUCTURAL (POST-CONSTRUCTION) BMP TABLEMAINTENANCESTORMWATER REQUIREMENTS THAT APPLY:STANDARD STORMWATER REQUIREMENTSPRIORITY PROJECT REQUIREMENTSYES (SEE SWMP FOR DOCUMENTATION)NOEXEMPT FROM HYDROMODIFICATION?domusstudio architectureCity of Carlsbad Dove Library Parking Relocation320-7E20200044744T2.04744General Notes, Legends and Abbreviations1775 Dove Lane Carlsbad, CA 92011Architectural AbbreviationsA/CAir ConditioningADAAmericans with Disabilities ActAFFAbove Finish FloorALTAlternateALUMAluminumANODAnodizedARCHArchitect(ural)ASTMAmerican Society for Testing MaterialsA/VAudio VisualBDBoardBLDGBuildingBTUBritish Thermal UnitCBCCalifornia Building CodeCFMCubic Foot of Air per MinuteCLCenterlineCLRClear(ance)CMUConcrete Masonry UnitCONCConcreteCONTContinuous/ContinueCSIConstruction Specifications InstituteDEMODemolish/DemolishionD.F.Drinking FountainDIADiameterDIMDimensionDNDownDWGDrawing(E)ExistingEAEachELECElectric(al)ELEVElevationEQEqualEQUIPEquipmentEXISTExistingFAUForced Air UnitFEFire ExtinguisherFFFinished FloorFINFinish(ed)FLRFloor(ing)FOCFace of Concrete / CurbFOFFace of FinishFOMFace of MasonryFOSFace of StudFRPFiber Reinforced PlasticFTFootGAGage, GuageGALVGalvanizedGLU-LAM Glue/Pressure LaminatedGYPGypsumHVACHeating Ventilation Air-ConditioningIDInside DiameterINInchLAMLaminate(d)LAVLavatoryMAXMaximumMECHMechanicalMEDMediumMFRManufacture(r)MINMinimumMISCMiscelaneousNICNot In ContractNOMNominalNTSNot To ScaleOCOn CenterODOutside DiameterPERFPerforate(d)PLProperty LinePLAMPlastic LaminatePSFPounds per Square FootPSIPounds per Square InchPTPressure TreatedPVCPolyvinyl ChlorideREFReferenceREVRevision(s), RevisedSCHEDScheduleSIMSimilarSPECSpecification(s)SQSquareSSStainless SteelT&BTop and BottomT>ounge and GrooveTOTop OfTOCTop of Concrete / CurbTVTelevisionTYPTypicalUNOUnless Noted OtherwiseUONUnless Otherwise NotedVCTVinyl Composition TileStorm Water Quality Notes / Construction BMP's1. This project shall comply with all requirements of the state permit; California Regional Water Quality Control Board. Notes below represent key minimum requirements for construction BMP's.:2. The contractor shall be responsible for cleanup of all silt and mud on adjacent street(s), due to construction vehicles or any other construction activity, at the end of each work day, or after a storm event that causes a breech in installed construction BMP's which may compromise storm water quality within any street(s). A stabilized construction exit may be required to prevent construction vehicles or equipment from tracking mud or silt onto the street.3. All stockpiles of soil that are intended to be left for a period greater that seven calendar days are to be covered. All removable BMP devices shall be in place at the end of each working day when five day rain probability forecast exceeds 40%.4. A concrete washout shall be provided on all projects which propose the construction of any concrete improvements which are to be poured in place on site.5. The contractor shall restore all erosion/sediment control devices to working order after each run-off producing rainfall or after any material breach in effectiveness.6. All slopes that are created or disturbed by construction activity must be protected against erosion and sediment transport at all times.7. The storage of all construction materials and equipment must be protected against any potential release of pollutants in the environment.Demolition Notes1.1 The word "Demolish" shall mean to remove. Make good existing any surface damaged during demolition and disposal of the demolished materials off site entirely at the general contractors expense. 1.2 Extent of demolition work is only graphically shown, full scope of demolition work shall be determined by the general contractor to accommodate new construction.1.3 Refer to consultants plans for additional demolition notes.1.4 Refer to plans and details for the interface between new and existing construction, in order to determine the full scope of demolition.2.0 Verify Existing Conditions2.1 The drawings reflect general information only. Examine the site to determine the exact existing conditions, character and extent of the work to be performed and operations required. Verify the location of existing utilities prior to demolition and start of work. 2.2 Verify existing dimensions before proceeding with the work. Obtain field measurements for work required to be accurately fitted to other construction. Contractor's responsible for the accuracy of such measurements and precise fitting and assembly of finished work. 2.3 Notify the architect in writing of any discrepancies prior to proceeding with any work.3.0 Protection3.1 Protect all existing and new construction especially finishes, equipment and adjacent work which is to remain or to be reused from damage.3.2 Provide weather protection and waterproofing as needed to prevent damage to remaining existing work and to new work. 3.3 Protect all active utilities, fixtures, pipes and other appurtenances within building and site. Disconnect and cap pipes and services as required by company, utility, or local authority having jurisdiction, and as required for demolition work. Bypass utility services such as pipe and conduit before cutting, where such utility services are shown or required to be removed. After bypass and cutting, cap valve or plug and seal tight remaining portion of pipe and conduit to prevent entrance of moisture or other foreign matter.3.4 Provide barricades, maintenance and supervision thereof, in accordance with applicable federal, state and local codes and their respective requirements. Install temporary barricades, enclosures and protections before demolition work is started.3.5 If hazardous materials are encountered during demolition operations, comply with applicable regulations, laws and ordinances concerning removal, handling and protection against exposure or environmental pollution.3.6 Protect adjoining property from damage during construction and demolishin work. Provide protection for footings, foundations, walls, chimneys, skylights, and roofs. Control water runoff and erosion during construction or demolition activities.3.7 The person making or causing an excavation to be made shall provide written notice to the owners of adjoining buildings advising them that the excavation is to be made and that the adjoining buildings should be protected, delivered not less than 10 days prior to the scheduled excavation starting date4.0 Removal of Material4.1 Provide all demolition as shown on these drawings and as required for a complete and proper installation of new work.4.2 Remove debris and abandoned items from area and from concealed spaces. Remove rubbish and debris from project site and dispose of in a legal disposal site. Upon completion of work, leave area in clean condition.4.3 Remove existing work items which are required to be removed in such a manner that minimum damage and disturbance is caused to adjacent and connection work scheduled to remain. Repair or replace, at the discretion of the architect, existing work scheduled to remain which is damaged by these operations.4.5 Maintain protected egress and access to the work at all times, 5.0 Patching and Replacing5.1 Patch areas requiring patching, including damage caused by removing, relocating or adding fixtures and equipment, and damages caused by demolition of adjacent materials.5.2 Replace and restore existing items which have been removed to allow the installation of new work. Restore exposed finishes to patched areas, U.N.O.5.3 Match existing products, finishes, textures and work for patching and extending work, U.N.O. provide same products or types of construction as that in existing structure, as needed to patch, extend or match existing work.5.4 Where new work abuts or aligns with existing, perform a smooth and even transition, U.N.O. patched work to match existing adjacent work in texture, color and appearance. Repaint entire plane to achieve even uniform appearance.5.6 When finished surfaces are cut so that a smooth transition with new work is not possible, terminate existing surface along a straight line at a natural line of division and provide trim appropriate to the finished surface. Finish patches to produce uniform finish and texture over entire area. When finish cannot be matched, refinish entire surface to nearest intersections.5.7 Where a 1/4 inch or more change in surface occurs, submit recommendations for providing smooth transition for architects review.Architectural LegendDetail CalloutDimensionSlope Arrow0" / 12"Centerline Dim.0' -0"0' -0"0A000212DocuSign Envelope ID: 63E11941-716E-486B-B78B-F9FB0A707DE4
Do
v
e
L
i
b
r
a
r
y
RW(a
b)
RW(a
b)
RW(a
b)
RW(a
b)
RW(a
b)
RW(
a
b)
RW(
a
b)
RW(
a
b)
RW(
a
b)
RW(
a
b)RW(ab)RW(ab)S(ab)S(ab)S(ab)S(ab)S(ab)S(ab)S(ab)S(ab)S(ab)S(ab)RW(ab)RW(ab)civil engineers and land surveyors
Snipes-Dye associates
4
REVISION DESCRIPTION CITY APPROVAL
INITIALDATE
ENGINEER OF WORK
INITIALDATE
ENGINEERING DEPARTMENT
DRAWING NO.PROJECT NO.
CHKD BY:
DWN BY:
APPROVED:
SHEETSSHEET
DATE INITIAL
OTHER APPROVAL RVWD BY:
CITY OF CARLSBAD
"AS BUILT"
DATE
INSPECTOR DATE
REVIEWED BY:
IMPROVEMENT PLANS FOR:
P.E.EXP.
1
JASON S. GELDERT
4744 320-7E
1775 DOVE LANE, CARLSBAD, CA 92011
City of Carlsbad Dove Library Parking Relocation
CITY ENGINEER RCE 63912 DATEEXPIRES 9/30/20
1
GRADING PLAN C1.0CITY TRAFFIC ENGINEER APPROVAL
BY:DATE:
TYPE DESCRIPTION OWNERSHIP AGREEMENT SHEET NO.FREQUENCY
MAINTENANCE
STRUCTURAL (POST-CONSTRUCTION) BMP TABLE
MAINTENANCE
STORMWATER REQUIREMENTS THAT APPLY:
STANDARD STORMWATER REQUIREMENTS
PRIORITY PROJECT REQUIREMENTS
YES (SEE SWMP FOR DOCUMENTATION)
NO
EXEMPT FROM HYDROMODIFICATION?
°
DocuSign Envelope ID: 63E11941-716E-486B-B78B-F9FB0A707DE4
RW(
a
b)
RW(
a
b)
RW(
a
b)
RW(
a
b)
RW(
a
b)
RW(
a
b)
RW(a
b)S(ab)S(ab)S(ab)S(ab)S(ab)S(ab)S(ab)S(ab)S(ab)S(ab)S(ab)S(ab)civil engineers and land surveyors
Snipes-Dye associates
4
REVISION DESCRIPTION CITY APPROVAL
INITIALDATE
ENGINEER OF WORK
INITIALDATE
ENGINEERING DEPARTMENT
DRAWING NO.PROJECT NO.
CHKD BY:
DWN BY:
APPROVED:
SHEETSSHEET
DATE INITIAL
OTHER APPROVAL RVWD BY:
CITY OF CARLSBAD
"AS BUILT"
DATE
INSPECTOR DATE
REVIEWED BY:
IMPROVEMENT PLANS FOR:
P.E.EXP.
1
JASON S. GELDERT
4744 320-7E
1775 DOVE LANE, CARLSBAD, CA 92011
City of Carlsbad Dove Library Parking Relocation
CITY ENGINEER RCE 63912 DATEEXPIRES 9/30/20
2
ENLARGED GRADING PLAN C2.0
DocuSign Envelope ID: 63E11941-716E-486B-B78B-F9FB0A707DE4
civil engineers and land surveyors
Snipes-Dyeassociates
4
REVISION DESCRIPTION CITY APPROVAL
INITIALDATE
ENGINEER OF WORK
INITIALDATE
ENGINEERING DEPARTMENT
DRAWING NO.PROJECT NO.
CHKD BY:
DWN BY:
APPROVED:
SHEETSSHEET
DATE INITIAL
OTHER APPROVAL RVWD BY:
CITY OF CARLSBAD
"AS BUILT"
DATE
INSPECTOR DATE
REVIEWED BY:
IMPROVEMENT PLANS FOR:
P.E.EXP.
1
JASON S. GELDERT
4744 320-7E
1775 DOVE LANE, CARLSBAD, CA 92011
City of Carlsbad Dove Library Parking Relocation
CITY ENGINEER RCE 63912 DATEEXPIRES 9/30/20
3
DETAIL SHEET C3.0
DocuSign Envelope ID: 63E11941-716E-486B-B78B-F9FB0A707DE4
civil engineers and land surveyors
Snipes-Dye associates
4
REVISION DESCRIPTION CITY APPROVAL
INITIALDATE
ENGINEER OF WORK
INITIALDATE
ENGINEERING DEPARTMENT
DRAWING NO.PROJECT NO.
CHKD BY:
DWN BY:
APPROVED:
SHEETSSHEET
DATE INITIAL
OTHER APPROVAL RVWD BY:
CITY OF CARLSBAD
"AS BUILT"
DATE
INSPECTOR DATE
REVIEWED BY:
IMPROVEMENT PLANS FOR:
P.E.EXP.
1
JASON S. GELDERT
4744 320-7E
1775 DOVE LANE, CARLSBAD, CA 92011
City of Carlsbad Dove Library Parking Relocation
CITY ENGINEER RCE 63912 DATEEXPIRES 9/30/20
4
DETAIL SHEET C4.0
DocuSign Envelope ID: 63E11941-716E-486B-B78B-F9FB0A707DE4
2% max2% maxExisting drop off aisle to remainNew fire lane rated concrete path painted with accessible striping. Slope not to exceed 2% in any direction, see civil and landscape. Existing pavers to be palletized and returned to ownerSolar powered double sided crosswalk signsPlanting to be replaced in kind. Irrigation to be modified accordingly to accommodate walk aisle, typ. Solar powered double sided crosswalk signs to be centered on stop sign, patch and repair concrete and detectable warning in kind New detectable warning, See 4/A1.1Curb to be painted federal blue to match aisle stripingExisting accessible path of travel to the front doorExisting LibraryExisting Library CourtyardExisting colonnade to remain, typ.Asphalt overlay Existing bollards to remain, typ. New 6" curb to match existing±69'-6" VIF±88'-4" VIFExisting pavement to remainExisting detectable warning at zero curb to remainExisting concrete pavement band to remainCurb to be painted federal blue to match aisle stripingRestripe standard parking in overlay area, typ.12" no parking stencil, typ.Accessible symbol, see civil, typ.Boundary of area not to exceed 2% slope in either directionPath of travelExisting asphalt pavingExisting asphalt pavingExisting asphalt paving8'-0". 9' - 0" 5' - 0" 9' - 0" 5' - 0" 9' - 0" 5' - 0" 9' - 0"18'-0" Typ.typ.2' - 6"A1.16TYP.A1.15TYPA1.12TYPA1.11TYPSee Landscape construction detail A/L3.0 for construction jointsEx. 24' wide public utility and access easement per PM No. 16044See Civil for more informationEx. 25' wide public utility and access easement per PM No. 16044.See Civil for more informationExisting public utility and access easement per PM No. 16044.See Civil for more informationEx. 6" ductile iron reclaimed water per dwg 305-6Ex. 30" RCP Storm Drain per dwg 301-2Ex. 36" RCP Storm Drain per dwg 301-2Ex. 8" PVC Sewer Main per dwg 305-6CONSISTENCY DETERMINATION EXHIBITFOR ORIGINAL PROJECT NO.Date:Don Neu, City PlannerRECOMMENDED BY:DATE:CD NO.CRADESNo. C12113YAS EA TTLWNECIA ORCFOFILAINNAIHHENTLOTCET REN 9.30.21D:\DRAWING FILES\TITLE SHEETS\IMPROVEMENT TITLE SHEET.DWG REVISED: 2/23/17REVISION DESCRIPTIONCITY APPROVALINITIALDATEENGINEER OF WORKINITIALDATEENGINEERING DEPARTMENTDRAWING NO.PROJECT NO.CHKD BY:DWN BY:SHEETSSHEETDATE INITIALOTHER APPROVALRVWD BY:CITY OF CARLSBADIMPROVEMENT PLANS FOR:1TYPEDESCRIPTIONOWNERSHIPAGREEMENTSHEET NO.FREQUENCYMAINTENANCESTRUCTURAL (POST-CONSTRUCTION) BMP TABLEMAINTENANCESTORMWATER REQUIREMENTS THAT APPLY:STANDARD STORMWATER REQUIREMENTSPRIORITY PROJECT REQUIREMENTSYES (SEE SWMP FOR DOCUMENTATION)NOEXEMPT FROM HYDROMODIFICATION?domusstudio architectureCity of Carlsbad Dove Library Parking Relocation320-7E20200044744A1.04744Site Plan1775 Dove Lane Carlsbad, CA 920111/8" = 1'-0"1SiteN712DocuSign Envelope ID: 63E11941-716E-486B-B78B-F9FB0A707DE4
Identification sign per 5/A1.1Pedestrian route: 5% MAX slope. 2% MAX cross slope.Wheel stop. See detail 6/A1.1Access aisle: Must be located on passenger side at van spaces. 5'-0" MIN. or when van space is 9'-0" wide, aisle to be 8'-0" MIN.Blue painted borderline and stripes.2% MAX surface slope in anydirection.Surface identification, see detailWithin the access aisle paint the words 'NO PARKING' in 12" MIN high white letters.Measured from inside of aisleto center of parking stripes13895673532217896NOPARKING3' - 0"18'-0" MINCBC 11B-50244...When only one accessible space is provided it must be made van accessible. Van space: 12'-0" MIN wide or 9'-0" MIN wide when access aisle is 8'-0" MIN. Car space: 9'-0" MIN wide. 4O.C.3' - 0"2A1.1Profile view of wheelchair with occupant, painted white. Align with the end of the space adjacent to the traffic aisle so that it is visible to a traffic enforcement officer when a vehicle is properly parked in the space CBC 11B-502.6.4 & 1129B.42" wide border, paint white.Paint background blue to match color no. 15090 in Federal Standard 595b36" MINCBC FIG. 11B-703.7.2.136" MIN0.65" min.0.18" - 0.22"Base diameter of 0.9" -0.92"Top diameter of 0.45" -0.47"Detectable warning surfaces shall be an integral part of the surface. They shall be yellow to match color no. FS 33538 in Federal Standard 595c or shall provide a 70% MIN visual contrast with adjacent walking surfaces per 11B-705.1.1.3.2.Detectable warning surfaces shall differ from adjoining surfaces in resiliency or sound-on-cane contact per 11B-705.1.1.4.CBC FIG 11B-705.12.3" - 2.4"2.3" - 2.4"Detectable warning tile per details and notes aboveAt joints seeAdjacent paving as occursEmbedment surface per plansEmbedment flange where occursReflectorized sign with the ISA constructed of porcelain steel w/ beaded text or equal. Area of sign to be a min. of 70 sq. inches. with white profile on blue background equal to color no.15090 in Federal Standard 595b. Designate "VAN ACCESSIBLE" where occurs.Provide additional language or additional sign below the ISA stating "$250 MINIMUM FINE"2" diameter galvanized steel post where occurs. Sign may also be permanently posted on a wall at the interior end of the parking space.Post set in 12" diameter concrete pierPARKINGONLYVANACCESSIBLE$250MINIMUM FINE36" MIN80" MIN if located within circulation path60" MINCBC 11B-502.6Finish Surface12" MIN3"(1) #4 horiz. bar full length with 1 1/2" conc. cover all edges and endsEpoxy adhesivePaving per plans5/8" Dia. x 18" L steel pin at each end of concrete wheel stop, typ. Flush top with wheel stop5/8" steel pinPrecast concrete wheel stopPrecast concrete wheel stop6" at single stalls12" at dbl. stall2"1 3/4"7 1/2"4"1 3/4"3'-0" at single stall6'-0" at double stallSECTION6" at single stalls12" at dbl stalls2"PLAN5"2"1 1/4"Per SchedulePer Schedule3/8"1/4"Tooled joint with 1/8" radius tooled edges -Spacing per plan (20' -" O.C. max)Concrete pavement per planCompacted subgrade per Soils / Civil1/8" Radius tooled edges at premolded felt expansion joint with tear-off cap-Spacing per plan-Remove cap after concrete curing and fill with elastomeric sealant. Sand top of sealant with silica sand before set.-Color to match pavementConcrete pavement per planCompacted subgrade per Soils / CivilTooled JointConstruction JointCONSISTENCY DETERMINATION EXHIBITFOR ORIGINAL PROJECT NO.Date:Don Neu, City PlannerRECOMMENDED BY:DATE:CD NO.CRADESNo. C12113YAS EA TTLWNECIA ORCFOFILAINNAIHHENTLOTCET REN 9.30.21D:\DRAWING FILES\TITLE SHEETS\IMPROVEMENT TITLE SHEET.DWG REVISED: 2/23/17REVISION DESCRIPTIONCITY APPROVALINITIALDATEENGINEER OF WORKINITIALDATEENGINEERING DEPARTMENTDRAWING NO.PROJECT NO.CHKD BY:DWN BY:SHEETSSHEETDATE INITIALOTHER APPROVALRVWD BY:CITY OF CARLSBADIMPROVEMENT PLANS FOR:1TYPEDESCRIPTIONOWNERSHIPAGREEMENTSHEET NO.FREQUENCYMAINTENANCESTRUCTURAL (POST-CONSTRUCTION) BMP TABLEMAINTENANCESTORMWATER REQUIREMENTS THAT APPLY:STANDARD STORMWATER REQUIREMENTSPRIORITY PROJECT REQUIREMENTSYES (SEE SWMP FOR DOCUMENTATION)NOEXEMPT FROM HYDROMODIFICATION?domusstudio architectureCity of Carlsbad Dove Library Parking Relocation320-7E20200044744A1.14744Details1775 Dove Lane Carlsbad, CA 920111/8" = 1'-0"1Accessible Parking Stall3/4" = 1'-0"2Accessible Parking Surface Identification3" = 1'-0"4Truncated Domes3/4" = 1'-0"5Accessible Parking Identification Sign1/8" = 1'-0"6Precast Wheel Stop1 1/2" = 1'-0"7Concrete Pavement Joints812DocuSign Envelope ID: 63E11941-716E-486B-B78B-F9FB0A707DE4
LIMIT OF WORK
LIMIT OF WORKLIMIT OF WORK
NO PARKINGNO PARKING NO PARKING NO PARKINGNO PARKINGNO PARKINGNO PARKINGNO PARKINGP.A.
EQ.
ALIGN
CENTERLINE
RADIUS
EQUAL
R
CL
PLANTING AREA
EXPANSION JOINTS
FLOW LINE
REFERENCE POINT
EJ
SYMBOLS LEGEND
CONSTRUCTION NOTES:
1. ALL HIGH POINTS, LOW POINTS, OR GRADE BREAKS ON CONCRETE SURFACES SHALL HAVE A SMOOTH CURVE. CONCRETE SHALL NOT BE BUILT TO A POINT. 2. ALL DIMENSIONS ARE FROM FACE OF BUILDING OR BACK OF CURB UNLESS OTHERWISE NOTED. 3. ALL NEW CONCRETE PAVEMENTS ARE TO HAVE CONTINUOUS 1/8" RADIUS WITH EXPANSION JOINT WHERE ADJOINING EXISTING 'COLD JOINT' CONCRETE OR OTHER FIXED STRUCTURES INCLUDING BUILDING. MATCH SCORES AND FINISHES TO EXISTING WALKS, UNLESS OTHERWISE NOTED.
4. WALK CROSS SLOPES SHALL NOT EXCEED 1.8%. NO WALKS
ARE TO EXCEED 4.9% LONGITUDINALLY IN ANY AREA. TYPICAL
LONGITUDINAL SLOPES SHALL BE 2% MAXIMUM.
CONSTRUCTION LEGEND
1 EXISTING BOLLARD TO REMAIN
2 EXISTING CONCRETE PAVING TO REMAIN
3 EXISTING PAVERS TO REMAIN
4 EXISTING WALL TO REMAIN
5 EXISTING BIKE RACK TO REMAIN
6 EXISTING DRIVE PAVERS TO REMAIN
7 EXISTING PARKING LOT CURB TO REMAIN
8 EXISTING AC PAVING TO REMAIN
9 EXISTING WARNING TILES TO REMAIN
10 SIGN-PER CIVIL ENGINEER
11 CONCRETE CURB-PER CIVIL ENGINEER
12 DECORATIVE CONCRETE DRIVE PAVING
13 PARKING LOT STRIPING-PER CIVIL ENGINEER
14 AC PAVING-PER CIVIL ENGINEER
15 TACTILE WARNING TILES
16 CONCRETE WHEEL STOP-PER CIVIL ENGINEER
17 CONCRETE TURN DOWN EDGE
A
L-3.0
C L-3.0
D
L-3.0
3'-0"
2
6
9
10
1TYP.
4
12
7
11
12
15
11
10
7
6
EPA
EPA
EPA
EPA
5TYP.1 TYP.
3
8
8
8
14
14
14
10
TYP.
16
TYP.
13 TYP.
17
EX. 24' WIDE PUBLIC UTILITY AND ACCESS EASEMENT PER PM NO. 16044 SEE CIVIL FOR MORE INFORMATION
EX. 36" RCP STORM DRAIN
PER DWG 301-2
EX. 8" PVC SEWER MAIN
PER DWG. 305-6
EX. 6" DUCTILE IRON RECLAIMED
WATER PER DWG 305-6
EX. 30" RCP STORM DRAIN PER DWG 301-2
EX. 25' WIDE PUBLIC UTILITY AND
ACCESS EASEMENT PER PM NO. 16044
SEE CIVIL FOR MORE INFORMATION
17-017
DATE
ENGINEERING DEPARTMENT
CITY ENGINEER RCE 63912 EXPIRES 9/30/20
TITLE
REVIEWED BY:
DATEINSPECTOR
DATE
"AS BUILT"
CITY OF CARLSBAD
RVWD BY:OTHER APPROVAL
INITIALDATE
SHEET SHEETS
APPROVED
DWN BY:
CHKD BY:DATE INITIAL
ENGINEER OF WORK
DATE INITIAL
CITY APPROVALREVISION DESCRIPTION
City of Carlsbad Dove Library Parking Relocation
1775 Dove Lane, Carlsbad, CA 92011
4744
PROJECT NO. DRAWING NO.
320–7E
IMPROVEMENT PLANS FOR:
NORTH
80
SCALE: 1/8" = 1'-0"
16 32
5.1.20
Landscape Construction Plan L-1.0
DocuSign Envelope ID: 63E11941-716E-486B-B78B-F9FB0A707DE4
LIMIT OF WORK
LIMIT OF WORKLIMIT OF WORK
NO PARKINGNO PARKING NO PARKING NO PARKINGNO PARKINGNO PARKINGNO PARKINGNO PARKINGEX
EX
17-017
DATE
ENGINEERING DEPARTMENT
CITY ENGINEER RCE 63912 EXPIRES 9/30/20
TITLE
REVIEWED BY:
DATEINSPECTOR
DATE
"AS BUILT"
CITY OF CARLSBAD
RVWD BY:OTHER APPROVAL
INITIALDATE
SHEET SHEETS
APPROVED
DWN BY:
CHKD BY:DATE INITIAL
ENGINEER OF WORK
DATE INITIAL
CITY APPROVALREVISION DESCRIPTION
City of Carlsbad Dove Library Parking Relocation
1775 Dove Lane, Carlsbad, CA 92011
4744
PROJECT NO. DRAWING NO.
320–7E
IMPROVEMENT PLANS FOR:
NORTH
80
SCALE: 1/8" = 1'-0"
16 32
5.1.20
EXISTING TREE & SHRUB NOTES
ALL EXISTING TREES AND SHRUBS NOTED ON THE PLANS TO REMAIN ARE TO BE
PROTECTED DURING THE ENTIRE CONSTRUCTION PERIOD. DO NOT TRENCH ADJACENT
TO TREES, (EXCEPT AS REQUIRED FOR IRRIGATION INSTALLATION) OR STORE
MATERIALS UNDER TREES. FENCE OFF FROM CONSTRUCTION AT THE START OF WORK AND MAINTAIN FENCING UNTIL FINAL LANDSCAPE INSTALLATION. EXISTING TREES AND SHRUBS MUST BE IRRIGATED REGULARLY DURING CONSTRUCTION BY THE CONTRACTOR, EVEN IF THIS REQUIRES HAND WATERING SEVERAL TIMES PER WEEK. THE CONTRACTOR IS RESPONSIBLE FOR ASSURING THE EXISTING TREES AND SHRUBS SURVIVE IN GOOD FORM. EXISTING TREES OR SHRUBS THAT ARE NOTED TO REMAIN, BUT DECLINE OVER 50% OR DIE (IN THE OPINION OF THE LANDSCAPE ARCHITECT) ARE TO BE REPLACED AT THE CONTRACTOR'S COST AS FOLLOWS: A. REPLACE IN SIZE AND KIND ANY TREES 6" AND LESS IN CALIPER MEASURED 2' ABOVE THE BASE.
B. REPLACE TREES LARGER THAN 6" IN CALIPER WITH PLANTS OF THE SAME KIND
HAVING A MINIMUM DIAMETER OF 6" MEASURED 2' ABOVE THE BASE.
PLANTING NOTES
1. ALL SHRUB BEDS ARE TO BE MULCHED WITH 3" WALK-ON TYPE BARK CHIPS
FOLLOWING PLANTING. ICE PLANT BEDS DO NOT RECEIVE MULCH.
2. QUANTITIES SHOWN ARE FOR REFERENCE ONLY. INSTALL PLANTS IN QUANTITIES
AS SHOWN BY SYMBOLS ON PLAN.
3. ROOT BARRIER 'ROOT SOLUTIONS' SHALL BE PLACED ALONG EDGE OF ALL WALKS
(12" DEPTH). IN AREAS WHERE TREES ARE PLANTED WITHIN 10' OF PAVING, (24"
DEPTH) ROOT BARRIERS SHALL BE PLACED AT THE EDGE OF PAVING AND SHALL
EXTEND 10' MINIMUM EACH SIDE OF THE CENTER OF THE TREE. ROOT SOLUTIONS,
800.554.0914.
4. PLANTS ARE TO BE INSTALLED IN EVENLY SPACED STRAIGHT LINES AS SHOWN ON
THE PLANS TO FORM HEDGES AND MASS PLANTINGS. IRREGULAR PLANT
SPACING WILL NOT BE ACCEPTABLE.
5. ANY DAMAGE, EITHER STRUCTURAL OR AESTHETIC, TO ANY PUBLIC AND / OR
PRIVATE STREETS IS TO BE REPAIRED UPON COMPLETION OF THE PROJECT BY THE
CONTRACTOR TO THE SATISFACTION OF THE CITY INSPECTOR. THE IMPROVEMENTS
WILL NOT BE ACCEPTED BY THE CITY UNTIL NECESSARY REPAIRS ARE COMPLETED.
PLANT LEGEND
BOTANICAL NAME COMMON NAME SIZE QTY.NOTES
TREES
EXISTING-TO REMAIN VARIOUS MATURE 2EX
PATCH EXISTING
GROUNDCOVER &
REPAIR IRRIGATION
AS NEEDED.
Irrigation & Planting Plan L-2.0
TYPICAL IRRIGATION EQUIPMENT
IRRIGATION PIPE SIZING
ALL SHRUB HEADS TO BE IN 6" POP-UP BODIES MINIMUM. DO NOT USE STAKED RISERS.
MFGR
PWP SCH 40 PVC - TWICE LINE SIZE CARRIED WITHIN
PWP SCH 40 PVC - SIZE PER GPM - WITH 18" COVER
PWP CLASS 200 PVC - SIZE PER GPM - WITH 12" COVER
WILKINS 850 SERIES BALL VALVE - LINE SIZE
WILKINS 975 - "RP" TYPE - LINE SIZE
1300A-FRAINBIRD
EFB-CP-PRS-B REMOTE CONTROL VALVERAINBIRD
33DLRCRAINBIRD
ESP-MC SERIES WALL MOUNT - # STATIONS AS REQ'DRAINBIRD
1800 SERIESPOP-UP SPRAY HEADS
MODEL #
FLOOD BUBBLERS
AUTOMATIC VALVES
QUICK COUPLER VALVE
RAINBIRD
CONTROLLER
BACKFLOW PREVENTER
ISOLATION VALVES
LATERAL LINE
MAINLINE
SLEEVE
3/4"
1"
1 1/4"
1 1/2"
2"
GPM - CL 200 GPM - SCH 40 PIPE SIZE
0 - 11
12 - 16
17 - 26
27 - 36
37 - 57
0 - 8
9 - 13
14 - 23
24 - 32
33 - 50
IRRIGATION NOTES
1. THE WORK SHOWN ON THE IRRIGATION PLANS IS SCHEMATIC. ALL ITEMS, I.E.
CONTROLLERS, VALVES, MAINLINES, SLEEVES, WIRES, IRRIGATION HEADS, PIPING,
ETC. ARE SHOWN IN THEIR APPROXIMATE LOCATIONS ONLY. DETAIL DRAWINGS AND
SPECIFICATIONS WILL PROVIDE ADDITIONAL CLARIFICATION.
2. THE CONTRACTOR SHALL NOT LOCATE ANY ITEMS WHERE IT IS OBVIOUS THEY ARE
IN DIRECT CONFLICT WITH THE UNDERGROUND UTILITIES, STRUCTURES, PERMANENT
IMPROVEMENTS OR PEDESTRIAN OR VEHICULAR SAFETY CONSIDERATIONS.
3. SPRINKLER HEAD LOCATIONS ARE TO BE ADJUSTED FROM THE DIMENSIONS
SCALED OFF OF THE DRAWINGS TO PREVENT OVERSPRAY ONTO BUILDINGS, WALKS
AND STRUCTURES.
4. NOTIFY THE LANDSCAPE ARCHITECT OF CONFLICTS BETWEEN THE PLACEMENT OF
PLANT MATERIALS AND IRRIGATION HEADS, AND DISCREPANCIES BETWEEN THE
PLANS AND ACTUAL FIELD CONSIDERATIONS.
5. THE CONTRACTOR AND/OR OPERATOR SHALL ONLY APPLY SUFFICIENT WATER TO
PROMOTE THE HEALTHY GROWTH OF THE PLANT MATERIALS. AT NO TIME SHALL
THE CONTRACTOR / OPERATOR APPLY WATER AT A RATE OR FREQUENCY WHICH
RESULTS IN RUNOFF OR SOIL SATURATION.
6. DO NOT LOCATE TREES OR TALLER SHRUBS IN LOCATIONS WHERE THEY WILL BLOCK
IRRIGATION HEADS AND PREVENT ADEQUATE COVERAGE. WHERE CALLED FOR,
OBTAIN APPROVAL OF THE LANDSCAPE ARCHITECT FOR PLACEMENT OF TREES,
SHRUBS OR OTHER ITEMS OF WORK.
7. ALL LAWN HEADS ARE TO BE IN 4" POP-UP BODIES MINIMUM. ALL SHRUB HEADS
ARE TO BE IN 6" POP-UP BODIES MINIMUM. ALL BUBBLERS TO BE ON SHORT NIPPLE RISERS 1" +/- ABOVE GRADE AND UNSTAKED. 8. VALVE BOXES ARE TO BE LOCATED IN SHRUB AND GROUND COVER BEDS WHERE EVER POSSIBLE, AND AT LEAST 12" FROM THE EDGE OF THE BED. 9. IRRIGATION MAINLINES AND LATERALS THAT ARE SHOWN ON THE PLAN IN PAVED AREAS ARE TO BE LOCATED IN THE ADJACENT PLANTING AREA, 6" FROM THE EDGE OF PAVEMENT.
TLDL-4-18 IN LINE DRIP EMITTER TUBINGNETAFIMIN-LINE DRIP
DocuSign Envelope ID: 63E11941-716E-486B-B78B-F9FB0A707DE4
17-017
DATE
ENGINEERING DEPARTMENT
CITY ENGINEER RCE 63912 EXPIRES 9/30/20
TITLE
REVIEWED BY:
DATEINSPECTOR
DATE
"AS BUILT"
CITY OF CARLSBAD
RVWD BY:OTHER APPROVAL
INITIALDATE
SHEET SHEETS
APPROVED
DWN BY:
CHKD BY:DATE INITIAL
ENGINEER OF WORK
DATE INITIAL
CITY APPROVALREVISION DESCRIPTION
City of Carlsbad Dove Library Parking Relocation
1775 Dove Lane, Carlsbad, CA 92011
4744
PROJECT NO. DRAWING NO.
320–7E
IMPROVEMENT PLANS FOR:
Landscape Construction Details L-3.0
5.1.20
NO SCALE
CONCRETE PAVEMENT SCHEDULEAWIDTH (W)EQUAL TO WIDTH (W) OR PER PLAN
CONCRETE PAVING SCHEDULEPLAN SYMBOL DEPTH COLOR FINISH OTHER NOTES
CONCRETE PAVEMENT WITH DEPTH
AND FINISH PER PAVING SCHEDULE
3/8" EXPANSION JOINT PER
@ 20'-0" O.C. MAX. (UNLESS
SHOWN OTHERWISE ON PLAN)
SAWCUT JOINT PER
12"-90% COMPACTED SUBGRADE
PLAN
SECTION
1" IN TURF AREAS
2" IN SHRUB AREAS
12 7 1/2"LIGHT RETARDANT
B
L-3.0
B
L-3.0
DAVIS INTEGRAL COLOR
ADJACENT GRADE
EXPOSED SANDS ONLY
CONCRETE PAVEMENT JOINTS
NO SCALEB
SECTION
1/4"1 1/4"PER SCHEDULEDEEP TOOLED JOINT W/ 1/8" R TOOLED EDGES -
SPACING PER PLAN OR CONCRETE PAVEMENT
SCHEDULE
CONCRETE PAVEMENT PER SCHEDULE
3/8"
1/8" R TOOLED EDGES
PREMOLDED FELT EXPANSION JOINT WITH TEAR-
OFF CAP - SPACING PER PLAN OR CONCRETE
PAVEMENT SCHEDULE. REMOVE CAP AFTER
CONCRETE CURING AND FILL WITH ELASTOMERIC
SEALANT - COLOR TO MATCH PAVEMENT. SAND
TOP OF SEALANT WITH SILICA SAND BEFORE SET
CONCRETE PAVEMENT PER SCHEDULESECTION
EXPANSION JOINT
18" LONG, #4 GREASED SMOOTH STEEL DOWEL @ 12" O.C.
CONTROL JOINT
NOTE - JOINTS MAY BE SAWCUT INSTEAD
OF TOOLED. CUT AT 1/8" WIDE x 1/3 THE DEPTH
OF THE SLAB
SCALE: 3/4"=1'-0"D CONCRETE TURN DOWN EDGE
EXISTING PAVERS-SAWCUT
AND RESET AS NECESSARY
MIN.
FINISH GRADE OF
DECORATIVE CONCRETE
DRIVE PAVING
6"6"6"THICKEN AND TURN DOWN
DRIVE PAVING @ EX. PAVERS
COMPACTED SUBGRADE
NOTES
1. WARNING PAVER TO BE 3'-0" X 3'-0" TILES AS
MANUFACTURED BY ARMOR-TILE TACTILE SYSTEMS
(armor-tile.com, TILE TECH PAVERS
(tiletechpavers.com), OR EQUAL.
2. COLOR TO BE SELECTED BY LANDSCAPE ARCHITECT
TACTILE WARNING PAVER
NO SCALEC
1 3/8" TO 2" THICK DECTABLE
WARNING PAVERS
SWEEP MORTAR / SAND MIXTURE INTO JOINTS AFTER SETTING PAVERS
LATEX THIN SET MORTAR BED
SPREAD PER MANUFACTURER'S
SPECIFICATIONS
4" CONCRETE SLAB
1/4" EXP. JOINT
1'-0"
THICKEN ADJACENT WALK TO DEPTH OF PAVER BASE SLAB
#4 x 18"
GREASED
DOWEL @
2'-0" O.C.
TURN DOWN #4 @ 18"
FROM SLAB8"DocuSign Envelope ID: 63E11941-716E-486B-B78B-F9FB0A707DE4
17-017
DATE
ENGINEERING DEPARTMENT
CITY ENGINEER RCE 63912 EXPIRES 9/30/20
TITLE
REVIEWED BY:
DATEINSPECTOR
DATE
"AS BUILT"
CITY OF CARLSBAD
RVWD BY:OTHER APPROVAL
INITIALDATE
SHEET SHEETS
APPROVED
DWN BY:
CHKD BY:DATE INITIAL
ENGINEER OF WORK
DATE INITIAL
CITY APPROVALREVISION DESCRIPTION
City of Carlsbad Dove Library Parking Relocation
1775 Dove Lane, Carlsbad, CA 92011
4744
PROJECT NO. DRAWING NO.
320–7E
IMPROVEMENT PLANS FOR:
Irrigation Details L-4.0
5.1.20
POP-UP ROTOR OR SPRAY HEAD DETAIL
SCALE 3/4"=1'-0"A
THRDxSxS SCH 80 PVC TEE
MARLEX STREET EEL
PVC LATERAL LINE - SEE PLAN
FOR SIZE
TBE SCH 80 PVC NIPPLE -
LENGTH AS REQUIRED
(8" MIN)
(2) MARLEX STREET ELLS
POP -UP ROTOR OR SPRAY HEAD PER LEGEND
FINISH GRADE
IRRIGATION PIPE - TRENCHING
NO SCALEB
FINISH GRADE 1'-0" MIN.4" MAX.2'-0" MIN.1'-6" MIN.OPEN AREAS DETAIL
PRESSURE SUPPLY LINE
COMMUNICATION
CABLE (WHEN USED)
CONTROL WIRES
CLEAN BACKFILL
DRIP LATERAL
LINE
IN LINE DRIP TUBING
LATERAL LINE
NOTE:
1. BACKFILL MATERIAL SHALL BE FREE OF RUBBISH, VEGETABLE MATTER, FROZEN MATERIALS, AND STONES LARGER THAN 3/8 INCHES IN MAX. 2. PROVIDE NOT LESS THAN 3 INCHES OF CLEARANCE BETWEEN EACH LATERAL LINE, AND NOT LESS THAN 6 INCHES OF CLEARANCE BETWEEN LATERAL LINES AND MAINS.
3. SLEEVE ALL PIPE AND WIRES UNDER WALKS,
DRIVEWAYS, STRUCTURES, WALLS, ETC. EXTEND
SLEEVE INTO LANDSCAPE AREA 12 INCHES MIN.
UNDER HARDSCAPE DETAIL2'-0" MIN.2'-6" MIN.PAVEMENT FINISH SURFACE
SUBGRADE
CLEAN BACKFILL
PRESSURE MAINLINE
PIPE - IN SLEEVE
CONTROL WIRES
COMMUNICATION
CABLE (WHEN USED)
IN CONDUIT
LATERAL LINE - IN SLEEVE
BUBBLER HEAD ON SHORT RISER
SCALE 3/4"=1'-0"2" MAX.3/4" MARLEX STREET ELLS -
(3) REQUIRED
3/4" THRD COUPLING
FINISH GRADE
BUBBLER HEAD PER IRRIGATION LEGEND
3/4" SCH 80 PVC TBE NIPPLE-
LENGTH AS REQUIRED
PVC LATERAL LINE - SEE PLAN
FOR SIZE
SHORT SCH 80 PVC NIPPLE
3/4" THRDxSxS PVC TEE
C
DocuSign Envelope ID: 63E11941-716E-486B-B78B-F9FB0A707DE4
Steven Stewart, Municipal Projects Manager
Suzanne Smithson, Library & Cultural Arts Director
Aug. 25, 2020
Approval of plans and specifications
and authorization to advertise for bids
for the Carlsbad City Library Parking
Lot Renovation Project
Recommendation
•Adopt a resolution approving the plans and
specifications and authorizing the city clerk to
advertise for bids for the Carlsbad City Library
parking lot renovation, Capital Improvement
Program (CIP) Project No. 4744
Project Details
•Use of parking lot for a temporary fire station will compromise existing ADA parking stall count
•Library & Cultural Arts Director requests that ADA parking be created in front of library in advance of Fire Department use of parking lot
•Revised ADA parking stall area has been designed and permitted
•ADA parking stall count will increase from its current count of 8 to 15, once the temporary fire station is removed from the parking lot
•Red area is location of
temp fire station
•Upper blue area is
location of 8 current
ADA parking stalls
•Lower blue area is
location of 7 new ADA
parking stalls with
lighted crosswalk
Project Features:
Next Steps
•City Council Meeting Aug. 25, 2020 –approve
contract documents and authorize project to be
advertised for bidding
•Anticipated City Council Meeting Nov. 17, 2020 –
accept bids and authorize contract with lowest
responsive and responsible bidder
Recommendation
•Adopt a resolution approving the plans and
specifications and authorizing the city clerk to
advertise for bids for the Carlsbad City Library
parking lot renovation, Capital Improvement
Program (CIP) Project No. 4744
Thank you