HomeMy WebLinkAbout2015-01-13; Municipal Water District; 797; Recycled Water Pipeline Expansion Contractp4 cegis
CARLSBAD MUNICIPAL WATER DISTRICT -AGENDA BILL
AB# 797 APPROVAL OF RESOLUTION ACCEPTING BIDS DEPT.DIRECTOR
MTG. 01-13-15 AND AWARD OF CONTRACT FOR CONSTRUCTION GEN. COUNSEL
DEPT. PW-UTIL OF THE RECYCLED WATER PIPELINE EXPANSION CITY MGR.
SEGMENT NO. 18. PROJECT NO.5208
RECOMMENDED ACTION:
W 04
Approval to adopt Resolution No. 1512 accepting bids and awarding a contract for
the construction of the Recycled Water Pipeline Expansion Segment No. 18, located within Palmer Way
and Impala Drive, north of Faraday Avenue, Project No. 5208.
ITEM EXPLANATION:
The project is located along Palmer Way and extends north from Faraday Avenue to Impala Drive, then
west along Impala Drive to Orion Street. The project is part of the Phase III Recycled Water Project. The
pipeline includes the construction of approximately 720 linear feet of 8-inch diameter polyvinyl chloride
(PVC) pipeline, and approximately 1,550 linear feet of 6-inch diameter PVC Pipeline and recycled water
services. Recycled water in this pipeline segment will be used for landscape irrigation.
On November 18, 2014, eight sealed bids were received for the construction of this project as shown on
the following table. The engineer's estimate was $500,000.
CONTRACTOR
TOTAL BID
Burtech Pipeline Inc.
$371,833.87
GRFCO Inc.
$384,250
Transtar Pipeline, Inc.
$389,430
Shaw Equipment Rentals Inc.
$407,364
Rich Construction Inc.
$432,555
Palm Engineering Construction Company
$472,070
Piperin Corporation
$532,620
Wier Construction Corporation
$559,272
DEPARTMENT CONTACT: David Ahles at 760-602-2748 or email davidahles@carlsbadca.gov
FOR SECRETARY USE.
BOARD ACTION: APPROVED
JS
CONTINUED TO DATE SPECIFIC
❑
DENIED
❑
CONTINUED TO DATE UNKNOWN
❑
CONTINUED
❑
RETURNED TO STAFF
❑
WITHDRAWN
❑
OTHER — SEE MINUTES
❑
AMENDED
13
REPORT RECEIVED
13
Recycle Water Pipeline Contract
January 13, 2015
Page 2 of 2
The lowest responsive bidder, Burtech Pipeline Inc., submitted a bid in the amount of $371,833.87. Staff
has completed its review of the contract documents and has determined that Burtech Pipeline Inc. is the
confirmed low bidder and their bid documents are responsive. Staff recommends that Burtech Pipeline
Inc. be awarded the contract.
FISCAL IMPACT:
An Engineer's Estimate of the construction cost of Recycled Water Pipeline Expansion Segment No. 18,
Project No. 5208 was prepared and totals $500,000. The project's construction contract will be with
CMWD. A summary of estimated construction costs and available funds is shown in Table 1.
TABLE 1— PROJECT CONSTRUCTION COST ESTIMATE
RECYCLED WATER PIPELINE EXPANSION SEGMENT NO. 18, PROJECT NO. 5208
ESTIMATED COSTS
Construction Contract (Burtech Pipeline Inc.)
$371,834
Construction Contingency
$50,000
Construction Management, Inspection, and Material Testing
$50,000
TOTAL ESTIMATED CONSTRUCTION COSTS (Segment 18)
$471,834
Current Appropriation- Recycled Water Pipeline Expansion Segments,
Project No. 5208
$10,100,000
Current Expenditures/Encumbrances- Recycled Water Pipeline Expansion
Segments, Project No. 5208
$194,129
TOTAL AVAILABLE PHASE III PIPELINE PROGRAM, CIP NO. 5208
$9,905,871
ADDITIONAL APPROPRIATION FOR CONSTRUCTION
None
Sufficient funds have been appropriated from the Recycled Water Fund to fund this project.
ENVIRONMENTAL IMPACT:
The Recycled Water Pipeline Expansion Segment No. 18 is part of the Phase III Recycled Water Project.
An environmental impact assessment was conducted for the Phase III Recycled Water Project, and a
Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program was approved by the
Board through Resolution No. 1455, on November 27, 2012.
PUBLIC NOTIFICATION:
None required.
EXHIBITS:
1. Resolution No. 1512 accepting bids and awarding the contract to Burtech Pipeline
Inc. for the construction of the Recycled Water Pipeline Expansion Segment No. 18, Project No. 5208.
2. Location Map.
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
EXHIBIT 1
RESOLUTION NO. 1512
A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD
MUNICIPAL WATER DISTRICT (CMWD), ACCEPTING BIDS AND
AWARDING THE CONTRACT TO BURTECH PIPELINE INC. FOR THE
RECYCLED WATER PIPELINE EXPANSION SEGMENT NO. 18,
LOCATED WITHIN PALMER WAY AND IMPALA DRIVE, PROJECT
NO. 5208
WHEREAS, the Board of Directors of the Carlsbad Municipal Water District, California
has determined it necessary, desirable, and in the public interest to construct an 8-inch and 6- 1
inch recycled water pipeline in Palmer Way and Impala Drive; and
WHEREAS, an environmental impact assessment was conducted for the Phase III
Recycled Water Project, and a Mitigated Negative Declaration and Mitigation Monitoring and
Reporting Program was approved by the Board through Resolution No. 1455, on November 27,
2012; and
WHEREAS, on August 26, 2014, the Board of Directors of the Carlsbad Municipal Water
District, California adopted Resolution No. 1497, which approved the plans for the construction
of the Recycled Water Pipeline Expansion Segment No. 18, Project No. 5208; and
WHEREAS, eight sealed bids were received on November 18, 2014 by the Carlsbad
Municipal Water District for the construction of the Recycled Water Pipeline Expansion
Segment No. 18, Project No. 5208; and
WHEREAS, the lowest responsive and responsible bid to construct said project was
submitted by Burtech Pipeline Inc. in the amount of $371,833.87; and
WHEREAS, there are sufficient funds available in the Recycled Water Fund to complete
the project; and
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
WHEREAS, under the operating agreement with the City of Carlsbad, Carlsbad Municipal
Water District adopted the city's purchasing rules; and
WHEREAS, subsection 3.28.040(C)(5) of the Carlsbad Municipal Code authorizes the
Executive Manager to approve change orders in the amount equal to the contingency set at the
time of project award.
NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of
the City of Carlsbad, California, as follows:
1. That the above recitations are true and correct.
2. That the low bid of $371,833.87 submitted by Burtech Pipeline Inc. for the
construction of the Recycled Water Pipeline Expansion Segment No. 18, Project No. 5208 is
accepted and the President is hereby authorized to execute a contract for this project.
3. That the Executive Manager is hereby authorized to approve construction change
orders up to $50,000.
4. That the award of this contract is contingent upon the bidder submitting the lowest
responsible bid executing the required contract and submitting the required bonds and
insurance policies, as described in the contract, within twenty (20) days of adoption of this
resolution. The Executive Manager may grant reasonable extensions of time.
//
H
//
//
//
1
2
3
4'
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of Directors of the
Carlsbad Municipal Water District of the City of Carlsbad on the 13th day of January 2015, by
the following vote to wit:
AYES: Board Members Hall, Blackburn, Schumacher, Wood, Packard.
NOES: None.
ABSENT: None.
MATT HALL, President
ATTEST:
(�3aJyu"�z ��IaA----" -'
BARBARA ENGLESON, ecretary
��'�,basla`do .���
LOCATION MAP
SITE
CITY OF OCEANSIDE
HIGHWAY )a
VICINITY
MAP
E
NOT TO
v
SCALE
c?
R�
CITY OF VISTA
PALOMAR
Q`p!9
CITY OF
SAN
SITE WARCOS
PACIFIC
OCEAN =
NOT TO SCALE CITY OF ENCINITAS
PROJECT NAME I PROJECT I EXHIBIT
RECYCLED WATER SEGMENT PIPELINEEXPANSIONON MBE5208R Z
PLOTTED BY. SCOTT EVANS PLOT DATE.,12117114 PATH:D: \UTILITIES DEPARTMENT\LOCATION MAPS\5208_SEGMENT 18.DWG
LJ