RECOMMENDED ACTION:
Staff requests that the Water Commissioners recommend to the Board of Directors approval of Montgomery-Watson as consultants
to perform the Rate Study for the District's water and reclaimed
water systems.
TITLE:
CITY ATTY
CITY MGR.
CONSULTANT RECOMMENDATION FOR WATER
RATE STUDY
ITEM EXPLANATION:
Staff sent our Request For Proposals on September 23 for a Rate
Study to be performed for the District. This Study is to assist
the District in Analyzing its current water rate structure, recommending rate structure alternatives, and developing an implementation plan for those rates. (a copy of the RFP is
attached) There were eight
proposals submitted and the city and district staff narrowed the
firms to four and interviewed each of the four on Monday,
November 14.
The RFP was sent out to ten firms.
Staff has selected the firm of Montgomery-Watson to perform the Rate Study (a copy of their proposal is attached for your information) .
It is expected that there will be a committee established by the Board that will be comprised of representatives from the individual customer classification, such as residential,
industrial, commercial, agricultural, etc. This committee will
also have one Commissioner as a representative and this selection will be made by the Commission subsequent to the Board's approval of how the committee will be established.
FISCAL IMPACT:
There has been $105,000 budgeted in this 1994-95 Fiscal Year for studies. Therefore there is sufficient monies available for this contract. The fee for this study is $75,000.
For the Commissioner's information there will be a breakdown of
tasks to be performed by the consultant and the fee for each
task handed out at the meeting.
EXHIBITS :
1. Request for Proposal
2. Montgomery Watson's Proposal
REQUEST FOR PROPOSALS
FOR WATER RATE CONSULTANT
The Carlsbad Municipal Water District (District) invites your proposal to perform
professional services in the capacity of water rate consultant to the District. The
primary purpose of the retention of a consultant will be to assist the District in analyzing
its current water rate structure, recommending rate structure alternatives, and
developing an implementation plan for those rates. Other fees and revenue will need to
be considered in the analysis and presented by the consultant.
All questions regarding this proposal should be directed to Jeanne FIack, Carlsbad
Municipal Water District at (61 9) 438-2722, extension 1 10.
I. GENERAL INFORMATION
A. The District
The District's water service area encompasses approximately 20,000 acres, all within
the City of Carlsbad, located along the northern San Diego County coastline. The
District serves water to a population of 55,000 through 17,000 water connections.
Some of Carlsbad's largest water customers include San Diego Gas & Electric, which
operates a power plant in Carlsbad, Hughes Aircraft Corporation, and the La Costa Spa
resort and golf course. Carisbad has recently been chosen as the U.S. site for a LEGO
park. LEGO park will be located in the Carlsbad Ranch area, which will also
incorporate two large hotel complexes, golf ranges and an industrial park.
The largest potable water customer group is currently residential at 47% of total
demand. Agricultural usage was a major water demand, but has dropped over the
years to its current 10% of total demand. The remaining uses are for industrial
processes, landscape irrigation and commercial customers. There are presently no
local, developed sources of water within the District's service area, leaving Carlsbad
completely reliant on water supplied by the San Diego County Water Authority.
The treated water system is supplied through transmission mains connected to San
Diego County Water Authority pipelines. The District's policy is to maintain a ten-day
water supply. To accomplish this, the District operates Maerkle Dam with a storage
capacity of 196 million gallons and eleven reservoirs with a collective capacity of 45.5
million gallons. Together, the result is a thirteen-day storage capacity at average daily
demands. A state-of-the-art telemetry system monitors and operates the entire water
network.
The District has a Reclaimed Water Master Plan that is being implemented in five
phases over the next twenty years. Phase I was recently completed in 1994 with a
delivery capacity of 3,080 acre feet per year. The ultimate system plans for deliveries of 11,480 acre feet per year. The District currently delivers reclaimed water to five
major customers, with an annual delivery of approximately 1,200 acre feet.
In addition to potable and reclaimed water services, the District provides sewer services
to approximately 90% of its water service area.
The District's current water rate is $1.70 per unit (100 cubic feet), with a consenration
rate of $1.51 for single-family residential customers whose usage is seven units or less
per month (approximately 5,000 customers). The monthly delivery charge for a 5/8"
meter is $8.50, with higher fees for correspondingly larger meters. Reclaimed water
rates are the same as potable at $1.70 per unit.
Water rates for San Diego County agencies will continue to rise due to planned
increases from both the Metropolitan Water District and the San Diego County Water
Authority. These two agencies have adopted billion dollar capital improvement
programs designed to increase water reliability and supply to Southern California. As a
member agency of the Metropolitan Water District, the San Diego County Water
Authority will be the recipient of a number of rate increases to fund MWD's capital
projects. . MWD has adopted a revised revenue structure that incorporates the following
types of charges: 1) a Readiness to Serve charge based on a rolling average of water
sales, 2) a New Demand charge based upon increased demands over a rolling average
of water use initially set during fiscal year 1990-91 , 3) a Treated Water Peaking charge,
4) a Connection Maintenance charge, and 5) water rates as currently constituted. All of
these charges will be passed on to the Water Authority which will, in turn, pass them on
to its member agencies, of which Carlsbad is one. In light of the economic downturn
that San Diego County has experienced over the past several years, it will be difficult
and painful to increase water rates to accommodate MWD's increased rates. It will also
be next to impossible to increase rates to fund rising costs for operations and
maintenance or for any of the District's own projects. These issues must be considered
when adopting any rate plan.
B. Organization
The District was organized in 1954 and operated as an independent special district until
January 1990 when it became a subsidiary district of the City of Carlsbad. At this point,
the District became a retail water purveyor. The District is governed by a five-member
Board of Directors, who also sewe as the City Council for the City of Carlsbad. .
The District currently has 53 full-time positions providing the following services: potable
water, wastewater collection and reclaimed water. The budget for fiscal year 1994-95 shows operating expenses for these three enterprise funds at $18,151,100. The total
capital improvement program budget to buildout is $63.9 million for potable and
reclaimed water and $82.4 million for wastewater services.
II. CONSULTANT FWSPONSIBILITIES
The consultant will be expected to analyze current District practices with regard to the
following rate issues and then make recommendations on possible modifications and
their implementation.
A. Potable Water Rates
Analyses to be included: + Per unit (commodity) charge and delivery (monthly fixed) charge - allocation of
costs between each of these charges. + Delivery charge for multi-family dwelling units which are served with a master
meter. + Existing water use patterns and revenues from various sources. + Drought penalty rate (Inclining block water rate structure or other mechanism)
+ Lifeline water rates (do we want it; how to pay for it; what criteria to use)
A Water Rate Model on floppy disk for use in Lotus 1-2-3 for DOS, version 2.4 is
requested, as well as a brief manual explaining its use.
B. Reclaimed Water Rates
Issues to be addressed: + Optimum rate for reclaimed water for both commodity and monthly fixed rates,
taking into account MWD's agricultural discount. + Whether water and/or sewer customers should pay a fee to the reclaimed
water fund as a contribution for the benefits of having reclaimed water. + Long-term effects on the potable water revenue system as more reclaimed
customers are added.
C. Connection Fees
Also known as Major Facilities Fees, these are currently being charged according
to the number of Equivalent Dwelling Units per development or structure.
Issues to be addressed: + Sufficiency of the Major Facilities Fees to cover the costs of the future water
delivery needs, which correspond to the CIP. + Analysis of various methods of charging connection fees with a
recommendation of optimum method. + Whether new building connecting to existing water and sewer systems should
pay a connection fee.
D. Financing Options
There are two large projects scheduled for the immediate future which need to be
financed. One project is the covering and lining of an open potable water
reservoir. The other project is acquisition of property for and construction of an
advanced wastewater treatment plant as part of Phase I1 of the Reclaimed Water
Master Plan. The cost of these projects will be between $10 and $30 million. The
District is asking for recommendations on financing alternatives.
With regard to financing, the following issues are also to be addressed:
+ How to integrate capital planning with rate analysis (25 year plan?) + How to collect funds to develop alternative water resources, such as
desalination projects, aquifer storage and recovery, etc.
A sensitivity analysis of the various fees is requested that illustrates the effects of
different methods of implementation; Le., how much revenue will be generated for
capital projects, operating expenses, etc., given differing levels of rate increases and
timing of implementation. This could be incorporated into the Water Rate Model.
The District is asking for some discussion on how to incorporate flexibility into the rates
to account for irregular growth, the City of Carlsbad's Growth Management Plan,
drought impacts, and changes in various state and federal regulations.
The consultant will be expected to make no more than two presentations each to the
Water Commission (an advisory commission to the Board) and the Board of Directors.
Regular status reports of the progress of the study are required. These updates can be
made either via meetings or written reports to District management staff.
Twenty-five (25) copies of the final recommendations in a bound format will be
submitted to the District at the conclusion of the project. Prior to the final product, a
draft will be provided to the District for review and comments.
The District's goal with regard to this project is to establish a comprehensive water rate
structure that will accommodate system revenue requirements and support day-to-day
operations with minimal impacts on customers that can be implemented at the
beginning of fiscal year 1995-96 and provide guidance for the following five years.
III. PROPOSAL FORMAT
A. Proposal Preparation
No proposal should exceed twenty (20) pages, exclusive of appendices. Elaborate
brochures and binding are not necessary or desired.
October 21,1994 3
3
f 3
1
1 -
1
1
I
i
1
Ms. Jeanne Flack
Administrative Manager
Carlsbad Municipal Water District
5950 El Camino Real
Carlsbad, CA 92008
Subject: Proposal for Water Rate Consultant
Dear Ms. Flack:
Montgomery Watson is pleased to present this proposal for a Water Rate
Consultant to the Carlsbad Municipal Water District (District). Our knowledge
of the District's customers, the District's concerns regarding the water and
reclaimed water rate structures and our experience in assisting several agencies
in the San Diego area will allow us to develop innovative and forward
thinking solutions that are politically acceptable and implementable in a timely
manner.
The District may wish to consider this project as an opportunity to benefit from
the experiences of other California agencies which made modifications in
response to the drought. Other southern California public agencies have
successfully implemented alternative rate structures which have enhanced
their financial stability while at the same time induced good water
management practices, protected base revenues from adverse drought impact,
and improved fairness within and across customer classes.
In an effort to gain a better understanding of the District's needs, Montgomery
Watson has reviewed the water utility's rates and finances. This extra level of
effort at the proposal stage allows us an opportunity to adequately address your
needs in a timely and cost efficient manner. We have identified several key
issues that need to be addressed. Some of these are listed below.
Delivery charges for larger meters do not appear to be in proportion to the
higher demands that they place on the system.
Delivery charges for multi-family users appear to be higher than the
demands they would place on the water system.
Commodity charges appear to be higher than delivery charges and need to
be reviewed to ensure costs are being fairly allocated.
JU1 North Lake Avenue
Suite 600
pasaceria, Cat,iarqia
?lqQl
Tei 818 7969141
Fax 818 568 6101
IJ
T
II
7 I
7
I
J
c,
J
7 d
.
W
Ms. Jeanne Hack
Carlsbad MWD
-2- October 21,1994
Connection fees based on EDUs tend to be unfair in some cases because
EDUs may be defined based on wastewater generation and not related to
water demands. This could be corrected by developing a connection fee
based on meter size or redefining EDUs for the water system.
To address these issues, we have assembled a team specifically structured to
address your needs. The advantages offered by this team are:
.
Well-Qualified Project Team. The proposed Project Manager, Mr. Sudhir
Pardiwala, is a professional engineer with a business administration degree
in finance. Mr. Pardiwala has over 17 years engineering and financial
experience and is a full time financial consultant. Mr. Pardiwala has
assisted several agencies in Southern California in developing water and
reclamation revenue programs. He helped develop and implement the
City's wastewater program a few years ago. To assist with capital financing
and with the implementation plan, we have Mr. Jim Laughlin, until
recently, General Manager of Elsinore Valley Municipal Water District. Mr.
Laughlin has over 40 years of experience in management of water utilities.
Mr. John T. Morris will be a special consultant on reclaimed water issues.
He was Chief Engineer at Irvine Ranch Water District, one of the first
agencies to market reclaimed water in southern California. He has over 30
years of experience and is currently a Director of MWD. To ensure a quality
product, an Technical Review Committee oversees the project and offers
insight on practical matters. The members of the Technical Review
Committee are all highly experienced in financial and engineering matters.
Proven Technical Expertise: Montgomery Watson has completed over 150
revenue programs for cities such as Oceanside, Del Mar, Chula Vista, Poway
and Banning and special districts such as Sweetwater Authority, Elsinore
Valley Municipal Water District, Rancho California Water District and
Ramona Municipal Water District. We have developed reclamation
revenue programs for Burbank, Orange County Water District, Irvine
Ranch Water District and are currently assisting the cities of Pasadena and
Oxnard.
Knowledge of Local Conditions: Our team is locally based with a thorough
knowledge of local issues. We have assisted numerous agencies in
Southern California for many years and will develop solutions that are
tried, tested and successfully implemented. We successfully helped
implement the City of Carlsbad's last wastewater rate restructuring
including a large rate increase and a financing plan We are currently
assisting MWD with a plan of incentives for developing local alternate
sources of water.
c
:J
1
I
1 i
7
I
? i d
Ms. Jeanne Flak
Carlsbad MWD
-3- October 21,1994
Rate Model: Montgomery Watson has developed user friendly computer
rate models that may be used by the District to analyze and determine rates
in the future. We will provide a computer rate model in EXCEL 4 for an
IBM-PC, the format preferred by the District.
Service: Montgomery Watson has a reputation for providing top quality
service. You can be assured that our professionals will produce results on
time and within budget. Our service will continue even after the study is
completed in the form of assistance with implementation and updates.
We appreciate the opportunity to submit this proposal and look forward to
working with the District on this interesting project. If you have any questions
or need any additional information, please contact Mr. Sudhir Pardiwala at
(818) 568-6144.
Sincerely,
Lee Aldridge
Vice President
w
r
.
I
3
-. Table of Contents
Section 1
Section 2
Section 3
Section 4
Section 5
Introduction
Method of Approach
and Schedule
Related Experience
and References
Project Team
Fees
Appendix A - Biodata
Montgomery Watson considers the data and informa-
tion contained in this proposal and subsidiary docu-
ments to be proprietary. This proposal and any other
information contained or referenced herein, or submit-
ted or shown at the interview, shall not be disclosed
outside of the Carlsbad Municipal Water District of-
fices and shall not be duplicated, used, or disclosed in
whole or in part for any purpose other than the evalu-
ation of this proposal and use during the overall selec-
tion process or resultant contract or agreement.
MONTGOMERY WATSON
Section I - Introduction
During the last few years the reality of the water
situation in Southern California has had a sub-
stantial impact on utilities and their customers.
Water shortages and the accompanying rate in-
creases have forced utilities into considering in-
novative strategies. MWD has also been im-
pactedbythesechangesandhasproposedchanges
in the rate structure by increasing fixed charges.
These changes in turn will have sigdicant im-
pact on the member agencies that purchase water
from MWD and especially on agenaes such as
the District that continue to grow and are largely
dependent on MWD for their water supplies. It is
in the District’s interest to ensure that the impacts
of these changes are reviewed so that the District
is in a stronger position to aggressively face these
new challenges to manage the finanaal elements
of its enterprises.
PROJECT UNDERSTANDING
The issues that need to be addressed include the
following.
Analysis of the water rate structure to meet
District’s policies and meet standards of fair-
ness and equity among different classes of
customers. Review of drought penalty rates
for “abusive” use and lifeline rates for low
use. Analysis of the fixed delivery charge for
different meter sizes and for multi-family
dwellings to determine the validity and the
equitability of the existing rates. The existing
fixed delivery charges do not appear to be
fairly allocated among different meter sizes.
Review impact of changesproposedby MWD
on rate structure.
Analysis of reclaimed water use, its impacts
on the potable water system, justification for
reclaimed water expansion in view of change
in MWD’s rate structure and incentives.
0 Capital improvement program (CIP) financ-
ing. This includes replacement programs to
ensure that the water utility facilities are well
maintained to provide excellent quality ser-
vice. The master plan projects should be adequately financed and within the means of
the customers. Investigate feasibility of low
cost sources of funding potable and redaimed
water projects.
Review method and amount of connection
fees for potable and reclaimed water that is
simple to implement and allows growth to
pay its fair share proportional to benefits re-
ceived from existing and new facilities. The
existing EDU based method needs to be re-
vised.
Lastly and perhaps most importantly, develop
an integrated approach that can be effectively
implemented with the acceptance of the rev-
enue program by the public and the District
Board.
OBJECTIVE
The objective of the work plan is to develop a
revenue program is acceptable to the public, the
Water Commission and the Board of the District.
Rates shouldbe adequate to recover the expenses
of the enterprise, costs should be equitably allo-
cated so that rates and charges are fair and in
proportion to the service received and in con- formance with District policies. The revenue
program should integrate least cost financing of
capital improvements.
PROPOSAL STRUCTURE
This Montgomery Watson proposal is presented
in five sections. The Methodology, Tasks and
Schedule for completion are outlined inSection 2.
The Capabilities and Related Experiences are pre-
sented in Section 3 and Project Team in Section 4.
The Fees are presented in Section 5.
MONTGOMERY WATSON 1-1
r-
-1
1
1
1
1
3
-!
7
3
1
7
1
1
1
!I
7 1 I - !
-
-
Section 2 = Method of Approach and
Schedule
Based on many years of experience, Montgomery
Watson’s project approach is well organized and
will lead efficiently and quickly to the desired
results. Our approach is reflective of the data
available, of past experience, of management and
timing requirements. The underlying basis of
our approach is that the revenue plan developed
should be acceptable to the District and its cus-
tomers. It is therefore very important to keep the
District staff and Water Commission apprised of
the status of the study and seek direction to
ensure final acceptance. This may require that
some recommended changes be adopted incre-
mentally as implemented on the wastewater side
at the City.
The following tasks outline Montgomery
Watson’s strategy to assist the District in success-
fully implementing a revenue program
SCOPE OF WORK
The project is identified by the tasks shown be-
low:
1. Meetings
2. Data Compilation and Analysis
3. Data Projection
4. Policy Considerations
5.
6. Reserves Review
7. Rate Calculations
8. Reports and Deliverables
Capital Improvement Program Review and
Financing
Ordinance Preparation (Optional)
Implementation Assistance (Optional)
These tasks are described below.
Task 1 - Meetings
Ongoing communications are of prime impor-
tance to successful completion of the Financial
MONTGOMERY WATSON
Plan. Since we prefer a nosurprises relationship
with the District, we will promote frequent writ-
ten and oral communications with staff. We will
conduct regular meetings with the District to
report progress and plans for future work and
have more frequent telephonic and written com-
munications to seekguidance and approval from
the District prior to finalizing our recommenda-
tions. We propose the following meetings:
Task 1.1 - Kick-Off Meeting
The kick-off meeting will be convened within a
week of Notice to Proceed to discuss issues re-
lated to the study. These include data require-
ments, policy considerations, restraints on capital
financing, rate structure, budget,and adjustments or refinements to schedule and scope.
Task 1.2 - Mid-Course Meeting
A midcourse meeting to discuss the course of the
study and to seek direction will be held about six
weeks into the study. Rates and rate structures
will be reviewed. Impacts of reclaimed water use
and connection fees will be discussed to allow
staff members preview results and provide direc-
tion.
Task 1.3 - Draft Review Meeting
A meeting will be held after a draft report submit-
tal to review and address District staff and Com-
mission members’ comments on the draft report.
Task 1.4 - Workshop Meeting
This meeting will be held, if required, to present
the findings and recommendations of the study.
Results of the various issues to be studied will be
presented. Montgomery Watson will answer
questions regarding any aspects of the study.
2-1
‘I I-
1
1
1
1
1
1
3
3
1
1
3
1
1
1 i
1
Section 2 - Method of Approach and Schedule
Task 1.5 - Public Hearings
Montgomery Watson will make formal presenta-
tions to the Board at two public hearings and will
answer any questions that the Board or public
may have about the study. Montgomery Watson
will assist preparing the staff report to Board, if
requested.
Additional, optional meetings may be held to
address public concern and provide information
and educate customers that may be sigruficantly
impacted by changes in rates and rate structure.
Task 2 - Data Compilation And Analysis
Water conservation is a major issue in California.
For the proper study of this issue and the effects
on the District’s revenue’base, data requirements
of the District’s customers and their usage pat-
terns will be important. Montgomery Watson
will compile the following data for the study.
The number of active and inactive meter service
accounts, fire service and other accounts will be
summarized by size and type of service. Water
customers should also be characterized by classes
such as residential, agricultural, commercial, and
industrialcustomers. Forlifeline rates tobe imple-
mented, the number of accounts qua- for
lifeline rates and their meter sizes should be pro-
vided.
The last three to five years of potable water pur-
chases, consumption, and unaccounted for water
(as available) will be compiled. Water usage
should be available by meters and by month so
that summer and winter months consumption
can be determined. Water usage for different
customer classes will be analyzed to help deter-
mine ideal rate structure. Similarly reclaimed
water use will be compiled.
Historical revenues and expenditures (last three
years) and currently budgeted figures for the
water and reclaimed water enterprise will be
compiled. Depreciation schedules and list of
assets, with their historic values, should be pro-
vided. Revenue data may be characterized by
customer class and other types of revenue such as
MONTGOMERY WATSON
taxes and miscellaneous revenues. Current re-
serves will be compiled.
Task 3 - Data Projection
Five-year financial planning periods will be used
to make projections. The computer rate model
will be set up so that projections for additional
years can be accomplished easily.
Using growth figures received from District staff,
the number and types of services, resulting po-
table water and reclaimed water consumption
over the planning period will be projected. Our
experience in the past indicates that staff may
wish to adjust the projections presented in the
General Plan Element.
The various revenue sources currently funding
the District’s operations will be reviewed and
projected.
Each expenditure item will be reviewed and pro-
jected separately. Costs of water purchase will be
determined in concert with MWD indications,
taking into consideration the new proposed rate
structure although it is recognized that no com-
mitment will be forthcoming from MWD on fu-
ture water pricing. Changes, if any, in O&M costs
due to changes in number of users or capacity will
be considered.. Impacts arising out of the use of
reclaimed water will be considered.
Task 4 - Policy Considerations
There are several key issues that need to be con-
sidered in developing a revenue program. These
will be discussed and presented to the District for
consideration. It is important to realize that a
comprehensive water resources plan can be used
to justify changes in rate structures without nec-
essarily calling it a water rate increase. Users who
demand more from the system should be charged
proportionately more.
Task 4.1- Alternate Rate Structures
Different rate structures will be reviewed to de-
termine the most suitable one for the District.
Changes in structure could have significant im-
2-2
Section 2 - Method of Approach and Schedule
I- 3
1
pacts on different types of users as well as imple-
mentation considerations for the District.
1
I)
I
:I
t ! -
t
-
The structures to be reviewed may include:
Tiered rates. Many utilities are beginrung to
implement inclining block rates. We how of
other utilities that are following this approach
and will draw on their experience if required.
Drought penalty rates would be included to pe-
~lizR “abusive users”.
Seasonal rates. Water use can be compiled by
seasons. Costs of peaking can be tied into a
seasonal rate structure.
Lifeline rates are implemented by several utilities
and reflect the concern of the community for the
economically weaker sections of the community.
A uniform policy may be considered for water,
sewer and solid waste fees if lifeline fees are
desired.
The impacts of implementing these will be as-
sessed in view of the experience of other agencies
withspecialemphasis onthecirmmstancesexist- mg in the District. Benefits and likely drawbacks
on the alternate rate structures will be presented
at a meeting. These could include qualitative and
quantitative impacts on different customerclasses,
on overall water use in the District, and on rev-
enue impacts on the water utility.
Task 4.2 - Reclaimed Water Pricing
Thisisasensitiveissuebecausetypicallyredaimed
water is more costly at the present time than
potable water. Customers are required to incur
additional costs to use reclaimed water. The
fairness of levying the same fees as for potable
water will be examined. The issues involved in
charging water and/or sewer users for customers
to offset costs of reclaimed water will be dis-
cussed and recommendations provided. MWD’s
interruptible rates for agricultural users will be
discussed with reference to pricing of reclaimed
water.
Task 4.3 - Connection Fees
Connection fees should be based on the total
capital costs of facilities from which a user re-
ceives benefit. This may include existing as well
as future facilities. The fairness of charging users
for connecting to existing water and sewer sys-
tems willbe discussed. Issues related to charging
connection fees for reclaimed water and potable
water will be presented.
There are several methods for computingconnec-
tion fees. The buy-in method, the ITLarguliil cost
method, and the specific recovery methods will
be reviewed and the optional method($ suitable
to the District will be recommended based on
District needs and conditions.
Task 5 - Capital improvement Program
Review and Financing
We will review the annual historic CIP program
and the CIP recommendations of the potable and
reclaimed water master plans. These will be
integrated into a financial plan to develop recom-
mendations for an adequate level of annual capi-
tal improvements that can be funded by the Dis-
trict. This dindude a review of funding mecha-
nisms and the best method of funding different
types of capital improvements, including low
interest loans and grants. Facilities needed to
meet greater demand, such as alternate water
resources, may be funded by several sources in-
cluding penalty rates and connection fees, on a
pay-as-you-go and pay-as-you-use basis. Other
alternatives may include standby charge on un-
developed property, assessments, etc.
Task 6 - Reserves Management
Reserves management is an important element in
the practice of sound financial management. It is
especially important given the water supply situ-
ation in Southern California, and when external
funding is sought. Montgomery Watson will re-
view the District’s reserve funds and set up a plan
to establish and maintain these funds in conform-
ance with utility practices, keeping in view the
Cities unique circumstances and risk manage-
MONTGOMERY WATSON 2 -3
'1
1
1
1
I
1
1 J
1
1'
;
1
I
I
1
I
I
-I
1
1 1
7
Section 2 - Method of Approach and Schedule
ment practices. This will conform with the waste-
water funds we helped establish during the last
wastewater rate study from previous page. Mont-
gomery Watson will review depreciation to en-
sure that it is reasonable for theDistictbyreview-
ing the assets.
Task 7 - Rate Calculations
It is important to note that public acceptance is a
critical component of our rate program. Mont-
gomery Watson will make presentations to the
Water Commission and to the public. Special attention will be focused on groups or classes of
customers that are most si@cantly impacted.
This approach helped us implement a large waste-
water rate increase in the City a few years ago.
The approach should be to develop an integrated
and comprehensive water resources management
plan which charges users in a fair manner de-
pending on the demands they place on the water
system.
Task 7.1 - Rate Structure Design
The existing rate structure will be reviewed for
equity and fairness, perceived and real, within
user categoriesandbetweenuser categories. Rev-
enues and expenses will be allocated to custom-
ers, capacity and commodity cost centers to deter-
mine revenue requirements. Attentionwill focus
on the allocation between fixed meter charges
and commodity rates in the new rates to ensure
faimess, equity and acceptance. Uniform rates
will be provided. Options could include increas-
ing tiered rate structures. Lifeline rates for low
income users will be provided.
When considering MwD's proposed rate struc-
ture and incentive programs, it needs tobeunder-
stood that each element and program is in some
degree of flux. Incentive programs offered by
MWD are currently being reviewed by Mont-
gomery Watson and are likely to change signifi-
cantly and there is ongoing discussion as to
whether a portion of the Readiness-to-Serve (RTS)
charge may be collected through property tax
bills at the member agency's discretion. How-
ever, MWD's rate structure is changing to include
MONTGOMERY WATSON
fixedcostssuchas RTScharges and New Demand
Charges. If RTS charges that are currently billed
to property owners directly on the tax roll, are
collected from the utility in the future, there will
be an increase in revenue requirements through
rates. Demand charges for exceeding three or
four year rolling averages are significant. Both
these charges as well as Peaking charges and
Connection Maintenance charges that are also
scheduled to be implemented by MWD will be
considered in the analysis.
The impact of increasing reclaimed water use on the potable water system will be analyzed. The
rate of growth in the District's customer and use
base will be important in this regard. A compre-
hensive program combining water and reclaimed
water ratesand connection fees willbe developed
that is fair and acceptable.
Task 7.2 - Reclaimed Water Rates
Based on the review of policy in Task 4.2, Mont-
gomery Watson will recommend reclaimed wa-
ter rates to be implemented. Impacts of MWD's
discounts for interruptible water will be consid-
eredkeepinginview thefactthatreclaimedwater
would be a more reliable water supply and not
subject to the same cutbacks that MWD would
impose on agricultural deliveries.
Task 7.3 - Compute Connection Charges
The District's connection fees will be reviewed
and computed based on existing facilities and
new expansion related facilities planned in the
based on meter sizes so that they can be easily
master plans. Connection fees will be compute
implemented. In view of the fact that MWD is
in the coming years, it may be a good idea to
explore the potentiaI for levying connection fees
for water supply capacity on new customers in
the future so that existing customers are not re-
quired to pay for growth. This would be in
addition to charges imposed by CWA. Com-
Duted connection fees will be in comdiance with
#
@P
planning to impose significant demand charges d/$%
Section 2 - Method of Amroach and Schedule
Task 7 4 - Recommend Rates and Financial Plan
Based on the calculations and District poliaes, a
set of rates and plans to meet District's goals will
be prepared. Effects of the new rates on selected
users will be demonstrated.
Task 7.5 - Review and Recommend Miscella-
neous Fees and Charges (optional)
Miscellaneous fees will be reviewed and new fees
will be proposed, if required, to ensure users pay
in accordance with costs of service. For example,
backflow charges for commercialcustomerscould
be considered if it does not exist now, and fire
service rates and installation fees could be re-
viewed based on costs of providing service.
Task 8 - Reports and Deliverables
The report for the midcourse meeting will be a
compendium of tables, without text, showing the
effects of various alternatives on rates. Tencopies
will be provided.
1 i
Prior to the workshop, a draft report will be
produced for critical review by staff and Mont-
gomery Watson. Ten copies of the draft report
will be provided.
Following receipt of comments on the draft re-
port, the final report will be produced. It will
include complete textual information supporting
the many tabulations and graphics; 25 copies will
be provided.
A computer diskette including the rate calcula-
tion model on EXCEL 4 for an IBM-PC will be
provided. Documentation explaining the model,
the data requirements and methods to update the
model will be provided. Models will include
macros which will simplify the task of printing
the tables and updating the calculations. All of
these will be discussed and explained at an op-
tional training session.
Task 9 -Ordinance Preparation and Imple-
mentation (Optional),
Montgomery Watson will assist in drafting a user
fee ordinance to take into consideration any new
rate structure adopted by the District. Montgom-
ery Watson can help the District with implemen-
tation to assist staff and public answers to specific
questions regarding the revenue program.
Task 10 - Cost of Delivery Analysis (Op-
tional)
Typical delivery charges will be addressed in the
cost allocations performed in Task 7-1. These
allocations will provide delivery charges for dif-
ferent meter sizes based on the demands the
meter puts on the system. Multi-family units and
irrigation meters would be covered under this
methodology.
If the District
sis of demands from different customer classes,
Montgomery Watson would investigate peaking
factors specifically used in the master plan for
different customer classes and based on our expe-
rience to determine demands placed on different
customers. A more detailed analysis (which we
do not believe is necessary) would be actually
measuring demands specifically for the different
classes. If the District desires this latter option, it
could be provided on a cost and materials basis.
Task 11 - Public Involvement (Optional)
Montgomery Watsonhas partiapatedmany times
inpublicmeetmgsmakingpresentations, answer-
ing questions in a manner that can be easily
understood by the lay person, and listening to
customer concerns. Our approach on this task,
included inTasks 1-3and 14,wouldbe topresent
the issues under a comprehensive water resources
management plan and have users buy into this
approach which allows revenues to be collected
from "abusive" users without impacting water.-
wise users of the District.
MONTGOMERY WATSON 2-5
J Section 2 - Method of Approach and Schedule
If the District decided to substantially change its
water r,i te structure, Montgomery Watson would
assist in targeting classes or groups of customers
that wouldbe sigruficantly impacted and conduct
meetings to inform and educate them of the pro-
posed changes. Fees for this task would be on a
per meeting basis, with costs ranging between
$500 to$1,000permeeting,dependurgonwhether
we would be required to prepare presentation
materials, etc.
SCHEDULE
Montgomery Watson has an excellent record in
meeting its schedule commitments. We expect
that the study can be completed within 100 days.
We will meet the following schedule:
Notice to Proceed Week of
Kick-Off Meeting
Follow Up Meeting
Mid-Course Meeting
Draft Report
Review Meeting
Workshop Meeting Final Report
Public Hearing
January 1,1995
January 5,1995 January 24,1995
February 14,1995
March 9,1995
March 16,1995 March 31,1995
April 14,1995
open
MONTGOMERY WATSON 26
3
I i
i
J
1
*
i
i
-
j
1
4 i ! A
I 4
I I
J
i
.I
Section 3 - Related Experience
and References
Montgomery Watson provides a wide range of
expertise in the environmental business. It has
provided service for over 140 years. There are
currently over 3,000 employees and 80 offices
worldwide. Montgomery Watson’s single guid-
ing prinaple is: To be the best operated environmen-
tal setpiceS and technology firm in its sector qf busi-
ness. This means that Montgomery Watson will
deliver only products of proven high quality and
consistently set new industry standards for ser-
vice, maintaining continued client respect, confi-
dence, and loyalty both before and after an as-
signment.
Montgomery Watson’s Financial and Manage-
ment Consulting Practice consists of profession-
als with both engineering and business adminis-
tration backgrounds. They have performed simi-
lar studies to that proposed herein on time and
within budget. Montgomery Watson has pre-
pared numerous financial and rate studies in-
volving water and wastewater systems and fi-
nancing alternatives for capital improvement
programs (CIP). Our staff provides many years
of experience in financial and planning analysis
and rate investigations. Montgomery Watson
has completed well over 150 analytical and statis-
tical finanaal studies of water and wastewater
systems.
The following pages list and describe projects
undertaken by Montgomery Watson’s Financial
and Management Division and references, which
Montgomery Watson invites the District to con-
tact.
RELATED EXPERIENCE
Sweetwater Authority, California
Water Rate Study and Financial Plan
(1 994)
Montgomery Watson was retained to prepare a
revenue program and a financial plan so that the
Authority could finance a large capital improve-
ment program and design a fair and equitable
system of rates. Water rates were to be designed
to aid in conservation programs. Montgomery
MONTGOMERY WATSON
Watson reviewed the master plans and recom-
mended a financing plan to carry out the projects
design and construction. Capital projects were
rescheduled so that rates would be implemented
in an orderly manner without causing a hardship to users. Montgomery Watson analyzed the wa-
ter use and revenues from different classes of
customers and in different blocks to assist in the
development of a water rate structure. The Au-
thority implemented an incremental blodc rate
structure with multiple blocks to aid in conserva-
tion. Incentives were provided to the small single
family residential users to aid in conservation.
The computer rate model was designed to com-
pute rates in cases of drought resulting in lo%,
30% and 50% cutbacks in water use. Alternate
fees to recover costs related to providing services
were proposed and accepted.
Montgomery Watson provided the computer rate
model, a manual explaining the model and train-
ing to use the model. Mr. Pardiwala was the
project manager.
City of Oceanside, California
Water and Wastewater Rate Study and
Financial Plan (1990-92)
Montgomery Watson was retained by the City to
prepare a revenue program and a financial plan
so that the City could apply for low interest loans
from the State Revolving Fund to partially fi-
nance a large capital improvement program and
design a fair and equitable system of rates. Water
rates were to be designed to aid in conservation
programs. Montgomery Watson reviewed the
master plans of the City and recommended a
financing plan to carry out the projects designand
construction. Midway through the study, the
Metropolitan Water District of Southern
California’s (MWD)mandatory conservationpro-
grams required implementation. Montgomery
Watson reviewed different rate structures and
designed an incremental blodc rate structure to
aid in conservation and to recover rebates and
penalties imposed by MWD. Montgomery Wat-
son provided rates for different scenarios de-
pending upon the Incremental Interruptible Con-
3- 1
J Section 3 - Related Experience and References
i
J
7
servationPlanphaseMWDwould declare. Mont-
gomery Watson also reviewed other charges and
assisted staff in presentations to City Council.
On the wastewater side, the City was planning
reclamation facilities and upgrade and expansion
of the treatment facilities. They needed an ap-
proved revenue program for submittal to the
State Water Resources Control Board (SWRCB).
Montgomery Watson prepared a revenue plan
that was approved by SWRCB. Montgomery
Watson reviewed the management of operational,
replacement and expansion reserves and made
recommendations to meet EPAand developer fee
(California AB 1600) requirements.
Montgomery Watsondeveloped reclaimed water
rates for the City and assisted with applications
for low interest loans to the state for desalination
of groundwater.
Montgomery Watson provided thecomputer rate
model, a manual explaining the model and train-
ing to use the model. Mr. Pardiwala was the
project manager.
Ramona Municipal Water District
Water Rate and Administrative Study
(1 991)
Ramona MWD provides water, sewer, fire, medi-
cal, and recreational services to the Ramona area
inSanDiegoCounty. The areaischaracterizedby
low density population hilly regions and high
elevation. All the water is purchased from San
Diego County Water Authority. Rates are much
higher than the general San Diego area. Mont-
gomery was selected to do a rate study and evalu-
ate organizational staffingand management struc-
ture for efficiency in operations as well as man-
agement information systems. In addition the
drought conditions required mandatory cutbacks
in an area where agricultural irrigation is still
important. Montgomery completed the rate study
and modified the rate structure to encourage
conservation. Recommendations to increase effi-
ciency and reorganize managemenfstructure were
made. Rationale for the higher rates was pro-
vided to ensure the community that rates were
reasonable. Mr. Pardiwala was the project man-
ager.
City of Burbank, California
Water and Wastewater Reclaimed Water
Rate Study and Financial Plan (1 987-1 993)
The City of Burbank had been using system de-
velopment charges to fund operations and run-
ning a defiat in their budget. The State Water
Resources Control Board required the City to
meet EPA's revenue program guidelines and rec-
ommended Montgomery Watson to develop the
City's wastewater revenue program.
Montgomery Watson successfully performed a
user charge study that included an analysis of the
City's wastewater rate structure. This included a
detailed study of historical water consumption
data and infiltration and inflow data. Analysis
showed that revenues collected fromhigh strength
users was totally inadequate. Rates were struc-
tured to take into account the wastewater flow
and the strength of the City's large commercial
and industrial accounts. In addition because of
large capital expenditures at Hyperion treatment
facilities, Montgomery Watson designed a life-
line rate for the City's senior atizens so that they
would not be unduly burdened by high sewer
rates. A program of charges for inspections of
industrial waste discharge permitees was devel-
oped to reflect cost of service. In addition, a
system of reserves was designed to prevent com-
mingling of funds from system development
charges, from restricted bond accounts and from
operations. Montgomery Watson made presen-
tations to the City Council and at public hearings
to ensure smooth passage of the rate increases.
The revenue program was approved by the
SWRCB. Montgomery Watson also drafted an
ordinance to reflect the recommended changes.
One of the features of this ordinance provided
staff the flexibility to implement rate increases
necessitated by inflation without approaching
Council for approval. As part of this study,
Montgomery Watson provided a rate model on
Lotus Symphony to the City. This model is being
used to determine rates for subsequent years.
MONTGOMERY WATSON 3-2
Section 3 - Related Experience and References 3
City of Oceanside 1992 Water and
Wastewater Rate Study
Mr. Barry Martin
ht. Water Utilities Dir.
(619) 9661873
Sweetwater Authority
1994 Water Rate Study
Financial Plan
Mr. Dick Reynolds
General Manager
Ci of San Fernando
1984-94 Water and
Wastewater Rate
Studies
Mr. Mike Drake Director of Public Works
(818) 898-1222
1619) 420-1413
As a follow up to the user charge study, Mont-
gomery Watson was retained to perform a study
on the system development charges. The City’s
facilitiesneeded tobeexpanded tomeet increased
demand. Montgomery Watson evaluated the
costs of increase in treatment capacity and recom-
mended system development charges for the resi-
dential and various commercial and industrial
users.
!
City of Banning 1994 Water and Wastewater
Rate Study
Mr. Paul Toor
Public Works Director
(909) 922-1230
City of Redlands
1994 Outside City Water and Wastewater Rates
Mr. Gary Phelps Utilities Director
City of Burbank
1993 Redaimed Water
Revenue Plan Mr. Leighton Fong
Supervising Civil Engineer
(815) 953-9617
(909) 798-7698
Following the above work, Montgomery Watson
provided a financial analysis study to be included
in the City’s Official Statement for a proposed
bond sale to finance construction of the City’s
plant expansion. This included an analysis of
bond sizing, estimating reserves, bond issue costs,
coverage requirements and methods of increas-
ing rating and reducing interest costs.
Montgomery Watson also performed an engi-
neering feasibility study and evaluated the eco-
nomics of water conservation by using reclaimed
water to irrigate the City’s parks, golf courses,
and for freeway landscaping and industrial uses
such as plating.
On the water side, the City of Burbank had just
completed a master plan and wanted a thorough
investigation of the water rate structure and rev-
enue plan. The City wanted to implement a water
conserving rate structure, and introduce other
service charges in accordance with a cost of ser-
vice analysis. Montgomery Watson modified
their rate structure basing demand on water con-
sumption during the peak summer months. The
rate structure included a separate component on
cost of water and power so that those costs could
be passed on directly to the customers if they
changed. The capital costs were incorporated in
the service charges. Funding of capital improve-
ments on a pay-as-you-go basis as well as through
issue of debt was evaluated and rates were pre-
pared under each scenario. Montgomery Watson
developed charges for new connections, zonal
elevation charges, fire service charges, backflow
connections administrative chargesand other ad-
ministrative fees. In addition, Montgomery Wat-
son evaluated impact of drought conditions sce-
narios on rates and revenues with water con-
sumption decreasing by varying amounts. Mont-
gomery Watsonevaluated impacts of new charges
md modifications in rate structure of existing
mes and made recommendations to ease imple-
nentation. Montgomery Watson also rewrote
he rules and regulations governing the water
lepartment.
?allowing the above work, Montgomery Watson
xovided a finanrial analysis study to be included n the City’s Offiaal Statement for a proposed mnd sale to finance construction of the City’s
>lant expansion. This included an analysis of
Iond sizing, estimating reserves, bond issue costs,
:overage requirements and methods of increas-
ng rating and reducing interest costs.
wlontgomery Watson also performed an engi-
leering feasibility study and evaluated the eco-
iomics of water conservation by using reclaimed
vater to irrigate the Cit-fs parks, golf courses,
Lnd for freeway landscaping and industrial uses
iuch as plating. Montgomery Watson assisted
he City with applications for a low interest loan
mder the Water Reclamation Loan Program.
konomic analyses and rates to serve users were
bo computed.
ill of these projects were completed on schedule
vithin budget to the satisfaction of the client with
vlr. Pardiwala was the project manager/projed
ngineer for the various projects.
VIONTGOMERY WATSON REFERENCES
MONTGOMERY WATSON 3-3
-I Section 4 - Project Team
Montgomery Watson has assembled a team spe-
cifically structured to meet the District’s needs.
Our team provides the highest level of profes-
sionals with extensive experience in their special-
ties to provide the Districtwithaproductthatwill
be implementable. The team provides excellent
management, review, and analytid abilitiescom-
bined with proven experience. All projects are
carried out utilizing a team approach with coor-
dination between the client and the team main-
tained at all times.
Other team members include Jim Laughlin, until
recently, General Manager of Elsinore Valley
MWD, and John Moms, ex-Chief Engineer for
Irvine Ranch Water District. The presence of these team members will ensure the District a
quality product.
For eachof its projects, it is Montgomery Watson’s
policy to form an Technical Review Committee.
This committee will consist of individuals who
have substantial background in the engineering
and financial and management aspects of water
and wastewater facilities. The Technical Review
Committee is the District’s insurance of technical
excellence.
.
The organization of our proposed project team is
shown graphically on the following page. A
concise summary of qualifications of the key
project team members is presented in the follow-
ing paragraphs. Detailed education and experi-
ence biographies for the principal project team
members follow in the appendix.
PROJECT TEAM
The project team will consist of
Principal-in-Charge (PIC)
Mr. Ajit S. Bhamrah
As PIC, Mr. Bhamrah wiU be responsible for
ensuring that the District’s expectations are met
on all aspects of the project. He will ensure that
resources required for a timely completion of the
highest quality product will be available to the
Project Manager. Mr. Bhamrah has over 20 years
of experience in the environmental engineering
field and is a registered engineer with a masters
degree in engineering and business administra-
tion.
Project Manager Mr. Sudhir D. Pardiwala
Mr. Pardiwala is the Head of the Montgomery
Watson Southwest Group Financial and Manage-
ment Consulting Division. He has served as
Project Manager or Project Engineer on many water and wastewater, reclaimed water rate stud-
ies, and administrative studies including the Cit-
ies of Carlsbad, Oceanside, San Fernando, Del
Mar, Burbank, Pomona and Ramona Municipal
Water District and Dana Point Sanitary District.
He has several years of experience in project
economic and financial analysis with Montgom-
ery Watson and other engineering firms. He is a
registered engineer witha masters degree inengi-
neering and business administration.
Mr. Pardiwala‘smajor responsibility as the Project
Manager will be to provide the overall supervi-
sion and administration of the project, directing
the project approach, reviewing the quality of the
finished project, monitoring progress, meeting
deadlines, and assuring the cost control of the
total effort. Mr. Pardiwala will also be directly
responsible for the revenue program.
Technical Support
The following team members will provide their
technical expertise in their areas of specialty to
support Mr. Pardiwala.
Capital Financing
Mr. Jim Laughlin
Mr. Laughlinuntil recently wasGeneral Manager
at Elsinore Valley Municipal Water District. He
has over 40 years of experience in the water busi-
ness and has successfully obtained low interest
loans and grants from Farmers Home Adminis-
tration, Bureau of Reclamation and State Revolv-
MONTGOMERY WATSON 4-1
1
I
1
Section 4 - Project Team
ing Fund. He is on a select committee to design
the new program to fund capital water projects to
be developed by the Bureau. Mr. Laughlrn will
assist the District with his expertise in capital
firaancing.
Reclaimed Water Issues Mr. John Moms
Mr. Moms has over 30 years of experience in the
water industry. He is currently a Director of
MWD and was Director and member of the Tech-
nical Advisory Committee of the South Orange
County Reclamation Authority. He was Chief
Engineer at Irvine Ranch Water District (IRWD),
one of the first utilities in Southern California to
implement water conservation through the use of
reclaimed water. He has been involved with
developing policy on reclaimed water and po-
table water pricing and design of penalty rates for
“abusive” users. Prior to his employment with
IRWD, he spent 15 years in consulting, which
included many California water, reclaimed water
and wastewater projects including rate analyses
and revenue programs.
Financial Analysis
Mr. Michael Blum
Mr. Blum is a Senior Economist with experience
in planning, economic analysis, negotiations, and
environmental engineering. He is versatile in
computer modeling and environmental finance.
He has assisted several clients with billing calcu-
lation methods, demand forecasting, revenue
planning and rate setting. He has a degree in
engineering and business administration. He
will assist in the financial analyses on this project.
He has an engineering and advanced business
degree.
Technical Review Committee (TRC)
For each of its projects, it is Montgomery Watson’s
policy to formanTRC. This committee consists of
individuals who have substantial background in
the engineering, management and financial as-
pects of water and wastewater facilities. The TRC
is the District’s insurance of technical excellence.
TRC Member
Mr. Bill Butler
Mr. Butler, a Vice President with Montgomery
Watson, has over 20 years of management expe-
rience as both a management consultant and a
public official for one of the largest regional waste-
water management utilities in the United States.
He has been responsible for project management,
construction program management and financ-
ing for major EPA grant-funded wastewater sys-
tem expansion and improvement programs. Mr.
Butler has extensive experience in rate studies,
cost allocation studies, personnel management,
project scoping, planning, budgeting, financial
planning, A/E contractor and equipment vendor
negotiations and contract management. He has
also successfully supported major wastewater
agenaes in EPA grant application submissions,
program reviews and grant audit reviews and
appeals in several states and EPA Regions. He
has personally directed major project financing
for the local share portions of EPA grant projects,
including a $117 million financing for a major
regional wastewater utility in California.
TRC Member MI. Dale Burgoyne
Mr. Burgoyne, a pMcipal engineer, has a unique
combination of experience in civil engineering
and financial consulting for muniapal utilities
and local governments. He has performed rate
and financial studies and valuation studies, for a
number of agencies. He has extensive experience
preparing contracts for utility service. Mr.
Burgoyne also has experience in flood control and
drainage studies and designs. His education
includes a broadly based study of water resources
engineering and planning along with finance and
business.
TRC Member
Mr. Jack Weber
Mr. Weber is a Principal Economist has over 22
years of experience in rate and structure develop-
ment, economic analysis and financial planning.
He was manager of budgets and planning at East
MONTGOMERY WATSON B 4-2
- Section 4 - Project Team 1
Bay Municipal Utility District and was respon-
sible for setting and implementing water and
wastewater rates. His experience there includes
over six years of conservation related rates and
charges. He has assisted many utilities with water and wastewater rates analysis and has de-
veloped rate models that are approved by AWWA
for utilities throughout the U.S. He is an expert on
water demand forecasting analyses.
MONTGOMERY WATSON 4-3