Loading...
HomeMy WebLinkAbout2016-12-07; Planning Commission; ; EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 – UPTOWN BRESSI The City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION Item No. Application complete date: December 7, 2016 P.C. AGENDA OF: December 7, 2016 Project Planner: Van Lynch Project Engineer: David Rick SUBJECT: EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 – UPTOWN BRESSI – Request for the certification of an Environmental Impact Report, including the approval of Candidate Findings of Fact and a Mitigation Monitoring and Reporting Program and a recommendation of approval of a General Plan Amendment from Planned Industrial to Local Shopping Center and R-23 Residential, Local Facilities Management Plan Amendment, Master Plan Amendment, Vesting Tentative Tract Map, Planned Development Permit, two Site Development Plans and two Conditional Use Permits for the development of a 17.71 acre site within the Bressi Ranch Master Plan with a 91,164 square foot shopping center, and a 125 unit multi- family condominium project, all located at the southwest corner of Palomar Airport Road and El Fuerte Street, north of Gateway Road, and east of Colt Place and located within the southeast quadrant of the City within Local Facilities Management Zone 17. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7174 RECOMMENDING that the City Council CERTIFY the Environmental Impact Report EIR 15-01, including the approval of Candidate Findings of Fact and a Mitigation Monitoring and Reporting Program, ADOPT Planning Commission Resolution No. 7175 RECOMMENDING APPROVAL of General Plan Amendment 14-04, Local Facilities Management Plan Amendment 87-17(A), and Master Plan Amendment 178(I) and ADOPT Planning Commission Resolution Number 7176 RECOMMENDING APPROVAL of Carlsbad Tract Map 14-09, Planned Development Permit 14-10, Site Development Plans 14-13 and 16-06, and Conditional Use Permits 14-09 and 16-01 based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND Shea Properties has submitted an application for the development of a local shopping center and multi- family subdivision on 17.71 acres of land generally located at the southwest corner of Palomar Airport Road and El Fuerte Street within the Bressi Ranch Master Plan. The existing Planned Industrial General Plan Land Use designation is proposed to change to Local Commercial and R-23 Residential to accommodate a mixed–use project. An environmental impact report has been prepared which analyzes the potential impacts to the environment which may be caused by the development of the site. The environmental analysis identified that there are no significant unmitigable environmental impacts. The project site is divided into two separate yet interconnected development areas. The eastern 9.97- acre commercial portion of the site would be developed with approximately 91,164 square feet of commercial use development. The proposed commercial square footage consists of a 28,000-square-foot food market, 16,454 square foot pharmacy/drive-thru, 11,650 square foot major tenant, and 35,060 square feet of smaller retail uses. Outdoor plazas and dining areas (9,160 sq. ft.) are dispersed around the multi-tenant shop areas. Architecturally, the buildings are designed to complement the existing Bressi Ranch commercial project adjacent to the south. 5 EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 2 The western 7.67-acre portion of the site would be developed with a maximum of 103 townhome units and 22 residential stacked flats (total of 125 units). The proposed residential density is 16 dwelling units per acre. There are 21 residential buildings with 4 to 6 three-story townhome units per building and two buildings of three story stacked flats with 11 units each. The townhomes will have a ground floor two-car garage and living space with two floors of living space above. Unit sizes range from 1,665 sq. ft. to 2,068 sq. ft. (all 3 bd. rm./3 ba.). The stacked flats will have either a single- or two-car garage on the ground floor. One residential unit is provided on the ground floor with the remaining 10 dwelling units being on the second and third floors. Unit sizes range from 735 sq. ft. (1 bd.rm.) to 1,340 sq. ft. (3 bd.rm.). The architecture of the residential portion of the project is a Contemporary Craftsman style incorporating brick, plaster, lap and board and batt wood siding. The materials and forms create a residential component that is complementary as well as an appropriate companion to the existing architecture. The buildings have a variety of roof pitches. The predominant roof pitch is 3.5:12. The maximum building height for buildings with a minimum 3:12 roof pitch is 40 feet. A bulk of the townhome building heights are 36 feet to 38 feet and the stacked flats are 39 feet, 8 inches. Buildings roofs with a roof pitch flatter than 3:12 have a maximum building height of 35 feet. The buildings have flat roof architectural elements up to 39 feet 8 inches on the townhomes and 41 feet on the stacked flats, which is in excess of the 35- foot height limit. However, these protrusions are allowed per Section of 21.46.020 of the Carlsbad Municipal Code, as the architectural features will not provide additional floor space and, in some cases, are for the housing of elevators, stairways and other building maintenance features. Three common active and passive recreational areas are provided within the residential area. The southern recreation area includes a tot-lot, artificial turf area and a BBQ area with seating. The two northern areas include a pool, pool deck with seating, gas fire pit, table tennis, putting green, bocce ball court, shuffleboard courts and BBQ area with seating. Access to the proposed project site is proposed via El Fuerte Street, Gateway Road, and Colt Place. The commercial portion of the project would be accessed via a new entry point along El Fuerte Street. A new southbound deceleration lane would be constructed, and a right turn in, right turn out access would be created. A new signalized access would be created along Gateway Road at the existing intersection with Finnila Place. The main and direct access to the residential portion of the project site would be provided off of Colt Place. Three vehicular drives and sidewalks provide interconnectivity between the residential and commercial areas. Off-site improvements include a new signalized intersection at Gateway Road and Finnila Place, a raised median in El Fuerte Street, and two chicanes on Gateway Road. A chicane is a series of two or more staggered curb extensions on alternating sides of the roadway, which causes motorists to reduce speed. As a traffic calming measure, concurrent with development of the project, chicanes will be installed on Gateway Road between Innovation Way and Alicante Road, as well as on Gateway Road between Innovation Way and Village Green Drive. The site was previously entitled with a Planned Industrial Permit (PIP 05-23) for a 300,000 square foot multi-building office/industrial development. Table 1 below includes the General Plan designations, zoning and current land uses of the project site and surrounding properties. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 3 TABLE 1 – GENERAL PLAN AND ZONING Location General Plan Designation Zoning Current Land Use Site Planned Industrial (PI) Planned Community (P-C) Vacant North PI P-M Industrial South Local Commercial (L)/R-23 Residential P-C Commercial/Multi-family Residential East PI P-C Industrial West PI P-C Industrial/Vacant Table 2 below includes the project site’s gross and net acreage, the number of dwelling units allowed by the General Plan’s Growth Management Control Point (GMCP) density and the proposed projects number of dwelling units and density. TABLE 2 – PROJECT DENSITY Gross Acres Net Acres DUs Allowed at GMCP Density of 19 du/ac DUs Proposed and Project Density (R-23) 7.67 7.67 146 125 (16 du/ac) The project will require the following discretionary actions: • Certification of an Environmental Impact Report (EIR 11-02) The project EIR constitutes all environmental review required for the approval of the Master Plan Amendment and all related discretionary applications. • General Plan Amendment (GPA 14-04) An amendment to the Land Use Element is required for the change in land use from Planned Industrial (PI) to Local Commercial (L) and Residential 23 (R-23). • Master Plan Amendment (MP 178(I)) A master plan amendment is required to change the permitted uses from industrial to residential and commercial to establish the new Planning Area 16 with development standards (underlying zoning). • Local Facilities Management Plan Amendment Zone 17 (LFMP 87-17(A)) A LFMP amendment has been prepared which identifies infrastructure needs and describes how the needed facilities will either be constructed or guaranteed as a result of the land use changes. • Vesting Tentative Tract Map (CT 14-09) A Vesting Tentative Tract Map has been filed concurrently for the creation of a residential condominium lot (with 125 units) and three commercial lots.  Planned Development Permit (PUD 14-10) A Planned Development Permit for the airspace subdivision of the residential development. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 4  Site Development Plan (SDP 14-13) A Site Development Plan permit for the Affordable Housing review.  Site Development Plan (SDP 16-06) A Site Development Plan for the review of the commercial development.  Conditional Use Permit (CUP 14-09) A Conditional Review Permit for the proposed pharmacy drive thru facility.  Conditional Use Permit (CUP 16-01) A Conditional Use Permit for a proposed liquor store (i.e. BevMo!/Total Wine). The Table 3 below summarizes the proposed permits and final decision making authority. TABLE 3 – PROPOSED PERMITS PROJECT APPLICATION(S) ADMINISTRATIVE APPROVALS PLANNING COMMISSION CITY COUNCIL Environmental Review (Environmental Impact Report 15-01) RA X GPA 14-04 RA X MP 178(I) RA X LFMP 87-17(A) RA X CT 14-09 RA X PUD 14-10 RA X SDP 14-13 and SDP 16-06 RA X CUP 14-09 and CUP 16-01 RA X RA = Recommended Approval X = Final City decision – making authority III. ANALYSIS The proposed project is subject to the following plans, ordinances and standards as analyzed within the following section of this staff report: A. General Plan Land Use and Community Design (Residential 23 and L Land Use Designations), Mobility, Noise and Housing Elements; B. Bressi Ranch Master Plan/Planned Community Zone Planned Community (P-C) Zone, Chapter 21.38 of the Municipal Code; C. Growth Management, Chapter 21.90 of the Municipal Code - Local Facilities Management Plan Zone 17; D. City Council Policy 43 compliance; E. Subdivision Ordinance, Title 20 of the Municipal Code; F. Planned Development and non-Residential Planned Development Ordinance, Chapter 21.45 and 21.47 of the Municipal Code; G. Site Development Plans, Chapter 21.53(Affordable Housing) and 21.31 (CL Zone) of the Municipal Code; H. Conditional Use Permits, Chapter 21.42 of the Municipal Code; and I. McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP). EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 5 The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable regulations and policies. The project’s compliance with each of the above regulations is discussed in detail in the sections below. A. General Plan The General Plan Amendment (GPA) will modify and reconfigure the land use designations of the property. The existing Planned Industrial (PI) designation will be removed and replaced by a new Residential 23 (R-23) and Local Shopping Center (L) land use designations. The R-23 designation will be placed on 7.67 acres on the west side of the property and L designation on the 9.97 acres located on the east side of the property. This project is in conformance with the Master Plan, as revised, and, therefore, is also in compliance with the General Plan. The project complies with Elements of the General Plan as outlined in Table 4 below. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 6 TABLE 4 – GENERAL PLAN COMPLIANCE Land Use and Community Design Element Goal, Policy Project Consistency Land Use Goal 2-G.1: Maintain a land use program with amount, design and arrangement of varied uses that serve to protect and enhance the character and image of the city as expressed in the Carlsbad Community Vision, and balance development with preservation and enhancement or open space. The proposed project provides land uses that would provide additional housing opportunities within the City and, more specifically, the Bressi Ranch Master Plan area. The proposed project is representative of an infill development project that would support continued open space preservation and would be supported by existing community facilities within the Master Plan development. The project would integrate the proposed uses with the existing Master Planned community thereby encouraging social interaction through the provision of supporting recreational and open space needs of project residents and connection to the existing pedestrian circulation system. Residential development will include up to 125 units (100 market rate units and 25 affordable units) in a variety of product types that will appeal to a wide cross-section of home buyers. Residential products would include flats and townhomes. In addition, a majority of the units proposed will meet the higher density criteria to qualify (per State Guidelines) as affordable to low and moderate income buyers. Land Use Goal 2-G.2: Promote a diversity of compatible land uses throughout the city, to enable people to live close to job locations, adequate and convenient commercial services, and public support systems such as transit, parks, schools, and utilities. Such a diverse mix of housing options will enhance the energetic character of the community. Land Use Goal 2-G.3: Promote infill development that makes efficient use of limited land supply, while ensuring compatibility and integration with existing uses. Ensure that infill properties develop with uses and development intensities supporting a cohesive development pattern. The project site is representative of a classic infill site, surrounded by existing development on all sides, and is not located within a proposed preserve area identified in the City’s HMP. Land Use Goal 2-G.4: Provide balanced neighborhoods with a variety of housing types and density ranges to meet the diverse demographic, economic and social needs of residents, while ensuring a cohesive urban form with careful regard for compatibility. Project design recognizes the need for vehicular traffic, but the emphasis has been placed on access to alternative forms of transportation to the degree possible. Public transit access is integral to the community. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 7 Land Use Goal 2-G.6: Allow a range of mixed- use centers in strategic locations that maximize access to commercial services from transit and residential areas. A regional and local serving bus transit service line (Route 445) along Palomar Airport Road will provide connectivity between the project site and employment and community facilities outside the project site. An existing transit stop is located on Palomar Airport Road, approximately 150 feet east of El Fuerte Street. Regional pedestrian and biking trails on internal roadways provide access to adjacent neighborhoods and villages, and the off-site open space preserves. Pedestrian access would be provided to the proposed shopping center and the existing Bressi Ranch Village Center shopping center to the south. That any proposed commercial development can be justified economically at the location proposed and will provide adequate commercial facilities of the types needed at such location proposed, in that an extensive commercial study was prepared and the Uptown Bressi site was identified as a desirable location for commercial services to satisfy the needs of the greater Carlsbad residents. There is sufficient desire for additional restaurants and food options based on Sales Tax Capture and Gap Analysis reports for the City of Carlsbad in these commercial categories. The retail vacancy rate city wide remains very low (3%) which supports greater demand for retail space and indicates a need for options in the primary and secondary market areas. Land Use Goal 2-G.7: Ensure that neighborhood serving shopping and mixed-use centers include shopping as a pedestrian- oriented focus for the surrounding neighborhood, are physically integrated with the surroundings, and contain neighborhood- serving stores and small offices. Where appropriate, include in the centers high and medium density housing surrounding the retail core or integrated in mixed-use buildings. Land Use Goal 2-G.8: Provide opportunities for continued economic growth and vitality that enhance Carlsbad’s position as a premier regional employment center. Land Use Goal 2-G.19: Ensure that new neighborhood commercial centers are designed for pedestrian comfort, and integrate with the surrounding neighborhoods with new streets and paths. Land Use Policy 2-P.17: Application for re- designation of land to commercial land uses shall be accompanied by a conceptual development plan and market study that demonstrates the economic viability and impacts on the viability of commercial uses within shared trade areas. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 8 2013-2021 Housing Element Goal, Policy Project Consistency Policy 10-P.10: Ensure the availability of sufficient developable acreage in all residential densities to accommodate varied housing types to meet Carlsbad’s 2010-2020 Regional Housing Needs Assessment (RHNA), as discussed in Section 10.3 (Resources Available). Per CMC Section 21.85.030, a project is required to provide 15 percent of the total units as affordable units. City Council Policy 43 notes that if a project is allocated units from the Excess Dwelling Unit Bank, the allocation is considered an incentive and the city could, therefore, request that 20 percent of the units be qualified as affordable units. Similarly, in September 2015, the City Council approved Planning Commission Resolution No. 7114, which required projects as part of the General Plan Update requesting units from the Excess Dwelling Unit Bank, to provide a minimum of 20 percent of the total housing units on the site as affordable to lower income households. Given that no residential units were previously proposed for the project site, all 125 residential units will be allocated from the Excess Dwelling Unit Bank. Therefore, the project is required to provide 20 percent of the total units (25 units) as affordable units. The proposed project would provide a diversity of housing. The affordable housing component proposes 25 units that will provide for-sale housing opportunities for low-income households. The project will develop an infill site that is currently designated for planned industrial uses. The project would introduce new land uses to replace the existing planned industrial use with residential and commercial uses, and implements and establishes consistency with the requirements and policies of the Housing Element. The project would expand the City’s affordable housing stock to assist the City in meeting its Regional Housing Needs Assessment. The city currently has a jobs/housing ratio where there are more jobs than housing. Providing more housing would reduce impacts on surrounding communities and would reduce commutes. Policy 10-P.15: Pursuant to the Inclusionary Housing Ordinance, require affordability for lower income households of a minimum 15 percent of all residential ownership and qualifying rental projects. For projects that are required to include 10 or more units affordable to lower income households, at least 10 percent of the lower income units should have three or more bedrooms (lower income senior housing projects exempt). Policy 10-P.19: Address the unmet housing needs of the community through new development and housing that is set aside for lower and moderate income households consistent with priorities set by the Housing and Neighborhood Services Division, in collaboration with the Planning Division, as set forth in the city’s Consolidated Plan. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 9 Mobility Element Goal, Policy Project Consistency Goal 3-G.1: Keep Carlsbad moving with livable streets that provide a safe, balanced, cost- effective, multi-modal transportation system (vehicles, pedestrians, bikes, transit), accommodating the mobility needs of all community members, including children, the elderly and the disabled. The circulation system for the proposed project would connect to the existing circulation system developed in conjunction with the Master Plan development. The main commercial entry to the project site is from Gateway Road, north of Finnila Place, which accesses the Bressi Ranch Village Center shopping center. At this point, a new access road will be extended north from Gateway Road to access the commercial shopping center proposed in the eastern half of the project site. Main access to the residential uses on the western half of the project site would occur via a new access road from Colt Place. This access road would connect to multiple internal roadways within the residential portion of the project as well as the commercial portion of the project site. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 10 Goal 3-G.3: Provide inviting streetscapes that encourage walking and promote livable streets. The project’s roadways are designed with parkways and bike lanes, and to minimum drive widths to calm traffic and to reduce the amount of paved surface within the project site. Traffic calming measures have been incorporated into the project design as an important part of the provision of "Complete Streets", or livability as promoted within the Bressi Ranch Master Plan area. These measures contribute to allowing the roadway to operate with all users in mind, including motorists, bicyclists, public transportation vehicles and pedestrians. The traffic calming measures, which are intended to slow traffic, discourage cut-thru trips and provide for a safer pedestrian and bicycle oriented community, include the provision of entry medians, roundabouts/traffic circles, well-identified mid-block pedestrian crossings and roadway neckdowns (chicanes). Bike lanes will be included on all public streets within the project. Bicycle racks or storage would be located in the commercial shopping center. Five-foot wide sidewalks will be provided to facilitate pedestrian access to other uses within and adjacent to the project site. Transportation alternatives will be available to those living in and visiting the project. The project contains easy and convenient connection to the regional bus system and the planning area via the existing transit stop on Palomar Airport Road just east of El Fuerte Street. The North County Transit District (NCTD) bus route #445 will provide service to the project and the above referenced bus stop on Palomar Airport Road. This bus stop features a bus turnout, street furniture, including benches, shelters and transit information. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 11 Noise Element Goal, Policy Project Consistency Goal 5-G.1: Protect public health and welfare by eliminating existing noise problems where feasible, maintaining an acceptable indoor and outdoor acoustic environment, and preventing significant degradation of the acoustic environment. The primary noise source associated with the proposed project will be from traffic along Palomar Airport Road and from noise generated by the proposed commercial uses. The project will require the installation of a six-foot high noise wall at one location along the northern perimeter of the project site to mitigate noise from Palomar Airport Road to an acceptable noise level. The project will not create a noise impact to off-site uses. Landscaping is currently installed along Palomar Airport Road. The proposed six-foot high noise wall would be screened by the existing landscaping along Palomar Airport Road. Goal 5-G.2: Ensure that new development is compatible with the noise environment, by continuing to use potential noise exposure as a criterion in land use planning. Goal 5-G.3: Guide the location and design of transportation facilities, industrial uses and other potential noise generators to minimize the effects of noise on adjacent land uses. Policy 5-P.6: Discourage the use of berms and sound walls for noise mitigation; rather, encourage the use of project design techniques such as increasing the distance between the noise source and the noise sensitive receiver and use non-noise sensitive structures (e.g., a garage) to shield noise sensitive areas. If a berm or wall is determined necessary to mitigate noise, discourage exclusive use of walls in excess of six feet in height and encourage use of natural barriers such as site topography or constructed earthen berms. When walls are determined to be the only feasible solution to noise mitigation, then the walls shall be designed to limit aesthetic impacts. When walls over six feet in height are necessary to mitigate noise, a berm/wall combination with heavy landscaping, a terraced wall heavily landscaped, or other similar innovative wall design technique shall be used to minimize visual impacts. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 12 Policy 5-P.16: Require new nonresidential development to comply with the noise compatibility criteria in the ALUCP. Require dedication of avigation easements for new developments designated as conditionally compatible for noise in the ALUCP, and which are located within the 65 dB CNEL noise contour as mapped on Figure 5-4: Airport Noise Compatibility Policy Map. The project site is located within Airport Overflight Notification Area (Review Area 1) of the AIA for Palomar Airport. Residential properties located in an overflight notification area may be subject to some of the annoyances or inconveniences associated with their proximity to airport operations. The ALUCP requires that all new residential projects located within the overflight notification area be required to record a notice informing of the potential environmental impacts related to the aircraft, and the property is subject to overflight, sight and sound of aircraft operating from the McClellan-Palomar Airport. Implementation of Mitigation Measure LU-1 would maintain compatibility with the ALUCP and ensure that impacts associated with intermittent airport overflights remain less than significant. Public Safety Element Goal, Policy Project Consistency Goal 6-G.1: Minimize injury, loss of life, and damage to property resulting from fire, flood, hazardous material release, or seismic disasters. The City has adopted the City of Carlsbad Emergency Plan, which addresses the City’s planned response to extraordinary emergency situations. The City’s plan identifies certain open space areas and public buildings to serve as emergency shelters when residents must be relocated. Goal 6-G.2: Minimize safety hazards related to aircraft operations in areas around the McClellan-Palomar Airport. The proposed project is in compliance with the ALUCP airspace protection surfaces because a determination of no hazard to air navigation has been issued by the FAA. Goal 6-G.4: Maintain safety services that are responsive to citizens’ needs to ensure a safe and secure environment for people and property in the community. The project site is not located within a 100-year flood plain. The proposed project does not involve the routine use and storage of hazardous materials and hazardous waste. The project will not result in a significant hazard to the public or environment. The project site currently consists of primarily vacant, undeveloped land with non-native vegetation. According to maps produced by the State, the project site has little to no threat from wildfires. Open Space, Conservation and Recreation Element Goal, Policy Project Consistency Goal 4-G.1: Develop a balanced and integrated open space system reflecting a variety of considerations – resource conservation, production of resources, recreation, and The project site is situated within the Bressi Ranch Master Plan area, which includes a plan for open space. As adopted, the Master Plan provides for approximately 191 acres of natural and improved open EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 13 aesthetic and community identity – and ensuring synergies between various open space components and compatibility with land use planning. space. None of these open space areas overlap with the project site, which is currently proposed for planned industrial development. In accordance with the adopted HMP, the project would not alter the existing preservation strategy for the Bressi Ranch Master Plan, which already permanently preserves and protects a majority of the sensitive habitats in the Master Plan development. Goal 4-G.3: Protect environmentally sensitive lands, wildlife habitats, and rare, threatened or endangered plant and animal communities. These designated open space areas would be unaffected by the proposed project and associated Master Plan amendment. In addition to the open space opportunities provided off-site, the project’s residential component would provide three on-site neighborhood recreation areas on approximately 0.66 acres spread throughout the site. As required by the Planned Development Ordinance, Chapter 21.45 of the Carlsbad Municipal Code, active and passive recreational opportunities are required in the form of pocket parks and/or common recreation areas located in the residential planning areas. Common recreation facilities for the residential component of the project will include the required active and passive recreational areas. Goal 4-G.13: Protect air quality within the city and support efforts for enhanced regional air quality. The project implements and is consistent with measures identified in the CAP thought the provision of renewable energy generation (photo-voltaic systems), energy conservation (Green Building Code), Transportation Demand Management, and by accommodating Zero-Emission vehicles and other greenhouse gas reduction measures and features. Policy 4-P.1: Maintain an integrated open space classification system that accommodates conservation, resource production, recreation, and aesthetic needs. The proposed project would provide its own common and private amenities, including private patios and decks, a resort-style pool and spa, outdoor kitchen and social space, children's play area, bocce ball court, dedicated green space, and bicycle (or surfboard) storage. Per Section 21.45.060 of the CMC, 18,750 sf of common recreation space (150 sf per unit) is required, of which 75 percent (14,063 sf) is required to be active recreational space. A total of 28,685 square feet of common recreational space is provided, and 14,073 sf is dedicated to active recreation, including the pool/spa area, tot lot, shuffleboard and bocce ball courts. Policy 4-P.28: Require, where possible, developers of master planned communities to provide pocket parks and active recreational facilities unique to each development. The Bressi Ranch Master Plan provides individual open space within individual neighborhoods to serve the residents. The Village Green is a common open space EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 14 Maintenance of pocket parks shall be accomplished through homeowners’ association dues. Pocket parks shall remain in private ownership. area within Open Space Area 2 and serves the entire community. Sustainability Element Goal, Policy Project Consistency Policy 9-P.1: Enforce the Climate Action Plan (CAP) as the city’s strategy to reduce greenhouse gas emissions. The project implements and is consistent with measures identified in the CAP through the provision of renewable energy generation (photo-voltaic systems), energy conservation (Green Building Code), Transportation Demand Management, and by accommodating Zero-Emission vehicles and other greenhouse gas reduction measures and features. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 15 B. Master Plan/Planned Community Zone Planned Community (P-C) Zone The intent and purpose of creating a master plan is to encourage the orderly implementation of the General Plan by the comprehensive planning and development of large tracts of land. A master plan provides a flexible regulatory procedure to encourage the creative and imaginative planning of coordinated communities involving a mixture of residential densities and housing types, open space, community facilities and, where appropriate, commercial and industrial areas. All master plans are required to reserve a site (or sites) for community facility uses which benefit the community as a whole by satisfying social/religious/human service needs. The Master Plan will provide a framework to allow for the coordination of planning efforts between the developer and the City to provide for the orderly development of all necessary public facilities to ensure their availability concurrent with need. The proposed project would involve amending the Planned Industrial land use designation of Planning Area 4 to allow a mixed-use development consisting of high density for-sale residential units and commercial/retail uses. While the previously contemplated Planned Industrial square footage would be reduced within Bressi Ranch by approximately 300,000 sf, the previously approved 623 dwelling units under the Master Plan would be increased by 125 units to 748 dwelling units, along with an increase of approximately 91,164 sf in commercial use. As part of the Master Plan Amendment (MP 178 (I)), the applicant proposes that the project site be removed from PA 4 and be placed into a new planning area, Planning Area 16. PA 4 allows for the development of office, research & development, light manufacturing and warehouse uses. The purpose of Planning Area 16 is to allow for the creation of a unique mixed-use neighborhood that will provide additional residential units and expand the commercial and restaurant uses available that are within walking distance to Bressi Ranch residents. Table 5 below outlines the consistency of the project with the goals of the Master Plan. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 16 TABLE 5 – BRESSI RANCH MASTER PLAN CONSISTENCY DETERMINATION SUMMARY Master Plan Goal Consistency Determination 1. All planning should be in the form of complete and integrated communities containing housing, shops, work places, schools, parks, and civic facilities essential to the daily life of the residents. The proposed project provides land uses that would provide additional housing opportunities within the City and Bressi Ranch Master Plan area and takes advantage of existing community facilities constructed as part of the Master Plan development. Residential development will include approximately 100 market rate units and 25 affordable housing units that will appeal to low and moderate income home buyers. For purposes of the Housing Element and other state housing programs, the California Department of Housing and Community Development has established five income categories based on Area Median Income (AMI) of a Metropolitan Statistical Area. The AMI, which is different from estimated median household incomes, is applicable to all jurisdictions in San Diego County and changes in the cost of living. As identified in the City’s 2013-2021 Housing Element, the AMI for San Diego County is $75,900. According to the California Department of Housing and Community Development, low income is defined as a household whose income does not exceed 80 percent of area median income of San Diego County. Moderate income is defined as a household whose income does not exceed 120 percent of the area median income of San Diego County. These residences would be integrated and situated closely to existing (and proposed) retail, recreational, and community facilities. 2. Community size should be designated so that housing, jobs, daily needs and other activities are within easy walking distance of each other. The project provides moderate and low-income housing opportunities along with numerous employment opportunities within less than a quarter mile of the project site. 3. As many activities as possible should be located within easy walking distance of transit stops. The project would be constructed in close proximity to existing retail and commercial development, thereby encouraging non- motorized forms of transportation. A transit stop is located 150 feet from the northeast corner of the project site, thereby enabling for connectivity to transit. 4. A community should contain a diversity of housing types to enable citizens from a wide range of economic levels and age groups to live within its boundaries. The Bressi Ranch Master Plan area currently contains low to medium density single-family residences, medium density single-family or attached multi-family residences and medium high small lot single-family or attached multi-family residences. The proposed project would introduce housing product types that are not currently offered in the Master Plan area. The proposed project would provide high density, attached multi- family residences in the form of stacked flats and townhomes. 5. Businesses within the community should provide a The project’s retail/commercial component would provide a variety of building sizes that would attract a diversity of tenants. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 17 Master Plan Goal Consistency Determination range of job types for the community’s residents. 6. The location and character of the community should be consistent with a larger transit network. The project would enhance the character of the existing Master Plan area by replacing planned industrial development with a mix of commercial and residential uses near the northern entrance. The proposed project would complement the already successful Bressi Ranch Village Center located on the south side of Gateway Road. The proposed project would expand the commercial and restaurant uses available within walking distance to Bressi Ranch residents. Finnila Place would be extended through the middle of the retail/general commercial site to create a main street, and buildings would be located along both sides of this road. To encourage pedestrian activity and create gathering places wherever possible, plazas have been located throughout the retail/general commercial center. 7. The community should have a center focus that combines commercial, civic, cultural, and recreational uses. 8. The community should contain an ample supply of specialized open space in the form of squares, greens and parks whose frequent use is encouraged through placement and design. The project site would be contained within the Bressi Ranch Master Plan development which contains multiple recreational land uses including open space areas, recreation facilities, pocket parks, and a pedestrian circulation system to serve the proposed residential component of the project. The proposed project would provide its own common and private amenities, including private patios and decks, a resort- style pool and spa, outdoor kitchen and social space, children's play area, bocce ball court, dedicated green space, and bicycle (or surfboard) storage. Per Section 21.45.060 of the CMC, 18,750 sf of common recreation space (150 sf per unit) is required, of which 75 percent (14,063 sf) is required to be active recreational space. A total of 28,685 square feet of common recreational space is provided, and 14,073 sf is dedicated to active recreation, including the pool/spa area, tot lot, shuffleboard and bocce ball courts. 9. Public spaces should be designed to encourage the attention and presence of people. Both the retail/commercial and residential land use will include common areas to provide a sense of place within each portion of the development. 10. Each community or cluster of communities should have a well-defined edge, such as agricultural greenbelts or wildlife corridors, permanently protected from development. The project site is representative of a classic infill site with defined edges on all sides of the development. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 18 Master Plan Goal Consistency Determination 11. Streets, pedestrian paths and bike paths should contribute to a system of fully connected and interesting routes to all destinations. Their design should encourage pedestrian and bicycle use by being small and spatially defined by buildings, trees, and lighting; and by discouraging high speed traffic. The project would integrate with the existing non-motorized transportation network within the Bressi Ranch Master Plan Development. The project’s roadways are designed with parkways and bike lanes, and to minimum drive widths to calm traffic and to reduce the amount of paved surface within the project site. Traffic calming measures have been incorporated into the project design as an important part of the provision of "Complete Streets", or livability as promoted within the Bressi Ranch Master Plan area. These measures contribute to allowing the roadway to operate with all users in mind, including motorists, bicyclists, public transportation vehicles and pedestrians. The traffic calming measures, which are intended to slow traffic, discourage cut-thru trips and provide for a safer pedestrian and bicycle oriented community, include the provision of entry medians, roundabouts/traffic circles, well- identified mid-block pedestrian crossings and roadway neckdowns (chicanes). Bike lanes will be included on all public streets within the project. Bicycle racks or storage would be located in the commercial shopping center. Five-foot wide sidewalks will be provided to facilitate pedestrian access to other uses within and adjacent to the project site. 12. Wherever possible, the natural terrain, drainage and vegetation of the communities should be preserved with superior examples contained within parks or greenbelts. As discussed in Section 7.0 of the EIR, the project site has been mass-graded associated with the previously-approved PI uses for the site and does not contain any natural vegetation or sensitive biological habitats; riparian, aquatic or wetland habitat; or federally protected wetlands. No sensitive biological resources are located on the project site that would otherwise be impacted by the proposed project. 13. The community design should help to conserve resources and minimize waste. The proposed project will comply with CALGREEN, which requires every new building constructed in California to reduce indoor water use by 20 percent, divert 50 percent of construction waste from landfills, and install low pollutant-emitting materials. The proposed project includes indoor and outdoor water conservation measures. Indoor water conservation measures will include water pressure reducing valves and water efficient dishwashers in kitchens and dual flush toilets. Outdoor water conservation will be accomplished through the use of reclaimed water and through the use of water conserving plant materials. The project will also include efficient lighting and Photo-voltaic panels. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 19 The following Tables 6, 7 and 8 demonstrate project compliance with the Commercial Master Plan Design Standards, the C-L Zoning Compliance, and the Residential Master Plan Design Criteria and Development Standards contained within the Master Plan. TABLE 6 – COMMERCIAL MASTER PLAN DESIGN STANDARDS AND GUIDELINES Master Plan design standards and guidelines Provided Adequate building separation to preserve a sense of place, open space, pedestrian scale and amenities to make the space inviting. Pedestrian plazas and eating areas are provided between buildings. All structures should be located in relation to each other to enhance the vision of creating safe, convenient, and interesting pedestrian places. Buildings are located in relation to each other to form a street scene with pedestrian scale plazas with seating and amenities. Buildings face the internal streets. Pedestrian Orientation. Sidewalks are provided along the drive aisle and also provided as interconnecting walks throughout the site and to adjacent uses. Buildings oriented away from residential uses. Commercial store fronts do not face the residential area to the west and a landscape buffer provides separation. Double loaded parking on streets and bulb-outs for pedestrians. The extension of Finnila Place has angled parking on both sides of the street and bulb-outs are provided. Public gathering places. Two gathering areas are provided within the residential area in addition to the public areas within the Master Plan. The commercial area provides multiple locations in plazas where the public can gather. TABLE 7 – COMMERCIAL DEVELOPMENT CL ZONE COMPLIANCE STANDARD – CL Zone PERMITTED/REQUIRED PROPOSED Property Size 7 gross acres 9.97 gross acres Building Height 35 feet w/allowed protrusions to 45 feet 24 to 28 feet/single levels/w architectural feature to 38 feet. Yards (C-L Zone) Palomar Airport Road (Prime) - 20 feet El Fuerte Street (Secondary) - 15 feet Gateway Road (Local Street) – 10 feet Prime setback = 65 feet to buildings and 25 feet to parking Secondary setback = 49 feet to buildings and 20 feet to parking Local setback = 29 to buildings and 15 to parking Landscaping Per landscape manual Parking areas and slopes are landscaped per landscape manual. Walls and Fences Provided along common lot line Project provides an open space buffer between commercial and residential land uses. The Master Plan discourages the EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 20 use of walls to separate uses in PA 16. Lighting Exterior lighting required for parking, walkways and building entrances and exits. Lighting to be designed to avoid direct or indirect glare. Project is conditioned to provide a lighting plan prior to building permit issuance. The lighting plan shall include light design and a photometric plan, and lighting shall be designed to reflect downward and avoid any impacts on adjacent homes or property. Roof appurtenances Shield and screen roof appurtenances Roof equipment is screened and shielded by building design elements such as roof parapets or equipment screens. Trash enclosures Enclosed in six-foot-high enclosures. Trash enclosures are provided throughout the project site and meet Engineering Standard GS - 16. Loading Areas and Docks Oriented and screened from adjacent streets or properties. All loading areas and docks are oriented and/or screened from adjacent public streets and residential properties, and noise attenuation walls are included. Parking* 502 spaces required (5 sp/1,000 sq. ft).* 491 parking spaces are provided (4.89 sp/1,000 sq. ft.)* Employee eating areas 546 square feet or public eating area Public eating areas are provided in multiple plazas over 600 sq. ft. in area. Signs Sign Program required The project is conditioned to provide a sign program to create a comprehensive sign plan for the commercial project. Recycling Areas Receptacles adequate in capacity and number to serve the project. Provided within proposed trash enclosures *The applicant is requesting a 2.2% reduction for shared parking between all the commercial uses on the site. The 9,160 sq. ft. of outdoor dining area is included in the overall parking demand. The parking ordinance allows up to a 15% reduction for shared parking. The 2.2% reduction amounts to 11 fewer parking spaces than required by Code. All of the parking spaces are available to any user of the center and parking is well distributed to provide adequate parking to each individual tenant. Other commercial projects that have requested and were approved reductions are: Bressi Ranch Village Center 5% (SDP 06-17(A)), Palomar Commons 5%, La Costa Town Square 8.3%. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 21 TABLE 8 – RESIDENTIAL MASTER PLAN DESIGN CRITERIA AND DEVELOPMENT STANDARDS Master Plan design standards and guidelines Provided Convenient pedestrian connectivity Homes have pedestrian access and front onto Gateway Road encouraging pedestrian activity. Sidewalks are provided off of Gateway Road. The sidewalks provide a pedestrian connection to the public streets and commercial area to the east. Residential development shall comply with the Municipal Code, including Chapter 21.45, Planned Developments. Compliance with the Planned Development (PD) ordinance is discussed in Section E below and provided in Attachment No. 4, PD Tables C, E and City Council Policy 66. The Master Plan Amendment also includes updates to the Master Plan to reflect the new General Plan Land Use designations and past Zone Code amendments, including, the title change of the Planning Director to City Planner, Planning Department to Planning Division, references to past Code sections that have changed, and the permit processing change from Planned Industrial Permit to Site Development Plan. An underline/strikeout version has been made available as a separately attached document. C. Growth Management – Local Facilities Management Plan (LFMP) Zone 17 A Local Facilities Management Plan (LFMP) has been previously prepared for Zone 17 pursuant to the requirements of the Growth Management Ordinance, Chapter 21.90 of the Municipal Code. This amendment is to reflect the revision to the land use boundaries as a result of the proposed land use changes. The project will be in compliance with the required performance standards by satisfying the general and special conditions listed in the LFMP. The facility demands of the build out of Local Facilities Management Zone 17 were based on a projection of future development within the zone. Table 8 below summarizes the anticipated development within Zone 17 compared to the proposed project. TABLE-8 – EXISTING AND PROPOSED DEVELOPMENT LAND USE DEVELOPMENT ASSUMPTION PROPOSED PROJECT NET CHANGE Industrial 300,000 sq. ft. 0 sq. f.t -300,000 sq. ft. Commercial 0 sq. ft. 91,164 sq. ft. + 91,164 sq. ft. Residential 23 0 dwelling units (du) 125 du + 125 du The citywide facilities impact for Zone 17 are summarized in Table 9 below and are further analyzed in the EIR and LFMP Zone 17. TABLE 9 – LFMP ZONE 17 SUMMARY STANDARD IMPACTS COMPLIANCE W/STANDARDS City Administration 442 sq. ft. Yes Library 236 sq. ft. Yes Waste Water Treatment 175 EDU – no impact Yes Parks .88 Acres Yes Drainage No impact Yes EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 22 Circulation 9,014 ADT Yes Fire Station #5 Yes Open Space Provided as part of Master Plan Yes Schools: Carlsbad Unified School District Elementary: 15 Middle: 6 High: 7 Yes: School Fees Sewer 462,560 or 175 EDU Yes Water 52,468 gpd Yes As identified in the Public Services and Utilities Section of the EIR 15-01, all facilities to serve the project are adequate and no significant impacts have been identified with public facilities. The City currently maintains an excess number of unbuilt dwelling units in the excess dwelling unit bank. The Uptown Bressi project proposes to reduce the number by 125 units for the Residential High density site. These dwelling units can be accommodated within Zone 17 without exceeding the Southeast Quadrant dwelling unit cap. The Southeast Quadrant may allow up to 661 additional units before the quadrant cap is met. The quadrant cap number of 661 does not include existing vacant (unbuilt) residential land use designated properties. There are adequate units in the Excess Dwelling Unit Bank (352) for the allocation of 125 dwelling units for the land use change from Planned Industrial to R-23. The project’s 125 dwelling units do not significantly increase the demands of facilities as shown above and adequate facilities are provided. D. City Council Policy 43 compliance City Council Policy No. 43 identifies that an allocation of excess dwelling units is an “incentive”, as defined by Carlsbad Municipal Code (CMC) Section 21.86.020.A.12 and Government Code Section 65915(k), in that it is a regulatory concession that modifies the requirements of CMC Chapter 21.90 by permitting development with more dwelling units than otherwise permitted by the growth management control point established in CMC Chapter 21.90 or the allocation of excess dwelling units to a property will permit more dwelling units on a site than would otherwise be allowed by the existing underlying General Plan land use designation. Since the project is to change the General Plan Land Use from Planned Industrial to Residential (R-23), a request for withdrawal of 125 dwelling units from the excess dwelling unit bank is required. In exchange for making such offset/allocation available, the city council finds it is appropriate to require, in accordance with Carlsbad Municipal Code (CMC) Section 21.85.100, any residential development (rental or for-sale) to enter into an affordable housing agreement with the City of Carlsbad to provide a minimum of 20 percent of the total housing units on the site of the residential development as affordable to lower income households at 80% or below the San Diego County Area Median Income. The project is conditioned to enter into an affordable housing agreement with the city and to provide 25 units as affordable housing units. The location and density of the site to be allocated excess dwelling units is compatible with existing adjacent residential neighborhoods and nearby existing and proposed commercial uses in that the site is within close proximity to neighborhood services (shopping, employment, parks, schools, etc.); is not located in areas that contain significant natural or manmade hazards; and is adjacent to or near properties with similar densities. E. Subdivision Ordinance, Title 20 of the Municipal Code The project necessitates the processing of a Tentative Tract Map for the creation of individual commercial lots and 125 airspace units. The applicant has requested a Vesting Tentative Tract Map (CT 14-09). The EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 23 commercial project proposes three lots and the residential proposes 125 airspace (condominium) units on one lot. A Residential Planned Development Permit (PUD 14-10) accompanies this application for the condominium units. Tables 10 and 11 below summarize the projects compliance with the Subdivision Ordinance. TABLE 10 – COMMERCIAL PROJECT (CT 14-09) COMPLIANCE TABLE STANDARD REQUIRED PROVIDED COMPLY? Minimum Lot Area 4 acres (net) or 7 acres (gross) 9.97 ac. gross Yes Front on a dedicated street Frontage on a public street unless allowed per Chapter 21.47 for non- residential planned developments. The project fronts onto El Fuerte Street and Gateway Road, which are publicly dedicated streets. The PUD lots are allowed per Chapter 21.47. Yes Lot width N/A 680 ft. (El Fuerte St.) and 700 ft. (Gateway Rd.). Yes Bicycle routes Provide for bicycle routes on Circulation Element roadways. Bicycle routes are provided along Palomar Airport Road and Gateway Rd. Yes Street Plan Assure proper development of abutting properties and street plans. The project’s intersections have been aligned with existing driveways and street intersections. Yes Passive heating/cooling design Design for passive heating and cooling. Project provides, where feasible, building orientation to take advantage of passive heating and cooling. Yes TABLE 11 – RESIDENTIAL PROJECT (CT 14-09) COMPLIANCE TABLE STANDARD REQUIRED PROVIDED COMPLY? Minimum Lot Area 10,000 sq. ft. 7.67 acres. Yes Front on a dedicated street Frontage on a public street. Lots front onto publicly dedicated streets. Yes Lot width 60 feet/33 on cul-de-sac 360 ft. Gateway Rd and 420 ft. Colt Pl. Yes Bicycle routes Provide for bicycle routes on Circulation Element roadways. Bicycle routes are provided along Gateway Rd. Yes Street Plan Assure proper development of abutting properties and street plans. The project’s intersections have been aligned with existing street intersections and connections to adjacent streets are provided. Yes Passive heating/cooling design Design for passive heating and cooling. Project provides, where feasible, building orientation to take advantage of passive heating and cooling. Yes EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 24 The Engineering Department has reviewed the proposed Vesting Tentative Map and has concluded that the subdivision, as conditioned, complies with all the applicable requirements of the Subdivision Map Act and the City’s Subdivision Ordinance. All of the parcels are within the same Tax Code Area. All infrastructure improvements, including frontage and project-related roadways and the extension of existing drainage and sewer facilities, are existing or are being installed concurrent with development. General utility, access, and water/reclaimed-water easements will be dedicated with recordation of the final maps. An owners association will be required for the maintenance of common properties. F. Planned Development and Non-Residential Planned Development Ordinance, Chapter 21.45 and 21.47 of the Municipal Code The proposal is to create a one-lot residential development that shares access and necessitates that a Planned Development Permit be processed to supplement the proposed Vesting Tentative Map (CT 14- 09). The 125 residential lots airspace condominium units will share common driveway access, parking areas, recreation and landscaped areas which will be commonly maintained by an owners association. The units proposed for Planning Area 16 are intended to add a diversity of housing opportunities available within the community by providing a high density attached housing product. The units are ideally situated in close proximity to Uptown Bressi and the Bressi Ranch Shopping Center. Pursuant to Section X.E.8 of the Master Plan (Planning Area 16), multi-family airspace condominiums are required to comply with the Planned Development standards of the Zoning Ordinance (CMC Chapter 21.45), as well as City Council Policy No. 66, Livable Neighborhoods. The project is in compliance with the Planned Development Ordinance and City Council Policies and the compliance tables are included as Attachment 4, PD Tables C, E and City Council Policy 66, of the staff report. G. Site Development Plans, Chapter 21.53 (Affordable Housing) and 21.31 (CL Zone) of the Municipal Code The C-L Zone requires the processing of a Site Development Plan processed pursuant to Chapter 21.06, the Qualified Development Overlay Zone. Per the Municipal Code (21.31.040(C), the City Council shall be the decision maker for the commercial SDP and related permits. The residential development also requires a Site Development Plan permit. Pursuant to section 21.53.120 of the Municipal Code, the Site Development Plan findings are the same for both commercial and residential projects. Four findings are required for the Q-Overlay Zone. The required findings with justification for each are contained in the Planning Commission Resolution for each of the projects. This section summarizes the necessary findings and support for each. 1. That the requested use is properly related to the site, surroundings, and environmental settings; it is consistent with the various elements and objectives of the General Plan; it will not be detrimental to existing uses or to uses specifically permitted in the area in which the proposed use is to be located; and it will not adversely impact the site, surroundings, or traffic circulation. The requested use is properly related to the site, surroundings and environmental setting as the project design complies with the requirements of the Bressi Ranch Master Plan and all other applicable development regulations as discussed previously in this report. The proposed commercial and residential uses are consistent with and implement the respective Local Commercial and Residential 23 Land Use designations. The required setbacks and roadways provide an appropriate buffer between the commercial center and existing residential developments and ensure the proposed project will not be detrimental to existing uses. Furthermore, the surrounding residential EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 25 uses will benefit directly by having an additional commercial center to serve everyday commercial needs in close proximity to their residences. The project’s architectural design will complement the area’s neo-traditional architecture. All required parking has been provided for and the infrastructure needs (full street improvements, curb, gutter, sidewalk, and traffic signals) of the uses were planned for with the construction of existing facility improvements or are conditioned to be installed. 2. That the site for the intended use is adequate in size and shape to accommodate the use. The subject site is adequate in size and shape to accommodate the proposed buildings, and the proposed uses comply with the required development and design standards of the Bressi Ranch Master Plan, C-L, and Residential Density Multiple Zones of Carlsbad Municipal Code Title 21 as previously discussed in Section B of this report. The proposed project complies with the development standards for building setbacks, building height, and parking (shared with 2.2 % reduction) as proposed within the Master Plan, C-L, and planned Development Zones. 3. That all yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested use to existing or permitted future uses in the neighborhood will be provided and maintained. The site functions as a component of the Bressi Ranch Master Plan’s desire to create a strong mixed- use component that includes residential, commercial and office/industrial uses in close proximity. The project has been designed in accordance with all development and design standards of the Master Plan, C-L, and Residential Zones; therefore, the project is compatible with existing permitted and future uses. The project has been conditioned to include traffic mitigation measures and noise attenuation to ensure compatibility with the surrounding uses. 4. That the street system serving the proposed use is adequate to properly handle all traffic generated by the proposed use. Access to the retail/general commercial site would be provided from Colt Place, Gateway Road and El Fuerte Street. The access point on El Fuerte Street would be a right in/right out only configuration, and a deceleration lane would be constructed on southbound El Fuerte Street. In addition, a four-way traffic signal is proposed at the Gateway Road/Finnila Place intersection. Pursuant to the Circulation Analysis of the project EIR 15-01, the street system serving the proposed uses will be adequate to handle the 9,014 Average Daily Trips generated by the proposed project. The surrounding public streets are improved to their full-width improvements, including curbs, gutters, and sidewalks. H. Conditional Use Permits, Chapter 21.42 of the Municipal Code A drive through facility and a liquor store (i.e. BevMo!/Total Wine) are proposed within this project. Conditional uses, such as drug store drive-thru windows and liquor stores possess unique and special characteristics that make it impractical to include them as permitted uses “by right” in any of the various zoning classifications (i.e. commercial, office, industrial). Pursuant to the underlying Local Shopping Center (C-L) Zone, drive-thru businesses that are not restaurants, gas stations and car washes are permitted in the zone with the approval of a CUP pursuant to the provisions and findings of Chapter 21.42.030. Staff has reviewed the drive-thru facility and liquor store in the proposed project and concludes that all the necessary findings can be made to approve the CUPs. The required findings and satisfaction of these findings are discussed below. EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 26 1. That the requested use is necessary or desirable for the development of the community, and is in harmony with the various elements and objectives of the General Plan, including, if applicable, the certified local coastal program, specific plan or master plan in that a drug store drive-thru and a liquor store provide a desirable service and is a convenience to the community by providing increased accessibility and is designed to operate safely and efficiently within the commercial center. The uses are consistent with the General Plan Land Use, Mobility, and Public Safety Elements as shown in Table 1. “Public convenience or necessity” is a tool for local government and communities that directly ties them into the state liquor licensing process. A liquor store can provide a benefit to the community through employment gain, business taxes, and as a unique business addition. The Municipal Code allows liquor stores for off-site consumption (off-sale) with specific conditional use restrictions to protect the community by regulating how the business operates and the use has been conditioned accordingly. Current state law limits the issuance of new licenses in geographical regions defined as high crime areas or in areas of “undue concentration” of retail alcohol outlets. The Bressi Ranch area does not have a high concentration of liquor stores, nor does it have a crime rate that is higher than neighboring communities. 2. That the requested use is not detrimental to existing uses or to uses specifically permitted in the zone in which the proposed use is to be located in that the proposed drive-thru facilities lanes are designed so that they will not impact other commercial uses in the center. The drive-thru provides an adequate vehicle stacking lane so as to prevent blocking the commercial center’s internal circulation aisles, parking aisles, or parking spaces. The liquor store provides adequate parking, does not cause congestion or impact the traffic of other nearby commercial uses as shown in the traffic study. The store is not, and is conditioned to not be, within 500 feet of any other licensed liquor store. 3. That the site for the proposed conditional use is adequate in size and shape to accommodate the yards, setbacks, walls, fences, parking, loading facilities, buffer areas, landscaping and other development features prescribed in this Code and required by the City Planner in order to integrate the use with other uses in the neighborhood in that the project complies with all of the applicable development standards of the C-L Zone and the design of the drive-thru lane utilizes a building design element to pass under (awning) with planters and landscaping to screen and separate the drive-thru lane from the parking lot, drive aisles, and El Fuerte Road. The liquor retail store will occupy Building C. Adequate parking is provided in front of the building and adequate vehicular circulation is provided by the design of the center. 4. That the street system serving the proposed use is adequate to properly handle all traffic generated by the proposed use in that access to the retail/general commercial site would be provided from Colt Place, Gateway Road and El Fuerte Street. The access point on El Fuerte Street would be a right in/right out only configuration, and a deceleration lane would be constructed on southbound El Fuerte Street. In addition, a four-way traffic signal is proposed at the Gateway Road/Finnila Place intersection. Pursuant to the Circulation Analysis of the project EIR 15-01, the street system serving the proposed uses will be adequate to handle the 9,014 Average Daily Trips generated by the proposed project. The surrounding public streets are improved to their full-width improvements, including curbs, gutters, and sidewalks. I. McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP) The proposed project falls within the boundaries of the McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP). The ALUCP was amended on March 4, 2010 and all projects within its boundary are required EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 27 to be reviewed for consistency with its goals and policies. The ALUCP identifies four types of airport impacts that must be considered for each development: Noise, Safety, Airspace Protection, and Overflight. Based on a review of the ALUCP, the project site is located in Safety Zone 6 within the airport influence area (AIA) of the McClellan Palomar Airport (San Diego County Regional Airport Authority - SDCRAA 2011). Additionally, the project site is located within the ALUCP’s Airport Overflight Notification Area and Review Area 1 of the AIA (SDCRAA 2011). On November 23, 2015, the ALUC determined that the proposed project is consistent with the McClellan- Palomar ALUCP. Based on the ALUC’s consideration of four compatibility factors and their associated policy objectives as they relate to noise, safety, airspace protection, and overflight, the following summarizes the ALUC’s consistency determination as it relates to each of these factors: 1. Based on a review of Exhibit III-1 from the ALUCP (2011), the project site is located to the south of the 60 dBA CNEL noise contour and the ALUCP identifies all uses located outside the 60 dB CNEL noise contour as compatible with airport uses. 2. According to Policy 3.4.4(e) of the ALUCP (2011), residential development as proposed under the project is compatible with Safety Zone 6 (see Table III-2 of the ALUCP). Similarly, in the context of non- residential development, the ALUCP does not restrict the number of people per acre within Safety Zone 6 (see Table III-2 of the ALUCP) and the ALUCP identifies residential and community/neighborhood shopping center and lodging uses located within Safety Zone 6 as compatible with airport uses. 3. The proposed project is in compliance with the ALUCP airspace protection surfaces because a determination of no hazard to air navigation has been issued by the FAA. Additionally, an avigation easement is already recorded over the property (August 20, 1987), as the ALUCP requires an avigation easement for height on properties where the ground surface already penetrates FAA airspace protection layers. 4. The project site is located within Airport Overflight Notification Area (Review Area 1) of the AIA for Palomar Airport. Residential properties located in an overflight notification area may be subject to some of the annoyances or inconveniences associated with their proximity to airport operations. No additional overflight notification is required in instances when an avigation easement applies. IV. ENVIRONMENTAL REVIEW An Environmental Impact Report (EIR) was prepared for the Uptown Bressi project in accordance with the California Environmental Quality Act (CEQA), the CEQA Guidelines, and the Environmental Protection Procedures (Title 19) of the CMC. The EIR addresses the environmental impacts associated with all discretionary applications for the proposed project, including ultimate build-out of the entire project. City staff issued a Notice of Preparation (NOP) on August 10, 2015. The NOP was distributed to all Responsible and Trustee Agencies, as well as other agencies, and members of the public. Staff scheduled a public scoping meeting session in order to increase opportunities for public input. Notices of the scoping meeting were sent to all property owners within a 600-foot radius of the project boundaries as well as being published in the San Diego Union Tribune. The public scoping session took place on August 19, 2015 at the Bressi Ranch Boys and Girls Club. At the scoping session, the public was invited to comment on the scope and content of the EIR. Written responses were received and these comments were taken into consideration prior to developing a detailed scope of work for the EIR and are published in the EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 28 Introduction chapter of the EIR. The Uptown Bressi Project EIR analyzed the following areas of potential environmental impact:  Aesthetics  Air Quality  Greenhouse Gas Emissions/Global Climate Change  Hydrology and Water Quality  Land Use and Planning  Noise  Population and Housing  Parks/Recreation  Public Services and Utilities  Transportation and Traffic Following the preparation of the Initial Study and consideration of the public and agency comments submitted on the NOP, it was determined that the proposed project would not result in a significant impact to the following environmental topics:  Agriculture and Forestry Resources  Biological Resources  Cultural Resources  Geology and Soils  Hazards and Hazardous Materials  Mineral Resources Additionally, the Draft EIR includes other sections required by CEQA including an Executive Summary, Project Description, Cumulative Effects, Effects Found Not to Be Significant, and Growth Inducing Effects and Alternatives. Three alternatives are considered in the EIR. The alternatives include the "no project/existing General Plan" alternative, a “no project/no development" alternative and a reduced commercial alternative. On April 15, 2016, the Draft EIR was published and the City notified interested Responsible and Trustee Agencies, as well as other interested agencies. The "Notice of Completion" commenced an initial 45-day public review and comment period expiring on May 31, 2016. The "Notice of Completion" advised that the Draft EIR was available for review at three locations: City of Carlsbad Planning Division; the City Clerk's Office; and the Georgina Cole Library (Dove library was under remodel). Complete hardbound and CD copies were also available with the appendices through the Planning Division. The Draft EIR was also published on the City’s website at (http://www.carlsbadca.gov/services/depts/planning/agendas.asp). The analysis contained in the EIR concluded that all significant impacts would be mitigated to below a level of significance. The main comments submitted on the NOP during the public review and comment period were directed towards the deterioration in the Level of Service (LOS) for local roadway intersections, including Gateway Road and Innovation Way, and Gateway Road and Finnila Place and the project’s compliance with the Climate Action Plan. A total of 29 comment letters were submitted prior to the close of the public review period. Responses to the comment letters are contained in the Final EIR. Responses were prepared and sent to Caltrans. The response transmittal letter also provided notice of availability of the Final EIR. The Final EIR includes EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14- 09/CUP 16-01 – UPTOWN BRESSI December 7, 2016 Page 29 a Mitigation Monitoring and Reporting Program (MMRP). The MMRP is also attached to the Planning Commission Resolution No. 7174 for the EIR. ATTACHMENTS: 1. Planning Commission Resolution No. 7174 (EIR) 2. Planning Commission Resolution No. 7175 (GPA/MP/LFMP) 3. Planning Commission Resolution No. 7176 (CT/PUD/SDP/CUP) 4. Planned Development Compliance Tables C, E and City Council Policy 66 5. Location Map 6. Disclosure Statements 7. Reduced Exhibits “A” – “GGG”, dated July 20, 2016 8. Final EIR for Uptown Bressi dated November, 2016 (copy on file in the Planning Division and available at http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?BlobID=32034) 9. Bressi Ranch Master Plan dated December 2016 (previously distributed and copy on file in the Planning Division and available at http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?BlobID=32086 as Appendix B of the Final EIR) 10. Zone 17 Local Facilities Management Plan, dated July 2016 (copy on file in the Planning Division and available at http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?BlobID=32088 as Appendix C of the Final EIR) 11. Uptown Bressi Retail Center Retail Market Analysis, London Group Realty Advisors, April 2015 Uptown Bressi - EIR 15-01/GPA 14-04/LFMP 87-17(A)/MP 178(I)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 PLANNED DEVELOPMENTS (CMC SECTION 21.45.060) TABLE C: GENERAL DEVELOPMENT STANDARDS APPLICABLE TO ALL PLANNED DEVELOPMENTS REF. NO. SUBJECT DEVELOPMENT STANDARD COMPLIANCE COMMENT C.1 Density Per the underlying General Plan designation. When two or more general plan land use designations exist within a planned development, the density may be transferred from one general plan designation to another with a general plan amendment. The project complies with the R-23 General Plan Land Use Designation density of 16.3 du/acre. C.2 Arterial Setbacks All dwelling units adjacent to any arterial road shown on the Circulation Element of the General Plan shall maintain the following minimum setbacks from the right-of-way: Prime Arterial 50 Feet Major Arterial 40 Feet Secondary Arterial 30 Feet Carlsbad Boulevard 20 Feet The project complies with the 50- foot-wide setback requirement from Palomar Airport Road. Half (50%) of the required arterial setback area located closest to the arterial shall be fully landscaped to enhance the street scene and buffer homes from traffic on adjacent arterials, and: Shall contain a minimum of one 24” box tree for every 30 lineal feet of street frontage; and Shall be commonly owned and maintained The project complies with the requirement that half of the required setback area shall be fully landscaped from Palomar Airport Road. Project perimeter walls greater than 42 inches in height shall not be located in the required landscaped portion of the arterial setback, except noise attenuation walls that: Are required by a noise study, and Due to topography, are necessary to be placed within the required landscaped portion of the arterial setback. A 6-foot high sound wall will be located along the northern perimeter of the project site adjacent to Palomar Airport Road in the residential portion of the project as required by the noise study. C.3 Permitted Intrusions into Setbacks/ Building Separation Permitted intrusions into required building setbacks shall be the same as specified in Section 21.46.120 of this code. The same intrusions specified in Section 21.46.120 shall be permitted into required building separation. All buildings meet all required setbacks and building separation requirements. C.4 Streets Private Minimum right-of-way width 56 feet N/A. Project is not proposing a private street; private drive aisles are proposed throughout the development. Minimum curb-to-curb width 34 feet Minimum parkway width (curb adjacent) 5.5 feet, including curb Minimum sidewalk width 5 feet (setback 6 inches from property line) Public Minimum right-of-way width 60 feet N/A. Project is not proposing a public street. Minimum curb-to-curb width 34 feet Minimum parkway width (curb adjacent) 7.5 feet, including curb Minimum sidewalk width 5 feet (setback 6 inches from property line) Street Trees within One-family dwellings and twin homes on small-lots A minimum of one street tree (24-inch box) per lot is required to be planted in the parkway along all streets. N/A Uptown Bressi - EIR 15-01/GPA 14-04/LFMP 87-17(A)/MP 178(I)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 parkwa ys Condominium projects Street trees shall be spaced no further apart than 30 feet on center within the parkway. Project complies. Street trees are proposed adjacent to Palomar Airport Road, Gateway Road and Colt Place as well as along the main ingress/egress private drive isles off Colt Place. Tree species should be selected to create a unified image for the street, provide an effective canopy, avoid sidewalk damage and minimize water consumption. The landscaping complies with the Bressi Ranch Master Plan and creates a unified image for the streets, provides an effective canopy, avoids sidewalk damage and incorporates recycled water for irrigation. C.5 Drive-aisles 3 or fewer dwellin g units Minimum 12 feet wide when the drive-aisle is not required for emergency vehicle access, as determined by the Fire Chief. N/A If the drive-aisle is required for emergency vehicle access, it shall be a minimum of 20 feet wide. 4 or more dwellin g units Minimum 20 feet wide. All private drive aisles have a minimum width of 20 feet. All projects No parking shall be permitted within the minimum required width of a drive-aisle. No parking is proposed within the minimum required width of the proposed private drive-aisles. A minimum 24-foot vehicle back-up/maneuvering area shall be provided in front of garages, carports or uncovered parking spaces (this may include driveway area, drive-aisles, and streets). All garages provide a minimum 24- foot vehicle back-up maneuvering area in front of garages. Additional width may be required for vehicle/emergency vehicle maneuvering area. Fire truck turning movements have been incorporated into the design of the drive aisles. Parkways and/or sidewalks may be required. Pedestrian walkway connections are provided throughout the project. No more than 24 dwelling units shall be located along a single- entry drive-aisle. No more than 24 dwelling units are proposed along a drive aisle. All drive-aisles shall be enhanced with decorative pavement. The drive aisles are enhanced with concrete pavers. C.6 Number of Visitor Parking Spaces Required (1) Projects with 10 units or fewer A .30 space per each unit. The proposed project includes 125 dwelling units. As a result, a total of 32 visitor parking stall are required. The project provides 35 stalls on-site and therefore complies with this requirement. Projects 11 units or more A .25 space per each unit. When calculating the required number of visitor parking spaces, if the calculation results in a fractional parking space, the required number of visitor parking spaces shall always be rounded up to the nearest whole number. Uptown Bressi - EIR 15-01/GPA 14-04/LFMP 87-17(A)/MP 178(I)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 C.7 Location of Visitor Parking On Private/ Public Streets On-street visitor parking is permitted on private/public streets, subject to the following: The private/public street is a minimum 34-feet wide (curb-to- curb) There are no restrictions that would prohibit on-street parking where the visitor parking is proposed The visitor parking spaces may be located: Along one or both sides of any private/public street(s) located within the project boundary, and Along the abutting side and portion of any existing public/private street(s) that is contiguous to the project boundary N/A In parking bays along public/private streets within the project boundary, provided the parking bays are outside the minimum required street right-of-way width. N/A When visitor parking is provided as on-street parallel parking, not less than 24 lineal feet per space, exclusive of driveway/drive-aisle entrances and aprons, shall be provided for each parking space, except where parallel parking spaces are located immediately adjacent to driveway/drive-aisle aprons, then 20 lineal feet may be provided. The parallel parking stalls provided throughout the development comply with this requirement. Within the Beach Area Overlay Zone, on-street parking shall not count toward meeting the visitor parking requirement. N/A On Drive- aisles Visitor parking must be provided in parking bays that are located outside the required minimum drive-aisle width. The visitor parking stalls are located outside the minimum drive aisle width. On a Drivewa y Outside the Beach Area Overlay Zone One required visitor parking space may be credited for each driveway in a project that has a depth of 40 feet or more. N/A For projects with 10 or fewer units, all required visitor parking may be located within driveways (located in front of a unit’s garage), provided that all dwelling units in the project have driveways with a depth of 20 feet or more. N/A Within the Beach Area Overlay Zone One required visitor parking space may be credited for each driveway in a project that has a depth of 40 feet or more. N/A If the streets within and/or adjacent to the project allow for on-street parking on both sides of the street, then visitor parking may be located in a driveway, subject to the following: All required visitor parking may be located within driveways (located in front of a unit’s garage), provided that all dwelling units in the project have driveways with a depth of 20 feet or more. If less than 100% of the driveways in a project have a depth of 20 feet or more, then a .25 visitor parking space will be credited for each driveway in a project that has a depth of 20 feet or more (calculations resulting in a fractional parking space credit shall always be rounded down to the nearest whole number). N/A Uptown Bressi - EIR 15-01/GPA 14-04/LFMP 87-17(A)/MP 178(I)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 All projects The minimum driveway depth required for visitor parking (20 feet or 40 feet) applies to driveways for front or side-loaded garages, and is measured from the property line, back of sidewalk, or from the edge of the drive-aisle, whichever is closest to the structure. N/A Compac t Parking For projects of more than 25 units, up to 25% of visitor parking may be provided as compact spaces (8 feet by 15 feet). No overhang is permitted into any required setback area or over sidewalks less than 6 feet wide. No compact visitor parking spaces are provided. For all projects within the Beach Area Overlay Zone, up to 55% of the visitor parking may be provided as compact spaces (8 feet by 15 feet). N/A Distanc e from unit Visitor parking spaces must be located no more than 300 feet as measured in a logical walking path from the entrance of the unit it could be considered to serve. Visitor parking is located within 300 feet of the units it could potentially serve. C.8 Screening of Parking Areas Open parking areas should be screened from adjacent residences and public rights-of-way by either a view-obscuring wall, landscaped berm, or landscaping, except parking located within a driveway. Visitor parking will be screened with landscaping. The retail parking lot will be screened from adjacent residences with a low-obscuring wall and landscaped berm. C.9 Community Recreation al Space (1) Community recreational space shall be provided for all projects of 11 or more dwelling units, as follows: Project complies. The project includes 125 dwelling units. As a result, a total of 18,750 square feet of community recreational space is required. The project provides 28,685 square feet of common community recreation space and therefore complies with this requirement. Minimum community recreational space required Project is NOT within R-23 general plan designation 200 square feet per unit Project IS within R-23 general plan designation 150 square feet per unit Projects with 11 to 25 dwelling units Community recreational space shall be provided as either (or both) passive or active recreation facilities. N/A Projects with 26 or more dwelling units Community recreational space shall be provided as both passive and active recreational facilities with a minimum of 75% of the area allocated for active facilities. The project complies. Projects with 50 or more dwelling units Community recreational space shall be provided as both passive and active recreational facilities for a variety of age groups (a minimum of 75% of the area allocated for active facilities). Project complies. The project includes 125 dwelling units. As a result, 14,063 square feet of active recreation space is required. The project proposes 14,073 sf(75%) of active recreation space including a pool/spa area, tot lot, shuffle board and bocce ball courts. For projects consisting of one-family dwellings or twin homes on small-lots, at least 25% of the community recreation space must be provided as pocket parks. Pocket park lots must have a minimum width of 50 feet and be located at strategic locations such as street intersections (especially “T-intersections”) and where open space vistas may be achieved. N/A Uptown Bressi - EIR 15-01/GPA 14-04/LFMP 87-17(A)/MP 178(I)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 All projects (with 11 or more dwelling units) Community recreational space shall be located and designed so as to be functional, usable, and easily accessible from the units it is intended to serve. Project complies. Community recreational space is located throughout the development and is functional, usable, and easily accessible from the units its serves. Credit for indoor recreation facilities shall not exceed 25% of the required community recreation area. N/A Required community recreation areas shall not be located in any required front yard and may not include any streets, drive-aisles, driveways, parking areas, storage areas, slopes of 5% or greater, or walkways (except those walkways that are clearly integral to the design of the recreation area). N/A Recreation Area Parking In addition to required resident and visitor parking, recreation area parking shall be provided, as follows: 1 space for each 15 residential units, or fraction thereof, for units located more than 1,000 feet from a community recreation area. N/A The location of recreation area parking shall be subject to the same location requirements as for visitor parking, except that required recreation area parking shall not be located within a driveway(s). N/A Examples of recreation facilities include, but are not limited to, the following: Active Swimming pool area Children’s playground equipment Spa Courts (tennis, racquetball, volleyball, basketball) Recreation rooms or buildings Horseshoe pits Pitch and putt Grassy play areas with a slope of less than 5% (minimum area of 5,000 square feet and a minimum dimension of 50 feet) Any other facility deemed by the City Planner to satisfy the intent of providing active recreational facilities Passive Benches Barbecues Community gardens Grassy play areas with a slope of less than 5% C.10 Lighting Lighting adequate for pedestrian and vehicular safety shall be provided. Project complies. Pedestrian scaled LED path lighting will be installed along the pedestrian walkways and drive aisles. C.11 Reserved C.12 Recreation al Vehicle (RV) Storage (1) Required for projects with 100 or more units, or a master or specific plan with 100 or more planned development units. Exception: RV storage is not required for projects located within the R-15 or R-23 land use designations. Project complies. RV storage is not required for projects located within the R-23 land use designation. As identified in the Bressi Ranch Master Plan, the Master Homeowners Association controls, operates, and maintains the recreational vehicle storage area. 20 square feet per unit, not to include area required for driveways and approaches. Developments located within master plans or residential specific plans may have this requirement met by the common RV storage area provided by the master plan or residential specific plan. Uptown Bressi - EIR 15-01/GPA 14-04/LFMP 87-17(A)/MP 178(I)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 RV storage areas shall be designed to accommodate recreational vehicles of various sizes (i.e. motorhomes, campers, boats, personal watercraft, etc.). N/A The storage of recreational vehicles shall be prohibited in the front yard setback and on any public or private streets or any other area visible to the public. A provision containing this restriction shall be included in the covenants, conditions and restrictions for the project. All RV storage areas shall be screened from adjacent residences and public rights-of-way by a view-obscuring wall and landscaping. N/A C.13 Storage Space 480 cubic feet of separate storage space per unit. Each unit proposes either one or two-car garage (12 ft. x 20 and 20 ft. x 20 ft. minimum interior space), which satisfies the storage space requirement. If all storage for each unit is located in one area, the space may be reduced to 392 cubic feet. Required storage space shall be separately enclosed for each unit and be conveniently accessible to the outdoors. N/A Required storage space may be designed as an enlargement of a covered parking structure provided it does not extend into the area of the required parking stall, and does not impede the ability to utilize the parking stall (for vehicle parking). N/A A garage (12’x20’ one-car, 20’x20’ two-car, or larger) satisfies the required storage space per unit. Complies – see above. This requirement is in addition to closets and other indoor storage areas. N/A (1) This standard does not apply to housing for senior citizens (see Chapter 21.84 of this code). Uptown Bressi – EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 PLANNED DEVELOPMENTS (CMC SECTION 21.45.080) TABLE E: CONDOMINIUM PROJECTS REF. NO. SUBJECT DEVELOPMENT STANDARD COMPLIANCE COMMENT E.1 Livable Neighborhood Policy Must comply with City Council Policy 66, Principles for the Development of Livable Neighborhoods. SEE SEPARATE COMPLIANCE CHART E.2 Architectural Requirements One-family and two-family dwellings Must comply with City Council Policy 44, Neighborhood Architectural Design Guidelines N/A. Townhomes and residential flats are proposed. Multiple-family dwellings There shall be at least three separate building planes on all building elevations. The minimum offset in planes shall be 18 inches and shall include, but not be limited to, building walls, windows, and roofs. Project complies. At least three separate building planes are proposed on all building elevations. The minimum offset in planes are 18 inches and include building walls, windows, decks, balconies and roofs. All building elevations shall incorporate a minimum of four complimentary design elements, including but not limited to:  A variety of roof planes;  Windows and doors recessed a minimum of 2 inches;  Decorative window or door frames;  Exposed roof rafter tails;  Dormers;  Columns;  Arched elements;  Varied window shapes;  Exterior wood elements;  Accent materials such as brick, stone, shingles, wood, or siding;  Knee braces; and  Towers. Project complies. All building elevations incorporate at least four complimentary design elements including a variety of roof planes, recessed windows and doors, decorative window and door frames, exposed roof rafter tails, varied window shapes, exterior wood elements (hardwood paneling and hardwood trim), decorative ceramic tiles, sectional garage doors, and plaster corbels. E.3 Maximum Coverage 60% of total project net developable acreage. Project complies. Total building coverage for 125 townhome and residential flat units is 38.2% (i.e., less than 60%) E.4 Maximum Building Height Same as required by the underlying zone, and not to exceed three stories (1)(7) Project complies. Projects within the R- 23 general plan designation (1)(7) 40 feet, if roof pitch is 3:12 or greater Project complies. Building heights do not exceed 40 feet. The proposed townhomes would be 39 feet, 8 inches in height. The stacked flats would not exceed 40 feet in height. The proposed tower protrusion would be to an elevation of 41 feet. These protrusions are allowed as these architectural features do not provide additional floor space. 35 feet, if roof pitch is less than 3:12 Building height shall not exceed three stories E.5 Minimum Building Setbacks From a private or public street(2)(3) Residential structure 10 feet Project complies. Buildings meet all setback requirements (minimum 20 feet from Palomar Airport Road, 10 feet from Gateway Road and Colt Place). Direct entry garage 20 feet From a drive-Residential 5 feet, fully landscaped (walkways Project complies. Uptown Bressi – EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 PLANNED DEVELOPMENTS (CMC SECTION 21.45.080) TABLE E: CONDOMINIUM PROJECTS REF. NO. SUBJECT DEVELOPMENT STANDARD COMPLIANCE COMMENT aisle(4) structure (except as specified below) providing access to dwelling entryways may be located within required landscaped area) Residential structure – directly above a garage 0 feet when projecting over the front of a garage. Project complies. Residential structures directly above a garage complies with the 0 foot setback. Garage 3 feet Project complies. The project provides 3 foot setbacks for garages facing directly onto a drive-aisle. All residential units will be equipped with an automatic garage door opener. Garages facing directly onto a drive-aisle shall be equipped with an automatic garage door opener. Projects of 25 units or less within the R- 15 and R-23 general plan designations 0 feet (residential structure and garage) Project complies. The project provides 3 foot setbacks for garages facing directly onto a drive-aisle and 0 foot setbacks for residential structures directly above the garage. Garages facing directly onto a drive-aisle shall be equipped with an automatic garage door opener. Project complies. All residential units will be equipped with an automatic garage door opener. Balconies/deck s (unenclosed and uncovered) 0 feet Project complies. Buildings meet all setback requirements, no balconies or decks cantilever over a drive isle. May cantilever over a drive-aisle, provided the balcony/deck complies with all other applicable requirements, such as:  Setbacks from property lines  Building separation  Fire and Engineering Department requirements From the perimeter property lines of the project site (not adjacent to a public/private street) The building setback from an interior side or rear perimeter property line shall be the same as required by the underlying zone for an interior side or rear yard setback. Project complies. Buildings meet all setback requirements. E.6 Minimum Building Separation 10 feet 20 feet provided, project complies. E.7 Resident Parking (6) All dwelling types If a project is located within the R-23 general plan designation, resident parking shall be provided as specified below, and may also be provided as follows:  25% of the units in the project may include a tandem two-car garage (minimum 12 feet x 40 feet).  Calculations for this provision resulting in a fractional unit may be rounded up to the next whole number. Each unit proposes either one or two- car garage (12 ft. x 20 and 20 ft. x 20 ft. minimum interior space), which satisfies the resident parking requirement. One-family and two- family dwellings 2 spaces per unit, provided as either:  a two-car garage (minimum 20 feet x 20 feet), or  2 separate one-car garages (minimum 12 feet x 20 feet each) N/A Uptown Bressi – EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 PLANNED DEVELOPMENTS (CMC SECTION 21.45.080) TABLE E: CONDOMINIUM PROJECTS REF. NO. SUBJECT DEVELOPMENT STANDARD COMPLIANCE COMMENT  In the R-W Zone, the 2 required parking spaces may be provided as 1 covered space and 1 uncovered space (5) Multiple- family dwellings Studio and one-bedroom units 1.5 spaces per unit, 1 of which must be covered (5) Project complies. The one bedroom flats provide 1.5 spaces per unit, 1 of which is in a garage. When calculating the required number of parking spaces, if the calculation results in a fractional parking space, the required number of parking spaces shall always be rounded up to the nearest whole number. Units with two or more bedrooms 2 spaces per unit, provided as either:  a one-car garage (12 feet x 20 feet) and 1 covered or uncovered space; or (5)  a two-car garage (minimum 20 feet x 20 feet), or  2 separate one-car garages (minimum 12 feet x 20 feet each)  In the R-W Zone and the Beach Area Overlay Zone, the 2 required parking spaces may be provided as 1 covered space and 1 uncovered space (5) Each unit proposes either one or two- car garage (12 ft. x 20 and 20 ft. x 20 ft. minimum interior space), which satisfies the resident parking requirement. Required parking may be provided within an enclosed parking garage with multiple, open parking spaces, subject to the following:  Each parking space shall maintain a standard stall size of 8.5 feet by 20 feet, exclusive of supporting columns; and  A backup distance of 24 feet shall be maintained in addition to a minimum 5 feet turning bump-out located at the end of any stall series. Each unit proposes either one or two- car garage (12 ft. x 20 and 20 ft. x 20 ft. minimum interior space), which satisfies the resident parking requirement. Required resident parking spaces shall be located no more than 150 feet as measured in a logical walking path from the entrance of the units it could be considered to serve. The required resident parking spaces are located within 150 feet from the entrance of the units it would be considered to serve. E.8 Private Recreational Space One-family, two-family, and multiple- family dwellings Required private recreational space shall be designed so as to be functional, usable, and easily accessible from the dwelling it is intended to serve. Project complies. Private recreational space is designed to be functional, usable, and easily accessible from the dwelling units it is intended to serve. Required private recreational space shall be located adjacent to the unit the area is intended to serve. Project complies. Private recreational space is located adjacent to the units it is intended to serve. Required private recreational space shall not be located within any required front yard setback area, and may not include any driveways, parking areas, storage areas, or common walkways. Project complies. Required private recreational space is not located within any required front yard setback area; and does not include any driveways, parking areas, storage areas or common walkways. Uptown Bressi – EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 PLANNED DEVELOPMENTS (CMC SECTION 21.45.080) TABLE E: CONDOMINIUM PROJECTS REF. NO. SUBJECT DEVELOPMENT STANDARD COMPLIANCE COMMENT One-family and two- family dwellings Minimum total area per unit Projects not within the R- 15 or R-23 general plan designations 400 square feet N/A Projects within the R-15 or R-23 general plan designations 200 square feet May consist of more than one recreational space. N/A May be provided at ground level and/or as a deck/balcony on a second/third floor or roof. N/A If provided at ground level Minimum dimension Not within the R-15 or R- 23 general plan designations 15 feet N/A Within the R- 15 or R-23 general plan designations 10 feet Shall not have a slope gradient greater than 5%. N/A Attached solid patio covers and decks/balconies may project into a required private recreational space, subject to the following:  The depth of the projection shall not exceed 6 feet (measured from the wall of the dwelling that is contiguous to the patio/deck/balcony). The length of the projection shall not be limited, except as required by any setback or lot coverage standards. N/A Open or lattice-top patio covers may be located within the required private recreation space (provided the patio cover complies with all applicable standards, including the required setbacks). N/A If provided above ground level as a deck/ balcony or roof deck Minimum dimension 6 feet N/A Minimum area 60 square feet Multiple-family dwellings Minimum total area per unit (patio, porch, or balcony) 60 square feet Project complies. Each of the townhome units have both patios and decks, ranging in size from 7 – 255 sf. Each of the residential flats would have a deck with these spaces ranging in size from 78 – 128 sf. Uptown Bressi – EIR 15-01/GPA 14-04/MP 178(I)/LFMP 87-17(A)/CT 14-09/PUD 14-10/SDP 14-13/SDP 16-06/CUP 14-09/CUP 16-01 PLANNED DEVELOPMENTS (CMC SECTION 21.45.080) TABLE E: CONDOMINIUM PROJECTS REF. NO. SUBJECT DEVELOPMENT STANDARD COMPLIANCE COMMENT Minimum dimension of patio, porch or balcony 6 feet Project complies. Projects of 11 or more units that are within the R-23 general plan designation may opt to provide an additional 75 square feet of community recreation space per unit (subject to the standards specified in Table C of this Chapter), in lieu of providing the per unit private recreational space specified above. Project complies. The project includes 125 dwelling units. As a result, a total of 18,750 square feet of community recreational space are required. The project provides 28,685 square feet of common community recreation space and therefore complies with this requirement. (1) If a project is located within the Beach Area Overlay Zone, building height shall be subject to the requirements of Chapter 21.82 of this code. (2) See Table C in Section 21.45.060 for required setbacks from an arterial street. (3) Building setbacks shall be measured from the outside edge of the required street right-of-way width, whichever is closest to the building. (4) Building setbacks shall be measured from one of the following (whichever is closest to the building): a) the outside edge of the required drive-aisle width; b) the back of sidewalk; or c) the nearest side of a parking bay located contiguous to a drive- aisle (excluding parking located in a driveway in front of a unit’s garage). (5) Any uncovered required parking space in the R-W zone may be located within a required front yard setback and may be tandem. (6) This standard does not apply to housing for senior citizens (see Chapter 21.84 of this code). (7) Protrusions above the height limit shall be allowed pursuant to Section 21.46.020 of this code. Such protrusions include protective barriers for balconies and roof decks. CITY COUNCIL POLICY 66 – LIVABLE NEIGHBORHOODS Principle Compliance Comments 1 Building Facades, Front Entries, Porches Facades create interest and character and should be varied and articulated to provide visual interest to pedestrians. Clearly identifiable front doors and porches enhance the street scene and create opportunities for greater social interaction within the neighborhood. Building entries and windows should face the street. Front porches, bay windows, courtyards and balconies are encouraged. The project is designed to complement the Bressi Ranch Master Plan Design Guidelines with contemporary craftsman features. The three-story residential buildings provide interest through architectural features incorporating a variety of colors, planes and materials to provide visual articulation and reduce massing. Materials include hardwood paneling and trim, wood beams, brick veneer, plaster, and board and batt siding. Entrances of residential units are highlighted and clearly identified to provide a sense of place as well as enhance the street scene and recreation areas and influence social interaction as well as encourage walkability. Pedestrian pathways connecting to the front entrances are provided to encourage social interaction and walkability. The 4, 5, and 6 unit townhome buildings have both street-facing private patios and decks ranging in size from 7 to 255 square feet. The residential stacked flats each have a deck ranging in size from 78 to 128 square feet. Patios and decks are designed to enhance private residential amenities and recreation consistent with the Bressi Ranch Master Plan. 2 Garages Homes should be designed to feature the residence as the prominent part of the structure in relation to the street. A variety of garage configurations should be used to improve the street scene. This may include tandem garages, side-loaded garages, front- loaded garages, alley-loaded garages and recessed garages. Residential units are designed to feature street and recreation area facing entrances as the prominent feature to improve visual impacts as well as encourage social interaction and walkability. Garages are provided off private drive aisles throughout the development. 3 Street Design An interconnected, modified (grid) street pattern should be incorporated into project designs when there are no topographic or environmental constraints. Interconnected streets provide pedestrians and automobiles many alternative routes to follow, disperse traffic and reduce the volume of cars on any one street in the neighborhood. Streets should be designed to provide both vehicular and pedestrian connectivity by minimizing the use of cul-de-sacs. The street network should also be designed to create a safer, more comfortable pedestrian and bicycling environment. Local residential streets should have travel and parking lanes, be sufficiently narrow to slow traffic, provide adequate access for emergency and service vehicles and emergency evacuation routes for residents and include parkways with trees to form a pleasing canopy over the street. Local residential streets are the public open space in which children often play and around which neighborhoods interact. Within this context, vehicular movement should be additionally influenced through the use of City-accepted designs for traffic calming measures. Recognizing that the layout of the built environment influences the way residents and visitors experience a neighborhood, the project is designed with an inter- connected, pedestrian friendly street network designed to encourage pedestrian and bicycle use to reduce automobile dependence and enhance the sense of community. Access to the residential community is provided from El Fuerte Street, Gateway Road and Colt Place, with the primary entrance on Colt Place. The residential community is designed with an interconnected network of drive aisles to easily access resident parking and garages, as well as provide access for emergency and service vehicles. Pedestrian pathways will be located throughout the site to allow residents to easily and safely access the adjacent retail/general commercial amenities in Bressi Ranch. Chicanes, or pop-out features will be provided on Gateway Road between Alicante and Innovation Way, and Innovation Way and Colt Place to assist in traffic calming along Gateway Road. 4 Parkways Street trees should be planted in the parkways along all streets. Tree species should be selected to create a unified image for the street, provide an effective canopy, avoid sidewalk damage and minimize water consumption. Landscaping and street trees are provided to enhance architecture, provide green areas and screen parking in accordance with the Design Guidelines of the Bressi Ranch Master Plan as well as the Landscape Manual of the City of Carlsbad. 5 Pedestrian Walkways Pedestrian walkways should be located along or visible from all streets. Walkways (sidewalks or trails) should provide clear, comfortable and direct access to neighborhood schools, parks/plazas and transit stops. Primary pedestrian routes should be bordered by residential fronts, parks or plazas. Where street connections are not feasible (at the end of cul-de-sacs), pedestrian paths should also be provided. Consistent with the tenants of Smart Growth and sustainable development, the project is planned as a pedestrian oriented community designed to reduce vehicle trips while fostering community and connectedness. Pedestrian pathways will be located throughout the site to allow residents to easily and safely access the adjacent retail/general commercial amenities in Bressi Ranch. 6 Centralized Community Recreation Areas Park or plazas, which serve as neighborhood meeting places and as recreational activity centers should be incorporated into all planned unit developments. As frequently as possible, these parks/plazas should be designed for both active and passive uses for residents of all ages and should be centrally located within the project. Parks and plazas should be not be sited on residual parcels, used as buffers from surrounding developments or to separate buildings from streets. To encourage pedestrian activity and create gathering places wherever possible, plazas have been located throughout both the commercial and residential developments. Pedestrian paseos will link the residential neighborhood to the shops and restaurants located in the retail/general commercial center. Consistent with the Bressi Ranch Master Plan, the project has incorporated three neighborhood recreation areas to further promote healthy lifestyles, connectedness, and foster a sense of community. These recreation facilities include a pool/spa area, children’s play area, bocce ball courts and shuffleboard, in addition to passive amenities including benches and dedicated green space. COTTAGEDRTOWN GARDEN RD LEIGHTON CR VILLAGEGREENDRGATEWAYRD FINNILAPLCOLT PLLOKERAV E A S TLOKERAVWEST PALOMARAIRPORTRD EL FUERTEST EIR 15-01 / GPA 14-04 / LFMP 87-17(A) / MP 178(I) / CT 14-09 /PUD 14-10 / SDP 14-13 / SDP 16-06 / CUP 14-09 / CUP 16-01 Uptown Bressi SITE MAP JPALOMARAIRPORTRD E L C AMREALL A COSTA AV C A R L S B A D B LELCAMINOREAL MELR O S E DRAVIARAPY RANCHOS ANTAFERDCOLLEGEBLSITE 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%&29(56+((71762)*3$03 , &738'6'3&83(,5/)03 $ &836'3 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%2)81,7%8,/',1*  ),567)/2253/$1*3$03 , &738'6'3&83(,5/)03 $ &836'3 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%2)81,7%8,/',1*  6(&21')/2253/$1*3$03 , &738'6'3&83(,5/)03 $ &836'3 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%2)81,7%8,/',1*  7+,5')/2253/$1*3$03 , &738'6'3&83(,5/)03 $ &836'3 UPTOWN BRESSISHEA HOMES5/11/16 2013065P44.DWGOF 34064 UNIT BUILDING3/16" = 1'-0"ROOF PLANSGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P45.DWGOF 34074 UNIT BUILDING3/16" = 1'-0"EXT. ELEVATIONS 'A'ELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06GPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P46.DWGOF 34084 UNIT BUILDING3/16" = 1'-0"EXT. ELEVATIONS 'A'ELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P47.DWGOF 34094 UNIT BUILDING3/16" = 1'-0"EXT. ELEVATIONS 'B'ELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P48.DWGOF 34104 UNIT BUILDING3/16" = 1'-0"EXT. ELEVATIONS 'B'ELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%2)81,7%8,/',1*  ),567)/2253/$1*3$03 , &738'6'3&83(,5/)03 $ &836'3 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%2)81,7%8,/',1*  6(&21')/2253/$1*3$03 , &738'6'3&83(,5/)03 $ &836'3 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%2)81,7%8,/',1*  7+,5')/2253/$1*3$03 , &738'6'3&83(,5/)03 $ &836'3 UPTOWN BRESSISHEA HOMES5/11/16 2013065P54.DWGOF 34145 UNIT BUILDING3/16" = 1'-0"ROOF PLANSGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P55.DWGOF 34155 UNIT BUILDING3/16" = 1'-0"EXT. ELEVATIONS 'A'ELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P56.DWGOF 34165 UNIT BUILDING3/16" = 1'-0"EXT. ELEVATIONS 'A'ELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P57.DWGOF 34175 UNIT BUILDING3/16" = 1'-0"EXT. ELEVATIONS 'B'ELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P58.DWGOF 34185 UNIT BUILDING3/16" = 1'-0"EXT. ELEVATIONS 'B'ELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%2)81,7%8,/',1*  ),567)/2253/$1*3$03 , &738'6'3&83(,5/)03 $ &836'3 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%2)81,7%8,/',1*  6(&21')/2253/$1*3$03 , &738'6'3&83(,5/)03 $ &836'3 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%2)81,7%8,/',1*  7+,5')/2253/$1*3$03 , &738'6'3&83(,5/)03 $ &836'3 UPTOWN BRESSISHEA HOMES5/11/16 2013065P64.DWGOF 34226 UNIT BUILDING3/16" = 1'-0"ROOF PLANGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P65.DWGOF 34236 UNIT BUILDING3/16" = 1'-0"EXT. ELEVATIONS 'A'ELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P66.DWGOF 34246 UNIT BUILDING3/16" = 1'-0"EXT. ELEVATIONS 'A'ELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P67.DWGOF 34256 UNIT BUILDING3/16" = 1'-0"EXT. ELEVATIONS 'B'ELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P68.DWGOF 34266 UNIT BUILDING3/16" = 1'-0"EXT. ELEVATIONS 'B'ELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%2)67$&.(')/$7%/'*  ),567)/2253/$1*3$03 , &738'6'3&83(,5/)03 $ &836'3 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%2)67$&.(')/$7%/'*  6(&21')/2253/$1*3$03 , &738'6'3&83(,5/)03 $ &836'3 8372:1%5(66,6+($+20(656#4%-3':*#TEJKVGEVWTG 2NCPPKPI-GVVPGT$QWNGXCTF5WKVG5CP&KGIQ%CNKHQTPKC(QP(CZ%##4%*+6'%674#..+%'05'%2)67$&.(')/$7%/'*  7+,5')/2253/$1*3$03 , &738'6'3&83(,5/)03 $ &836'3 UPTOWN BRESSISHEA HOMES5/11/16 2013065P74.DWGOF 3430STACKED FLAT BLDG.3/16" = 1'-0"ROOF PLANGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P75.DWGOF 3431STACKED FLAT BLDG.3/16" = 1'-0"EXT. ELEVATIONSELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 UPTOWN BRESSISHEA HOMES5/11/16 2013065P76.DWGOF 3432STACKED FLAT BLDG.3/16" = 1'-0"EXT. ELEVATIONSELEV. KEYNOTES2345678911EAVE1METAL AWNING: POWDER COATED* ALL WOOD AND METAL ELEMENTS TO BE PAINTED. 10SLIDING GLASS DOOR STEEL PLATEMETAL GUARDRAIL/RAILINGASPHALT SHINGLE ROOFEXTERIOR FINISH: PER HATCH SCHEDULE BELOWVINYL WINDOW 12STEEL CABLEENTRY DOOR STANDING SEAM METAL ROOFDECORATIVE CERAMIC TILE13SECTIONAL GARAGE DOORHATCH SCHEDULEINTEGRAL COLOR PLASTERBRICK VENEERPAINTED HARDBOARD LAP SIDINGBOARD AND BATT SIDING14PLASTER RECESS15RESAWN WOOD: BEAM/BRACKETS16PLASTER CORBEL17PLASTER TRIM TYP.18SLOPING PLASTER SILL19PLASTER CONTROL JOINT TYP.20HARDWOOD PANELING WITH HARDWOOD TRIM21HARDWOOD TRIMGPA 14-04/ MP 178(I)/CT 14-09/PUD 14-10/ SDP 14-13/ CUP14-09/EIR 15-01/LFMP 87-17(A)/ CUP 15-01/SDP 16-06 1128139EAST ELEVATIONT.O. SLAB0' - 0"PLT HGT 18' - 0"PLT HGT 212' - 0"ROOF PLAN18' - 0"8' - 0"4' - 0"6' - 0"6631091341127SOUTH ELEVATION8NORTH ELEVATIONWEST ELEVATION3" / 12"3" / 12"1/4" / 12"ROOF PLANPOOLEQUIP.WOMENMEN17' - 6"27' - 11"FLOOR PLANS T A R C KA r c h i t e c t u r e + P l a n n i n g2045 Kettner Boulevard Suite 100 San Diego California 92101 Fon: 619 299 7070 Fax: 619 295 8768CA ARCHITECTURAL LICENSE C 10560UPTOWN BRESSISHEA - 2013065P7733 OF 34POOL TOWER -PLANS/ELEVATIONS09/28/2015ELEVATIONKEYNOTESKEYVALUEKEY TEXT1 4X8@24"O.C.2METALGATE3 HARDBOARDSIDING4 HARDWOODPANELINGWITHHARDWOODTRIM6 STEELSUPPORTFORBEAMS7 BRICKVENEER8 WOODFASCIABOARD9 PLASTERTRIMTYP.10 VINYLWINDOW12 STANDINGSEAMMETALROOF13 WOODTRIM*3$03 , &738'6'3&83(,5/)03 $ &836'3 EAST ELEVATION2NORTH ELEVATIONT.O. SLAB0' - 8"PLT HGT 18' - 0"ROOF HGT10' - 9"134656' - 0"1' - 4"2' - 9"SOUTH ELEVATIONWEST ELEVATION3" / 12"3" / 12"3" / 12"3" / 12"ROOF PLAN14' - 0"5' - 4"4' - 0"5' - 4"14' - 8"5' - 2"3' - 0"5' - 2"87FLOOR PLANS T A R C KA r c h i t e c t u r e + P l a n n i n g2045 Kettner Boulevard Suite 100 San Diego California 92101 Fon: 619 299 7070 Fax: 619 295 8768CA ARCHITECTURAL LICENSE C 10560UPTOWN BRESSISHEA - 2013065P7834 OF 34TRASH ENCLOSUREPLAN/ELEVATIONS09/28/2015ELEVATIONKEYNOTESKey ValueKeynote Text1 STANDINGSEAMMETALROOF2 4054METALGATE3 6X12RESAWNWOODBEAM/BRACKETS48"CMUWALL5 5254METALGATE6 4X4STEELSUPPORTFORBEAMS7 EDGEOFCONCRETECURB8 EDGEOFROOFABOVE*3$03 , &738'6'3&83(,5/)03 $ &836'3