HomeMy WebLinkAbout1991-09-18; Planning Commission; ; PCD|GPC 02 - 1991-92 CAPITAL IMPROVEMENT PROGRAMSTAFF REPORT DATE: SEPTEMBER 18, 1991 TO: PLANNING COMMISSION FROM: PLANNING DEPARTMENT SUBJECT: PCD/GPC 91-2 -1991-92 CAPITAL IMPROVEMENT PROGRAM - Request for a General Plan Consistency Determination for the 1991-92 Capital Improvement Program. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 3298, APPROVING PCD/GPC 91-2, based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND The project is the determination of General Plan consistency for the 1991-92 Capital Improvement Program. Section 65401 of the California Government Code requires that a list of the proposed public works recommended for planning, initiation or construction during the ensuing fiscal year be reviewed as to conformity with the adopted general plan. The goal of the General Plan is to provide for the development of Carlsbad as a carefully planned, balanced community that will provide its citizens with the full range of physical facilities and human services that will ensure a life of quality for all. The Capital Improvement Program is developed to implement and maintain that goal. The majority of the projects are circulation related; to include, intersection improvements and a traffic signal at Carlsbad Boulevard and State Street, a traffic signal at Palomar Airport Road and Palomar Oaks Way, modification of the traffic signal at El Camino Real and Tamarack Avenue, Carlsbad Boulevard bridge at Batiquitos Lagoon, Carlsbad Boulevard Shore Protection, improvements to El Camino Real from Palomar Airport Road to Faraday Avenue, Jefferson Street bike paths, improvements to Palomar Airport Road from El Camino Real to Business Park Drive, improvements to Carlsbad Boulevard from Manzano Drive to Cannon Road, improvements to El Camino Real from Tamarack Avenue to Chestnut Avenue, the sidewalk construction program, improvements to Laguna Drive from State Street to Jefferson Street, improvements to Tamarack Avenue from Carlsbad Boulevard to Jefferson Street, Handicap Access Ramps, and Madison Street sidewalks. PCD/GPC 91-2 - 1991-95 SEPTEMBER 18, 1991 PAGE 2 ^CAPITAL IMPROVEMENT PROGR^ Park improvements include the golf course, Larwin Park, Alta Mira Park, Hosp Grove, the Whale Watch fence, and Holiday Park irrigation renovation. Other renovations include the Cole Library and Buena Vista Drainage Channel. There are two sewer projects listed: the Buena Vista Lift Station and the Vista Carlsbad Trunk Line. Planning Commission Determinations of General Plan consistency have been made previously for the following projects: the Vista Carlsbad Trunk Line, modifications to the traffic signal at El Camino Real and Tamarack Avenue, improvements to Tamarack Avenue from Carlsbad Boulevard to Jefferson Street, the Carlsbad Boulevard Shore Protection project, and the Whale Watch fence. III. ANALYSIS Planning Issues 1. Is the project consistent with the goals and policies of the City's General Plan? Discussion The project list includes improvements to park, circulation, drainage, sewer, and library facilities. The following is a list of pertinent elements of the general plan with an accompanying overall goal statement for each: 1. Land Use - Provide a plan to guide the physical development of the City in an orderly, functional and compatible manner. 2. Circulation - Provide a safe, realistic, and integrated circulation system compatible with the existing and proposed land use pattern of the City. 3. Conservation - Provide a plan for the conservation, development, and utilization of the natural resources in the City. 4. Open Space - Provide for the comprehensive and long-range preservation and conservation of open space land within the City. 5. Safety - Provide a comprehensive plan to prepare for and protect against fires, floods, and other major disasters. 6. Parks and Recreation - Meet the recreational needs of the community by providing a system of parks, green belts, land and water recreation facilities and buildings in an integrated, useful, attractive and comfortable environment. PCD/GPC 91-2 - 1991 -^CAPITAL IMPROVEMENT PROGR^ SEPTEMBER 18, 1991 PAGE 3 7. Public Facilities - Assure that adequate public services and facilities are available to meet the needs of the existing and future population of the City. The policies of the Land Use Element include permitting the development of land only after adequate provision for services such as transportation, water, sewerage, utilities and public facilities. The policies of the Circulation Element require that operational efficiencies of streets should be improved using modern design standards and latest available technology (C.3.1), adequate traffic safety measures should be provided at all intersections (C.3.2), and adequate sidewalks should be provided as required by the City's public improvement ordinance, with special attention to streets classified as collectors, or higher, areas of impaired public safety, adjacent to schools, and along Carlsbad Boulevard (C.3.4). The policies of the Open Space and Conservation Elements state (I.C.I 8) Open Space areas designated for recreational use should be accessible to the public and should be provided with essential utilities, public facilities and services, (2.C.3) initiate, coordinate, and supervise specific implementation programs for both short range and long range plans, including among other items the Capital Improvement Program, Growth Management Plan, a financial plan, proposed changes to the City's development regulations, and the acquisition of fee and less than fee rights to land. The policies of the Public Safety Element include, (Bl) the City will establish standards and criteria to reduce flood hazards and implement them by adopting new codes and ordinances or strengthening existing ones, and (D2) the City will maintain and periodically update standard design criteria for the design of public works improvements in the City of Carlsbad. The goals of the Parks and Recreation Element also include, (Al) to provide a diversified, comprehensive park system for the City of Carlsbad, utilizing contemporary concepts and planning strategies. The policies of the Public Facilities Element require that emphasis shall be given to ensuring good traffic circulation, schools, parks, libraries, open space and recreational amenities. Summary As demonstrated by the above review the Capital Improvement Program is not only consistent with the various elements of the General Plan, but is recognized within the elements as a necessary implementation tool for the goals and policies contained therein. -tcPCD/GPC 91-2 - 1991-^CAPITAL IMPROVEMENT SEPTEMBER 18, 1991 PAGE 4 IV. ENVIRONMENTAL REVIEW Since a Planning Commission Determination of General Plan consistency is based on the existing General Plan, the Planning Director has determined that the environmental effects of the project (the General Plan consistency of the Capital Improvement Program) have already been considered in conjunction with previously certified environmental documents and, therefore, no additional environmental review will be required. Approval for this project does not constitute prior environmental review for the projects listed within the Capital Improvement Program. All projects within the Capital Improvement Program shall undergo environmental review per Title 19 of the Carlsbad Municipal Code. Any mitigation measures determined during a project's environmental review shall be complied with in their entirety unless findings of overriding consideration are made by the City Council. ATTACHMENTS 1. Planning Commission Resolution No. 3298 2. Exhibit "A", dated September 18, 1991 August 26, 1991 BH:km:vd:lh PROJECTS NEEDING GENERAL PLAN CONSISTENCY FINDING 1990& PRIOR F.Y. - .''"yv^s^ • Golf Course Larwin Park Alta Mira Park: Phase I Buena Vista Lift Station Vista Carlsbad Trunk Line Carlsbad Boulevard/State Street: Intersec. Impr. & Traffic Signal Traffic Signal: Palomar Airport Road/Palomar Oaks Traffic Signai: (Modify) ECR/Tamarack Avenue Carlsbad Boulevard Bridge Over Batiquitos Lagoon Carlsbad Boulevard Shore Protection ECR: Palomar Airport Road to Faraday Avenue & Intersection Jefferson Street: Bike Paths Palomar Airport Road: ECR to Business Park Drive Carlsbad Boulevard: Manzano Drive to Cannon Road El Camino Real: Tamarack Avenue to Chestnut Avenue Sidewalk Construction Program Laguna Drive: State Street to Jefferson Street Tamarack Avenue: Carlsbad Boulevard to Jefferson Street Whale Watch Fence TYPE Park Park Park Sewer Sewer Circulation Circulation Circulation Circulation Circulation Circulation Circulation Circulation Circulation Circulation Circulation Circulation . Circulation Maintenance COST $8,800,000 3,790,000 8,370,000 80,000 1,760,000 190,000 90,000 105,000 1,600,000 2,700,000 2,450,000 95,000 5,000,000 2,100,000 1,760,000 700,000 250,000 1,900,000 155,000 RHA:jkb 4/19/91 CITY OF CARLSBAD PLANNING COMMISSION CASENO PC b /APS 9/0 EXHIBIT NO., A .DATE. PROJECTS NEEDING GENERAL PLAN CONSISTENCY FINDING 1991-92 F.Y. ' :. . NAlOlE^'-'^:^;;;v:V:^^V: J-^H ':: Cole Library: Renovate Hosp Grove Improvements Handicap Access Ramps Madison Street Sidewalks Buena Vista Channel Repair Holiday Park Irrigation Renovation TYPE Civic Park Circulation Circulation Maintenance Maintenance COST $1 ,744,400 172,000 70,000 200,000 200,000 95,000 NOTE: All water projects are part of the Water Master Plan for which a General Plan Consistency finding was approved previously. RHA:jkb 4/19/91 CAPITAL PROJECT DESCRIPTION RENOVATR (DT.R TJRRARY Project Title PROJECT LOCATION MAP 1-5 'A •LAGUNA \ m •- \C.H. LIB. SITE ELM 7 AVENUE TJ O -o Oo a2 m F.S. PROJECT LOCATION Aftt the site of the existing library, 1250 Carlsbad Village Drive. PROJECT DESCRIPTION This project is based upon a Master Plan and Feasibil- ity Study completed by Cardwell/Thomas & Associates and James McGraw Associates, Architects in July 1990. The recommended remodeling includes new_wood and steel screen walls, nev elevator, new stairs and ramped bridge to connect two mezzanines, new atrium roof and clerestory, handicap accessible bathrooms, replace all non-tempered glazing, new carpet, new paint, new furniture and eguiprtient. This remodel will increase usable public service area by 3,000 square feet and improve access to and layout of public service areas. PROJECT NEED Provides for needed health and safety improvements, restores building to its original beauty, and allows for delivery of quality library service. TOTAL PROJECT COST: Fiscal Year Funding Source Purpose DpcrotHKj Costs PROJECT FUNDING , | 744 4£o 1991-92 199Z-93 1993-94 1994-95 1995-96 1996-2001 200H PFF ' PFF np.sirm . Constr, .. . $i73.nnn $1 ,fi?i .4nn CAPITAL PROJECT DESCRIPTION TAMARACK AVENUE Project Title PROJECT LOCATION MAP PROJECT LOCATION From Carlsbad Boulevard to Jefferson Street. PROJECT DESCRIPTION Widen existing narrow road to new ^»^yir? curb- to-curb width of 44 feet and 64 feet (where the are parking areas). Construct curb and gutter, pavement widening, striped center turn lane, sidewalks and streetlights. In addition, existing overhead utilities will be placed underground. At a later date, a bridge is proposed to be constructed over the AT&SF Railway. PROJECT NEED Required to meet Growth Management Standards and identified in the Circulation Element of the General Plan. TOTAL PROJECT COST: $3,900,000 Fiscal Year 1990-91 . 1991-92 Funding Source PFF Purpose Design/Const. Amount $1,900.000 Operating Costs $8.400 PROJECT FUNDING 1992-93 1993-94 1994-1995 1995-2000 2000+ PFF Design/Const. $2.000.000 $8 400 $8,400 $8,400 $42,000 126 CAPITAL PROJECT DESCRIPTION WHALE WATCH FENCE REPLACEMENT Project Title PROJECT LOCATION MAP PROJECT LOCATION At bluff along Carlsbad Blvd. between Tamarack Avenue and Cherry Street. PROJECT DESCRIPTION Replace 1200 feet of existing wooden fence along ocean bluff-top on the west side of Carlsbad Blvd. with 1200 feet of new aluminum railing. PROJECT NEED On 12/12/89 Council directed that the existing wooden fence be replaced. TOTAL PROJECT COST: Fiscal Year Funding Source Purpose Amount Operating Costs PROJECT FUNDING $ 155.000 1990-91 1991-92 1992-93 1993-94 1994-1995 1995-2000 2000+ GCC Design/Construct $155.000 20A CAPITAL PROJECT DESCRIPTION SIDEWALK CONSTRUCTION PROJECT LOCATION LOCATION 9. PINE AVENUE 10. VALLEY STREET 11. OCEAN STREET 12. CHESTNUT AVENUE 13. MAGNOLIA AVENUE f4. MAGNOLIA AVENUE SIDEWALK SEGMENT Lincoln St. to 184.0' West Garfield St. to 82.0' West Lincoln St. to 19.0' West Magnolia Ave. to 610.0' South Oak Ave. to 71.0' South Elm Aye. to Grand Ave. Christiansen Wy. to Grand Ave. Beech Ave. to 232.0' South Pacific Ave. to 395.0' North Pacific Ave. to Cypress Ave. Elm Aye. to 510.O1 South Christiansen Wy. to Grand Ave. Pacific Ave. to Cypress Ave. Pacific Ave. to 163.0' North Mountain View Dr. to Garfield St. 90,0' w/o Seaview Wy. to Donna Dr. , Westhaven Dr. to 485.0' East Highland Dr. to 25.0' East Valley St. to 437.0' East Monroe St. to 389.0' West Valley St. to 176.0' East Monroe St. to 189.0' West Pio Pico Dr. to Adams St PioPico Dr. to 189.0' East Adams St to 275.0' East Highland Dr. to 243.0' West REMARKS F.I.A. (2 Parcels) F.I.A F.I.A. F.I.A (1 Parcel) PROJECT LOCATION See Project Location at left. PROJECT DESCRIPTION Construct various sidewalk segments in accordance with Year II of the Sidewalk Inventory Report. Locations/segments indicated with FIA (Future Improvement Agreement) should be investigated as alternative funding sources. PROJECT NEED Location/segments are listed in priority order in accordance with the Sidewalk Inventory Report. The sidewalk is needed to accommodate pedestrian traffic. 1 1991-92 TIP TOTAL PROJECT COST: $ 316.250 Fiscat fear Finding Source Purpose Amount Operating Costs 1992-93 PROJECT FUNDING 1993-94 1995-96 1996-2001 2001+ Construction $316.250 - H/A CAPITAL PROJECT DESCRIPTION SIDEWALK CONSTRUCTION PROJECT LOCATION LOCATION 1. TAMARACK AVENUE 2. VALLEY STREET 3. CAMINO VIDA ROBLE 4. MONROE STREET 5. CHESTNUT AVENUE 6. HIGHLAND DRIVE 7. VICTORIA AVENUE TAMARACK AVENUE JEFFERSON STREET 8. BASSWOOD AVENUE PARK DRIVE SIDEWALK SEGMENT Park Dr. to 214.0'West Basswood Ave. to 335.0' North Yarrow Dr. to Corte Del Abeto Corte Del Nogal to 260.0' South Palomar Airport Rd. to Corte Del Nogal 528.0' e/o Palomar Oaks Wy. to 123.0' East Owens Ave. to 117.0' East 528.0' w/o Owens Ave. to 121.0' West El Camlno Real to Las Palmas Dr. Las Palmas Dr. to Palomar Oaks Wy. Palomar Oaks Wy. to Palomar Airport Rd. Park Dr. to 350.0f North F.I.A. 103.0' n/o Karren Ln. to 81.0' North Basswood Ave. to 52.0' South > Magnolia Ave. to 430.0' South Basswood Ave. to 451.0' South Magnolia Ave. to 137.0' North Donna Dr. to 152.0' West Chestnut Ave. to 331.0'North - HilMew Ct. to Magnolia Ave. Chestnut Ave. to 314.0'South Basswood Ave. to Chestnut Ave. 125.0' w/o Elm Ave. to 101.0' West La Portalada Dr. to 363.0' West Chinquapin Ave. to Citrus Pf. Citrus PI. to Tamarack Ave. Tamarack Ave. to Chinquapin Ave. 99.0' s/o Magnolia Ave. to 101.0' South Donna Dr. to 78.0' West Valley St. to Maezel Ln. Maezel Ln. to Canyon St Donna Dr. to Belle Ln. Monroe St. to 463.0' South 68.0' s/o Tamarack Ave. to 51.0' South 119.0' s/o Tamarack Ave. to 78.0' South 192.0' s/o Tamarack Ave. to 226.0' South 112.0' s/o Monroe St. to 262.0' South Tamarack Ave. to 462.0' North REMARKS F.I.A. (Various Parcels) PROJECT LOCATION See Project Location at left. PROJECT DESCRIPTION Construct various sidewalk segments in accordance with Year I of the Sidewalk Inventory Report. Locations/segments indicated with FIA (Future Improvement Agreement) should be investigated as alternative funding sources. PROJECT NEED Location/segments are listed in priority order in accordance with the Sidewalk Inventory Report. The sidewalk is needed to accommodate pedestrian traffic. PROJECT FUNDING TOTAL PROJECT COST: < 424.100 Fiscal Year 1990-91 Funding Source TIF Purpose Amount Operating Costs 1992-93 1993-94 1994-95 1995-2000 2000+ Construction S424.100 H/A CAPITAL PROJECT DESCRIPTION EL CAMINO REAL WIDENING (TAMARACK AVE. TO CHESTNUT AVE.) Project Title PROJECT LOCATION MAP PROJECT LOCATION Portions of El Camino Real from Tamarack Avenue to Chestnut Avenue. PROJECT DESCRIPTION Add the outside lane to widen street to full prime arterial standards. Widen west side approximately 1200 ft. in length and east side approximately 600 ft. in length. Construct curb & gutter, sidewalk, base, and asphalt pavement and streetlights. PROJECT NEED To complete widening to prime arterial standards where no developers are likely to develop and to improve the road capacity. PROJECT FUNDING TOTAL PROJECT COST: SI.760.OOP Fiscal Year 1991-92 Finding Source Purpose Amount Operating Costs 1992-93 TIF 1993-94 1994-95 1995-96 1996-2001 2001+ Construction $1.110.000 CAPITAL PROJECT DESCRIPTION PROJECT LOCATION MAP PROJECT CARLSBAD BOULEVARD WIDENING Project Title ! _J CANNON ROAD ^ CEREZO ill ct Q CO UJi CO 0 DC CO O LU CC O DRIVE — J O CO DC LU y MANZANO DRIVE PC9 •• ~ H - 33 r~ - 33 I O - D = ( t1 PROJECT LOCATION From Manzano Drive to Cannon Road. PROJECT DESCRIPTION Widen Carlsbad Boulevard from two lanes to four lanes with a center raised median (major arterial). Construct curb and gutter, stamped concrete and landscaping and streetlights. PROJECT NEED Required to meet Growth Management Standards and the Circulation Element of the General Plan. PROJECT FUNDING TOTAL PROJECT COST: t2.100.OOP Fiscal Year 1991-92 Funding Source Purpose Amount Operating Costs 1992-95 1993-94 1994-95 1995-96 1996-2001 TIP 2001+ Construction $2.OOP.OOP CAPITAL PROJECT DESCRIPTION P ALOMAR AIRPORT ROAD Project Title PROJECT LOCATION MAP COH 33mm PROJECT LOCATION From El Camino Real to Business Park Drive. PROJECT DESCRIPTION An interim project to widen the road to four lanes with a median. Work includes grading to full prime arterial width, pavement removal, new pavement, median and drainage as needed. TransNet/Hwy. funding must be augmented by developer funding to construct project. Ultimate project width of six lanes will be done by developers on an assessment district. PROJECT NEED Required to meet Growth Management Standards. TOTAL PROJECT COST Fiscal Year Funding Source Purpose Amount Operating Costs PROJECT FUNDING : $5.000,000 1990-91 1991-92 1992-93 1993-94 1994-1995 1995-2000 2000+ fr-Huy/Deve toper Construction $1,625.000/$2.850,000 $38.000 $38.000 $38.000 $38.000 $190,000 111 CAPITAL PROJECT DESCRIPTION CARLSBAD BOULEVARD SHORE PROTECTION Project Title PROJECT LOCATION HAP AGUA HEDIONDA LAGOON PROJECT LOCATION At the west edge of Carlsbad Boulevard between the warm and cold water jetties at the Agua Hedionda Lagoon. PROJECT DESCRIPTION Construct a concrete capped sheet piling wall at. the west edge of Carlsbad Boulevard approximate!! 2,000 feet long. Funds listed below are for a 25% match for State Boating and Waterway funds of $2,400,000. PROJECT NEED To reduce damage to Carlsbad Boulevard from winter storms and ocean wave action and prevent( pavement and sidewalk from being undermined. TOTAL PROJECT COST Fiscal Year Funding Source Purpose Amount Operating Costs PROJECT FUNDING : $3,500.000 1990-91 1991-92 1992-93 1993-94 1994-1995 1995-2000 2000+ GCC/State Grant Construction $800. 000 £$2. 400, 000 84 CAPITAL PROJECT DESCRIPTION CARLSBAD BOULEVARD BRIDGE CSQUTHBQUND1 Project Title PROJECT LOCATION MAP PROJECT LOCATION The southbound bridge structure over Batiquitos Lagoon. PROJECT DESCRIPTION Remove old existing bridge and replace with prestressed concrete bridge structure. Project will be coordinated with the Batiquitos Lagoon Enhancement Project. PROJECT NEED The old existing bridge is deficient and requir replacement. TOTAL PROJECT COST: Fiscal Year Funding Source Purpose Amount Operating Costs PROJECT FUNDING $2.000.000 1990-91 1991-92 1992-93 1993-94 1994-1995 1995-2000 2000+ BR/POLA Design/Const. 1.600.000/400.000 83 CAPITAL PROJECT DESCRIPTION STATE STREET/CARLSBAD BOULEVARD INTERSECTION Project Title PROJECT LOCATION MAP PROJECT LOCATION The intersection of State Street and Carlsbad Boulevard. PROJECT DESCRIPTION Add a northbound left-turn lane on State Street for turns to southbound Carlsbad Boulevard. Construct curb and gutter, pavement and restripe streets. Project will be done concurrently with the State Street/Carlsbad Boulevard traffic signal. PROJECT NEED Required to provide turns into the Home Plant pump station and returns to Carlsbad without traveling to the City of Oceanside. TOTAL PROJECT COST: Fiscal Year Funding Source Purpose Amount Operating Costs PROJECT FUNDING $90.000 1990-91 1991-92 1992-93 1993-94 1994-1995 1995-2000 2000+ GCC Design/Const. $90.000 125 CAPITAL PROJECT DESCRIPTION TRAFFIC SIGNAL - STATE STREET/CARLSBAD BOULEVARD Project Title PROJECT LOCATION MAP SSGNAl LOCATION 1-5 PROJECT LOCATION Intersection of State Street and Carlsbad Boulevard. PROJECT DESCRIPTION Installation of a 4-phase, fully actuated traffic signal, including Type 170 controller, 176 inter- section control program, minor intersection improvements, signing and striping. PROJECT NEED; When •a-ignal warrants are me.t,—feiwn oemaidci-ad 'for inatai TOTAL PROJECT COST: Fiscal Year Funding Source Purpose Amount Operating Costs PROJECT FUNDING $100.000 1990-91 1991-92 1992-93 1993-94 1994-1995 1995-2000 2000+ , PFF Construction $100.000 $4 750 $4 750 $4.750 $4.750 $23.750 i 58 CAPITAL PROJECT DESCRIPTION VISTA/CARLSBAD INTERCEPTOR Project Title PROJECT LOCATION MAP HWY 78 BUENA VISTALAGOON;? \ INTERCEPTOR >**' PACIFIC OCEAN PROJECT LOCATION; Along Jefferson Street from 1-5 to Grand Avenue; along Grand Avenue from Jefferson Street to the railroad; along the railroad from Grand Ave. to the Encina WPCF. PROJECT DESCRIPTION Installation of new and upgraded sewer trunk lin through the downtown portion of Carlsbad to the Encina WPCF. The new pipe sizes will range from 36" pipe in Reach 5 to 60" pipe in Reach 14. The various reaches will be upgraded in phases as demand requires. This is a joint use line with the City of Vista and the cost of upgrading will be shared between the agencies. The included estimate is Carlsbad's share. PROJECT NEED Required to meet Growth Management Standards identified in the Master Plan of Sewerage. and/ PROJECT FUNDING TOTAL PROJECT COST: $4.000.000 Fiscal Year Funding Source Purpose Amount Operating Costs 1990-91 1991-92 1992-93 1993-94 1994-1995 1995-2000 Sewer Construction $990.000 2000+ Sewer Construction $1.250.000 39 CAPITAL PROJECT DESCRIPTION ALTA MIRA TENNIS CENTER Project Title PROJECT LOCATION MRP PROJECT LOCATION In the Southwest Quadrant east of Paseo del Norte between Palomar Airport Road and Poinsettia Lane. PROJECT DESCRIPTION Construct 19 lighted tennis courts in Alta Mira Park and include a clubhouse facility. PROJECT NEED; Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plant PROJECT FUNDING TOTAL PROJECT COST: Fiscal Year Funding Source Purpose Amount Operating Costs 1990-91 PFF 1993-93 1993-94 1994-1995 1995-2000 2000+ Design $252.000 Construction $1.008.000 $27 000 $27.000 $27,000 $135.000 29 CAPITAL PROJECT DESCRIPTION ALTA MIRA PARK Project Title PROJECT LOCATION MAP PROJECT LOCATION In the Southwest Quadrant east of Paseo del Norte between Palomar Airport Road and Poinsettia Lane. PROJECT DESCRIPTION The first phase of development of this 42-acre park will be to develop 32 acres. The second phase will develop an additional 10 acres. Proposed facilities include lighted sports fields, tot-lot, restrooms, indoor and outdoor soccer facilities, tennis courts, picnic areas, maintenance storage area and parking lots. PROJECT NEED; Required to meet Growth Management Standards and identified in the Parks and Recreation Element of the General Plan. TOTAL PROJECT COST: Fiscal Year Funding Source Purpose Amount Operating Costs &B 37O 000 IMC. TffNAJK cji > r i 1990-91 1991-92 PFF PFF Design/Const. Construction $1.260.000 $3.840,000 ~i~t?<L PROJECT FUNDINGrAJTfci^— 1992-93 1993-94 1994-1995 1995-2000 2000+ PFF Construction $1,200.000- $258.000 $258.000 $338,000 $1,690,000 CAPITAL PROJECT DESCRIPTION LARWIN COMMUNITY PARK - NORTHEAST QUADRANT Project Title PROJECT LOCATION MAP CITY BOUNDARY PROJECT LOCATION; This project is located in the northeast quadrant on the north side of Elm Avenue, west of Concord Street. PROJECT DESCRIPTION This community park project will involve the development of 22.3 acres of land. The plans call for tennis courts (2), basketball courts (4), baseball field (1), soccer multi-use field (1), parking areas, several picnic/view sites and gazebos. Extensive grading will be required for the completion of this park. PROJECT NEED; Required to meet Growth Management Standards. Currently there are numerous apart- g^ ments and attached housing projects in this area^P with a large number of children requiring recreational area.J TOTAL PROJECT COST: $?,790,000J fiscal Year 1990-91 Funding Source PFF Purpose Design Amount $290,000 PROJECT FUNDING 1991-92 1992-93 1993-94 1994-1995 1995-2000 2000+ PFF Constr. $?,500,000 Operating Costs CAPITAL PROJECT DESCRIPTION GOLF COURSE DEVELOPMENT Project Title PROJECT LOCATION MAP CITY BOUNDARY PROJECT LOCATION In the northeast quadrant of the City surrounding Lake Calavera. PROJECT DESCRIPTION Construct an 18-hole championship golf course. Work will include grading, landscaping and a clubhouse. The Golf Course Steering Committee may consider additional features to be included. DEBT REPAYMENT In order to construct the golf course in a timely manner, golf course construction bonds were sold for the financing. This debt will be repaid from the General Capital Construction fund. Repayment amount includes interest. The source of revenue for the golf course is the transient occupancy tax. PROJECT NEED Because of strong citizen interest, the Parks and Recreation Commission recommended building a golf course. TOTAL PROJECT COST: Fiscal Year Finding Source Purpose Amount Operating Costs $15.283.000 1991-92 1992-93 Golf Bonds Construction $14.000.000 PROJECT 1993-94 Enterprise Repay Debt $1.400.000 FUNDING 1994-95 Enterprise Repay Debt $1.400.000 1995-96 Enterprise Repay Debt $1.400.000 1996-2001 Enterprise Repay Debt $7.000.000 2001+ Enterprise Repay Debt $16.800.000 GOLFDEV.C1P CAPiTAL PROJECT DESCRIPTION HOLIDAY PARK JRRiGATIQN RENOVATION Project Title PROJECT LOCATION MAP BASSWOOD PROJECT CHESTNUT AVENUE \ PROJECT LOCATION Holiday Park, adjacent to Pio Pico Drive, between Pine Avenue and Chestnut Avenue. PROJECT DESCRIPTION Design and install a new irrigation system for Holiday Park. Tests have revealed the existing 20 year old irrigation system in need of major repairs and is operating far below acceptable water conservatic standards. The upgrade will standardize the heads, provide efficient uniform spacing and includes the installation of a state-of-the-art controller. PROJECT NEED Part of the City's overall water conservation effort. TOTAL PROJECT COST: Fiscal Year Funding Source Purpose Amount Operating Costs PROJECT FUNDING $95.000 1991-92 1992-93 1993-94 1994-95 1995-96 1996-2001 2001+ GCC Design/Construct. $95.000 • CAPITAL PROJECT DESCRIPTION BUENA VISTA CHANNEL REPAIR Project Title PROJECT LOCATION MAP ^\ BRIDGED BUENA VISTA CREEK CHANNEL EL CAMINO REAL-^ r^\ HIGHWAY 78 ' ^-PROJECT mitlH^ TOTAL PROJECT COST: S200.000 Fiscal Year 1991-92 Finding Source ' GCC Purpose Design/Construct. Amount $200.000 PROJECT LOCATION East of El Camino Real between Haymar Road & Highway 78. PROJECT DESCRIPTION Repair large section of concrete drainage channel that has been undermined by water. A| PROJECT NEED • Maintenance project required to prevent underming of bridge columns^^ of El Camino Real bridge. PROJECT FUNDING 1992-93 1993-94 1994-95 1995-96 1996-2001 2001+ Operating Costs CAPITAL PROJECT DESCRIPTION MADISON STREET SIDEWALKS Project Title PROJECT LOCATION MAP GRAND AVENUE 1 F PROJECT LOCATION From Grand Avenue to Laguna Drive. PROJECT DESCRIPTION Construct sidewalks, curbs & gutters and widen pavement on both sides of Madison Street (approximately 1450 feet in length). PROJECT NEED Complete street to local street standards per the Circulation Element of the General Plan and improve pedestrian circulation in the redevelopment area. TOTAL PROJECT COST: Fiscal Year Funding Source Purpose Amount Operating Costs PROJECT FUNDING $200.000 1991-92 1992-93 1993-94 1994-95 1995-96 1996-2001 2001+ GCC Design/Construct. $200.000 CAPITAL PROJECT DESCRIPTION HANDICAP ACCESS RAMPS Project Title PROJECT LOCATION MAP PROJECT\ HOME AVENUE D AVENUE PROJECT LOCATION Forty-nine (49) various intersections within redevelopment project and surrounding areas. PROJECT DESCRIPTION Construct standard concrete handicap access ramps to improve pedestrian access in the Village area. This is a second phase to complete work started two years ago. PROJECT NEED Based on citizen complaints and a need to provide safer, more convenient sidewalk access to handicap persons. TOTAL PROJECT COST: Fiscal Year Funding Source Purpose Amount Operating Costs PROJECT FUNDING $70.000 1991-92 1992-93 1993-94 1994-95 1995-96 1996-2001 2001+ GCC Design/Construct. $70,000 CAPITAL PROJECT DESCRIPTION HOSP GROVE IMPROVEMENTS Project Title PROJECT LOCATION MAP BUENA VISTA LAGOON PROJECT LOCATION A portion of Hosp Grove on the southwest corner of Jefferson Street and Marron Road. PROJECT DESCRIPTION Proposition 70 State Grant funds will be used to develop a portion of Hosp Grove (approximately 5 acres). Proposed amenities include: picnic facilities, tot lot play area, parking, pathways, and minimal landscaping. PROJECT NEED Part of NW Quadrant Park Enhancement Program approved by the Cil Council on August 28, 1990. TOTAL PROJECT COST: Fiscal Year Funding Source Fxirpose Amount Operating Costs PROJECT FUNDING $172.000 1991-92 1992-93 1993-94 1994-95 1995-96 1996-2001 2001+ State Grant Des i qn/Const ruct . $177.000 $12.500 CAPITAL PROJECT DESCRIPTION EL CAMINQ REAL & PALQMAR AIRPORT ROAD INTERSECTION Project Title PROJECT LOCATION MAP I i \ \ I PALOMAR AIRPORT ROAD PROJECT LOCATION At the above intersection and north to Faraday Avenue and 1000 feet east, south and west of the intersection. PROJECT DESCRIPTION Widen the intersection within the above limits to full prime arterial standards. Add one (1) thru lane and one (1) left turn lane on all and add one (1) right turn lane on all legs except westbound to southbound. Construct curb & gutter, median islands, pavement and base and sidewalks. PROJECT NEED Required to meet Growth Management Standards and conform to the Circulation Element of the General Plan. TOTAL PROJECT COST: $2.450.000 Fiscal tear Funding Source . Purpose Amount Operating Costs Construction $1.500.000 PROJECT FUNDING 1992-93 1993-94 1994-95 1995-96 1996-2001 2001+ CAPITAL PROJECT DESCRIPTION EL CAMINO REAL & TAMARACK AVENUE Project Title TAMARACK AVENUE PROJECT LOCATION MAP PROJECT Hi DC O2 O HI PROJECT LOCATION Intersection of El Camino Real and Tamarack Avenue. PROJECT DESCRIPTION Remove island and free right turn lane on Tamarack Avenue to provide^ an additional westbound thru lane. Revise traffic signal and add left turn phase to Tamarack Avenue. Work includes curb & gutter on northeast corner, restriping and signing. PROJECT NEED Deleting free right turn will facilitate pedestrians (school children) crossing El. Camino Real. Left turn phase will improve level of service i for this high-volume move. PROJECT FUNDING TOTAL PROJECT COST: tlOS.OOO Fiscal Year 1991-92 Funding Source Purpose Amount Operating Costs 1992-93 1993-94 1994-95 1995-96 1996-2001 2001* CAPITAL PROJECT DESCRIPTION LAGUNA DRIVE WIDENING Project Title PROJECT LOCATION MAP PROJECT LOCATION From State Street to Jefferson Street. PROJECT DESCRIPTION Widen pavement to standard collector street. Construct curb & gutter, pavement and base and sidewalks. PROJECT NEED To conform to the Circulation Element of the General Plan and provide adequate capacity for traffic. PROJECT FUNDING TOTAL PROJECT COST: $250,000 Fiscal Year Funding Source ' Purpose Amount Operating Costs 1991-92 1992-93 1993-94 1994-95 1995-96 1996-2001 200H CAPITAL PROJECT DESCRIPTION TRAFFIC SIGNAL - PALOMAR AIRPORT ROAD/PALOMAR OAKS WAY Project Title PROJECT LOCATION MAP SIGNAL LOCATION PROJECT LOCATION Intersection of Palomar Airport Road and Paiomar Oaks Way. PROJECT DESCRIPTION Installation of a 4-phase, fully actuated traffic signal, including Type 170 controller and Type 176 intersection control program. Work will includj minor restriping and signing. PROJECT NEED Traffic volumes are increasing in this industrial area. Warrants are currently met for a traffic signal in order to assign right-of-way. PROJECT FUNDING TOTAL PROJECT COST: S90.000 Fiscal Year 1991-92 Finding Source Purpose Araxnt 1992-95 1993-94 1994-95 1995-96 1996-2001 2001* Operating Costs CAPITAL PROJECT DESCRIPTION JEFFERSON STREET BIKE PATHS Project Title PROJECT LOCATION MAP ZHm BUENA VISTA LAGOON JEFFERSON STREET PROJECT LOCATION Jefferson Street from the 1-5 overcrossing to Marron Road along the south side of the Buena Vista Lagoon. PROJECT DESCRIPTION Widen pavement four (4) feet on each side and add bicycle lane striping and signs. PROJECT NEED To conform to the Circulation Element of the General Plan showing Jefferson Street as a bicycle route. PROJECT FUNDING TOTAL PROJECT COST: $95.000 Fiscal Year 1991-92 Finding Source _ Purpose _ 1992-93 1993-94 1994-95 1995-96 1996-2001 2001+ Operating Costs CAPITAL PROJECT DESCRIPTION BUENA ViSTA LIFT STATION Project Title PROJECT LOCATION MAP PROJECT LOCATION Adjacent to the east side of Jefferson Street just south of Buena Vista Creek. PROJECT DESCRIPTION Upgrade and expand the lift station facility to a capacity of 15.5 million gallons per day (MGD). Improvements include revision to building to add a second floor, new control systems, new back-up generators an£ the addition of two (2) new pumps. Total project cost (84.5% paid by Vista) is $1,855,000. PROJECT NEED TOTAL PROJECT COST: $80.000 Fiscal Year 1991-92 Funding Source Purpose Amount Operating Costs PROJECT FUNDING 1992-93 1993-94 1994-95 1995-96 1996-2001 2001+ $200.000