A REPORT TO THE PLANNING COMMISSION
Item No.'
P.C. AGENDA OF: September 15, 1999
Application complete date: May 4, 1999
Project Planner: Greg Fisher
Project Engineer: David Rick
SUBJECT: SDP 99-08/CDP 99-16/AV 99-06 - CHESTNUT CONDOS - Request for
approval of a Site Development Plan, Coastal Development Permit and
Administrative Variance to develop a two-unit residential condominium on a site
located at the northeast corner of Carlsbad Boulevard and Chestnut Avenue within
Local Facilities Management Zone 1.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolutions No. 4636, 4637, and
4641 APPROVING SDP 99-08, CDP 99-16 and AV 99-06 based upon the findings and subject
to the conditions contained therein.
II.INTRODUCTION
The applicant proposes to demolish an existing two-family residence and construct a new two-
unit condominium project on a .13-acre infill site located at the northeast corner of Carlsbad
Boulevard and Chestnut Avenue between Sycamore Avenue and Maple Avenue. The project is
located within the Beach Area Overlay Zone (BAOZ) and therefore requires a Site Development
Plan. The site lies within the Mello II segment of the Local Coastal Program and therefore, a
Coastal Development Permit will be issued by the City of Carlsbad. The applicant has requested
a variance for the project. The Variance is similar to those approved previously for front yard
setbacks along Carlsbad Boulevard and can be supported by staff. The project also requires a
Minor Condominium Permit (CP), and a Minor Subdivision (MS) Both of these administrative
permits have been approved by the Planning Director and the City Engineer subject to the
approval of the Planning Commission's decision on the Site Development Plan, Coastal
Development Permit and Administrative Variance. The project's proposed density of 15.3 units
per acre is below the 19 units per acre allowed per the growth management control point for the
property's Residential High (RH) General Plan designation. The proposed project has been
determined not to have a significant effect on the environment, and is categorically exempt from
the provisions of CEQA. With the exception of the noted Administrative Variance, the project
conforms to all applicable City development standards and regulations; there are no outstanding
project issues and findings can be made for the approval of the project.
HI. PROJECT DESCRIPTION AND BACKGROUND
The .13 acre project site is located at the northeast corner of Chestnut Avenue and Carlsbad
Boulevard. The in-fill site has been previously graded and is relatively level. The site is
SDP 99-08/CDP 99-16/AV 99-06 - CHESTNUT CONDOS
September 15, 1999
Page 2
currently developed with an existing residence, concrete paving, non-native grasses and is void
of any significant or sensitive vegetation.
The site is zoned R-3 and is within the Beach Area Overlay Zone. It has a General Plan
designation of RH (Residential - High Density). Surrounding properties to the north, east and
south are also zoned R-3 and also have an RH General Plan designation. The surrounding
development consists of attached multi-family units to the north, single family residence to the
east, Chestnut Avenue to the south, and Carlsbad Boulevard to the west. Surrounding properties
within the immediate neighborhood have already been developed with a variety of residential
uses, including older single family residences, and newer two family and multi-family projects.
The applicant is proposing to develop a two-unit residential condominium project on the subject
site. The proposed two story units will contain approximately 2,400 square feet each. The
structure incorporates a variety of architectural facade materials including stone veneer, stucco,
color coordinated metal railings, doors, windows and trim, and color/textured paving surfaces.
The proposed colors and materials for the building are light earth tone colored stucco walls with
complementary colored trim ("holiday green & white"). Roofing materials consist of earth tone
colored slate shingles. Other features of the proposed project include private patios, balconies
and roof deck. On-site parking will be subterranean (basement) providing two car garages for
each unit. Building height for the proposed structure is 29.3 feet. The project also includes a
common passive recreation area and one at-grade guest parking space. The proposed structure
will be compatible with surrounding development.
The applicant has requested a variance to the Planned Development Standards for a reduced front
yard setback. This is discussed in detail in Section C of this report. Staff is recommending that
the necessary findings for the requested variance can be made and that the project complies with
all other applicable regulations.
IV. ANALYSIS
The project is subject to the following regulations and requirements:
A. General Plan R-H (Residential - High Density) designation;
B. Beach Area Overlay Zone (BAOZ), R-3 (Multiple-Family Residential) Zone, and
Condominium Permit (Planned Unit Development) regulations (Chapters 21.82, 21.16, and
21.45 respectively of the Carlsbad MunicipalCode);
C. Administrative Variance regulations (Chapter 21.51 of the Carlsbad Municipal code);
D. Local Coastal Program (Mello II segment);
E. Inclusionary Housing (Chapter 21.85 of the Carlsbad Municipal Code); and
F. Growth Management (Chapter 21.90 of the Carlsbad Municipal Code).
SDP 99-08/CDP 99-16/AV 99-06 - CHESTNUT CONDOS
September 15, 1999
Page3
The recommendation for approval for this project was developed by analyzing the project's
consistency with the applicable City regulations and policies. The project's compliance with
each of the above regulations is discussed in detail in the sections below.
A.General Plan
The proposed project is consistent with the policies .and programs of the General Plan. The
property has a General Plan designation of RH (Residential - High Density). The RH
designation allows the development of multi-family residential units at a density of 15 - 23
dwelling units per acre. The growth control point is 19 dwelling units per acre. The proposed
project involves two condominium units being developed on a 5,682 square foot (.13-acre)
rectangular shaped lot. Development at the growth control point would allow 2.47 units on the
property. The proposed project is for two condominium units at a density of 15.32 dwelling
units per acre. The project complies with all the Elements of the General Plan as outlined in the
table below:
GENERAL PLAN COMPLIANCE
ELEMENT
Land Use
Housing
Public Safety
Open Space
&
Conservation
Circulation
USE, CLASSIFICATION,
GOAL OBJECTIVE OR
PROGRAM
Site is designated for Residential
High at 19du/ac.
In-lieu contribution for the
inclusionary requirement per
Objective 3.6
Provide project review that allows
consideration of seismic and
geologic hazards.
Minimize environmental impacts
to sensitive resources within the
City.
Utilize Best Management Practices
for control of storm water and to
protect water quality.
Requires new development to
construct improvements needed to
serve proposed development.
PROPOSED USES &
IMPROVEMENTS
Multi-family residential
units at 15.32 du/ac.
Project conditioned to
pay an in-lieu
contribution on a per
unit basis per Program
3.'6c
Project improvements
will not significantly
impact or be impacted
by geologic or seismic
conditions.
Project is set back from
Carlsbad Boulevard to
minimize the visual
impact to the coast.
Project will conform to
all NPDES
requirements.
All public facilities
including curb, gutter
and sidewalk exit along
the property frontage.
COMPLY
Yes
Yes
Yes
Yes
Yes
SDP 99-08/CDP 99-16/AV 99-06 - CHESTNUT CONDOS
September 15, 1999
Page 4
o
B. Beach Area Overlay Zone/R-3 Zoning/Condominium (Planned Unit Development)
The proposed project is subject to the Beach Area Overlay Zone (BAOZ) regulations, the R-3
Zone regulations, and the Planned Unit Development (PUD) regulations. (The PUD regulations
are the development standards for condominium projects.)
Projects located within the Beach Area Overlay Zone (BAOZ) require the processing of a Site
Development Plan (SDP) to ensure consistency with the BAOZ standards per Section 21.82.040
of the Carlsbad Municipal Code. The BAOZ is intended to supplement the underlying zoning by
providing additional development regulations to: 1) ensure that proposed development is
compatible with existing surrounding uses; 2) provide adequate parking for residential
developments; and 3) ensure that public facilities exist to serve the beach area.
The proposed two story structure, with a building height of less than thirty feet, will be
compatible with existing and proposed developments and complies with the BAOZ regulations.
The two car garage per unit and guest parking space provides enough parking to satisfy the
BAOZ requirements. All public facilities including curb, gutter and sidewalk exist along the
property frontage.
The proposed two-unit condominium project is also subject to the regulations of the R-3 Zone
and the PUD (condominium standards) regulations. (The Condominium Permit is a Minor CP
which will be acted upon by the Planning Director subsequent to the Planning Commission's
actions on the SDP, CDP and AV.)
Table A (below) illustrates how the project complies with the applicable BAOZ, R-3 zoning, and
PUD development regulations.
Table A: BAOZ, R-3 ZONING, AND PUD (CONDOMINIUM)
STANDARDS COMPLIANCE
STANDARD
Min. Lot Size (PUD)
Max. Lot Coverage (R-3)
Min. Front Setback (PUD)
Min. Side Setback (R-3)
Min. Street Side Setback (PUD)
Max. Building Height (BAOZ)
Resident Parking (PUD)
PERMITTED/
REQUIRED
3,500 sf
60%
40' (Major Arterial)
measured from R.O.W.
5'
10"
3072 stories
4 covered spaces
(2 full-sized covered spaces/du)
PROPOSED
5,682 sf
47%
20'
(See Variance Discussion)
5'
10'
29'3"/2 stories
4 covered spaces
(Subterranean)
SDP 99-08/CDP 99-16/AV 99-06 - CHESTNUT CONDOS
September 15, 1999
Page 5
Visitor Parking (PUD)
Storage Space (PUD)
Recreational Space (PUD)
1. Private
2. Common
1 space
(1 sp/2 du)
480 cf/du
Total: 400 sf (200 sf/du)
1. +-200 sf
2. +-200 sf
1 space
3700 cf (2783 cf/du)
Total: 1261 sf
871 sf
390 sf
C. Variance
The applicant is requesting an Administrative Variance for this project to reduce the required
front yard setback. The Planned Development Ordinance requires a 40' front yard setback along
Carlsbad Boulevard (Major Arterial). The applicant has proposed a 20' front yard setback along
Carlsbad Boulevard, which is consistent with the adjacent and neighboring properties. Many
Planned Developments along Carlsbad Boulevard were developed prior to the adoption of the
Planned Development Ordinance in 1986. These projects were constructed according to the
underlying Zoning (R-3) which required a 20' front yard setback. Requiring this development to
comply with the Planned Development 40' front yard setback would overly burden the project
and not be consistent with surrounding developed properties.
D. Local Coastal Program compliance
The proposed project site is located outside the appeal area of the City's Coastal Zone and lies
within the Mello II segment of the Local Coastal Program (LCP).
1. Mello II Segment
The proposed project is consistent with the Mello II segment of the LCP which contains land use
policies for development and conservation of coastal land and water areas within the Segment
boundaries. The policies of the Mello II segment emphasize topics such as preservation of
agriculture and scenic resources, protection of environmentally sensitive resources, provision of
shoreline access and prevention of geologic instability and erosion.
The project is consistent with the coastal act policies as follows: A) no agricultural lands exist on
the project site, therefore no impacts to such will occur; B) the site does not contain
environmentally sensitive habitats, water or marine resources; C) the site is geologically stable
and the proposed grading for the site has been limited to the area necessary to develop the site;
D) the project has been designed to reduce the amount of off-site runoff by surface drains and has
been conditioned to implement the NPDES standards to ensure the quality of the water leaving
the site; E) the project meets the parking requirements of the zoning ordinance; F) the project has
been conditioned to record a notice concerning proximity of Carlsbad Boulevard transportation
corridor (the project, being less that five units and not multi-family, did not meet the threshold
for requiring a noise report per the City of Carlsbad noise Guidelines Manual); G) the project
does not preclude any recreational opportunities or shoreline access as the property is not a
shorefront property; and H) no significant visual resources exist on or near the project site.
Given the above, the project is consistent with the Mello II segment land use policies.
SDP 99-08/CDP 99-16/AV 99-06 - CHESTNUT CONDOS
September 15, 1999
Page 6
£. Inclusionary Housing
The City's Inclusionary Housing regulations require that a minimum of 15% of all approved
units in any residential project be made affordable to lower income households. The
inclusionary housing requirement for this project would be 0.3 dwelling units. However,
residential projects involving six or fewer dwelling units may satisfy their lower income
inclusionary housing requirement by paying an in-Iieu fee or other in-lieu contribution.
Therefore, this project has been conditioned to pay an in-lieu fee prior to building permit
issuance.
F. Growth Management
The proposed project is located within Local Facilities Management Zone 1 in the Northwest
quadrant of the City. The impacts on public facilities created by the project, and its compliance
with the adopted performance standards, are summarized in Table C below.
Table C: GROWTH MANAGEMENT
STANDARD
City Administration
Library
Waste Water Treatment
Parks
Drainage
Circulation
Fire
Open Space
Schools
Sewer Collection System
Water
IMPACTS
7.41 sf
3.95 sf
n/a
.01 ac
Basin A
16 ADT
Stations 1 & 3
n/a
CUSD
2EDU
440 GPD
COMPLIANCE
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
The project is .479 dwelling units below the Growth Management Dwelling Unit allowance of
2.479 dwelling units for the subject property.
V.ENVIRONMENTAL REVIEW
This project is exempt from CEQA per the exemptions listed below:
(1)Section 15304 of CEQA exemptions (Class 4) exempts minor alterations to land
including grading on land with a slope of less than 10% from environmental
review.
(2) Section 15303 of CEQA exemptions (Class 3) exempts the construction of
apartments, duplexes, and similar structures, with no more than four dwelling
oSDP 99-08/CDP 99-16/AV~99-06 - CHESTNUT CONDOS
September 15, 1999
Page?
units if not in conjunction with the building of two or more such structures. A
Notice of Exemption will be filed by the Planning Director upon project approval.
The City has received its annual Growth Management Traffic Monitoring Report. The
Report has recorded an unanticipated intersection "level of service" (LOS) failure at
Palomar Airport Road (PAR) and El Camino Real (ECR) during both the a.m. and p.m.
peak hours. This potentially creates a changed circumstance negating reliance on
previous environmental documentation. Pursuant to §15162 of the CEQA Guidelines a
lead agency must prepare a "Subsequent" environmental documentation if substantial
evidence (i.e., the recorded intersection failure) determines that a changed circumstance
exists. However, case law has interpreted this section of the CEQA Guidelines to not
require the preparation of a "Subsequent EIR" if mitigation measures are adopted which
reduce the identified impacts to a level of insignificance.
A mitigation measure has been identified which, if implemented, will bring the peak
hours LOS into the acceptable range. The mitigation measure involves construction of
two dual right turn lanes-northbound to eastbound and westbound to northbound. This
project has been conditioned to pay its fair share of the intersection "short-term
improvements" thereby, guaranteeing mitigation to a level of insignificance.
In light of the above, a Notice of Exemption will be filed by the Planning Director upon
project approval.
ATTACHMENTS:
1. Planning Commission Resolution No. 4636 (SDP)
2. Planning Commission Resolution No. 4637 (CDP)
3. Planning Commission Resolution No. 4641 (AV)
4. Location Map
5. Background Data Sheet
6. Local Facilities Impact Assessment Form
7. Disclosure Statement
8. Reduced Exhibits
9. Exhibit "A" - "I", dated September 15,1999
GF:eh
SITE
140 CHESTNUT CONDOS
SDP 99-08/CDP 99-16/AV 99-06
BACKGROUND DATA SHEET
CASE NO: SDP 99-08/CDP 99-16/AV 99-06
CASE NAME: Chestnut Condos
APPLICANT: Barry Blue
REQUEST AND LOCATION: Two unit condominium project located at the northeast corner
of Chestnut Avenue and Carlsbad Boulevard in the northwest quadrant of the City.
LEGAL DESCRIPTION: Lot 4. Block B". Palisades. City of Carlsbad
APN: 204-122-08 Acres: 5.682 Sq Ft. Proposed No. of Lots/Units: 2 units
GENERAL PLAN AND ZONING
Land Use Designation: RH-Residential High
Density Allowed: 15-23 units per acre Density Proposed: 15.32du/ac
Existing Zone: R-3 Proposed Zone: N/A
Surrounding Zoning and Land Use: (See attached for information on Carlsbad's Zoning
Requirements)
Zoning Land Use
Site R-3 Residential
North R-3 Residential
South R-3 Residential
East R-3 . Residential
West Pacific ocean N/A
PUBLIC FACILITIES
School District: Carlsbad Water District: Carlsbad Sewer District: Carlsbad
Equivalent Dwelling Units (Sewer Capacity): 2
Public Facilities Fee Agreement, dated: April 2. 1999
ENVIRONMENTAL IMPACT ASSESSMENT
Negative Declaration, issued
Certified Environmental Impact Report, dated.
/\ Other Notice of Exemption
CITY OF CARLSBAD
GROWTH MANAGEMENT PROGRAM
LOCAL FACILITIES IMPACTS ASSESSMENT FORM
(To be Submitted with Development Application)
PROJECT IDENTITY AND IMPACT ASSESSMENT:
FILE NAME AND NO: SDP 99-08/CDP 99-16/AV 99-06 - CHESTNUT CONDOS
LOCAL FACILITY MANAGEMENT ZONE: 1 GENERAL PLAN: RH
ZONING: R-3
DEVELOPER'S NAME: BARRY BLUE
ADDRESS: 2231 La Mirada. Vista Ca 92083
PHONE NO.: 760-599-0460 ASSESSOR'S PARCEL NO.: 204-122-08
QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): .1305 acres
ESTIMATED COMPLETION DATE: April 1999
A.
B.
C.
D.
E.
Demand in Square Footage = 6.95
Demand in Square Footage = 3.71
2 EDU'S
.55
F.
G.
H.
I.
20
J.
K.
L.
City Administrative Facilities:
Library:
Wastewater Treatment Capacity (Calculate with J. Sewer)
Park: Demand in Acreage =
Drainage: Demand in CFS =
Identify Drainage Basin =
(Identify master plan facilities on site plan)
Circulation: Demand in ADT =
(Identify Trip Distribution on site plan)
Fire: Served by Fire Station No. =
Open Space: Acreage Provided =
Schools:
JHS=.1Q4. HS=.28 Total=.842
(Demands to be determined by staff)
Sewer: Demands in EDU
Identify Sub Basin =
(Identify trunk line(s) impacted on site plan)
Water: Demand in GPD =
The project is .479 units below the Growth Management Dwelling unit allowance.
= 1
N/A
Elm=458.
2 EDU's
1H
440
City of Carlsbad
Planning Department
DISCLOSURE STATEMENT
Applicant's statement or disclosure of certain ownership interests on all applications which will require
discretionary action on the part of the City Council or any appointed Board, Commission or Committee.
The following information MUST be disclosed at the time of application submittal. Your project cannot
be reviewed until this information is completed. Please print.
Note:
Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club, fraternal
organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county, city
municipality, district or other political subdivision or any other group or combination acting as a unit."
Agents may sign this document; however, the legal name and entity of the applicant and property owner must be
provided below.
1 .
2.
APPLICANT (Not the applicant's agent)
Provide the COMPLETE. LEGAL names and addresses of ALL persons having a financial
interest in the application. If the applicant includes a corporation or partnership, include the
names, title, addresses of all individuals owning more than 10% of the shares. IF NO
INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-
APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the
names, titles, and addresses of the corporate officers. (A separate page may be attached if
necessary.)
Person
Title
Corp/Part_
Title
Address Address
OWNER (Not the owner's agent)
Provide the COMPLETE, LEGAL names and addresses of ALL persons having any ownership
interest in the property involved. Also, provide the nature of the legal ownership (i.e,
partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a
corporation or partnership, include the names, title, addresses of all individuals owning more
than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES,
PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-
owned corporation, include the names, titles, and addresses of the corporate officers. (A separate
page may be attached if necessary.)
Corp/Part
Title
Address
2O75 Las Palmas Dr. • Carlsbad, CA 92OO9-1576 - (76O) 438-1161 • FAX (760) 438-O894
NON-PROFIT OkZiNIZATION OR TRUST
If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust.. list the
names and addresses of ANY person serving as an officer or director of the non-profit
organization or as trustee or beneficiary of the.
Non Profit/Trust Non Profit/Trust
Title Title
Address Address
Have you had more than $250 worth of business transacted with any member of City staff.
Boards, Commissions, Committees and/or Council within the past twelve (12) months?
Yes No If yes, please indicate person(s):_
NOTE: Attach additional sheets if necessary.
I certify th ve informiuoh is true and correct to the best of
Print or type name of owner Print or type name of applicant
Signature of owner/applicant's agent if applicable/date
Print or type name of owner/applicant's agent
H:ADMIN\COUNTER\DISCLOSURE STATEMENT 5/98 Page 2 of 2
jijj jjj jMjIj ji| 11!L Ie2 I
'!*' Im 5™ » *
iSiiijfjI-
iiil.kl
hi I -
~i - ptH -<< •'iii-.r
...SS.
a I'BE 8 888888
ml i;
Si*? J *B
* «•
I siti it i MJ
III!!i:
*!
; 1 =2 s a; t :>| §s E a; e t s; if
fill!
5^e^;
^VliiH^^l'l-^ Fo^M^- t
I, t! '[] TU»KIH*l«AplftHOlWA»i» f V~* LATEST M «»4/-MCWIOI
"AASHTO" TURNING RADII P GARAGE - UNIT "A"
I ,T.,t™«^.
"AASHTO" TURNING RADII @ GARAGE - UNIT "B"
HNM* RAD1 ftHOMN AM <N &ONPOKMANCC CWTM TM>TEST fl 4ft4T-HOKIZOMTAL&O)>(TROL MAKDAWtTTA'AA5HTI7 (AMWCAh A»*OC4ATIOM Of"*""""""' ——-••• "•
DAVIS GROUP
phOf». 6192325990 I M4 Smnth Anna
tax 619.Z3Z.5992 I Sm 0*00, CA «ZIO!
Atom* PMttlxmnt P»m« uvhtem 5/1VM
pragnn ]/]/»
BASEMENT LEVEL FLOOR PLAN
BASEMENT LEVEL FLOOR PLAN
"AASHTO" TURNING RADII
A2
2ND. LEVEL FtOOR PLAN
\-.—. X. ..fc^^fe
t tf*:- .....,,. . ..|J.3» _| ._ J......2 j
DAVIS GROUP
ptan*. S19.232.5WO I 344 SMrffl AwniM
In 619.2325992 I S«iDtogo.CA92l01
S/14/99
Cotttil OcvBlopntmt Pemft prognm 5/5/M
niOJECT MJMBEK
1 ST. LEVEL FLOOR PLAN
ZND. LEVEL FLOOR PLAN
A3
DAVIS GROUP
HfHUIIBUMimiUBHHB
phona. 619.232.5990 I 344 Sm«rih Amnu*
ft* <19.232.S992 I SinDMgo.CA 92101
BUILDING "CROSS" SECTION
BUILDING "LONGITUDINAL" SECTION
BUILDING ROOF PLAN
BUILDING SECTIONS
A4
DAVIS GROUP
«i.i«n..»n«n;tw.»L. mxxm MM
phone. 619.232.5990 : 3M Seventh Avenue
lair 619.232.5992 ' S»n D4BOO. CA 9210?
B5S5S5
NORTH (Side) ELEVATION
WEST (Carlsbad Blvd.) ELEVATION
SOUTH (Chestnut Ave.) ELEVATION
SWETNUMBtB: