HomeMy WebLinkAbout2001-02-21; Planning Commission; ; SDP 96-13B|SUP 96-09B - EL CAMINO TERRACE'1e City of Carlsbad Planning Departme, A REPORT TO THE PLANNING COMMISSION ItemNo. (!) P.C. AGENDA OF: February 7, 2001 Application complete date: May 2, 2000 Project Planner: Michael Grim Project Engineer: Clyde Wickham SUBJECT: SDP 96-13(B)/SUP 96-09(B) -EL CAMINO TERRACE -Request for a Site Development Plan Amendment and Special Use Permit -Scenic Corridor, to allow the construction of a 20,442 square foot, three story office building on a pre-graded site generally located at the southeast comer of El Camino Real and Cougar Drive, in Local Facilities Management Zone 5. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolutions No. 4916 and 4917, APPROVING Site Development Plan Amendment SDP 96-13(B) and Scenic Corridor Special Use Permit SUP 96-09(B), based upon the findings and subject to the conditions contained therein. II. BACKGROUND This item was continued from the February 7, 2001 meeting. ATTACHMENTS: 1. Planning Commission Resolution No. 4916 (SDP) 2. Planning Commission Resolution No. 4917 (SUP) 3. Staff Report dated February 7, 2001 with attachments '• City of Carlsbad Planning Departmel tfirJ)_ A REPORT TO THE PLANNING COMMISSION P.C. AGENDA OF: February 7, 2001 Item No.@ Application complete date: May 2, 2000 Project Planner: Michael Grim Project Engineer: Clyde Wickham SUBJECT: SDP 96-13(B)/SUP 96-09(B) -EL CAMINO TERRACE -Request for a Site Development Plan Amendment and Special Use Permit -Scenic Corridor, to allow the construction of a 20,442 square foot, three story office building on a pre-graded site generally located at the southeast comer of El Camino Real and Cougar Drive, in Local Facilities Management Zone 5. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolutions No. 4916 and 4917, APPROVING Site Development Plan Amendment SDP 96-13(B) and Scenic Corridor Special Use Permit SUP 96-09(B), based upon the findings and subject to the conditions contained therein. II. INTRODUCTION The proposal involves the construction of a 20,442 square foot, three-story office building on a pre-graded pad at the southeast comer of El Camino Real and Cougar Drive. The majority of the ground floor of the building consists of parking with two stories of office above. A Site Development Plan Amendment is required due to the Qualified Development Overlay Zone on the property and a Special Use Permit is required due to the Scenic Corridor Overlay Zone on properties fronting on El Camino Real. The proposed office building development meets all applicable regulations and staff has no issues with the proposal. III. PROJECT DESCRIPTION AND BACKGROUND The applicant, McArdle Architects Associates, is requesting approval of a Site Development Plan Amendment and Special Use Permit Amendment to allow the construction of a 20,442 square foot, three-story office building on a vacant, pre-graded pad. The site is located at the southeast comer of El Camino Real and Cougar Drive. The site is designated Planned Industrial (PI) on the General Plan and is zoned Industrial with a Qualified Development Overlay (M-Q). While the property fronts on El Camino Real, it takes access off of Cougar Drive via a shared driveway with the industrial property to the east. The site is bounded by industrial or future industrial uses on the south, west and east; and to the north, across Cougar Drive, is the Madonna Hill retirement home. The site has been previously reviewed by the Planning Commission through a Site Development Plan, Special Use Permit, and two Local Facilities Management Plan Amendments (SDP 96- 13/SUP 96-09/LFMP 87-05(D)/LFMP 15(A)) for a three-lot, non-residential planned if'\ "•+;' SDP 96-13(B)/SUP 96-09(1-EL CAMINO TERRACE February 7, 2001 Pa e2 development. Two administrative actions, Minor Subdivision MS 96-11 and Non-residential Planned Development PUD 96-08, were also related to the action. All combined, the previous approval allowed the creation of three industrial lots and one open space lot. Two of the lots also received approvals for the construction of office buildings, the remaining lot being the subject of this current proposal. The LFMP amendments were required to transfer the industrially designated lots from Zone 15 to Zone 5. The Planning Director has conditionally approved an amendment to the Non-residential Planned Unit Development (PUD 96-08(A)) to accommodate the current proposal. This administrative approval is conditioned to be subject to approval of the Site Development Plan Amendment and Special Use Permit Amendment by the Planning Commission. The current proposal involves a 20,442 square foot, three-story office building. The two upper stories would be entirely office uses, while the ground floor includes lobby access, equipment and other support rooms, trash enclosures and 19 parking spaces. The remaining 63 parking spaces are provided as surface parking to the east of the building. The architecture and materials of the building match the other office buildings in the area, with tempered glass and limestone veneers. The building measures 35 feet from existing grade to the top of the parapet and no roof equipment is proposed. The El Camino Terrace project is subject to the following regulations: A. General Plan; B. M -Industrial Zone (Chapter 21.32 of the Zoning Ordinance); C. El Camino Real Corridor Standards; D. Growth Management Ordinance (Chapter 21.90 of the Zoning Ordinance) E. Zone 5 Local Facilities Management Plan; IV. ANALYSIS The recommendation for approval of this project was developed by analyzing the project's consistency with the applicable policies and regulations listed above. The following analysis section discusses the compliance with each of these regulations/polices utilizing both text and tables. A. General Plan The El Camino Terrace proposal is consistent with the applicable policies and programs of the General Plan. Particularly relevant to the office development are the Land Use, Circulation, and Public Safety elements. Table 1 below indicates how the project complies with these particular elements of the General Plan. SDP 96-13(B)/SUP 96-09(, -EL CAMINO TERRACE February 7, 2001 Pae 3 TABLE 1-GENERAL PLAN COMPLIANCE Element Use Classification, Goal, Objective Proposed Use and or Program Improvements Land Use Project site is designated for Planned Proposed use is office, which is Industrial (PI) uses. an allowed use in the Planned Industrial area. Require new industrial development The proposal is located within an to be located in modem, attractive, industrial planned development well-designed and landscaped with adequate access. Project industrial parks in which each site includes adequate amounts of adequately provides for internal parking, landscaping, loading traffic, parking, loading, storage, and and storage areas and outdoor other operational needs. employee eating areas. Circulation To provide safe, adequate and The proposed parking areas attractively landscaped parking provide circulation consistent facilities. with City Standards and meet the landscaping requirements of the City's Landscape Manual. Public Safety Design all structures in accordance The proposed office building is with seismic design standards of the designed in conformance with all UBC and State building codes. seismic design standards. Require new development to install emergency water systems and all-Project will provide emergency weather access roads prior to placing water systems and all-weather combustible materials on site. access during construction. Parks and To finance future public park and Project is conditioned to pay Recreation recreation facilities. non-residential park-in-lieu fee for Zone 5. Compliance Yes Yes Yes Yes Yes Yes Given the above, the El Camino Terrace project is consistent with the applicable programs and policies of the General Plan. B. M -Industrial Zone The El Camino Terrace site is located within the Industrial (M) Zone and is therefore subject to the provisions of Chapter 21.32 of the Zoning Ordinance. The proposed office use is an allowed use in the M Zone. The development standards for the M zone deal exclusively with building setbacks, building height, and employee eating areas. The requirements for a front, side or rear yard building setback are solely for those properties adjacent or proximate to residential uses or those properties under a precise plan or conditional use permit. Therefore, none of the setback regulations of the M zone apply to this property. Despite this lack of M zone setback requirements, the building is set back from all property lines by a minimum of 15 feet. SDP 96-13(B)/SUP 96-091-EL CAMINO TERRACE February 7, 2001 Pa e4 With regard to building height, the maximum allowed in the M zone is 35 feet or three levels. The proposed three-story office building would measure a maximum of 35 feet from the pad to the top of the parapet, thereby meeting the building height requirement. As with the P-M zone, the M zone requires employee eating areas at a ratio of 300 square feet per 5,000 square feet of building area. The total building area would be 20,442 square feet, requiring just over 1,200 square feet. The project includes several employee eating areas: one main outdoor eating area on the ground floor and five outdoor balconies· on the third floor totaling 1,334 square feet in area. In addition to the M zone compliance discussed above, the proposal also meets the requirements of the Parking Ordinance by providing the appropriate number of parking spaces and parking lot landscaping. The 20,442 square foot office building requires parking at a ratio of one space for every 250 square feet of gross floor area -totaling 82 spaces. As discussed above, 19 spaces are provided in the ground floor parking garage and the remaining 63 spaces, as well as the loading area, are provided east of the building. Given the above, the project conforms to the requirements of the M zone and the Parking Ordinance. C. El Camino Real Corridor Standards In accordance with the General Plan and Chapter 21 .40 of the Zoning Ordinance, a Scenic Preservation Overlay was placed over El Camino Real and corridor standards were adopted for all development along the scenic roadway. The El Camino Real Corridor Standards are divided into five geographic sections with particular standards for each area. The El Camino Terrace project is located in Area 4. Table 2 below describes these corridor standards and the project's conformance with those standards for Area 4. TABLE 2 -EL CAMINO REAL SCENIC CORRIDOR CONFORMANCE Standard Required Proposed Compliance Grading No cut or fill exceeding 15 Maximum cut is 13 feet feet from original grade. located along the southwest Yes area of the property Setback from For upslope properties: The building is setback a roadway minimum 30 feet. minimum of 30 feet from El Yes Camino Real. Roof equipment No roof equipment shall be The building does not include visible from the roadway. any mechanical equipment on Yes the roof Given the above, the El Camino Terrace project is consistent with the provisions of the El Camino Real Corridor Standards. D. Growth Management Ordinance The El Camino Terrace proposal involves no residential uses, therefore many of the facilities regulated by the Growth Management Ordinance are not affected. Table 3 below shows the project's compliance with the applicable Growth Management facility requirements. SDP 96-13(B)/SUP 96-091-EL CAMINO TERRACE February 7, 2001 Pae 5 TABLE 3 -GROWTH MANAGEMENT COMPLIANCE Standard Impacts/Standards Compliance City Administration NIA Yes Library NIA Yes Waste Water Treatment 11.36 EDU Yes Parks NIA Yes Drainage PLDAB Yes Circulation 168 ADT Yes Fire Station #4 Yes Open Space NIA Yes Schools CUSD Yes Sewer Collection System 11.36 EDU Yes Water 2,499 GPD Yes E. Zone 5 Local Facilities Management Plan The El Camino Terrace site is located within Local Facilities Management Zone 5. There are no special development conditions in the zone plan that apply to this non-residential project, except for the requirement for a 40 cent per square foot park-in-lieu fee. All public facilities needed to serve the development are already in place. In addition, the project has been conditioned to pay a Traffic Impact Fee and comply with all existing and future requirements of the Zone 5 LFMP. As is standard practice, a Public Facilities Fee will be collected for the office building prior to building permit issuance. Given the above, the El Camino Terrace project is consistent with the Local Facilities Management Plan for Zone 5. V. ENVIRONMENTAL REVIEW The project consists of the construction of a 20,442 square foot, three story office building on a 1.48 acre, pre-graded site. As discussed above, the project is consistent with the applicable General Plan designation and all applicable General Plan policies as well as with applicable zoning designation and regulations. The project site has no value as habitat for endangered, rare or threatened species. Approval of the project would not result in any significant effects relating to traffic, noise, air quality or water quality and the site is adequately served by all required utilities and public services. Therefore the project qualifies as a In-Fill Development Project and is exempt from environmental review pursuant to Section 15332 of the State CEQA Guidelines. A Notice of Exemption will be issued upon final project determination. SDP 96-13(B)/SUP 96-09, -EL CAMINO TERRACE February 7, 2001 Pae 6 ATTACHMENTS: 1. Planning Commission Resolution No. 4916 2. Planning Commission Resolution No. 4917 3. Location Map 4. Disclosure Statement 5. Local Facilities Impact Assessment Form 6. Background Data Sheet 7. Exhibits "A" -"I", dated February 7, 2001 MG:cs ·' EL CAMINO TERRACE SOP 96-13(8)/PUD 99-08(8)/SUP 96-09(8) --City of Carlsbad IG6ihhih·l•l4•Eilii,t4,II DISCLOSURE STATEMENT Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board. Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed until this information is completed. Please print. Note: Person is defined as "Any jndividual, finn, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county, city municipality, district or other poJitical subdivision or any other group or combination acting as a unit." Agents may sign this document; however, the legal name and entity of the applicant and property owner must be provided below. ~ 1. APPLICANT (Not the applicant's agent) Provide the COMPLETE, LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership. include the names, title, addresses of all individuals owning more than I 0% of the shares. IF NO INDJVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON- APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person S /) tlJ /vlb fV f,fr/1 Y 7 Title f/Uf.flDff,// Address .?6.[' 41t1t,-/lf-{ot,/tf Cf/t,,fA /,//fl? C/} tj/1 /o Corp/Part · Ty C_tl o,1 ,, fi,pu PJ11i'rlf' Ct:J/J. f /& Title fftP'~/0£.,,,.l,7 Address /'IC /'91'15rJ,9 ~u/ll e-Hui11 1/11' 1'"4 c4 , 19 /o 2. OWNER (Not the owner's agent) Provide the COMPLETE, LEGAL names and addresses of ALL persor,,. having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e, partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a corporation or partnership. include the names, title. addresses of all individuals owning more · than I 0% of the shares. IF NO INDIVIDUALS OWN MORE THAN I 0% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (NIA) IN THE SPACE BELOW. If a publicly- owned corporation, include the names. titles. and addresses of the corporate officers. (A separate page may be attached if necessary.) Person ___________ _ Corp/Part _____________ _ Title ____________ _ Title ---------------Address ___________ _ Address_,__ ______ __,.. ____ _ ---------------------------------------2075 La~ Palmas Dr.• Carlsbad, CA 92009-1576 • (760) 438-1161 • FAX (760) 438-0894 .. - 3. NON-PROFIT 01 ~ZATION OR TRUST If any person identified pursuant to (I) or (2) above is a nonprofit organization or a trust. list the names and addresses of ANY person serving as an officer or director of the non-profit organization or as trustee or beneficiary of the. Non Profit/Trust ________ _ Non Profit/Trust ·----------- Title -------------Title _____ -,--________ _ Address __________ _ Address _____________ _ 4. Have you had more than $250 worth of business transacted with any member of City staff. Boards, Commissions, Committees and/or Council within the past twelve ( 12) months? 0 Yes D No If yes, please indicate person(s):. ______________ _ NOTE: Attach additional sheets if necessary. I certify that all the above information is true and correct to the best of ll]Y knowledge. 2-//-{J{) 2--//-0.; Signature of owner/date Signature of applicant/date 17t,c I,,/ P~'v-?/.JJ fp,~,J7 u;jl..f ' Print or type name of owner Print or type name of :pplicant ownerlapplicant' s agent if applicable/date Print or type name of owner/applicant's agent H :ADMIN\COUNTER\DISCLOSURE STATEMENT 5/98 Page 2 of 2 .. CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES IMP ACTS ASSESSMENT FORM (To be Submitted with Development Application) PROJECT IDENTITY AND IMP ACT ASSESSMENT: FILE NAME AND NO: El Camino Terrace -SDP 96-13(B)ISUP 96-09(B) LOCAL FACILITY MANAGEMENT ZONE: 2 GENERAL PLAN: ~PI"---------- ZONING: M-O -Industrial with a Qualified Development Overlay DEVELOPER'S NAME: Ed McArdle, McArdle Associates Architects, Inc ADDRESS: 6965 El Camino Terrace, Suite 105-472, Carlsbad CA 92008 PHONE NO.: 760-431-7775 ASSESSOR'S PARCEL NO.: -=2=09;_-..=;__04..:...::0_-4=2'-------- QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): =l.'-'-4-=--8 =ac=-re=s ____ _ ESTIMATED COMPLETION DATE: =--=Ja=n=ua=r..;....;y,'-"'2=0-=02=--------------- A. B. C. D. E. F. G. H. I. J. K. City Administrative Facilities: Demand in Square Footage = NIA Library: Demand in Square Footage = NIA Wastewater Treatment Capacity (Calculate with J. Sewer) 11.36 EDU Park: Demand in Acreage = NIA Drainage: Identify Drainage Basin = PLDAB (Identify master plan facilities on site plan) Circulation: Demand in ADT = 168 (Identify Trip Distribution on site plan) Fire: Served by Fire Station No. = =S=ta=ti=on="""-#-"-4 ___ _ Open Space: Schools: (Demands to be determined by staff) Sewer: Acreage Provided= =-N=I A'---"------- Carlsbad Unified Demands in EDU 11.36 (Identify trunk line(s) impacted on site plan) Water: Demand in GPD = 2499 CASE NO: -BACKGROUND DATA SHEET - SDP 96-13(B)/SUP 96-09(B) CASE NAME: El Camino Terrace APPLICANT: Ed McArdle, McArdle Associates Architects, Inc. REQUEST AND LOCATION: A Site Development Plan Amendment, Non-residential Planned Unit Development Permit and Special Use Permit -Scenic Corridor, to allow the construction of a 20,442 square foot, three story office building on a pre-graded site generally located at the southeast comer of El Camino Real and Cougar Drive. LEGAL DESCRIPTION: Parcel 3 of Parcel Map No. 96-11, according to Map No. 18059, filed in the Office of the County Recorder on July 2, 1998, in the City of Carlsbad, County of San Diego, State of California APN: 209-040-42 Acres: 1.48 Proposed No. of Lots/Units: =--N::....::/Ac..=.-_________ _ GENERAL PLAN AND ZONING Land Use Designation: _P_I _-_P_la_nn_e_d_In_d_u_s_tri_· a_l _________________ _ Density Allowed: _N_/ A ______ _ Density Proposed: N_/A __________ _ Existing Zone: M=-=---"'Q ______ _ Proposed Zone: =--N"-'/ A:...=..-__________ _ Surrounding Zoning, General Plan and Land Use: Zoning General Plan Current Land Use Site M-Q PI Vacant North M-Q RH/C/O Retirement home South M-Q PI Industrial office East M-Q PI Vacant West L-C UA Vacant PUBLIC FACILITIES School District: Carlsbad Water District: Carlsbad Sewer District: Carlsbad Equivalent Dwelling Units (Sewer Capacity): ~11=·=-36"'--=E=D--"'U'----------------- ENVIRONMENTAL IMPACT ASSESSMENT D Negative Declaration, issued ____________________ _ D Certified Environmental Impact Report, dated ______________ _ ~ Other, Exempt pursuant to Section 15332 of the State CEOA Guidelines