Loading...
HomeMy WebLinkAbout1991-12-18; Design Review Board; ; RP 91-08 - GAMETOWNEWJ APPUCATION COMPLETE DATE: AUGUST 29. 1991 (0 DATE: TO: FROM: SUBJECT: I. gTAFF REPORT DECEMBER 18, 1991 DESIGN REVIEW BOARD PLANNING DEPARTMENT/REDEVELOPMENT DEPARTMENT RP 91-8 - GAMETOWNE - A Major Redevelopment Permil to allow the demolition of an existing retail use and the constmction of a two story retail building of 3,000 square feel within Sub-area 1 ofthe Village Redevelopment Zone at 2933 Roosevelt Street. The project site has a general plan designation of Central Business District (CBD) and is wilhin Local Facilities Managemeni Zone 1. RECOMMENDATION That the Design Review Board ADOPT Design Review Board Resolution No. 176 RECOMMENDING APPROVAL of the Negative Declaration issued by the Planning Director and ADOPT Design Review Board Resolution 177 RECOMMENDING APPROVAL of RP 91 -8 based on the findings and subject lo the conditions therein. n. PROJECT DESCRIPTION AND BACKGROUND The proposed project involves the demolition of the existing Gametowne retail use at 2933 Roosevelt Street and the constmction of a two story 3,000 square foot retail building designed for two retail tenants (one of them being Gametowne). The site is surrounded by existing development within the City's Central Business District. The proposed building complies with all applicable development standards and features an architectural style that maintains the existing village scale and style as described by the Design Manual and Village Area Redevelopment Plan. As shown on Exhibits "C and "D", dated December 18, 1991, the proposed building has a variety of pitched roofs, textured stucco and plant-on wall and window detailing. As shown on the floor plan (Exhibit "B", dated December 18, 1991), the project provides pedestrian orientation with a central corridor that connects the parking area in the rear with the Roosevelt Slreet frontage. In addition, an open roof garden is provided on the upper level. Since the projeci is for a retail use, no food serving use of any kind will be allowed since appropriate parking requirements cannot be met. The retail use of 3,000 square feet requires 10 spaces; which are provided on-site. As shown on Exhibit "E", dated December 18, 1991, the project also proposes landscaping on the roof garden as well as around the parking lot perimeter. 6) GAMETOWNE DECEMBER 18, 1991 PAGE? in. ANALYSIS Planning Issues 1. Is the proposed project consistent with the Village Redevelopmenl Plan, the Village Design Manual and the Zoning Ordinance? 2. Is the project consistent with the Local Facilities Managemeni Plan for Zone 1? DISCUSSION Village Redevelopment Plan/Village Design Manual The Village Redevelopmenl Plan and Design Manual allow the proposed retail use. The project site is located wilhin Sub-area 1 of the Village Redevelopment Area which is intended to function as the major financial, specialty and commercial cenler for the downtown area. In addition, the project site is with one of two special trealment areas located in Sub-area 1 known as the Village Centre Special Treatment Area which is intended to act as the focal point with these objectives by providing a specialty retail use with village-like archilecture and a scale of development designed for pedestrian orientation. The proposed redevelopment of this site will contribute significantiy to Carlsbad's Central Business District. Zoning Ordinance The proposed projeci complies with all applicable development siandards of the Zoning Ordinance. As shown on Exhibits "C and "D", dated December 18,1991, the highest peak of the proposed projeci is 27 feet; the maximum height allowed is 35 feet measured to the peak. The project proposes a lot coverage of approximately 76% which is below the 80% lot coverage allowed by the Village Design Manual. The proposed 3,000 square feet of retail use requires 10 parking spaces (using the retail ratio of 1:300). As shown on the site plan (Exhibit "A", dated December 18, 1991), ten (10) spaces are provided onsite. Two of the required spaces are located within an enclosed garage. These spaces will be used for employee parking and conditions will be placed on the project to (1) ensure their use by employees only, and (2) prevent any future conversion which would eliminate these required spaces. Zone 1 Local Facilities Management Plan The project is located in Local Facilities Management Zone 1 in the northwest quadrant. All public utilities and services will be available to serve the project. The impacts on public facilities created by the proposed projeci and compliance with adopted performance standards are summarized below: GAMETOWNE DECEMBER 18, 1991 PAGE 3 FACILITY IMPACTS COMPLL\NCE WITH STANDARD City Administration Faciiily N/A Yes Library N/A Yes Wastewater Treatment Capacity N/A Yes Parks N/A Yes Drainage N/A Yes Circulation 120 ADTs Yes Fire Station #1 Yes Schools N/A Yes Sewer Collection System 2 EDU's Yes Water Distribution System 440 GPD Yes Open Space N/A Yes IV. ENVIRONMENTAL REVIEW The proposed projeci involves a use that is permitted and compatible wilh exisling, adjacent development. In addition, the project site is currentiy developed but is proposed to be substantially upgraded and redeveloped. Therefore, the Planning Direcior has determined lhat this project will not have a significant impact on the environment and has issued a Negative Declaration on November 7, 1991. ATTACHMENTS 1. Design Review Board Resolution No. 176 2. Design Review Board Resolution No. 177 3. Location Map 4. Background Data Sheet 5. Local Facilities Impacts Assessment Form 6. Disclosure Form 7. Exhibits "A" - "E", dated December 18, 1991 ENM:vd:lh November 18, 1991