CARLSBAD MUNICIPAL WATER DISTRICT - AGENDA BILL
m# & TITLE: AWARD OF CONTRACT FOR THE DEPT. HD.
MTG. $-k%?- CONSTRUCTION OF THE
MAERKLE RESERVOIR - COVER AND LINER CITY ATTY. &fz
DEPT. CMWD CMWD PROJECT NO. 90-109 CITY MGR.
CONTRACT NO. 3388
RECOMMENDED ACTION:
Adopt Resolution No. 4 58 accepting a bid and awarding a contract for the construction
of the Maerkle Reservoir - Cover and Liner, CMWD Project No. 90-109, Contract No. 3388.
ITEM EXPLANATION:
On June 11, 1996, the Board of Directors authorized the advertisement of bids for construction
of Maerkle Reservoir - Cover and Liner, CMWD Project No. 90-109, Contract No. 3388. Six (6)
sealed bids were received on September 11, 1996, as follows:
1. JW Contracting Corporation, Corona CA. $4,563,000.00
2. Pacific Hydrotech Corporation, Perris, CA. $4,795,000.00
3. West Coast General, Lakeside, CA. $5,341,410.00
4. Orion Construction, San Marcos, CA. $5,497,247.00
5. C.A. Rasmussen Inc., Simi Valley, CA. $5,712,000.00
6. Cambridge Concrete, Inc., Victorville, CA. $6,768.191.00
This project will involve construction to regrade the interior of the earthen reservoir, install an
asphalt liner and polypropylene cover and appurtenances. Construction is anticipated to require
approximately five hundred forty (540) calendar days to completion. The Engineer’s estimate for
construction was $7,800,000.
Plans and specifications for the Maerkle Reservoir - Cover and Liner were prepared by the
District engineering staff. In accordance with Section 3.28.120 of the Municipal Code, an
invitation to Bid was published. Six (6) responses, were received, opened, witnessed, and
recorded on September 11, 1996. Project Manager and Purchasing staff have reviewed the
complete bid documents from all parties in detail and concluded that the lowest responsive,
responsible bidder is JW Contracting Corporation, Corona, CA. for a contract amount of
$4,563,000.
The project will require surveying and construction management services. The construction
management includes shop drawing review, cover inspection, electrical and structural review,
geotechnical testing and inspection, and as needed engineering related services. The following
firms were selected to perform this work:
Survey: Right-of-Way Engineering Services, Inc.
Construction Management: John Powell & Associates
Total Cost for Surveying and Construction Management Services
$ 32,660.OO
$127,960.00
$160,560.00
Page 2 of Agenda Bill No. 3w
ENVIRONMENTAL REVIEW:
The City Planning Department issued a Mitigated Negative Declaration for this project on June 8,
1995. No permit was required from the Coastal Commission.
FISCAL IMPACT:
Funds in the amount of $7,800,000 have been appropriated in the 1996-97 Budget as part of the
Water Replacement and New Development Fund. The available balance is $7,606,096.
The construction bid for the project is $4,563,000. The estimated District-funded project costs
are as follows:
Construction $4,563,000
Construction Contingencies 10% $ 456,000
Inspection/Administration $ 150,000
Surveying $ 33,000
Construction Management Services $ 128,000
Total Estimated Project Costs $5,33Q,OOO
Total Appropriation $7,606,096
EXHIBITS:
1. Location Map
2. Resolution No. 958 accepting a bid and awarding a contract for the construction of
Maerkle Dam - Cover and Liner, CMWD Project No. 90-I 09, Contract No. 3388
CMWD 90-109
LOCATION MAP
VISTA . ~CANSCC CCEANSEE /-
v/S TA
.u
-7 / ‘
A
IA
VICINITY MAP
PROJECT NAME: PROJECT NO. EXHBIT NO.
MAERKLE DAM COVERING 8r LINING go-109 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 958
A RESOLUTION OF BOARD OF DIRECTORS OF THE
CARLSBAD MUNICIPAL WATER DISTRICT OF
CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND
AWARDING CONTRACT FOR CONSTRUCTION OF
MAERKLE RESERVOIR COVER AND LINER,
CMWD PROJECT NO. 90-109. CONTRACT NO. 3388
WHEREAS, the Board of Directors of the Carlsbad Municipal Water
District has previously authorized the advertisement for bids for the Maerkle Reservoir -
Cover and Liner, CMWD Project No.90-109, Contract No.3388; and,
WHEREAS, Six (6) sealed bids were received on September 11, 1996,
for said project; and,
WHEREAS, all bid documents received from all bidders have been
reviewed in detail and the Board of Directors does hereby find that the lowest
responsive, responsible bid received for the construction of said project was submitted
by J.W. Contracting Corporation in the amount of $4,563,000.
NOW, THEREFORE, BE IT RESOLVED, as follows:
1. That the above recitations are true and correct.
2. That the bid amount in the amount $4,563,000 submitted by JW
Contracting Corporation of Corona, California, is hereby accepted, and the President
is hereby authorized to execute a contract thereafter.
3. That Right-of-Way Engineering Services, Inc., proposal for surveying
services in the amount of $32,660.00 is hereby accepted, and the President is hereby
suthorized to execute a contract thereafter.
‘/I
‘0
c
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
4. That John Powell and Associates proposal for construction
management services in the amount of $127,960.00 is hereby accepted, and the
President is hereby authorized to execute a contract thereafter.
PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad
Municipal Water District held on the 1st day of October I 1996, by the
~ following vote to wit:
~ AYES: Board Members Lewis, Nygaard, Kulchin, Hall and Finnila
NOES: None
ABSENT: None
Al-TEST:
(SEAL)
CMWD 90-I 09
September 26. 1996
TO: RAY PATCHETT, CITY MANAGER
FROM: Bill Plummer, District Engineer
i i(7z 7~;:’ ;I:;-;” :,,“‘(:;rf II;
I -,-;.j 1. i-1 T’; \/ . UC I .L.‘-
MAERKLE RESERVOIR - COVER AND LINER
CMWD PROJECT NO. 90-109 - CONTRACT NO. 3388
COMPARISON OF BID TO ENGINEER’S ESTIMATE
Attached is a comparison of the major bid items for Maerkle Reservoir - Cover and
Liner showing the variance between the engineer’s estimate from Powell & Associates
and the contractor’s bid. Major differences between the two include the following:
1. Powell’s estimate was $6,485,000 for construction, but they also included $950,000
for contingencies (IO%), and the..contractor had none.
2. The reservoir cover was $700,000 lower. The bid was prepared based on a
Hypalon material. As an option, we allowed the use of a newer material called
polypropylene. The manufacturers of polypropylene indicated it was lower in cost
than hypalon. However, this cost reduction was greater than expected. The
contractor specified polypropylene in his bid.
3. Earthwork was also $560,000 lower, mobilization.was $175,000 lower, the concrete
ringwall was $430,000 lower, and the AC liner was $240!000 lower.
4. We noted that the contractor submitted bids on two similar reservoir projects in San
Diego County! both involving floating covers. These projects include the Maerkle
Reservoir plus a project in Otay Water District. This contractor was low bidder on
both projects. There may be some cost savings as a result of both projects being
advertised at the same time.
Respectively submitted,
WILLIAM E. PLUMMER,’ P.E.
District Engineer
WEP:sjs
CMWD 90-I 09
. . -a . .
.
JW CONTRACTING CORPORATION
JWC POWELL
1 CONSTRUCTION ACTIVITY
MOBILIZATION
EARTHWORK
ASPHALT CONCRETE
PIPE/MATERIALS WATER SYSTEMS
RCP STORM DRAINS
RESERVOIR RINGWALL
MINOR CONCRETE
RESERVOIR COVER
ELECTRICAL
MISC. UNIDENTIFIED CONST. ITEMS
CONTINGENCIES
TOTALS:
VARIANCE:
JWC CONTRACT BID
JWD BID + VARIANCE
RESPONSIBILITY COSTS COSTS VARIANCE
JWC
SUBCONTRACTOR
SUBCONTRACTOR
JWC
SUBCONTRACTOR
SUBCONTRACTOR
JWC
SUBCONTRACTOR
SUBCONTRACTOR
S175.267
S621,120
S688,300
s294,513
S188,049
S164,800
S246,276
S1,296,720
$132,000
$0
so
S3.807,045
s349.352
S1.181.375
$926,410
5315,086
$175.030
s594.000
S232,060
52,000,000
$336.500
$308,843
$648,570
S7,067.226
S3,260,181
34,563,OOO
S7,823,181