P.C. AGENDA OF: February 4,2004
A REPORT TO THE PLANNING COMMISSION
Application complete date: July 2,2003
Project Planner: Saima Qureshy
Project Engineer: Frank Jimeno
SUBJECT: CT 02-2WSDP 03-18/CP 02-13/HDP 02-14 - LA COSTA CONDOMINIUMS
- Request for approval of a Mitigated Negative Declaration, Mitigation
Monitoring and Reporting Program, Tentative Tract Map, Site Development Plan,
Condominium Permit and Hillside Development Permit to develop a 58-unit
residential condominium project on an 8.18 acre site located on the south side of
La Costa Avenue, east of El Camino Real and west of Castilla Way, within Local
Facilities Management Zone 6.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolution No. 5554
RECOMMENDING ADOPTION of a Mitigated Negative Declaration and Mitigation
Monitoring and Reporting Program, and ADOPT Planning Commissioii Resolutions No. 5555,
5556, 5557, and 5558 RECOMMENDING APPROVAL of Tentative Tract Map (CT 02-28),
Site Development Plan (SDP 03-18), Condominium Permit (CP 02-13) and Hillside
Development Permit (HPD 02-14) based on the findings and subject to the conditions contained
therein.
11. INTRODUCTION
The applicant proposes to develop a previously graded vacant lot totaling 8.18 acres (5.05 net
acres) with a 58-unit air space condominium project located on the south side of La Costa
Avenue, east of El Camino Real and west of Castilla Way. The development of the proposed
condominium project requires the processing and approval of a Tentative Tract Map, Site
Development Plan, Condominium Permit and Hillside Development Permit. The project
proposes a density of 11.48 dwelling units per acre which is slightly below the growth
management control point density of 11.5 dwelling units per acre for the Residential Medium-
High (RMH) General Plan designation (8-15 ddac) for the subject site. The project as designed
and conditioned is in compliance with all City standards including the General Plan, Subdivision
Ordinance, Planned Development Ordinance, and Residential Density-Multiple (RD-M) zoning
regulations of the Carlsbad Municipal Code (CMC). The project will not have a significant
effect on the environment and a Mitigated Negative Declaration has been prepared for the
project. The project conforms to all applicable standards, there are no outstanding project issues,
and all necessary findings can be made for the approval being requested. City Council action is
required as the subdivision contains more than 50 residential units.
I L . 3 ‘a
CT 02-28/SDP 03-18/CP O~-~J/HDP 02-14 -LA COSTA CONDOMLINMS
February 4,2004
Page 2
111. PROJECT DESCRIPTION AND BACKGROUND
The subject site is 8.18 acres in size and is located on the south side of La Costa Avenue east of
El Camino Real, west of Castilla Way and immediately adjacent to the eastern boundary of an
existing multi-family development, called the Marbella Condominium project. The site is
currently vacant and was previously graded under the jurisdiction of the County of San Diego,
prior to the annexation of La Costa into the City of Carlsbad.
Topographically, the site is characterized by a slope along the fkontage of La Costa Avenue
which increases in height as La Costa Avenue goes downhill fiom the east end of the property to
the west end. A large, rectangular pad (5.05 acres) runs through the middle of the site with its
longest dimension being east to west. A significant slope runs east-west along the southern
section of the site and ranges in height from 50 to 90 feet. This slope separates the pad location
on the site from the duplexes that back onto the property located on Sacada Circle and Torrejon
Place to the south.
Although the site has been previously graded, over time, vegetation has grown along the large
slope that runs along the southerly side of the property. The slope and vegetation is not
integrated into any open space system in the area. However, some minor patches of non-
occupied Coastal Sage Scrub (CSS) are located on this slope, totaling 1.1 acres. The project is
proposing to impact 0.29 acres of the total CSS on site. The project is conditioned to mitigate all
impacts to the coastal sage scrub by acquiring 0.29 acres of mitigation credit in a pre-approved
mitigation area or mitigation bank as approved by the City and the resources agencies.
The geotechnical study prepared for this project has revealed ancient landslides below the
surface of the southerly slope. The slope itself ranges fiom 50 to 90 feet in height. The lots
located south of the subject site, above the slopes drain down the slope to the subject site. A lack
of an adequate drainage system has caused erosion and partial destabilization of the slopes. This
project is conditioned to both stabilize the slopes and contain and control the runoff to the site.
The project’s grading will contribute to the overall stabilization of these slopes. The applicant is
proposing to excavate and re-compact the ancient landslides and use the upper pad of the
development to serve as a buttress for this slope. The geotechnical study addresses this
mitigation measure and staff has found this buttressing, along with drainage control, to be an
adequate solution.
The site is zoned RD-M and has a General Plan designation of RMH. Surrounding land uses
consist of the Marbella Condominium project to the west, single family dwellings on the north
side of La Costa Avenue, vacant land to the east, and duplex residences to the south. The duplex
units are on average 80 feet above the subject site.
The buildings proposed for this project have varied massing, roof forms, balconies and roof
decks that follow the form of the topography, and are oriented to take advantage of the views to
the north. The architectural design of the buildings is of a Mediterranean style and include
sloping tile roofs, plaster exteriors, decorative recesses, wainscots at the base of the buildings,
iron balcony rails, fabric awnings and rectangular and arched openings.
There are three types of buildings proposed: two, three-plex buildings, four, four-plex buildings
and six, six-plex buildings. The three-plex building is simply half of a six-plex building. The
- I 4 *-*
CT 02-28/SDP 03-18/CP 02-13/HDP 02-14 -LA COSTA CONUOMINIUMS
February 4,2004
Pane 3
Floor Plans Area Bed rooms/ Baths
Plan 1 1,340 sq. ft. 3 bedrms.12 bath
Plan 2 1,590 sq. ft. 3 bedms./2 bath
Plan 3 1,737 sq. ft. 4 bedrms./2 bath
three-plex and six-plex buildings are proposed to be located on the lower, larger pad closest to
La Costa Avenue and take their access off of Private Drive ‘B.’ The four-plex buildings would
be located on the higher buttress pad at the base of the existing slope along the southerly edge of
the site and will take their access off of Private Drive ‘A.’ The site is designed to provide
pedestrian connections between the buildings.
No. of units in Affordable units
project
14 9
14 0
14 0
Three-Plex and Six-plex Buildings
The three-plex and six-plex buildings have a variety of shapes and forms. Four of the six units
are oriented around a motorcourt. The other two units have garages that are accessed directly
from the private drive. The motorcourt design orients the garage doors inward and allows for a
more pleasing street scene. Each six and three-plex building has three floor plans. Plan 1 is
1,340 square feet, Plan 2 is 1,590 square feet and Plan 3 is 1,737 square feet in size. These
buildings contain a total of 42 units.
Four-plex Buildings
The four-plex buildings are three story town homes and afford the best views fi-om the site. They
are of a split level configuration and their foundation is designed to help retain the slope behind
them. The garages of these units face directly to the private drive at the lowest floor level.
These units are 2,016 square feet in size and each unit contains 4 bedrooms and 3 bathrooms.
There are four, four-plex buildings and they contain a total of 16 Units.
Recreation Area
Two common recreation areas are proposed for the project; a centrally located pocket-park (530
square feet) and a 14,330 square foot active recreation area located in the northeastern corner of
the project site. The amenities in the active recreation area include: swimming pool, spa,
barbeque area, bathroodchanging room, play equipment, and turf play area. Both recreation
areas are accessible by foot and are connected to the units by pedestrian walkways.
IV. ANALYSIS
The project is subject to the following plans, ordinances and standards:
A.
B.
C.
D.
General Plan RMH (Residential-Medium High Density) designation;
Hillside Development Regulations (Chapter 2 1.95 of the Carlsbad Municipal
Code);
RD-M Zone (Residential Density-Multiple) and Planned Development regulations
(Chapters 2 1.24 and 21.45 respectively of the Carlsbad Municipal Code);
Subdivision Ordinance (Title 20 of the Carlsbad Municipal Code);
CT 02-28/SDP 03-18/CP O~-IJ/HDP 02-14 - LA COSTA CONDOMhlUMS
February 4,2004
ELEMENT
Land Use
Housing
Pane 4
GOAL OBJECTIVE OR IMPROVEMENTS
PROGRAM
Site is designated for Residential Multi-family residential Yes
Medium-High (8-15 du/acre) w/
growth management control
point of 11.5 ddac.
15% inclusionary housing Project conditioned to Yes
requirement per Objective 3.6.
units at 11.48 ddac.
provide 9 affordable
dwelling units on site.
E.
F.
Inclusionary Housing Ordinance (Chapters 21.85 & 21.53 of the Carlsbad
Municipal Code); and
Growth Management Regulations (Chapter 2 1.90 of the Carlsbad Municipal
Code).
The recommendation for approval of this project was developed by analyzing the project’s
consistency with the applicable regulations and policies. The project’s compliance with each of
the above regulations is discussed in detail in the sections below.
A. General Plan
The proposed project is consistent with the policies and programs of the General Plan. The
property has a General Plan designation of RMH which allows the development of multi-family
residential units at a density of 8-15 dwelling units per acre with a growth control point of 11.5
dwelling units per acre. The proposed density of the project, at 1 1.48 dwelling units per acre, is
slightly below the growth management control point (11.5 ddac) used for the purpose of
calculating the City’s compliance with Government Code Section 65584. However, consistent
with Program 3.8 of the City’s certified Housing Element, all of the dwelling units, which were
anticipated toward achieving the City’s share of the regional housing need that are not utilized by
developers in approved projects, are deposited in the City’s Excess Dwelling Unit Bank. These
excess dwelling units are available for allocation to other projects. Accordingly, there is no net
loss of residential unit capacity and there are adequate properties identified in the Housing
Element allowing residential development with a unit capacity, including second dwelling units,
adequate to satisfy the City’s share of the regional housing need. The project proposes fifty-
eight condominium units being developed on a net 5.05 acre lot. The project complies with all
the elements of the General Plan as outlined in Table 1 below:
Table 1 - GENERAL PLAN COMPLIANCE I USE, CLASSIFICATION, I PROPOSED USES & I COMPLY I
/
L I 'Xl
CT 02-28/SDP 03-18/CP 02-13/HDP 02-14 - LA COSTA CONUVOMIN~UMS
February 4,2004
Page 5
Tal
ELEMENT
Public Safety
Noise
Open Space
&
Conservation
Circulation
e 1 - GENERAL PLAN COMPL
USE, CLASSIFICATION,
GOAL OBJECTIVE OR
PROGRAM
Provide project review that
allows consideration of seismic
and geologic hazards.
Residential interior noise
standards of 45 dBA CNEL.
Exterior noise level of 60 dB (A)
CNEL in private open space
areas.
Minimize environmental impacts
to sensitive resources within the
City.
Utilize Best Management
Practices for control of storm
water and to protect water
quality.
Requires new development to
construct improvements needed
to serve proposed development.
ANCE CONTINUED
PROPOSED USES &
IMPROVEMENTS
Project improvements will
not significantly impact or
be impacted by geologic
or seismic conditions. The
project is conditioned to
stabilize the slopes located
on site and contain and
control the runoff to the
site from adjacent
properties located on top
of the slope.
The project is conditioned
to comply with the 45
&A CNEL interior noise
standard. North-facing
private open space
balconies comply with the
60 &A exterior noise
level standard with the
implementation of
mitigation measures. The
project is designed with a
5.5' high noise wall
located along La Costa
Avenue.
The project is conditioned
to mitigate impacts to non-
occupied Coastal Sage
Scrub by acquiring 0.29
acres of mitigation credit.
The project will conform
to all NPDES
requirements.
All public facilities
including curb, gutter and
sidewalk will be
constructed along the
property fkontage.
COMPLY
Yes
Yes
Yes
Yes
CT 02-28/SDP 03-18/CP 02-15/HDP 02-14 - LA COSTA CONDOMIJVIUMS
February 4,2004
Pane 6
B. Hillside Development Regulations
A Hillside Development Permit is required for the project since the subject site contains slopes
of 15 percent or greater and has an elevation differential greater than 15 feet.
The constraints map associated with this project properly identifies existing and proposed
hillside conditions and slope percentages. The geotechnical study prepared for this project has
revealed ancient landslides below the surface of the southerly slope. The slope itself ranges fiom
50 to 90 feet in height. The existing residential lots located above and south of the subject site,
drain over and down the slope to the subject site. A lack of an adequate drainage system has
caused erosion and partial destabilization of the slopes. The applicant is proposing to excavate
and re-compact the ancient landslides and use the upper pad of the development to serve as a
buttress for this slope. As a result of this corrective grading work, the project grading quantities
will exceed the acceptable level of grading (8,000 cubic yarddacre) identified in CMC Section
21.95.120.
However, pursuant to CMC Section 21.95.120, grading quantities for the project are allowed to
exceed identified allowable grading quantities due to unusual geotechnical and soil conditions
that necessitate corrective grading measures. Grading into slopes in excess of 40 percent is also
allowed since this grading is required for remedial purposes.
The project is consistent with the Hillside Ordinance architectural guidelines in that all of the
units, including balconies and patio covers, are set back fiom the top of slope a minimum of 15
feet. The 7:l ratio view line fiom La Costa Avenue, as required by the Hillside Development
Ordinance, is maintained.
C. RD-M Zoning/Condominium (Planned Development)
The proposed project is subject to the RD-M Zone regulations, and the Planned Development
(PD) regulations. The PD regulations provide the development standards for condominium
proj ec t s .
The proposed three-story structures, with a building height of 35 feet, will be compatible with
existing and proposed developments and complies with all of the requirements of the RD-M zone
and Planned Development regulations for multi-family developments. The project will be
compatible in size, scale, and design with the surrounding multi-familylcondominium projects.
Access to the site meets all Fire Department and Engineering Department standards and the
proposed parking (2 spaces per unit and 22 guest parking spaces) meets the parking
requirements .
Pursuant to the Fire Department’s requirement, all units will contain a sprinkler system and the
project is designed with fire turnaround areas on both private driveways to mitigate the safety
concerns of the Fire Department.
To mitigate the Engineering Department’s concerns, a double-throated driveway entrance is
proposed at the project’s entrance and the slope along La Costa Avenue will be cut back up to 30
feet to provide a 510 foot minimum site distance in both directions along La Costa Avenue
I -
CT 02-28/SDP 03-18/CP 02-13/HDP 02-14 - LA COSTA CO~OOMINIUMS
February 4,2004
Page 7
PERMITTED/
REQUIRED
60%
30’ measured from ROW
looking from the driveway entrance. Table 2 illustrates how the project complies with the
applicable RD-M zoning and PD development regulations.
PROPOSED
14.96%
30’ minimum
Table 2: RDM Zoning and P
STANDARD
8’
35’
Max. Lot Coverage (RD-M)
Secondary Arterial Setback - La
Costa Avenue (PD)
Min. Side Setback (RD-M)
Min. Rear Setback (RD-M)
(PD Setbacks)
Setback from driveway (garage)
Setback from driveway
(residence)
Max. Building Height (PD/RD-
M)
8’ minimum
35’
Minimum Building Separation
(PD)
17
10 ft. x 10 ft. patio or 6ft x loft
balcony
200 sq ft of community
recreational space per unit
(1 1,600 sq. ft. total)
20 sq. ft. per unit (1,160 sq ft)
392 cubic feet/unit
Resident Parking
22
28 units will feature 10
ft. x 10 ft. patios and 30
units will have 6ft x loft
decks
14,330 sq. ft.
30.2 sq. f’t. per unit
(1,750 sq ft)
392 cubic feet or
m-eatedunit
Visitor Parking
Private Recreational Space
Common Recreation Area
RV Storage
Storage Space
D. Subdivision Ordinance
5’ 20’
10’ 70’
5’ I 5’
20 feet average with a
structures between structures
2 spacesldu - 2 car garage for each
1 coveredl uncovered
20 feet average with a
The Engineering Department reviewed the proposed tentative map and concludes that the
subdivision complies with all applicable requirements of the Subdivision Map Act and the City’s
Subdivision Ordinance (CMC Title 20). The project is conditioned to install all infrastructure
improvements concurrent with the development. Access to the site will be from La Costa
Avenue. The proposed building setbacks will allow for adequate air circulation and the
opportunity for passive heating and cooling.
CT 02-28ISDP 03-18/CP 02-13/HDP 02-14 - LA COSTA CONDOMlPvIUMS
February 4,2004
STANDARD
Citv Administration
Pane 8
IMPACTS COMPLIANCE
214.6 sf Yes
E. Inclusionary Housing
Library
Waste Water Treatment
Parks
The City’s Inclusionary Housing Ordinance (CMC Chapter 21.85) requires that a minimum of
15% of all approved units in any qualified residential subdivision be made affordable to lower
income households. The inclusionary housing requirement for this project would be 9 dwelling
units. The applicant is proposing to satisfy this requirement by designating 9 of the proposed for
sale units on-site as affordable. The affordable units will be type “Plan 1” located in the six-plex
buildings. Each affordable unit is 1,340 square feet in size and will have three bedrooms and
two bathrooms. The project has been conditioned to enter into an Affordable Housing Agreement
with the City in accordance with the requirements set forth in Chapter 21.85 of the Carlsbad
Municipal Code. Therefore, with this condition in place, the proposed project complies with all
applicable inclusionary housing requirements.
114.72 sf Yes
58 EDU Yes
0.43 ac Yes
F. Growth Management
Drainage
Circulation
The proposed project is located within Local Facilities Management Zone 6 in the Southeast
quadrant of the City. The impacts on public facilities created by the project, and its compliance
with the adopted performance standards, are summarized in Table 3 below.
36.51 CFS Yes
464 ADT Yes
Table 3: GROWTH MANAGEMENT
Fire
Ouen SDace
Stations No. 2 & 6 Yes ~
n/a Yes
Schools
Sewer Collection Svstem
EncinitadSan Dieguito Yes
58 EDU Yes 1 Water I 12,760GPD I Yes
*The project is 0.02 dwelling units below the Growth Management Dwelling Unit allowance of
1 1.5 dwelling units for the subject property.
V. ENVIRONMENTAL, REVIEW
Pursuant to the California Environmental Quality Act (CEQA) and the Environmental Protection
Ordinance (Title 19) of the Carlsbad Municipal Code, staff has conducted an environmental
impact assessment to determine if the project could have any potentially significant impact on
the environment.
The site is not identified by any habitat conservation plan as containing a protected, rare or
endangered plant or animal community. A Biological Resources Report and Impact Analysis
was prepared for the proposed project by Affinis Environmental Services in August 2002 and
was updated in March, 2003. The report and update were based upon surveys of the site
f f - h
CT 02-28ISDP 03-18/CP 02-13/HDP 02-14 - LA COSTA CONuOMINIUMS
February 4,2004
Pane 9
conducted in May 2002 and a literature review. The report identified that 1.1 acres of non-
occupied CSS exist on site and 0.29 acres of this total will be impacted by the project and will be
mitigated by acquiring mitigation credit in a pre-approved mitigation area or mitigation bank.
Since the project is subject to noise impacts from La Costa Avenue, an Acoustical Analysis
report was prepared for the proposed project by Mestre Greve Associates in May 2002. The
report indicates that the project site will be subject to a traffic noise level of about 66.3 CNEL
from La Costa Avenue at the northern property line. In order to meet the 60 CNEL exterior
noise standard, noise barriers are required along La Costa Avenue. The project is designed with
a 5.5-foot high decorative noise attenuation wall located at the top of slope along La Costa
Avenue. Also, to meet exterior noise levels for balconies located on the third floor, 5-foot high
solid balcony barriers are required. The interior noise levels are required to be no greater than 45
dBA CNEL. The report indicates that the buildings closest to La Costa Avenue will be exposed
to noise levels of less than 60 CNEL and therefore will require less than 15 dB exterior to
interior noise reduction in order to meet the standard of 45 CNEL. With construction practices
common in California, residential buildings achieve outdoor to indoor noise reduction of at least
20 dB. In addition a mitigation measure is included in the Mitigation Monitoring and Reporting
Program which requires mechanical ventilation for the units facing La Costa Avenue.
The necessary mitigation measures have been agreed to by the developer and a mitigation
monitoring and reporting program has been prepared. Consequently, a Notice of Intent to adopt
a Mitigated Negative Declaration was published in the newspaper and sent to the State
Clearinghouse for public agency review. A letter was received from the wildlife agencies during
the public review period. The letter and staff response are attached to this report.
ATTACHMENTS:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Planning Commission Resolution No. 5554 (MND)
Planning Commission Resolution No. 5555 (CT)
Planning Commission Resolution No. 5556 (SDP)
Planning Commission Resolution No. 5557 (CP)
Planning Commission Resolution No. 5558 (HDP)
Location Map
Background Data Sheet
Local Facilities Impact Assessment Form
Disclosure Statement
Letter fiom wildlife agencies and response from staff
Reduced Exhibits
Exhibits “A” - “WW” dated February 4,2004
SQ:bd:mh
LA COSTA CONDOMINIUMS
CT 02-28/SDP 03-1 8/CP 02-1 3/HDP 02-14
I r
L - -
BACKGROUND DATA SHEE'i
CASE NO: CT 02-28/SDP 03-18/CP 02-13/HDP 02-14
CASE NAME: La Costa Condominiums
APPLICANT: Calso, LLC
REQUEST AND LOCATION: Mitigated Negative Declaration. Mitigation Monitoring and
Reporting Program. Tentative Tract Map, Site Development Plan, Condominium Permit and
Hillside Development Permit to develop a 58-unit residential condominium on an 8.18 acre site
located on the south side of La Costa Avenue, east of El Camino Real and west of Castilla Way,
within Local Facilities Management Zone 6.
LEGAL DESCRIPTION: Lot 185 of La Costa South Unit 1. in the Citv of Carlsbad, Countv
of San Diego. State of California, according to map thereof no. 6117, filed in the office of the
County Recorder of San Diego County, June 3,1968.
APN: 216-160-27 Acres: 8.18 Proposed No. of LotsAJnits: one lot/58 airspace condominiums
GENERAL PLAN AND ZONING
Land Use Designation: RMH
Density Allowed: 11.5
Existing Zone: RD-M
Surrounding Zoning, General Plan and Land Use:
Density Proposed: 11.48
Proposed Zone: RD-M
Zoning
Site RD-M
North R-1
South R-2
East RD-M
West m-M
General Plan Current Land Use
RMH VACANT
RLM Single Family Residential
RM Duplexes
RMH Vacant
RMH Condominiums
PUBLIC FACILITIES
School District: EncinitadSan Diemito Water District: Carlsbad Sewer District: Leucadia
Equivalent Dwelling Units (Sewer Capacity):
ENVIRONMENTAL IMPACT ASSESSMENT u Negative Declaration, issued
0 Certified Environmental Impact Report, dated
Other, Mitigated Negative Declaration
CITY OF CARLSBAD
GROWTH MANAGEMENT PROGRAM
LOCAL FACILITIES IMPACTS ASSESSMENT FORM
(To be Submitted with Development Application)
PROJECT IDENTITY AND IMPACT ASSESSMENT:
FILE NAME AND NO: La Costa Condominiums - CT 02-28/SDP 03-18/CP 02-13/HDP 02-14
LOCAL FACILITY MANAGEMENT ZONE: 6 GENERAL PLAN: RMH
DEVELOPER’S NAME: Calso, LLC
ADDRESS: 2683 Costabelle Drive. La Jolla, CA 92037
QUANTITY OF LAND USEDEVELOPMENT (AC., SQ. FT., DU): 8.18 acres
ESTMATED COMPLETION DATE:
ZONING: RD-M
PHONE NO.: (858) 453-4575 ASSESSOR’S PARCEL NO.: 216-160-27
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
City Administrative Facilities: Demand in Square Footage = 214.6
Library: Demand in Square Footage = 114.72
Wastewater Treatment Capacity (Calculate with J. Sewer)
Park: Demand in Acreage = 0.43
Drainage: Demand in CFS = 36.51
Leucadia
Identify Drainage Basin = PLDA D
Circulation: Demand in ADT = 464
Fire: Served by Fire Station No. = 2 & 6
Open Space: Acreage Provided = N/A
Schools:
(Student Generation: Elementary = 23.8; Middle = 19.14; High = 19.14)
Sewer: Demands in EDU Leucadia
Water: Demand in GPD = 12,760
The project is 0.02 dwelling units below the Growth Management Dwelling unit
qllowance.
Encinitas Union Elementarv/San Diemito Union Hi&
DISCLOSURE STATEMENT
~ Applicant’s statement or disclosure of certain ownership interests on all applications which will require
discretionary action on the part of the City Council or any appointed Board, Commission or Committee.
The following information MUST be disclosed at the time of application submittal. Your project cannot
be reviewed until this information is completed. Please print.
Note:
Person is defmed as “Any individual, firm, co-partnership, joint venture, association, social club, fraternal
organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county, city
municipality, district or other political subdivision or any other group or combination acting as a unit.”
Agents may sign this document; however, the legal name and entity of the applicant and property owner must be
provided below.
1. APPLICANT (Not the applicant’s agent)
Provide the COMPLETE, LEGAL names and addresses of persons having a financial
interest in the application. If the applicant includes a corporation or partnership, include the
names, title, addresses of all individuals owning more than 10% of the shares. IF NO
INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-
APPLICABLE (N/A) IN THE SPACE BELOW If a publicly-owned corporation, include the
names, titles, and addresses of the corporate officers. (A separate page may be attached if
necessary.)
Person Bill Hofman
Title President Title
Address Address 5900 Pasteur Court, Suite 150
CorpFart Hofman Planning Associates
Carlsbad. CA 92008
2. OWNER (Not the owner’s agent)
Provide the COMPLETE, LEGAL names and addresses of & persons having any ownership
interest in the property involved. Also, provide the nature of the legal ownership (i.e,
partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a
corporation or partnership, include the names, title, addresses of all individuals owning more
than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES,
PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-
owned coruoration, include the names, titles, and addresses of the corporate officers. (A separate
page may be attached if necessary.)
Person Kwan So
Title President Title
Address Address 2683 Costabelle Drive
CorpPart Calso. LLC.
La Jolla. CA 92037
1635 Faraday Avenue 0 Carlsbad, CA 92008-7314 0 (760) 602-4600 FAX (760) 602-8559
3. NON-PROFIT ORGANIZATION OR TRUST
c
If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust, list the
names and addresses of ANY person serving as an officer or director of the non-profit
organization or as trustee or beneficiary of the.
Non ProfitfTrust Non ProfitfTrust
Title Title
Address Address
4. Have you had more than $250 worth of business transacted with any member of City staff,
Boards, Commissions, Committees and/or Council within the past twelve (1 2) months? 0 Yes No If yes, please indicate person(s):
NOTE: Attach additional sheets if necessary.
I certify that all the above information is true and correct to the best of my knowledge.
Bill Hofman
Print or tyie name of owner Print or type name of applicant
Signature of owner/applicant’s agent if applicable/date
Print or type name of owner/applicant’s agent
H:ADMIN\COUNTER\DISCLOSURE STATEMENT 5/98 Page 2 of 2
U.S. Fish and Wildlife Service
Carlsbad Fish and Wildlife Office
60 10 Hidden Valley Road
Carlsbad, California 92009
California Department of Fish & Game
South Coast Regional Office
4949 Viewridge Avenue
San Diego, California 92 123
(760) 43 1-9440 (858) 467-4201
FAX (760) 431-5902 + 9618 FAX (858) 467-4299
In Reply Refer To:
FWS-SDG-3859.1
Ms. Saima Qureshy, Associate Planner
City of Carlsbad
1635 Faraday Avenue
Carlsbad, California 92008
Re: Mitigated Negative Declaration for the La Costa Condominium Project, City of Carlsbad,
San Diego County, California (SCH# 2003 12 1 139)
Dear Ms. Qureshy:
The U.S. Fish and Wildlife Service (Service) and the California Department of Fish and Game
(Department), collectively referred to as the Wildlife Agencies, have reviewed the draft
Mitigated Negative Declaration (MND), dated December 23,2003, for the above-referenced
project in the City of Carlsbad (City), California. The City issued a cover letter with the MND
that states the public review period is from December 23,2003 to January 23,2004. The
Wildlife Agencies have identified concerns regarding the potential effects of this project on
wildlife and regional conservation planning. The comments provided herein are based on the
information provided in the MND and related documentation; the Wildlife Agencies’ knowledge
of sensitive and declining vegetation communities in San Diego County; and our participation in
regional conservation planning efforts.
The primary concern and mandate of the Service is the protection of public fish and wildlife
resources and their habitats. The Service has legal responsibility for the welfare of migratory
birds, anadromous fish, and endangered animals and plants occurring in the United States. The
Service is also responsible for administering the Federal Endangered Species Act of 1973, as
amended (Act) (16 U.S.C. 1531 et seq.). The Department is a Trustee Agency and a Responsible
Agency pursuant to the California Environmental Quality Act (CEQA), Sections 15386 and
15381, respectively. The Department is responsible for the conservation, protection, and
management of the state’s biological resources, including rare, threatened, and endangered plant
and animal species, pursuant to the California Endangered Species Act (CESA), and administers
the Natural Community Conservation Planning Program (NCCP). The City is currently
participating in the NCCP program through the preparation of a draft Multiple Habitat
Conservation Program (MHCP) Habitat Management Plan.
Ms. Saima Qureshy (FWS-SDG-3859.1) 2
The 8.18-acre project site is located on the south side of La Costa Avenue between El Camino
Real and Castilla Way, and is surrounded mainly by residential land uses, with patches of
undeveloped land to the east and southwest. The project proposes a 58-unit condominium
complex.
Vegetation communities on site include coastal sage scrub/mixed chaparral (1.1 acres; CSS),
annual grasslandlandscaped (0.6 acre), landscaped land (2.7 acres), and disturbed land (3.6
acres). Protocol-level gnatcatcher surveys, conducted by Affinis in July 2002, were negative.
According to the MND, the proposed project will directly impact 0.3 acre of CSS, 0.6 acre of
annual grasslandhndscaped, 0.5 acre of landscaped land, and 3.6 acres of disturbed land.
Impacts to CSS are proposed to be mitigated through the acquisition of 0.3 acre of mitigation
credit in a pre-approved mitigation area or mitigation bank.
The Wildlife Agencies offer the following recommendations and comments to assist the City in
minimizing and mitigating project impacts to biological resources and to assure that the project is
consistent with ongoing regional habitat conservation.
1. The MND states that the proposed project will directly impact 0.3 acre of CSS and
assumes the remaining 0.8 acre of CSS on site is impact neutral. The proposed project
will cause significant indirect physical changes to that remnant patch by fUrther isolating
the already tenuous connection between the CSS on site and larger block of habitat to the
west. Additionally, small, edge effected patches of this habitat type would be expected to
eventually lose long-term value. The issue of indirect effects is addressed in Section
15064 in the CEQA Guidelines which states: "In evaluating the significance of the
environmental effect of a project, the lead agency shall consider direct physical changes
in the environment which may be caused by the project and reasonably foreseeable
indirect physical changes in the environment which may be caused by the project." In
light of the preceding information, the Wildlife Agencies recommend that City consider
the significance of the indirect impacts to the remnant patch of CSS habitat, and propose
mitigation pursuant to CEQA consistent with that decision.
2. The final MND should discuss how impacts to annual grassland will be mitigated.
During a January 21,2004 phone conversation with Nancy Frost (Department), you
confirmed that the City will require the applicant to mitigate impacts to annual grassland
through the payment of an in lieu fee, a mitigation option that becomes effective
following final approval of the City's Habitat Management Plan, or acquisition of annual
grassland at a mitigation bank at a 0.5: 1 ratio.
3. The breeding season for nesting birds occurs approximately February 15 through August
3 1 ; however, raptors may begin breeding as early as January. Several bird species may
nest in the habitat on site. If construction is planned during the bird breeding season, we
recommend that the vegetation be cleared prior to the breeding season. Additionally, if
construction occurs during raptor breeding season (approximately February 1 to August
TAKE PRIDE^^^ j 1NAMERlCAv
I ‘ 2; /23/2004 15: 45 FAX 760431,5902 *> US FISH AND WILDLIFE El 002
Ms. Saima Qureshy (FWS-SDG-3859.1) 3
30, or July 31 for Buteo spp.), a qualified biologist should conduct a pre-construction
survey of the project site and surrounding habitat to determine whether there are active
raptor nests within that area. If an active nest is observed, we recommend that a buffer be
established between the construction activities and the nest so that nesting activities are
not interrupted. The buffer should be a minimum c-f 500 feet and should be in effect as
long as construction is occurring and until the nest IS no longer active.
Please contact Kurt Roblek of the Service at (760) 43 1-944.0, or Nancy Frost of the Department
at (858) 637-5511, if you have any questions or comments concerning this letter.
% Therese O’Rourkg
Assistant Field Supervisor
U.S. Fish and Wildlife Service
Sincerely,
V William E. Tippets
Deputy Regional Manager
California Department of Fish and Game
cc: State Clearinghouse
- City of Carlsbad
January 27,2004
Kurt Roblek
U.S. Fish and Wildlife Service
60 10 Hidden Valley Road
Carlsbad, CA 92009
SUBJECT: CT 02-28/ CP 02-13/ HDP 02-14 - La Costa Condominiums
FWS-SDG-3859.1
This letter is in response to your comment letter to the City for La Costa Condominiums project,
FWS-SDG-3859.1. Following are the responses to the three issues raised in your letter:
1. The following response regarding your comment on indirect impacts to CSS is received
fkom the Project Biologist Marcia Gross of Affinis Environmental Services dated January
27, 2004. “The remnant coastal sagejchaparral habitat on-site is not contiguous with any
habitat to the west due to the presence of existing residential development immediately
west of the site. It is contiguous with habitat to the east, and will remain connected to
that habitat after project implementation. This habitat is already subject to edge effects
from existing residential development at the top of the bluff, as well as noise from traffic
along La Costa Avenue. Because this small area of habitat is of relatively low biological
value, it was not included in any proposed hardline conservation areas or proposed
standards areas of the City’s Habitat Management Plan (HMP). Thus, the project would
be consistent with the HMP, which was developed to protect sensitive biological
resources while allowing for new development in accordance with the City’s General
Plan and Growth Management Plan.
Presently, the site is not fenced and is subject to edge effects associated with trespass by
the public. Upon project completion, this would no longer be the case. The remaining
0.8 acre of habitat on-site would not be expected to experience significant additional
indirect impacts due to the design of the project and the site’s topography. The habitat is
on a steep slope above the grade of the project and would be separated from the
developed area by a concrete block wall averaging six feet in height. Thus, it would be
very difficult for humans or pets to access, and would not receive any nuisance runoff
from the development. None of the proposed residential units would be immediately
adjacent to the habitat, which would minimize potential impacts from additional light and
noise. For these reasons, no additional mitigation measures are expected to be necessary.”
2. The project is conditioned through Planning Commission Resolution No. 5555 to
mitigate impacts to annual grassland. The standard condition regarding impacts to
wildlife habitats or other land states “This project has been found to result in impacts to
wildlife habitat or other lands, such as agricultural land, which provide some benefits to
@ 1635 Faraday Avenue Carlsbad, CA 92008-731 4 (760) 602-4600 FAX (760) 602-8559 www.ci.carlsbad.ca.us
wildlife, as documented in the City’s Habitat Management Plan and the environmental
analysis for this project. Developer is aware that the City has adopted an In-lieu
Mitigation Fee consistent with Section E.6 of the Habitat Management Plan and City
Council Resolution No. 2000-223 to fund mitigation for impacts to certain categories of
vegetation and animal species. The Developer is further aware that the City has
determined that all projects will be required to pay the fee in order to be found consistent
with the Habitat Management Plan and the Open Space and Conservation Element of the
General Plan. The fee becomes effective following final approval of the Habitat
Management Plan. The City is currently updating the fee study, which is expected to
result in an increase in the amount of the fee. If the Habitat Management Plan is
approved, then the Developer or Developer’s successor(s) in interest shall pay the
adjusted amount of the fee. The fee shall be paid prior to recordation of a final map, or
issuance of a grading permit or building permit, whichever occurs first. If the In-lieu
Mitigation Fee for this project is not paid, this project will not be consistent with the
Habitat Management Plan and the General Plan and any an all approvals for this project
shall become null and void.”
3. The following condition has been added to the project resolution No. 5555, in response to
your letter:
“If any construction activities including grading are to occur during February 15 to
August 31, the applicant should clear the vegetation on-site prior to the bird breeding
season. If construction is to occur during raptor breeding season of approximately
February 1 to August 30, a qualified biologist should conduct a pre-construction survey
of the subject site to determine if there are any active raptor nests on-site. If an active
nest is observed, a buffer of 500 feet should be established between the construction
activities and the nest and the buffer should remain in,effect until the construction is
completed or until the nest is no longer active.”
Please call me, at (760) 602-4619, if you have any questions or comments regarding this project.
Sincerely,
SAIMA QURESHY, AICP
Associate Planner
SQ:bd
c: NancyFrost
California Department of Fish & Game
South Coast Regional Office
4949 Viewridge Avenue
San Diego, CA 92123
VICINITY MAP MDDYT
02004 O'b Cnnsultonts. hc.
-- ................................... -------
mMIm .......................................
-.WYP&IIRI ........................... MWX7 -- .................................................
~RUU., ........................ - - -I- -
--Y*.A# .......................... ---*-+ -mu -IICXI*r rmrrmrra*. -mm. ................................
y.Iyu
.............. ........................................ %i9 mml ............................. mmml ........................................ - - __L -A- W-W.' ?... ....................... -t'L--Y- llowc1oouowum ..................... - .......................................... mm ** -- ............................... +
IIICI.*QI ................................... - - --c -
ILE ra I. CL (ho.. ................... - -s-=- cIILSmY~~&U ............................ - -*e
~T~IYICQ ........................ - aMVRm. ................................... mum ......................................... 4 Mmau ........................................ ____A ____
mQ ............................................. -----E--
NCILC .............................................. 0
.................................... -I R-
RU.LI8- .............................
am ............................ a
-mu-- r... ................... !+-
ilcw .................................. 6
Kc- ..................................... %.'.%.': .*"*.'
m- ............................................ 0
-I*- ................................... 0
IQWrUKU .................................. d
LA COSTA CONDOMINIUMS
MnIIKbSMEI7 -Jw ml . RTIm
C.T. 02-28
u
R.D.P. 02-14 C.P. 02-13 S.D.P. 03-18
LA COSTA
CONDOMINIUMS
LA COXA
SHEET I Of 3 SHEEi . __ C.T. 02-2 H.D.P. 02-1.
S.D.P. C.P. 03-11 02-1:
HILLSIDE DEVELOPMENT
1
"-- AM-
* m I.. IW
LA COSTA
LA COSTA
CONDOMINIUMS
mm unm WmSWS~ 1Icm BENCHMARK mx -
4' .
SITE PLAN
LA COSTA PROPERTY
CALSO, LLC
IW1
1ff2
1 SITE SECTION
LA COSTA PROPERTY
CALSO, LLC
v-204
2 OF 2
!
I/ A-2 ISK, 5 F tom.
p\ F.& -
6-PLEX
RIsTLEva
FLOOR PLAN
LA COSTA PROPERTY
CALSO, LLC
!
1 OF 16
. - . . ......... ...........
-i I
s-tcoN)LEvEL
FWRPLAN
LA COSTA PROPERTY
CALSO, LLC
2ff 16.
mwcd .......
6-PLEX
THROLNEL
FLOOR PLAN
LA COSTA PROPERTY
CALSO, LLC
I,.*-, a-
6-PLEX
ROOF PLAN LA COSTA PROPERTY
CALSO, LLC
1(--17
6-PLEX
SECTION A-A LA COSTA PROPERTY CALSO, LLC
5ff 16
+.. - . ... .~ ...... . . ~.
\
.___..________._____..____I__..~._ 'TliltB(M..L ~ ~ . ~ . -. .... . - 4. . .... ... ~ . . .. ... .... . __. . .... . . . .. .- - -. . .. . . .
6-PLEX
FRONT ELEVATIONS
LA COSTA PROPERTY
CALSO, LLC
!#-,a.
6ff 16
...... ...
............. ... ^.-I. ....
i
.... -. .
3, I..
... --
&Z ______. .... - ..... . ............. 4 . - ____. -. , . .......... .... __F ..-- ~.* ~ ... ..... ._ ~ .......................... --. .c..___----
.i I . ._ 3 ___ .. ....... . ........ .-. .......... -. ...... .- .
SXRU(S
6-PLEX
REAR ELEVATlONS i LA COSTA PROPERTY
CALSO, LLC w-v*
-I-
)
..... . ......... - - . ...... -. __ 13 -I $*
_. &I _..
1
I
I ! .. - .
!
..
.+ i:
. ._ . - .............. ... ..................... -
! \,
'1 _i
1
!
1
.c , .......... ....
................. ................
-
,,
- - -- 6-PLEX 1:-'I
ELEVATIONS LA COSTA PROPERTY sE~.folnrCy~
CALSO, LLC
IW - ,'a.
Eff 16
.. .. ..
, ... .
l:$&/- 9
6-PLEX
ELEVATIONS I
LA COSTA PROPERTY '
CALSO, Y- 17 LLC
03.I9m . ... . . .
$OF 16
:.L --
....
,
......... I. ............. ...... ......
\
lj ii j: .... I
! ... .I-..-. . -. ... __ ............... .....
I J. . ~ ___ ...~ .... ................... ~.-- ._ ......... .
6-PLEX
ELEVATIONS LA COSTA PROPERTY i
CALSO, LLC
V-1.0- I
1OW 16
11.1103 .......
Y 1w-r
6s-v
i- i *- II I
6-PLFX
FLOOR PLAN LA COSTA PROPERTY
CALSO, LLC
Exkmrr
11 OF 16
6-PLEX MmEs~oEsrrJ~ FRONT ELEVATIONS
LA COSTA PROPERTY
CALSO, LLC
Occupancy classification: TYPICAL BuLmw MATERIALS
-1- CILDl wm * 1%. - R-l Residential
/
/
/
T 1-
\ \
\
/’
/ .L
,
/
/
/ /
/I
/I
i - r
LA COSTA PROPERTY
CALSO, LLC
Exm
15oF 16
---I-- -
\ \
\
\
\ L
/ / / /
I---
am
16CF 16 .
I
1. / 9Z'-O"
i
-
-----r-
PLAN tu
-7
RAN 1R
--f f
I *---r
PLAN 1
r-
I
4-PLEX BUILDING
BASEMENT FLOOR PLANS LA COSTA PROPERTY
CALSO, LLC
I-l'Q.
NOTE. AU BUllDlNGS *RE TO BE PROTECTED BY AN AUTOLIATK: FIRE SPRINKLER SYSTEN DELlloNED TO NFPA 15R. STANMRDS
'\, --v
I
\
s
PLAN 1R
PLW 1R PLAN 1
CPLEX BUILDING
FIRST LEVEL FLOOR PLANS LA COSTA PROPERTY
CALSO, LLC
"--,'q
t
PLAN
4-PLEX BUILDING
SECOND LEVEL FLOOR PLANS LACOSTAPROPERTY
.-. -9
w WTS on"
CALSO, LLC w-n.0-
I I I
4PLEX BUILDING
ROOF DECK FLOOR PLANS LA COSTA PROPERTY
CALSO. LLC
. -. Q
4 ff '17
..
4-PLEX BULDING
ROOF PLAN
LA COSTA PROPERTY
CALSO, LLC c - 17
i i I ..
5 OF 17
. . . . . - . . . . . .. ' ..
- I j
4-PLEX BUILDING
SECTION A-A LA COSTA PROPERTY
CALSO, LLC w- rr
.. .. .
4-PLEX BUILDING
SECTION B-B LA COSTA PROPERTY
CALSO, LLC
w-1'4.
7CF17
.... - ..... .......... .
.. ..
i L : d~cupancyclssrifiation: R- I Residential U-1 Private gmges
4-PLEX BUILDING
FRONT ELEVATION
LA COSTA PROPERTY !
CALSO, LLC
%--I.*
Type of construction: Type V- One Hour
4-PLEX BUILDING
SIDE ELEVATION LA COSTA PROPERTY 1 I I CALSO, LLC *--,'e
. ......
............ ..... ..............
(REAR 'B ELEVATloN SrrrAR)
4-PLEX BUILDING
REAR ELEVATION
LA COSTA PROPERTY
CALSO, LLC
X." I'Q
I'
4-PLEX BUILDING
FRONT ELEVATION
LA COSTA PROPERTY
CALSO, LLC
%--,'a.
11 OF 17
.>i! I ...
.
....
..... , .\ . . E...
.. -
.... .....
.... .- ,, \ .... _I ..
............ I .............. ...! 7:
i 'I
4-PLEX BUILDING
SIDE ELEVATION
LA COSTA PROPERTY
CALSO. LLC
120F 17 .
, . . .. . .. . _. . /"....... . ,. 1. . .., ,". . ~... . . .. .. .. .
FACACES: ARCHITECTURAL DESIGN ELEMENTS
4-PLEX BUILDING
FRONT ELEVATION LA COSTA PROPERTY
CALSO, LLC
U..(I-F
R-I Residential u-I privategarages
Type ~fconst~cti~n: Typa V- One Hour
ARWTECTURAL DESIGN ELEMENTS
4-PLEX BUILDING
SIDE ELEVATION
LACOSTAPROPERTY
CALSO, LLC
%--IT
. .. .
._
ARCHITECTURAL DESIGN ELEMENTS
me-
CPLEX BUILDING
REAR ELEVATION LA COSTA PROPERTY
CALSO, LLC ---,.e
.. .,,:,_ ..... .~ ._,,_ "_, . ... -- . .. . .
ARCHITECTURAL DESIGN ELEMENTS
4-PLEX BUILDING
FRONT ELEVATION
LA COSTA PROPERTY CALSO, LLC u-- 04.
EXHBIT .
16s 17
.
!
. . . -. . . .
ARCHITECTURAL DESIGN ELEMENTS
4-PLEX BUILDING
SIDE ELEVATION
LA COSTA PROPERTY
CALSO, LLC *--I'm
EXHBIT
17ff 17
CT 02-28/sDp 03-18ICP 02-13/HDP 02-14 @ wo, =-yrE 05'10' ..I ...I
W D. mu e: DI4I.d n.11..1 LANDSCAPE CONCEPT PLAN mrm( sCA&:l"=30'
LA COSTA CONDOMINIUM
.
V6. +F!Lsz%E!2 --amc-m-am a 2'4' b' -I.= SULE: 1/8"=1"0"
CT 02-281SDP 03-18/CP 02-131HDP 02-14
D. ml .: 11.os1(.10 OAR; n-rt.ol RECREATION AREA LAYOUT
_w- -.-..IN-. - rr I. I LA COSTA CONDOMINIUMS Carlsbad. CA
I
C