A REPORT TO THE PLANNING COMMISSION
Item No.
Application complete date: January 25, 2013
P.C. AGENDA OF: September 18, 2013 Project Planner: Christer Westman
Project Engineer: Steve Bobbett
SUBJECT: SDP 12-05 – FAITH COMMUNITY CHURCH – Request for a determination that the
project is within the scope of a previously certified Environmental Impact Report (EIR
91-04 Rancho Carrillo) and for approval of a Site Development Plan for the development
of a 34,308 square foot church building which includes a 500 seat sanctuary, child
daycare center for 40 children, church classrooms, and administrative offices on a 3.44
acre site, Village “T” of the Rancho Carrillo Master Plan (MP 139), generally located at
the northeast corner of El Fuerte and Rancho Pancho in Local Facilities Management
Zone 18.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolution No. 7013 APPROVING Site
Development Plan SDP 12-05 based on the findings and subject to the conditions contained therein.
II. PROJECT DESCRIPTION AND BACKGROUND
Village “T” is located within the boundaries of the Rancho Carrillo Master Plan (MP 139), which was
approved by the City Council on October 21, 1997. The purpose of the master plan is to provide for the
orderly development of Rancho Carrillo, while preserving the environmental resources of the area.
Grading for the entire master plan area was approved under Hillside Development Permit HDP 91-17.
For planning purposes, the Rancho Carrillo Master Plan is divided into Villages “A” – “T.” The master
plan identifies the allowable type and intensity of land uses in each village and provides general
development and design standards, requirements, and the method by which the Rancho Carrillo Master
Plan will be implemented. The proposed church and child day care center uses are permitted within
Village “T” by the Master Plan and underlying Community Facilities (CF) zoning and a Site Development
Plan (SDP) is needed to develop the site.
In the original Master Plan, Village “T” carried the Residential Medium Density (RM) General Plan Land
Use designation (4-8 units per acre) with a three year reservation for Community Facility uses. Pursuant
to the original Master Plan, if the site was not developed with a community facility use within three
years of the grading of the right-of-way for El Fuerte Street or Rancho Pancho, then the site would revert
back to its underlying designation of RM upon a showing that the applicant had made good faith efforts
to market this site to a community facility type of use during the three-year period without any success.
The applicant had previously requested two such determinations and on both accounts the Planning
Commission and City Council determined that the applicant had not shown a good faith effort and
denied the requests. The Planning Commission made a minute motion that the City Council adopt a
Resolution of Intention to preserve Village “T” as a permanent Community Facility site. On December 3,
2003, the City Council adopted Resolution No. 2002-348 directing the Planning Director to prepare a
Master Plan Amendment. The City initiated a Master Plan and General Plan Amendment to preserve
Village “T” of the Rancho Carrillo Master Plan as a Community Facility site. On February 17, 2004, the
2
SDP 12-05 – FAITH COMMUNITY CHURCH
September 18, 2013
Page 2
City Council approved a General Plan Land Use Amendment and Master Plan Amendment establishing
the site as a Community Facilities site for a 10 year period.
Consistent with Section 21.25.030 of the CF Zone, the currently adopted Rancho Carrillo Master Plan
requires the reservation of Village “T” as a CF site for a minimum period of ten (10) years. The ten-year
period commenced when the final inspections were approved for 100 percent of the units in the first
residential planning area in the Master Plan. The first village to be completed was Village “J” on October
19, 2000. Even though the ten-year reservation period expired in October 2010, and community
facilities have not developed in the community facilities designated area, the site continues to have the
Community Facilities designation.
Village “T” (Lot 103) was created by the Village “Q” subdivision (CT 93-04) approved by the Planning
Commission on January 4, 1995 and the final map was recorded with the San Diego County Clerk’s office
on March 31, 1998.
The project site, Village “T,” has been previously graded into a large building pad as part of the Rancho
Carrillo mass grading and is therefore devoid of vegetation. The site is 3.44 acres in size (2.33 acre pad
area) and is bounded by manufactured and landscaped slopes to the north and an open space lot
(portion of Open Space Area 12) to the east. Adjacent to the north is a storm water detention basin that
is part of the Bressi Ranch development. To the south is Rancho Pancho (street), which provides access
to the southern portion of the Rancho Carrillo Master Plan consisting of Villages “O,” “Q,” “R,” “T,” Open
Space area nine (OS-9), and the recreational vehicle (RV) storage area for the Rancho Carrillo Master
Plan. West of the site is El Fuerte Street and Open Space area six (OS-6). The entrance to the RV storage
area is directly south of, and across the street from, the entrance to Village “T.”
The applicant, Faith Community Church, has requested approval of an SDP to allow for the construction
of a 34,308 square foot building, a 104 space parking lot, vehicular circulation aisles, and landscaping.
The proposed building has two floors, is 24 feet tall to the flat roof, has 28.5 foot tall parapets which will
also serve to screen 53” tall roof mounted equipment, and architectural towers at a height of 37.5 feet.
The ground floor (21,740 sq. ft.) provides space for the buildout of a 500 seat sanctuary and related
rooms, a fellowship room, child day care center at the northern end of the building, kitchen, restrooms
and administrative offices. The second floor (12,568 sq. ft.) provides classrooms for study sessions,
office space, and restrooms.
Church services are typically held on Sundays. Class rooms will be used mid-week in the evening for
bible studies or for occasional use by groups not associated with the church. The child day care center is
approximately 2,560 square feet in area proposed with a maximum number of 40 children and eight
teachers. Operation of the child day care center is proposed Monday through Friday from 7:00 a.m. to
6:00 p.m.
The church proposes to develop the site in three phases. The first phase would be the construction of a
building with a 12,570 square foot ground floor for the child care center at the northern end of the
building adjacent to a 3,100 square foot outdoor play area, restrooms, kitchen, lobby, offices, and 292
seat sanctuary, and 6,449 square feet on the second floor for storage. All of the onsite improvements
will be completed with Phase 1 including storm water bioretention basin, landscaping, buildout parking
lot (100 spaces) and internal circulation, and the 3,100 square foot child day care center play yard. The
second building phase would be to complete interior improvements to the second floor for offices,
classrooms, restrooms, storage, and workrooms. The third phase is the addition of a new 9,170 square
foot ground floor building for the main 500 seat sanctuary, the addition of 6,117 square feet of second
SDP 12-05 – FAITH COMMUNITY CHURCH
September 18, 2013
Page 3
floor space above the “old” 292 seat sanctuary space, removal of the 292 seats from the Phase 1 ground
floor sanctuary space, new classrooms within that new second story area, and a remodel of the Phase 1
sanctuary ground floor as a fellowship space for pre and post church services gathering. The gathering
space will be vacant when not in use but will be set up with the appropriate arrangement of tables and
chairs for pre and/or post sanctuary events. No timing of construction of the second or third phase has
been provided.
The smooth tilt-up building is painted tan and emulates elements of the Spanish/Early California
architectural theme for Rancho Carrillo through the incorporation of arched windows and window
surrounds, red barrel tile arcades, and stone colored trim. The northern and southern building faces
include tower features which are 37.5 feet tall. The features do not provide any floor area or contain or
screen mechanical equipment. Red barrel colored tile covered walkways extend along the building on
the eastern, northern, and westerly southerly building faces as an accent feature to the building and to
provide shelter at doorways.
The church occupies the western side of the triangular shaped site, along El Fuerte Street. The access
point to the site is from Rancho Pancho along the south side of the lot. The remainder of the site is
dedicated to parking and landscaping.
Table 1 below includes the current land uses, General Plan designations and zoning of the project site
and surrounding properties.
TABLE 1
Location General Plan Designation Zoning* Current Land Use
Site Community Facilities (CF) Community Facilities (CF) Vacant
North Open Space (OS) Open Space (OS)
OS 6 Bressi Ranch
Open Space
South Open Space (OS) Open Space (OS)
Village OS 9 Rancho Carrillo
RV Storage Lot
Open Space
East Open Space (OS) Open Space (OS)
Village OS 12 Rancho Carrillo
Open Space
West Open Space (OS) Open Space (OS)
Village OS 6 Rancho Carrillo
Open Space
* Underlying Zoning pursuant to Rancho Carrillo Master Plan (MP 139)
III. ANALYSIS
The proposed project is subject to the following plans, ordinances and standards:
A. General Plan Community Facilities (CF) Land Use Designation;
B. Rancho Carrillo Master Plan (MP 139);
C. Carlsbad Municipal Code, Title 21, Chapter 06 – Qualified Development Overlay Zone;
D. Carlsbad Municipal Code, Title 21, Chapter 25 – Community Facilities Zone;
E. Carlsbad Municipal Code, Title 21, Chapter 83 – Child Care;
F. Carlsbad Municipal Code, Title 21. Chapter 44 – Parking; and
G. Local Facilities Management Plan and Growth Management.
SDP 12-05 – FAITH COMMUNITY CHURCH
September 18, 2013
Page 4
The recommendation of approval for this project was developed by analyzing the project’s consistency
with the applicable policies and regulations listed above. Therefore, this section will cover the project’s
compliance with each of the regulations listed above in the order in which they are presented.
A. General Plan
An objective of the Land use Element of the General Plan is “to ensure that new master planned
communities...contribute to a balanced community by providing, within the development, adequate
areas to meet some social/human service needs such as sites for worship, daycare, youth and senior
activities, etc.” To implement this objective, Master Planned communities and residential Specific Plans
over 100 acres are to provide usable acreage to be designated for community facilities. The Rancho
Carrillo Master Plan included Village “T” as a community facilities site to satisfy a portion of this
requirement. The development of Village “T” as a church, with an associated child day care center, is
fulfilling the objectives of, and is consistent with, the General Plan and the Rancho Carrillo Master Plan.
B. Rancho Carrillo Master Plan (MP 139)
The Master Plan established Village “T” as Community Facilities (CF) site subject to the approval of a Site
Development Plan (SDP) in lieu of a Conditional Use Permit (CUP). The development of Village “T” as a
Community Facility site meets the goals and objectives of the Rancho Carrillo Master Plan. The site is
compatible with surrounding development in that the site is located at least 700 feet from the nearest
residential property and is surrounded by open space and the recreational vehicle storage lot for the
Master Plan. The development of the site would not disrupt the open space network which preserves
the environmental resources of the area. The orientation of the building takes advantage of views to
the north. The site was considered as a Community Facility site as part of the initial development of the
Master Plan, therefore adequate public facilities and services have already been provided and no new
facilities are required. The proposed church and child day care center project complies with the
development standards identified in the Rancho Carrillo Master Plan in Table 2 below. Otherwise, the
church use is subject to the development standards of the CF Zone and the child day care center is
subject to the Child Care Ordinance as discussed below.
TABLE 2 – RANCHO CARRILLO MASTER PLAN (MP 139) COMPLIANCE
Code Section Standard Provided Compliance
Setbacks- Buildings 30 ft. (El Fuerte Street )
20 ft. (Rancho Pancho)
30 ft.
25 ft. 3 in.
Yes
Yes
Furthermore, while church uses are normally approved through a CUP, MP 139, the Carrillo Ranch
Master Plan, instead requires the processing of a Site Development Plan for any uses proposed in Village
“T.”
C. Qualified Development Overlay Zone
As identified in the Carrillo Ranch Master Plan, development of the project site requires the approval of
a Site Development Plan consistent with the procedures and findings set forth in the C.M.C. Chapter
21.06 Qualified Development Overlay. The project is consistent with the required findings. The General
Plan lists churches and child day care centers as expected land uses within the designation of
Community Facilities. The project site plan and building design fits within the context of the site as it
provides all of the required parking, access, circulation, water quality facilities onsite and consistent with
all required setback and other development standards. The project site is surrounded by open space
SDP 12-05 – FAITH COMMUNITY CHURCH
September 18, 2013
Page 5
and an RV storage lot and is also somewhat removed from existing residential developments so there is
no expectation that the daily onsite operations or activities will have an adverse impact on existing uses
in the area. El Fuerte Street and Poinsettia Lane are arterial roadways intended to carry larger volumes
of traffic. These two roadways are anticipated to be the primary roads used to access to the site. The
Average Daily Trips (ADT) assumed for the child day care center and weekday operations of the church is
509 ADT, and 1,235 ADT on Sundays for church services. These additional trips will not have adverse
impacts to either roadway. Those trips that would be distributed eastbound on Rancho Pancho are a
contribution that is within the design capacity of the road. No unique conditions or features are
necessary to adjust the project to make it compatible since it is surrounded by open space on three
sides and a recreational vehicle storage lot on the other.
D. Community Facilities Zone
The Master Plan established the underlying zoning of Village “T” as Community Facilities (CF).
Furthermore, the Master Plan specifies that uses within Village “T” are subject to the development
standards of the CF Zone. The CF Zone (Chapter 21.25 of the Carlsbad Municipal Code) allows churches
as a conditionally permitted use and child day care centers are a permitted use. However, the Rancho
Carrillo Master Plan substitutes a Site Development Plan (SDP) for a Conditional Use Permit (CUP) as the
required discretionary permit of approval. The proposed project complies with the development
standards identified in the Community Facilities Zone as shown in Table 3 below.
TABLE 3 – CF ZONE COMPLIANCE
Code Section Standard Provided Compliance
Building Height Not to exceed 35 feet/three levels
(3:12 roof pitch)
Not to exceed 24 feet/two levels
(<3:12 roof pitch)
Architectural projections and
parapet walls may be allowed above
the height limits of the zone
provided they do not accommodate
additional floor space (C.M.C.
section 21.46.020).
N/A
Flat roof portion is 24 feet
Architectural towers at
37.5 feet which do not
contain any usable floor
area. Parapet screen wall
is 28.5 feet.
N/A
Yes
Yes
E. Child Day Care Center Regulations
The child day care center is a permitted use per the CF Zone and subject to the approval of a Site
Development Plan pursuant to MP 139 and is subject to the regulations of C.M.C. Chapter 21.83 Child
Care Ordinance. The child day care center operator will be required to obtain all licenses and permits
required by State law for operation of the facility. Approximately 2,560 square feet of the building will
be utilized for child day care use. The maximum number of children planned is 40 and the number of
caretakers required would be eight. The center would be open Monday through Friday from
approximately 7 a.m. to 6 p.m. The project meets the requirements of the Child Care Ordinance as
outlined in Table 4 below.
SDP 12-05 – FAITH COMMUNITY CHURCH
September 18, 2013
Page 6
Table 4 – CHILD CARE ORDINANCE REGULATIONS
Code Section Standard Provided Compliance
Licenses and Permits Have or obtain all licenses
and permits required by
the state.
Conditioned to obtain
licenses and permits
required by the state prior
to occupancy.
Yes
Zoning Meet all Zoning Standards See Tables 2 and 3 above Yes
Indoor Play Area Meet San Diego daycare
licensing agency
requirements.
Conditioned to obtain
licenses and permits
required by the county or
state prior to occupancy.
Yes
Outdoor Play Area Adjacent to and accessible
through the center.
Enclosed by minimum 5
foot tall barrier. Not
allowed within any
required setback.
Viewable outdoor play
space from interior.
Adjacent to and accessible
through the center.
Enclosed by minimum 5
foot tall steel tube fence.
Not located within any
required setback.
Each classroom includes
windows facing the
outdoor play area.
Yes
Yes
Natural Light Provide direct source of
natural light and view
windows.
Windows provide natural
light and views from the
interior.
Yes
Loading/Unloading Provided without the need
to cross driveways or
streets.
Designated loading and
unloading area located
adjacent to the building.
Yes
F. Parking
The City’s Parking Ordinance (C.M.C. 21.44.030) states that when the parking requirement for a use is
not specifically defined, the requirement shall be determined by the City Planner. The City Planner’s
determination shall be based on the most comparable use specified in the chapter, by parking study, or
other evidence satisfactory to the City Planner. Church parking is not specifically defined in the Parking
Ordinance and historically the City Planner has made the determination that “public assembly” is the
most comparable defined use in the chapter.
The parking requirements for the project are for those uses proposed onsite and occurring
simultaneously. Typically the number of spaces needed to serve the church sanctuary as a place of
public assembly is used to satisfy the parking requirement since it generates the greatest parking
demand and is a unique solo event on one day during the week. Other uses have been proposed onsite
such as classrooms for bible study, various weekly or monthly ministry events, and possibly secular
studies as well as a child daycare center. As seen in Table 5 below, the church, under the public
assembly requirement of the Parking ordinance, requires 100 parking spaces. The site is designed with
the provision of 104 parking spaces. Twelve parking spaces are required to serve the child day care
center. One space is required for each ten children and one space is required for each day care center
employee.
SDP 12-05 – FAITH COMMUNITY CHURCH
September 18, 2013
Page 7
TABLE 5 – PHASE 3 BUILDOUT PARKING
Required Spaces Provided Spaces
Use Standard Weekday Weekend Weekday Weekend
Church Sanctuary
Church Service
(500 seats)
1 / 5 seats
0
(Sunday)
100
0
(Sunday)
100
Church Sanctuary
Wedding or Funeral
(500 seats)
1 / 5 seats
0
(Saturday)
100
0
(Saturday)
100
Fellowship Room None No use
proposed
Used before and
after sanctuary
service or event
No use
proposed
Used before and
after sanctuary
service or event
5 General Classrooms
109 students
1 / Instructor
1 / 3 students
5
37
42 total
54
Sunday School:
3 classrooms
90 students
1 / Instructor
1 / 10 children
3
9
12 total
4
Offices
2,449 sq.ft.
1 / 250 sq.ft.
10
22
**Day Care Center
8 Care Givers
40 Children
1 / employee
1 / 10 children
8
4
12 total
24
Totals 64 112 104 104*
*The applicant has stated that the Sunday School will be open only for the children of parents attending
church services and will therefore not have a separate parking requirement from that of the sanctuary.
**Per Section 21.44.080 (A)(1)(d) of the C.M.C., up to 50 percent of the parking facilities required by the
Parking Ordinance for a church may be jointly used by an onsite child day care center provided there is
no substantial conflict in the principal operating hours of the church and child day care center. The day
care center will be in operation Monday through Friday 7:00 a.m. to 6:00 p.m. The peak demand for
church parking will be during Sunday church services which typically occur mid-morning.
The Planning Commission received a letter on August 7, 2013 from a resident on Rancho Pancho who is
concerned that the proposed 104 space parking lot will not provide adequate parking capacity to
accommodate the church sanctuary at full buildout of 500 seats and other concurrent church uses
(which would occur with the third phase of development). The letter and staff’s responses are included
as attachments no. 6 and 7. The proposed church has been analyzed and parked at the parking ratio of
one space per five fixed sanctuary seats which historically has been applied to churches within the City.
As previously discussed, churches are normally processed through a Conditional Use Permit (CUP) which
requires annual staff reviews of the church operations and an ongoing ability to bring the church back to
the Planning Commission to modify the conditions of approval or impose new conditions if the church
use is incompatible with surrounding uses. However, since the project is being processed through a Site
Development Plan (SDP) as required by the Rancho Carrillo Master Plan, rather than a CUP, and
consequently staff does not have the ability to regularly monitor church operations or re-condition the
SDP 12-05 – FAITH COMMUNITY CHURCH
September 18, 2013
Page 8
church, staff has added a condition of approval to the project to address potential parking issues that
could be associated with the implementation of phase three buildout of the church.
The condition specifies that the owner/operator of the Faith Community Church provide to the City
Planner a parking study, conducted by a professional parking consultant, for a six month period prior to
the request for a building permit for phase two and then again for a six month period prior to the
request for a building permit for phase three. The parking study shall evaluate peak weekend parking
demand at the church, on a minimum of six different weekends over a six month period of church
operations. If the on-site parking capacity of 104 spaces is inadequate to accommodate peak weekend
demand, resulting in church parking along the adjacent streets, or if the remaining on-site parking
supply is unable to accommodate the additional classrooms or sanctuary capacity of 208 seats
(proposed with phase three of the project) which requires 42 parking spaces, then phase two or phase
three of the project, whichever is applicable, shall not be allowed to pull building permits until additional
parking capacity is provided on-site to address demand or the project sanctuary capacity is reduced to a
size for which adequate parking can be provided onsite.
G. Local Facilities Management Plan and Growth Management
The proposed project is located within Local Facilities Management Zone 18 in the southeast quadrant
of the City. The impacts on public facilities created by the project, and its compliance with the adopted
performance standards, are summarized in Table 6 below.
Table 6: GROWTH MANAGEMENT COMPLIANCE
STANDARD IMPACTS COMPLIANCE
City Administration N/A Yes
Library N/A Yes
Waste Water Treatment 19 EDU Yes
Parks N/A Yes
Drainage Basin D Yes
Circulation 509 ADT (weekday)
1,235 ADT (Sunday)
Yes
Yes
Fire Station No. 2 Yes
Open Space N/A Yes
Schools N/A Yes
Sewer Collection System 19 EDU Yes
Water 7,891 GPD Yes
IV. ENVIRONMENTAL REVIEW
Staff has reviewed the request for the Site Development Plan and the City Planner has determined that
the project, the development of the site with a church facility and child day care center creates no new
or significant adverse environmental impacts above what was identified in the original CEQA document
(EIR 91-04 for Rancho Carrillo).
The City Council certified EIR 91-04 on July 27, 1993. At that time, CEQA Findings of Fact, a Statement of
Overriding Considerations, and a Mitigation Monitoring and Reporting Program were approved. All
mitigation measures contained in the adopted Mitigation Monitoring and Reporting Program from EIR
91-04 applicable to the Planning Area have been completed, incorporated into the project design or are
SDP 12-05 – FAITH COMMUNITY CHURCH
September 18, 2013
Page 9
required as conditions of approval for the project. The EIR 91-04 Findings of Fact and Statement of
Overriding Considerations apply to all subsequent projects covered by the Rancho Carrillo Master Plan
Final Program EIR.
The proposed activities would have no effects beyond those analyzed in the program EIR, as they are a
part of the program analyzed earlier and no further CEQA review is required
ATTACHMENTS:
1. Planning Commission Resolution No. 7013
2. Location Map
3. Disclosure Statement
4. Reduced Exhibits
5. Exhibits “A”-“K” dated September 18, 2013
6. Letter dated August 7, 2013 from Linda Geldner
7. Staff response to Letter dated August 7, 2013 from Linda Geldner
8. Letter dated August 9, 2013 from Sharon O. Lightholder
9. Staff response to Letter dated August 9, 2013 Sharon O. Lightholder
10. Planning Commission minutes dated August 7, 2013
POINSETTIA LNEL FUERTE
ST
RANCHO PANCHO
LA GOLONDRINA ST
A S C O T A V
CAYENNE LNESTURION ST
PLUMERIA
D
R
CARRILLO W YPASEO LUNADASDP 12-05FAITH COMMUNITY CHURCH
SITE MAP
J
SITE
EL CAMINO R
E
A
LLA COSTA AV
LGA RD
C
A
R
L
S
B
A
D
B
L
EVEVEVEVVEVE 19039405051575868699126'0"28'0"ELECSERVICER A N C H O P A N C H OE L F U E R T E S T R E E T42'0"8'6"
17'-0"24'0"17'-0"
17'0"
24'0"
17'-0"7'-0"9'-0"8'-630'0"
3'-ABANDONED 500"30'0"20'-0"9'0"'0"9'0"30'0"8'83'-0"
3'-0"4' HIGHMONUMENTSIGN9'0"9'-0"'-6"8-6"9'-0"2'0"20'0"7'0"1PLAN TI N G
PLANTING VANPLAY AREA3100 SF N89°26'46"W 62109'N5°50'55"W 132 54'L=17842'R=33000'=30°58'39"N53°10'26"E 19470'L=4175'R=17000'=14°0412"N67° 14'38"E10046'L=3927'R=2500'=90°0000"N2 2°45'22W 395 65'BIORETENTIONBASINEASEMENTSETBCKSETBACKEXSTCURB CUTEXISTSDEWALKEXISTCURB RAMPFHFHEXISTFIREHYDRANTRETAINING WALLPER CIVILDRAWINGSEXISTFIREHYDRANTTRASH ANDRECYCLINGENCLOSUREUNDEVELOPED LOTUNDEVELOPED LOTUNDEVELOPED LOTUNDEVELOPED LOTRV STORAGEN - GROUND NATURALLOOKING WTER FEATURE︵2 SECURE BIKELOCKERS(5) 2'x6' SHORTTERM B CYCLEPARK NG SPACESw/ PERMANENTLYANCHOREDRACKSCEEC
CEEC
CEECE
CEECE
CEECE
CEECE
CEECE
CEECE
OUTDOO PLAY AREASTEEL TBULARFENCE MINIMUM 5-0"TALLPROVIDE SIGN TOREAD:"DAYCARELOADNG &UNLOADING ONLYMONDAY-FRDAY 7:00AM - 6:00PM"1PROPOSED BUILDINGPHASE 1TYPE II-N CONSTRUCTIONFIRE SPRINKLERED2 STORIES35'-0" HIGHA-3 B OCCUPANCY︵RELIGIOUS & OFFICE ︶XXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXNSITESANA FEBLVDLA COSAAVEREAL
PALOMARCARLSB D
A IARA PKWYAIRPORTEL CAMNO ROADAL GAROADSCALENOT TOPANCHORANCHOOINSTTA LANEEL UERTE STPOINSETTIA LNEN S 5
MELROSE DR
ACI COCEANACCESSIBLE PATHOF TRAVELproject:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10: 5:54 AMDD‐1AFaith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR: 1 = 30 -0PHASE 1DD-SITEPLANFAITH COMMUNITY CHURCH5962 LA PLACE CT SUIT E 265CARLSBAD CALIFORNIA 92008Tel: 760- 930- 0400CO NT A CT : DO N MI TCHELLAPPLICANTREQUIRED PARKING: OFFICE: 1 SPACE PER 5 SEATS NUMBER OF SEATS = 292 292 / 5 = 59 OFFICE SPACESTOTAL PARKING SPACES REQUIRED = 59 SPACESPARKI NG PROVI DED: 4 DISABLED SPACES PROVIDED 8 CLEAN AIR VEHICLE SPACES PROVIDED 67 STANDARD SPACES PROVIDED 79 TOTAL SPACES PROVIDED 5 SHORT TERM BI CYCLE SPACES 2 LONG TERM BICYCLE SPACESTOTAL SQUARE FOOTAGE 19 021 SFADTs FOR CHURCH USE AT 9/1000 = 172DAY CARE WILL BE LIMITTED TO 40 CHILDRENADT s FO R DA Y CA RE AT 5/CHI LD = 200PARKING TABULATION - PHASE 11YARDS USED FOR AREA INCREASES SHALL BE PERMANENTLY MAINTAINED2THI S PROJECT SHALL COMPLY WIT H THE 2010 EDIT ION OF T HE CALI FORNIABUILDI NG CODE (CBC) T HE 2010 CA LI FO RNIA E LE CT RI CA L CO DE ( CE C) THE2010 CALIFORNIA MECHANICAL CODE (CMC) THE 2010 CALIFORNIA PLUMBINGCODE (CPC) THE 2010 CALIFORNIA FIRE CODE (CFC) IN ADDITION TO ALL THEIRRESPECTIVE 2010 CALIFORNIA AMENDMENTS AND THE CURRENT EDITION OF THECALIFORNIA ENERGY EFFICIENCY STANDARDS3NO HAZ ARDOUS MAT ERI ALS SHALL BE ST ORED AND/ OR USED IN THI S BUI LDINGIN EXCESS OF THE QUANT ITI ES LISTED IN CBC T ABLES 307 1 (1) AND 307 1 (2)4ALL PROPERTY LINES EASEMENTS STREET AND EXISTING AND PROPOSEDSTRUCTURES ARE SHOWN ON THIS SITE PLAN5A GRADING PERMIT S REQUI RED FOR T HI S PROJECT6FI RE HY DRA NT S A RE TO CO MP LY W IT H T HE CI TY ' S ENG INE ERING DE PA RT MENTSTANDARDS AND SPECIFICATIONS FOR ON-SITE FIRE HYDRANTS7ALL CURBING WHICH OUTLINES THE ACCESS ROADWAY SHALL BE PAINTED REDWHI TE 4" HI GH LETT ERING REA DI NG " NO PA RK ING - FI RE LA NE " SHA LL B E STE NCILEDEVE RY 30'- 0" ON T HE RE D CURB I F NO CURB IS P RES ENT AN 8" W IDE RED ST RI PESHALL BE PAINTED ON THE PAVEMENT THIS 8" STRIPE SHALL BE MARKED WITH4" HIGH WHITE LETTERING EXACTLY AS IF IT WERE A CURB8BACKFLOW PROTECTION OF WATER CONNECTION TO FIRE PROTECTION SYSTEMSSHALL BE PROVIDED PER UPC SECT 603 4 18SITE NOTESAPPLI CATI ON F OR SI TE DEVELOPMENT PLANADDRESS: EL FUERTE STREETCARLSBAD CALIFORNIA 92009APN: 222-600- 01- 00ZO NE : P - C (P LA NNE D CO MMUNI TY )LAND US E DE SI GNAT IO N: CF (COMMUNI TY F ACILIT Y)EXISTING USE: VACANT GRADED PADPROPOSED USE: RELIGIOUS A-3 BSITE AREA: 3 44 ACRES 149 846 S FPROPOSED BUILDING COVERAGE: 12 507 S F 8 4%PROPOSED NEW LANDSCAPE AREA: 38 100 S FEXISTING LANDSCAPE AREA: 61 637 S FTOTAL LANDSCAPE AREA: 99 737 S F 66 5%PROPOSED PAVING AREA: 37 602 S F 25 1%UTILITIES:AVERAGE WATER DEMAND: 13 GPMPEAK WATER DEMAND: 62 GPMSEWER GENERATION: 4 215 GPM AVERAGESITE INFORMATION - PHASE 1LOT 103 OF CARLSBAD TRACT NO 93-04 RANCHOCARRILLO VI LLAGE “ Q IN T HE CI TY OF CA RLSBA DCOUNTY OF SAN DIEGO STATE OF CALIFORNIAACCORDING TO MAP THEREOF NO 13551 FILED IN THEOFFICE OF THE COUNTY RECORDER OF SAN DIEGOCO UNTY MARCH 31 1998LEGAL DESCRIPTIONNORTHCARLSBAD MUNICIPAL WATER DISTRICT5950 EL CAMI NO REALCARLSBAD CALIFORNIA 92008760-602-2420CITY OF CARLSBAD WASTEWATER DIVISION5950 EL CAMI NO REALCARLSBAD CALIFORNIA 92008760-438-2722SAN MARCOS UNIFIED SCHOOL DISTRICT255 PI CO AVENUE #250SAN MARCOS CALIFORNIA 92069760-752-1289UTILITY & SCHOOL DISTRICTSKENNETH D SMI TH ARCHIT ECT & ASSOCIATES INC500 FESLER ST STE 102EL CAJON CALIFORNIA 92020Tel: 619-444-2182CO NT ACT: RO N ELLICKS ON x 231ARCHITECTVICINITY MAPDD-1A SITE PLAN- PHASE 1DD-1B SITE PLAN- PHASE 3DD-1C SITE SECTIONDD-2 PHASE 1 FIRST FLOOR PLANDD-3 PHASE 1 SECOND FLOOR PLANDD-4 PHASE 1 & 2 ROOF PLANDD-5 PHASE 1 & 2 EXTERIOR ELEVATIONSDD-6 PHASE 2 FIRST FLOOR PLANDD-7 PHASE 2 SECOND FLOOR PLANDD-8 PHASE 3 FIRST FLOOR PLANDD-9 PHASE 3 SECOND FLOOR PLANDD-10 PHASE 3 ROOF PLANDD-11 PHASE 3 EXTERIOR ELEVATIONSDD-12 PHASE 1 & 2 PERSPECTIVESDD-13 PHASE 3 PERSPECTIVESDD-14 RENDERNGSL-1 LANDSCAPE CONCEPT PLAN PHASE 1L-2 LANDSCAPE CONCEPT PLAN PHASE 1L-3 RECYCLED WATER AREA USE PHASE 1L-4 LANDSCAPE CONCEPT PLAN PHASE 2L-5 LANDSCAPE CONCEPT PLAN PHASE 2L-6 RECYCLED WATER AREA USE PHASE 2C-1 CONCEPTUAL GRADING PLANC-2 SITE DETALS & SECTIONSSHEET INDEXRevision Schedule# Date Description
EEVEVEVE
VEV26785 6970677878989910024'-0"25'3"8'6"8-6"5'-9"16'-1"9-0"9'0"216.23R A N C H O P A N C H OE L F U E R T E S T R E E T42'0"'6"
17'-0"2'0"17'-0"
17'-0"24'-0"17'-0"7-0"9-0"8-6"0'0"
0
ABANDONED 50'030'0"20'-0'0"'0"'0"30'0"8'83'-0"
3'-0"4' HIGHMONUMENTSGN9'-0"9-0"8-6"8'-6"9'-0"24'0"20'0"17'0"1PL ANTI NG
PLANTI NG VANPLAY AREA3100 SF N8926'46"W 62109'N5°50'55"W 13254'L=17842'R=33000'=30°5839"N53°1026"E 19470
L=4175'R=17000'=14°04'12"N67° 14'38E10046'L=3927'R=2500'=90°00'00"N 22°45'22 W 395 6 5'BORETENTIONBASNEASEMENTSETBACKSETBACKEXISTCURB CUTEXSTSIDEWALKEXSTCURB RAMPFHFHEXISTFIREHYDRANTRETAINNG WALPER CIVILDRAWINGSEXISTFIREHYDRANTTRASH ANDRECYCLINGENCLOSUREUNDEVELOPED LOTUNDEVELOPED LOTUNDEVELOPED LOTUNDEVELOPED LOTRV STORAGEIN - GRUND NATURALLOOKIN WATER FEATURE︵2 SECURE BKELOCKERS(5) 2 x6' SHORTTERM BICYCLEPARKING SPACESw/ PERMANENTLYANCHOREDRACKSCEEC
CEECE
CEECE
CEECE
CEECE
CEECE
CEEC
CEECE
OUTDOO PLAY AREASTEEL TBULARFENCE MINIMUM 5'-0"TALLPROVIDE SIGN TOREAD:"DAYCARELOADING &UNLOADING ONLYMONDAY-FRIDAY 700AM - 6:00PM"1PROPOSED BUILDINGPHASE 3TYPE III-N CONSTRUCTIONFIRE SPRNKLERED2 STORIES35'-0" HIGHA-3 B OCCUPANCY︵RELIGOUS & OFFICE ︶XXXXXXXXXXXXXXXXXXXXXXXXX X X
XXXXXXXNSITESANA FEBLVDLA COSAAVEREAL
PALOMARCARLSBAD
AVIARA
PK WYAIRPORTEL CAMINO ROADAL GA
ROADSCALENOT TOPANCHORANCHOPOINETTA LANEEL FUERTE ST
POINSETTIA LNE
N S
MELROSE DR
ACI COCEA NACCESSIBLE PATHOF TRAVELproject:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10: 5:54 AMDD‐1BFaith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR: 1 = 30 -0PHASE 3DD-SITEPLAN1YARDS USED FOR AREA INCREASES SHALL BE PERMANENTLY MAINTAINED2THI S PROJECT SHALL COMPLY WIT H THE 2010 EDIT ION OF T HE CALI FORNIABUILDI NG CODE (CBC) T HE 2010 CA LI FO RNIA E LE CT RI CA L CO DE ( CE C) THE2010 CALIFORNIA MECHANICAL CODE (CMC) THE 2010 CALIFORNIA PLUMBINGCODE (CPC) THE 2010 CALIFORNIA FIRE CODE (CFC) IN ADDITION TO ALL THEIRRESPECTIVE 2010 CALIFORNIA AMENDMENTS AND THE CURRENT EDITION OF THECALIFORNIA ENERGY EFFICIENCY STANDARDS3NO HAZ ARDOUS MAT ERI ALS SHALL BE ST ORED AND/ OR USED IN THI S BUI LDINGIN EXCESS OF THE QUANT ITI ES LISTED IN CBC T ABLES 307 1 (1) AND 307 1 (2)4ALL PROPERTY LINES EASEMENTS STREET AND EXISTING AND PROPOSEDSTRUCTURES ARE SHOWN ON THIS SITE PLAN5A GRADING PERMIT IS REQUI RED FOR T HI S PROJECT6FI RE HY DRA NT S A RE TO CO MP LY W IT H T HE CI TY ' S ENG INE ERING DE PA RT MENTSTANDARDS AND SPECIFICATIONS FOR ON-SITE FIRE HYDRANTS7ALL CURBING WHICH OUTLINES THE ACCESS ROADWAY SHALL BE PAINTED REDWHI TE 4" HI GH LETT ERING REA DI NG " NO PA RK ING - FI RE LA NE " SHA LL B E STE NCILEDEVERY 30 -0" ON T HE RED CURB I F NO CURB IS PRESENT AN 8" WIDE RED ST RI PESHALL BE PAINTED ON THE PAVEMENT THIS 8" STRIPE SHALL BE MARKED WITH4" HIGH WHITE LETTERING EXACTLY AS IF IT WERE A CURB8BACKFLOW PROTECTION OF WATER CONNECTION TO FIRE PROTECTION SYSTEMSSHALL BE PROVIDED PER UPC SECT 603 4 18SITE NOTESREQUIRED PARKING: OFFICE: 1 SPACE PER 5 SEATS NUMBER OF SEATS = 500 500 / 5 = 100 OFFICE SPACESTOTAL PARKING SPACES REQUIRED = 100 SPACESPARKI NG PROVI DED: 4 D SABLED SPACES PROVIDED 8 CLEAN AIR VEHICLE SPACES PROVIDED 88 STANDARD SPACES PROVIDED 100 TOTAL SPACES PROVIDED 5 SHORT TERM BICYCLE SPACES 2 LONG TERM BICYCLE SPACESTOTAL SQUARE FOOTAGE 34308ADTs FOR CHURCH USE AT 9/1000 = 309DAY CARE WILL BE LIMITTED TO 45 CHILDRENADT s FOR DAY CA RE AT 5/CHILD - 225PARKING TABULATION - PHASE 2FAITH COMMUNITY CHURCH5962 LA PLACE CT SUIT E 265CARLSBAD CALIFORNIA 92008Tel: 760- 930- 0400CO NT A CT : DO N MI TCHELLAPPLICANTLOT 103 OF CARLSBAD TRACT NO 93-04 RANCHOCARRILLO VILLAGE “Q IN THE CITY OF CARLSBADCOUNTY OF SAN DIEGO STATE OF CALIFORNIAACCORDING TO MAP THEREOF NO 13551 FILED IN THEOFFICE OF THE COUNTY RECORDER OF SAN DIEGOCO UNTY MARCH 31 1998LEGAL DESCRIPTIONAPPLICATION FOR SITE DEVELOPMENT PLANADDRESS: EL FUERTE STREETCARLSBAD CALIFORNIA 92009APN: 222-600- 01- 00ZO NE : P - C (P LA NNE D CO MMUNI TY )LAND US E DE SI GNAT IO N: CF (COMMUNI TY F ACILIT Y)EXISTING USE: VACANT GRADED PADPROPOSED USE: RELI GIOUS A-3 BSITE AREA: 3 44 ACRES 149 846 S FPROPOSED BUILDING COVERAGE: 21 696 S F 14 5%PROPOSED NEW LANDSCAPE AREA: 39 942 S FEXISTING LANDSCAPE AREA: 50 606 S FTOTAL LANDSCAPE AREA: 90 548 S F 60 4%PROPOSED PAVING AREA: 37 602 S F 25 1%UTILITIES:AVERAGE WATER DEMAND: 13 GPMPEAK WATER DEMAND: 62 GPMSEWER GENERATION: 4 215 GPM AVERAGESITE INFORMATION - PHASE 2KENNETH D SMITH ARCHITECT & ASSOCIATES INC500 FESLER ST STE 102EL CAJON CALIFORNIA 92020Tel: 619-444-2182CO NT ACT: RO N ELLICKS ON x 231ARCHITECTCARLSBAD MUNICIPAL WATER DISTRICT5950 EL CAMI NO REALCARLSBAD CALIFORNIA 92008760-602-2420CITY OF CARLSBAD WASTEWATER DIVISION5950 EL CAMI NO REALCARLSBAD CALIFORNIA 92008760-438-2722SAN MARCOS UNIFIED SCHOOL DISTRICT255 PI CO AVENUE #250SAN MARCOS CALIFORNIA 92069760-752-1289UTILITY & SCHOOL DISTRICTSVICINITY MAPNORTHRevision Schedule# Date Description
S 0 180190200210220180190200210220230230EXISTING GROUNDPROPOSED 6" CURBPROPOSED PARKING& DRI VE ISLEPROPOSED 6" CURBEXISTING GROUNDPROPOSED BUILDINGF F 196 00PROPOSED PARKING& DRI VE ISLEPROPOSED 6"CURBDAYLIGHTXSTING SLOPEPROP LI NEPROP LI NEBIORETENTION BASINF S 193 00STREETSTREETEXISTING SLOPEDAYLIGHTPROPOSEDRETAINING WALL30' - 0"project:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10: 5:55 AMDD‐1CFaith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR: 1 = 20'-0SITESECTIONRevision Schedule# Date Description
WHUPDNDD-53DD-5DD-5DD-512A39DBCLASSROOM113CLASSROOM116MEN120WOMEN121KITCHEN110OFFICE109WORK108BACKSTAGE105GREEN104CRY103CLASSROOM118CLASSROOM115OFFICE107RESTROO1142222222222222222222220181128292 SEATS164' - 0 3/ 4"2' - 6"9' - 5 1/2"4' - 4 /4"84' - 0 3 4"' - 6"22' - 62' - 6"23' - 6"2' - 623' - 6"2' - 6"23 6"2' - 6"58' - 6 3/4"14' - 11 3/ 4"60' - 3 1/2"27' - 1 3/4"1' - 3 7 8"8' - 3 1/ "51' - 4 1/4"2 - 2 1/4"612' - 8"4' - 0"21' - 6"6' - 6"11' - 620' - 0"23' - 6"0' - 8 1/2"SANCTUARY10215' - 8 1/4"38' - 0"37' - 8"72' - 0"0' - 8 1/2"THIS ROOM TO BE USEDFOR DAY CARE ANDSUNDA Y SCHOOLTHIS ROOM TO BE USEDFOR DAY CARE ANDSUNDA Y SCHOOLTHIS ROOM TO BE USEDFOR DAY CARE ANDSUNDA Y SCHOOLTHIS ROOM TO BE USEDO D C E DSUNDA Y SCHOOL27584C1EHALL119HALL106HALL11114' - 11 3/ 4"67 - 4 3/8"8' - 8"73' - 0 3/4"84' - 5"4' - 0"2' - 6"14' - 3"2' - 6"14' - 3"2' - 6"14' - 3"2' - 6"35' - 8"4" to 6" underground conduitr om s ound boot h t o st age100' - 4 1/2"STAIR101APASS THROUGH OPENABLEWINDOW ROLL-UP SHUTTERIS MORE MONEYREFR SPACESJANITOR123PANTRY22REFR SPACESELECTRICALSERVICE2' - 6"12' - 5 3/ "7' - 6 /4"2' - 620 0"2' 6"19' 11 3/ 4"2 - 6"20 - 0 1' " - 4 1 2"6' - 0"4' - 0"6' - 0"5' - 6"6' - 0"4' - 0"6' - 0"5' - 6"6' - 0"4' - 0"6' - 0"3' - 11 7 8"3' - 8"3' - 4"1' - 8"13' - 9 1/4"6' - 4"3' 86' - 4"12' - 8"6' - 4"3 - 86' - 4"13' - 11 1 2"0' - 8 1/2"0' - 8 1/2"0' - 8 1/2"0' - 8 1 2"0' - 1/2"19' - 3 1 4"3' - 4"4' - 11 3/ 8"6' - 0"6' - 0"6' - 0"4' - 8 7 8"6' - 0 5/8"6' - 0"6' - 3 3/ "6' - 0"4' - 1 1 4"13' - 7 3/ "6' - 4"13' - 10"6' - "3' - 8"6' - 4"10' - 2 1/4"16' - 2 1/4"6' - 4"3' - 8"6' - 4"18' - 8"6' - 4"3' - 8"6' - 4"16' - 6 1 2"0' - 4 1/4"0' - 5"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"0' - 5"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"' - 0"1' - 0"0' - 5"3' - 4 1 4"6' - 0"3' - 5"3' - 4"3' - 5"6' - 0"3' - 5"3' - 4"3' - 5"6' - 0"3' - 5"3' - 4"3' - 5"6' - 0"2' - 113' - 4"6' - 2"3' - 4"10' - 9 3 4"CONCRETE TILT-UP PANELS w/ 1/2" PANEL GAPS4" NOM STUD WALL (3 5/8" METAL or 2x4 WOOD)SEE NOTES BELOW4" NOM STUD WALL w/ R-13 INSULATION BATTS6" NOM STUD WALL (6" METAL or 2x6 WOOD)SEE NOTES BELOW6" NOM STUD WALL w/ R 19 INSULATION BATTSNOTES:•ALL NON STRUCTURAL WALLS SHALL BE METAL STUDS PER DETAILSREFERENCED U N O•ALL DIMENSIONS TO STUD WALLS ARE TO BE TO FACE OF STUD U O N•SEE STRUCTURAL FOUNDATION PLAN FOR LOCATIONS OF ANY STRUCTURALWALLS•IF THE ALLOWABLE WALL HEIGHT TABLE REQUIRES A LARGER STUDSECTION THE TABLE SHALL GOVERNWALL LEGENDproject:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10: 5:56 AMDD‐2Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR: 3/32 = 1'-0PHASE 1FIRSTFLOORPLANSQUARE FOOTAGE PHASE 1 (DD)FIRST FLOOR PHASE 1 & 2 12507 SFFIRST FLOOR 1 12507 SFSECOND FLOOR PHASE 1 & 26139 SFSECOND FLOOR 1 6139 SFGrand total18646 SFNORTHRevision Schedule# Date Description
COLORCOLORCOLORBBBDCOLORAAAA4 SIDES4 SIDES4 S DES4 SIDESDBDDDCOLORCOLORCOLORCOLORBDCOLORBA4 SIDESCOLORA4 SIDESCOLORA4 SIDESA4 SIDESCOLORCOLORCOLORBDCOLORBDPHASE 1 SIGNCOLORDDBBBDBDCOLORA4 SIDESA4 S DESA4 SIDESA4 SIDESCOLORCOLORCOLORCOLORCOLORCOLORCOLOCOLORBproject:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10:20:55 AMDD‐5Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR: 1/8 = 1'-0PHASE 1EAST 1/8 = 1'-0PHASE 1NORTH 1/8 = 1' 0PHASE 1SOUTH 1/8 = 1'-0PHASE 1WESTDE6215 WOODEN PEGEXTERIOR PAINT :APPLY ONE COAT W6232 PRIMER AND TWO COATS W704A WALL SURF ACE INSPECT ION BY A REPRESENT AT IVE OF THE PAINTMANUFACTURER IS RECOMMENDED PRIOR TO PAINT APPLICATIONPERSONNEL DOORS AND ROLL-UP DOORS ARE TO BE PAINTED TO MATCHADJACENT WALL COLORS U N OPROVIDE A PAINT MOCK-UP (APPROX 20FT WIDE X FULL PANEL HEIGHT) FORAPPROVAL BY THE OWNER PRIOR TO BULK PAINT ORDERABDE6220 POROUS STONEDDE6229 CALICO ROCKCNOT USEDRevision Schedule# Date Description
DNCONCRETE TILT-UP PANELS w/ 1/2" PANEL GAPS4" NOM STUD WALL (3 5/8" METAL or 2x4 WOOD)SEE NOTES BELOW4" NOM STUD WALL w/ R 13 INSULATION BATTS6" NOM STUD WALL (6" METAL or 2x6 WOOD)SEE NOTES BELOW6" NO M ST UD W ALL w/ R-19 INSULAT I ON BAT T SNOTES:•ALL NON STRUCTURAL WALLS SHALL BE METAL STUDS PER DETAILSREFERENCED U N O•ALL DIMENSIONS TO STUD WALLS ARE TO BE TO FACE OF STUD U O N•SEE STRUCTURAL FOUNDATION PLAN FOR LOCATIONS OF ANY STRUCTURALWALLS•IF THE ALLOWABLE WALL HEIGHT TABLE REQUIRES A LARGER STUDSECTION THE TABLE SHALL GOVERNWALL LEGEND3DD-5DD-5DD-512A39DB627584C1E17171171111711711711711717171171171717131313ATTIC201OPEN14' - 11 3/ 4"149' - 1"11' - 11 1/2"4' - 4 1/4"84' - 0 3/4"12' - 8"4' - 0"21' - 6"6' - 6"11' - 6"20' - 0"23' - 6"0' - 8 1/2"0' - 8 1/2"38' - 0"37' - 8"72' - 0"0' - 8 1/2"14' - 11 3/ 4"67 - 4 3 88' 8"73' - 0 3/4"52' - 0 3/4"88' - 9"8' - 3 1/ "A7.1337' - 6 1/2"6' - 0"6' - 0"6' - 0"9' - 0"6' - 0"6' - 0"6' - 0"6' - 2 1/2"13' - 7 3/ "6' - 4"13' - 10"6' - "3' - 8"6' - 4"10' - 2 1 4"2' - 2 1 4"0' - 7 1/2"1' - 3"1' - 3"1' - 3"1' - 3"1' - 3"1' - 3"1' - 3"1' - 3"1' - 3"1' - "1 - 3"1' - 3"1' - 31' - 3" - 3"1' - 3"1' - 3"1' - "1 - 3"1' - 3"1' - 3"1' - "MECHANICAL DUCT (TYP)OPEN100' - 4 1/2"16' - 2 1/4"6' - 4"3' - 8"6' - 4"18' - 8"6' - 4"3' - 8"6' - 4"16' - 6 1 2"164' - 0 3/ 4"4' - 4 1 2"6' - 0"4' - 0"6' - 0"5' - 6"6' - 0"4' - 0"6' - 0"5' - 6"6' - 0"4' - 0"6' - 0"3' - 11 7 8"4' - 6"2' - ' - 8"13' - 9 1 4"6' - 4"3' - 8"6' - 4"12' - 8"6' - 4"3' - 8"6' - 4"13' - 11 1 2"84' - 5"3' - 4 1 4"6' - 0"10' - 2"6' - 0"10' - 2"6' - 0"10' - 2"6' - 0"26' - 6 3 4"0' - 7 1/2"0' - 7 1/2"project:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10: 5:57 AMDD‐3Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR:NORTH 3/32 = 1-0PHASE 1SECONDFLOORPLANRevision Schedule# Date Description
DD-53DD-5DD-5DD-512A39DB627584C1E22' - 8 1/222' - 722' - 722' - 722' - 722' - 8 1/222' - 8 1/222' - 8 1/22 ' - 02 ' - 022' - 8 1/222' - 722' - 7164' - 0 3/ 4"11' - 11 1/2"4' - 4 1 4"84' - 0 3/4"12' - 8"4' - 0"21' - 6"6' - 6"11' - 6"20' - 0"23' - 6"0' - 8 1 2"15' - 8 1 4"38' - 0"37' - 8"72' - 0"0' - 8 1 2"14' - 11 3/ 4"67' - 4 3/8"8' - 8"73' - 0 3 4"84' - 5"4' - 0"100' - 4 1 2"164' - 0 3/ 4"CRICKET AS REQUIREDCRICKET AS REQUIRED32' - 028' - 6 TOW28' - 6 TOW28' - 6 TOW28' - 6 TOW28' - 6 TOW26' - 0 5/8R DGESLOPESLOPEROOF HATCHproject:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10: 5:57 AMDD‐4Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR: 3/32 = 1-0PHASE1&2ROOFPLANCOATED FOAM ROOFING1THE ROOFING SYSTEM SHALL BE SPRAYED POLYURETHANE FOAM APPLIED ATA MINIMUM THICKNESS OF 1 1/2" WITH PROTECTIVE COATING2FOAMBASE: "FOAM ENTERPRISE LLC " (U L 790) TWO COMPONENT R GIDCLASS POLYURETHANE FOAMNORMAL DENSITY: 2 8 LB/CU FT WHEN TESTED PER ASTM D 1622CLOSED CELL CONTENT: 90 PERCENT WHEN TESTED PER ASTM D 2856COMPRESSIVE ST RENGTH: 40 t o 60 PSI WHEN T ESTED PER ASTM D 1621R-VALUE: 6 20 (1 1/2" THICK = R-9)K-FACTOR: 15 BTU/HR /S F /deg F AS MEASURED PER ASTM C 177 or C 5183PROTECTIVE COATING ACRON 60 ROOF COATING SYSTEM BY UNITEDCOATINGS INC MINIMUMCOATING THICKNESS AT ANY POINT ON THE ROOFSHALL BE MIN 28 DRY MI LS PROVIDE GRANULES INTHE TOP COAT AT A RATERECOMMENDED BY THE ROOFING SYSTEM MANUFACTURER GRANULESSHALL BE 3M NUMBER 11 QUARTZ GRANULE OR EQUAL APPLICATOR SHALLBE CURRENTLY APPROVED AND LICENSED BY "UNITED COATINGS"4ROOFING CLASSIFICATION:CLASS 'B' AT COMBUSTIBLE DECKSCLAS S ' A' A T NON- CO MB US T IB LE DE CK S5WHERE A CLASS 'A' ROOF I S REQUIRED AT COMBUSTI BLE DECKS PROVIDE1/4" GEORGIA-PACIF C DENSDECK OVER THE PLYWOOD DECK USINGAMERI GLUE AT A RAT E OF 1 GALLON PER 100 S F ST AGGER JOI NT S FROM T HEDECK JOINTS PER MANUFACTURER'S SPECIFICATIONS6COOL ROOF RATING COUNCIL PRODUCT LISTING FOR ACRON 60 ROOFCOATI NG SYST EM BY " UNIT ED CO AT INGS I NC " : 0614- 00067ICC EVALUATION SERVICE INC : ER-55138SEE THE MANUFACTURER'S SPECIFICATIONS FOR COMPLETE PRODUCT &INSTALLMENT REQUIREMENTSNORTHRevision Schedule# Date Description
UPWHUPDNA39DB627584C1E22222222222222222222201814128292 SEATSTHIS ROOM TO BE USEDFOR DAY CARE ANDSUNDA Y SCHOOLTHIS ROOM TO BE USEDFOR DAY CARE ANDSUNDA Y SCHOOLTHIS ROOM TO BE USEDFOR DAY CARE ANDSUNDA Y SCHOOLTHIS ROOM TO BE USEDFOR DAY CARE ANDSUNDA Y SCHOOLEX.CLASSROOM113EX.CLASSROOM116EXWOMEN121EX.KITCHEN110EX.OFFICE109EX. WORK108EX. BACKSTAGE105EX.GREEN104EX. CRY03EX.CLASSROOM118EX.CLASSROOM115EX. HALL111EX.OFFICE107EXRESTROOM114FUTURERESTROOM117EX.SANCTUARY102EX.LOBBY101EX. HA L119EX. HALL106NEWEQUIP.RM.112ANEWE EVATOR1122' - 2 1 4"EX. STAIR101A2.5164' - 0 3/ 4"2' - 69' - 5 1 2"4' - 4 1 4"84' - 0 3/4"2' - 6"22' - 6"2' - 6"23' - 6"2' - 6"23' - 6"2' - 6"23' 6"2' - 6"58' - 6 3/4"14' - 11 3/ 4"0' - 3 1/2"27' - 1 3/4"1' - 3 7/8"8' - 3 1/4"5 ' - 4 1/4"2' - 2 1 4"12' - 8"4' - 0"21' - 6"6' - 6"11' - 620' - 0"23' - 6"0' - 8 1/2"15' - 8 1/4"38' - 0"37' - 8"72' - 0"0' - 8 1/2"14' - 11 3/ 4"67 - 4 3 8"8' - 8"73' - 0 3/4"84' - 5"4' - 0"2' - 6"14' - 3"2' - 6"14' - 3"2' - 6"14' - 3"2' - 6"35' - 8"100' - 4 1 2"2' - 6"12' - 5 3/4"7' - 6 1/4"2' - 6"20' - 0"2' - 6"19' - 1 3/ 4"2' - 6"0' - 0 1/' "67' - 4 3 8"3' - 8"3' - 4"1' - 8"13' - 9 1/4"6' - 4"3 - 86' - 4"12' - 8"6' - 4"3' 86' - 4"13' - 11 1/ 2"0' - 8 1/2"0' - 8 1/2"0' - 8 1/2"0' - 8 1/2"0' - 1/2"19' - 3 1/4"3' - 4"14' - 11 3/ 8"6' - 0"6' - 0"6' - 0"4' - 8 7/8"6' - 0 5/8"18' - 3 3/ "4' - 1 1/4"13' - 7 3/4"6' - 4"13' - 10"6' - 4"3' - 8"6' - 4"10' - 2 1/4"16' - 2 1/4"6' - 4"3' - 8"6' - 4"18' - 8"6' - 4"3' - 8"6' - 4"16' - 6 1/2"0' - 4 1 4"0' - 5"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"' - 0"1' - 0"1' - 0"1' - 0"1' - 0"0' - 5"1' - 0"1' - 0"1' - 0"1' - 0"1' - 01' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"0' - 5"EX.PANTRY122EX. JAN.123EX. MEN1203' - 4 1/4"6' - 0"3' - 5"3' - 4"3' - 5"6' - 0"3' - 5"3' - 4"3' - 5"6' - 0"3' - 5"3' - 4"3' - 5"6' - 0"2' - 113' - 4"6' - 2"3' - 4"10' - 9 3 4"EXISTING CONCRETE WALLEXISTING 4" NOM STUD WALLEXISTING 6" NOM STUD WALLNOTES:•ALL NON STRUCTURAL WALLS SHALL BE METAL STUDS PER DETAILSREFERENCED U N O•ALL DIMENSIONS TO STUD WALLS ARE TO BE TO FACE OF STUD U O N•SEE STRUCTURAL FOUNDATION PLAN FOR LOCATIONS OF ANY STRUCTURALWALLS•IF THE ALLOWABLE WALL HEIGHT TABLE REQUIRES A LARGER STUDSECTION THE TABLE SHALL GOVERNWALL LEGENDNEW 4" NOM STUD WALL w/ R-13 INSULATION BATTSNEW 6" NOM STUD WALL w/ R-13 INSULATION BATTSNEW 6" NOM STUD WALL (6" METAL or 2"x 6" WOOD)SEE NOTES BELOWNEW 4" NOM STUD WALL (4" METAL or 2"x 4" WOOD)SEE NOTES BELOWproject:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10: 5:59 AMDD‐6Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR:NORTH 3/32 = 1-0PHASE 2FIRSTFLOORPLANSQUARE FOOTAGE PHASE 2 (DD)FIRST FLOOR PHASE 1 & 2 12507 SFFIRST FLOOR 112507 SFSECOND FLOOR PHASE 1 & 26139 SFSECOND FLOOR 16139 SFGrand total18646 SFRevision Schedule# Date Description
DNDNEXISTING CONCRETE WALLEXISTING 4" NOM STUD WALLEXISTING 6" NOM STUD WALLNOTES:•ALL NON STRUCTURAL WALLS SHALL BE METAL STUDS PER DETAILSREFERENCED U N O•ALL DIMENSIONS TO STUD WALLS ARE TO BE TO FACE OF STUD U O N•SEE STRUCTURAL FOUNDATION PLAN FOR LOCAT ONS OF ANY STRUCTURALWALLS•IF THE ALLOWABLE WALL HEIGHT TABLE REQUIRES A LARGER STUDSECTION THE TABLE SHALL GOVERNWALL LEGENDNEW 4" NOM STUD WALL w/ R-13 INSULATION BATTSNEW 6" NOM STUD WALL w/ R-13 INSULATION BATTSNEW 6" NOM STUD WALL (6" METAL or 2"x 6" WOOD)SEE NOTES BELOWNEW 4" NOM STUD WALL (4" METAL or 2"x 4" WOOD)SEE NOTES BELOWA39DB627584C1EOFFICE201CLASSROOM202CLASSROOM203MEN204WOMEN205STORAGE206KITCHEN207CONFERENCE208WORKROOM209OFFICE2 0WORKROOM209 - 5OPEN14' - 11 3/ 4"149' - 1"11' - 11 1/2"' - 4 1/4"84' - 0 3/4"12' - 8"4' - 0"21' - 6"6' - 6"11' - 6"20' - 0"23' - 6"0' - 8 1 2"0' - 8 1/2"38' - 0"37' - 8"72' - 8 1/2"14' - 11 3/ 4"' - 4 3 88' 8"73' - 0 3 4"52' - 0 3 4"88' - 9"8' - 3 1 4"37' - 6 1/2"6' - 0"6' - 0"6' - 0"9' - 0"6' - 0"6' - 0"6' - 0"6' - 2 1 2"13' - 7 3 4"6' - 4"13' - 10"6' - 4"3' - 8"6' - 4"10' - 2 1 4"2' - 2 1 4"0' - 7 1/2"1' - 3"1' - 3"1' - 3"1' - 3"' - 3"1' - 3"1' - 3"1' - 3"1' - 3"1' - "1 - 3"1' - 3"1' - 3"1' - 3"1 - 3"1' - 3"1' - 3"1' - "1 - 3"1' - 3"1' - 3"1' - "100' - 4 1/2"16' - 2 1/4"6' - 4"3' - 8"6' - 4"18' - 8"6' - 4"3' - 8"6' - 4"16' - 6 1 2"164' - 0 3/ "4' - 4 1/2"6' - 0"4' - 0"6' - 0"5' - 6"6' - 0"4' - 0"6' - 0"5' - 6"6' - 0"4' - 0"6' - 0"3' - 11 7/8"4' - 6"2' - 1' - 8"13' - 9 1 4"6' - 4"3' - 8"6' - 4"12' - 8"6' - 4"3' - 8"6' - 4"13' - 1 1/ 2"84' - 5"3' - 4 1 4"6' - 0"10' - 2"6' - 0"10' - 2"6' - 0"10' - 2"6' - 0"26' - 6 3 4"0' - 7 1/2"0' - 7 1/2"project:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10: 5:59 AMDD‐7Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR:NORTH 3/32 = 1'-0PHASE 2SECONDFLOORPLANRevision Schedule# Date Description
UPWHUPEXISTING CONCRETE WALLEXISTING 4" NOM STUD WALLEXISTING 6" NOM STUD WALLNOTES:•ALL NON STRUCTURAL WALLS SHALL BE METAL STUDS PER DETAILSREFERENCED U N O•ALL DIMENSIONS TO STUD WALLS ARE TO BE TO FACE OF STUD U O N•SEE STRUCTURAL FOUNDATION PLAN FOR LOCATIONS OF ANY STRUCTURALWALLS•IF THE ALLOWABLE WALL HEIGHT TABLE REQUIRES A LARGER STUDSECT ON THE TABLE SHALL GOVERNWALL LEGENDNEW 4" NOM STUD WALL w/ R-13 INSULATION BATTSNEW 6" NOM STUD WALL w/ R-13 INSULATION BATTSNEW 6" NOM STUD WALL (6" METAL or 2"x 6" WOOD)SEE NOTES BELOWNEW 4" NOM STUD WALL (4" METAL or 2"x 4" WOOD)SEE NOTES BELOWNEW CO NCRETE WALLA39DBDD-112DD-111DD-11315142242423222221212019237212224242423222221202019262500 SEATSGREEN152METERRM153amp up 18"sound6A'SANCTUARY151LOBBY154WOMEN157MEN15627584C1EFELLOWSHIP(RENAMED)10212' - 8"4 - 0"21' - 6"6' - 6"11' - 6"20' - 0"23' - 6"0' - 8 1/2"1'2'NEWOFFICE124EX. STAIR101AEX.CLASSROOM113EX.CLASSROOM115EX.CLASSROOM116EX.CLASSROOM118FUT.RSTRM117EX.RSTRM114EEQUIP.RM.112AEXE EVATOR112EX. HALL111EX.KITCHEN110EX.LOBBY101EX. MEN120EX.WOMEN121EX.OFFICE109EX. WORK108EX.OFFICE107EX. HALL125EX. STAIR1 ADEMOSTAGEWALLS ANDST AI RS2.5109' - 0 5 8"2' - 2 1 4"164' - 0 3/ 4"100' - 9 1/ 4"2' - 69' - 5 1 2"4' - 4 1 4"84' - 0 3/4"2' - 6"22' - 6"2' - 6"23' - 6"2' - 6"23' - 6"2' - 6"23' 6"2' - 6"58' - 6 3/4"15' - 9"2' - 6"18' - 6"2' - 6"61' - 6 1 4"14' - 11 3/ 4"0' - 3 1/2"27' - 9 1/8"8' - 11 3/4"52' - 0 3 4"27' - 7 7/8"9' - 1 1/8"0' - 3 3/8"18' - 4 5/8"7' - 9"17' - 7 1/4"2' - 2 1 4"15' - 8 1/4"38' - 0"37' - 8"72' - 0"1 0' - 9 1/ 4"0' - 8 1/2"14' - 11 3/ 4"67 - 4 3/8"8' - 8"73' - 0 3/4"21' - 0 1/4"65 - 8 1 4"8' - 11 7/8"5' - 0 7/8"84' - 5"4' - 0"2' - 6"14' - 3"2' - 6"14' - 3"2' - 6"14' - 3"2' - 6"35' - 8"100' - 4 1 2"2' - 6"12' - 5 3/4"7' - 6 /4"2' - 620' 0"2' "19' 11 3/ 4"2 - 6"20 - 0 1/' "' - 4 1/2"6' - 0"4' - 0"6' - 0"5' - 6"6' - 0"4' - 0"6' - 0"5' - 6"6' - 0"4' - 0"6' - 0"3' - 11 7 8"3' - 8"3' - 4"' - 8"13' - 9 1/4"6' - 4"' - 8"6' - 4"12' - 8"6' - 4"' 86' - "13' - 11 1/ 2"13' - 2 1/4"3' - "4' - 6"25' - 3 1/8"6' - 4"12' - 0"6' - 4"15' - 9 1/8"0' - 8 1/2"0' - 8 1/2"0' - 8 1/2"0' - 8 1/2"0' - 1/2"19' - 3 1 4"3' - 4"1 ' - 11 3/ 8"6' - 0"6' - 0"6' - 0"4' - 8 7/8"6' - 0 5/8"6' - 0"6' - 3 3/4"6' - 0"3' - 4 3/4"14' - 4 1/4"6' - 4"13' - 10"6' - 4"3' - 8"6' - 4"10' - 2 1/4"7' - 6 1 2"3' - 4"16' - 9 3/8"84' - 0 3/4"0' - 5"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0"0' - 5"5' - 6"6' - 9 5/8"5' - 6"5' - 0"72' - 10 3 4"8' - 3 3 8"5' - 0 7/8"2' - 6"3' - 0"2' - 6"10' - 1 1/8"4' - 8 1/2"2' - 2 1 4"0' - 5"35' - 10 1/2"6' - 4"11' - 10"6' - 4"12' - 6 1/4"REMOVE EXISTING WALLDEMO RAMP2' - 10 1/2"Room22Room1233' - 4 1/4"6' - 0"3' - 5"3' - 4"3' - 5"6' - 0"3' - 5"3' - 4"3' - 5"6' - 0"3' - 5"3' - 4"3' - 5"6' - 0"2' - 113' - 4"6' - 2"3' - 4"10' - 9 3/4"project:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10: 6:01 AMDD‐8Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR: 3 32 = 1'-0PHASE 3FIRSTFLOORPLANSQUARE FOOTAGE PHASE 3 (DD)FIRST FLOOR PHASE 1 & 212507 SFFIRST FLOOR PHASE 39189 SFFIRST FLOOR 221697 SFSECOND FLOOR PHASE 1 & 26139 SFSECOND FLOOR PHASE 36146 SFSECOND FLOOR 212285 SFGrand total33981 SFNORTHRevision Schedule# Date Description
DNDA39DBDD-112DD-111DD-1136OFFICE250CLASSROOM251CLASSROOM252CLASSROOM253CLASSROOM254STORAGE256A'27584C1EHALL3111'2'2 5OFFICE208EX.OFFICE201CONFERENCE202EX.CLASSROOM203MEN204WOMEN205EXSTORAGE206EX.OFFICE210WORK207HALL311OPENSTORAGE255KITCHEN257OFFICE258EXISTING CONCRETE WALLEXISTING 4" NOM STUD WALLEXISTING 6" NOM STUD WALLNOTES:•ALL NON STRUCTURAL WALLS SHALL BE METAL STUDS PER DETAILSREFERENCED U N O•ALL DIMENSIONS TO STUD WALLS ARE TO BE TO FACE OF STUD U O N•SEE STRUCTURAL FOUNDATION PLAN FOR LOCATIONS OF ANY STRUCTURALWALLS•IF THE ALLOWABLE WALL HEIGHT TABLE REQUIRES A LARGER STUDSECTION THE TABLE SHALL GOVERNWALL LEGENDNEW 4" NOM STUD WALL w/ R-13 INSULATION BATTSNEW 6" NOM STUD WALL w/ R-13 INSULATION BATTSNEW 6" NOM STUD WALL (6" METAL or 2"x 6" WOOD)SEE NOTES BELOWNEW 4" NOM STUD WALL (4" METAL or 2"x 4" WOOD)SEE NOTES BELOWNEW CO NCRETE WALLproject:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10: 6:02 AMDD‐9Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR: 3/32 = 1'-0PHASE 3SECONDFLOORPLANNORTHRevision Schedule# Date Description
A39DBDD-112DD-1116-A'22 ' - 02 ' - 020' - 1020' - 107584C1E1'2'2.5-3' - 028' - 6 TOW28' - 6 TOWRIDGESLOPESLOPESLOPECRICKET AS REQUIRED164' - 0 3/ 4"6' - 1 1/2"2' - 6 5/8"12' - 8"2' - 2"1' - 10"21' - 6"6' - 6"11' - 6"20' - 0"23' - 6"0' - 8 1 2"15' - 8 1/4"8' - 0"7' - 8"72' - 0"100' - 9 1/ 4"0' - 8 1 2"14' - 11 3/ 4"67' - 4 3/8"8' - 8"73' - 0 3/ "21' - 0 1 4"65' - 8 1/4"14' - 0 3/4"84' - 5"4' - 0"109' - 0 5 8"164' - 0 3/ 4"100' - 9 1/ "project:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10: 6:02 AMDD‐10Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR: 3/32 = 1'-0PHASE 3ROOFPLANCOATED FOAM ROOFING1THE ROOFING SYSTEM SHALL BE SPRAYED POLYURETHANE FOAM APPLIED ATA MINIMUM THICKNESS OF 1 1 2" WITH PROTECTIVE COATING2FOAMBASE: "FOAM ENTERPRISE LLC " (U L 790) TWO COMPONENT RIGIDCLASS POLYURETHANE FOAMNORMAL DENSITY: 2 8 LB/CU FT WHEN TESTED PER ASTM D 1622CLOSED CELL CONTENT: 90 PERCENT WHEN TESTED PER ASTM D 2856COMPRESSIVE ST RENGTH: 40 t o 60 PSI WHEN T ESTED PER ASTM D 1621R-VALUE: 6 20 (1 1/2" THICK = R-9)K-FACTOR: 15 BTU/HR /S F /deg F AS MEASURED PER ASTM C 177 or C 5183PROT ECT I VE COAT I NG ACRON 60 ROOF COAT ING SYST EM BY UNI TEDCOATINGS INC MINIMUMCOATING THICKNESS AT ANY POINT ON THE ROOFSHALL BE MIN 28 DRY MI LS PROVIDE GRANULES INTHE TOP COAT AT A RATERECOMMENDED BY THE ROOFING SYSTEM MANUFACTURER GRANULESSHALL BE 3M NUMBER 11 QUARTZ GRANULE OR EQUAL APPLICATOR SHALLBE CURRENTLY APPROVED AND LICENSED BY "UNITED COATINGS"4ROOFING CLASSIFICATION:CLASS 'B' AT COMBUSTIBLE DECKSCLAS S ' A' A T NON- CO MB US T IB LE DE CK S5WHERE A CLASS 'A' ROOF I S REQUIRED AT COMBUSTI BLE DECKS PROVIDE1/4" GEORGIA-PACIFIC DENSDECK OVER THE PLYWOOD DECK USINGAMERIGLUE AT A RATE OF 1 GALLON PER 100 S F STAGGER JOINTS FROM THEDECK JOINTS PER MANUFACTURER S SPECIFICATIONS6COOL ROOF RATING COUNCIL PRODUCT LISTING FOR ACRON 60 ROOFCOATI NG SYST EM BY " UNIT ED CO AT INGS I NC " : 0614- 00067ICC EVALUATION SERVICE INC : ER-55138SEE THE MANUFACTURER'S SPECIFICATIONS FOR COMPLETE PRODUCT &INST ALLMENT REQUIREMENT SROOF MO UNTEDMECHANICAL EQUIPMENTROOF MO UNTEDMECHANICAL EQUIPMENTNORTHROOF HATCHRevision Schedule# Date Description
ACOLORBBDCOLORCOLORABACOLORDBCOLORDBPHASE 2 SIGNCOLORproject:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10:21:21 AMDD‐11Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR: 3 32 = 1'-0PHASE 3EAST 3/32 = 1-0PHASE 3WEST 3/32 = 1'-0PHASE 3SOUTHDE6215 WOODEN PEGEXTERIOR PAINT :APPLY ONE COAT W6232 PRIMER AND TWO COATS W704A WALL SURF ACE INSPECT ON BY A REPRESENT AT IVE OF THE PAINTMANUFACTURER IS RECOMMENDED PRIOR TO PAINT APPLICATIONPERSONNEL DOORS AND ROLL-UP DOORS ARE TO BE PAINTED TO MATCHADJACENT WALL COLORS U N OPROVIDE A PAINT MOCK-UP (APPROX 20FT WIDE X FULL PANEL HEIGHT) FORAPPROVAL BY THE OWNER PRIOR TO BULK PAINT ORDERABDE6220 POROUS STONEDDE6229 CALICO ROCKCNOT USEDENHANCEDWESTELEVATIONRevision Schedule# Date Description
project:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10:21:24 AMDD‐12Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR:lookingnortheastlookingsouthwestRevision Schedule# Date Description
project:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10:21:29 AMDD‐13Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR:PHASE 2lookingnortheastPHASE 2lookingsouthwestRevision Schedule# Date Description
project:CHECKED BY:DRAWN BY:JOB NO:DATE:CTEH NEICDUASHTEDARITH NNo C 25315Ren 2/ 28/15ESMT IAIFLCOFAORICATSL TKENNENEKENNETH D. SMITHARCHITECT& ASSOCIATES, INC.500 FESLER ST. SUITE 102EL CAJON - CA - 92020PH / 619 444 2182Fax / 619 442 2699C:Users\ken.DOMAIN1\Documents\017fath3_Short_Ken.rvt8/23/2013 10:21:30 AMDD‐14Faith Community ChurchCARLSBAD, CALIFORNIA1201712/13/12RONRONA NEW BUILDING FOR:Revision Schedule# Date Description
Planning Commission Minutes August 7, 2013 Page 1
Minutes of: PLANNING COMMISSION
Time of Meeting: 6:00 p.m.
Date of Meeting: August 7, 2013
Place of Meeting: COUNCIL CHAMBERS
CALL TO ORDER
Chairperson Siekmann called the meeting to order at 6:00 p.m.
PLEDGE OF ALLEGIANCE
Commissioner Schumacher led the Pledge of Allegiance.
ROLL CALL
Present: Chairperson Siekmann, Commissioners Anderson, Black, L’Heureux, Schumacher, Scully and Segall
Absent: None STAFF PRESENT
Don Neu, City Planner
Jane Mobaldi, Assistant City Attorney Bridget Desmarais, Administrative Secretary Christer Westman, Senior Planner Van Lynch, Senior Planner
Jason Geldert, Senior Engineer
PUBLIC COMMENTS ON ITEMS NOT LISTED ON THE AGENDA Sharon Lightholder, 2832 Via Conquistador, Carlsbad, spoke regarding project number SDP 12-05 - Faith Community Church, stating her concerns with the overflow parking and standards in the neighborhood.
Ms. Lightholder asked the Planning Commission to consider an administrative standard to adopt a fact based parking requirement.
Commissioner Segall asked if Ms. Lightholder was going to attend the upcoming hearing. Ms. Lightholder stated yes.
Jane Mobaldi, Assistant City Attorney, informed Ms. Lightholder that she may submit comments in writing to the City Council, who sets the parking standards for the community.
Linda Geldner, 2814 Rancho Pancho, Carlsbad, also spoke in regards to the Faith Community Church
parking and safety concerns. Ms. Geldner requested that the Planning Commission approve the project based on phases 1 and 2, and requested that the applicant apply for an amendment on phase 3 to
ensure adequate parking is provided.
Chairperson Siekmann asked if there were any questions for the speaker.
Don Neu, City Planner, stated that the comments are recorded and will be included in the minutes of the meeting. The minutes will be attached to the staff report so that the Commission has the comments
made by the speakers at the time the project is considered.
Ms. Mobaldi stated that Ms. Geldner submitted a written letter for the Planning Commission.
Planning Commission Minutes August 7, 2013 Page 2
PLANNING COMMISSION PUBLIC HEARING
Chairperson Siekmann asked Mr. Neu to introduce the first item and opened the public hearing on Agenda Item 1.
2. SDP 12-06/PUD 13-01/CUP 190(C) – COTTAGE ROW APARTMENTS – Request for
the approval of a Conditional Use Permit amendment CUP 190(C) to rescind Conditional Use Permit CUP 190(B), and the approval of a Site Development Plan SDP 12-06 and
Planned Development Permit PUD 13-01 to allow for the existing 24 apartment units to remain onsite and be made available for rent to the general public on property generally
located at 1400 Flametree Lane in Local Facilities Management Zone 20. The project is exempt from the provisions of CEQA per the General Rule [CEQA Guidelines Section
15061(b)(3)].
3. GPA 12-01/ZC 12-01/LCPA 12-02 – KELLY CORPORATE CENTER – Request for the recommendation of adoption of a Mitigated Negative Declaration and a Mitigation
Monitoring and Reporting Program and a recommendation of approval of a General Plan Amendment to change the General Plan Land Use designation from Planned Industrial
(PI) and Open Space (OS) to Office (O) and Open Space (OS), a Zone Change to change the zoning from Planned Industrial, Qualified Development Overlay Zone (P-M-Q)
and Open Space (OS), to Office (O) and Open Space (OS) and a Local Coastal Program Amendment on a 7.5 acre site with an existing 50,000 square foot office building and a
vacant lot with approvals for another 50,000 square foot office building located at the southeast corner of Palomar Airport Road and Hidden Valley Road in Local Facilities
Management Zone 5.
Mr. Neu stated Agenda Items 2 and 3 would normally be heard in a public hearing context; however, the projects appear to be minor and routine in nature with no outstanding issues and Staff recommends
approval. He recommended that the public hearing be opened and closed, and that the Commission proceed with a vote as a consent item. Staff would be available to respond to questions if the
Commission or someone from the public wished to comment on Agenda Items 2 or 3.
Chairperson Siekmann asked if any member of the audience wished to address Agenda Items 2 or 3.
A gentleman stated he wished to speak on Agenda Item 2.
Chairperson Siekmann pulled Agenda Item 2 from the consent items.
Chairperson Siekmann opened and closed public testimony on Agenda Item 3.
MOTION
ACTION: Motion by Commissioner Black and duly seconded, that the Planning Commission approve Agenda Item 3 including the errata sheet dated August 7, 2013.
VOTE: 7-0
AYES: Chairperson Siekmann, Commissioner Anderson, Commissioner Black, Commissioner L’Heureux, Commissioner Schumacher, Commissioner Scully and
Commissioner Segall
NOES: None
ABSENT: None
ABSTAIN: None
Chairperson Siekmann closed the public hearing on Agenda Item 3, asked Mr. Neu to introduce the next item and opened the public hearing on Agenda Item 1.
Planning Commission Minutes August 7, 2013 Page 3
1. SDP 01-04(A) – LA COSTA TOWN SQUARE – Request for approval of a Site Development Plan Amendment (SDP 01-04(A)) to allow for the provision of common
parking facilities in lieu of individual use parking requirements and approve an 8.3 percent parking reduction within the La Costa Town Square shopping center generally
located on the northeasterly corner of La Costa Avenue and Rancho Santa Fe Road in Neighborhood 13A of the La Costa Master Plan and in Local Facilities Management Zone
11.
Mr. Neu introduced Agenda Item 1 and stated Senior Planner Van Lynch would make the staff presentation.
Mr. Lynch gave a brief presentation and stated he would be available to answer any questions.
Chairperson Siekmann asked if there were any questions of Staff.
Commissioner L’Heureux asked about the maximum number of parking spaces that will be reduced and if
there still is a 120 space reduction if all the outdoor dining is utilized. Mr. Lynch stated that the areas that are not utilized would not generate a parking demand, but the overall project would still have 120 fewer
spaces for the use of the plaza areas.
Chairperson Siekmann stated that the outdoor dining area will be increasing in size which changes the parking ratio. Mr. Lynch stated no existing parking spaces will be removed from the plan. Mr. Lynch also
stated the reduction is to utilize more of the plaza’s outdoor areas which do generate parking.
Commissioner L’Heureux inquired about the parking reduction and the number of parking spaces that may be compromised. Mr. Lynch clarified that the project is designed with the square footage of the
buildings and with adequate parking on the site. Mr. Lynch also stated the addition of the exterior plaza area which generates parking, creates a greater number of required parking spaces. The parking for the
outdoor plazas will not be provided and that is at the request of the applicant.
Chairperson Siekmann clarified that the outdoor areas are treated as though they add square footage to the property, rather than increasing or reducing parking spaces.
Chairperson Siekmann asked if there were any further questions of Staff. Seeing none, she asked if the
applicant wished to make a presentation.
Mark Langan, architect, 13280 Evening Creek Drive, San Diego, gave a brief presentation and asked if there were any questions.
Commissioner Schumacher inquired about the change of the restaurant outdoor seating area from when
the project was approved in 2009. Mr. Langan stated that the project has gone through some changes due to the economy, including a different developer.
Commissioner Anderson stated her concerns with the parking reduction, the size of the lot, and the
amount of people who may access the property to its fullest extent. Mr. Langan responded stating the project’s type of use is a neighborhood commercial center, with both heavy and light uses on the site and
parking.
Mr. Neu stated that per the Municipal Code, the rate of an individual retail parking space is 1 per 300 square feet and the rate for shopping centers is 1 per 200 square feet. The higher rate was created to
account for the variety of tenants that locate in a shopping center.
Chairperson Siekmann asked if there were any questions of the applicant.
Commissioner Segall asked if the applicant could specify the types of businesses that will occupy the center. Juan Arriaga, developer at Property Development Centers, 5918 Stoneridge Mall Road,
Pleasanton, California 94588, stated that due to letters of intent, he is not able to release the names of the occupants of the property. Mr. Arriaga also stated the nature of the shops that will occupy the project
will include a Vons, a fitness center, a pet store, soft apparel stores, some restaurants, a financial
Planning Commission Minutes August 7, 2013 Page 4
institution, a pharmacy, a gas station, dry cleaners, a beauty parlor/spa, a coffee shop and an ice cream shop.
Commissioner Segall inquired about the provision of the outdoor seating area in buildings 13 and 23. Mr.
Arriaga responded stating they agreed to comply with Vons restrictions not to have any food tenants in building 23.
Chairperson Siekmann asked if there were any further questions of the applicant.
Chairperson Siekmann asked how the plan caters to the community in regards to it being pedestrian
friendly. Mr. Langan responded stating that there are 3 different access points to the property: the sidewalks off of Rancho Santa Fe, the center of Main Street, and the eastern end of the project. Mr.
Langan also stated an open area surrounding the property is connected to other areas for pedestrians to access the shops.
Chairperson Siekmann asked if there were any members of the audience who wished to speak on the
item. Seeing none, she opened and closed public testimony.
DISCUSSION
Commissioner Schumacher stated he can support the project and agrees with the findings.
Commissioner Segall stated that while he has some concerns with parking, he can support the project.
Commissioner L’Heureux stated he can support the project.
Commissioner Scully stated she can also support the project.
Commissioner Anderson stated she had concerns with adding 24,000 square feet to the property and not accommodating parking. Because of those concerns, she does not support the project.
Commissioner Black stated he can support the project.
Chairperson Siekmann also stated she can support the project.
MOTION
ACTION: Motion by Commissioner Black and duly seconded, that the Planning Commission
that the Planning Commission adopt Planning Commission Resolution No. 6995
approving Site Development Plan Amendment SDP 01-04(A) based on the findings and subject to the conditions contained therein including the errata sheet dated
August 7, 2013.
VOTE: 6-1
AYES: Chairperson Siekmann, Commissioner Black, Commissioner L’Heureux,
Commissioner Schumacher, Commissioner Scully and Commissioner Segall.
NOES: Commissioner Anderson
ABSENT: None
ABSTAIN: None
Chairperson Siekmann closed the public hearing on Agenda Item 1, asked Mr. Neu to introduce the next
item and opened the public hearing on Agenda Item 2.
Planning Commission Minutes August 7, 2013 Page 5
2. SDP 12-06/PUD 13-01/CUP 190(C) – COTTAGE ROW APARTMENTS – Request for the approval of a Conditional Use Permit amendment CUP 190(C) to rescind Conditional
Use Permit CUP 190(B), and the approval of a Site Development Plan SDP 12-06 and Planned Development Permit PUD 13-01 to allow for the existing 24 apartment units to
remain onsite and be made available for rent to the general public on property generally located at 1400 Flametree Lane in Local Facilities Management Zone 20. The project is
exempt from the provisions of CEQA per the General Rule [CEQA Guidelines Section 15061(b)(3)].
Mr. Neu introduced Agenda Item 2 and stated Senior Planner Christer Westman would make the staff
presentation.
Mr. Westman gave a brief presentation and stated he would be available to answer any questions.
Chairperson Siekmann asked if there were any questions of staff.
Commissioner Anderson asked if the existing structure required inclusionary housing if it was not going through any structural changes. Mr. Westman stated no due to the facility being built prior to the
inclusionary housing requirement and the ordinance, and no additional units or construction will be made to the project.
Chairperson Siekmann asked if there were any further questions of Staff. Seeing none, she asked if the
applicant wished to make a presentation.
Jack Henthorn, P.O. 237, Carlsbad, gave a brief presentation and stated he would be available to answer any questions.
Chairperson Siekmann asked if there were any questions of the applicant. Seeing none, she asked if
there were any members of the audience who wished to speak on the item.
Chairperson Siekmann opened public testimony.
Bob Ebert, 1187 Mariposa Road, stated he had concerns with the project and asked if the owner has been in violation of the existing conditional use permit.
Christine Nguyen, 1290 Mariposa Road, stated her concerns with noise, traffic and her property value.
John Madrid, 1266 Mariposa Road, stated his concerns with traffic as well as RVs and boats parking
around the community.
Commissioner Scully inquired if the RVs and boats were from the Cottage Row community. Mr. Madrid stated he was not certain.
Elise Fox, 1274 Mariposa Road, stated the RVs and boats were from the tenants that resided at the
complex. Ms. Fox also stated her concerns with property values and traffic.
Commissioner Anderson inquired if Ms. Fox was aware that the City of Carlsbad recently passed an ordinance prohibiting RVs from parking on city streets, and that a permit must be obtained in order to do
so. Ms. Fox stated no.
Zhixia Shi, 1278 Mariposa Road, stated her concerns with the width of the street, and frequent noise from the tenants of the apartment buildings.
Denise Madrid, 1266 Mariposa Road, stated her concerns with the change in the use from a faith based
retirement community to an apartment community.
Chairperson Siekmann asked if there were any other members of the audience who wished to speak on the item. Seeing none, she closed public testimony and asked the applicant to respond to the issues
raised by the speakers.
Planning Commission Minutes August 7, 2013 Page 6
Mr. Henthorn replied to the neighbors’ concerns clarifying the restrictions of new ownership. The new owner attempted to attract a faith based operator to the site which was not successful. Mr. Henthorn also
stated that the property has strict management, they meet all parking requirements and there are no additional development proposals.
Commissioner Scully inquired about the number of residents and units on the property. Mr. Henthorn
stated that there are 24 units at its full capacity.
Commissioner L’Heureux inquired as to when the project was converted from faith based to non-faith based. Mr. Henthorn replied the change took effect 2-3 years ago due to renovation and vacancy.
Commissioner Anderson asked what the benefits were for the previous owner to have the property
restricted only for a faith based retirement facility. Mr. Neu stated that because the property was developed in 1980, in which regulations were different, the faith based retirement community may have
been a requirement to allow the use through a conditional use permit in the R-1 zone. Mr. Neu also stated that the use was still permitted under that dated Conditional Use Permit after the code changed.
Commissioner Segall asked if there was an onsite manager to manage the RV parking on private
property. Mr. Henthorn stated yes.
Commissioner Anderson inquired if public parking was allowed on Briarwood. Mr. Geldert replied stating Briarwood Street is 38 feet wide, and in accordance with the code, parking is allowed on both sides of a
street which are in excess of 30 feet.
Chairperson Siekmann closed public testimony and asked if there were any questions of staff.
Commissioner L’Heureux asked if the Conditional Use Permit remains with the faith based requirement if the project is not approved. Mr. Neu stated yes that the applicant would then be limited as to how the
facility is occupied.
DISCUSSION
Commissioner Schumacher stated he can support the project.
Commissioner Segall concurs with Commissioner Schumacher and can also support the project.
Commissioner L’Heureux stated he can support the project.
Commissioner Scully stated that while she has concerns with the Conditional Use Permit, she can support the project.
Commissioner Anderson stated that because the project is within the low-medium density usage, which is
allowed on the site but it does not have the facilities required to make it a retirement community, she feels the Commission has no choice but to remove the Conditional Use Permit and let it become a market rate
apartment project.
Commissioner Black stated he can also support the project.
Chairperson Siekmann stated she can also support the project.
Community & Economic Development
1635 Faraday Ave. Carlsbad, CA 92008 760-602-2710 760-602-8560 fax
ERRATA SHEET FOR AGENDA ITEM # 2
Memorandum
September 18, 2013
To: Planning Commission
From: Christer Westman, Senior Planner
Via Don Neu, City Planner
Re: Errata Sheet for Agenda Item # 2 SDP 12-05 FAITH COMMUNITY CHURCH
Staff is recommending that the Planning Commission include the following revisions:
The staff report and Planning Commission Resolution No. 7013 should be corrected to reference
buildout onsite parking proposed as 104 parking spaces versus 100.
Staff is recommending modifications to Finding No. 4 and Condition No. 21 of Planning Commission
Resolution No. 7013 as follows:
FINDING
4. That the site for the intended use is adequate in size and shape to accommodate the use, in that
the proposed building, parking, and landscaping can fit within the boundaries of the
developable portion of the property with no need for a variance to standards and that the
assembly capacity proposed onsite will be modified as needed to fit within the onsite parking
capacity as delineated in parking surveys conducted before the issuance of building permits
for both phases 2 and 3 phase three.
CONDITION
21. Owner/operator of the Faith Community Church shall provide a parking study, prepared to
the satisfaction of and submitted to the City Planner, for a six month period prior to the
request for a building permit for phase two and then again for a six month period prior to the
request for a building permit for phase three. The parking study shall evaluate peak weekend
parking demand at the church, on a minimum of six different weekends over a six month
period of church operations. If the on-site parking capacity of 104 spaces is inadequate to
accommodate peak weekend demand for phase one phases one and two, resulting in church
parking along the adjacent streets, or if the study illustrates that the Faith Community Church
on-site parking demand exceeds the minimum requirement of one space per five seats in the
sanctuary per the Carlsbad Municipal Code Chapter 21.41, then phase two or phase three of
the project, whichever is applicable, shall not be allowed to pull building permits until
additional parking capacity is provided on site to address demand or the project sanctuary
capacity is reduced to a size for which adequate parking can be provided onsite as approved
by a City Planner approved Consistency Determination.