HomeMy WebLinkAbout2009-07-28; Municipal Water District; 690; Maerkle pump station upgrade projectCARLSBAD MUNICIPAL WATER DISTRICT - AGENDA BILL
AB# 690
MTG. 07/28/09
DEPT. ENG
APPROVAL OF PLANS AND AUTHORIZATION TO
ADVERTISE FOR BIDS FOR THE CONSTRUCTION
OF MAERKLE PUMP STATION UPGRADE
PROJECT NO. 5009-B
DEPT. HEAD/ j^fj"
CITY ATTY. <@.
CITYMGR. (fc^_—
RECOMMENDED ACTION:
Adopt Resolution No. 1366 approving plans and specifications for the construction of
Maerkle Pump Station Upgrade Project No. 5009-B.
ITEM EXPLANATION:
Maerkle Dam reservoir and its auxiliary facilities are located in the northeast part of the City and are a
critical part of the potable water supply system for the City. Maerkle Dam reservoir (formerly known as
Squires Dam reservoir) was initially constructed in 1963. In the late 1980's and early 1990's, various
auxiliary facilities were added, including a 10 million gallon concrete storage tank, transmission
pipelines, a 33.5 million gallons per day pump station, and chlorination facilities.
In May 2007, staff commissioned a study to evaluate all the facilities at Maerkle Dam reservoir.
The study report identified 20 priority items that need replacement to meet current code requirements
for health and safety and to maintain reliability of this water supply source. These items were
presented to the Board via Agenda Bill No. 645 on December 11, 2007, and are summarized in
Exhibit 2. Additional agenda bills will be presented to the Board for consideration when the plans and
specifications are completed and appropriate implementation schedule windows are identified.
This project involves high priority items 2 and 19. Item 2 replaces and upgrades electrical components
at the pump station, such as variable frequency drives, switches, soft starters, controls, relays, lights,
etc. The existing pumps were constructed in 1992. The existing units are requiring increased attention
to remain operable and have reached the end of their useful life. To minimize the risk of pump failure
and inability to deliver water, the existing electrical components need to be replaced. Item 19 provides
for improvements at the two existing gates to the site to provide for a more secure site.
ENVIRONMENTAL IMPACT:
This project is a Class 2 categorical exemption (replacement or reconstruction of existing structures or
facilities) and is, therefore, exempt from environmental review pursuant to Section 15302 of the
California Environmental Quality Act (CEQA).
FISCAL IMPACT:
The Engineer's Estimate for the cost to construct the replacements and upgrades to the pump station
and gates at Maerkle Facility is shown in the table below.
DEPARTMENT CONTACT: Eva Plajzer 760-602-2787 eplai@ci.carlsbad.ca.us
FOR CITY CLERKS USE ONLY
BOARD ACTION: APPROVED
DENIED
CONTINUED
WITHDRAWN
AMENDED
Xnn
D
n
CONTINUED TO DATE SPECIFIC
CONTINUED TO DATE UNKNOWN
RETURNED TO STAFF
OTHER - SEE MINUTES
Dn
n
n
Page 2
ITEM
Items 2 & 19 Design Cost
Items 2 & 19 Estimated Construction Cost
Contingency for Construction of Items 2 & 19 (10%)
Inspection for Construction of Items 2 & 19 (10%)
ESTIMATED TOTAL COST FOR ITEMS 2 &19
Design Cost for Remaining Items in Exhibit 2
Construction Budget for Remaining Items in Exhibit 2
Contingency Budget for Remaining Items in Exhibit 2
Inspection Budget for Remaining Items in Exhibit 2
ESTIMATED PROJECT TOTAL COST
CURRENT APPROPRIATION
ADDITIONAL APPROPRIATION NEEDED
ESTIMATED COSTS
$55,000
$330,000
$33,000
$33,000
$451,000
$200,000
$1,236,800
$123,700
$123,700
$2,135,200
$2,135,200
$0
Sufficient funds exist in the Water Replacement Fund to construct these improvements. There are
also sufficient funds for the remaining items in Exhibit 2.
Staff placed this project on the projects' list for economic recovery funding under the California
Department of Public Health's Drinking Water Program. Even though this project was listed on the
priority list, the economic recovery funding program did not have sufficient funds for the project.
Staff recommends approving the plans and specifications and authorizing the City Clerk to advertise
for bids for the construction of Maerkle Pump Station Upgrade Project No. 5009-B.
This project will be advertised with prevailing wage requirements because it is a CMWD project and
not subject to the City of Carlsbad charter regulations.
EXHIBITS:
1. Location Map.
2. Maerkle Dam Reservoir Facility Prioritization List.
3.Resolution No.1366 Approving Plans and Specifications and Authorizing to
Advertise for Bids for the Construction of Maerkle Pump Station Upgrade Project No. 5009-B.
LOCATION MAP
S/7E
NOT TO SCALE
PROJECT NAME
MAERKLE PUMP STATION
UPGRADE PROJECT
PROJECT
NUMBER
50096
EXHIBIT
1
DRAWN BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 2/18/09 H:\CAPITAL IMPROVEMENT PROGRAM\5009 UAERKLE SITE IHPROVEMENTS\PLANS * EXHIBIJS\5009A.DWG
EXHIBIT 2
Maerkle Dam Reservoir Facility Prioritization List
Item
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Item
Replace controls and PLC for pump station
Replace VFDs and switchgear for pump station
Replace/reinstall discharge piping air valves
Repair leak in 10 MG tank
Replace joint sealant in 10 MG tank (west bay)
Replace flow meter
Replace chlorine dioxide generator
Install SCADA monitoring system to chlorine dioxide
generator
Replace ammonia/monochlorite analyzer
Install ammonia chillers
Remove existing scrubber and install dry type scrubber
Remove existing scrubber and install dry type scrubber
Remove chlorine evaporator and pressure chlorine gas
system
Remove chlorine evaporator and pressure chlorine gas
system
Replace joint sealant in 10 MG tank (east bay)
Install SCADA control of chloramine dosing system
Install security lighting on access road
Install security cameras (connected to SCADA) at gates,
pump station, tank, upper and lower disinfection facilities,
and reservoir.
Install automatic rolling gate
Underwater inspection of floating cover
Location
Pump Station
Pump Station
Pump Station
lOMGTank
lOMGTank
Pump Station
Upper Disinfection Facility
Upper Disinfection Facility
Lower Disinfection Facility
Lower Disinfection Facility
Upper Disinfection Facility
Lower Disinfection Facility
Upper Disinfection Facility
Lower Disinfection Facility
lOMGTank
Lower Disinfection Facility
General Site
General Site
General Site
200 MG Reservoir
Implementation
Priority
1
1
2
1
2
2
1
1
1
1
1
1
2
2
2
2
2
2
1
1
Status
Completed
Requesting approval to bid
Completed
Completed
Under investigation
Under investigation
Completed
Under design
Completed
Completed
Under construction
Under construction
Completed
Completed
Under investigation
Completed
Under investigation
Under investigation
Requesting approval to bid
Completed
RESOLUTION NO. 1366
2
A RESOLUTION OF THE BOARD OF DIRECTORS OF
3 CARLSBAD MUNICIPAL WATER DISTRICT (CMWD),
APPROVING PLANS AND SPECIFICATIONS AND
4 AUTHORIZING TO ADVERTISE FOR BIDS FOR THE
CONSTRUCTION OF MAERKLE PUMP STATION UPGRADE
5 PROJECT NO. 5009-B.
6 WHEREAS, the Board has determined it necessary and in the public interest to construct
7 the electrical component at Maerkle Pump Station and update the entrance gates to the site; and
8 WHEREAS, the plans and specifications for furnishing of all labor, materials, tools,
9 equipment, transportation, and other expenses necessary and incidental to the construction of the
10 Maerkle Pump Station Upgrade Project NO. 5009-B have been prepared and are on file in the
11 Engineering Department of the City of Carlsbad and are incorporated by reference herein; and
12 WHEREAS, the project is a Class 2 categorical exemption (replacement or reconstruction
13 of existing structures or facilities) and is, therefore, exempt from environmental review pursuant to
14 Section 15302 of the California Environmental Quality Act (CEQA); and
'^ WHEREAS, there are sufficient funds in the Water Replacement Fund to complete the
16 project.
17 NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board
18 of Directors of the City of Carlsbad, California, as follows:
19 1. That the above recitations are true and correct.
20 2. That the plans, specifications, and contract documents for the construction of the
21 Maerkle Pump Station Upgrade Project NO. 5009-B, on file in the Public Works-Engineering
22 Department of the City of Carlsbad are hereby approved.
3. The Secretary of the Carlsbad Municipal Water District is hereby authorized and
directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the
24
construction of the Maerkle Pump Station Upgrade Project NO. 5009-B, in accordance with the
25
plans, specifications, and contract documents referred to herein.
26 ///
27 ///
28 in
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Special Meeting of the Carlsbad
Municipal Water District of the City of Carlsbad on the 28th day of June 2009, by the
following vote, to wit:
AYES:
NOES:
ABSENT:
Board Members Lewis, Kulchin, Hall, Packard, Blackburn
None
None
CLAUDE A. LEWIS, PRESIDENT
ATTEST:
Karen R. Kundtz, Assist
(SEAL)
CRETARY
Secretary