STAFF REPORT
DATE: October 12, 1983
APPLICATION SUBMITTAL DATE:i~ •r11. 31, 1983
✓P4/4lt 8(/-:::3
@
TO: Planning Commission
FROM: Land Use Planning Manager
SUBJECT: EIR 83-5/GPA 70(A)/ZC-276 -ALANDA -Request for 1)
Certification of an Environmental Impact Report for a
47 acre parcel located on the northwest and southwest
corners of Elm Avenue and El Camino Real, 2) a general
plan amendment from RM to RMH and a zone change from
R-A-10,000 to RDM(Q) on approximately 8.8 acres of
property located on the northwest corner of Elm Avenue
and El Camino Real.
I • RECOMMENDATION
It is recommended that the Planning Commission:
1) ADOPT Resolution' Nb. 2: 192 recorimiending ..
CERTIFICATION of EI~ 83-5 to the City Council based
on the findings contained therein.
2) Adopt Resolution Nos. 2193 and 2194 recommending
APPROVAL of GPA 70(A) and ZC-276 to the City
Council based on the findings and subject to the
conditions contained therein.
II. PROJECT DESCRIPTION
The applicant is requesting approval for: 1) The certification
of an Environmental Impact Report on a 47 acre parcel located as
described above, and 2) a general plan amendment and zone change
from RM (4-10 du's/acre) to RMH (10-20 du's/acre) and R-A-10,000
to RDM (Q) respectively on the portion of the property north of
future Elm Avenue.
The applicant's intent is to develop a comprehensive residential
development on the entire 47 acre parcel. Staff has seen
preliminary plans for a 220 unit apartment project on the north
side of the future extension of Elm Avenue, a clustered single
family development on the south side of Elm Avenue, and a 10,000
square foot lot subdivision along the western boundary of the
property. The steeper portions of the site would remain in open
space.
• • The applicant has recently acquired additional properties to
include in a proposed mixed use development. Due to these project
boundary changes, the applicant has not finalized development
plans ·and is only requesting a land use change and rezone for the
portion north of proposed Elm Avenue. While both staff and the
applicant would prefer bringing the total proposal before the
Planning Commission at one time, the time constraints of General
Plan Amendments (the next scheduled hearing is not until June,
1984), precludes this arrangement. Within a few weeks, the
applicant will be submitting a tentative tract map and planned
development permit for the southern portion of the property along
with a zone change from R-A-10,000 to R-1-7500 on the portion of
his property just south of Elm Avenue. Also, the applicant will
be submitting a site development plan for the apartment project
north of Elm Avenue in the near future. Staff has not completed
a detailed review of any development proposals and presently is
not ready to make a recommendation for these.
Staff has indicated to the applicant that a transitional land
use concept could be considered on the property. The transition
would be from a medium high density development on the north
side of Elm Avenue to a larger lot (10,000 square foot minimum)
on the western boundary of the property adjacent to existing.
~ingle.~amily ~om~s~ . · ·
The site is presently vacant except for a~ existing horse ranch
in the center of the property. Eucalyptus groves are located in
the northwestern and southern portions of the site.
III. EIR 83-5 MAJOR IMPACTS
1. Traffic Circulation
The EIR pointed out that the project could potentially impact
Chestnut Avenue and create cumulative impacts to the
interchange at SR 78 and El Camino Real. The extension of
Elm Avenue to El Camino Real should help mitigate these
impacts, however, not to an insignificant degree. Staff
believes that the extension of Elm Avenue is an overriding
consideration to traffic impacts created by the project.
2. Geology
The EIR states that a potentially significant impact exists
with regard to an ancient landslide that may be present on
the site. Subsequent studies and test borings have indicated
that this landslide does not exist. Instead, an ancient
mudflow exists in this area, which can be stabilized through
traditional grading practices.
The EIR further states that any significant development of
the site would constitute a significant impact to topography
due to its steepness. Most of this impact would be created
by the construction of Elm Avenue. Staff believes that the
need to extend Elm Avenue to El Camino Real overrides this
impact.
-2-
•
3. Sedimentation
The EIR points out that the site is highly erodible in and
around the drainage basin along the east side of the property
which drains directly into Buena Vista Creek and into Buena
Vista Lagoon. A potentially significant impact could result
from grading which could increase sedimentation of the
lagoon. Mitigation measures include the construction of
drainage structures and desiltation basins on-site to
minimize off-site sedimentation.
4. Archaeology
The possibility exists that significant archaeological
resources may be found on the site. Mitigation measures
include further study prior to grading and salvage if
determined necessary by a qualified archaeologist. The
project will be conditioned that an archaeologist be on-site
during the initial grading operation.
5. Air Quality
The proposeq project is.· cQns idere<;I to. have an advers~ .
climurative. impac·t ·on regional" a·i-r quality based on RAQS
· population projections~-The need to provide appropriate
housing for the city overrides this impact.
IV. ANALYSIS
Planning Issues
1) Would the proposed land use/zoning change be compatible
with existing and future land uses in the area?
2) Are adequate buffers provided between different land
uses?
Discussion
It is Staff's opinion that the site lends itself well to a land
use transition, decreasing in density as one moves southward.
The northern boundary of the site is directly adjacent to an
apartment project which will be constructed at 19 du/ac. A
general plan designation of RMH (10-20 du/ac) on the northern
portion of this site (north of Elm Avenue) would be compatible
with such a project. Elm Avenue provides an excellent buffer
between the RMH and the lower density development to the south.
-3-
As previously mentioned, the applicant proposes to submit a zone
change application for the central portion of the property
immediately south of Elm Avenue to R-1-7500. This would be
submitted in conjunction with a clustered development plan. The
remainder of the property along the western boundary line and the
southern half of the property will remain zoned as R-A-10,000
square foot minimum. Since detailed development plans have not
been submitted, a precise zoning boundary cannot be determined at
this time.
Staff believes the northern portion of the site, north of Elm
Avenue, can stand on its own with regard to the RMH designation
and RDM(Q) zone. The property will tie in well with the parcel
to the north which currently has an RMH designation. Also, Elm
Avenue and El Camino Real would serve as logical land use
boundaries for an RMH designation on this site. Both these
streets will be able to handle the additional traffic that could
be generated by uses allowed in this designation
In addition, the applicant has indicated his intent of providing
low cost housing for low and moderate income families. Staff
believes the provision of such housing futher justifies a
general plan amendment ·to a ,highe.~ -<{ensi ty.
The Q overlay will provide for Planning Commission review of a
site development plan prior to any development of the property.
Since Staff believes the proposed land uses and zoning are ·
appropriate for the northern site, staff is recommending approval
of GPA 70(A) and ZC-276. At this time, no change in zoning is
recommended for the portion of the property south of Elm Avenue.
Attachments:
1. Resolution Nos. 2192, 2193 and 2194
2. Location Map
3. Background Data Sheet
4. Disclosure Statement
5. Exhibits "A" and "B", dated September 28, 1983
BH:ad
9/28/83
-4-
------------~-----•-1•-•~L•-·-•-•~--~f-•-•C-------------, i".'-:..i(1 L. --:.-•-----------------------~r.;>jit:11rtl, .... J Rlii'twl I * t .....
l .
l. i .
·i j
' ·•
.i .,
J
' ', i
.i
l '1 ,I
1 , .
.i
·1
;{
~ . , -~
'i ,!
l i
l
i
! l
1
l l ..
!: 0 z :a 0 rn
U) ....
. .
\ ; .. --· ~ ....
Subject Project
! l I _____ A_L_A_N_D_A _________ T EIR a3-s
1
BACKGROUND DATA SHEE'T
CASE 00: EIR 83-5/GPA 70(A)/ZC-276
APPLICANT: ALANDA -------------
•
REQUEST .AND I.CCATICN: EIR ona 47 acre parcel, General Plan Amendment from RM to
RMH, and zone change from R-A-10,000 to RDM(Q); northwest and southwest corner
of El Cainino Real and Elm Avenue
L&;AL DESCRIPTION: that :portion of Lot "J" of the Rancho Agua Hedionda in City
of Carlsoad, county of San Diego, according to Map 823,
filed November 1896. APN: 167-060-10 & 13
Acres 47 Proposed No. of Lots/Units --------------
GENERAL PLAN AND ZONING
Land Use Designation --------RM
Dens_ity ,Allowed
Existin:J Zone
4·-10. du's/acre Del)Sity.J;>ro~ed 10-20 .. d1:1 1s/acre
R-A-10,000 Prqposed Zone RDM(Q) -------------
Surroundin:J Zonin:J and Land Use:
Zoning
Site R-A-10,000
North P-C
South R-A-10,000
East R-1 ---
West R-A-10,000
PUBLIC FACILITIES
Land Use
Vacant
Future Apartment
Vacant
SFR
SFR
School District Carlsbad Water Carlsbad Sewer Carlsbad EDU's -----
Public Facilities Fee Agreement, dated March 30, 1983 ------------------
ENVIRCNMENTAL IMPACT ASSESSMENT
__ Negative Declaration, issued __________ _
X E.I.R. Certified, dated --------------
Other, _____________________________ _
. t!ScA TION MAP
RMH
EXHIBIT A SEPT. 28, 1983
1--.---. SITE
RLM
ALANDA
RM/0 __ ..... , ----. ' .... ' '
RM TO RMH
....
GPA-70(A)
· l!:,cA TION MAP
P-C
R-A-10
ALANDA
EXHIBIT B
SEPT. 28, 1983
J-......-ai~a. SITE
R-A-10 TO RDM(Q)
__ ... , -----..... ' ' ' '
ZC-276