AB# 632
MTG. 4/03/07
DEPT. ENG
APPROVAL OF AMENDMENT NO. 2 WITH
NOLTE ASSOCIATES, INC., AND INCREASE APPROPRIATION
FOR SAN MARCOS BOULEVARD WIDENING
PROJECT NO. 6005
DEPT. HEAD "j^T^T
CITY ATTY. $&-
CITY MGR. -^C\/
RECOMMENDED ACTION:
Adopt Resolution No.1295 approving and authorizing Amendment No. 2 to the
engineering services agreement with Nolte Associates, Inc., for construction management and
inspection services, and increase contingency and appropriation for the San Marcos Boulevard
Widening, Project No. 6005.
ITEM EXPLANATION:
Project - The work is located in San Marcos Boulevard and extends primarily from Business Park
Drive east to Rancho Santa Fe Road. The construction contract includes the San Marcos Boulevard
Water Transmission Main Replacement, Project No. 3956, and the San Marcos Boulevard Widening,
Project No. 6005. The District designed and is funding that portion of the project which replaces the
transmission main. The City of San Marcos designed and is funding the street widening portion of the
construction contract. The District awarded and is administering the construction contract, and is also
providing all construction management and inspection services through an agreement with the City of
San Marcos, approved by the Board under Resolution No. 1252, and executed on July 15, 2005.
The following recommended appropriation increase only impacts the San Marcos Boulevard
Widening, Project No. 6005.
Amendment No. 2 to Nolte Associates, Inc. - On January 17, 2006, the Board adopted Resolution
No. 1267, accepting and approving the proposal from Nolte Associates, Inc., for construction
management and testing services for the San Marcos Boulevard Water Transmission Pipeline
Replacement project and the San Marcos Boulevard Widening project. The District and
Nolte Associates, Inc., entered into an agreement for construction management and inspection
services for the not-to-exceed amount of $250,263. The District's share in this budget is $129,729 and
San Marcos' share is $120,534. The cost share for these services are based on a ratio of construction
cost for the two projects.
Amendment No. 1 in the amount of $60,500 was executed on December 19, 2006. The cost share of
Amendment No. 1 was $31,364 for Project No. 3956 and $29,136 for Project No. 6005. During the
course of construction, several unanticipated conflicts were discovered causing delays in the
completion date of the construction contract. The current projected completion date is July 5, 2007.
The utilization of Nolte Associates, Inc., services beyond the originally contemplated 10 months
construction schedule necessitates Amendment No. 2 in the amount of $64,000. The District's share
of Amendment No. 2 is $33,178, and San Marcos' share is $30,822.
FOR CITY CLERKS USE ONLY.
BOARD ACTION: APPROVED
DENIED
CONTINUED
WITHDRAWN
AMENDED
nn
Dn
CONTINUED TO DATE SPECIFIC D
CONTINUED TO DATE UNKNOWN D
RETURNED TO STAFF D
OTHER - SEE MINUTES D
Page 2
Change Order for the San Marcos Boulevard Widening, Project No. 6005 - It was discovered
during construction that a portion of the southerly curb and gutter on San Marcos Boulevard had to be
redesigned, at the request of the City of San Marcos, as well as the adjacent retaining wall, slopes,
and facilities. The redesign work was completed by San Marcos and a construction change order
proposal was obtained from the contractor. The additional unforeseen work requires additional funds
to be appropriated for the San Marcos Boulevard Widening in the amount of $146,437. In addition,
staff is recommending $133,093 for future unforeseen change orders. This results in a need to
increase the contingency for the San Marcos Boulevard Widening portion of the construction
contract from $209,423 to $459,423, or $250,000. In accordance with Section I B7 of the agreement
with the City of San Marcos, the Public Works Director for the City of San Marcos has reviewed and
approved the change order work and concurs in increasing the project's contingency by $250,000
(see attached letter).
Appropriation Increase for the San Marcos Boulevard Widening, Project No. 6005 - The $59,958
cost increase for construction management, inspection, and material testing (Nolte Associates, Inc.),
and the contingency increase of $250,000, results in a need to increase the total appropriation
for the street widening portion of the project by $309,958. This will increase the appropriation for
Project No. 6005 from $2,424,189 to $2,734,147 (Table 1). All funds allocated and expended for the
construction of the roadway work will be reimbursed by the City of San Marcos under the existing
agreement between the District and City of San Marcos.
ENVIRONMENTAL IMPACT:
The City of San Marcos is the lead agency for environmental review. A Mitigated Negative Declaration
was prepared by the City of San Marcos in accordance with California Environmental Quality Act
(CEQA) guidelines. The CMWD San Marcos Boulevard Water Transmission Main Replacement,
Project No. 3956, was included in the Mitigated Negative Declaration for the widening project.
Since the project is located within the City of San Marcos, the City of Carlsbad does not have
regulatory jurisdiction.
FISCAL IMPACT:
The revised total cost of constructing the San Marcos Boulevard Widening Project is shown in
Table 1. This table reflects two changes that include an increase to the construction management
budget by $59,958 and increasing the construction contingency budget by $250,000. Combining the
two cost increases results in a need to increase the appropriation for Project No. 6005 by $309,958.
No adjustment is required for the San Marcos Boulevard Transmission Main, Project No. 3956
appropriation.
TABLE 1
SAN MARCOS BOULEVARD WIDENING PROJECT, PROJECT NO. 6005
Construction Contract (J. Fletcher Creamer & Sons, Inc.)
Change Order Total to Date
Proposed Change Order
Budget for Future Change Order (s)
Subtotal
Current Construction Contingencies Appropriation
Requested Contingency Increase Amount
Construction Management, Inspection, and Material Testing (Nolte Associates)
Amendment No. 1 ($60,500 x 48.16%)
Amendment No. 2 ($64,000 x 48.16%)
Total San Marcos Share of Cost
TOTAL COST
CURRENT APPROPRIATION
ADDITIONAL APPROPRIATION REQUESTED
$2,094,232
$179,893
146,437
133.093
459,423
209.423
$250,000
$120,534
29,136
30.822
$180,492
! .2,734,147
U2,424,189
$309,958
PageS
EXHIBITS:
1. Location Map.
2. Resolution No. 1295 approving and authorizing Amendment No. 2 to the
engineering services agreement with Nolte Associates, Inc., for construction management and
inspection services, and increase contingency and appropriation for the San Marcos Boulevard
Widening, Project No. 6005.
3. Letter from City of San Marcos.
4. Amendment No. 2 to Engineering Services Agreement with Nolte and Associates, Inc.,
for construction management and inspection services for construction of San Marcos
Boulevard Water Transmission Pipeline Replacement, Project No. 3956, and San Marcos
Boulevard Widening, Project No. 6005.
DEPARTMENT CONTACT: William Plummer, (760) 602-2768, bplum@ci.carlsbad.ca.us
3
LOCATION MAP
CITY OF OCEANSIDE
HIGHWAY,*?
PACIFIC
OCEAN
NOT TO SCALE
\\
\\
SITE
PROJECT NAME
SAN MARCOS BOULEVARD WATER TRANSMISSION PIPELINE
REPLACEMENT AND STREET WIDENING
PROJECTNUMBER
3956 &
6005
EXHIBIT
1
DRAWN BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 3/5/07 C: \CAPITAL\AHLES\3956-6005.DWG
1
RESOLUTION NO. 1295
2
A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD
3 MUNICIPAL WATER DISTRICT (CMWD), APPROVING AMENDMENT
NO. 2 TO ENGINEERING SERVICES AGREEMENT WITH
4 NOLTE ASSOCIATES, INC., FOR CONSTRUCTION MANAGEMENT
AND INSPECTION SERVICES, AND INCREASE THE APPROPRIATION
5 FOR SAN MARCOS BOULEVARD WIDENING. PROJECT NO. 6005.
6 WHEREAS, a funding and administration agreement was approved by Resolution No.
7 1252, dated July 15, 2005, between the City of San Marcos and CMWD for the San Marcos
8 Transmission Main Replacement, and the San Marcos Boulevard Widening Project; and
9 WHEREAS, on January 17, 2006, by Resolution No. 1267, the Board of Directors of the
10 Carlsbad Municipal Water District awarded the construction contract for the San Marcos
Transmission Main Replacement, Project No. 3956, and the San Marcos Widening, Project No.
6005, and approved an engineering services agreement with Nolte Associates, Inc., to provide
13 construction management and inspection services; and
14 WHEREAS, it is necessary to increase the construction management budget by $59,958
for Nolte Associates, Inc., for the San Marcos Widening, Project No. 6005; and
WHEREAS, it is necessary to increase construction contingency of the San Marcos
Widening, Project No. 6005, by an amount of $250,000, which has been approved by the
1R Public Works Director of the City of San Marcos; and
19 WHEREAS, it is therefore necessary to increase the total appropriation for the San Marcos
on Boulevard Widening, Project No. 6005, by an amount of $309,958.
21 NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal
22 Water District (CMWD) of the City of Carlsbad, California, as follows:
po 1. That the above recitations are true and correct.
2. That the Executive Manager is hereby authorized to execute Amendment No. 2
25 with Nolte Associates, Inc., for a total amount of $64,000.
26 ///
27 ///
28
1 3. That the contingency for construction of the San Marcos Widening, Project No.
2 6005, shall be increased by $250,000 and the Executive Manager is hereby authorized to
3 approve construction change orders up to $459,423 for Project No. 6005.
4 4. That the appropriation for construction of the San Marcos Boulevard Widening,
5 Project No. 6006, shall be increased by $309,958 to a total amount of $2,734,147.
6 5. That the Finance Director is authorized to appropriate an additional $309,958 from
7 the General Capital Construction Fund for the San Marcos Boulevard Widening, Project No.
6005, with the understanding that the City of San Marcos will reimburse the City of Carlsbad8
based on monthly progress payments approved by the City of Carlsbad,y ///10
///11
12 '"
13 '"
14 '"
15 '"
16 '"
17 '"
18 '"
19 '"
20 '"
21 "I
22 "/
23 "I
24 ///
25 ///
26 ///
27 ///
28 ///
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of
Directors of the Carlsbad Municipal Water District of the City of Carlsbad on the 3rd day
of April, 2007, by the following vote:
AYES: Board Members Lewis, Kulchin, Hall, Packard
NOES: None
ABSENT: None
, President
ATTEST:
.\EJOfl lUK^i ISAJVfrt) M
LORfRAINE M. WOOD, Secretary
(SEAT)
Public Works Department
201 Mata Way
San Marcos, CA 92069-2948
3
Telephone
760. 752.7550
FAX: 760. 752.7578
March 8, 2007
Mr. Bill Plumber
Deputy City Engineer
City of Carlsbad
1635 Faraday Ave.
Carlsbad, CA. 92008
SUBJECT:
Dear Bill,
SAN MARCOS BL. TRANSMISSION MAIN AND ROAD IMPROVEMENTS
CMWD PROJECT NO. 3956 AND COSM CIP NO. 274
INCREASE TO COSM CONSTRUCTION CONTINGENCY
I have revised this letter of authorization at Mr. John Maashoff s request by changing the
construction contingency amount from $175,000.00 to $250,000.00. Please disregard the
3/2/07 letter of authorization.
I have reviewed and approve the work order items No. 1-7 and 9 in Change Order No.5 to
Fletcher Creamer and Sons contract for $146,437.00. Per the reimbursement dated July
15, 2005, Section 1B7, I authorize the construction contingency to be increased by
$250,000.00 (two hundred fifty thousand dollars and no cents).
Respectfully,
Michael Mercereau
Public Works Director
cc: Jim Chafe, Construction Manager
Jim Bozer, Project Manager
Mike Edwards, City Engineer
CITYCpUNCIL:
Jim Desmond, Mayor Hal Martin, Vice-Mayor Mike Preston
O Printed on 30% post-consumer recycled paper
Chris Orlando Rebecca Jones
6
4
AMENDMENT NO, 2 TO AGREEMENT FOR CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES ON THE SAN MARCOS BOULEVARD TRANSMISSION MAIN
(PROJECT NO. 39561) AND SAN MARCOS BOULEVARD WIDENING (PROJECT NO. 6005)
(NOLTE ASSOCIATES, INC.)
This Amendment No, 2 is entered into and effective as of the .JT. day of
, 2007, amending the agreement dated
January 18,2006 (the "Agreement") by and between the Carlsbad Municipal Water District,, a
Public Agency organized under the Municipal Water Act of 1911, and a Subsidiary District of the
City of Carlsbad, referred to as f CMWD"}, and NOLTE ASSOCIATES, INC., ("Contractor")
(collectively, the "Parties") for construction management and inspection services on the San
Marcos Boulevard Transmission Main (PROJECT NO, 30561 ) AND SAN MARCOS
BOULEVARD WIDENING (PROJECT NO. 6005}
RECITALS
A. The Parties desire to alter the Agreement's compensation to increase the
allowable Agreement amount $84,000 fora total Agreement amount of $374,763; and
B, Due to changes in the anticipated time of completion for the construction project,
the Parties have negotiated and agreed to supplemental compensation in an amount not to
exceed $64,000,00.
NOW, THEREFORE, in consideration of these recitals and the mutual covenants
contained herein, CMWD and Contractor agree as follows
1. CMWD will pay Contractor for all work associated with those services described
in Exhibit "A" of the original agreement dated January 18, 2008, on a time and materials basis
• not-to-exceed three hundred seventy four thousand seven hundred sixty three dollars
($374,763), Contractor will provide CMWD, on a monthly basis, copies of invoices sufficiently
detailed to include hours performed, hourly rates, and related activities and costs for approval by
CMWD.
2. Contractor wilt complete all work described in the original agreement, as
amended by amendment no. 1, and as amended by this amendment no. 2, by January 18, 2008.
3. All other provisions of the Agreement, as may have been amended from time to
time, will remain in full force and effect,
4. All requisite insurance policies to be maintained by Contractor pursuant to the
Agreement, as may have been amended from time to time, will include coverage for Shis
Amendment,
•General Counsel Approved Version #07.05,01
6. The individuals executing this Amendment and the instruments referenced in it on
behalf of Contractor each represent and warrant that they have the legal power, right and actual
authority to bind Contractor to the terms and conditions of this Amendment.
CARLSBAD MUNICIPAL WATER
DISTRICT, a Public Agency organized
under the Municipal Water Act of 1911,
and a Subsjjdjary p»frict of the City of
Carlsbad
By:(print name/title)
\ II*
(e-mail address)
*By:
(sign here)
(print name/title)
tTORRAINE M. WOOD
Secretary
VVVVO ** = • <•c^v?^"".£ -$?••*-ccj.-v= Si*= ^\0
p'^r?,;m^••r-fl-^&-.a-grt • —~ ~^/eo r
(e-mail address)x/>//'/,
If required by CMWD, proper notarial acknowledgment of execution by contractor must be
attached. If a Corporation. Agreement must be signed by one corporate officer from each of the
following two groups.
•Group A.
Chairman,
President, or
Vice-President
**Group B.
Secretary,
Assistant Secretary,
CFOor
Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant
secretary under corporate seal empowering the officer(s) signing to bind the corporation.
APPROVED AS TO FORM:
RONALD R. BALL, General Counsel
'Deputy General O^jnsel
General Counsel Approved Version #07.05.01
I/
6. The individuals executing this Amendment and the instruments referenced in it on
behalf of Contractor each represent and warrant that they have the legal power, right and actual
authority to bind Contractor to the terms and conditions of this Amendment.
CARLSBAD MUNICIPAL WATER
DISTRICT, a Public Agency organized
under the MunicipalWater Act of 1911,
and a Subf^iaryjB^strapt of the City of
Carlsbad/
SrTJtereJ
i^kOo'U.yOJPO
(print name/title)
LORRAINE M. WCNDO
Secretary
(e-mail address)
If required by CMWD, proper notarial acknowledgment of execution by contractor must be
attached, lf.a,,CQffi:gratJ.OD, Agreement must be signed by one corporate officer from each of tie
following two groups.
*0roup A.
Chairman,
President, or
Vice-President
**Group B.
Secretary,
Assistant Secretary,
CFOor
Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant
secretary under corporate seal empowering the officers) signing to bind the corporation,
APPROVED AS TO FORM:
RONALD R, BALL, General Counsel
Genera! Counsel Approwd Version f 07.05.01
/f.