Loading...
HomeMy WebLinkAbout2012-06-20; Planning Commission; ; GPA 07-02 - ENVISION CARLSBAD The City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION Item No. Application complete date: N/A P.C. AGENDA OF: June 20, 2012 Project Planner: Jennifer Jesser Project Engineer: N/A SUBJECT: GPA 07-02 – ENVISION CARLSBAD – Planning Commission focused discussion on land uses in the Barrio, as related to: 1) the Envision Carlsbad Land Use Concepts Community Feedback report (previously distributed to the Planning Commission and available at www.carlsbadca.gov/envision) and 2) the Envision Carlsbad Citizens Committee (EC3) recommendations on a draft preferred land use plan; and 3) 2005-2010 Housing Element Program 2.1. I. RECOMMENDATION That the Planning Commission discuss Barrio land uses in relation to the Envision Carlsbad Land Use Concepts Community Feedback report, EC3 recommendations and Housing Element Program 2.1, and provide feedback to staff that will guide the preparation of a draft preferred land use plan (Preferred Plan). II. INTRODUCTION On May 2 and 16, 2012, the Planning Commission discussed and provided direction to staff regarding the preparation of a draft Preferred Plan, which proposes land use designation changes within 11 focus areas throughout the city. This report includes information that supplements the May 2 and 16, 2012 Reports to the Planning Commission. The supplemental information includes various exhibits and information related to the Barrio area, as described below. The March 2011 “Barrio Workshop Summary Report” and Section 6 of Envision Carlsbad Working Paper #6 “Small Town Feel, Beach Community Connectedness; Neighborhood Revitalization, Community Design and Livability” are attached to this report as additional background information on the Barrio neighborhood. Staff requests that the Planning Commission have a focused discussion on land uses in the Barrio area, which is located within the draft Preferred Plan Focus Area 1 – Northwest Coastal, and provide staff with feedback that will refine the draft Preferred Plan relative to the Barrio area. III. INFORMATION RELATIVE TO BARRIO LAND USES As reflected in the draft Preferred Plan, the EC3 recommended Land Use Concept B for Focus Area 1, which includes the Barrio area (the neighborhood generally located north of Tamarack Ave., south of Oak Ave, west of Interstate 5, and east of the railroad). Staff requests that the Planning Commission consider the Barrio area in more detail and refine the draft Preferred Plan to ensure the proposed land uses: 2 GPA 07-02 - ENVISION CARLSBAD June 20, 2012 PAGE 2 Meet existing requirements of 2005-2010 Housing Element Program 2.1 regarding housing needs. Protect the neighborhood character of the center of the Barrio, which consists primarily of single-family and duplex dwellings on small lots. Bring existing uses into conformity with density limits. Existing residential development on many lots within the Barrio exceed the density currently allowed by the existing General Plan. Increasing allowed density on these sites will bring most of them into conformance with the General Plan. Encourage redevelopment around the perimeter of the Barrio by increasing the allowed residential densities. A. 2005-2010 Housing Element Program 2.1 Program 2.1 of the city’s current Housing Element (2005-2010) requires that the General Plan be amended to allow higher residential densities throughout the Barrio. The increased density described in the 2005-2010 Housing Element would result in the potential for an overall net increase of approximately 596 dwelling units; 332 of those dwelling units count toward satisfying the city’s Regional Housing Need Assessment (RHNA) for the 2005-2010 housing cycle. There are currently 1,114 dwelling units in the Barrio and 50 additional units are currently under construction for the Tavarua Senior Apartments on the corner of Palm Ave. and Harding St. The draft Preferred Plan described below implements Housing Element Program 2.1 for the Barrio and assists in satisfying the city’s RHNA for the next Housing Element (2010-2020). The draft Preferred Plan, as recommended by the EC3 and refined per staff’s recommendations, will result in the potential for an overall net increase of approximately 755 dwelling units, of which approximately 366 dwelling units may count toward satisfying the 2010-2020 RHNA. The overall net increase in dwelling units noted above (596 dwellings per the 2005-2010 Housing element and 758 dwellings per the proposed draft Preferred Plan) assumes that every lot in the Barrio will develop to the full potential density (based on the proposed growth control point density); however, that is not likely to occur and the actual net increase in dwelling units will likely be less than what the proposed densities will allow. B. Refined Preferred Plan for the Barrio Figure 1 is an exhibit that shows a refined version of the EC3-recommended draft Preferred Plan for the Barrio area. After reviewing the existing uses within the Barrio, staff recommends minor modifications to the draft Preferred Plan, as described below. In general, staff has identified the lots along the perimeter of the Barrio as being appropriate for high density residential uses; however, within the center of the Barrio staff recommends applying a residential land use category that would protect the existing single-family/duplex character, and retain the commercial land use designation on the southeast corner of Walnut Ave. and Roosevelt St. (Barrio Museum and vacant structures). GPA 07-02 - ENVISION CARLSBAD June 20, 2012 PAGE 3 Much of the residential development within the Barrio was built prior to the 1980’s, when the city approved a General Plan amendment that reduced allowed densities below the density of existing development. As a result, approximately 45 percent of the residential lots within the Barrio are currently built at a density that exceeds the density allowed pursuant to the existing General Plan (see Figure 4). This limits the ability/desire of property owners to remodel or redevelop their land. As residential structures age, property owners are less inclined to redevelop if they are unable to retain or increase the number of units on their property. Staff recommends that the draft Preferred Plan allow residential densities that are consistent with most of the existing densities. C. Barrio Center The center of the Barrio (the area generally between Pine Ave. and Magnolia Ave., and Harding St. and Roosevelt St.) is comprised of the city’s Senior Center, Pine Avenue Park and Chase Field, as well as small residential lots developed with individual single-family homes, two single-family homes, or duplex dwellings. Within this area are several historic structures, including the Barrio Museum (3304 Roosevelt St.), Ramirez House (3309 Roosevelt St.), Gaus House (3442 Roosevelt St.) and Mission Santiago (3329 Roosevelt St.). The majority of lots within the Barrio center are 3,500 square feet in area (25 feet wide by 140 feet in depth); however, the majority of dwellings (small scale single-family and two-family homes) in the center are constructed on a combination of two lots resulting in 7,000 square foot parcels. Approximately one-half of the lots in the center are currently developed within the Residential Medium-High (RMH) density range of 8 to 15 dwelling units/acre (see Figure 4); however, these lots are currently designated Residential Medium Density (RM), which only allows 4 to 8 dwelling units/acre (see Figure 2). A few of the lots in the center are developed with multi-family structures (3+ units). Staff recommends the following for the Barrio center: 1. The lots designated RM under the current General Plan should be re-designated as RMH, which will ensure most of the existing non-conforming residential densities will become consistent with the General Plan, and the vacant lots or the lots with only one house may develop at a density (2 units) consistent with much of the existing development in the Barrio Center (approximately 49 percent of the existing RM designated lots in the center are developed with 2 or more units). 2. Lots within the Barrio center that are designated RMH under the current General Plan should remain RMH. 3. The draft Preferred Plan as recommended by EC3 shows the lots along Roosevelt St. between Walnut Ave. and Chestnut Ave. as Residential High Density (RH); however, these lots are predominately developed with single-family and duplex dwellings, including the Ramirez House and Barrio Museum. To protect the neighborhood character in this area, staff recommends that the Barrio Museum lot remain as it is designated under the current General Plan (general commercial) and the residential lots be designated RMH, which will allow for the continuation and new development of single-family and duplex dwellings. GPA 07-02 - ENVISION CARLSBAD June 20, 2012 PAGE 4 One concern expressed by some Barrio community members is that applying a land use designation that would allow a higher density would change the single-family/duplex character of the center of the Barrio. Staff agrees the single-family/duplex character of the Barrio center should be protected. Designating the Barrio center as RMH (8 to 15 dwelling units/acre) will enable most lots to be developed with no more than one to two units, which is consistent with the existing neighborhood character. In addition, the RMH designation will enable a property owner to build the same number of units on their lot as a typical neighbor who currently has two units, but those two units exceed today’s allowed density. Approximately 50 percent of the lots in the Barrio center, which are currently designated RM or RMH, have two or more units constructed on them today. Figure 1 illustrates the draft Preferred Plan and indicates how many units could be built on each parcel in addition to the existing units if the plan were approved. For example, Figure 1 indicates that several parcels, which are a combination of two 3,500 square foot lots, within the Barrio center can accommodate one additional unit; the majority of these parcels currently have one existing dwelling (see Figure 4); therefore, the addition of one unit, pursuant to the draft Preferred Plan will result in the potential for a total of two dwellings on those parcels. D. Barrio Perimeter The lots located along the Barrio perimeter (generally, between Oak Ave. and Pine Ave., adjacent to Interstate 5, west of Roosevelt St., and south of Magnolia Ave.) consist primarily of multi-family dwellings, most of which exceed today’s allowed densities, as well as a limited number of duplex and single-family dwellings (see Figures 3 and 4). Within this perimeter area are a few non-residential uses, such as a church and a Pac Bell facility. The lots in the Barrio perimeter are also larger than those within the Barrio center. Based on the existing multi-family character and larger lot sizes, staff recommends that this area be designated for high density residential uses at 23 to 30 dwelling units/acre; with the exception of the Pac Bell site, which staff recommends be designated as a public use to reflect the existing land use. The proposed density of 23 to 30 dwelling units/acre is a new proposed residential classification with a Growth Management Control Point of 25 dwelling units/acre and the potential for up to 30 dwelling units/acre, subject to City Council Policy 43. The draft EC3-recommended Preferred Plan shows most of the Barrio perimeter as “High Density Residential”; however there are three areas that the draft plan does not show as high density, which staff recommends be changed to high density: 1. The block between Palm Ave. and Magnolia Ave. between Interstate 5 and Harding Street. This block includes a large parcel on the southeast corner of Palm Ave. and Harding Street, which is the site of the recently approved Tavarua project, a 100% affordable senior apartment building for which the city granted a density increase above 30 dwelling units/acre; 2. The area located between Oak Ave. and Pine Ave. west of Harding St., which consists primarily of a mix of multi-family and duplex dwellings; and GPA 07-02 - ENVISION CARLSBAD June 20, 2012 PAGE 5 3. The site of the 40-unit Dolphin Beach Apartments, located at Tamarack Avenue and Jefferson Street, next to and south of Jefferson Elementary School. These 1970’s era apartments are currently designated and developed at medium-high density (RMH); re- designating the site to high density (RH) could encourage redevelopment of the property, thus providing additional, contemporary multi-family residences at the Barrio’s southern boundary. Most of the sites within the Barrio perimeter that currently exceed today’s allowed density will become consistent with the recommended high density land use category. V. ENVIRONMENTAL REVIEW The activities associated with Envision Carlsbad Phase 2 (public outreach, analysis, research, and preparation of draft documents) will not involve or result in any disturbance to the environment, and is categorically exempt from the California Environmental Quality Act (CEQA). CEQA Section 15306 describes the following activities as being exempt from environmental review: “…basic data collection, research, experimental management, and resource evaluation activities which do not result in a serious or major disturbance to an environmental resource. These may be strictly for information gathering purposes, or as part of a study leading to an action which a public agency has not yet approved, adopted, or funded.” An Environmental Impact Report (EIR) will be prepared as part of Envision Carlsbad Phase 2, which will analyze the environmental impact associated with the new General Plan, Local Coastal Program and Zoning Ordinance. The EIR will be prepared consistent with CEQA. Prior to city adoption of a new General Plan, Local Coastal Program, or Zoning Ordinance, the EIR must be adopted by the City Council. ATTACHMENTS: 1. Barrio Land Use Maps Figures 1 – 4 2. Barrio Workshop Summary Report, dated March 2011 3. Envision Carlsbad Existing Conditions and Issues Exploration Working Paper 6, Section 6 - Barrio Neighborhood Preservation and Revitalization ! ! PINE AVE PARK CHASE FIELD JEFFERSON ELEMENTARY SCHOOL §¨¦5 U N D E R PA SS SENIOR CENTER CARLSBADCOMMUNITY CHURCH !PAC BELL FACILITY !PI O PI CO DRHA R DI NG S T ADAMS STT A M AR A C K A VGAR FI E L D S T R OOS E V E L T S T PIN E A V G R AN D A V T Y L E R S T J E F F ER S ON S TO A K A C AR LSBAD V ILLA G E D R JU N IPER A V A C A C IA A V EUREKA PLH EM LO C K A V R ED W O O D A V P AL M A V L I NMAR LNA N C H O R W Y M A G N O L IA A V HI B IS CUS CRWASHINGTON S T MCC H ER R Y A V C AM E L L IA P L A V O C AD O L N C AR O L P L C IT R U S P L BAL O AK A VMAGNOLIA AV HI BI S CUS CRPA LM A VJE F F E R S ON S T P A L M A V C H EST N U T A VPINE A V MA DIS ON S T W AL N U T A V O AK A V LOLA'S MARKET HARDING COMMUNITY CENTER Gaus House Mission Santiago Barrio Museum & Pool Hall Ramirez House ! 144 0 9 9 0 0 11 53 0 30 0 0 0 4 10 2 4 3 0 0 4 0 2 3 0 4 9 9 0 7 8 0 2 6 8 0 20 8 9 03 0 8 1 5 6 5 4 2 0 1 1 6 5 10 1 0 1 5 2 0 1 2 5 5 3 5 2 1 2 2 2 0 4 1 4 4 4 4 1 0 3 0 1 3 1 0 5 1 1 0 0 10 1 1 1 0 32 0 3 0 1 0 1 1 1 24 0 1 1 1 0 1 3 1 1 1 1 0 0 2 0 0 0 2 0 0 1 0 1 0 0 0 0 01 1 0 1 3 4 2 1 0 0 2 2 2 1 1 1 1 0 3 1 0 0 4 1 1 0 0 2 1 0 0 3 0 0 0 1 0 0 0 3 0 2 0 1 4 0 1 1 0 0 0 0 1 0 3 00 1 2 2 2 0 0 2 2 2 2 2 2 2 2 2 2 0 0 0 0 2 2 2 2 0 2 0 3 3 2 2 2 2 2 2 2 3 2 2 2 4 0 3 2 2 2 0 2 2 3 2 0 2 2 1 2 0 2 2 0 2 0 0 22 1 1 00 0 22 0 3 1 1 0000 0 000 00000 0 011 11 100 VILLAGE Highways Railroad Figure 1: Barrio Historic Site Barrio Staff Proposed Draft Preferred Plan Medium High Density 0 300 600150 Feet Source: City of Carlsbad, 2011; SANDAG, 2011; Dyett & Bhatia, 2012. ! ! ! High Density Residential Commercial Public/Semi-Public Open Space Residential (8-15 du/ac) (23-30 du/ac) New Net Capacity# (Allowable Units - Existing Units) 31 ! ! PINE AVE PARK CHASEFIELD JEFFERSONELEMENTARYSCHOOL §¨¦5 OVER PASS U N DER PA S S U N DERPASS SENIOR CENTER CARLSBADCOMMUNITYCHURCH !PAC BELLFACILITY !PI O PI CO DRHARDI NG S TADAMS STT A M A R A C K A VGARF I E L D S TROOS E VE L T S TP IN E A V G R A N D A V TYL ER S TJ EFFERSON STO A K A V C A R L S B A D V IL L A G E D R JU N IP E R A V A C A C IA A V EUREKA PLH E M L O C K A V R E D W O O D A V P A L M A V LI NMAR LNA N C H O R W Y M A G N O L IA A V HI BI SCUS CRWAS HI NGTON S TMCKI NL E Y S TC H E R R Y A V HARBOR DRC A M E L L IA P L A V O C A D O L N C A R O L P L C IT R U S P L BALDWI N LNO A K A V MAGNOLIA AV HI BI SCUS CRP A L M A V J E F F E RS ON S TP A L M A V C H E S T N U T A V P IN E A V MADI S ON S TW A L N U T A V O A K A V LOLA'S MARKET HARDING COMMUNITY CENTER Gaus House Mission Santiago Barrio Museum & Pool Hall Ramirez House ! VILLAGE Highways Railroad Figure 3: Barrio Historic Site Barrio Existing Land Use Single Family Two Family Multi-Family (3+units) 0 300 600150 Feet Source: City of Carlsbad, 2011; SANDAG, 2011; Dyett & Bhatia, 2012. Commercial Education/Institutional Transportation, Park/Recreation Undeveloped Residential Non-Residential Communication, Utilities ! ! ! ! ! PINE AVE PARK CHASEFIELD JEFFERSONELEMENTARYSCHOOL §¨¦5 OVER PASS U N DER PA S S U N DERPASS SENIOR CENTER CARLSBADCOMMUNITYCHURCH !PAC BELLFACILITY !PI O PI CO DRHARDI NG S TADAMS STT A M A R A C K A VGARF I E L D S TROOS E VE L T S TP IN E A V G R A N D A V TYL ER S TJ EFFERSON STO A K A V C A R L S B A D V IL L A G E D R JU N IP E R A V A C A C IA A V EUREKA PLH E M L O C K A V R E D W O O D A V P A L M A V LI NMAR LNA N C H O R W Y M A G N O L IA A V HI BI SCUS CRWAS HI NGTON S TMCKI NL E Y S TC H E R R Y A V HARBOR DRC A M E L L IA P L A V O C A D O L N C A R O L P L C IT R U S P L BALDWI N LNO A K A V MAGNOLIA AV HI BI SCUS CRP A L M A V J E F F E RS ON S TP A L M A V C H E S T N U T A V P IN E A V MADI S ON S TW A L N U T A V O A K A V LOLA'S MARKET HARDING COMMUNITY CENTER Gaus House Mission Santiago Barrio Museum & Pool Hall Ramirez House ! VILLAGE Highways Railroad Figure 2: Barrio Historic Site Barrio Existing General Plan Medium Density Residential 0 300 600150 Feet Source: City of Carlsbad, 2011; SANDAG, 2011; Dyett & Bhatia, 2012. ! ! ! Medium High Density High Density Residential Combination District Commercial Elementary School Open Space (4-8 du/ac) Residential (8-15 du/ac) (15-23 du/ac) (RMH/O) ! ! PINE AVE PARK CHASE FIELD JEFFERSON ELEMENTARY SCHOOL §¨¦5 U N D E R PA SS SENIOR CENTER CARLSBADCOMMUNITY CHURCH !PAC BELL FACILITY !PI O PI CO DRHA R DI NG S T ADAMS STT A M AR A C K A VGAR FI E L D S T R OOS E V E L T S T PIN E A V G R AN D A V T Y L E R S T J E F F ER S ON S TO A K A C AR LSBAD V ILLA G E D R JU N IPER A V A C A C IA A V EUREKA PLH EM LO C K A V R ED W O O D A V P AL M A V L I NMAR LNA N C H O R W Y M A G N O L IA A V HI B IS CUS CRWASHINGTON S T MCC H ER R Y A V C AM E L L IA P L A V O C AD O L N C AR O L P L C IT R U S P L BAL O AK A VMAGNOLIA AV HI BI S CUS CRPA LM A VJE F F E R S ON S T P A L M A V C H EST N U T A VPINE A V MA DIS ON S T W AL N U T A V O AK A V LOLA'S MARKET HARDING COMMUNITY CENTER Gaus House Mission Santiago Barrio Museum & Pool Hall Ramirez House ! VILLAGE Highways Railroad Figure 4: Barrio Historic Site Barrio Densities and Intensities 0 - 4 units/acre 4 - 8 units/acre 8 - 15 units/acre 15 - 23 units/acre 23 - 30 units/acre 30+ units/acre 0 300 600150 Feet Source: City of Carlsbad, 2011; SANDAG, 2011; Dyett & Bhatia, 2012. ! ! ! X.X / X acres / existing units 9.66 / 98 7.1 / 0 3.37 / 0 2.73 / 0 2.1 / 0 1.9 / 18 2.13 / 42 1.74 / 34 1.44 / 4 71.41 / 26 1 .2 / 7 5 1.38 / 26 1 .3 1 / 3 5 0 .9 2 / 1 0 .9 2 / 0 0 .9 1 / 3 0 0. 7 8 / 0 0.89 / 18 0.79 / 18 0.78 / 16 0.69 / 14 0 .5 / 3 0 .6 7 / 2 4 0 .6 7 / 22 0.63 / 120.48 / 9 0 .4 / 8 0 .4 / 4 0 . 4 / 2 0.45 / 1 0.51 / 13 0.44 / 2 0. 4 3 / 2 0.48 / 10 0. 4 2 / 4 0 .4 1 / 2 0 .4 5 / 1 7 0. 3 9 / 2 0. 4 3 / 1 3 0.37 / 00 .4 1 / 1 6 0 .3 9 / 1 1 0 .3 3 / 1 0 .3 2 / 0 0.29 / 2 0 .3 2 / 1 2 0 .2 8 / 2 0 .2 7 / 10.2 7 / 20.27 / 30 .2 6 / 1 0 . 2 6 / 8 0 .2 6 / 20.2 6 / 2 0 .2 6 / 1 0 .2 5 / 1 0 .2 5 / 2 0 .2 5 / 4 0 .2 4 / 2 0. 2 4 / 10 .2 4 / 1 0 .2 4 / 3 0 .2 4 / 20.2 / 1 0 . 2 / 1 0 . 2 / 1 0 .2 4 / 1 0 .2 / 10.24 / 1 0 .2 4 / 1 0 .2 / 1 0. 2 3 / 3 0.2 / 1 0 .2 / 2 0 .2 3 / 1 0.22 / 1 0.21 / 1 0.21 / 1 0.2 1 / 3 0 .2 1 / 1 0.19 / 2 0.19 / 10.19 / 2 0 .2 1 / 1 0 0. 1 8 / 2 0 .1 8 / 1 0 .1 8 / 2 0 .1 8 / 20.1 8 / 10.1 8 / 2 0.1 8 / 1 0 .1 8 / 1 0 .1 7 / 1 0 .1 7 / 2 0 .1 7 / 10.1 7 / 2 0 .1 7 / 2 0 .1 7 / 2 0 .1 7 / 1 0 .1 7 / 2 0 .1 7 / 10.1 7 / 10.1 7 / 2 0 .1 7 / 00.1 7 / 2 0 .1 7 / 1 0 .1 7 / 1 0 .1 7 / 1 0 .1 6 / 2 0 .1 6 / 1 0 .1 6 / 10.1 6 / 1 0 .1 6 / 1 0 .1 6 / 20 .1 6 / 2 0 .1 6 / 2 0 .1 6 / 2 0 .1 6 / 2 0 .1 6 / 2 0 .1 6 / 3 0 .1 6 / 3 0 .1 6 / 1 0 .1 6 / 2 0 .1 6 / 2 0 .1 6 / 2 0 .1 6 / 2 0 .1 6 / 2 0 .1 6 / 1 0 .1 6 / 3 0 .1 6 / 1 0 .1 6 / 1 0 .1 6 / 0 0 .1 6 /2 0 .1 6 / 2 0 .1 6 / 1 0 .1 6 / 0 0 .16 / 2 0 .1 6 / 1 0 .1 6 / 10 .1 6 / 3 0 .1 6 / 1 0 .1 6 / 2 0 .1 6 / 1 0 .1 6 / 1 0 .1 6 / 1 0 .1 6 / 3 0 .1 6 / 6 0 .1 6 / 0 0 .1 6 / 1 0 .1 6 / 5 0 .1 6 / 2 0.1 6 / 1 0 .1 6 / 6 0 .1 6 / 1 0 .1 6 / 1 0 .1 6 / 6 0 .1 6 / 2 0 .1 6 / 6 0 .1 6 / 6 0 .1 6 / 2 0 .1 6 / 1 0 .1 6 / 2 0 .1 6 / 2 0 .1 6 / 1 0 .1 6 / 0 0 .1 6 / 4 0 .1 6 / 2 0 .1 6 / 2 0 .1 6 / 2 0.1 6 / 1 0 .1 5 / 3 0 .1 5 / 1 0 .1 5 / 2 0 .1 5 / 3 0 .1 5 /2 0 .1 5 / 2 0.15 / 2 0 .1 5 /20.14 / 20.14 / 2 0 .1 4 / 2 0 .1 4 / 2 0 .1 4 / 10 .1 4 / 1 0 .1 3 / 1 0 .1 3 / 1 0 .1 3 / 1 0 .1 2 / 10.1 2 / 10.11 / 5 0.35 / 4 0.2 / 2 0.22 / 2 0 . 1 9 / 10.19 / 2 0.19 / 0 0.18 / 1 0.17 / 1 0.17 / 1 0.16 / 1 0.16 / 2 0.16 / 2 0.16 / 2 0.16 / 1 0.16 / 1 0. 1 6 / 10.16 / 20.16 / 10.16 / 2 0 .16 / 10.16 / 2 0.16 / 20.16 / 10.16 / 1 0.16 / 2 0.15 / 2 0.15 / 1 0.15 / 2 0.15 / 2 0.15 / 2 0.15 / 2 0.15 / 2 0.15 / 2 0.15 / 2 0.15 / 2 0.15 / 2 0.15 / 2 0.15 / 2 0.15 / 2 0.15 / 2 0.15 /2 0.14 / 2 0.14 / 2 0.14 / 1 0. 1 4 / 1 0.14 / 2 0.14 / 2 0.14 / 2 0.14 / 1 0.14 / 2 0.14 / 2 0.14 / 2 0.14 / 1 0.14 / 20.14 / 10.14 / 2 0.14 / 2 0.14 / 2 0.14 / 2 0.14 / 2 0.14 / 2 0.14 / 2 0.1 4 / 1 0.14 / 2 0.13 / 2 0.1 3 / 1 0.13 / 2 0.1 / 1 0 .1 / 1 0.2 / 0 0.12 / 1 0.12 / 1 0. 1 / 1 0.1 / 1 0 .0 9 / 1 0 .0 9 / 1 0 .0 9 / 1 0 .09 / 0 0.09 / 1 0.08 / 0 0 .0 8 / 0 0 .0 8 / 0 0.08 / 1 0.08 / 10.0 8 / 1 0 .0 8 / 2 0 .0 8 / 20.08 / 2 0.08 / 1 0 .0 7 / 0 0 .0 6 / 1 0.05 / 0 0.03 / 0 0 .0 7 / 1 0.16 / 10.15 / 2 0.15 / 2 8.14 / 0 2.89 / 40 3.13 / 27 3.07 / 27 0.89 / 0 0.85 / 0 0.38 / 2 2.3 / 26 0.5 / 1 0 . 3 8 / 10.25 / 1 0.17 / 1 0.08 / 1 0 .0 6 / 1 0.14 /2 0 .1 5 /2 0 .1 4 / 2 0 .1 4 / 20.15 / 2 0.15 / 2 BARRIO WORKSHOP SUMMARY REPORT March 2011 Barrio Workshop Summary 2 INTRODUCTION As part of Envision Carlsbad Phase 2, a 2 ½ hour workshop was held on March 10, 2011 beginning at 6:00 P.M. at the City of Carlsbad Senior Center. Approximately 85 community members participated. Input obtained during the workshop will be considered during the General Plan update process. The objectives of the workshop included: Identifying the cultural core of the Barrio and location of other important sites and features How to enhance the neighborhood’s culture and identity Where to locate new multifamily housing to meet the city’s Housing Element goals How tall should new housing be What other land uses are desirable How to improve connections to the beach and adjacent neighborhoods How to improve bicycle and pedestrian circulation How to improve street character/streetscape The workshop was announced through media release, the city’s website, and direct mailing to residents and property owners within the Barrio neighborhood and within 600’ of the neighborhood. The workshop consisted of a short presentation on workshop objectives and background material, followed by three facilitated small-group exercises focused on the objectives listed above. This summary report includes: A summary of the common themes that were expressed by workshop participants The notes and a copy of the maps from each of the nine small-group tables A copy of the comment forms received at the end of the workshop A copy of a letter received the day after the workshop (dated March 11, 2011, from Richard Norman, addressed to Gary Barberio, Community and Economic Development Director) Barrio Workshop Summary 3 SUMMARY CULTURAL AND HISTORIC CHARACTER Identifying the cultural “core” and other important sites/features In general, workshop participants identified the cultural core of the Barrio as being bounded by Oak Avenue, Chestnut Avenue, Harding Street and Roosevelt Street. Within this broader area, some groups saw the area directly around Walnut Avenue and Roosevelt Street (surrounded by Lola’s, Ramirez House and other older buildings) as the core, while others saw the Pine Park and Chase Field as the primary community amenities and the core of the Barrio. One group did not see the need to identify a Barrio core—this group felt that the Village forms the core for the Barrio. In regard to other important sites and features, most groups identified Lola’s, Pine Park, Chase Field, the Senior Center, and the Barrio Museum. How to Improve the Barrio? Groups offered a variety of ideas to improve the Barrio. Most groups felt that more should be done to preserve significant older buildings and to repair or demolish buildings in poor condition. In addition, streetscape improvements, signage and community activities (such as a fiesta, street fairs and concerts in the park) were offered as suggestions. Many groups indicated that the Barrio Museum needs to be repaired/upgraded. However, one group indicated that city money should not be directed toward a private museum; if city money is used to upgrade the museum it should be a public museum. LAND USE OPPORTUNITIES Location/height of new multifamily housing Two out of nine groups felt that the Barrio should not have additional higher density/multifamily housing. A couple of other groups had a mixed response—some people in the group not wanting more multifamily housing and some people not opposed to it. However, most groups were either supportive of more multifamily housing or were at least willing to identify preferable locations for such housing. One group indicated that the Barrio had not seen investment in the past decade, and higher densities were needed to foster economic revitalization and upgrading and/or re-use of existing buildings. Generally, most groups indicated the higher density multifamily housing should be located along the freeway (east of Harding) and near the railroad. Some groups also indicated an appropriate area for such housing would be the area north of Jefferson Elementary School, south of Chestnut, and between the railroad and Roosevelt Street/Magnolia Avenue. Several groups indicated that apartments would not be preferable, but townhomes, condominiums or row homes would be more preferable. Most groups felt that the geographically central portion of the Barrio— bounded by Pine Avenue, Magnolia Avenue, Roosevelt Street and Harding Street—would not be a preferable location for new multifamily housing and should generally have lower densities. Barrio Workshop Summary 4 Some groups indicated that more senior housing was needed (particularly near the Senior Center and Pine Park). In terms of building heights, seven groups specified appropriate building heights and/or number of building stories. Generally, there was a mix of support for two stories maximum up to three or four stories maximum. Some groups that preferred two stories also indicated a maximum height of 35 feet, and some who supported three to four stories indicated a maximum height of 45 feet. Most of the groups that supported three to four stories also specified that those heights would be appropriate for multifamily or mixed use development along the freeway or railroad (in the areas where multifamily housing was identified as appropriate). Several groups indicated that the central Barrio area should have a two-story and 35 feet maximum. Other Uses In terms of other desired land uses, a common theme was that the city should “complete Pine Park.” In addition, several groups indicated support for mixed use development along Roosevelt Street and Harding Street. There was a range of other desired land uses identified, including community garden, community pool, and a skate park. There was some mention of a desire for more retail, such as along the freeway and Roosevelt north of Walnut, but there was also opposition to any additional retail, because of perceived potential traffic and parking issues and some felt the Village provides sufficient shopping opportunities. Parking The issue of parking came up repeatedly. Most groups felt that the Barrio was under-parked. A variety of suggestions were offered, dealing with both private and public parking. These included eliminating or reducing parking requirements for narrow lots, allowing tandem parking to be counted, and restriping streets to include diagonal parking or even along medians, to increase parking availability in the neighborhood. CONNECTIVITY AND STREETSCAPE IMPROVEMENTS There was near unanimity among the participants that connections to the surroundings— especially the beach—need to be enhanced, and streetscapes need to be improved for appearance as well as pedestrian safety. Almost everyone agreed that an underpass/overpass at Chestnut Avenue across the railroad tracks is desirable, with some mentioning that the needs of seniors in accessing this connection should be considered, and sidewalks leading to the connection improved. Participants agreed that many of the streets are wide, and traffic speeds quickly through the neighborhood. Traffic calming was a popular solution, with several groups mentioning use of additional roundabouts/circles. Undergrounding utilities, adding more street lights, planting consistent street trees, and adding/improving sidewalks all got multiple mentions. There was some mention of need for additional bikeways and one group mentioned small buses/shuttles catering to the mobility needs of senior citizens was needed. Barrio Workshop Summary 5 TABLE NOTES AND MAPS Barrio Workshop Summary 6 TABLE 1 NOTES AND MAP Cultural and Historic Character Land Use and Housing Connectivity and Streetscape Improvements “Core” - Pine Park and Chase Field Important features: o Lola’s o Museum High density north of Jefferson Elementary (from tracks to Jefferson St), including the large parcels in the southwest Mixed use along freeway – 3 to 4 stories Restaurants along Chestnut Ave Food concessions at ballpark Update Barrio Museum Community garden Pool Decorative, pedestrian friendly walkway along Roosevelt St and Chestnut Ave Safe railroad crossing at Chestnut Ave Traffic circles for calming Agree with streetscape recommendations of other groups Barrio Workshop Summary 7 TABLE 2 NOTES AND MAP Cultural and Historic Character Land Use and Housing Connectivity and Streetscape Improvements “Core”: One group favored the intersection of Walnut Ave and Roosevelt St. That COULD become the core, IF the buildings were fixed up. o Others thought that Chase Field, Pine Park and the Senior Center represent the core of the Barrio. This area is significant to the region, not just the Barrio. Two areas for high density housing/mixed use (45’ height max; 3 stories): East of Harding St between Oak and Pine avenues Between Roosevelt St/Magnolia Ave and the railroad tracks, south of Chestnut Ave/north of Anchor Way. 35’ max – all other areas More flexibility on housing density Condos preferred over apartments Prefer no underground parking Community gardens There has not been much investment in Barrio in the last 20 years, so we need the densities to get investment Quiet zone needed at Tamarack Ave and railroad Overpass at Chestnut Ave and railroad Traffic calming at Chestnut Ave/ Roosevelt St and Walnut Ave/ Roosevelt St Pedestrian friendly streets: Sidewalks Traffic calming:  Decorative pavements  Narrow streets  Roundabouts  Medians (landscaped) Greenbelts Underground utilities Barrio Workshop Summary 8 TABLE 3 NOTES AND MAP Cultural and Historic Character Land Use and Housing Connectivity and Streetscape Improvements Don’t need a core in Barrio. Village is the core center—we can use the Village Important features: Lola’s Museum o Park Some thought the Barrio has too many multifamily dwellings – no need for more Others thought multifamily dwellings should be located along the freeway or railroad 2 stories maximum Remove empty gas station on Tamarack Ave – replace with retail Mixed uses – resident serving businesses on bottom floor and residential on 2nd floor Community garden for Barrio Remove eye sore on Roosevelt St (steel building) Park should be finished Formal garden (like a rose garden), with places to sit YMCA – small scale, swimming pool Quaint – “Village like” Install sidewalks and trees Manmade lakes with greenbelt Clean streets and alleys Parking restrictions on front yard Restrict street parking on some main streets and replace with bike paths separated from cars Underground utilities Reduce front yard setback to allow a front porch Architecture streetlights and addition of more lights Access to the beach from Chestnut Ave Streetlights Walking trails Bike path marked on the street Sidewalks with trees Underground utilities Improving street character would encourage home owners to move back into the Barrio (most owners live elsewhere) Barrio Workshop Summary 9 TABLE 4 NOTES AND MAP Cultural and Historic Character Land Use and Housing Connectivity and Streetscape Improvements “Core” – intersection of Roosevelt St and Walnut Ave Important features: o Lola’s o Barrio Museum (needs to be renovated) o Historic homes, like the Ramirez House o Chase field Improve landmarks Enhance Mexican- American style Higher density along the tracks and freeway 2 stories, maximum 3 stories Parking issues needs to be addressed Live work units Professional space Open space Light retail/mixed use Bring back the Fiesta del Barrio Property west of Pine Park (Madison St lot): Could be used for event parking. Native plants/community garden Add community pool (indoor) Chestnut Ave bridge at railroad with a unique statement that says it’s the Barrio Roundabouts Extend the sidewalks at the intersections (bulbouts) to increase pedestrian visibility More benches Beautification through public art Pedestrian lighting Underground utilities Wider sidewalks Barrio Workshop Summary 10 TABLE 5 NOTES Cultural and Historic Character Land Use and Housing Connectivity and Streetscape Improvements “Core” - Pine Park and Lola’s: toss-up between the two. Preserve Lola’s, museum, pool hall building Preserve vintage homes Struggle with density. Don’t want apartments Talked about encouraging row-homes 50’ wide lots could be split into 25’ lots, with rowhouses, parking access from alley Location/height of multifamily Along freeway (east of Harding) and along Madison 2 stories/35’ max (allow roof decks) East of Harding –3 to 4 stories (45’ max) More mixed-use on Roosevelt St, north of Lola’s to Village Industrial uses to stay on Tyler St. Accommodate youth and cultural activity Finish Pine Park Pine Park - more activities like craft shows, farmers markets, small concerts, etc. Skate park PRIORITY - Rail crossing at Chestnut Ave Traffic calming on Madison St- roundabouts Street signs that are unique: historical markers. Decorative streetlights Extend rail trail to Village Fix sidewalk along Chestnut Ave Enhance access under I-5 (Chestnut) Traffic concerns near Jefferson Elementary (entrance improvements) Maintain and improve access to commercial etc (I-5/Oak Ave) All lots have City ROW in front. Some owners do a good job in maintaining it, others don’t—city assistance with landscaping would be great Barrio Workshop Summary 11 TABLE 5 MAP 1 Barrio Workshop Summary 12 TABLE 5 MAP 2 Barrio Workshop Summary 13 TABLE 6 NOTES Cultural and Historic Character Land Use and Housing Connectivity and Streetscape Improvements “Core” – between Pine Ave and Chestnut Ave/ Roosevelt St and Harding St Important features: o The people (a lot of 3rd /4th generation families in the area) o Corner of Madison St and Walnut Ave o Pine Park and Chase Field o Boys Club Barrio museum - split opinion – if we are going to keep it, then fix it up Don’t replace single family with multifamily Keep zoning as is Density needs to match zoning Don’t want cracker box houses – want every house to be unique Need site by site assessment to evaluate quality of buildings – if it’s run-down/bad condition, then tear it down Make standards more flexible Make it easier to maintain and upgrade homes Do away the requirement for garage (for lots with widths of 50’ or less) Allow tandem parking to count toward parking requirement Allowing two driveways (circular driveways)—where lots are 50’ wide. Make it more affordable to build modular homes Do more to get grants to help people with their properties Improve infrastructure Finish Pine Park Don’t need more commercial uses Don’t want change More activities like Jazz in the Park and street fairs I-5 expansion will impact how we feel about things—need more information Need more and better street lights Need better traffic management/calming Undergrounding utilities. Roosevelt St and Madison St have been undergrounded. Improve gas and water lines (in some cases they are stacked vertically) Need street sweeping in alleys Want a crossing at Chestnut Ave Barrio Workshop Summary 14 TABLE 6 MAP 1 Barrio Workshop Summary 15 TABLE 6 MAP 2 Barrio Workshop Summary 16 TABLE 7 NOTES AND MAP Cultural and Historic Character Land Use and Housing Connectivity and Streetscape Improvements Some thought the core is between Oak Ave and Chestnut Ave, and Roosevelt St and Pine Park Others thought the core was larger – between Carlsbad Village Drive and Chestnut Ave/ Railroad and Harding St Important features: o Lola’s museum o Senior center Church - Old St. Patrick Some thought why have high density in the Barrio? Density is fine as is. Don’t increase housing. Will add traffic Others thought high density should be located close to freeway, north of Chestnut and Walnut avenues Some people thought density should not go above 15 units/acre Others thought 25-28 units/acre is okay 2 stories, but maybe could go to 3 Allow granny flats Revitalize Barrio homes – permit process faster/easier; no reassessment penalty Railroad crossing at Chestnut Ave Community garden o Educate people on growing food Holistic/peace center Fabric shop Mixed use Traffic: too fast. Want slower speeds. Roundabouts would be good Chestnut Ave open from east to west Sidewalk on Tyler St (widen street; parking on both sides) Overhead crosswalk/undercrossing at railroad and Chestnut Ave (if overhead crosswalk – seniors will need elevator or escalator). Underground utilities Plan transit next to high density Smaller buses/transportation to transport people/seniors from Barrio to PO or banks, libraries, beach, at reasonable prices. Traffic is horrible by school – need to study what can be done Need more parking Improve timing of street lights Barrio gets unequal treatment compared to other areas (maintenance, trees, etc) Barrio Workshop Summary 17 TABLE 8 NOTES AND MAP Cultural and Historic Character Land Use and Housing Connectivity and Streetscape Improvements “Core” – generally between railroad and Harding St/Oak Ave and Magnolia Ave Important features: o Roosevelt St/Walnut Ave intersection o Chase field and Pine Park o Boys and Girls Club o Roosevelt St as Main Street Roosevelt St west to railroad West end by railroad tracks – additional multifamily housing 2-3 stories East end (Pine-Palm/east of Harding) higher density/3 stories Center of Barrio – lower density/2 stories Perhaps some mixed-use from Lola’s to Village along Roosevelt St East of Tyler St 3 stories Finish park Neighborhood services and shops No boxing Skate park Roundabouts and crosswalks should have flashing lights Roosevelt St roundabouts at Chestnut Ave and Walnut Ave Underground utilities Chestnut Ave through to beach Roosevelt St and Madison St – pedestrian friendly (safer crossings) Quiet Crossings at railroad Safer railroad crossing at Carlsbad Village Drive Wider sidewalks, add bike lanes Continue rail trail Barrio Workshop Summary 18 TABLE 9 NOTES AND MAP Cultural and Historic Character Land Use and Housing Connectivity and Streetscape Improvements “Core” – around the two parks and extending west to Roosevelt St This was the original play ground Keep the area around the core as is Police substation If a house/building has been empty for 20 years, it should be knocked down Finish the project across from Lola’s or knock it down No more stores Future Barrio Museum – if city owned, the city should only fund a “city” museum, not a private museum Retain historical buildings Improve underpass to Holiday Park and Library Provide parking between park and Chase Field Pine trees need to be removed (roots are invasive) around Senior Center More benches Many areas don’t have enough parking Several homes are overcrowded/illegal residents Walking areas should have cobblestones and artwork displays Safer underpass More lighting on all the streets Banners in Barrio Build a bridge to beach Keep wide streets (like Roosevelt St) Barrio Workshop Summary 19 COMMENTS AND LETTERS Barrio Workshop Summary 20 Barrio Workshop Summary 21 Barrio Workshop Summary 22 Barrio Workshop Summary 23 Barrio Workshop Summary 24 Barrio Workshop Summary 25 Barrio Workshop Summary 26 Barrio Workshop Summary 27 Barrio Workshop Summary 28 69 The Barrio is primarily a residential neighborhood with a small amount of neighborhood serving commer-cial uses. 6 Barrio Neighborhood Preservation and Revitalization Established in the 1920s, the Barrio neighborhood first served as a residential enclave for new immi-grants supporting the agriculture economy of the city. Today, the Barrio reflects elements of its past in its many cultural markers and historic buildings, as well as in its long-time residents and cohesive community. As the city evolves over the next 20 years, it will be important to define clear param-eters for improvements and new development in the Barrio that will honor community desires for change and preservation. This chapter reviews existing conditions in the Barrio neighborhood, including development and streetscape characteristics; as well as planning efforts to date. A community workshop focused on the Barrio neighborhood in particular is scheduled for March 10, 2011, but not in time to incorporate into this paper. Although this chapter does not include perspectives of local residents beyond what was shared during Phase 1 of Envision Carlsbad, following the workshop a separate document will be prepared that summarizes the meeting. 6.1 Neighborhood Context and Scale The roughly 150-acre Barrio neighborhood is situated on the northwestern portion of the city, just south of Carlsbad Village. The neighbor- hood is bounded by I-5 to the east and the railroad tracks to west; Tamarack Avenue, an arterial along which traffic moves quickly, provides a strong southern edge. The northern edge of the neigh- borhood is somewhat amorphous: while from a planning perspective the Barrio extends up to the Village planning boundary to Oak and Walnut 70 Envision Carlsbad www.carlsbadca.gov/envision Development scale in the Barrio ranges from single family homes to multiple-story structures in large parcels, such as the Public Storage facility. avenues, boundaries between the two areas are not distinctive. One of the focus areas in the Barrio is the new Pine Avenue Park and Chase Field, as well as the adjacent senior center. The corner of Walnut Avenue and Roosevelt Street is also a focus area and contains several cultural markers, including Lola’s Market, the only local store and tacqueria serving the area, although technically it is just outside the Barrio planning area. There is community interest in reha-bilitating several of the buildings in this area to create a permanent “Barrio Museum” according to the property owners, as well as to celebrate the house where Victor Villasenor, author of the nationally acclaimed best-seller Rain of Gold, was born and lived. Land Use Context Land use in the Barrio neighborhood is primarily residential, comprising approximately 75 percent of the developable land in the area, as shown in Figure 6-1. The neighborhood has mostly small lot single-family/duplex homes that face the street and encourage interaction among neighbors. These homes constitute the heart of the neighborhood along Roosevelt and Madison streets, while higher density residential development is located to the southwest and east along Magnolia Avenue and Harding Street. Public, institutional, and recreation uses comprise much of the remaining land in the Barrio, while commercial uses are limited—located primarily at the corner of Tamarack Avenue and I-5 and constituting a gas station and a few stores. Development Scale The neighborhood is fairly heterogeneous in its development character, and buildings are of varied vintage. North of Chestnut Avenue, the neighbor-hood is laid out along a gridded network of streets that extend into the Village. Buildings in this part of the Barrio are generally older than those in the south. Lot sizes and housing densities are extremely varied, as shown in Figure 6-2. Lot and building sizes are generally small along Roosevelt and Madison streets—the area where many of Community members have proposed to create a permanent Barrio Museum to celebrate the neighborhood. PINE AVE PARK CHASEFIELD JEFFERSONELEMENTARYSCHOOL HOLIDAYPARK 5 OVER P A S S OVERP A S S UND E R P A S S UNDERPASSPIO P ICO DRHARD ING S T ADAMS STCHEST N U T A V TAMA R A C K A VGARFI E LD S T ROO S EV E LT ST PINE A V GRAN D A V TYL E R S T JE FFERSON STCARL SBAD B L OAK A V CARL S B A D VI L L A G E D R JUNIP E R A V ACACI A A V EUREKA PLBASSWOOD AV HEML O C K A V REDW O O D A V PALM A V LINMAR LN ANCH O R W Y MAGN O LI A A V LINCO LN ST WOODLAND WYMADI SON ST HI B I SCU S CRHIGHLAND DR WALN U T A VWASH INGTON ST MCKIN L EY ST MAPL E A V CHER R Y A V HARBOR DR LONG P L CAME L L I A P L AVOC A D O L N CARO L P L CITRU S P L BALDWIN LN CHINQ U A PI N A V OAK A V MAGNOLIA AV HIB ISCU S CR PALM A V J E F F E R SON ST PINE A V PALM A V CHES T N U T A V PINE A V MADI SON ST WALN U T A V Highways Railroad Figure # Barrio City Limits Existing Land Use Commercial Education/Institutional Transportation, 0 500 1,000250 Feet Source: City of Carlsbad, 2011; SANDAG, 2011; Dyett & Bhatia, 2011. VILLAGE REDEVELOPMENT AREA Communication, Utilities Single Family Two Family Multi-Family (3+units) Residential Non-Residential Recreation Undeveloped Working Paper 6 Figure 6-1: Barrio Existing Land Use PINE AVE PARK CHASEFIELD JEFFERSONELEMENTARYSCHOOL HOLIDAYPARK 5 OVER P A S S OVERP A S S UND E R P A S S U NDERPASSPIO P ICO DRHARD ING S T ADAMS STCHEST N U T A V TAMA R A C K A VGARFI E LD S T ROO S EV E LT ST PINE A V GRAN D A V TYL E R S T JE FFERSON STCARL SBAD B L OAK A V CARL S B A D VI L L A G E D R JUNIP E R A V ACACI A A V EUREKA PLBASSWOOD AV HEML O C K A V REDW O O D A V PALM A V LINMAR LN ANCH O R W Y MAGN O L I A A V LINCO LN ST WOODLAND WYMADI SON ST HI B I SCU S CRHIGHLAND DR WALN U T A VWASH INGTON ST MCKIN L EY ST MAPL E A V CHER R Y A V HARBOR DR LONG P L CAME L LI A P L AVOC A D O L N CARO L P L CITRU S P L BALDWIN LN CHINQ U A P I N A V OAK A V MAGNOLIA AV HIB ISCU S CR PALM A V J E F F E R SON ST PINE A V PALM A V CHES T N U T A V PINE A V MADI SON ST WALN U T A V Highways Railroad Figure # Barrio City Limits Density No Residential Units 1 - 8 units/acre 8 - 15 units/acre 15 units/acre - 25 units/acre 25+ units/acre 0 500 1,000250 Feet Source: City of Carlsbad, 2011; SANDAG, 2011; Dyett & Bhatia, 2011. VILLAGE REDEVELOPMENT AREA Figure 6-2: Barrio Densities and Intensities Working Paper 6 73 WP6: Small Town Feel, Beach Community Character and Connectedness; Neighborhood Revitalization, Community Design and Livibility the homes are also older. Low-rise multifamily buildings and developments are concentrated west of Magnolia Avenue, and between Harding Street and I-5. Duplexes and townhomes are scattered in many locations, including several concentrations in the southeast. Buildings are of a variety of styles, reflecting their age—from simple early wooden bungalows, to Modern apartment buildings con-structed in the 1960s that are showing their age, as well as an eclectic collection of historical styles. While most buildings are one to two stories tall, there are several three story buildings, and densities can be exceptionally high, up to 62 units per acre—exceeding those currently allowed by the General Plan, and thus non-conforming due to density or other development standards. 6.2 Walkability and Neighborhood Function Physical Connections Figure 6-3 illustrates the Barrio’s structure and con- nectivity. On a daily basis, children, families, and other residents can be seen walking to school, parks, community facilities and other destinations. The grid pattern of streets and shorter blocks of 250 feet by 440 feet allow for good circulation on the north side of the neighborhood. The southern portion has a more introverted street pattern, with some cul-de- sacs and a looping network of streets. Because of the larger block sizes, this area is not as well-connected within or to the surroundings. The Barrio has excellent north-south connectiv- ity to the Village through the gridded network of streets, but access to the rest of the city is limited due to the train tracks and freeway. Tamarack Avenue and Carlsbad Village Drive are the only connections west over the train tracks to the beach, leaving the entire Barrio neighborhood devoid of connections across the rail corridor. The Barrio community has expressed desire for a pedestrian connection at the western end of Chestnut Avenue across the railroad—whether at grade, below or above—to provide direct access to the beach. To the east across I-5, Chestnut Avenue provides one The Barrio is home to several recreation amenities that emphasize walking, including Chase Field, the Senior Center, and the rail trail. CAR L S BAD B LVD TAMA R A C K A V E S AN D I EGO NORTH E RN RR CHES T N U T A V E HA RD IN G S T PIO PICO DR GRAN D A VE OAK A V E JE F F E R SON S TMADISON S T ROO S E V E L T S T PINE AV E LINCO LN S T GA R F I E LD S T PINE AV E BASSWOOD AVE MAGN O LI A A V EADAMS ST CHINQ U A PI N A V E HEML O C K A VEJUNIPER A VE WALN U T A VE OAK A VE CARL S B A D VI L L A G E D R SAN D IEGO FREEWAY Barrio Core SeniorCenter PineAvenuePark ChaseField 5 Development Impacted by Freeway Jefferson Elementary School Physical Barrier No Through Street At-Grade Railroad Crossing Bike/Pedestrian Path Gateway Activity Node Key Connection/StreetscapeImprovement Opportunity Single Family Development Multifamily Development Commercial/Retail Core Barrio Boundary 00010050520 FEETPark/Open Space Public/Institutional Figure 6-4 Barrio Neighborhood Form CITY OF CARLSBAD Source: City of Carlsbad, 2009; SANDAG, 2009; Dyett & Bhatia, 2011 Figure 6-3: Barrio Neighborhood Form Working Paper 6 75 WP6: Small Town Feel, Beach Community Character and Connectedness; Neighborhood Revitalization, Community Design and Livibility additional connection—and a critical one—to Holiday Park and the neighborhood’s middle and high schools, as well as the Library Learning Center and Centro de Informacion. Streetscapes In general, streets in the Barrio are too wide for the amount of traffic they carry. With the exception of Chestnut Avenue and some streets that feed to it, streets serve primarily local traffic and have one lane of traffic in either direction. Several streets, such as Hibiscus Circle, have consistently planted street trees; however, most streets are bereft of street trees. While most streets have sidewalks, some sidewalks are discontinuous or narrow, and a few streets lack them. The City has spent considerable efforts in recent years improving streets in the area, including undergrounding utilities; however, many streets still have overhead utilities. Looking ahead, the Barrio’s character could benefit from strategic streetscape enhancements: consistent street trees and other streetscape improvements, especially on the linkages to the Village; planted medians where feasible; potentially a roundabout at Roosevelt Street and Walnut Avenue and perhaps other intersections, providing focus to the cultural elements; and improved bikeway and pedestrian linkages, especially to the trails along the railroad. Neighborhood Functionality The Barrio neighborhood has a strong community identity and an active residential population. Figure 6-4 shows land uses, opportunities, and challenges in the Barrio. As residential uses comprise the majority of uses in the Barrio, it is the activities and needs of its residents that dictate how the neighbor-hood functions. The Barrio has several key elements of a good neighborhood, including ample park and play space, community centers, and an elemen-tary school, all of which provide key community services and gathering space. However, the neigh-borhood lacks in neighborhood-serving retail uses, aside from the Village Plaza and Lola’s Market (both are just outside of the planning boundary); this necessitates residents leave the neighborhood for most conveniences and services from shopping to dry cleaning, or a quick bite to eat. Addition-ally, higher density residential areas, where most residents are focused in the community, are even further removed from daily activity and services in the Village by the lack of easy access and connectiv-ity to surrounding areas. There are several key elements that could improve the functionality of the Barrio as a neighborhood—the most primary being access to retail that serves everyday needs. Existing activity centers, such as at Walnut Avenue and Roosevelt Street, in the heart of the Barrio, could be expanded to include more retail options while still preserving the cultural and historical qualities of the area. Additionally, connections to surrounding development, such as to the beach should be explored as a necessary improvement. However, connections should be strategic, and developed in concert with access to key services where none currently exist—whether these are within the Barrio or just outside. 6.3 Recent Planning Efforts The Barrio’s organic growth over time and resulting eclectic neighborhood fabric pose a challenging planning framework, in that community interests are diverse and sometimes opposing, and common goals and a vision for the neighborhood are hard to establish. Several planning efforts have been conducted for the Barrio, as described below. These efforts and their recommendations serve as a basis for understanding past community concerns and desires, and are described below. Draft Barrio Specific Plan (1995) At the request of Barrio residents, the Barrio Specific Plan was drafted by the city in 1995 following two years of planning analysis and community outreach, including stakeholder inter-views, a community tour, workshops, and open houses. However, the Barrio Specific Plan was not adopted by the City Council. The draft plan divides the neighborhood into five planning areas, each of which exemplifies unique characteristics. For example, the oldest part of the Barrio (along 76 Envision Carlsbad www.carlsbadca.gov/envision Madison Street) is one planning area, which is characterized by small lot single-family homes, duplexes, and small apartments in a range of archi-tectural styles. The draft plan provides goals and policies for land use, such as promoting compatible uses and a tran-sition buffer between the Village and Barrio. It segments housing policies into three categories: promoting owner-occupation of units to reduce absentee landlord impacts, encouraging housing rehabilitation to improve structural and visual conditions; and improving affordability of rental housing to reduce overcrowding and the cost burden of housing. Development standards and policies seek to maintain existing densities and single-fam-ily character. Other policies include improving streetscapes and pedestrian safety (e.g. adding crosswalks and public art), adding entry markers to signify entrance into this unique neighbor-hood, and instituting neighborhood improvement programs (e.g. graffiti removal, abandoned vehicle abatement, etc.). Draft Colonia District Master Plan (2007) The Colonia District Master Plan (prepared by a private party) proposes policies and standards for land use, design, and development in the Colonia District (otherwise known as the Barrio neighbor-hood). The District is generally bounded by Oak Avenue to the north, I-5 to the east, Carol Place and Anchor Way to the south, and the railroad line and Madison Street (from Walnut Avenue northward) to the west. This master plan is in the draft stage, has not been submitted to the city as a formal appli-cation and has not been adopted. The Colonia District Master Plan cites that the city’s development standards are successful in suburban portions of the city, but do not apply well to the Colonia District.  In response, the plan proposes a new zoning district and a partnership between landowners and the city to provide incen-tives to developers/property owners to revitalize the neighborhood. These incentives include: allowing higher densities to increase economic opportunities and the vibrancy of the neighborhood; providing community improvements, such as a connection on Chestnut Avenue across the rail line and a greater mix of uses to allow neighborhood-serving retail; and establishing more flexible design standards (e.g. revisiting setbacks, heights, and parking require-ments). Like the 1995 Draft Barrio Specific Plan, the Colonia District Master Plan envisions distinct planning areas within the district, each of which proposes allowed and conditional uses, and appro-priate development standards. 2009 housing Element Update The Barrio represents a critical part of the City’s strategies to meet its regional housing needs allo-cation and state law. According to the City’s most recent Housing Element, vacant and underutilized sites with the potential for redevelopment at below-market rates are concentrated in the Carlsbad Village Redevelopment Area and the Barrio neigh-borhood. The Housing Element includes a specific program that identifies potential for 330 new units in the Barrio, as a result of redevelopment of aging structures, homes in disrepair due to absentee landlords, and/or locations where the structure value is less than the land value. The Barrio is identi-fied as ideally located next to major transportation, shopping and recreation, but with a substantial number of older, underutilized properties with high absentee ownership, that may be appropriate for redevelopment. The Housing Element envisions that a future master or specific plan would establish a new or unique land use designation for the neigh-borhood that permits higher densities in excess of the current RMH and RH land use designations, which permit a maximum of 15 and 23 units per acre, respectively. 77 §¨¦8 ADAMS STA RA C K A V H A R DI NG S T PI O P I CO DRGA R FIE L D S T G R AND A V PIN E A V C A R LS BA D V ILL A G E D R N S T JU N IPER A V AC A C IA A V EUREKA PLO A K W A LN U T A V H E M LO C K A V RE D W O O D AV A NC H O R W Y WOODHIBIS CUS CR A DIS ON S T MC KI NL E Y S T M A P LE A V C H ER R Y A V C A M E LL IA P L O R E A V A V OC A D O L N CI TR U S P L S B ALD WS HE RI DATAMAR A C K A V E N P L C H E ST N U T A VWA S HI NG T O PIN E A V JEF F E R S ON S T W A LN U T A V C H E ST N U T A VP A L M A V M ADIS ON S T ADAMS STC H E S T N U T A V RO OS E V E L T S T RO OS E V E L T S T A L L E Y GA R FIE L D S T G R A N D A V A VPINE A V BASSWOOD AV T Y L E R S T JE F F E RS ON S TJU N IP ER A V A C A C IA A VEUREKA PLTO N S T O A K A V W A LNU T A V H EM LO C K A V V L I NMAR L NWOODL AND WYMMAD I SON S T A L L E Y AD I S ON S T O A K A V P A LM VILLAG E CI R VILLA GE D R VI LLAGE DRNAUTIC A L DR CAROL P L CHEST N U T A V E A VM A G N O L IA A V JE FF E R S ON S T Senior affordable apartment building built to 75 units per acre located between Tyler Street and the railroad. Freeway underpass at Chestnut Avenue Housing density varies from single family homes to higher density structures such as this aparment building. (1) Carlsbad Senior Center and (2) the playground at Pine Avenue Park Historic commercial building (4) Lola’s (left) and “Barrio Museum” (right) at Roosevelt Street and Walnut Avenue. (5) Ramirez House was built in 1918 by one of the rst families who moved into the Barrio. (6) Fences at Chestnut Avenue terminus at railroad tracks. (7) Dedicated bike path and trails along the railroad from Tamarack Avenue to Carlsbad Village Drive in the Village. (8) Older apartment project on approximately nine acres, with density of ten units per acre. Alley between residential properties Most roads are wide, without consistent street trees and some with utility poles overhead. Retail use within the Barrio neighborhood Landscaped medians and street trees along Tamarack Avenue Single-family attached homes along Magnolia Avenue 2 3 3 4 5 9 4 1 7 8 8 9 7 6 6 2 1 10 10 11 Gaus House, a bungalow house built by Louis Gaus, the only electrician in Carlsbad in the 1920’s. 17 Vacant parcel 18 A variety of architectural styles exist such as this apartment structure. 19 Building (right) shows the variety of scale of existing buildings. 20 Apartment project off of Magnolia Avenue 21 Example of older apartments in the neighborhood 22 22 21 20 5 19 18 17 11 1212 12 13 13 14 14 15 15 16 16 Source: City of Carlsbad, 2011; SANDAG, 2011; Dyett & Bhatia, 2011 Railroad and Station Barrio Boundary 0 500 1,000 Feet Working Paper 6 Figure 6-4: Barrio Opportunities and Challenges