’ &Is> CARLSBA; MUNICIPAL WATER DISTRl:T - AGENDA BILL /v@
AB# 359 TITLE- -- ACCEPTANCE OF PUBLIC IMPROVEMENTS DEPT. HD.
OF MTG. - 03-25-97 SEAPOINTE RESORT, CT 93-10 !ziE CITY Al-W.
CMWD NO. 94-202 DEPT. ENG CITY MGR. &?
El > P e %
RECOMMENDED ACTION:
Adopt Resolution No. 9 b 8 to accept improvements, authorize the Secretary to record the
Notice of Completion and release bonds in accordance with State Law and District Codes.
ITEM EXPLANATION:
The developer has constructed improvements required of this project and has requested Carlsbad
Municipal Water District (CMWD) to accept the public improvements. City forces have inspected
the public improvements and found them to be satisfactory. Staff recommends formal acceptance
by the Board of Directors of the Carlsbad Municipal Water District.
The public improvements constructed consist of the installation of water and sewer improvements.
FISCAL IMPACT:
The Carlsbad Municipal Water District will be required to maintain the public improvements. The
valuation of these improvements is $209,367.
EXHIBITS:
1. Location map.
2. Resolution No. 9m to accept improvements, authorize the Secretary to record the
Notice of Completion and release bonds in accordance with State Law and District Codes constructed between Carlsbad Boulevard and Avenida Encinas, south of Palomar Airport Road
in the City of Carlsbad, California.
3. Notice of Completion.
4. ltemization of Public Improvements.
- h
LOCATION MAP
--
PROJECT NAME
; SEAPOINT RESORT PROJECT EXHIBIT
NUMBER CT93-IO I
CAt?lS¶AD ENCINC+RNr t~fipf I ,
1
2
3
4
RESOLUTION NO. 968
A RESOLUTION OF THE CARLSBAD MUNICIPAL WATER DISTRICT OF
CARLSBAD, CALIFORNIA, ACCEPTING THE PUBLIC IMPROVEMENTS
OF SEAPOINTE RESORT. CT 93-10. CMWD NO. 94-202.
WHEREAS, the public improvements consisting of the installation of water 5
6 improvements located between Carlsbad Boulevard and Avenida Encinas, south of Palomar
7 Airport Road in the City of Carlsbad, California, have been successfully completed.
8 NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad
9 Municipal Water District of Carlsbad, California, as follows:
10 1. That the above recitations are true and correct.
11 2. That the construction of the above described public improvements is deemed
12
13
14
15
16
17
complete and hereby accepted.
3. The Secretary is hereby authorized and directed to record the Notice of
Completion for said project and release bonds in accordance with State Law and District
Codes.
4. That the Carlsbad Municipal Water District of Carlsbad, California, is hereby
18
19
20
21
22
directed to commence maintaining the above described public improvements for said project.
PASSED, APPROVED AND ADOPTED at a special meeting of the Board of Directors of
the Carlsbad Municipal Water District held on the 25th day of March , 1997 by the
following vote, to wit:
AYES: Board Members Lewis, Finnila and Hall
23
24
25
26
NOES: None
ABSENT: Board Members Nygaard an
(,Cm K: LEWIS, Pr&%ient
27 ATTEST: I
28 ALETHA L. RAUTENKRANZ, Secretary \ (SEAL)
rC
RECORDED REQUESTED BY
CITY OF CARLSBAD
AND WHEN RECORDED,
PLEASE MAIL TO
Secretary
Carlsbad Municipal Water District
1200 Carlsbad Village Drive
Carlsbad, California 92008
Space above this line for Recorder’s use.
NOTICE OF COMPLETION
Parcel No. 214-010-01
Notice is hereby given that:
1.
2.
3.
4.
5.
6.
7.
8.
The undersigned is owner of the interest or estate stated below in the property hereinafter described.
The full name of the undersigned is Carlsbad Municipal Water District, a municipal corporation.
The full address of the undersigned is 5950 El Camino Real, Carlsbad, California 92008.
The nature of the title of the undersigned is: In fee.
A work or improvement on the property hereinafter described was complete on February 25, 1997.
The name of the contractor, if any, for such work or improvement is Carlsbad Seapointe Resort LP.
The property on which said work or improvement was completed is in the City of Carlsbad, County of San Diego,
State of California, and is described as follows: Between Carlsbad Boulevard and Avenida Encinas, south of
Palomar Airport Road. CT 93-10/O No. 94-0ZJoq
The street address of said property is NONE.
CARLSBAD MUNICIPAL WATER DISTRICT ;“Th /
WILLIAM E. PLUMMER, P.E.
District Engineer
VERIFICATION OF SECRETARY
I, the undersigned, say:
I am the Secretary of the Board of Directors, Carlsbad Municipal Water District, 5950 El Camino Real,
Carlsbad, California, 92008; the Board of Directors of said District on March 25 ,1%x--,
accepted the above described work as completed and ordered that a Notice of Completion be filed.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on w\a& 3 I , 19fi, at Carlsbad, California.
CARLSBAD MUNICIPAL WATER DISTRICT
CMWD 94-202 -- ALETHA L. RAUTENKRANZ /
06114195 Rev.
Exhibit 3
April 2, 1997
Gregory J. Smith
County Recorder
Post Office Box 1750
San Diego, CA 92112-4147
RE: NOTICES OF COMPLETION
Enclosed for recordation are the following described documents:
Notice of Completion
Aviara Land Associates
South of Aviara Parkway and west of Aviara Drive
CT 85-35(E)/CMWD No. 89503
Notice of Completion
Carlsbad Seapointe Resort LP
Between Carlsbad Boulevard and Avenida Encinas, south of Palomar Airport
Road
CT 93-lO/CMWD No. 94-2
Notice of Completion
Davidson Coscan Partners,
North of Batiquitos Drive between Kestrel Drive and Aviara Drive
CT 90-34/CMWD No. 91-509
Notice of Completion
Kaiza Poinsettia
Between Carlsbad Boulevard and Interstate 5, south of Poinsettia Lane
CT 94-l/CMWD No. 94-503
Also enclosed are instructions on how the City is to be billed for the recordation fees
incurred. Thank you for your assistance in this matter.
City Clerk
ALR:ijp
Enclosures
1200 Carlsbad Village Drive - Carlsbad, California 92008-1989 - (760) 434-2808
ITEMIZATION OF PUBLIC IMPROVEMENTS
SEAPOINTE RESORT CT 93-10
CMWD NO. 94-202
DWG NO. 341-2
WATER IMPRO!
ITEM
Sanitary Sewers Main 8” Pipe, PVC S-4
Sanitary Sewers Main 8’ Pipe, PVC S-4 (DWG 331-8)
Sanitary Sewer Misc 6” Laterals, 30 feet long S-l 3
Sanitary Sewer Misc Accesshole
Sanitary Sewer Misc Accesshole (DWG 331-8)
Water Mains 12” Pipe, PVC
Water Mains 12” Pipe, PVC (DWG 331-8)
Water Mains IO” Pipe, PVC
Water Mains 8” Pipe, PVC (DWG 331-8)
Water Valves 12” Gate Valve Assembly (DWG 331-8)
Water Valves IO” Gate Valve Assembly
Water Valves 8” Gate Valve Assembly (DWG 331-8)
Water Valves 6” Gate Valve Assembly (DWG 331-8)
Water Special Assemblies Fire Hydrant W-l 2
Water Special Assemblies 2’ A.V.A. W-6
Water Special Assemblies 2” Man. Air Release W-6 (DWG
Water Special Assemblies 2” Blow-off Assl’y W-6
Water Special Assemblies 2” Blow-off Assl’y W-6 (DWG 33
Water Misc 2” Water Service W-2
Water Misc 6” Fire Service
Water Misc Trench Resurfacing SDG-107,108
Water Misc Dry Tap Connection
Water Misc Wet Tap Connection (DWG 331-8)
Water Distribl
ZMENTS
UNITS 1 UNIT PRICE 1 TOTAL COST
377 LFI $ 29.00 1 $ 10,933.oo
863 LF $ 29.00 $ 25,027.OO
2 EA $ 780.00
3 EA $ 2’310.00 i
1,560.OO
6’930.00
3 EA $ 2,310.OO $ 6,930.OO
538 LF
619 LF : 36.00 36.00
$ 19,368.OO
$ 22,284.OO
1396 LF $ 31 .oo $ 43,276.OO
31 LF $ 25.00
3 EA $ 1,360.OO z
775.00
4,080.OO
1 EA ~ $ 1,250.oo 1,250.OO
1 EA : 820.00
3 EA : 820.00 630.00
2 EA $ 2,730.OO !
1,890.OO
5’460.00
3 EA !§ 1,800.OO 5,400.oo
2 EA $ 800.00 i 1,600.OO
2 EA 800.00 1,600.OO
2 EA i i 800.00 i 1,600.OO
2 EA !$ 1’090.00
3 EA I $ 1,200.00 i
2,180.OO
3,600.OO
1130 LF $ 11.50 $ 12,995.oo
1 EA $ 500.00
1 EA( $ 2,OOO.OO 1 ;
500.00
2,ooo.oo
ion Subtotal: $ 182,058.OO
15% Contingencies: $ 27,309.oo
WATER DISTRIBUTION TOTAL: $ 209,367.OO