HomeMy WebLinkAbout2002-09-10; Municipal Water District; 539; Approval to Appropriate Additional FundsI CARLSBAD MUNICIPAL WATER DISTRICT -AGENDA BILL
\B# 539
ITG.
TITLE: APPROVAL TO APPROPRIATE
IEPT. ENG
c1TYAl-W. WATER PIPELINE CROSSING AND OVERSIZING PIPELINE 9/10/02
ADDITIONAL FUNDS FOR THE INTERSTATE 5
IMPROVEMENTS IN MERMAID LANE AND NEPTUNE DRIVE
PROJECT NO. 36591
RECOMMENDED ACTION:
Adopt Resolution No. 1168 approving appropriation of additional funds for the additional
costs of the Interstate 5 water pipeline crossing and the oversizing water pipeline improvements in
Mermaid Lane and Neptune Drive, Project No. 36591,
ITEM EXPLANATION:
The Carlsbad Municipal Water District (District) has completed construction of a 16-inch diameter
water transmission main across Interstate 5 from Piovana Court west to Mermaid Lane. Mermaid
Lane is within a development constructed by Greystone Homes, Inc. (Greystone), referred to as
Poinsettia Shores Planning Area "C" and subsequently called "Santalina". The 16-inch diameter
transmission main continues through the Santalina development within Mermaid Lane, and then
Neptune Drive until connecting to an existing 16-inch diameter pipeline in Navigator Circle.
To provide water to the Santalina development, Greystone was required to construct a minimum
8-inch diameter pipeline in Mermaid Lane and Neptune Drive. Greystone agreed to oversize the
a 16-inch diameter. Greystone has constructed the 16-inch pipeline in Mermaid Lane and
pipelines with a reimbursement agreement to pay for oversizing cost from an 8-inch diameter to
Neptune Drive.
The District's Board of Directors approved a reimbursement agreement with Greystone on
July 18, 2000 with Resolution No. 1095. The District's reimbursement obligations are for the actual
costs of pipeline oversizing in Mermaid Lane and Neptune Drive.
Together, the costs for the Interstate 5 water pipeline crossing and water pipeline oversizing in
Mermaid Lane and Neptune Drive have exceeded the estimates for the improvements and also
exceeded the appropriated funds. An additional appropriation of $5,000 is necessary to cover the final costs of the project.
ENVIRONMENTAL REVIEW
The Planning Commission issued a Mitigated Negative Declaration for the Interstate 5 transmission
main on January 5, 2000. The water pipeline in Mermaid Lane and Neptune Drive were incorporated
into the environmental documentation and approval of a Negative Declaration for Poinsettia Shores
Planning Area C by the City Council on March 21, 2000 by Resolution No 2000-89.
FISCAL IMPACT:
The construction of the Interstate 5 water pipeline crossing was done through Public Works Contract No. 3659-1. Appropriations to Capital Improvement Project No. 3659-1 fund both the Interstate 5 waterline crossing and the oversizing of pipeline in Mermaid Lane and Neptune Drive. A total of
$982,000 has been appropriated for this project. The actual costs for the Interstate 5 water
transmission main and oversizing cost for the Mermaid Lane and Neptune Drive water pipeline have
exceeded the total estimated cost and the project's appropriated funding. An additional
appropriation from the Water Connection Fund of $5,000 is necessary to cover the total cost of the
project. The following table is a summary of the project cost.
I
Page 2 of Agenda Bill No. 539
EXHIBITS:
1. Location map.
2. Resolution No. 1168 approving appropriation of additional funds for the additional
costs of the Interstate 5 water pipeline crossing and the oversizing water pipeline
improvements in Mermaid Lane and Neptune Driw, Project No. 36591.
I LOCATION MAP
PROJECT NAME
3659- 1 & OVERSIZING WATER PIPELINE IN MERMAID LN & NEPTUNE DR
EXHIBIT PROJECT
INTERSTATE 5 WATER PIPELINE CROSSING NUMBER 7
/.. *,j , ,, ,::. ,,, ,. ,, ,, ., r , ., , ; , ,. ,,,;,,, .~ ,~ '2 .,., ,< , , , ,~< ,," : ~,,,, .,.!,:>,: '..1 . ,>< :, ,>,
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
-, 1 ,'I ' ' -
RESOLUTION NO. 1168
A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD
APPROPRIATION OF ADDITIONAL FUNDS FOR THE INTERSTATE 5
MUNICIPAL WATER DISTRICT (DISTRICT) APPROVING
WATER PIPELINE CROSSING AND OVERSIZING WATER PIPELINE
IMPROVEMENTS IN MERMAID LAND AND NEPTUNE DRIVE, PROJECT NO. 36591.
WHEREAS, the District has completed construction of the 16-inch diameter water
transmission pipeline across Interstate 5 from Piovana Court west to Mermaid Lane, continuing in
Mermaid Lane then into Neptune Drive; and
WHEREAS, that portion of the pipeline in Mermaid Lane and Neptune Drive are within a
development built by Greystone Homes, Inc., referred to as Poinsettia Shores Planning Area "C"
and subsequently called "Santalina" has been constructed by Greystone Homes, Inc.; and
WHEREAS, The Planning Commission issued a Mitigated Negative Declaration for the
Interstate 5 transmission main on January 5,2000; and
WHEREAS, The water pipeline in Mermaid Lane and Neptune Drive were incorporated
into the environmental documentation and approval of a Negative Declaration for Poinsettia
Shores Planning Area C (Santalina) by the City Council on March 21, 2000 by Resolution No
2000-89; and
WHEREAS, Greystone Homes, Inc., and the District entered into an agreement in which
the District would reimburse Greystone Homes, Inc., for construction cost to oversize Santalina's
8-inch diameter water pipelines in Mermaid Lane and Neptune Drive to a 16-inch diameter
pipeline; and
WHEREAS, appropriation of funds for this project was based on a preliminary cost
estimate for both the Interstate 5 water pipeline crossing and the oversizing of water pipeline in
Santalina; and
WHEREAS, costs for both the Interstate 5 crossing and oversizing of pipeline within
Santalina have exceeded the cost estimates and appropriated funds for the project; and
WHEREAS, to cover the District's ,reimbursement obligations to Greystone Homes, Inc.,
an additional appropriation of $5,000 from the Water Connection Fund is required; and
WHEREAS, the District's payment of the reimbursement obligations to Greystone Homes,
I Inc., is the final payment for costs relating to this project . I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
1
1
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad
Municipal Water District (CMWD) of the City of Carlsbad, California, as follows:
1. That the above recitations are true and correct:
2. That to cover the costs for this project, an additional appropriation of $5,000 is
necessary ;
3. That the appropriation increase of $5,000 from the Water Connection Fund to the
project is hereby approved:
4. That the Finance Director is authorized to appropriate $5,000 into the project
account.
PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad Municipal
Water District held on the W day of SEPTEMBER , 2002 by the following vote, to wit:
AYES: Board Members Lewis, Kulchin, Finnila, Hall
NOES: None
4TTEST
_W~lpd’ M. WOOD, Secretary
Page 2 of 2 of Resolution No. 1168
(SEAL)