Loading...
HomeMy WebLinkAbout2005-02-02; Planning Commission; ; CUP 04-14|SDP 82-03E|CDP 04-22 - POINSETTIA VILLAGE CREDIT UNIONle City of Carlsbad Planning Departmenf' A REPORT TO THE PLANNING COMMISSION P.C. AGENDA OF: February 2, 2005 ItemNo. @ Application complete date: August 23, 2004 Project Planner: Michael Grim Project Engineer: Frank Jimeno SUBJECT: CUP 04-14/SDP 82-03(D)/CDP 04-22 -POINSETTIA VILLAGE CREDIT UNION -Request for a Conditional Use Permit, Site Development Plan Amendment, and Coastal Development Permit to allow the construction and operation of a 5,000 square foot credit union with a drive-thru facility, located within the Poinsettia Village shopping center, on the east side of A venida Encinas, between Poinsettia Lane and Loganberry Drive, in Local Facilities Management Zone 9. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 5833 RECOMMENDING APPROVAL of Conditional Use Permit CUP 04-14, and ADOPT Planning Commission Resolutions No. 5834, and 5835 APPROVING Site Development Plan Amendment SDP 82-03(D), and Coastal Development Permit CDP 04-22, based upon the findings and subject to the conditions contained therein. II. INTRODUCTION The proposal_involves the construction and operation of a 5,000 square foot credit union building with drive-thru facilities within the Poinsettia Village shopping center. The proposed building would be located on a vacant, graded pad (Pad 6) in the southwestern portion of the shopping center. The proposal would involve minor modifications to the existing parking and circulation in the immediate area of the proposed credit union. The project also entails the restriping of portions of the shopping center parking lot to improve compliance with handicapped parking requirements. A Site Development Plan Amendment is necessary for development in the Qualified Development Overlay Zone and for the proposed modifications to the existing shopping center parking lot. A Conditional Use Permit is needed for businesses with drive-thru facilities as well as for development of commercial uses within the Commercial/Visitor-Serving Overlay Zone. A Coastal Development Permit is required for development in the City's Coastal Zone. The project complies with all applicable regulations and staff has no issues with the proposal. III. PROJECT DESCRIPTION AND BACKGROUND Architects Orange is requesting approval of a Conditional Use Permit, Site Development Plan Amendment and Coastal Development Permit to allow the construction and operation of a credit union with drive-thru facilities within the Poinsettia Village shopping center. The proposed structure would be located on an existing, vacant pad (Pad 6) located at the intersection of Avenida Encinas and Loganberry Drive, adjacent to the Chevron gasoline station. The project 1'' rw,r CUP 04-14/SDP 82-03(D)/!P 04-22-POINSETTIA VILLAGE·C,DIT UNION February 2, 2005 Pa e2 site is designated Travel/Recreation Commercial and Local Shopping Center (T-R/L) in the City's General Plan and is zoned General Commercial with a Qualified Development Overlay (C-2-Q). The total shopping center site covers approximately 22 acres, while the area proposed for the credit union development measures approximately 6 acres. The Poinsettia Village shopping center is completely surrounded by roadways, namely Poinsettia Lane, A venida Encinas, and Interstate 5. To the west and south of the shopping center, across Avenida Encinas, is·the Lakeshore Gardens Mobilehome Park. North of the site, across Poinsettia Lane, is the Inns of America hotel, and east of the site is the Interstate 5 freeway. The project site is one of two remaining vacant pads (Pads #4 and 6) within the Poinsettia Village shopping center. The shopping center was originally approved through Site Development Plan SDP 82-03(A) in March of 1986. The project also included a subdivision map and non-residential planned development (CT 81-6(B)/PUD 94), creating individual lots within the shopping center. Development of the center proceeded with six individual pads being reserved for later use. Pad #1 was developed with a drive-thru financial institution; Pads #2 and 3 were developed with drive-thru restaurant facilities. Pad #5 was developed with a gasoline station in 2000 through SDP 82-03(B)/CUP 99-15/CDP 99-35 -Chevron Poinsettia Village. SDP 82-03(C) represented a proposal for an 8,500 square foot childcare center that was withdrawn. The proposal includes the construction and operation of a one-story credit union with drive-thru facilities on Pad #6. The proposed improvements would also include the redesign and restriping of the parking and circulation area adjacent to the credit union building to accommodate the drive-thru traffic and truck turning. Landscaping would be added to the perimeter of the building and parking lot as well as to new planter islands within the parking lot. The proposed architecture, materials and colors would match the existing shopping center buildings. The one- story building would measure 30 feet to the peak of the roof, with a tower element that would reach a maximum of 38 feet but contains no habitable floor area. In addition to the credit union development, the project includes the adjustment of some of the handicapped parking spaces and pedestrian crossing striping. The owner of the shopping center is undertaking this effort to improve compliance with the standards for handicapped parking. As shown on Exhibit "A," dated February 2, 2005, these improvements are located throughout the center and the total parking spaces provided still meets the minimum required by the Parking Ordinance and the CommercialNisitor-Serving Overlay Zone. The Poinsettia Village Credit Union proposal is subject to the following regulations: A. General Plan; B. Local Coastal Program; C. C-2-Q -General Commercial Zone with a Qualified Development Overlay (Chapters 21.0p and 21.28 of the Zoning Ordinance); D. Commercial/Visitor-Serving Overlay Zone (Chapter 21.208 of the Zoning Ordinance); E. Conditional Use Ordinance (Chapter 21.42 of the Zoning Ordinance); and F. Growth Management Ordinance (Chapter 21.90 of the Zoning Ordinance). CUP 04-14/SDP 82-03(D)/'P 04-22-POINSETTIA VILLAGE clDIT UNION February 2, 2005 Pae 3 IV. ANALYSIS The recommendation of approval of this project was developed by analyzing the project's consistency with the applicable policies and regulations listed above. The following analysis section discusses compliance with each of these regulations/policies utilizing both text and tables. A. General Plan The Poinsettia Village Credit Union project is consistent with the applicable policies and programs of the General Plan. Particularly relevant to the drive-thru credit union proposal are the Land Use, Circulation, and Public Safety Elements. Table 1 below indicates how the project complies with these particular elements of the General Plan. TABLE 1 -GENERAL PLAN COMPLIANCE Element Use Classification, Goal, Proposed Use and Compliance Ob.iective, or Program Improvements Land Use Site is designated for Proposed credit union use is Yes Travel/Recreation and Local consistent with the Local Shopping Center uses. Shopping Center land use designation. Circulation Provide safe, adequate, and The project includes the Yes attractively landscaped parking necessary parking spaces and areas. parking lot circulation, along with parking lot and perimeter landscaping improvements. Public Design all structures in Proposed structure must Yes Safety accordance with the seismic comply with all applicable design standards of the UBC and building codes, including the State building requirements. seismic standards of the UBC and State building requirements. Given the above, the Poinsettia Village Credit Union proposal is consistent with the applicable portions of the General Plan. B. Local Coastal Program The Poinsettia Village site lies within the Mello II segment of the City's Coastal Zone and is subject to the corresponding land use policies and implementing ordinances. This section addresses only conformance with the Land Use Plan since implementing ordinance conformance is addressed in Sections C - F below. The policies of the Mello II segment emphasize topics such as preservation of agricultural and scenic resources, protection of environmentally sensitive resources, provision of shoreline access, and prevention of geologic instability and erosion. The land uses allowed through the Local Coastal Program (LCP) segments are the same as those allowed through the General Plan, therefore the proposed commercial use is consistent with the LCP. There are no steep slopes on the property. All grading will conform to the City of Carlsbad Grading Ordinance and the City's National Pollutant Discharge Elimination System CUP 04-14/SDP 82-03(D)/~P 04-22-POINSETTIA VILLAGE clDIT UNION February 2, 2005 Pa e4 (NPDES) Permit, therefore, no erosion issues exist. There are no agricultural lands or significant scenic resources on or near the site. The property is located on a public dedicated street and is not adjacent to any coastal resources, therefore no existing or future coastal access routes exist on the site. Given the above, the proposed Poinsettia Village Credit Union project is consistent with the Mello II land use policies. C. General Commercial Zone with a Qualified Development Overlay The Poinsettia Village site is zoned C-2-Q and is therefore subject to the provisions of Chapters 21.06 and 21.28 of the Zoning Ordinance. Chapter 21.06 contains the findings necessary to approve a Site Development Plan, which are contained in Planning Commission Resolution No. 5834. These findings are very similar to the findings required for a Conditional Use Permit and are discussed in more detail in Section E below. The General Commercial (C-2) zone contains use allowances and development standards that apply to the proposed drive-thru credit union. The zone allows any service business catering directly to the consumer, such as a financial institution. With regard to development standards, the C-2 zone controls only the building height and placement of buildings adjacent to residential zones. The maximum building height in the C-2 zone is 35 feet to the peak of the roof. Allowed height protrusions are listed in Section 21.46.020 of the Zoning Ordinance and include architectural features or towers that do not provide for additional floor area. The proposed building would measure 30 feet to the peak of the roof with a tower element that would reach 38 feet in height. Therefore, the Poinsettia Village Credit Union proposal is consistent with the underlying zoning. D. CommerciaJNisitor-Serving Overlay Zone The Poinsettia Village site is located within the Commercial/Visitor-Serving Overlay Zone and is therefore subject to the provisions contained in Chapter 21.208 of the Zoning Ordinance. The Overlay zone contains regulations regarding the allowed uses, development standards, and architectural styles. With the exception of stand-alone liquor stores, outdoor storage, temporary display and sales, and incidental outdoor dining areas, all uses allowed in the underlying zone are allowed in the Overlay zone. Therefore, the proposed credit union is an allowed use ip. the Overlay zone. The development standards address building setbacks, signage, and parking. The Overlay zone requires a minimum street setback of 30 feet, a minimum of 20 feet of which must be landscaped. The proposed credit union structure is setback 45 feet from Avenida Encinas, with the drive-thru circulation aisle being 30 feet from the street right-of-way. All signage for the proposed project will be reviewed under a separate permit and, therefore, is not discussed in this report. The architectural styles allowed by the Overlay zone include Contemporary Southwest, with Spanish/mission style clay roof tiles on rectangular buildings with stucco walls and arches. This architectural theme is already the dominant theme at the Poinsettia Village shopping center and the proposed credit union building fits within that theme. With regard to parking the uses at Poinsettia Village, the Commercial/Visitor-Serving Overlay Zone contains parking standards for shopping center retail, restaurant, and gas station uses. For all other uses not listed in the ordinance, it refers to the Parking Ordinance. According to the Parking Ordinance, financial institutions require one space per 250 square feet of gross floor CUP 04-14/SDP 82-03(D)/IP 04-22 -POINSETTIA VILLAGE clDIT UNION February 2, 2005 Pae 5 area. The parking required for the existing center, office building, and the newly developed gasoline station totals 866 spaces. The proposed 5,000 square foot credit union would require 20 spaces; bringing the total parking required up to 886 spaces. According to the site plan on Exhibit "A," dated February 2, 2005, and field verifications, the proposed parking lot layout would provide 893 spaces. Therefore, given the above, the Poinsettia Village Credit Union proposal meets the requirements of the Commercial/Visitor-Serving Zone and Parking Ordinance. E. Conditional Use Ordinance According to Section 21.42.0lO(S)(N), drive-thru businesses that are not restaurants are permitted in all zones except residential and Community Facilities Zones with the approval of a CUP pursuant to the provisions contained in Chapters 21.42 and 21.50 of the Zoning Ordinance. Four findings must be made in order to approve a CUP. These findings, elaborated in Planning Commission Resolution No. 5833, deal mostly with the project's consistency with the General Plan, desirability for the community, and compatibility with its site and surroundings. The proposed credit union with drive-thru facilities is desirable for the community in that it provides increased accessibility to the financial institution. The proposed structure and drive- thru aisle would be set back from A venida Encinas and be surrounded with landscaping. The proposed financial institutional use is similar to other commercial and office uses in the shopping center therefore there are no issues of compatibility of the uses with the surroundings. All proposed improvements can fit on the site without the need for significant modifications to the original site plan and the proposed structure would meet all applicable development standards. The credit union would not generate any additional traffic not already envisioned with the original shopping center Site Development Plan approval, therefore no increased traffic impacts would result. Given the above, the Poinsettia Village Credit Union proposal is consistent with the Conditional Use Ordinance. F. Growth Management Ordinance The Poinsettia Village Credit Union proposal is a non-residential project, therefore many of the Growth Management performance standards do not apply. Table 2 below details the project's compliance with those applicable standards. TABLE 2 -GROWTH MANAGEMENT COMPLIANCE Standard Impacts/Standard Compliance City Administration NIA NIA Library NIA NIA Waste Water Treatment 2.77EDU Yes Parks NIA NIA Drainage PLDAD Yes Circulation 1,000 ADT Yes Fire Station #4 Yes Open Space NIA NIA CUP 04-14/SDP 82-03(D)/IP 04-22 -POINSETTIA VILLAGE clDIT UNION February 2, 2005 Pae 6 TABLE 2 -GROWTH MANAGEMENT COMPLIANCE CONTINUED Standard Impacts/Standard Compliance Schools NIA NIA Water 609 GPD Yes The Poinsettia Village site is located within Local Facilities Management Zone 9. No special development requirements, such as roadway construction or other infrastructure requirements, apply to this project. The Local Facilities Management Plan (LFMP) does require that all facilities and services necessary to serve the project be in place concurrent with, or prior to, need. The proposed credit union with drive-thru facilities will be served by the existing facilities within the shopping center site and the adjacent public rights-of-way. Given the above, the Poinsettia Village Credit Union project is consistent with the Growth Management Ordinance. V. ENVIRONMENTAL REVIEW The proposed 5,000 square foot credit union building with drive-thru facilities represents the new construction of a small structure. The building is within an urbanized area and is less than 10,000 square feet in area. The site is zoned for the proposed commercial use and the project does not include significant amounts of hazardous materials. All public services and facilities needed to serve the use are in place and the surrounding areas are developed and are not environmentally sensitive. Therefore, the project is exempt from further environmental documentation pursuant to Section 15303(c) -New Construction or Conversion of Small Structures-of the State CEQA Guidelines. A Notice of Exemption will be filed upon final project determination. ATTACHMENTS: 1. Planning Commission Resolution No. 5833 (CUP) 2. Planning Commission Resolution No. 5834 (SDP Amendment) 3. Planning Commission Resolution No. 5835 (CDP) 4. Location Map 5. Disclosure Statement 6. Local Facilities Impact Assessment 7. Background Data Sheet 8. Planning Commission Resolution No. 2541-CT 81-06(B)/PUD 94 9. Planning Commission Resolution No. 4738 -SDP 82-03(B) 10. Exhibits "A" -"D" dated February 2, 2005 SITE POINSETTIA VILLAGE CREDIT UNION CUP 04-14/SDP 83-02(0)/CDP 04-22 CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES IMPACTS ASSESSMENT FORM (To be Submitted with Development Application) PROJECT IDENTITY AND IMP ACT ASSESSMENT: FILE NAME AND NO: Poinsettia Village Credit Union-CUP 04-14ISDP 82-03(D)ICDP 04-22 LOCAL FACILITY MANAGEMENT ZONE: .2_ GENERAL PLAN: -=T-=-R/=L=--------- ZONING: C-2-0 -General Commercial with a Qualified Development Overlay DEVELOPER'SNAME:~Ar=c=h=it~ec~ts~O~r=an=-ge~---------------- ADDRESS: 144 N. Orange St., Orange, CA 92866 PHONE NO.: 714-639-9860 ASSESSOR'S PARCEL NO.: 214-430-22 -24 ---~-------- QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): _______ _ ESTIMATED COMPLETION DATE: ------------------- A. City Administrative Facilities: Demand in Square Footage= NIA B. Library: Demand in Square Footage = NIA C. Wastewater Treatment Capacity (Calculate with J. Sewer) 2.77 D. Park: Demand in Acreage = NIA E. Drainage: Identify Drainage Basin = PLDAD F. Circulation: Demand in ADT = 1 000 G. Fire: Served by Fire Station No. = Station #4 H. Open Space: Acreage Provided = NIA I. Schools: NIA J. Sewer: Demands in EDU 2.77 K. Water: Demand in GPD = 609 e e BACKGROUND DATA SHEET CASE NO: CUP 04-14/SDP 82-03(D)ICDP 04-22 CASE NAME: Poinsettia Village Credit Union APPLICANT: Architects Orange REQUEST AND LOCATION: Request for a Conditional Use Permit, Site Development Plan Amendment, and Coastal Development Permit to allow the construction and operation of a 5,000 square foot credit union with a drive-thru facility, located within the Poinsettia Village shopping center, on the east side of Avenida Encinas, between Poinsettia Lane and Loganberry Drive. LEGAL DESCRIPTION: Parcels 1-14 of Map No. 10829, Carlsbad Tract No. CT 81-6, filed in the Office of the County Recorder of San Diego County on January 26, 1984, in the City of Carlsbad, County of San Diego, State of California. APN: 214-430-22, -24 Acres: 22.88 Proposed No. ofLots/Units:N :::..;::...:/A=---------- GENERAL PLAN AND ZONING Land Use Designation: Travel/Recreation Commercial/Local Shopping Center Density Allowed: =-N~/A=-------Density Proposed: =-N:!..::/A=------------ Proposed Zone: =-N=/A=-=---------------Existing Zone: '"'"C-'-2=--_,,0 ______ _ Surrounding Zoning, General Plan and Land Use: Zoning General Plan Current Land Use Site C-2-Q T-R/L Shopping center North C-2 T-R Hotels South RMHP RM Mobile home park East T-C TC Interstate 5 West RMHP RM Mobile home park PUBLIC FACILITIES School District: Carlsbad Unified Water District: Carlsbad Sewer District: -=C=ar=l=sb=a=d'----- Equivalent Dwelling Units (Sewer Capacity): =2.'-'-7..,_7 _______________ _ ENVIRONMENTAL IMPACT ASSESSMENT D Negative Declaration, issued. ____________________ _ D Certified Environmental Impact Report, dated. ______________ _ 1:8:1 Other, Exempt pursuant to Section 15303(c) of the State CEOA Guidelines