HomeMy WebLinkAbout2001-03-19; Parks & Recreation Commission; 301-9; CIP Budget ReviewPARKS & RECREATION COMMISSION -AGENDA BILL
AB# 301 -9
MTG. DATE: 3-19-01
TITLE :
CAPITAL IMPROVEMENT PROGRAM
INFO,
(CIP) BUDGET REVIEW 0 ACTION STAFF: STEYAERT
RECOMMENDED ACTION :
Receive staff update regarding the CIP Budget Submittal for FY 2001-02. Comment as
appropriate. -
ITEM EXPLANATION :
Staff has prepared the CIP Budget Submittal for FY 2001-02. The primary requests are related
to compliance with the City's Growth Management Plan. Staff will review those projects for the
Commission and be available to answer specific questions. Please refer to Exhibit 1 for a more
detailed explanation of the specific projects and requests for funding.
Although internal staff review is currently underway, the initial City Council review, public
workshops and Council approval typically occur during late May and early June.
Any comments of the Commission will be submitted as part of that review process.
EXHIBITS:
1. CIP Park Project Submittal for FY 2001-02
1.
2.
3.
4.
5,
6.
Zone 5 Interim Ballfield (New project)
Larwin Park - (Move timing forward, decrease budget)
NE Quad Park Acquisition (Increase budget)
NE Quad Park Development (Move out to B.O.)
Zone 19 Park (Add Corn. Ctr, increase budget)
Park Cost Update (Increase budget of future parks)
Capital Improvement Program
Project Request Form
For CIP Committee’s Use Only
Date Recewed:
CIP Committee
Review Date:
Commrttee
Recommendation. Include In CIP 0 Add7 Info Requtred 0 Do not Include In CIP
CONTACT I I I. Project Sponsor Mark Steyaert Ext. 2855 I
2. Department 8 Division Recreation, Park Development
3. Department Head Signature
DESCRIPTION
1. 0 New Project Updated Project
2. Project Name Zone 5 Interim Ball Field Project No. None
3. Project Location 0 Located in Coastal Zone 151 Located outside Coastal Zone
Southeast corner of Faraday and Camino Hills (across the street from the Faraday Center).
4. Project Type: American Disabilities Act 0 Administrative 0 Police 8 Fire 0 Library Miscellaneous Civic 0 Public Arts Redevelopment Facilities Maintenance a Parks 0. Drainage Encina Wastewater Facility
0 Sewer Collection 0 Water Distribution Recycled Water 0 Traffic Signal 0 Street 0 Freeway Interchange
5. Project Description
Construction of an interim ball field on a portion of the future 13 acre “Business Park Recreational
Facility” site. The ball field will be constructed on the 3 acre flat pad and will include turf, irrigation,
backstop, fencing and a small a.c. parking lot. Sports lights will not be included, The field will replace
the existing ball field currently in use at the Safety Center that will be eliminated by the construction
Of the new Public Works Center. The ultimate park plan for the entire site is yet to be developed and
may or may not incorporate the interim field.
-
H:\WORD\MARKS MEMOS 8 LElTERS 2OOO\CIPUOO1-2002\CIPPro~ectRequestFormNew 01-08 ZONE 5 INTERIM doc PAGE 1 OF 4
L
.-
.-
-
rc
Capital Improvement Program
Project Request Form
DESCRlPTlON (CON'T)
6. Project Background
E 5 Master Plan supporting document and/or drawings.
0 Conceptual/Pre-Design Report and/or Drawings.
0 Site Study.
0 0 Detailed Cost Estimate.
. IS1 0 Geotechnical Studies.
0 Project Alternatives Analysis. a -.a Other. Please indicate Refer to Exhibits below
Brief Summaries of Background Documents:
Exhibit 1 - Concept Plan
2 - Memo outlining need
3 - Cost worksheet
4 - Cost estimate
7. Project Need
Needed to replace ball field being eliminated by development of the Public Works Center per GM Plan
(refer to Exhibit 2). Needed to accommodate business park users. -
ESTIMATED PERMlTTlNG/ENVIRONMENTAL REQUIREMENTS
1. Permits:
Conditional Use
0 Special Use
0 Building
2. Environmental:
CEQA: Exempt Other Existing Future Review Required
Environmental Document
I
NEPA: 0 Required Not Required 0 Unknown
0 Coastal
0 Army Corp
0 Regional Water
Quality Control
0 Fish 8 Game
0 Fish 8 Wildlife
0 Other
Please indicate
H.\WORD\MARKS MEMOS 8 LElTERS 2000\CIPL?001-2002\CIPPro~ectRequestFonNew 01-08 ZONE 5 INTERIM.doc PAGE 2 OF 4
,. 126
Capital Improvement Program
Project Request Form *-
FINANCING
1. Total Budget Request: $325,000 (supplements $20,000 being utilized from the current CIP appropriation for the Business Park Rec. Facility) (funding account yet - to be determined, possibly Gen. Fund)
2. Project Manager: Client Department c] Consultant Managed by Client Department 0 Engineering Design Division
3. Schedule: Estimated Cost
Fiscal Year
Requested
Funding
Source
Actiwty 01 -02 02-03 03-04 05-06 - 06-07 07-1 2 13-Bu1ldout
jtudles 8 Reports In-house
invironmental
kslgn budgeted
:onstrut?:. 325.000
4. Change to CostlSchedule: $325,000 Inr ?ease 0 Decrease
Reason:
Location and need for replacement of Safety Center ball field previously noi determined. Moving the
ball field to the Zone 5 park slte on an interim basis will satisfy the Growth Management Plan and public
use need issue.
Supporting Documentation Attached 0 . No Documentation Available
OPERATING COSTS
1. Annual Operating Cost: $63,000
2. Method Used to Determine Cost: Historic m&o costs provided by Parks div. (refer to Exhibit 3)
Documentation Attached 0 No Documentation Available
H:\WORD\MARKS MEMOS 8 LElTERS 2OOO\CIPV001-2002\CIP 01-02 PROJECT REQUEST FORMS FRONT
END\CIPProjectRequestFormNew 01 -08 ZONE 5 INTERIM doc PAGE 3 OF 4
127
.-
I
m .- E
'0 c
Y a
L
n 0
m 2
'b
c
x e
c 0, In 8
C C C I! c?
0 0 0. r .-
J
1
i
11
\
c
'\
L
/"
EXHIBIT I 129
#
December 19, 2000 .-
TO: ASSISTANT Clpl MANA -
VIA: RECREATION DIRECT&^
From: Park Development Coordinator
NORTHEAST QUADRANT PARK ISSUES
.Public Works Center Ballfield Removal
.Zone 5 Interim Ballfield
.NE. Quadrant Land Acquisition
c-3 ~Larwin Park
This report discusses the inter-connective nature of issues related to the topics above and makes
recommendations for a comprehensive solution to those issues.
- - - SUMMARY OF RECOMMENDED ACTIONS:
1. Construct a ball field on the lower pad of the Zone 5 Park to replace the field being
elimkated in Phase II of the Public Works Center. Construct concurrent with Public
Works Center. *
c 2. Immediately pursue development of Larwin Park to satisfy the Growth Management
Plan. Process a mid year CIP adjustment to begin the park development process this
year.
3. Continue to pursue acquisition of additional park acreage in the NE Quadrant for ball
fields.
BACKGROUND
PUBLIC WORKS CENTER
The Public Works Center will remove 2 acres of ballfields. This is partially offset by the recent
addition of 1 acre of Skate Park. The Public Works Department is processing a General Plan
Amendment (GPA) to eliminate the ballfield and add the Skate Park. They have successfully gone
through the Parks and Recreatlon Commisslon and are now anticipating a hearmg at the Planning
Commission in April 2001.
Two issues have arisen related to this process
1. We are currently in a park deficit in the NE Quadrant. The elimination of one acre of park at the
Public Works Center will accentuate the problem and will need to be addressed in the GPA report. -
2. The Growth Management Plan has a provision that no City facilities shall be removed without
being replaced. The Planning Department has preliminarily interpreted that provlsion to mean that
130 EXHIBIT 2
Pg. 2 of 3, NE QUAD PARK ISSUES
the ballfield being eliminated at the Public Works Center must be replaced. Staff is recommending
that this occur at the Zone 5 Park lower 3 acre pad Site on an interim basis.
ZONE 5 PARK BALLFIELD
TO show compliance with_ the requirement described above, it is recommended that a CUP for
Zone 5 Ballfield be processed after the first of the year and that the project be submitted in the 01-
02 CIP.
The actual implementation of the project is recommended to be dove-tailed into the Public Works
Center Project. The Public Works Center consultant could prepare the plans and the project could
be bid as .part of the Public Works Center project. This would minimize impacts on staff inrorkload
and provide for better bid prices than doing a small stand alone project.
Because there essentially no funds left in the Zone 5 Business Park account (after purchasing the
land several years ago), funding for the ballfield project will need to come from an alternative
sourie (possibly the General Fund). It is recommended that a budget of approximately $300,000
be established for this project.
Currently, staff from the Recreation Department, City Manager’s Office, and Community
Development are working on a goal of community outreach in the industrial zones to gather input
into what might ultimately serve that segment of the communities recreational needs. In addition,
we are testing the water for Interest in private participation. Because of the uncertainty of future
development plans for this site. staff is recommending that the replacement field be considered
temporary, keeping the constructlon slmple and development costs to a minimum.
LARWIN PARK
As previously mentioned, the NE Quadrant is currently experiencing a park deficit that needs
immediate attention. We are currently 10 acres in arrears, not counting the current new housing
projects coming on line. Last year, the marginally developable Larwin Park was moved out in the
CIP in favor of what, at the time, promised to be the acquisition of 10-15 acres of developable park
acreage in the Robertson Ranch (the jomt use flood control basin/park). After closer analysis of
the site revealed potential development constraints, land appraisals came in higher than staff felt
the land warranted, and the timing of access to the site via Cannon and College became
uncertain, we are recommending moving Larwin back up in the CIP to address the Growth
Management shortfall.
Staff is recommending that a new plan for Larwin Park be developed. Although no park planning
has occurred on the “new plan”, it is anticipated that the recently approved temporary Dog Park
would be incorporated into “upper” Larwin Park and that improvements to “lower” Lawin Park be
kept to a minimum (walkways, lawn, picnic areas, and possibly a tot lot). Trails could be used to
connect upper and lower Larwin and to connect to the City Wide Trail System. The ultimate plan
would of course be subject to the usual input (public outreach, Commissions, and Council). Cost
for this type of development would be significantly lower than the $2,090,000 currently
appropriated in the CIP.
I
Pg. 3 of 3; NE QUAD PARK ISSUES
- Public Works staff is also recommending that a “Mid-Year” CIP adjustment be made to appropriate
funds for Lawin Park for this fiscal year. We are recommending that $50,000 for preliminary
design and miscellaneous project management be appropriated out of the $2,090,000 (PFF) funds
currently scheduled in FY 2010-2020. This will show a commitment to meeting the Growth
Management shortfall and allow staff to start on this project at the first of the year.
-
NE QUADRANT LAND AQUlSlTlON
The 2000-2001 CIP appropriated $2, 625.000 for acquisition of park land for ballfields in the NE
Quadrant. As previously mentioned, the anticipated acquisition of a flood control basin on
Robertson Ranch that could have served dual use as ballfields is appearing less likely due to land
constraints and appraised land costs. While staff has not completely abandoned the possibility
that the Robertsons (or subsequent owners) might negotiate a favorable deal on the property, staff
is planning to proceed with further investigation of alternative sites in the NE Quadrant. Because
the availability of developable land continues to become harder to find -(and more expensive), staff
- - will cantinue to move forward toward this goal. -
Staff is seeking confirmation to proceed with the recommendations above.
Mark Steyaert
C: City Manager
Public Works Director
Public Works Manager Cook
Senior Civil Engineer, Hammann
Planning Director
Assistant Planning Dlrector
Principal Planner, Rldeout
Senior Planner, Munot
Senior Management Analyst, Beverly
Finance Director
Senior Accountant. Stover
132
,. RECREATION DEPARTMENT
Park Development
date: 1 /16/00
prepared by: MS
,- ESTIMATED CONSTRUCTION AND M&O COST SUMMARY SHEET
Project: ZONE 5 COMMUNITY PARK
- CONSTRUCTION
Park Improvements $ 325,000
Refer to attached cost estimate for further detail (Exhibit 4)
MAINTENANCE AND OPERATION
M&O ASSOCIATED WITH THE PARK IMPROVEMENTS
Parks M&0
ACRES Maintenance Cost / Acre / Total Cost
-
- -
Level Maintenance Level
3 A $1 5,000 45,000
PARKS M&O $ 45,000
Recreation M&O + 18,000 -
TOTAL GROSS PARK RELATED M&O
OFFSETTING REVENUES
$ 63,000
-0
TOTAL NET PARK IMPROVEMENT M&O %OST $ 63,000
EXHIBIT 3 133
COST ESTIMATE
INDUSTRIAL PARK BALLFIELD
I ! 1
PLANTING AREAS I I 1
24
25
$ 1,000.00 EA^ 20 Acacia - Slope Planting (5 Gal.) i 50
Wood Mulch -( 7400 SF/3" Depth) 1j LSI 3001 $ 300.00 28
$ SodNegetation Removal (slope) 6.2ooj SFI 0 27
$ 200.00 EA] 20 10 Small Shrub - Spillway Area (5 Gal.) 26
$ 160.00 EA1 20 Grasses - Spillway Area (5 Gal.) 8
I !
SPILLWAY REPAIR I I I I
29 200 LS 1 Replenish Rip Rap $ 200.00
Total $ 261,620.00
20% Contingency
Total I I
I I
$ 52,324.00 ~
GRAND TOTAL
3.5% inspection I I
$ 31 3.944.00
$ 11,000.00
I , $ 324,944.00 1
I I ! $ 325,000.00
I
~
Rounded I
CITY OF CARLSBAD
PARKDEVELOPMENT
December 2000
EXHIBIT 4 134
For CIP Committee’s Use on&
Date Received:
CIP Committee Review Date:
Committee Recommendation: 0 Include in CIP 0 Add’l Info Required
Do not Include in CIP
t
Capital Improvement Program
Project Request Form
I 1 I. Project Sponsor Mark Steyaert Ext. 2855
2. Department 8 Division Recreation, Park Development I
3. Department Head Signature Date //T/O( 1 I I
DESCRIPTION
1. 0 New Project Updated Project
2. Project Name Larwin Park Project No. None
3. Project Location 0 Located in Coastal Zone Located outside Coastal Zone
In the NE Quadrant off of Carlsbad Village Drive east of El Camino Real.
4. Project Type: 0 American Disabilities Act 0 Administrative 61 Police & Fire 0 Library Miscellaneous Civic 0 Public Arts Redevelopment 0 Facilities Maintenance @ Parks 0 Drainage 0 Encina Wastewater Facility 0 Sewer Collection 0 Water Distribution Recycled Water 0 Traffic Signal c3 Street 0 Freeway Interchange
5. Project Description
Construct a 22 acre park. A separate , temporary project, “The Dog Park”, has been approved for a
portion of the site and is anticipated to be completed by summer 2001. This project will complete the
remainder of the park. Anticipated amenities include open lawn area, picnic tables, walkways, tot lot
and trails.
I
H:\WORD\MARK’S MEMOS 8 LElTERS 2000\CIPUOO1-2002\ClPro~ectRequestForrnNew 01-06 LARWIN PARK.doc PAGE 1 OF 4
r
i
I
L
Capital Improvement Program
Project Request Form
DESCRIPTION (CON'T)
6. Project Background
E E E Mast'er Plan supporting document and/or drawings.
0 ConceptuaVPre-Design Report and/or Drawings.
0 0 Site Study.
0 Detailed Cost Estimate.
0 Ix] 0 Geotechnical Studies.
0 0 Project Alternatives Analysis.
- 0 0 Other. Please Indicate Refer to Exhibits below
L
Brief Summaries of Background Documents:
Exhibit 1 - Site diagram
2 - Memo outlining need
3 - Cost work sheet (construction and M 8, 0)
7. Project Need
Needed ASAP for Growth Management (refer to Exhibit 2). Required per Park & Recreation Element
of the General Plan.
ESTIMATED PERMlTTlNGlENVlRONMENTAL REQUIREMENTS
1. Permits:
(XI Conditional Use 0 Fish 8 Game
0 Special Use 0 Fish 8 Wildlife
0 Building 0 Other
Please indicate
2. Environmental:
CEQA: Exempt Other Existing Future Review Required
Environmental Document
NEPA: 0 Required a Not Required Unknown
H:\WORD\MARK'S MEMOS 8 LEnERS 2000\CIP\2001-2002\CIProlectRequestFormNew 01-06 LARWlN PARK,doc PAGE 2 OF 4
136
0 Coastal
0 Army Corp
0 Regional Water
Quality Control
Capital Improvement Program
Project Request Form
FINANCING
1. Total Budget Request: $ 0 ($500,000 of current CIP appropriation of $2,090,000 to be moved
up to 01-02. The remaining $1,590,000 can be eliminated).
2. Project Manager: Client Department
-
0 Consultant Managed by Client Department 0 Engineering Design Division
3. Schedule: Estimated Cost
Fiscal Year
Activity 01 -02 02-03 03-04 05-06 06-07 07-1 2 13-Buildout
Studies meports
Environmental
Prop. Acqutsitlon
Design
Constructlon
50.000
450.000
Requested
Funding
Source
PIL
PIL
4. Change to CostlSchedule: - $1,590,000 0 Increase a Decrease
Reason:
tot lot, parking, etc.). The ttmlng has been moved up to satisfy immediate Growth Management need
(refer to Exhibit 2).
(Schedule moved up from 6.0. to 01-02)
Cost decrease because scope of park reduced (elimination of tennis courts, basketball courts, one
[x] Supporting Documentation Attached 0 No Documentation Available
OPERATING COSTS
1. Annual Operating Cost: $98,00O/yr (refer to Exhibit 3)
2. Method Used to Determine Cost: Historical data developed by Parks Div. (refer to Exhibit 3)
[x] Documentation Attached 0 No Documentation Available
I
J
c
H:\WORDWARKS MEMOS 8 LElTERS 2OOO\CIPK001-2002\CIP 01-02 PROJECT REQUEST FORMS FRONT
END\CIProjectRequestFormNew 01-08 IARWlN PARK docPAGE 3 OF 4
137
n
W I- -
EXHIBIT 1
c
a ar
n
LLI I-
cf>
1L ar
-
a n
EXHIBIT 1
December 19, 2000
TO: ASSISTANT CITY
P
VIA: RECREATION DIRECT
From: Park Development Coordinator
NORTHEAST QUADRANT PARK ISSUES
.Public Works Center Ballfield Removal
.Zone 5 Interim Ballfield
0N.t. Quadrant Land Acquisition
,-> ~Larwin Park
This report discusses the inter-connective nature Of issues related to the topics above and makes
recommendations for a comprehensive solution to those issues.
- - - SUMMARY OF RECOMMENDED ACTIONS:
1. Construct a ball field on the lower pad of the Zone 5 Park to replace the field being
elimicated in Phase II of the Public Works Center. Construct concurrent with Public
Works Center.
- 2. immediately pursue development of Larwin Park to satisfy the Growth Management
e' Plan. Process a mid year CIP adjustment to begin the park development process this
year.
i
3. Continue to pursue acquisition of additional park acreage in the NE Quadrant for ball
fields.
BACKGROUND
PUBLIC WORKS CENTER
The Public Works Center will remove 2 acres of ballfields. Thts is partially offset by the recent
addition of 1 acre of Skate Park. The Public Works Department is processing a General Plan
Amendment (GPA) to eliminate the ballfield and add the Skate Park. They have successfully gone
through the Parks and Recreatron .Commlssron and are now anticipating a hearing at the Planning
Commission in April 2001.
Two issues have arisen related to this process.
1. We are currently in a park deficit tn the NE Quadrant. The elimination of one acre of park at the
Public Works Center will accentuate the problem and will need to be addressed in the GPA report.
2. The Growth Management Plan has a provlsion that no City facilittes shall be removed without
being replaced. The Planning Department has prelimrnarily Interpreted that provision to mean that
-
EXHIBIT 2 I41
Pg. 2 of 3, NE QUAD PARK ISSUES
7 the ballfield being eliminated at the Public Works Center must be replaced. Staff is recommending
that this occur at the Zone 5 Park lower 3 acre pad site on an interim basis.
ZONE 5 PARK BALLFIELD
To show compliance with the requirement described above, it is recommended that a CUP for
Zone 5 Ballfield be processed after the first of the year and that the project be submitted in the 01-
02 CIP.
The actual implementation of the project is recommended to be dove-tailed into the Public Works
Center Project. The Public Works Center consultant could prepare the plans and the project could
be bid as part of the Public Works Center project. This would minimize impacts on staff workload
and provide for better bid prices than doing a small stand alone project.
Because there essentially no funds left in the Zone 5 Business Park account (after purchasing the
land several years ago), funding for the ballfield project will need to come from an alternative
be established for this project.
- - - sourie (possibly the General Fund). It is recommended that a budget of approximately $300,000
Currently, staff from the Recreation Department, City Manager’s Office, and Community
Development are working on a goal of community outreach in the industrial zones to gather input
into what might ultimately serve that segment of the communities recreational needs. In addition,
we are testing the water for Interest in private participation. Because of the uncertainty of future
development plans for thls site. staff is recommending that the replacement field be considered
temporary, keeping the construction slmple and development costs to a mlnimum.
24- LA R WIN PARK
As previously menttoned. the NE Quadrant is currently experiencing a park deficit that needs
immediate attention We are currently 10 acres in arrears, not counting the current new housing
projects coming on ltne Last year. the margmally developable Larwin Park was moved out in the
CIP in favor of what. at the time. promised to be the acquisition of 10-15 acres of developable park
acreage in the Robertson Ranch (the Jomt use flood control basidpark). After closer analysis of
the site revealed potential development constratnts. land appraisals came in higher than staff felt
the land warranted, and the tlming of access to the site via Cannon and College became
uncertain, we are recommending moving Larwin back up in the CIP to address the Growth
Management shortfall.
Staff is recommending that a new plan for Larwtn Park be developed. Although no park planning
has occurred on the “new plan”, it IS antictpated that the recently approved temporary Dog Park
would be incorporated into “upper” Larwin Park and that improvements to “lower” Larwin Park be
kept to a minimum (walkways, lawn, picnic areas. and possibly a tot lot). Trails could be used to
connect upper and lower Larwln and to connect to the City Wide Trail System. The ultimate plan
would of course be subject to the usual input (public outreach, Commissions, and Council). Cost
for this type of development would be significantly lower than the $2,090,000 currently
appropriated in the CIP.
-
Pg. 3 of 3; NE QUAD PARK ISSUES
,- Public Works staff is also recommending that a "Mid-Year" CIP adjustment be made to appropriate
funds for Larwin Park for this fiscal year. We are recommending that $50.000 for preliminary
design and miscellaneous project management be appropriated out of the $2,090,000 (PFF) funds
currently scheduled in FY 2010-2020. This will show a commitment to meeting the Growth
Management shortfall and allow staff to start on this project at the first of the year.
-
NE QUADRANT LAND AQUISITION
The 2000-2001 CIP appropriated $2, 625,000 for acquisition of park 1an.d for ballfields in the NE
Quadrant. As previously mentioned, the anticipated acquisition of a flood control basin on
Robertson Ranch that could have served dual use as ballfields is appearing less likely due to land
constraints and appraised land costs. While staff has not completely abandoned the possibility
that the Robertsons (or subsequent owners) might negotiate a favorable deal on the property, staff
is planning to proceed with further investigation of alternative sites in the NE Quadrant. Because
the availability of developable land continues to become harder to find (and more expensive), staff
- - will mtinue to move forward toward this goal. -
Staff is seeking confirmation to proceed with the recommendations above.
Mark Steyaert
c: City Manager
Public Works Dlrector
Public Works Manager Cook
Senlor Civil Engmeer. Hammann
Planning Director
Assistant Planning Director
Principal Planner, Rideout
Senior Planner, Munoz
Senior Management Analyst, Beverly
Finance Director
Senior Accountant, Stover
143
RECREATION DEPARTMENT
Park Development
date: 1 I1 6/00
prepared by: MS
ESTIMATED CONSTRUCTION AND M&O COST SUMMARY SHEET
Project: LARWIN PARK
- CONSTRUCTION
NO plan has yet been developed for the park. Therefore, cost estimated is a “budgeted” amount based on
generic per acre park development costs calculated by using the most recent park construction costs
available. Currently, the costs are $250,000 per acre which includes design, admin., environmental, and
construction, However, $125,000 per acre is being used for Latwin Park due to the type of amenities
proposed (e.g. no ballfields, hardcourts, restroom blgs. etc.).
Park Improvements (4 acres of developed park x $125,00O/acre $ 500,000
- MAINTENANCE AND OPERATION
MBO ASSOCIATED WITH THE PARK IMPROVEMENTS
Parks M&O
ACRES Maintenance Cost / Acre / Total Cost
c Level Maintenance Level
3.5 B $12,000 42,000
18.5 D $ 3,000 56,000
PARKS M&O $ 98,000
Recreation M&0 (none antlclpated. no programmed activittes)
TOTAL GROSS PARK RELATED M&O
OFFSETTING REVENUES (none antlcipated)
TOTAL NET PARK IMPROVEMENT M&O COST
$ 98,000
+o
$ 98,000
-0
$ 98,000
$ 98,000
EXHIBIT 3 144
For CIP Committee's Use Only
Date Received:
CIP Commaee
Review Date:
Capital Improvement Program
Project Request Form I Committee Recommendation: 0 Include in CIP Tl Add1 Info Reaulred I is Do not Include In CIP
CONTACT
-
I I. Project Sponsor Mark Steyaert Ext. 2855
2. Department & Division Recreation-elopment
. 3. Department Head Signature - u Date 0
1
DESCRIPTION
1. 0 New Project Updated Project
2. Project Name NE QUAD PARK AQUlSlTlON Project No. 36981
3. Project Location 0 0 Located outside Coastal Zone
In the NE Quadrant. Specific site yet to be determined.
4. Project Type: 0 American Disabilities Act 0 Administrative 0 Police & Fire 0 Library Miscellaneous Civic D Public Arts 0 Redevelopment 0 Facilities Maintenance
Parks 0 Drainage 0 Encina Wastewater Facility
0 Sewer Collection 0 Water Distribution 0 Recycled Water 0 Traffic Signal 0 Street 0 Freeway Interchange
5. Project Description
The FY 00-01 CIP calls for acquisition of approximately 15 acres in the NE Quadrant for ballfields. The purpose of this
project is to find a site to construct ballflelds that were ellmlnated in the Lawin Park planning process due to site
constraints and neighborhood opposltion Currently, $2,625,000 IS approprlated for acqulsitlon based on $175,000 per
acre acquisition costs. In recognition of the land price cost escalation. the Recreation Dept. commlssioned a appraisal
of land costs throughout the City for the purpose of evaluating the adequacy of the current Park In Lieu Fee (which is
based on anticipated cost per acre).The appraisal Indicates that current land costs In the NE Quad. are In
neighborhood of $300,000.Therefore, In order to have sufficient funds to acquire the land for the NE Quad. Park, the
budget is proposed to be increased. This City expense will be offset by increasing the PIL charge (proposed for
, this year.
H:\WORDWRKS MEMOS 8 LElTERS 200O\CIP\2001-2002\CIP 01-02 PROJECT REQUEST FORMS FRONT
END\ClPProlectRequestFormNew 01-08 NE QUAD ACQUIS doc PAGE 1 OF 4
145
Capital Improvement Program
Project Request Form
OOrn
6. Project Background
Master Plan supporting document and/or drawings.
ConceptuaVPre-Design Report and/or Drawings.
Site Study.
Detailed Cost Estimate.
Geotechnical Studies.
Project Alternatives Analysis.
Other. Please Indicate refer to exhibits below
-
Briefsummaries of Background Documents:
Exhibit 1 - Excerpt from appraisal report
~~ ~~ ~~~~ ~~ ~~ ~~ ~~
7. Project Need
The NE Quad. Park is outlmed in the Parks and Recreation Element of the General Plan. Needed to
meet ballfield standards as approved by the Parks and Recreation Commission. The availability of
developable land in the NE Quad. is quickly disappearing, therefore, acquisition as soon as possible is
recommended.
~~ ~
~ ~~ ~~
ESTIMATED PERMlTTlNG/ENVIRONMENTAL REQUIREMENTS
1. Permits:
c] Conditional Use
0 Special Use
Building
2. Environmental:
CEQA: Exemp
0 Coastal
0 Amy Corp
Regional Water
Quality Control
Fish 8 Game
0 Fish 8 Wildlife
Other
Please indicate
It 0 Other Existing 0 Future Review Required
Environmental Document
NEPA: 0 Required c] Not Required 0 Unknown
~~
H:\WORD\MARKS MEMOS & LElTERS 2000\CIP\2001-2002\CIPPro~edRequestForrnNew 01-08 GENERIC ACQUIS. doc PAGE 2 OF 4
146
Capital Improvement Program
Project Request Form
FINANCING
1. Total Budget Request: $1,925,000 (supplements current CIP amount of $2,625,000 TOTAL PROJECT COST: $4,550,000;)
2. Project Manager: Client Department Consultant Managed by Client Department 0 Engineering Design Division
3. Schedule: Estimated Cost
Fiscal Year
~~
Activity 0 1-02 02-03 05-06 06-07 07-12 13-B~1ldout 03-04
Studies 8 Reports
Envlron@ntal
Prop. Acquisition
~~ ~ ~~ ~ ~~ ~~ ~
'30.000
20.000
"1,875.00[
Design
Requested
Funding - source
Construction total : $95,000 incl. current approp ** total $4,435.000 incl. current approp.
4. Change to CostlSchedule: $1,925,000 Increase 0 Decrease
Reason: Increase in cost per acre for acquisition from $175,000 per acre to $300,000 per acre.
~ ~~~ ~
a Supporting Documentation Attached No Documentation Available
OPERATING COSTS
1. Annual Operating Cost: NA
2. Method Used to Determine Cost: NA
Documentation Attached [7 No Documentation Available
H:\WORD\MARK'S MEMOS 8 LETTERS 2OOO\CIPK001-2002\CIP 01-02 PROJECT REQUEST FORMS FRONT
END\CIPProjectRequestFonNew 01-08 NE QUAD ACQUIS. doc PAGE 3 OF 4
L
1
0 0
0 N
9
8
h- City of Carisbad
Page 5
The southwest +ant had eleven (I 1) tfansacticms with a combmed 197.15-acres, and merage
per-acre price of $288,592. Sales occurred between February 1998 and July 2000. Rice range in
. December 28,2000
F
this quadrant was $95,491 to $561,497 per-acre.
The northeast quadrant ha two (2) transactions with a combined 18.2-acres, and average
per-acre price of $302,812. Sales occurred m Jan~mry 1998 and September 1999. Price range
indicated by the two transactions is $278,261 and $344,952 per-acre.
-
t
41
There was only one (1) transaction m the southeast qzahnt within the parameters of this study. .
Indicated price is $263,158 per-acre. This is an older, or March 1998 sale of a 4.56-acre parcel
located at Rancho Santa Fe Drive and La Costa Avenue. Zoning is RDM The site is rough-
graded and there were no entitlements. This was a bank REO sale.
- -
There are two (2) active listings involving vacant acreage within the city known to the appraiser,
one m the southeast quadrant. Located at the southeast corner of Rancho Santa Fe Road and
Los Coches is a 7.59-acre commercial site listed for $2,900,000, or $382,082 per-acre.
Located near Palomar Airport Road and Melrose Drive is a 50.1-acre tract listed for $10.5
million, or $209,581 per-acre. Land use indicated by the listing is industriat
The prices indicated by transactions submitted are clearly iduenced by value characteristics such
as topography and map status. For example, a generally level parcel with approved TM will sell
for significantly more than a raw hillside parcel with no TM. Land prices m the northwest
quadrant appear to be higher than other quadrants, howder there is very little data available m
the northeast and southeast quadrants for a usefid comparison. Salehesales in the industrial
corridor suggest considerable value appreciation m 1997 and 1998. (See Sale Nos. 5, 6 & 12)
Appreciation m the residential land market over time is also very apparent (Compare Sale No. 16
& 24), however quantlfymg it with paired-sales is difEcult because value characteristics (ie: topo,
map status and density) between individual parcels vary substantially. There is a relation%
between home prices and land value. According to a bi-annual study by the San Diego Regional
Chamber of Commerce, home prices m the La Costa area of Carlsbad increased 8% between
April 1997 and April 1998; increased another 2 1% between April 1998 and April 1999; and
another 6% between October 1999 and April 2000. A Land Sales Sunmay, along with an
individual summary of each market data item ( 1 thru 3 3 ), follows.
(appreciate the opportunity to be of professional service.
c
I
I (&.;,"' I /,L L:
!' AS.' I' . 11
Randy A. Tagg, MAI ,,'
California CertifidGtneral . '
Real Estate Appraiser No. AGO05 I70
THE TAGG COMPANY EXHIBIT 1
I Capital Improvement Program
Project Request Form
For CIP Committee's Use Only
Date Received:
CiP Committee Review Date:
Committee Recommendation 0 Include In CIP 0 Add'l info Required 0 Do not include In Cip
CONTACT
1. Project Sponsor Mark Steyaert Ext. 2855
2. Department & Division RECREATm;-PackDevelopment
3.. Department Head Signature Date I * //efo/
- DESCRIPTION
1. 0 New Project 0 Updated Project
2. Project Name NE QUAD PARK SITE DEVELOPMENT Project No. 3801 1 - 3. Project Location Located in Coastal Zone 0 Located outside Coastal Zone
In the NE Quadrant. Site to be determined.
4. Project Type: 0 American Disabilities Act Administrative 0 Police 8 Fire 0 Library 0 Miscellaneous Civic 0 Public Arts 0 Redevelopment 0 Facilities Maintenance
0 Sewer Collection 0 Water Distribution 0 Recycled Water 0 Traffic Signal D Street 0 Freeway Interchange
Parks 0 Drainage 0 Encina Wastewater Facility
5. Project Description
Develop 15 acres for ballfields.
J
H:\WORD\MARK'S MEMOS 8 LElTERS 2OOO\CIPV001-2002\CIP 01-02 PROJECT REQUEST FORMS FRONT END\CIP Project Request
Form NEW 01-02 NE QUAD PARK.doc PAGE 1 OF 4 1 SO
Capital Improvement Program
Project Request Form
DESCRIPTION (CON'T)
6. Project Background
E E 5 Ma*r Plan supporting document and/or drawings.
17 @ 17 ConceptuaVPre-Design Report and/or Drawings.
0 151 0 Site Study. a 0 Detailed Cost Estimate.
0 0 Geotechnical Studies.
E Project Alternatives Analysis.
0 -- 0 Other. Please Indicate
BriefSummaries of Background Documents:
-
-
7. Project Need
The NE Quad. Park is outlmed In the Parks and Recreation Element of the General Plan. Needed to
meet ballfield standards as approved by the Parks and Recreation Commission. The availability of
developable land in the NE Quad. is quickly disappearing, therefore, acquisition as Soon as possible is
recommended.
ESTIMATED PERMlTTlNGlENVlRONMENTAL REQUIREMENTS
1. Permits: I Conditional Use
0 Special Use
0 Building
0 Coastal
0 Army Corp
0 Regional Water
Quality Control
Fish 8 Game
0 Fish 8 Wildlife
0 Other I
Please indicate I 2. Environmental: I
I
CEQA: 0 Exempt 0 Other Existing Future Review Required
Environmental Document
NEPA 0 Required 0 Not Required 0 Unknown
H:\WORDWlARK'S MEMOS 8 LETTERS 2OOO\CIPV001-2002\CIP 01-02 PROJECT REQUEST FORMS FRONT END\CIP Project Request
FOVn NEW 01-02 NE QUAD PARK.dOC PAGE 2 OF 4
151
Capital Improvement Program
Project Request Form
FINANCING
1. Total Budget Request: NA: Timing change only (refer to "Park Cost Update" CIP submittal for
information on budget. -
2. Project Manager: a Client Department 0 Consultant Managed by Client Department 0 Engineering Design Division
3. Schedule: Estimated Cost
- Fiscal Year
Requested
Funding - Source
Activity 01 -02 02-03 03-04 05-06 06-07 07-12 13-Buildout
Studies i3 Reports
Environm-ental
Prop. Acquisition
Design
Construction
-
4. Change to CostlSchedule: NA: timing change only 0 Increase Decrease
Reason:
Move project back to buildout
Larwin Park will meet the immediate Growth Management needs.
0 Supporting Documentation Attached No Documentation Available
OPERATING COSTS
1. Annual Operating Cost: NA
2. Method Used to Determine Cost: NA
Documentation Attached No Documentation Available
H:\WORD\MARKS MEMOS 8 LElTERS 2OOO\CIPU001-2002\CIP 01-02 PROJECT REQUEST FORMS FRONT ENDCIP Project Request
Fo~ NEW 01-02 NE QUAD PARK.doc PAGE 3 OF 4
152
Capital Improvement Program
r_ Project Request Form
For CIP Committee's Use Only
Date Received:
CIP Committee
Revtew Date:
Committee Recommendation: 0 Include in CIP 0 Add7 Info Requlred Do not Include in CIP
-
CONTACT
4 Drn;ar+ Cnnnenr Mark Steyaert E*. 2855
2. Department & Division Recreatiomk Development
3. Department Head Signature Date .
DESCRIPTION
1. 0 New Project Updated Project
2. Project Name Zone 19 Community Park Project No. 36991
3. Project Location Located in Coastal Zone 0 Located outside Coastal Zone
In the SW quad; northern portlon of the Aviara Community; intersection of Poinsettia Lane and Ambrosia
4. Project Type: 0 American Disabilities Act 0 Administrative 0 Police 8 Fire 0 Library Miscellaneous Civic 0 Public Arts Redevelopment 17 Facilities Maintenance 151 Parks Drainage 0 Encina Wastewater Facility
0 Sewer Collection Water Distribution 0 Recycled Water
Traffic Signal E! Street 0 Freeway Interchange
5. Project Description
This 24 acre community park is anticipated to include a ball field, soccer field, tot lot, basketball courts,
walkway, trails, restrooms, parking and an approximate 17,000 s.f. community center. The community
center will house meeting rooms, banquet facilities, a senior component and outdoor terraces,
I
H:\WORD\MARK'S MEMOS 8 LETTERS 2000\CIP\2001-2002\CIPPro~ectRequestFonNew 01-08 ZONE 19 COMPARK doc PAGE 1 OF 4
.
Capital Improvement Program
Project Request Form
DESCRIPTION (CON'T)
6. Project Background
E E Master Plan supporting document and/or drawings.
@ 0 ConceptuaVPre-Design Report and/or Drawings.
0 IS1 0 Site Study.
@ 0 0 Detailed Cost Estimate.
0 0 Geotechnical Studies.
0 a Project Alternatives Analysis.
@ - 0 a Other. Please Indicate refer to exhibits below
Brief Summaries of Background Documents:
Exhibit 1 - Conceptual Plan 5 - Justification for merging Phase I and II
Exhibit 2 - Conceptual Floor Plan
-
3 - Cost Worksheet
4 - Preliminary Cost Estimate
7. Project Need
Needed ASAP to satisfy Growth Management. Required per the Parks and Recreation
Element of the General Plan Needed to meet needs of increased population in the SW Quadrant.
ESTIMATED PERMITTING/ENVIRONMENTAL REQUIREMENTS
1. Permits:
Ix] Conditional Use H Coastal
0 Special Use 0 Army Corp
Ls] Building 0 Regional Water Quality Control
2. Environmental:
CEQA: 0 Exempt Other Existing future Review Required
Environmental Document
r
1 NEPA: 0 Required 0 Not Required 0 Unknown
0 Fish 8 Game
0 Fish 8 Wildlife
0 Other
Please indicate
H:\WORDWRKS MEMOS B LElTERS 2000\CIPUOO1-2002\CIPPro~edRequestFormNew 01-06 ZONE 19 COMPARK.doc PAGE 2 OF 4
154
Capital Improvement Program
Project Request Form
FINANCING
1. Total Budget Request: $3,070,000 (supplements current CIP amount of $7,928,000. TOTAL PROJECT COSTS: $10,998,000) -
2. Project Manager: Client Department Consultant Managed by Client Department 0 Engineering Design Division
3. Schedule: Estimated Cost . Requested
Fiscal Year Funding - Source
Activity 01 -02 02-03 03-04 05-06 06-07 07-1 2 13-Buildout
Currently
Studies 8 - Reports budgeted
L Currently
Environmental budgeted
Prop. Acquisition
Deslgn '250.000
Construction "2.570.000
supplements current CIP of $250.000 , TOTAL 3500.000 ** supplements current CIP amount of $7.769.000, TOTAL $10.498.000
4. Change to CostlSchedule: $3,070,000 Increase 0 Decrease
Move up schedule for Phase I1 (community center) from 2010-20 to 2001-02
Reason: The Master Plan process currently underway, has allowed for the development of specific cost
estimates to replace the previous generic per acre cost assigned to the project (refer to Exhibit 4). Also
it is recommended to tncorporate the community center (previously a separate later phase) into Phase I
(refer to Exhibit 5).
Supporting Documentation Attached 0 No Documentation Available
OPERATING COSTS
1. Annual Operating Cost: $466,000 net M&O (m&o less revenue offsets; refer to Exhibit 3)
2. Method Used to Determine Cost: $ Historical data (refer to Exhibit 3)
1x1 Documentation Attached 0 No Documentation Available
H:\WORD\MARKS MEMOS 8 LElTERS 2OOO\CIPK001-2002\CIP 01-02 PROJECT REQUEST FORMS FRONT
END\CIPProlectRequestFormNew 01-06 ZONE 19 COMPARK.doc PAGE 3 OF 4
151
yl 0
0 0 4
9
c v
N
I
@
mcu cum
w* 0
m-
a
1
Q56
EXHIBIT 1 157
EXHIBIT 2
RECREATION DEPARTMENT
Park Development
date: 1 /16/00
prepared by: MS
ESTIMATED CONSTRUCTION AND M&O COST SUMMARY SHEET
Project: ZONE I9 COMMUNITY PARK
1 CONSTRUCTION -
Park Improvements
Community Center Building TOTAL COSTRUCTION
Design
GRAND TOTAL
$ 5,862,000 $ 4,636,000
$10,498,000
500,000
$10,998,000
Refer to Exhibit 4 for detailed cost estimate.
MAINTENANCE AND OPERATION
M&O ASSOCIATED WITH THE PARK IMPROVEMENTS (no corn. cfr. bldg. expenses)
Parks M&O
ACRES Maintenance Cost I Acre I Total Cost
18 A $1 5,000 270,000
6 D $ 3,000 18,000
PARKS M&0 $ 288,000
t Level Maintenace Level
Recreation M&O (refer to attached tnformatton for further detail)
TOTAL GROSS PARK RELATED M&O
OFFSETTING REVENUES (Refer to attached Informatton for further detail)
TOTAL NET PARK IMPROVEMENT M&O COST
M&O ASSOCIATED WITH THE COMMUNITY CENTER IMPROVEMENTS
Facilities M80 ($9 I square foot ~17,000 s.f.)
Recreation M&o (refer to attached informatton for further detail)
TOTAL GROSS COMMUNITY CENTER RELATED M&O
OFFSETTING REVENUES (refer to attached tnformatlon for further details)
TOTAL NET COMMUNITY CENTER M&O COST -
$288,000
+ 24,700
$312,000
$277,000
$1 53,000
+186,000
$399,000
-21 0,000
$1 89,OO
$1 89.000
GRAND TOTAL NET M80 EXPENSES $466,000
EXHIBIT 3
January 12,2001
I
TO : RECREATION DIRECTOR
c FROM: RECREATION SUPERVISOR II
ESTIMATED EXPENDITURE FOR POINSEITIA 8 ZONE 19 PARKS
The following are the estimated expenditure figures for recreation activities and facility use at Poinsettia and Zone 19 Parks. These figures are based on actual historic costs incurred at our existing facilities.
POINSElTIA PARK
Community Center (proposed)
-
Personnel
M80
Sub-total
. Park Programs Adult Sports - Personnel
Youth Sports -Personnel
M80
M80 - - - Sub-total
Tennis Center
Personnel
M8O
Sub-total
Indoor/Outdoor Soccer Arena - Personnel
MBO
Sub-total
GRAND TOTAL
$1 84,000 32.000
$21 6,000
$ 22,000 11,000
8,000
100
$ 41,100
$ 31.000 16.000
$ 47,000
$ 36,000
3.000
$ 39,000
$343,100
ZONE 19 PARK
Community Center (proposed) Personnel $154,000
M8O 32.000
Sub-total $1 86,000
Park Programs
Adult Sports - Personnel $ 13,000 MBO 6,000
Youth Sports- Personnel 5.600 M80 100
Sub-total $ 24.700
GRAND TOTAL $21 0,700
Dave Millikan
1sp --
January 12,2001
TO: RECREATION DIRECTOR
'\, ', . \
FROM: RECREATION SUPERVISOR II
ESTIMATED REVENUES FOR POlNSElTlA AND ZONE 19 PARKS
The following are estimated revenue figures for recreation activities and facility use at
Poinsettia and Zone 19 Parks. These figures are based on actual historic revenues
collected at our existing facilities, and estimated revenues for the Tennis Center and
Indoor/Outdoor Soccer Arena.
POINSETTIA PARK
Community Center (proposed)
- Instructional Classes $21 0,000
Room reservations/gym open play 12,000
Youth Basketball 30,000
Adult Basketball 14,000
Sub-total $266,000
Park Programs - Ball Field Rentals $ 4,000
Adult Sports Programming 36,000
Youth Sports Programming 9,000
Picnic Area 5,000
Sub-total $ 54,000
Tennis Center (proposed 11 courts)
Instructional Classes $ 23,000 Court Reservation Fees 30,000 Pro Shop 7,000
Sub-total $ 60,000
Indoor/Outdoor Soccer Arena
Reservation Fees
Adult Sports
Sub-total
$ 19,200
10.800
$ 30,000
GRAND TOTAL $41 0,000
ZONE 19 PARK
Community Center (proposed)
Instructional Classes
Room Reservations
Sub-total
Park Programs -
Ball Field Rentals
Adult Sports Programming
Youth Sports Programming
Picnic Areas
Sub-total
GRAND TOTAL
$1 60,000
50.000
$210,000
$ 2,000
22,000
6,000
5.000
$ 35,000
$245,000
- - DAVE MlLLlKAN
-y: Ph D ConsJont6, tnc.
401 Watt ‘A Street
Suite 2600
San Dlogo, CA 82101
SUBTOTAL PUBUC IMPROVEMENTS
PRIVATE IMPROVEMENTs
$1 *sa5
PRIVATE SURFACE IMPROVEMENTS
PRIVATE STORM DRAIN IMPROVEMENT6 PRIVATE WATER IMPROVEMENTS PRIVATE SEWER lMPROVE”$TS PRIVATE LANDSCAPE AND IRRIGATION
PRIVATE PARK SITE IMPROVEMENT‘S
RESTROOM EUILDINQS MAINTMANCE BUILDING
DRY UTILITIES
s412,400 Blm,ow
Sl6,Soa
S27,250
t1,385.000 S830.6000 s30omo
S150.000
f50.000
s%260,760
-
L
SUBTOTAL PRIVATE IMPROVEMEW
COMMUNINBUILDING
COMMUNIT BUIL31NO
COMMUNlTY BUG. TERRACE 6 UNDICAPE ~3.400,OOO
3250,000
S730,OOO
-000
CONTINGENCY (20%)
TOTAL COMMUNITY BUIUNQ COST
EXHIBIT 4 163
ZONE 19 PARK
JUSTIFICATION FOR MERGING PHASE I & II
Currently, Phase I includes all park improvements except the proposed community
center, which is scheduled for 2010-20. Recently, the Recreation Department has
come to the realization that “phasing” park improvements (unless there is’a compelling
reason) has not been in the best interest of the City, for the following reasons:
A.
B.
- -
C.
D.
Phasing (e.9. Poinsettia Park) has caused major problems in construction
contract administration. Claims arise when features installed in previous
phases, don’t match up to as-builts.
Construction of amenities (especially a major building) in a park that is open
to the public is problematic, causing inconvenience to the public and
potentially a liability situation.
Costs are greater because 1) increase related to inflation for phases that are
put of into the future, 2) by constructing smaller phased projects, and 2) via
potential claims as outlined in “A” above.
TO rightfully count ALL the park acreage as meeting the Growth Management
standards, ALL the park amenities should be completed and available to the
public.
In addition, the existing
turned away from progl
of new housing units in
community centers are extremely impacted. Citizens are being
-ams for lack of space. The recent completion of a large quantity
Aviara and adjacent developments will exacerbate the situation.
Finally, this community center will be geared to activities that create revenues to offset
the M & 0 costs.
EXHIBIT 5
4. Capital Improvement Program - Project Request Form
For CIP Committee's Use Only
Date Received:
CIP Committee
Review Date:
Committee
Recommendation: 0 Include in CIP 0 Add'l Info Requ~red 0 Do not Include In CIP
CONTACT
1. Project Sponsor Mark Steyaert Ext. 2855
2. Department & Division RECREATION. Park Development
3. Department Head Signature Date 1 \-
~ ~~ ~ ~~ ~~ ~
DESCRIPTION
1. 0 New Project Updated Project
2. Project Name PARK COST UPDATE Project No. Varies
3. Project Location: NA 0 Located in Coastal Zone 0 Located outside Coastal Zone
Pine School (NW Quad.), NE Quadrant Park, Alga Norte Park; Pine School Community Center,
Poinsettia Community Park
4. Project Type: 0 American Disabilities Act 0 Administrative 0 Police 8 Fire 0 Library 0 Miscellaneous Civic 0 Public Arts Redevelopment Facilities Maintenance @ Parks 0 Drainage 0 Encina Wastewater Facility
0 Sewer Collection Water Distribution 0 Recycled Water
Traffic Signal 0 Street 0 Freeway Interchange
5. Project Description
Upgrade future park projects costs. Future park project budgets (those far enough out in the future that
site specific costs have yet to be developed) are based on generic costs derived from historical data.
The current CIP park budgets are based on $200,000 per acre for site development, and $200 square foot for buildings. These costs include all expenses related to park development including, design,
environmental, administration, and construction (and FF&E for buildings). Costs are for high quality park
facilities typical of those developed in Carlsbad in the past. Recently, new information has been
received that indicate that costs are $250,000 per acre and $230 Der square foot for buildings.
These costs came from recently received Zone 19 Park estimates and City of San Diego Parks and
Recreation Department figures.
~ ~ -~
H:\WORDUWARKS MEMOS 8 LElTERS 2000\CIP\Z001-2002\CIPPro~edRequestFonNEW 01-02 GENERIC.doc PAGE 1 OF 4
165
.
Capital Improvement Program
Project Request Form
DESCRIPTION (CON'T)
6. Project Background
E E Master Plan supporting document and/or drawings.
[3 0 ConceptuaVPre-Design Report and/or Drawings.
0 0 @ Site Study.
@ [3 0 Cost Estimate.
[3 Geotechnical Studies.
0 a Project Alternatives Analysis. .a -. 0 Other. Please Indicate refer to Exhibits below.
Brief Summaries of Background Documents:
Exhibit 1- Summary chart
2 - Cost estimate for Zone 19 Park
-
7. Project Need
To provide realistic future costs so that financial impacts can analyzed and planned for.
ESTIMATED PERMlTTlNG/ENVIRONMENTAL REQUIREMENTS
1. Permits: NA
0 Conditional Use 0 Coastal Fish 8 Game
0 Special Use 0 Army Corp Fish & Wildlife
0 Building 0 Regional Water Other
Quality Control Please indicate
2. Environmental: NA
CEQA: Exempt 0 Other Existing X Future Review Required
Environmental Document
NEPA: Required x Not Required 0 Unknown
H:\WORD\MARKS MEMOS B LElTERS 2000\CIPL?001-2002\CIPProjeclRequestFonNEW 01-02 GENERIC.doc PAGE 2 OF 4
I66
Capital Improvement Program
Project Request Form
FINANCING
I. Total Budget Request:
2. Project Manager: Client Department D Consultant Managed by Client Department 0 Engineering Design Division
3. Schedule: Refer to attached chart.
Estimated Cost
Fiscal Year
Activity 01 -02 02-03 03-04 05-06 06-07
Studies 8 Reports
Environmental .(o
L -
Construction r- w
4. Change to CostlSchedule:
Reason:
Increase costs in park development
Supporting Documentation Attached
07-12 IbBuildout
Requested
Funding - Source
Increase 0 Decrease
No Documentation Available
OPERATING COSTS
1. Annual Operating Cost: NA
2. Method Used to Determine Cost: Current cost figures
Documentation Attached 0 No Documentation Available
H:\WORD\MARKS MEMOS 8 LElTERS 2000\CIPV001-2002\CIPPro~ectRequestFonnNEW 01-02 GENERCdoc PAGE 3 OF 4
1
c
.L
L
L
+ x
I 0
a
I- cn 0 0 c 2 z e 0 T I
0 0 0
m 0-
(v-
7
u)
"
*
c3 0
9
"
LL LL a
"
0 0 0
Lo 0
0
a-
I
"c
0 0 0
m N
0
a,
168