HomeMy WebLinkAbout1993-05-12; Municipal Water District; 0512-02; Sewer RatesCARLSBAD MUNICIPAL WATER DISTRICT - AGENDA BILL
z 0 F: 0 a
=! 0 z 3 0 0
MTG. 05/12/93
DEPT. CMWD
SEWER RATES CITY ATTY
CITY MGR.
RECOMMENDED ACTION:
Staff requests that the Commission recommend to the Board of Directors the proposed sewer rate
of $13.35 per month per EDU.
lTEM EXPLANATION:
The proposed 1993 - '94 Operating Budget for CMWD will be presented in draft form to the Board
of Directors at the May 25, 1993 Board meeting.
The proposed budget shows a $16,877,622 in total expenditures for water, sewer and reclaimed
water operations. The sewer operations budget shows a proposed expenditure of $4,216,255 for
1993 - '94 compared to a $4,410,820 figure for 1992 - '93.
There are no significant changes, and there is a slight decrease in overall expenditures. Sanitation
will be able to maintain its current level of services and programs. No new programs are being
proposed. There is, however, a 5% increase in the cost of treatment the Encina Wastewater Facility.
It should be noted that although the 1993 - '94 budget is basically the same as the 1992 - '93
budget, an increase in the sewer rate is proposed. This situation occurs because the 1992 - '93
budget did not balance with projected revenue and a rate increase was required. This rate increase
was needed to fund the system depreciation portion of the budget. The rate was then increased
incrementally to $13.06 with the provision that a second increase could be requested at the halfway
point of the fiscal year. Due to the Encina Wastewater Facility treatment cost being under budget
last year, the second rate increase request was avoided. In order to continue to fully fund system
depreciation this coming fiscal year and to absorb the 5% increase in treatment costs from Encina,
a 2% increase in sewer rates is proposed. This increase will resultin rates going from the present
$13.06 per EDU to $13.35 per EDU.
PROORAY: SAIIIITATIOY SERVICE1 IUHOI SANITATIOI XMTtRPRISL
vawmTILUFp8 mmt DISTRICT
PmsXNBL
wAtN"AN(% OPgRATIO((
CAPITAL OUTLAY
GRAND "AL
POSITIONS
I 1990-91 1991-92 1992-93 mu mAL lvDoR
$ 384.208 $ 419.564 $ 641.420
3,458,880 4,093,447 3,729,000
0 109,500 40.400
S 3,843,088 $ 4,622,511 $ 4,410,020
8.4 8.4 I1
3,653,187
$ 4,216,ZSS
ropair any u1tuGtioning Pup. or u-aociatod oquipwnt. %causa of safoty facto- and location of theso stations, tu0 (2) staff am r-ired to perform this operation wrdor nom1 conditi-.
Xah Clad t High presauro cleaning of rains tO oliaimto s7oppag.s. w (2) ataff re~krs arr mired to porforr this task.
K8aig.r~ Dewlop and continuously -to tho
corpl or sed mapping 8ystr. Review and corrrct plans for nev developmat. Prepare plaru and SJm2ifiCatiOna for projets to ruplace old sewor linom and othor facilitiom. Addnistor u or
engineers. capital improvemnt projets designed IJY cuts i do
-tu -in- rpd -pair, Caplote prevpntivw uintenanco on tno oevor tacilities to pnvent a major sewer stmmaao. 'Ihim includaa ~aintaininq -- Iiied, aewer maholos, and teldtering facilities. Repair all leak. hmediatoly to reduce sever outages.
TV nsp.ctioo an6 ~0~0rd.a ~ecords of lateral sites and depths OL M~M are needed for 8 preventive maintenance prograa. W inspections of sever mains to identify problem areaa. hro (2) ataff drr are mquirod to perform this operation.
1.
2.
1.
2.
1.
2..
3.
1.
2.
1.
Schedule prwontivw uintmmco as priorftlzod by TU inspoctian ud rucord..
Condition rating of tolwid lines to idontify and prioritis. critical pips.
8nt.r tho existing atlu abrwts onto tbm caclpltu.
Maintain plm check turn around tin at 10 days.
~I-OU&~Y md ~rtici.ntiy .cop. ail c.pi-1 project.. Deaign major dosign projocts in- hous. .
Daily, ueclkly, monthly pr.vurtiva uintauncw to msuro -ration of a11 facilities.
Cloan all .top up linoa with minhal damages, on 24 bau notico.
htaeato television inspction for tracking sewer problaa. Idontify sources of inflow and infiltration. streamline annu~l cleaning and inspection record wing. Continw 6 year rehabilitation progrm.
8I~I~I~ -8
Thero ara no significant cbangos this yoar. rzI. sanitation dep.rt.cmt will bo &lo to maintain current suvica levels and programs.
.
CITY OF CARLSBAD
1993-94 BUDGET MAINTENANCE AND OPERATION DETAIL
FUND: Sanitation Enterprlse PROG: Sanitation Servlces
ACCT # ACCOUNT DESCRIPTION
1100
1200
1300
1910
1920
1930
1940 1970
2111
2112
2130 2150 2180
2190
2210
2220
2240
2330
2350
2360
2430 2451 2479
2485
2489
2490
2494
2520
2530 2540
2550 2551 2610
2621
2630
2640
2641
2660
2673
2910
2940
2984
3900
Regular Salaries
Overtime Salaries
Part-time Salaries
Employer Cont Disab & Unemp
Employer Cont Retirement
Employer Cont Work Comp Employer Cont Hith & Life Ins
Employer Cont Soc Sec/Medicare Vehicle Maintenance Vehicle Replacement . insurance Street Patching Legal Services
Misc Sew from Other Depts
Heat & Light Telephone & Communications
Water
Other Machinery & Equipment Rental Property Rental
Leases Laundry & Uniform Maintenance Communications Equipment Mntce Misc Professional Sewices Temporary Help
Misc Contract Services
Miscellaneous Outside Services *
Encina Plant Services
Dues & Subscriptions
Postage Printing Office Supplies office Furniture & Equipment
Building Maintenance Supplies
Parts - Spec Oept Equipment
Rock & Mineral Products
Expendable Tools
Safety Equipment Special Departmental Supplies Corn pute r Software
Depreciation Expense Travel Expense
Training
Capital Eauimnt
1992-93 CURRENT
447,500
36,000
2,000
3,120
74,000
20,900 58,300 500 44,100
29,800 67,625
10,000 10,Ooo 31 6,000
42,000
4,000
2,m 4,700
300
7,000
1,300 1,500
20,000
3,000
90,000
132,000
2,000,000
20000 0
1,200 10,Ooo 15,000
9,000 15,000 4,500
5,500
80,000
1,000
766,000
1,900
1,200
40.400
3,000
ACCT NO: 51 1-61 10
ASOF 1992-93 1993-94 01/01/93 ESTIMATE REQUEST
167,769 357,700 387,000
23,826 42,000 43,000
0 0 0
2,651 5,302 6260
10,Ooo 20,000 6490 24,311 50,056 S3,829 462 924 U$o 22,118 43,Ooo 46,w 19,997 29,800 29,797 39,000 78,000 62,690 0 10,000 10,Ooo 0 0 0 158,OOO 316,000 316,000 15,639 31,000 42,000
805 2,OOO 2,m
330 4,000 4,000 295 295 0
0 7,000 7,000 432 1,100 1,300 759 4,500 1,500 14,168 20,000 30,000
0 0 3,000 0 20,000 90,Ooo 10,215 45,000 57,000 615,947 1,8OO,OOO 2,040,006
0 2,m 3,000
. 256 600 1,200 0 6,OOO 0
353 1 loo0 5,000
1,278 2,500 15,000
106 3,000 4,500 654 3,000 10,Ooo
18,381 36,000 50,000
0 250 1,000
0 766,000 766,000
10 500 1,900 270 600 1,200
55,798 310,Ooo - 6.00
28,530 56,457 60,m
1,416 2,800 5,000
8,893 17000 20#000
0 0 8m
6,123 12,000 25,000
TOTAL MAlhTENANCE & OPERATION 4,400;445 1,248,792 3,907;384 4,216i255
REVENUE
ACCT
NO ACCOUNT DESCRIPTION
841 1 Interest
8884 Sewer Service Charges
8887 Sewer Pie-Treatment Fees
8921 Sewer Lateral Connections
8999 Miscellaneous
TOTAL
REV AS 1992-93 OF 1992-93 1 993-94
CURRENT 02/01/93 ESTIMATE ESTIMATE
40,000 18,956 40,000 40,000
3,600,000 2,382,316 4,083,970 4,248,960
75,000 23,580 43,580 40,~
5,000 6,896 12,396 8,000
4,000 0 0 0
3,724,000 2,431,748 4,179,946 4,336,960
May 19,1993
TO: WATER COMMISSIONERS
FROM: GENERAL MANAGER
PROPOSED SEWER RATES FOR 1993 - '94 FISCAL YEAR
At the Commissioneis last meeting, May 12th, the budget and proposed sewer rates were reviewed.
There were no additions, modifications or alternatives suggested to the proposed rates. Therefore,
the agenda bill prepared for that meeting is still appropriate.
ROBERT J. GREANEY
GENERAL MANAGER
RJG:mg