Loading...
HomeMy WebLinkAbout2009-12-16; Planning Commission; ; GPA 09-01| ZC 09-01| MP 02-03| CT 09-01| SDP 09-01| PUD 09-01| ROBERTSON RANCH PA 22The City of Carlsbad Planning Department A REPORT TO THE PLANNING COMMISSION Item No. P.C. AGENDA OF: December 16, 2009 Application complete date: N/A Project Planner: Jason Goff Project Engineer: Steve Bobbett SUBJECT: GPA 09-01/ZC 09-01/MP 02-03(BVCT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 - Request for a recommendation of adoption of a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program and Addendum; a recommendation of approval for a General Plan Amendment, Zone Change, Master Plan Amendment, Tentative Tract Map, and Site Development Plan, and a request for approval of a Non-Residential Planned Development Permit to allow for the subdivision of a 10.07 acre site into four lots with 49 airspace condominium office units and the development of a 66,000 square foot three-story office building and permanent RV storage area on property generally located south of Cannon Road, east of El Camino Real, at the southeast corner of the intersection of Wind Trail Way and Cannon Road, within the Robertson Ranch Master Plan, Planning Area 22 and the "Option Parcel," in Local Facilities Management Zone 14. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 6657 RECOMMENDING ADOPTION of a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program and Addendum, and ADOPT Planning Commission Resolutions No. 6658, 6659, 6660, 6661, and 6662, RECOMMENDING APPROVAL of a General Plan Amendment (GPA 09-01), Zone Change (ZC 09-01), Master Plan Amendment (MP 02-03(B)), Tentative Tract Map (CT 09-01), and Site Development Plan (SDP 09-01), and ADOPT Planning Commission Resolution No. 6663, APPROVING a Non-Residential Planned Development Permit (PUD 09-01) based on the findings and subject to the conditions contained therein. II.INTRODUCTION The proposed project consists of a development proposal to subdivide a 10.07 acre site into four lots with 49 airspace condominium office units, and to allow for the grading and construction of a 66,000 square foot three-story office building and a permanent Recreational Vehicle (RV) storage area to serve the East and West Villages of the Robertson Ranch Master Plan. The project site consists of two parcels of land, which are generally located north of Rancho Carlsbad Estates and Calavera Creek, south of Cannon Road, east of Robertson Ranch PA 20, and west of Robertson Ranch PA 23F, at the southeast corner of the intersection of Wind Trail Way and Cannon Road in Local Facilities Management Zone 14. More specifically, the project site is located within the Robertson Ranch Master Plan community on Planning Area 22 (4.37 acres) and an adjacent property, referred to in the Master Plan as the "Option Parcel" (5.7 acres). GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 2 The proposed project requires a General Plan Amendment (GPA) to change the existing General Plan Land Use designations on the project site from Unplanned Area (UA) and Residential Low- Medium Density (RLM, 0-4 du/ac) to Office & Related Commercial (O) and Open Space (OS), and a Zone Change (ZC) to change the existing zoning designation on the 2.21 acre westerly portion of the 5.7 acre "Option Parcel" from Residential Mobile Home Park (RMHP) to Planned Community (P-C). A Master Plan Amendment (MPA) is also required to expand the existing Planning Area 22 boundary in the easterly direction to incorporate the 2.21 acre westerly portion of the 5.7 acre "Option Parcel" into the Robertson Ranch Master Plan; change the underlying zoning of Planning Area 22 from Limited Control (L-C) to Office (O) and Open Space (OS); establish permitted land uses and development standards for PA 22; create a new Robertson Ranch Planning Area 23(G) to include a 1.15 acre Open Space lot over the wetland buffer for Calavera Creek; and establish a permanent RV storage area on PA 22 to accommodate the RV storage requirements for the East and West Villages. A Tentative Tract Map (CT) is required in order to subdivide the two parcels into four lots and 49 air space condominium office units. A Site Development Plan (SDP) is required for the approval of a conceptual site design for the proposed development and to also allow for architectural features to extend up to 55 feet in height. A Non-Residential Planned Development Permit (PUD) is required to allow for the proposed 49 air space condominium office units. The GPA, ZC, MPA, CT, and SDP require the approval of the City Council. The approval of the PUD is final at the Planning Commission. The project has been reviewed for environmental impacts and no significant unmitigable impacts were found. As designed and conditioned, the project is consistent with all applicable standards and policies, and the necessary findings to approve the project can be made. III. PROJECT DESCRIPTION AND BACKGROUND On November 14, 2006, the City Council certified the Final Program Environmental Impact Report (EIR) for the Robertson Ranch Master Plan, and together approved the Master Plan document and the East Village Master Tentative Tract Map. The Master Plan established the permitted uses, development standards, and design criteria for each neighborhood within the Robertson Ranch, as well as the development review process to be utilized. Master Tentative Tract Map CT 02-16 subdivided the East Village area into the various neighborhood development boundaries. A final map has been recorded for the East Village area, grading and improvement plans have been approved, mass grading has been completed on the East Village and within a portion of the central habitat corridor areas located within the West Village, and subsequent Tentative Tract Maps and Planned Development Permits have been approved for the subdivision, plotting and approval of architecture within the various residential planning areas of the East Village. The Master Plan envisioned that one RV storage area would be provided for the entire master planned development within PA 2 of the West Village located on the northeast corner of the intersection at El Camino Real and Tamarack Avenue. However, it was anticipated that PA 2 would not be ready for development at the time RV storage was needed for the East Village. Accordingly, the Master Plan allowed for a temporary RV storage area to be developed to serve the market-rate units proposed within the East Village of the Robertson Ranch Master Plan until GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 3 a permanent RV storage area could be approved. Pursuant to the Master Plan, temporary RV storage could be provided within any single-family neighborhood of the East Village or within PA 22 (an Unplanned Area within the Master) subject to approval of a Conditional Use Permit. On June 18, 2008, a Conditional Use Permit (CUP 07-04) was approved by the Planning Commission allowing for a temporary RV storage area to be developed within PA 22. To date, construction and development of this facility has not been initiated. On January 14, 2009, the applicant (Brookfield Tamarack, LLC) instead submitted the subject project proposing to establish permanent land uses on PA 22 and a portion of the adjacent "Option Parcel", including a development proposal to subdivide the two properties into four lots with 49 airspace condominium office units and grading for the construction of a 66,000 square foot three-story office building and permanent RV storage area for the benefit of both the East and West Villages of the Master Plan. Surrounding land uses include single-family residential development (PA 21: approved, but undeveloped courtyard homes) and an existing three-story multifamily residential apartment complex (PA 15) located across Cannon Road to the north; the Rancho Carlsbad Estates residential community to the south; a community park site (PA 12) and water quality detention basin (PA 20) to the west; and a non-HMP open space lot (PA 23F) to the east. Access to the project site is provided by an existing signalized intersection at Wind Trail Way and Cannon Road. The project site presently exists in a partially developed state, having already been rough graded pursuant to the mass grading plans for the Robertson Ranch East Village Master Tentative Map, and developed with a street screening frontage wall, landscaping, and sidewalk improvements along Cannon Road. Other portions of the project site exist as previously farmed land, some eucalyptus woodland, a sewer trunk line, maintenance access easement, and a six foot tall masonry wall running along the common property line with Rancho Carlsbad Estates. The initial grading of the site avoided a stand of mature Sycamore trees and provided a 100-foot buffer from wetlands along Calavera Creek, except in areas where a buffer of a lesser width was approved by the Wildlife Agencies near the main project entrance at Wind Trail Way and Cannon Road. The proposed project will follow this existing grading scheme with the exception of some additional cut and fill areas along the western boundary of the "Option Parcel". The site will require an additional 6,200 cubic yards of excavation, 4,500 cubic yards of fill embankment, and a resulting 1,700 cubic yards of export of soil to accommodate the proposed project. The General Plan Land Use designation for PA 22 is Unplanned Area (UA), and the adjacent "Option Parcel" is Residential Low-Medium Density (RLM, 0-4 du/ac). A General Plan Amendment (GPA 09-01) is proposed to change the existing General Plan Land Use designations on the project site (i.e., PA 22 plus the 2.21 acre westerly portion of the 5.7 acre Option Parcel) from Unplanned Area (UA) and Residential Low-Medium Density (RLM, 0-4 du/ac) to Office & Related Commercial (O) and Open Space (OS). The remaining 3.49 acre portion of the Option Parcel will remain RLM. A Zone Change (ZC 09-01) is required to change the existing zoning designation on the 2.21 acre westerly portion of the 5.7 acre "Option Parcel" from Residential Mobile Home Park (RMHP) to Planned Community (P-C). A Master Plan Amendment (MP 02-03 (B)) is required to expand the existing Planning Area 22 boundary in the easterly direction in order to incorporate the 2.21 acre westerly portion of the 5.7 acre "Option Parcel" into the Robertson Ranch Master Plan community; change the underlying GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 4 zoning of Planning Area 22 from Limited Control (L-C) to Office (O) and Open Space (OS) for consistency with the General Plan; establish permitted land uses and development standards for the PA 22 project site; create a new Robertson Ranch Planning Area 23(G), which will include a 1.15 acre open space lot over the 100-foot wetland buffer for Calavera Creek and the existing stand of mature sycamore trees; and establish a permanent RV storage area on PA 22 to accommodate the RV storage requirements for both the East and West Villages. In addition to the three legislative actions discussed above, the project also requires a Tentative Tract Map (CT-09-01), Site Development Plan (SDP 09-01), and Non-Residential Planned Development Permit (PUD) to subdivide the project site into four lots and 49 air space condominium office units and to also approve a conceptual site design for the proposed development and to allow for increased building height from 35 feet to 43.5 feet, along with additional architectural features that extend up to 55 feet. Proposed Lot 1 is 4.63 acres in size and will accommodate the proposed office building. Proposed Lot 2 is 0.80 acres in size and will accommodate the proposed permanent RV storage facility. Proposed Lot 3 will become a 3.49 acre remainder of the "Option Parcel", which is not being developed as part of this project. Proposed Lot 4 is a 1.15 acre open space lot, which will include the 100 foot wide wetland buffer for Calavera Creek. The proposed 66,000 square foot office building is rectangular in shape and is three stories tall. The building is oriented along Cannon Road with the main entrance centered off of the south elevation. The proposed building has a variety of wall angles and offsets to provide architectural relief. The building's architecture is based on Spanish Mission influences and will compliment the architectural environment of the Robertson Ranch Master Plan. The main structure of the building consists primarily of concrete tilt-up construction, but has been further adorned with decorative architectural features including a colonnade that is complimented with wood rafter tails and decorative light fixtures running along the south and west elevations; exposed wood rafter tails extending from beneath the mission barrel tile roof sections and wood balcony; arched windows and entry features; tumbled travertine stone veneer around the center portion of the building and base; wainscot trim; faux window planters; decorative railings at select windows; decorative tile accents; tower elements; recessed windows; decorative window trim, and cornice features; window mullions; and a wood balcony on the third story off of the north elevation. The office building structural height is 43.5 feet to the top of the roof structure, 45 feet to the top of the parapet, and 55 feet to the top of the tallest architectural tower feature. The project design incorporates increased setbacks at a ratio of one foot per additional foot of building height in order to compensate for the proposed 8.5 feet of increased building height. A parking lot, accommodating 265 spaces is proposed around the south, west, and east sides of the office building. A ground mounted mechanical enclosure and trash enclosure is proposed on the southeast side of the building, which incorporates similar architectural features as the main building structure. The proposed RV storage area is located in the northeast corner of the property adjacent to the proposed office building and Cannon Road. The RV storage lot is 0.80 acres in size and will accommodate 11,667 square feet of RV storage (exclusive of drive aisles and approaches) fulfilling the Master Plans requirement to provide RV storage. The RV storage area will be surrounded by an eight foot high visual barrier, consisting of a two foot tall earthen berm and a GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page5 six foot tall solid masonry wall set on top. An existing six foot tall decorative masonry wall and landscaping is located along Cannon Road on the north side. The RV storage area is approximately 9 feet below the elevation of Cannon Road. The Conceptual Landscape Plan incorporates a plant palette and layout designed to reduce the mass of the proposed office building and to screen the permanent RV storage area from the existing Rancho Carlsbad Estates. The plan utilizes a combination six foot tall solid masonry wall at the top of the surrounding pad, along with a dense planting of both evergreen and deciduous trees. The perimeter screening and slope trees consist of California Sycamore, White Alder, and Catalina Ironwood. In order to provide a more mature and immediate effect, 25% of the perimeter screening and slope trees will consist of a 24-inch box container size, 50% will consist of a 36-inch box container size, and the remaining 25% will consist of a 48-inch box container size. A view analysis has been conducted from existing residences along the periphery of the Rancho Carlsbad Estates. This analysis concludes that the distance, which is approximately 250 feet away at the closest point, combined with a dense amount of landscaping will serve to eliminate the potential for any significant visual impacts from this area. IV. ANALYSIS The proposed project is subject to the following plans, ordinances, standards, and policies: A. Carlsbad General Plan Office & Related Commercial (O) and Open Space (OS) Land Use designation regulations; B. Office (O) Zone, and Open Space (OS) Zone (Chapters 21.27 and 21.33 of the Carlsbad Municipal Code); C. Robertson Ranch Master Plan (MP 02-03); D. Subdivision Map Act and City of Carlsbad Subdivision Regulations (Title 20 of the Carlsbad Municipal Code); E. Non-Residential Planned Development (Chapter 21.47 of the Carlsbad Municipal Code); F. Qualified Development Overlay (Q) Zone (Chapter 21.06 of the Carlsbad Municipal Code); G. Growth Management Ordinance (Chapter 21.90 of the Carlsbad Municipal Code) and Zone 14 Local Facilities Management Plan. The recommendation for approval of this project was developed by analyzing the project's consistency with the applicable regulations and policies. The project's compliance with each of the above regulations is discussed in the sections below. A. Carlsbad General Plan Office & Related Commercial (O) and Open Space (OS) Land Use designation The proposed Robertson Ranch Planning Area 22 project site is located within the Robertson Ranch Master Plan community and is composed of two properties, Planning Area 22 (4.37 acres) and a 2.21 acre westerly portion of the adjacent 5.7 acre property, commonly referred to in the Master Plan as the "Option Parcel". The existing General Plan Land Use designation for Planning Area 22 is Unplanned Area (UA). The UA designation indicates areas where planning GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 6 for future land uses has not been completed. The UA designation is implemented through the Planned Community (P-C) Zone, which is applied to all of the properties within the Master Plan. The adjacent 5.7 acre "Option Parcel" has a General Plan Land Use designation of Residential Low-Medium Density (RLM, 0-4 du/ac). The proposed project involves annexing 2.21 acres of the "Option Parcel" into the boundaries of the Master Plan to create a new 6.58 acre Planning Area 22 project site. A General Plan Amendment is proposed, which would modify the allowable land uses on the subject site from UA and RLM to Office & Related Commercial (O) and Open Space (OS). The OS designation would be applied to a portion of the project site (Lot 4), which includes a 100 foot wetland buffer for Calavera Creek and a mature stand of existing sycamore trees. The O General Plan Land Use classification designates areas that are compatible with and environmentally suited for office and professional uses, as well as related commercial uses. This designation is appropriate for office uses, and can function as a transitional land use between retail commercial areas and residential uses, or residential neighborhoods with varying densities. The office use would allow for the development of a commercial office building, related parking lot, and accessory uses, as well as an RV storage lot for the benefit of the residents of the Robertson Ranch East and West Villages. Development of office type land uses in close proximity to housing implements the smart growth principle of providing a balanced mix of land uses in a community, which is considered to be a critical component of achieving better places to live. By placing uses in close proximity to one another, alternatives to driving, such as walking or biking, become more viable. The Robertson Ranch Master Plan is strong in providing a mix of housing, ample parks and open space areas, along with local shopping. The O General Plan Land Use designation on this site will enhance the Master Plan one step further by providing employment opportunities proximate to residential uses, and therefore a more balanced community. In addition to the above, the project complies with all elements of the General Plan as illustrated in Table A below: TABLE A - GENERAL PLAN COMPLIANCE ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Land Use The development area of the project site as proposed will be designated Office & Related Commercial (O). The Office & Related Commercial land use anticipates office and professional uses, as well as related commercial uses. The project proposes office uses. Yes GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 7 TABLE A - GENERAL PLAN COMPLIANCE CONTINUED ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Land Use (continued) Protect and conserve natural resources The project includes placing an Open Space (OS) designation over Lot 4, which includes a 100 foot wetland buffer for Calavera Creek and a stand of existing mature sycamore trees. The OS designation will protect these existing natural resources. Yes Ensure that the review of projects places a high priority on the compatibility of adjacent land uses along the interface of different density categories. Special attention should be given to buffering and transitional methods, especially when reviewing properties where different land uses are involved. The proposed office building and RV storage area are situated on the site so as to minimize their impacts on the surrounding areas to the maximum extent possible. The proposed office building and RV storage area have been situated as far away as possible from the adjacent Rancho Carlsbad Estates, >250 feet to the south of the project site, and the developed multi- family apartment complex and undeveloped residential courtyard homes, approximately >200 ft. to the north across Cannon Road. Extensive screening along the southern boundary of the development site, consisting of dense mature landscaping and decorative masonry walls, have been included into the site design in order to minimize potential visual impacts and noise nuisance impacts on adjacent properties. The RV storage area is situated approximately nine feet below the elevation of Cannon Road and is screened on all sides by a minimum two foot high earthen berm combined with a six foot high decorative masonry screen wall set on top. Yes GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 PageS TABLE A - GENERAL PLAN COMPLIANCE CONTINUED ELEMENT Land Use (continued) Public Safety Open Space & Conservation USE, CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM Review new development proposals to consider emergency access, fire hydrant locations and fire flow requirements. Minimize environmental impacts to sensitive resources within the City. Designate as buffers portions of land next to sensitive environmental areas. PROPOSED USES & IMPROVEMENTS Increased building setbacks and parking lot setbacks have been applied to the site area in order to compensate for the additional 8.5 feet of building height. All required setbacks are adequately landscaped. The office buildings architecture complies with the Robertson Ranch Master Plan Design Guidelines and will compliment the architectural environment of the Robertson Ranch Master Plan. The project provides good road design by minimizing the number of intersections and other conflicting traffic movements and minimizes project access to one location at the existing signalized intersection of Wind Trail Way and Cannon Road; provides mitigation measures to protect neighboring properties from noise; and includes a 100-foot buffer area from sensitive environmental areas (i.e., Calavera Creek). The project includes or has been conditioned to provide facilities to ensure that the development proposal complies with public safety requirements. The project does not impact any sensitive resources. The project includes and designates as Open Space (OS), a 1 00-foot wetland buffer for Calavera Creek. COMPLY Yes Yes Yes GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 9 ' TABLE A - GENERAL PLAN COMPLIANCE CONTINUED ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Open Space & Conservation (continued) Utilize Best Management Practices for control of storm water and to protect water quality. The project has been designed in accordance with the City's Storm water regulations. It has been conditioned to implement Best Management Practices (BMP) for water quality protection, to comply with the City of Carlsbad Standard Urban Stormwater Mitigation Plan (SUSMP), Order R9-2007-0001 issued by the San Diego Region of the California Regional Water Quality Control Board and with the C.M.C. Yes Noise Control harmful or undesirable sound through the planning and regulatory process. An Acoustical Site Assessment was prepared for the project. Vehicle noise from Cannon Road was identified as the primary noise source affecting the project site. Through mitigation, the office building is required to provide a minimum noise reduction of 13.3 dBA CNEL to comply with the City's interior Leq(h) standard of 55 dBA CNEL. Additionally, the nearest noise sensitive area to the project is Rancho Carlsbad Estates, the boundaries of which are located approximately 215 feet to the south of the project site. The proposed office building is proposing a ground mounted mechanical equipment enclosure on the south side of the building. Yes GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 10 TABLE A - GENERAL PLAN COMPLIANCE CONTINUED ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Noise (continued) Mitigation measures prohibiting the venting of louvers on the south side of the enclosure, as well as requiring the wall height of the enclosure to extend a minimum of one foot above the surface height of the mechanical equipment, together with a proposed and an existing six foot tall masonry perimeter wall at the top of slope and southern boundary of proposed Lot 4, will reduce noise levels below 40 dBA Leq, which is below both the City's exterior 60 dBA CNEL and interior 45 dBA CNEL requirements for residential land uses. Circulation Good road design practice shall be utilized to minimize the number of intersections and other conflicting traffic movements. Project driveway for ingress and egress has been designed to align with the existing intersection at Wind Trail Way and Cannon Road in order to minimize the number of intersections and conflicting traffic movements along this corridor. Yes B. Office (O) Zone, and Open Space (OS) Zone (Chapters 21.27 and 21.33 of the Carlsbad Municipal Code) The proposed Robertson Ranch Planning Area 22 project site is composed of two properties, Planning Area 22 (4.37 acres) and a 2.21 acre westerly portion of an adjacent 5.7 acre property, which is referred to in the master plan as the "Option Parcel". Planning Area 22 is presently zoned Planned Community (P-C) with an underlying zoning designation of Limited Control (L- C). The adjacent 5.7 acre "Option Parcel" is zoned Residential Mobile Home Park (RMHP). As part of this project, 2.21 acres of the "Option Parcel" will be added into the master plan to create the new 6.58 acre Planning Area 22 project site. A Zone Change is proposed to change the existing zoning designation on the 2.21 acre westerly portion of the "Option Parcel" from Residential Mobile Home Park (RMHP) to Planned Community (P-C). As part of the Master Plan Amendment (see Section C below) a zone change is proposed to change the underlying zoning designation on Planning Area 22 from L-C to Office (O) and Open Space (OS), and to GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 11 add the O and OS Zone designation to the newly added 2.21 acre portion of the "Option Parcel". This will result in the Zoning for the project site being consistent with the proposed General Plan designation of Office & Related Commercial (O) and Open Space (OS). In addition to the above, the project meets or exceeds all applicable requirements of the O Zone as demonstrated in Table B below: TABLE B - OFFICE (O) ZONE COMPLIANCE STANDARD Lot Area Lot width Building Height Building Setbacks (2-3 Stories up to 35ft.) Driveways/Parking Setbacks REQUIRED 10,000 square feet (min.) 75 feet (measured at front setback) 35 feet/ 45 feet*; 55 feet for allowed protrusions. Front Yard (arterial): 30 feet, plus an additional 8.5 feet, for a total of 38.5 feet* Robertson Ranch Master Plan requires a minimum 40 foot building setback from Cannon Road. This minimum setback is maintained as part of the Master Plan Amendment. 40 feet, plus an additional 8.5 feet, for a total of 48. 5 feet.* Interior Side Yard: 10 feet, plus an additional 8.5 feet for a total of 18. 5 feet* Rear Yard: 10 feet, plus an additional 8.5 feet, for a total of 18. 5 feet* PROPOSED Lot 1=4.21 acres (183,388 sq. ft.) Lot 2 = 0.80 acres (34,848 sq. ft.) Lots 1 & 2 each have lot widths greater than 75 feet (measured at front setback) 43.5 feet maximum; 55 feet for allowed protrusions. 49 feet >1 8.5 feet >1 8.5 feet COMPLY Yes Yes Yes Yes Yes Yes Yes Front Yard (arterial): Lot 1:15 feet, plus an additional 8.5 feet, for a total of 23. 5 feet* Lot 2: 15 feet >30 feet >15feet Yes Yes GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 12 TABLE B - OFFICE (O) ZONE COMPLIANCE CONTINUED STANDARD Driveways/Parking Setbacks (continued) Building Coverage Lighting REQUIRED PROPOSED COMPLY Interior Side Yard: Lot 1 : 5 feet, plus an additional 8.5 feet, for a total of 13. 5 feet* Lot 2: 5 feet East Interior Side: >8 feet** West Interior Side: Between 3 feet*** and 43 feet East Interior Side: >17 feet West Interior Side: 5 feet Yes Yes Yes Yes Rear Yard: Lot 1 : 5 feet, plus an additional 8.5 feet, for a total of 13.5 feet* Lot 2: 5 feet 50% max. Exterior lighting is required for all employee and visitor parking areas, walkways, and building entrances and exits. Light sources shall be designed to avoid direct or indirect glare to any off- site properties or public right-of-way. Lot 1:>1 3.5 feet Lot 2: 5 feet 12.6% The project is conditioned to submit and obtain Planning Director approval of an exterior lighting plan including parking areas, walkways, and building entrances and exits, prior to the issuance of a grading permit. Furthermore, all lighting is conditioned to be designed to reflect downward and avoid any impacts on adjacent homes or property. Yes Yes Yes Yes GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 13 TABLE B - OFFICE (O) ZONE COMPLIANCE CONTINUED STANDARD REQUIRED PROPOSED COMPLY Roof Appurtenances All roof appurtenances, including air conditioners, shall be architecturally integrated and shielded from adjacent properties and streets. The project is proposing a 1,053 square foot mechanical equipment enclosure on Lot 1 to house the majority of the proposed office building's mechanical equipment. The enclosure is architecturally treated to match the proposed office building. Any additional roof mounted appurtenances that may be needed in addition to the ground mounted equipment is prohibited from exceeding the parapet height, which is at 45 feet above the first floor finished floor elevation. Therefore, all roof appurtenances will be shielded from adjacent properties and streets. Yes Trash Enclosures Trash receptacle areas shall be enclosed by a six- foot high masonry wall with gates pursuant to City Standards. A trash enclosure facility that is enclosed by six-foot high masonry walls and gates is proposed on Lot 1. The enclosure is designed in accordance with City Standards and is architecturally treated to match the proposed office building. Yes Loading Areas All loading areas shall be oriented and/or screened so as to be unobtrusive from the adjacent streets or properties. A loading area for mail deliveries is proposed within the first row of parking on Lot 1 near the front entrance of the proposed office building. The loading area is oriented so as to be unobtrusive, and furthermore is screened from the adjacent street (Cannon Road) and other properties by the building and an existing six-foot high masonry wall and dense landscaping. Yes GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 14 TABLE B - OFFICE (O) ZONE COMPLIANCE CONTINUED STANDARD Parking Employee Eating Areas REQUIRED Professional Office: One space per 250 square feet. 66,000 - 250 = 264 spaces 300 square feet for every 5,000 square feet of building area, except for office buildings located within 1,000 feet of an approved mini-park or City park. PROPOSED 265 spaces The office building proposed on Lot 1 is within a 1 ,000 foot walking distance of the approved Robertson Ranch Community Park (Planning Area 13). Therefore, the requirement to provide an employee eating area is not applicable. However, the project is proposing to construct a 2,750 square foot employee eating area along the south property line of Lot 1 (please see landscape plans for details). COMPLY Yes Yes * In accordance with C.M.C. Section 21.27.050(3)(b), all required setbacks shall be increased at a ratio of one horizontal foot for every one foot of vertical construction beyond thirty-five feet. The top of the main roof structure is 43.5 ft., minus the 35 ft. maximum building height, equals 8.5 ft. of additional setback area that is to be maintained as landscaping. ** In accordance with C.M.C. Section 21.27.050(4), setbacks for parking may be reduced with construction of a six-foot solid masonry wall and appropriate landscape buffer on a rear or interior side yard only (C.M.C. Section 21.27.050(4). The east side interior setback for parking has been reduced to 8 feet. A 6 ft. tall solid masonry wall with landscaping has been provided. *** In accordance with C.M.C. Section 21.27.050(5)(E), approved areas of ingress and egress are considered permitted intrusions within the required setbacks. C. Robertson Ranch Master Plan (MP 02-03) The project site is located in an area subject to the Robertson Ranch Master Plan (MP 02-03). The Master Plan provides a framework for the development of vacant properties within the Master Plan area to ensure the logical and efficient provision of public facilities and community amenities for future residents. The project site, which consists of PA 22 and a portion of a property referred to in the Master Plan as the "Option Parcel" are presently unplanned areas within the Master Plan. According to the Master Plan, a Major Master Plan Amendment is required for the inclusion of adjacent lands, such as the "Option Parcel" and/or modifications to land uses not presently identified in the Master Plan, such as the "Unplanned Area" within Planning Area 22. Major Master Plan Amendments shall be approved through a public hearing before the Planning Commission and City Council pursuant to Chapter 21.38.120 of the Carlsbad Municipal Code. GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 15 The proposed Master Plan Amendment (MP 02-03(B)) proposes to expand the existing Planning Area 22 boundary in the easterly direction to incorporate as part of the Robertson Ranch Master Plan community a 2.21 acre westerly portion of the 5.7 acre "Option Parcel". To implement the proposed General Plan Land Use designations, a change in the underlying zoning of PA 22 from Limited Control (L-C) to Office (O) and Open Space (OS) is proposed. The amendment proposes that development of PA 22 comply with all applicable regulations and development standards of the Carlsbad Municipal Code, including zoning standards for the O Zone (Chapter 21.27) except as modified by the Master Plan. As demonstrated in Section "A" above, the proposed land uses are compatible with the adjacent land uses and assist in creating a more balanced community. As demonstrated in Section "B" above, all development standards have been met. Permitted land uses for PA 22 will allow for RV Storage, as well as all permitted and conditional uses that are identified in the O Zone (Chapter 21.27.020). In order to include a 1.15 acre open space lot over the wetland buffer for Calavera Creek and the existing stand of mature sycamore trees, a new Robertson Ranch Planning Area 23(G) is being created. The addition of PA 23(G), consisting of 1.15 acres of non-HMP open space, will increase the Master Plan's total amount of open space to 143.6 acres. Lastly, the proposed amendment will establish a permanent RV storage area on PA 22, which will accommodate the RV storage requirements for both the East and West Villages. The RV storage facility is a requirement of the Master Plan and has been designed in accordance with the development standards outlined within the Master Plan. Section 21.45.060 of the Carlsbad Municipal Code requires that a minimum of 20 square feet of RV storage area be provide for each dwelling unit in a planned development, with the exception of rental apartment projects, standard single-family lots, and projects located in the RMH and RH land use designations. Of the total project dwelling units, a maximum of 320 are located in the East Village (PA 14, 16, 17, and 18), and 232 are located within the West Village (PA 1, 3, 6, 10, and 13), which results in a maximum requirement of 11,040 square feet, excluding drive aisles. The proposed RV storage area is providing 11,667 square feet, which will be available to both villages. The Master Plan Amendment includes 14 pages of revised text and 7 pages of revised figures, which are included as Exhibit "MP 02-03" and attached to Planning Commission Resolution No. 6660. D. Subdivision Map Act and City of Carlsbad Subdivision Regulations (Title 20 of the Carlsbad Municipal Code) The Engineering Department has reviewed the proposed tentative tract map and has concluded that the subdivision complies with all applicable requirements of the Subdivision Map Act and the City's Subdivision Ordinance. All major subdivision design criteria have been complied with and the project is conditioned to install infrastructure improvements concurrent with development. The developer will be required to offer various dedications (e.g., drainage, public utility) and will be responsible for a number of public and private improvements, including but not limited to curbs, gutters, sidewalks, sewer facilities, drainage facilities, water line facilities, fire hydrants, and street lights. The project has been designed in accordance with the City's Stormwater regulations. It has been conditioned to implement Best Management Practices (BMP) for water quality protection, and to comply with the City of Carlsbad Standard Urban Stormwater Mitigation Plan (SUSMP), Order GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 16 R9-2007-0001 issued by the San Diego Region of the California Regional Water Quality Control Board and with the City of Carlsbad Municipal Code. E. Non-Residential Planned Development (Chapter 21.47 of the Carlsbad Municipal Code) The intent and purpose of the Non-Residential Planned Development regulations are to: 1. Ensure that non-residential projects develop in accordance with the General Plan and applicable specific plans; 2. Provide for non-residential projects which are compatible with surrounding developments; 3. Provide a method to approve separate ownership of units within multiple-unit buildings; and 4. Provide for conversion of existing developments to condominiums. The proposal to create non-residential airspace condominium units necessitates that a Non- Residential Planned Development Permit be processed to supplement the proposed Tentative Map (CT 09-01). The 49 non-residential airspace condominium units will share common driveway access, parking areas, landscaping, and outdoor eating facilities, which will all be commonly maintained by an owners association. The project complies with the General Plan, Zoning, and the Robertson Ranch Master Plan as proposed and discussed in the sections above. The subdivision, by nature of the office use, will not be detrimental to the health, safety or welfare of the surrounding residential developments as office uses are considered by the General Plan to be transitional uses, which often function as buffers between commercial and residential areas. Furthermore, the project has been sited and designed to ensure land use compatibility with the adjacent residential uses (see Sections "A", "B", and "F"). No modifications to the development standards, other than increased setbacks to offset the 8.5 feet of increased building height are required to protect public health, safety, and general welfare of the community. There are no size or configuration standards for non- residential planned development units beyond those imposed as a part of the permit, except that they shall be reasonable as to the intended use and relation to the project. All 49 non-residential condominium units will be contained within the confines of the 66,000 square foot three story office building, for which all development standards and parking requirements are being met. F. Qualified Development Overlay (Q) Zone (Chapter 21.06 of the Carlsbad Municipal Code) Development within the O Zone is required to process a Site Development Plan (SDP) in accordance with the provisions of the Qualified Development Overlay (Q) Zone pursuant to Chapter 21.06 of the Carlsbad Municipal Code. There are four findings necessary to approve an SDP pursuant to the Q-Overlay. Additionally, the O Zone requires City Council approval of a SDP for additional building height beyond 35 feet up to a maximum of 45 feet. Provisions for allowing architectural features, such as flag poles, steeples, or architectural towers, to extend up to 55 feet in height are allowed if the City Council finds that the protruding architectural features (1) do not function to provide usable floor area; (2) do not accommodate and/or screen building GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 17 equipment; (3) do not adversely impact adjacent properties; and (4) are necessary to ensure a building's design excellence. The required findings with justification for each are contained in Planning Commission Resolution No. 6662. This section summarizes the necessary findings and supports each. The requested uses are properly related,to the site, surroundings and environmental setting, as the project design complies with the development standards of the O Zone. The proposed office building and RV storage area are situated on the site so as to minimize their impacts on their surroundings to the maximum extent practicable. Approximately >250 feet of horizontal separation exists between the proposed uses and the adjacent Rancho Carlsbad Estates community located to the south, and approximately >200 feet of horizontal separation exists between the neighboring multifamily apartment complex and undeveloped courtyard homes located across Cannon Road to the north. In addition to horizontal separation, approximately >20 feet of vertical separation exists between the pad grade of the project site and the existing/undeveloped residential uses to the north, and approximately 8 feet of vertical separation exists between the pad grade of the project site and the closest residences in Rancho Carlsbad Estates. Adequate separation is provided from these adjacent uses, and a 100-foot buffer from Calavera Creek has been incorporated into the site design. Furthermore, extensive screening along the southern boundary of the development site, consisting of dense mature landscaping and decorative masonry walls, have been incorporated into the project design to minimize any potential visual and noise nuisance impacts on adjacent residential properties. Increased building setbacks and parking lot setbacks have been applied to compensate for the additional building height, and all required setbacks have been landscaped. The site is also adequate in shape to accommodate the uses as all other code requirements have been met. The project meets the minimum office parking standard of one parking space per 250 square feet of gross building area. The building coverage of 12 percent is less than one fourth of the maximum 50 percent allowed. As shown on Exhibits "A" through "T", all features necessary to adjust the proposed uses to existing and permitted future uses will be provided. Landscaping, berming, and screen walls are proposed to screen parking areas from adjacent properties. Existing screen wall and landscaping improvements exist along Cannon Road to screen the RV storage area and parking areas from public roadways. Adequate vehicle circulation has been provided to accommodate truck-turning movements. Cannon Road will provide access to the site and is adequate to handle all traffic (1,320 average daily trips) generated by these uses. The proposed office building has a building height of 43.5 feet with a parapet height of 45 feet and architectural tower features up to 55 feet. The increase in building height from 35 feet to 43.5 feet complies with Section 21.27.050(3)(a-c), O Zone Development Standards, in that the building is not more than three stories, all setbacks have been increased by one foot for every foot of building height over 35 feet (i.e., 8.5 feet), and the building will conform to Section 18.04.170 of the Carlsbad Municipal Code (regarding fire sprinklers, smoke alarms, and elevators). The increase in height for the architectural tower features from 45 feet to 55 feet complies with Section 21.27.050(d) in that the proposed architectural tower features do not function to provide usable floor area; do not accommodate and/or screen any mechanical equipment; do not adversely impact adjacent properties because of the vertical and horizontal separation that is proposed between land uses; and are necessary to ensure the building's design GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 18 excellence. The building maintains the minimum setbacks from Cannon Road; does not adversely impact adjacent neighbors as discussed throughout the staff report; and the addition of the architectural elements provide vertical relief and add interest to the building's elevations. G. Growth Management Ordinance (Chapter 21.90 of the Carlsbad Municipal Code) and Zone 14 Local Facilities Management Plan. The proposed project is located within Local Facilities Management Zone 14 in the northeast quadrant of the City. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table C below. TABLE C - GROWTH MANAGEMENT COMPLIANCE STANDARD City Administration Library Waste Water Treatment Parks Drainage Circulation Fire Open Space Schools (Carlsbad) Sewer Collection System Water IMPACTS N/A N/A 0.0081 EDU N/A 21.1 CFS / Drainage Basin "B" 1.320ADT Fire Station 3 and 5 Acres Provided =1.15 acres N/A 0.0081 EDU 15,180GPD COMPLY Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes * All of the allowable residential density for PA 22 and the "Option Parcel" has already been allocated to other planning areas within the East Village through the Master Plan process. V.ENVIRONMENTAL REVIEW Pursuant to the California Environmental Quality Act (CEQA) and the Environmental Protection Ordinance (Title 19) of the Carlsbad Municipal Code, staff has conducted an environmental impact assessment to determine if the project could have any potentially significant impact on the environment. The environmental impact assessment identified potentially significant impacts to cultural resources and noise, and mitigation measures have been incorporated into the design of the project or have been included as conditions of approval for the project such that all potentially significant impacts have been mitigated to below a level of significance. Consequently, a Notice of Intent to adopt a Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP) was published in the newspaper for review and comment with copies also sent directly to the United States Fish and Wildlife Service (USFWS) and the California Department of Fish and Game (CDFG). One public comment letter was received from Preserve Calavera during the 20-day public review period, which began on October 21, 2009 and ended on November 10, 2009. A response of "no comment" was received from USFWS, and no comments were received from CDFG. The Preserve Calavera comments and staffs responses are included as an attachment at the back of the MND. An addendum has also been prepared in accordance with Section 15164 of CEQA to include an additional mitigation measure to address the payment of habitat in-lieu fees. This addition has no new GPA 09-01/ZC 09-01/MP 02-03(B)/CT 09-01/SDP 09-01/PUD 09-01 - ROBERTSON RANCH PA 22 December 16, 2009 Page 19 significant environmental effects not analyzed in the previously circulated MND, and none of the circumstances requiring recirculation or a subsequent Mitigated Negative Declaration under CEQA Guidelines Section 15162 exist. ATTACHMENTS: 1. Planning Commission Resolution No. 6657 (MND) 2. Planning Commission Resolution No. 6658 (GPA) 3. Planning Commission Resolution No. 6659 (ZC) 4. Planning Commission Resolution No. 6660 (MP) 5. Planning Commission Resolution No. 6661 (CT) 6. Planning Commission Resolution No. 6662 (SDP) 7. Planning Commission Resolution No. 6663 (PUD) 8. Location Map 9. Background Data Sheet 10. Local Facilities Impact Assessment Form 11. Disclosure Statement 12. Reduced Exhibits 13. Full Size Exhibits "A" - "T" dated December 16, 2009 SITEMAP NOT TO SCALE Robertson Ranch Planning Area 22 GPA 09-01 / ZC 09-01 / MP 02-03(B) / CT 09-01 / SDP 09-01/ PUD 09-01 BACKGROUND DATA SHEET CASE NO: GPA 09-01/ZC 09-01/MP 02-03fBVCT 09-01/SDP 09-01/PUD 09-01 CASE NAME: ROBERTSON RANCH PA 22 APPLICANT: Brookfield Tamarack, LLC REQUEST AND LOCATION: Request for a recommendation of adoption of a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program; a recommendation of approval for a General Plan Amendment, Zone Change, Master Plan Amendment, Tentative Tract Map, and Site Development Plan, and a request for approval of a Non-Residential Planned Development Permit to allow for the subdivision of a 10.07 acre site into four lots with 49 airspace condominium office units and the development of a 66,000 square foot three-story office building and permanent RV storage area on property generally located south of Cannon Road, east of El Camino Real, at the southeast corner of the intersection of Wind Trail Way and Cannon Road, within the Robertson Ranch Master Plan, Planning Area 22 and the "Option Parcel." in Local Facilities Management Zone 14. LEGAL DESCRIPTION: Lot 3 of Carlsbad Tract No. 02-16. Robertson Ranch East Village, in the City of Carlsbad, County of San Diego, State of California, according to Map thereof No. 15608. filed in the Office of the County Recorder of San Diego County, September 18, 2007; and Parcel 2 of Parcel Map No. 19804, in the City of Carlsbad, County of San Diego, State of California, filed in the Office of the County Recorder of San Diego County, August 3, 2005 as Instrument No. 2005-0659805 of Official Records. APN: 168-050-55. 168-360-03 Acres: 10.07 Proposed No. of Lots/Units: 4 lots / 49 units GENERAL PLAN AND ZONING Existing Land Use Designation: UA (Unplanned Area) & RLM (Residential Low-Medium Density. 0-4 du/ac) Proposed Land Use Designation: O (Office & Related Commercial), OS (Open Space), & RLM Density Allowed: NA Density Proposed: NA Existing Zone: P-C (L-C per MP 02-03) & RMHP Proposed Zone: P-C (O & OS) & RMHP Surrounding Zoning, General Plan and Land Use: Zoning General Plan Current Land Use Site P-C (L-C) & RMHP UA & RLM Graded pad, fallow farm land, sewer trunk line, and paved access easement. North P-C(RD-M) RH & RMH Multi-family Apartment Complex, approved but undeveloped single-family courtyard homes. South RMHP RM Rancho Carlsbad Estates East P-C (OS) OS Open Space West P-C (OS) OS Water quality facility & graded/undeveloped park site Revised 01/06 LOCAL COASTAL PROGRAM Coastal Zone: |~~l Yes [XI No Local Coastal Program Segment: NA Within Appeal Jurisdiction: I I Yes IXI No Coastal Development Permit: | | Yes IXI No Local Coastal Program Amendment: I I Yes IXI No Existing LCP Land Use Designation: NA Proposed LCP Land Use Designation: NA Existing LCP Zone: NA Proposed LCP Zone: NA PUBLIC FACILITIES School District: Carlsbad Unified Water District: Carlsbad Sewer District: Carlsbad Equivalent Dwelling Units (Sewer Capacity): 0.0081 EDU ENVIRONMENTAL IMPACT ASSESSMENT I | Categorical Exemption, Mitigated Negative Declaration, issued October 21, 2009 I I Certified Environmental Impact Report, dated D Other, Revised 01/06 CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES IMPACTS ASSESSMENT FORM PROJECT IDENTITY AND IMPACT ASSESSMENT: CASE NAME: Robertson Ranch PA 22 CASE NO: GPA 09-01/ZC 09-01/MP 02-03(BVCT 09-01/SDP Q9-01/PUD 09-01 LOCAL FACILITY MANAGEMENT ZONE: 14 GENERAL PLAN: UA & RLM ZONING: P-C (L-C per MP 02-03) & RMHP DEVELOPER'S NAME: Brookfield Tamarack. LLC ADDRESS: 12865 Pointe Del Mar, Suite 200, Del Mar. CA 92014 PHONE NO.: (858) 481-8500 ASSESSOR'S PARCEL NO.: 168-050-55, 168-360-03 QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 10.07 acres ESTIMATED COMPLETION DATE: Unknown A. City Administrative Facilities: B. Library: C. Wastewater Treatment Capacity (Calculate with J. Sewer) D. Park: E. Drainage: F. Circulation: G. Fire: H. Open Space: I. Schools (Carlsbad Unified): J. Sewer (Carlsbad): K. Water (Carlsbad): L. Demand in Square Footage = NA Demand in Square Footage = NA Demand in Acres = Demand in CFS = Identify Drainage Basin = Demand in ADT = Served by Fire Station No. = Acreage Provided : Elementary School = Middle School = High School = Demands in EDU = Demand in GPD = 0.0081 EDU NA 21.1 CFS Basin "B" 1.320 ADT 3&5 1.15 acres NA NA NA 0.0081 EDU 15 J 80 GPD All of the allowable residential density for PA 22 and the "Option Parcel" has already been allocated to other planning areas within the East Village through the Master Plan process. PA - 22 City of Carlsbad Planning Department DISCLOSURE STATEMENT Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed untH this information is completed. Please print. APPLICANT {Not the applicant's agent) Provide the COMPLETE. LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership, include the names, title, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Mr. Dale Gleed Corp/Part Brookfield Tamarack LLC Title v'p' En<3ineerin9 Address Title Address 12865 Pointe Del Mar, Del Mar, CA 92014 OWNER (Not the owner's agent) Provide the COMPLETE. LEGAL names and addresses of ALL persons having any ownership* interest in the property involved. Also, provide the nature of the legal ownership (i.e, partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a corporation or partnership, include the names, title, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE {N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Mr- Dale ~Tjt]e -V.P.. Engineering Address Corp/Part. Title Calavera Hills II LLC Address 12865 Pointe Del Mar, Del Mar, CA 92014 1S35 Faraday Avenua • Carlsbad, CA 92008-7314 • (760) 602-4600 • FAX (760) 602-8559 • www.ci.carlsbad.ca.us 3. NON-PROFIT ORGANIZATION OR TRUST If any person Identified pursuant to (1) or (2) above is a nonprofit organization or a trust, fet the /names and addresses of ANY person serving as an officer or director of the non-profit organization or as trustee or beneficiary of the. Non Profit/Trust Non Profit/Trust Title Title , Address Address 4. Have you had more than $500 worth of business transacted with any member of City staff, Boards, Commissions, Committees and/or Council withiniha past twelve (12) months? xj No if yea, please indicate person(s}:_ NOTE: Attach additional sheets If necessary. I certify that all the above information is true and correct to the best of my knowledge. Signature of owner^ate E".Bale Gleed, VP Signature ofappfic/nt/dai&E.Dale Gleed, VP By: Brookfa^ld Tainarack LLC,Member By: Brookfejteld Tamarack LLC, Member Calavera Hills II LLC Calavera Hills II LLC Print or type name of owner Print or type name of applicant . ._ __ Signature of cwrner/applican£s-ag^iFif applicable/data $ y Jr^,r7 s) Print or type name of owner/applicant's agent 12/os . Page 2 of 2 II *8Iill ^ K ^ 1 i III$ bis bb . *!iMS 5«IS ill? I'll IS i t pii Si *i H P Is &m *''II Is ?>:„ S *te HHBHSBHIiHMISIl §5s a »«S ?S ^ 111 p fIa S III «Ji ill ii Ip IIii a a llssJ S3-ii5 si! T b *1 s assb a"" s s * 3 ASSES SSS ^ S 1! ^B Is a LLLV - E6i (8S8) DC I It VD'08910 UBS pray UOUU53 LJOUBB uosyeqoy >-HOBL d m, • Pfl- T-1- ojdajd S=JQN O.V) §piM2 sa,cu SS"S< ll l|2 S'i. l!Jirl i.s *iNS fl«iii jj ttiiHS (22 Vd) pEoy uouurj i^ouey uosyaqoy I •CM CO T- ^ CO T" ^- ^"999999O) O) CSJ O) O) O)o o o o o o S J- 1 1U (52 Vd) psoy uouur) uosyeqoy >OS1llSl T- T" CO 1~ T- T"999999O> O> CM CD CD CDO OO OO O 96 ^OgLU O 1 O 3 UJ zOi UJ L (ess) i (8S8) feS Vd) S3 B9JV 6ujUUB|d HOUEH uosyaqoy "M'.N^'^ CD 08009 O) ^1 0) w) O)oo o o o (9 &(/> o,ecOO peoy uouurj nouey uosueqoy 60'81'60 leui *s »— *- CO r- i—00000 O> O> CM 0) 0)o o o o o c GL QC Oo CM e Sp81!L|OJV6uiJ|nSUOQL|}ILUS I S- a. DCO3u,•o n xiy isib-tu (BSB) LLL-r-tbL (0S8) OEIZ6 peoy UOUUIQ (tt Vd) 22 B9JV BlHUUBJd qouey O) O) CM O> O) O>oooooo t-j<{LQ(L(j CLOT OL. U. O Oec »y L9O' • E6i (058) LLLf - t6L (e?8) OEIZ6 spsi!L|OJv6u!i|nsuooL|i!iJUS I peoy 90BIIJA iseg uosyeqojj 60'8t'60 IBHI Q_ CN UJ CN ou < O 00Q CL o Q_ CN o s.u< U..00Q <_i Q_ ill vD O *-^ "•z muj • **tf>_l_1< r\ ,\ \ 1 « 1 h .0-.9 ANtZED WITH>;NCEULAR ST3EL, eALV3LTE3TCR COATINfiU- g tHi . t ! H t\Ijli i||M. i I thft lit I Hit L! I li! j if) CL CL CNLJJ CN D CJ < o 214 < Q- !{ •"! jiS 1 • ; r r \ ?w;s, 5,»,>WXPt '••-'••'.•/ ]>-'/'.'}}}\\\ :%,\%v;i V» • ?:: , - ,;-''x • 7 Lf-/-»vCMx W- .. ^ '"'"• \\ 'V(iv,\|^ \^.. 'II