Loading...
HomeMy WebLinkAbout2016-03-16; Planning Commission; ; CT 15-06/RP 15-07 - THE WAVE The City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION Item No. Application complete date: December 22, 2015 P.C. AGENDA OF: March 16, 2016 Project Planner: Greg Fisher Project Engineer: Steve Bobbett SUBJECT: CT 15-06/RP 15-07 – THE WAVE – Request for a recommendation of approval of a Tentative Tract Map and Major Review Permit to allow for the demolition of all structures onsite and the construction of a four-story mixed-use building consisting of 8 residential units, 13 timeshare units, 781 square feet of commercial space and a two level enclosed parking garage situated on a 0.249-acre project site located at 2646 State Street within District 4 – Residential Support Area of the Village Review (VR) Zone and Local Facilities Management Zone 1. The project qualifies as a CEQA Guidelines Section 15332 (In-Fill Development Projects) Class 32 Categorical Exemption. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7152 RECOMMENDING APPROVAL of Tentative Tract Map CT 15-06 and Major Village Review Permit RP 15-07 to the City Council based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND Project Site/Setting: The 0.249-acre project site is generally located on the east side of State Street between Beech Avenue and Laguna Drive. More specifically, the property is addressed as 2646 State Street. The project site is located within Land Use District 4 – Residential Support Area of the Village Master Plan and is located outside of the Coastal Zone. Topographically, the site is generally flat with little variation in height between the front and rear property lines. The property is currently developed with a residential structure and detached accessory shed. Table 1 below identifies the General Plan designations, zoning and current land uses of the project site and surrounding properties. TABLE 1 – SURROUNDING LAND USES Location General Plan Zoning Current Land Use Site Village (V) Village Review (V-R) Single Family Residence with Shed North Village (V) Village Review (V-R) RV Park South Village (V) Village Review (V-R) Commercial building (unknown use) East Village (V) Village Review (V-R) Office building (property management) West Village (V) Village Review (V-R) Commercial buildings (home furnishings, hair salon) Project Proposal: In general, the project applicant is requesting approval of a Tentative Tract Map (CT) and Major Village Review Permit (RP) to demolish all existing structures located on the property and to construct in place a 3 CT 15-06/RP 15-07 – THE WAVE March 16, 2016 Page 2 18,355 square foot four-story mixed-use building consisting of 8 residential units (seven market rate condominiums and one affordable apartment unit), 13 timeshare units, and one (1) ground floor commercial unit (781 square feet). The project also includes construction of an enclosed two level parking garage. The upper level (at-grade) parking garage will have 16 parking spaces while the lower subterranean level parking garage will have 18 parking spaces for a total of 34 on-site parking spaces. Access to the lower level parking garage is accommodated by a hydraulic car lift system which is an elevator for cars. The project is meeting all of their required parking needs onsite and is satisfying its inclusionary housing obligation onsite through the construction of one (1) affordable one-bedroom unit. The proposed density of this project is 32.1 dwelling units per acre and will generate 200 average daily traffic trips. Grading for the proposed project includes 3,400 cubic yards of cut and no fill. As a result, a total of 3,400 cubic yards of material is proposed to be exported. In addition to the 781 square feet of commercial space fronting State Street and 16 at grade on-site parking spaces; development of the ground floor uses will also include a separate lobby area with stairs and elevator access to the residential and timeshare units above; timeshare office, bathroom, trash and recycle enclosure and staircase. Frontage improvements along State Street include new street trees in planting wells and raised planters. The proposed commercial space will more than likely accommodate a single tenant opportunity. The commercial tenant will potentially be a lifestyle type tenant that focuses on fitness, health and sports type products or services. Aside from the recreational amenity in the form of a jacuzzi located on the second floor terrace, the three upper floors (i.e., 2nd, 3rd, and 4th floors) more or less mimic the other in orientation, design and use and are oriented one atop the other. Each of the 21 residential and timeshare units include a minimum of one deck while many units have either two or three decks. Table 2 below provides a unit summary of each of the upper floors: Table 2 – UNIT SUMMARY Floor Level Use No. of Units No. of Bedrooms Living Area 2nd Residential 2 2 bedroom 959 sq. ft. to 964 sq. ft. Timeshare 2 1 bedroom 659 sq. ft. to 664 sq. ft. Timeshare 2 2 bedroom 878 sq. ft. to 967 sq. ft. Affordable 1 1 bedroom 639 sq. ft. 3rd Residential 2 2 bedroom 959 sq. ft. to 964 sq. ft. Timeshare 3 1 bedroom 639 sq. ft. to 664 sq. ft. Timeshare 2 2 bedroom 878 sq. ft. to 967 sq. ft. 4th Residential 2 2 bedroom 959 sq. ft. to 964 sq. ft. Residential 1 1 bedroom 639 sq. ft. Timeshare 2 2 bedroom 878 sq. ft. to 967 sq. ft. Timeshare 2 1 bedroom 659 sq. ft. to 664 sq. ft. The proposed architectural design is characterized as coastal contemporary and utilizes form, materials and colors to reinforce this theme. The entire lower floor of the proposed building incorporates two (2) types of natural stone including decorative ledge stone banding contrasted by enhanced planter landscaping to provide a rich pedestrian experience along the streetscapes. To provide pedestrian scale, the massing of the three upper floors has been stepped back; and to enliven the street scene below, private balconies and decks have been added for residents and timeshare occupants. Material changes and clearly defined offsets are utilized to break the building into smaller vertical units so as to be consistent with the village character. Such material changes include natural stone; ledge stone banding, horizontal composite paneling; multiple stucco colors; colored tinted glazing, decorative metal trim, and CT 15-06/RP 15-07 – THE WAVE March 16, 2016 Page 3 undulating metal canopies. Tower elements with decorative metal outriggers have been added at each corner of the building. A Tentative Tract Map (CT) is required for the 22 airspace condominium units consisting of 8 residential units (one of which is affordable), 13 timeshare units, and one (1) ground floor commercial unit (781 square feet). The Major Review Permit (RP) is required for new construction of a building within the Village Area that has a building permit valuation greater than $150,000. Both permits require a Planning Commission recommendation and City Council approval. III. ANALYSIS The proposed project is subject to the following ordinances, standards, and policies: A. Village (V) General Plan Land Use designation; B. Village Review (V-R) Zone (C.M.C. Chapter 21.35), Land Use District 4 – Residential Support Area (Village Master Plan and Design Manual); C. Inclusionary Housing Ordinance (C.M.C. Chapter 21.85); D. Subdivision Ordinance (C.M.C. Title 20); and E. Growth Management Ordinance (C.M.C. Chapter 21.90), Local Facilities Management Plan Zone 1. A. Village (V) General Plan Land Use Designation The subject property has a General Plan Land Use designation of Village (V). As discussed in the Village Master Plan, properties within the Village Area do not have an assigned residential density as it relates to Growth Management Plan compliance. Therefore, the minimum and maximum densities for residential development are established in the Village Master Plan. For mixed use projects, the minimum density is calculated based on 50% of the developable area. Timeshares are considered commercial living units for purposes of temporary lodging and do not count towards project density. Table 3 below identifies the permissible density range for properties located within Land Use District 1. TABLE 3 – PROJECT DENSITY Gross Acres Net Acres Allowable Density Range; Min/Max Dwelling Units per Village Master Plan Project Density; Proposed Dwelling units 0.249 0.249 28-35 du/ac; Minimum: 6 dwelling units Maximum: 8 dwelling units 32.12 du/ac; 8 dwelling units Pursuant to the Housing Element of the General Plan, a Growth Management Control Point has not been established for residential development in the Village, all residential units approved in the Village must be withdrawn from the City’s Excess Dwelling Unit Bank. The City’s Excess Dwelling Unit Bank is implemented through City Council Policy No. 43. Pursuant to City Council Policy No. 43, an applicant for an allocation of dwelling units shall agree to provide the number of inclusionary units as required pursuant to C.M.C. Section 21.85.050 and shall execute an affordable housing agreement prior to recordation of the final map pursuant to C.M.C. Section 21.85.140. As discussed in Section C below, the proposal to construct one (1) inclusionary unit onsite is consistent with the inclusionary housing requirements as set forth in City Council Policy No. 43. In addition, the project is accordingly- conditioned to require the execution of the affordable housing agreement prior to recordation of the final map. CT 15-06/RP 15-07 – THE WAVE March 16, 2016 Page 4 In approving a request for an allocation of excess dwelling units, the project shall meet the findings identified in City Council Policy No. 43. Specifically, the project location and density shall be found to be compatible with adjacent land uses and applicable provisions of the General Plan and other applicable planning documents. As discussed in the attached Planning Commission Resolution No. 7152 the proposed project meets these findings. As the proposed project requires approval from City Council, the City Council is the final decision-making authority for the allocation from the Excess Dwelling Unit Bank. The following Table 4 describes how the proposed project is consistent with the various elements of the Carlsbad General Plan. TABLE 4 – GENERAL PLAN COMPLIANCE ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY? Land Use Goal 2-G.29 Maintain the Village as a center for residents and visitors with commercial, residential, dining, civic, cultural, and entertainment activities. Goal 2-G.30 Develop a distinct identity for the Village by encouraging a variety of uses and activities, such as a mix of residential, commercial, office, restaurants and specialty retail shops, which traditionally locate in a pedestrian-oriented downtown area and attract visitors and residents from across the community by creating a lively, interesting social environment. Policy 2-P.70 Seek an increased presence of both residents and activity in the Village with new development, particularly residential, including residential as part of mixed-use development, as well as commer- cial, entertainment and cultural uses that serve both residents and visitors. The proposed mixed-use development not only provides mutually supportive uses in the form of residential, timeshare and commercial opportunity, but reinforces the pedestrian-orientation desired for the downtown area by providing new residents and timeshare occupants an opportunity to walk to local shopping, dining, recreation, and mass transit functions. It’s close proximity to existing bus routes and mass transit help to further the goal of providing new economic and residential development near transportation corridors. Furthermore, the project will contribute to the revitalization of the Village area in the form of a new building at the northern end of State Street with new commercial lease space, new employment opportunities, and new consumers. Overall, the residential project will contribute to the revitalization of the Village area. Yes CT 15-06/RP 15-07 – THE WAVE March 16, 2016 Page 5 TABLE 4 – GENERAL PLAN COMPLIANCE (CONTINUED) ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY? Mobility Goal 3-G.3 Provide inviting streetscapes that encourage walking and promote livable streets. The proposed project includes new street trees within the existing sidewalk and planter boxes along State Street. In addition, the units facing the street each include decks which enhance the streetscape and promote livable streets. The proposed project has been designed to meet all of the circulation requirements, which includes a 20-foot-wide driveway off of State Street. Yes Sustainability Policy 9-P.10 Decrease the need for artificial cooling, heating and lighting, and promote outdoor lifestyles in Carlsbad’s sunny and moderate climate by:  Ensuring that the Zoning Ordinance provides for adequate private and common open spaces as part of multifamily developments.  Encouraging residential and office buildings to have windows that open to the outside in all habitable rooms, and maximize the use of daylight. Policy 9-P.11 Implement the city’s Landscape Manual to mitigate urban heat island effects through maximum tree canopy coverage and minimum asphalt and paving coverage, particularly for denser areas like the Village and the Barrio, shopping centers, and industrial and other areas with expansive surface parking. Each of the 8 residential units and 13 timeshare units has a minimum of one private deck while most units have either two or three decks. The total open space provided for the project is 4,949 square feet or 44 percent which far exceeds the requirements of the Village Master Plan. Given the nature of the product type, attached multi-family units and timeshare units, none of the units have windows on all four elevations. However, the elevations which do have sun exposure, include several windows which maximize the use of daylight. The project includes a landscape plan which has been determined to be consistent with the city’s Landscape Manual. The urban heat island effect is significantly reduced as surface parking coverage has been eliminated due to the project’s enclosed two level parking garage. Yes CT 15-06/RP 15-07 – THE WAVE March 16, 2016 Page 6 TABLE 4 – GENERAL PLAN COMPLIANCE (CONTINUED) ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY? Housing Goal 10-G.3 Sufficient new, affordable housing opportunities in all quadrants of the city to meet the needs of current lower and moderate income households and those with special needs, and a fair share proportion of future lower and moderate income households. Goal 10-P.15 Pursuant to the Inclusionary Housing Ordinance, require affordability for lower income households of a minimum of 15 percent of all residential ownership and qualifying rental projects. For projects that are required to include 10 or more units affordable to lower income households, at least 10 percent of the lower income units should have three or more bedrooms (lower income senior housing projects exempt). Policy 10-P.18 Adhere to City Council Policy Statement 43 when considering allocation of “excess dwelling units” for the purpose of allowing development to exceed the Growth Management Control Point (GMCP) density, as discussed in Section 10.3 (Resources Available). With limited exceptions, the allocation of excess dwelling units will require provision of housing affordable to lower income households. The project has been conditioned to enter into an Affordable Housing Agreement to construct one (1) inclusionary housing unit onsite. The applicant has set aside one of the (1) bedroom units for inclusionary housing purposes. The project has been accordingly conditioned to require the approval of an Affordable Housing Agreement prior to recordation of the final map. In approving a request for an allocation of excess dwelling units, the project shall meet the findings identified in City Council Policy No. 43. Specifically, the project location and density shall be found to be compatible with adjacent land uses and the project is consistent with the General Plan and any other applicable planning document. As discussed in the attached Planning Commission Resolution No. 7152 the proposed project meets these findings. Yes CT 15-06/RP 15-07 – THE WAVE March 16, 2016 Page 7 TABLE 4 – GENERAL PLAN COMPLIANCE (CONTINUED) ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY? Public Safety Goal 6-G.1 Minimize injury, loss of life, and damage to property resulting from fire, flood, hazardous material release, or seismic disasters. Policy 6-P.6 Enforce the requirements of Titles 18, 20, and 21 pertaining to drainage and flood control when reviewing applications for building permits and subdivisions. Policy 6-P.34 Enforce the Uniform Building and Fire codes, adopted by the city, to provide fire protection standards for all existing and proposed structures. Policy 6-P.39 Ensure all new development complies with all applicable regulations regarding the provision of public utilities and facilities. The proposed structural improvements are required to be designed in conformance with all seismic design standards. In addition, the proposed project is consistent with all of the applicable fire safety requirements. Further, the project has been conditioned to develop and implement a program of “best management practices” for the elimination and reduction of pollutants which enter into and/or are transported within storm drainage facilities. Yes CT 15-06/RP 15-07 – THE WAVE March 16, 2016 Page 8 TABLE 4 – GENERAL PLAN COMPLIANCE (CONTINUED) ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY? Noise Goal 5-G.2 Ensure that new development is compatible with the noise environment, by continuing to use potential noise exposure as a criterion in land use planning. Policy 5-P.3 For all projects that require discretionary review and have noise exposure levels that exceed the standards in Table 5-1, require site planning and architecture to incorporate noise-attenuating features. With mitigation, development should meet the allowable outdoor and indoor noise exposure standards in Table 5-2 (45 dBA). When a building’s openings to the exterior are required to be closed to meet the interior noise standard, then mechanical ventilation shall be provided. A Noise Impact Study (July 2015) in accordance with the City of Carlsbad’s Noise Guidelines was prepared by Rincon Consultants, Environmental Scientists, Planners and Engineers to address any potential noise and/or ground-borne vibration/noise impacts occurring as a result of 1) the project sites close proximity to the railroad tracks located approximately 415 ft. to the west, and 2) traffic noise associated with an urban environment. No significant adverse ground-borne vibration and/or ground-borne noise impacts were identified. Additionally, no significant adverse noise impacts were identified that would not be reduced by standard construction practices prescribed by the California Energy Code Title 24 standards. Yes B. Village Review Zone (C.M.C. Chapter 21.35), Land Use District 4 – Residential Support Area (Village Master Plan and Design Manual) The subject property is located within Land Use District 4 – Residential Support Area of the Village Master Plan. Mixed-use (residential and commercial uses) is a permitted use, while timeshares are identified as a provisional land use. No special considerations, findings or conditions for the timeshare use is listed in the Village Master Plan. The specific development standards for new development within Land Use District 4 and the project’s compliance with these standards are shown in Table 5 below: CT 15-06/RP 15-07 – THE WAVE March 16, 2016 Page 9 TABLE 5 – VILLAGE MASTER PLAN, LAND USE DISTRICT 4 (RESIDENTIAL SUPPORT AREA) STANDARD REQUIRED/ALLOWED PROPOSED COMPLY Setback: Front Yard No minimum or maximum for the first at grade floor. A 10 foot average setback shall be required for all floors above the first at grade floor. Ground Floor: 3 feet Upper Floors: Average 10 feet Yes Setback: Side Yards No minimum or maximum Ground Floor: North: 6 inches to 1 foot South: 11 inches Upper Floors: North: 6 inches to 1 foot South: 11 inches to 12 feet Yes Setback: Rear Yard No minimum or maximum Ground Floor: 1 foot Upper Floors: 1 to 15 feet Yes Open Space: 20% = 2,176 sq. ft. 45% (4,949 sq. ft.) Yes Open space may be public or private and may be dedicated to landscaped planters, open space pockets and/or connections, roof gardens/patios, balconies, other patios and outdoor eating areas. Landscape/Planters: 874 sq. ft. Private Balconies: 3,251 sq. ft. Pool Deck: 824 sq. ft. Building Coverage: 100% 94.6% Yes Building Height: 45 ft. maximum Roof Line: 45’ Yes Pursuant to C.M.C. 21.46.020, the following project related architectural features are allowed protrusions above height limits and are therefore exempted from the maximum building height standard: Tower elements (decorative metal outrigger). Architecture Features: 48’-2” to 49’-2” Tower: 53’-4” Property Line Walls/Fences: 6 ft. max No property line walls or fences are proposed. Yes CT 15-06/RP 15-07 – THE WAVE March 16, 2016 Page 10 TABLE 5 – VILLAGE MASTER PLAN, LAND USE DISTRICT 4 (RESIDENTIAL SUPPORT AREA)(CONTINUED) STANDARD REQUIRED/ALLOWED PROPOSED COMPLY Parking: Multi-family Dwellings (Outside Coastal Zone): One (1) space per studio or 1- bedroom; or two (2) spaces per 2- bedrooms or more. Guest: No spaces required for properties located outside of coastal zone For condominiums, at least one space must be covered. Residential development must provide its parking onsite. 8 Residential Condo. Units: 2 units = 1-bedroom 6 units = 2-bedrooms 34 spaces provided. 34 parking space are provided onsite within an enclosed two level parking garage. The project is not requesting to satisfy any portion of its parking requirements through the Village Parking In-Lieu Fee Program. Yes 1 space x 2 units = 2 spaces 2 spaces x 6 units = 12 spaces 2 + 12 = 14 14 spaces required (8 must be covered) Time Share: 1.2 spaces per unit 13 Timeshare units proposed 13 x 1.2 = 15.6 = 16 16 spaces required Commercial: One (1) space per 300 sq. ft. of net floor area. 781 sq. ft. ÷ 300 sq. ft. = 3 3 spaces required Total Spaces Required: 14 + 16 + 3 = 33 spaces 12 spaces must be provided onsite for the 8 residential units proposed. The remaining spaces can be provided onsite, or satisfied via the Village Parking In-Lieu Fee Program. CT 15-06/RP 15-07 – THE WAVE March 16, 2016 Page 11 TABLE 5 – VILLAGE MASTER PLAN, LAND USE DISTRICT 4 (RESIDENTIAL SUPPORT AREA)(CONTINUED) STANDARD REQUIRED/ALLOWED PROPOSED COMPLY Compact Parking A maximum 40% of the total number of parking spaces provided on-site may be constructed to meet the requirements of a small or compact vehicle. 40% of 34 spaces = 13 spaces 13 compact spaces provided. Yes C. Inclusionary Housing The City’s Inclusionary Housing regulations (C.M.C. Chapter 21.85) require that a minimum of 15% of all proposed ownership units in any residential project be restricted to lower income households. As a result, the proposal to construct 8 residential units requires a total of one (1) inclusionary unit. The applicant proposes to construct one (1) one-bedroom inclusionary unit onsite. The affordable unit is located on the second floor. As required by C.M.C. Chapter 21.85, the project has been accordingly- conditioned to require the approval of an Affordable Housing Agreement prior to recordation of the final map. D. Subdivision Ordinance The project includes twenty-two (22) airspace condominium units, consisting of 8 residential units (one of which is affordable), 13 timeshare units, and one (1) ground floor commercial unit and is therefore subject to the regulations of Chapter 20.16 of the Subdivision Ordinance. As conditioned, design of the proposed tentative tract map and the improvements are consistent with and satisfy the requirements of the General Plan, Village Master Plan, Titles 20 and 21 of the Carlsbad Municipal Code, and the State Subdivision Map Act. The Land Development Engineering Division has reviewed the proposed Tentative Tract Map and has concluded that the subdivision, as conditioned, complies with all the applicable requirements of the Subdivision Map Act and the City’s Subdivision Ordinance. No standards variances are needed to approve the project. Given the above, the proposed subdivision would provide all necessary facilities and improvements without producing land conflicts; therefore, the project is consistent with the Subdivision Ordinance. E. Growth Management The proposed project is located within Local Facilities Management Zone 1 in the northwest quadrant of the city. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table 6 below. S T A T E S T R O O S E V E L T S T ST A T E S T A L L E Y M A D I S O N S T BEECH AVCT 15-06 / RP 15-07The Wave SITE MAP J SITE EL CAMINO R E A LLA COSTA AV A L G A R D C A R L S B A D B L