HomeMy WebLinkAbout2007-09-18; Municipal Water District; 640; Maerkle Reservoir Rainwater SystemCARLSBAD MUNICIAPAL WATER DISTRICT - AGENDA
1
AB# 640
MTG. 9/18/07
DEPT. ENG
AWARD OF CONTRACT FOR
MAERKLE RESERVOIR COVER INSPECTION, CLEANING,
REPAIR AND RAINWATER SYSTEM UPGRADE,
PROJECT NO. 5005
DEPT. HEAD,/) -p^
CITYATTY. £Z&_
CITY MGR. "3^
RECOMMENDED ACTION:
Adopt Resolution No.1305 accepting bids and awarding the contract to
Layfield Environmental Systems Corporation for the Maerkle Reservoir Cover Inspection, Cleaning,
Repair, and Rainwater System Upgrade, Project No. 5005.
ITEM EXPLANATION:
Maerkle Dam is located near the eastern edge of Carlsbad, approximately two miles north of
Palomar Airport Road. The reservoir behind Maerkle Dam is a 200 million gallon potable water
storage facility with a flexible polypropylene floating cover and an asphaltic concrete liner. The floating
cover was installed in 1998 to meet California Department of Health Services (CDHS) requirements.
The cover is 45 millimeters thick and covers a surface area of about 16 acres when the reservoir is
full. The major components of the cover include floats for buoyancy, an access system made up of
19 hatches, and a rainwater removal system made up of eight in-sump pumps and approximately
2,000 feet of discharge hoses.
In 2006, CDHS performed an inspection of the cover and requested certain repair and maintenance
activities be undertaken. Project No. 5005 will meet the requirements of the CHDS through an
inspection, cleaning, and repair of the floating cover and the replacement and upgrade of the
rainwater removal system. The rainwater system has reached its useful life and is experiencing hose
leaks and pump failures. Since the reservoir contains treated drinking water, failures of the rainwater
systems could cause water contamination and expose Carlsbad Municipal Water District (CMWD) to
CDHS actions that could result in fines for non-compliance to State health requirements.
On June 19, 2007, through the adoption of Resolution No. 1299, the CMWD Board authorized the
advertisement to receive bids for the Maerkle Reservoir Cover, Project No. 5005.
On August 7, 2007, one (1) sealed bid was received for the construction of this project, which is
summarized below:
- - .- • . • , >H CONTRACTOR: v^n^ .*-.: --
1 . Layfield Environmental Systems Corporation
crrwsTATi;
El Cajon, CA
^TOFAliSv:*-
$168,693
The Engineer's Estimate for this project is $140,000. The bid submitted by Layfield Environmental
Systems Corporation is 20.5% higher than the Engineer's Estimate. The work involving the floating
cover is very specialized. As such, there are very few contractors with experience in this field.
Therefore, requesting new bids will not result in an increased number of bidders or a lower
construction cost.
Staff has completed its review of all documents and finds that they are' in order. Therefore, staff
recommends that Layfield Environmental Systems Corporation be awarded the contract.
FOR CITY CLERKS USE ONLY.
COUNCIL ACTION:APPROVED M
DENIED D
CONTINUED D
WITHDRAWN D
AMENDED D
CONTINUED TO DATE SPECIFIC D
CONTINUED TO DATE UNKNOWN D
RETURNED TO STAFF D
OTHER - SEE MINUTES D
Page 2
ENVIRONMENTAL IMPACT:
The project is a Class 2 categorical exemption (replacement or reconstruction of existing structures or
facilities) and is, therefore, exempt from the environmental review process under provision of the
California Environmental Quality Act (CEQA) Section 15302(c).
FISCAL IMPACT:
The estimated costs associated with this project are summarized in the following table.
TABLE 1 - PROJECT COST ESTIMATE
"z MAERKLE RESERVOIR FLOATING COVER/ PROJECT NOf^OS-
Total Design Cost
Construction (Layfield Environmental Systems Corporation)
Construction Contingency (8%)
Construction Management and Inspection (5%)
TOTAL ESTIMATED PROJECT COSTS
FY 06/07 APPROPRIATION
-.^EOT^tEafc
„ ^ <>> ^Co^ -;» e^Tfii™^^^^.*^
$9,500
$168,693
$13,300
$8,500
$199,993
$200,000
Sufficient funds are available to complete the project.
EXHIBITS:
1. Location Map.
2. Resolution No. 1305 accepting bids and awarding the contract to
Layfield Environmental Systems Corporation for the Maerkle Reservoir Cover Inspection,
Cleaning, Repair, and Rainwater System Upgrade, Project No. 5005.
DEPARTMENT CONTACT: Eva Plajzer, 760-602-2787 eplai@ci.carlsbad.ca.us
LOCATION MAP
NOT TO SCALE
SITE
PROJECT NAME MAERKLE DAM FLOATING COVER
RAINWATER SYSTEM REPLACEMENT
EXHIBIT
1
DRAWN BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 11/20/06 C:\CAPITAL\PLAJZER\UAERKLE DAM COVER.DWG
1
RESOLUTION NO. 1305
2
A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD
3 MUNICIPAL WATER DISTRICT (CMWD), ACCEPTING BIDS AND
AWARDING A CONTRACT FOR THE MAERKLE RESERVOIR
4 COVER INSPECTION, CLEANING, REPAIR, AND RAINWATER
SYSTEM UPGRADE. PROJECT NO. 5005.
5
WHEREAS, the Board has determined it necessary and in the public interest to
6
implement the Maerkle Reservoir Cover Inspection, Cleaning, Repair, and Rainwater System
Upgrade, Project No. 5005; and
8 WHEREAS, on June 19, 2007, through the adoption or Resolution No. 1299, the Board
9 approved plans and specifications for furnishing of all labor, materials, tools, equipment,
10 transportation, and other expenses necessary or incidental to the Maerkle Reservoir Cover
Inspection, Cleaning, Repair, and Rainwater System Upgrade, Project No. 5005; and
WHEREAS, one (1) sealed bid was received on August 7, 2007 by the CMWD for the
12
construction of said project; and
13 WHEREAS, the lowest responsive and responsible bid to construct said project was
'^ submitted by Layfield Environmental Systems Corporation, in the amount of $168,693; and
15 WHEREAS, there are sufficient funds available in the Water Replacement Fund to
16 complete the project.
17 NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board
of the City of Carlsbad, California, as follows:
18
1. That the above recitations are true and correct.
19 2. That the bid in the amount of $168,693 submitted by Layfield Environmental
20 Systems Corporation, for the construction of Maerkle Reservoir Cover Inspection, Cleaning,
21 Repair, and Rainwater System Upgrade, Project No. 5005, is accepted and the President is
22 hereby authorized to execute a contract with Layfield Environmental Systems Corporation.
23 3. That the Executive Manager is hereby authorized to approve construction
change orders up to $13,300.
4. That the award of this contract is contingent upon the bidder submitting the
25
lowest responsible bid executing the required contract and submitting the required bonds and
pc
insurance policies, as described in the contract, within twenty (20) days of adoption of this
27 resolution. The Executive Manager may grant reasonable extensions of time.
28
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of
Directors of the Carlsbad Municipal Water District of the City of Carlsbad on the 18th
day of September, 2007, by the following vote to wit:
AYES: Board Members Lewis, Kulchin, Hall, Packard and Nygaard.
NOES: None.