HomeMy WebLinkAbout1999-05-05; Planning Commission; ; MP 177BB - AVIARA PHASE III,,,..-.,,,
I "'""'. . ...,, 'fhe City of Carlsbad Planmng Department
A REPORT TO THE PLANNING COMMISSION
P.C. AGENDA OF: May 5, 1999
Item No.@
Application complete date: February 24, 1999
Project Planner: Van Lynch
Project Engineer: Bob Wojcik
SUBJECT: MP 177 (BB) -A VIARA PHASE III -Request for a minor master plan
amendment to allow two separate master homeowner associations within the
Aviara Master Plan located in Local Facilities Management Zone 19.
I. RECOMMENDATION
That the Planning Commission determine that the proposed master plan amendment be minor in
nature and ADOPT Planning Commission Resolution No. 4542, APPROVING MP 177(BB),
based upon the findings and subject to the conditions contained therein.
II. INTRODUCTION
The proposed amendment to the text of the A viara Master Plan would create two separate, but
parallel, master homeowner associations. Phases I and II of the A viara Master Plan would be
regulated by the A viara Master Association and Phase III would be regulated by the A viara-
Premier Collection Master Association. There are no modifications to development requirements
or standards associated with this amendment. Staff has reviewed the proposal and has addressed
all the issues related to the amendment of the A viara Master Plan to create two separate
associations.
III. PROJECT DESCRIPTION AND BACKGROUND
The applicant, Brehm-Aviara III Development Associates, has requested an amendment to the
A viara Master Plan to allow the creation of two master homeowner associations within the
A viara Master Plan area. The A viara Master Association, A viara Land Associates and other
owners of property within Phase III of the Aviara Master Plan, have been involved in negotiation
of a settlement agreement to resolve the litigation over the legality of the Phase III annexation
into the A viara Master Association. The essential term of the settlement is the deannexation of
Phase III from the Master Association and the creation of a separate association to govern Phase
III. The master plan currently requires that each phase of the A viara development annex into the
master association.
This amendment was placed on the Planning Commission agenda because Section 21.38.120 of
the Carlsbad Municipal Code requires that a master plan amendment request be presented to the
Planning Commission to determine the magnitude of the request. If the Commission determines
the master plan amendment to be minor in nature, the additional text may be approved by the ,, . .,
,,..-
\..,.,
MPl 77(BB) -AVIARA PHASE III
May 5, 1999
Page 2
Planning Commission and made a part of the original City Council approval without the
necessity of a public hearing. If the project is determined not to be minor, then planning staff
will return the item as a public hearing item to the Planning Commission for a recommendation
to the City Council for final action.
The Aviara Master Plan required the establishment of a master homeowners' association to
ensure the following: 1) the formation of a design review board for architectural and site plan
review; and 2) the maintenance of facilities common to all planning areas. Such facilities
include community trails, RV storage, entry monuments, open space lots, common slopes, fire
suppression zones, and community walls. This is in addition to the facilities specific to each
planning area and individually maintained by each planning area homeowners' association. As
indicated in Table 1, page three, the proposed project ensures compliance with master plan
provisions by providing maintenance for all facilities noted above.
IV. ANALYSIS
The project is subject to the following regulations and requirements:
A. General Plan;
B. Mello I Segment of the Local Coastal Program;
C. Aviara Master Plan (MP-177);
D. Planned Community Zone (PC) Section 21.38; and
E. Growth Management Ordinance.
The recommendation for approval for this project was developed by analyzing the project's
consistency with the applicable regulations and policies. The project's compliance with each of
the above regulations is discussed in detail in the sections below.
A. General Plan
When the A viara Master Plan was approved, the finding was made that the master plan
implements the General Plan and was consistent with the goals, objectives, and policies of the
General Plan. The finding was based on the fact that the master plan provides for the following:
(1) the provision of the necessary circulation element roadway improvements; (2) the protection
and enhancement of native vegetation and wetland areas; (3) the construction of public trails;
(4) the provision of affordable housing within the Villa Loma development; and (5) compliance
with the Local Facilities Management Plan Zone 19 for public facilities and services. Based on
this implementation and consistency relationship between the A viara Master Plan and the
General Plan, it can be assumed that if the Master Plan is amended, in text only, to create two
separate master associations from one, it is also consistent with the General Plan.
B. Local Coastal Program/Coastal Development Permit
Planning Area 19 lies within the Mello I segment of the City's Coastal Zone and is subject to the
corresponding land use policies and implementing ordinances. The implementing ordinances for
those portions of the Mello I segment within A viara are contained in the A viara Master Plan.
' >
MPl 77(BB) -AVIARA PHASE III
May 5, 1999
Page 3
The policies of the Mello I segment emphasize topics such as preservation of agriculture and
scenic resources, protection of environme~tally sensitive resources, provision of shoreline access,
and prevention of geologic instability and erosion.
The land uses allowed through the Mello I Segment are the same as those allowed through the
A viara Master Plan. Since the changes to the master plan do not involve land use changes, the
proposed master plan amendment remains consistent with the LCP. Because the Aviara Master
Plan serves as the implementing ordinance of the Local Coastal Program for this site, consistency
with the master plan also represents consistency with the LCP implementing ordinances. Given
the above, the project is consistent with the applicable overlay, namely, the Coastal Resource-
Protection Overlay Zone Mello I Segment. Therefore, the proposed project is consistent with the
Mello I land use policies.
Since the amendment to the master plan is a change in the text and does not involve development
as defined by Section 21.04.107 of the Carlsbad Municipal Code, the master plan amendment is
exempt from processing a Coastal Development Permit per Section 21.201.030.
C. A viara Master Plan
The amendment would allow a separate master association for the Phase I and II area and another
master association for the Phase III area. The amendment requires that various sections of the
master plan be amended to address the responsibilities and maintenance related to the creation of
separate associations. The table below is a summary of the common facilities and how they are,
and will be, maintained followed by a more detailed discussion of these issues
FACILITY
Community
Trails
RV Storage Lot
TABLE-1
AYIARA COMMON FACILITIES MAINTENANCE
COMPARATIVE MATRIX
EXISTING CC&Rs PROPOSED CC&Rs
All community trail All community trail segments
segments maintained by maintained by whichever of the
the A viara Master two Master Associations in
Association. which the segment is
geographically located
RV lot owned by Aviara RV lot owned by the Phase III
Land Associates, but Association, with a nonexclusive
maintained by A viara easement granted to Aviara
Master Association. Master Association for continued
access, use and maintenance.
RESULTS
All trails
maintained for
common use by all.
All rules and
regulations stay the
same.
RV lot maintained
by A viara Master
Association and
available for use by
all Aviara
residents. All rules
and regulations
governing RV lot
stay the same.
C
MPl 77(BB) -A VIARA PHASE III
May 5, 1999
Page4
Entry features
(including entry
monument signs)
All entry features and 1. Batiquitos Drive/ Azure Cove All entry
monument signs mam-monument signs maintained by monuments,
tained by the A viara A viara Master Association at including
Common
Manufactured
Slopes
Master Association.
All common
manufactured slopes
maintained by the A viara
Master Association.
Fire Suppression All fire suppression zones
Zones maintained by the A viara
Master Association.
Community
Walls
All community walls
maintained by the A viara
Master Association.
Design Review Board
sole cost.
2. Poinsettia Lane/ Ambrosia
Lane monument signs
maintained by Phase III
Association at sole cost.
3. All other monument signs
maintained by A viara Master
Association, but will have cost
contribution from Phase III
association m accordance with
agreed formula articulated m
Settlement Agreement.
All common manufactured
slopes maintained by whichever
of the two Master Associations in
which the slope is
geographically located.
All fire suppression zones
maintained by whichever of the
two Master Associations in
which the fire suppression zone
is geographically located.
All community walls maintained
by whichever of the two Master
Associations in which the
community wall is
geographically located.
monument entry
signs maintained.
All common
manufactured
slopes maintained.
All fire
suppression zones
maintained.
All community
walls maintained.
The original master plan required the establishment of a single master plan association and the
formation of a design review board to review the architectural and site planning for all
development proposals within the master plan. The proposed amendment will establish two
master associations: one having jurisdiction over planning areas 17, 18, 19, 21, 22, 23, and 32b,
which makes up Phase III of the A viara Master Plan; and, the second having jurisdiction over all
other planning areas in the master plan area. Separate design review boards will be created for
each association. Each design review board will use the same development criteria, as
established with the original master plan, for the review of architecture and site design. Since
most of the planning areas have already been designed and approved, except for planning areas
22 (nine single family homes) and 32b (church site), there should not be any impact from the
creation of two design review boards. Planning Area 22 and 32b will be reviewed by the Aviara
Premier Collection Master Association. As with the original master plan, each planning area will
still be required to have its own separate homeowners association, which will be governed by the
master association having jurisdiction over its planning area.
C MPl 77(BB) -AVIARA PHASE III
May 5, 1999
Page 5
Trails, Open Space and Slopes
With the division of the master association, comes the division ofresponsibility and maintenance
of some common facilities shared within the Aviara Master Plan. Facilities such as community
trails, manufactured slopes, fire suppression zones, and three coastal deed-restricted natural open
space preserves will be maintained by the master association with jurisdiction over the
geographical area upon which these facilities are located. Wording has been added to the master
plan that will allow reciprocal use of the master plan facilities such as community trails.
Recreational Vehicle Storage
Another facility that is shared is the recreational vehicle (RV) storage area. Since the existing
RV storage site is physically located within Phase III, the master plan has been amended to allow
all residents of the master plan area to have access and use of the RV storage site. Also, as part
of the settlement agreement, a non-exclusive easement will be granted by Phase III to the A viara
Master Association (Phase I and 11), which will allow all residents of the master plan area to
continue to have access to, and use of, the RV storage site. The recent approval of the Cristalla
project (CT 97-20), which provides access to the RV site, was conditioned to record a reciprocal
access easement to allow the residents of the master plan access to the RV storage site.
Community Entry Features
The master plan provides that the entry monument features and signs will be maintained by one
or both of the associations. The entry monument features and signs will be maintained by the
A viara Master Association with a separate private agreement for the new association to
contribute to the cost of maintenance.
Ancillary Documents
There are numerous ancillary documents that are related to the master plan. Documents such as
the A viara Development Overview and Residential Design Guidelines, A viara Sign Program,
and Fire Suppression Landscape Guidelines will not be changed. These documents are standards
and design references which pertain to the whole master plan and will be used by both of the
associations without amendment. The Master Maintenance Plan, a map showing the master
association maintenance responsibilities, will be changed into two maps, one showing Phase I
and II, the other showing Phase III.
D. Planned Community Zone
According to Section 21.38.120 of the Zoning Ordinance, a minor master plan amendment "shall
not change the densities, or the boundaries of the property or involve an addition of a new use or
group of uses not shown on the original master plan or the rearrangement of uses within the
master plan." The proposed master plan amendment involves only a text change to allow two
separate master associations to be formed within the master plan area. Considering that this
amendment proposal meets the criteria in section 21.38.120 and does not change the master
C
MPl 77(BB) -AVIARA PHASE III
May 5, 1999
Pa~e 6
plan's densities or uses allowed within the master plan, staff considers the amendment to be
minor in nature.
The underlying zoning of the proposed project is Planned Community (P-C). In accordance with
that designation, the A viara Master Plan was created to implement that zoning. No specific
development standards or design criteria exist in the P-C zone, however, and all applicable
standards and criteria are contained within the master plan documents. Therefore, conformance
with the master plan requirements also indicates conformance with the Planned Community
Zone.
E. Growth Management Ordinance
At the time the Local Facilities Management Plan for Zone 19 was approved, all facility impacts
were analyzed and it was determined that all facilities would be provided prior to or concurrent
with need pursuant to the facilities performance standards of Growth Management. Because the
proposed project is consistent with the master plan in which all facilities were determined to be
in compliance with adopted performance standards and the proposed creates no facility impacts,
no further growth management analysis is necessary.
V. ENVIRONMENTAL REVIEW
The potential impacts of having one Master Homeowners Association were already evaluated in
EIR 83-02(A) for the Aviara Master Plan and determined to result in no significant
environmental impacts. The proposed CC&R modifications do not affect the previous
environmental determination. The proposed action is covered by the general rule that CEQA
applies only to projects which have the potential for causing a significant effect on the
environment. In this instance where it can be seen with certainty that there is no possibility that
the activity in question may have a significant effect on the environment, the activity is not
subject to CEQA and therefore a Notice of Exemption will be filed per Section 15061(b)(3).
ATTACHMENTS:
1. Planning Commission Resolution No. 4542 (MP amendment)
2. Location Map
3. Disclosure statement
4. Master Maintenance Plan -Phase III
5. Bold/strikeout Master Plan text, dated May 5, 1999
VL:eh:mh
C
ARPORT
BATIQUITOS LAGOON
AVIARA PHASE Ill
MP 177(8B)
City of Carlsbad
■ #J 61 ,i,i i ,t-1 •J4-Ei, i, ,t§ ,i I
DISCLOSURE STATEMENT
Applicant's statement or disclosure of certain ownership interests on all
applications which will require discretionary action on the part of the City
Council or any appointed Board, Commission or Committee.
The following information must be disclosed:
1. APPLICANT
List the names and addresses of all persons having a financial interest in the
application.
see Attached .,
2. OWNER
List the names and addresses of all persons having any ownership interest in the
property involved.
See Attached
3. If any person identified pursuant to ( 1) or (2) above is a corporation or partnership,
list the names and addresses of all individuals owning more than 10% of the shares
in the corporation or owning any partnership interest in the partnership.
See Attached
4. If any person identified pursuant to ( 1) or (2) above is a non-profit organization or a
trust, list the names and addresses of any person serving as officer or director of
the non-profit organization or as trustee or beneficiary of the trust.
N/A
2075 Las Palmas Dr. • Carlsbad. CA 92009-1576• (619) 438-1161 • FAX (619) 438-0894
~
5. Have you had ~ e than $250 worth of business tr~dcted with any member of
City staff, Boards, Commissions, Committees and/or Council within the past twelve
(12) months?
D Yes ~No
I If yes, please indicate person(s): ___________ _
Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club,
fraternal organization, corporation, estate, trust, receiver, syndicate, this and any other county, city
and county, city municipality, district or other political subdivision or any other group or
combination acting as a unit."
NOTE: Attach additional sheets if necessary.
See Attachment #1 -~ .. _,, .. ------
Disclosure Statement 10/96
L.P. Bre -Aviara III Devel ment
Print or type name of applicant
L.P.
Page 2 of ?
1. Applicant:
2. Owner:
Attachment to Disclosure Statement~
Brehm-A viara III Development Associates, L.P.
283 5 Camino Del Rio South, Suite 220
San Diego, CA 92108
Brehm-Aviara Group, LLC
2835 Camino Del Rio South, Suite 220
San Diego, CA 92108
The Brehm Companies
2835 Camino Del Rio South, Suite 220
San Diego, CA 92108
Lumbermen's Investment Corporation
P.O. Box 2030
Austin, TX 78768
Prudential Insurance Company of Am~rica
CO-PAMG-Real Estate
4320 La Jolla Village Drive, Suite 205
San Diego, CA 92122
CALPers Investment Office
P.O. Box 2749
Sacramento, CA 95812-2749
Brehm-A viara III Development Associates, L.P.
2835 Camino Del Rio South, Suite 220
San Diego, CA 92108
Brehm-A viara Group, LLC
2835 Camino Del Rio South, Suite 220
San Diego, CA 92108
The Brehm Companies
2835 Camino Del Rio South, Suite 220
San Diego, CA 92108
Lumbermen's Investment Corporation
P.O. Box 2030
Austin TX 78768
Prudential Insurance Company of America
CO-PAMG-Real Estate
4320 La Jolla Village Drive, Suite 205
San Diego, CA 92122
CALPers Investment Office
P.O. Box 2749
Sacramento, CA 95812-2749
3. CALPers Investment Office
P.O. Box 2749
Sacramento, CA 95812-2749
Prudential Insurance Company of America
4320 La Jolla Village Drive, Suite 205
San Diego, CA 92122
Lumbermen' s Investment Corporation
P.O. Box 2030
Austin, TX 78768
The Brehm Companies
2835 Camino Del Rio South, Suite 220
San Diego, CA 92108
Attachment # 1
Applicant:
BREHM-A VIARA III DEVELOPMENT ASSOCIATES, L.P .,
a Delaware limited partnership
By: Brehm-A viara Group, LLC, a California
limited liability company, its general partner
By: The Brehm Companies, LLC, a California
limited liability company, its manager
)
Owner:
BREHM-AVIARA III DEVELOPMENT ASSOCIATES, L.P.,
a Delaware limited partnership
By: Brehm-A viara Group, LLC, a California
limited liability company, its general partner
By:
/
L£aND -23~ .~·--
151 OPEN SPACE LOTS
E7 OPEN SPACE EASEMENT
0~~ 0wALLS ANO FENCES
*~eftNTRY *
@~~TION* 0 COMMUMTY TRAILS
MAINTINANCE l£VEI.
lZ'.IMEDIANS
k:::JPARKWAYS
~ IRRIGATED SLOPE (REFINED)
~ HYDROSEEDED SLOPE
§NATIVE CJo EIJCAL YPTUS GROVE
UNIT Pl.ANNING
AREA COUNT
PA f1 / 21 120 Serenata
PA 18 288 Apartments
PA 19 90 Brindisi
PA22 7 canterina
PA23 61 Cristal/a
PA32b 7 Commercial
L __
\
\ \
\ \
\
\
\
\
~ 1..r\..jA.
NORlll SCALE, I' , •• -e•
EQUIVALENT
DWEWNG
UNITS
120
192
60
7
61
7
!*JA~~~~~N~~~'91\\,1ARA I PREMIER COLLECTION
Estrada
Land Planning
......................... cea,.ew ......
-ZIII--OM3 ...... 238-0578 ...
AVIARA
PREMIER COLLECTION
MASTER ASSOCIATION
MAINTENANCE RESPONSIBILITIES
2/4/99
I DRAFT I
,. ...
' M°'TACHMENT 5
May 5, 1999
A VIARA MASTER PLAN AMENDMENT
MP-177(BB)
PHASE III DEANNEXATION
PROPOSED REPLACEMENT PAGES
APPLICANT:
Brehm-Aviara III Development Associates
2835 Camino Del Rio South
Suite 200
San Diego, CA
92108
CONSULT ANT:
Planning Systems
1530 Faraday Ave.
Suite 100
Carlsbad, CA 92008
2/24/99