Loading...
HomeMy WebLinkAbout2019-09-04; Planning Commission; ; CT 2017-0008/SDP 2019-0006 (DEV2017-0064) – HARDING & PALM TOWNHOUSE Item No. Application complete date: April 3, 2019 P.C. AGENDA OF: September 4, 2019 Project Planner: Paul Dan Project Engineer: David Rick SUBJECT: CT 2017-0008/SDP 2019-0006 (DEV2017-0064) – HARDING & PALM TOWNHOUSE – Request for approval of a Tentative Tract Map and Site Development Plan to construct a six-unit, residential townhome project on a 0.44-acre site located at 3535 Harding Street in the Barrio Center (BC) District of the Village and Barrio Master Plan and within Local Facilities Management Zone 1. The City Planner has determined that this project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment and is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to section 15332 (In-Fill Development Projects) of the State CEQA guidelines. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7346 APPROVING Tentative Tract Map CT 2017-0008 and Site Development Plan SDP 2019-0006 based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND The 0.44-acre site is located on the southwest corner of Palm Avenue and Harding Street. The property is generally flat and is currently developed with a single-family residence and detached garage. The project is located within the Barrio Center (BC) District of the Village and Barrio Master Plan (VBMP). Table A below includes the General Plan designations, zoning and current land uses of the project site and surrounding properties. TABLE A – SITE AND SURROUNDING LAND USE Location General Plan Designation Zoning Current Land Use Site Village/Barrio (VB) Village/Barrio (V-B) – Barrio Center (BC) Single-Family Residence North Village/Barrio (VB) Village/Barrio (V-B) – Village-Barrio Other (VBO) City Owned/Operated Park South Village/Barrio (VB) Village/Barrio (V-B) – Barrio Center (BC) Single-Family Residences East Village/Barrio (VB) Village/Barrio (V-B) – Barrio Perimeter (BP) Multi-Family Residence and single family residence West Village/Barrio (VB) Village/Barrio (V-B) – Barrio Center (BC) Duplex 1 CT 2017-0008/SDP 2019-0006 (DEV2017-0064) – HARDING & PALM TOWNHOUSE September 4, 2019 Page 2 The project proposes a new Tentative Tract Map and Site Development Plan for the demolition of the existing single-family residence and the construction of six (6) residential air-space condominium townhomes. A detailed breakdown of each unit is summarized in Table B below. TABLE B – DETAILS FOR UNIT TYPE Unit Size (Gross SF) Bedroom/Bathrooms Garage Private Open Space/Balconies A 2,617 SF 3/4.5 Two-car 490 SF B 2,377 SF 4/4 Two-car 304 SF C 2,454 SF 4/4 Two-car 330 SF D 2,541 SF 4/5 Two-car 320 SF E 2,760 SF 4/4 Two-car 325 SF F 2,489 SF 4/3.5 Two-car 340 SF The project proposes to construct six residential air-space condominiums, within three buildings of two units each. Access would be provided by a private drive-aisle off of Harding Street. Each home includes an attached two-car garage with a direct entrance into the unit. The six units vary in size from 2,377 square feet to 2,617 square feet. The units are three stories tall with a maximum building height of 34 feet two inches as measured from the new finished grade. All six units include a private balcony off the second and third floor, as well as an exclusive yard area on the ground level. The underlying lot will be held in common interest divided between the six air-space condominiums. Grading for the project includes 400 cubic yards of cut, 400 cubic yards of fill, and 1,600 cubic yards of remedial. The front entry of each unit faces Palm Avenue, with the garage and drive aisle at the rear. This creates the focus of the units on Palm Avenue while alleviating the attention from the drive aisle and garages. The architectural design reflects a beach cottage style, incorporating Hardie plank lap siding with corner boards, large windows, wood railings, varied roof planes, private ground floor entry porches, second story balconies and third floor decks. The third floors are stepped back from the second floor levels. Doors, windows, and balconies as well as adequately weighted architectural projections minimize potentially blank walls. The buildings of materials complement the design and provide architectural interest. III. ANALYSIS The proposed project is subject to the following ordinances, standards, and policies: A. Village-Barrio (VB) General Plan Land Use Designation; B. Village-Barrio (V-B) Zone (CMC Chapter 21.35) and Barrio Center District (Village and Barrio Master Plan); C. Subdivision Ordinance (CMC Title 20); D. Inclusionary Housing Ordinance (CMC Chapter 21.85); and E. Growth Management Ordinance (CMC Chapter 21.90), Local Facilities Management Plan Zone 1. The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable regulations and policies. The project’s compliance with each of the above regulations and policies is discussed in the sections below. CT 2017-0008/SDP 2019-0006 (DEV2017-0064) – HARDING & PALM TOWNHOUSE September 4, 2019 Page 3 A. Village-Barrio (VB) General Plan Land Use Designation The subject property has a General Plan Land Use designation of Village-Barrio (VB) and is within the Barrio Center (BC) District of the Village and Barrio Master Plan (VBMP). The General Plan allows residential development in the BC District at a density range of 8-15 dwelling units per acres (du/ac) with a Growth Management Control Point (GMCP) of 11.5 du/ac. The project site has a net developable acreage of 0.44 acres and a proposed density of 13.6 du/ac. The project’s proposed six dwelling units exceeds the GMCP by one unit (0.44-acres X 11.5 GMCP = 5.06 dwelling units) requiring findings to be made pursuant to City Council Policy 43, noted below. Lastly, although the project exceeds the GMCP it is does not trigger the requirement to build inclusionary housing units per Carlsbad Municipal Code (CMC) Section 21.85.030.B, which applies to any residential development of seven or more units. To exceed the GMCP density and withdraw the difference in dwelling units (i.e., one dwelling unit) from the City’s “Excess Dwelling Unit Bank” (EDUB), the project must comply with City Council Policy No. 43 (Proposition E “Excess Dwelling” Unit Bank), which sets the criteria for the allocation of excess dwelling units. City Council Policy 43 establishes a list of qualifying residential projects that are eligible for allocation of excess units, if the unit allocation does not exceed the Growth Management maximum dwelling unit cap of the applicable quadrant of the City. The EDUB currently has a total of 424 excess dwelling units available for allocation in all quadrants excluding the village. The Northwest Quadrant of the EDUB currently has a remaining capacity to allocate 129 dwelling units (June 2019) outside the village. Furthermore, to exceed the GMCP density the project must be consistent with the following required General Plan findings: 1) that the project will provide sufficient additional public facilities for the density in excess of the control point to ensure that the adequacy of the City’s public facilities plans will not be adversely impacted; 2) that there have been sufficient developments approved in the quadrant at densities below the control point so that the approval will not result in exceeding the quadrant limit; and, 3) all necessary public facilities required by the City’s Growth Management Program will be constructed, or are guaranteed to be constructed, concurrently with the need for them created by this development and in compliance with the adopted City standards. The proposed project is consistent with the above required findings in that there have been sufficient developments in the Northwest Quadrant that have developed at densities below the GMCP such that the allocation of one dwelling unit would not result in exceeding the quadrant limit. In addition, the project is conditioned to pay the appropriate fees to comply with City’s Growth Management Program, and the City’s public facilities plans will not be adversely impacted as the allocation of one unit has already been analyzed and anticipated within the Northwest Quadrant. Pursuant to City Council Policy No. 43 – Proposition E “Excess Dwelling” Unit Bank, in approving a request for an allocation of excess dwelling units, the following three findings must also be made: 1) That the project location and density are compatible with existing adjacent residential neighborhoods and/or nearby existing or planned uses; 2) That the project location and density are in accordance with the applicable provisions of the General Plan and any other applicable planning document; and 3) That the project complies with the findings stated in the General Plan Land Use Element for projects that exceed the GMCP for the applicable density range. CT 2017-0008/SDP 2019-0006 (DEV2017-0064) – HARDING & PALM TOWNHOUSE September 4, 2019 Page 4 Table C below identifies the density range for the subject property, as well as the allowable density range based on the size of the project site and the proposed density and units. TABLE C – PROPOSED DENSITY Gross Acres Net Acres Allowable Density Range; Min/Max Dwelling Units per BP District Project Density; Proposed Dwelling Units 0.44 0.44 8-15 du/ac; 11.5 GMCP Minimum: 4 dwelling units (0.44-acre lot) Maximum: 6 dwelling units (0.44-acre lot) GMCP: 5 dwelling units (0.44-acre lot) 13.6 du/ac; 6 dwelling units Additionally, the project is subject to compliance with the Elements of the General Plan as outlined in Table D below. TABLE D – GENERAL PLAN COMPLIANCE Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply? Land Use Goal 2-G.4 Provide balanced neighborhoods with a variety of housing types and density ranges to meet the diverse demographic, economic and social needs of residents, while ensuring a cohesive urban form with careful regard for compatibility. Goal 2-G.17 Ensure that the scale and character of new development is appropriate to the setting and intended use. Promote development that is scaled and sited to respect the natural terrain, where hills, public realm, parks, open space, trees, and distant vistas, rather than buildings, dominate the overall landscape, while developing the Village, Barrio, and commercial and industrial areas as concentrated urban-scaled nodes. Goal 2-G.31 Promote rejuvenation of the Barrio while maintaining its walkable, residential character, and ensuring that new development enhances neighborhood quality and character. The proposed project enhances the neighborly community of the Barrio by providing additional multi-family residential options, and a design that is complementary. The Barrio currently enjoys a diverse mix of commercial, single-family and multi-family housing uses. The scale and character of the project is consistent with the Barrio community’s character and the development complies with the Village and Barrio Master Plan’s intent and standards, including development of structures that provide a cohesive transition between public and private space. The proposed residences are oriented in that the front entries face Palm Avenue with the garages located at the rear of the property. This orientation in design enhances the walkability of public sidewalks along Palm Avenue; residences closer to the public sidewalks creates pedestrian-friendly streets and enhances a sense of community. The project Yes CT 2017-0008/SDP 2019-0006 (DEV2017-0064) – HARDING & PALM TOWNHOUSE September 4, 2019 Page 5 Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply? reinforces the pedestrian orientation desired for the Barrio by providing residents an opportunity to walk to shopping, recreation, and mass transit. Mobility Goal 3-G.3 Provide inviting streetscapes that encourage walking and promote livable streets. Policy 3-P.5 Require developers to construct or pay their fair share toward improvements for all travel modes consistent with the Mobility Element, the Growth Management Plan, and specific impacts associated with their development. The proposed project is designed to meet circulation requirements, which include maintaining or enhancing frontage improvements consisting of sidewalks and landscaping and accommodating future bike lane improvement along Harding Street. The proposed project is located approximately one mile from the Carlsbad Village train station which provides rail and bus service throughout the day. The existing and proposed bike lanes along Harding Street and throughout the Barrio and Village provide residents the opportunity to access the station and job centers, thereby offering a method of alternative transportation which reduces vehicle miles traveled (VMTs) and overall carbon footprint. Furthermore, the project supports walkability and mobility by being located near existing goods and services in the Barrio and Village. Yes Noise Goal 5-G.2 Ensure that new development is compatible with the noise environment, by continuing to use potential noise exposure as a criterion in land use planning. Policy 5.P.2 Require a noise study analysis be conducted for all discretionary development proposals located where projected noise exposure would be other than “normally acceptable.” Based on the noise analysis report (LSA, dated October 2017) which studied short term noise level, during construction, and long term or operational level, post construction, the proposed project is in compliance with the City of Carlsbad Noise Standards. The project’s building design, with the windows closed and mechanical ventilation as conditioned, adequately attenuates the noise levels for the new condominiums. Yes Public Safety Goal 6-G.1 Minimize injury, loss of life, and damage to property resulting from fire, flood, hazardous material release, or seismic disasters. The proposed structures would be required to meet all seismic design standards. In addition, the proposed project is consistent with all applicable Yes CT 2017-0008/SDP 2019-0006 (DEV2017-0064) – HARDING & PALM TOWNHOUSE September 4, 2019 Page 6 Element Use, Classification, Goal, Objective, or Program Proposed Uses & Improvements Comply? Policy 6-P.6 Enforce the requirements of Titles 18, 20, and 21 pertaining to drainage and flood control when reviewing applications for building permits and subdivisions. Policy 6-P.34 Enforce the Uniform Building and Fire codes, adopted by the city, to provide fire protection standards for all existing and proposed structures. Policy 6-P.39 Ensure all new development complies with all applicable regulations regarding the provision of public utilities and facilities. fire safety standards as required by the State’s building and fire codes. The project is required to develop and implement a program of “best management practices” for the elimination and reduction of pollutants which enter into and/or are transported within storm drainage facilities. The project has been conditioned to pay all applicable public facilities fees for Zone 1 and meet with the Fire Marshal to determine if public fire hydrants are required. Housing Policy 10-P.15 Pursuant to the Inclusionary Housing Ordinance, require affordability for lower income households of a minimum of 15 percent of all residential ownership and qualifying rental projects. The inclusionary housing requirement may be satisfied through the payment of an in-lieu fee for projects that have less than seven units. Therefore, the project has been conditioned to require the payment of the housing in-lieu fee for six units prior to issuance of a building permit, or payment for five units if building permits are applied for within two years from demolition of the existing single-family residence. Yes B. Village-Barrio Zone (CMC Chapter 21.35) and Barrio Center District of the Village and Barrio Master Plan The subject property is located within the Village-Barrio (V-B) zoning district. Properties with the V-B zoning designation are governed by the Village and Barrio Master Plan (VBMP). The subject property is located within the Barrio Center District (BC) of the VBMP. The project’s compliance with the development standards specific to the BC District, as well as the area-wide standards within the VBMP, are provided in Tables E and F below. Please see Attachment 4 for an analysis of the project’s compliance with the Design Guidelines of the VBMP. CT 2017-0008/SDP 2019-0006 (DEV2017-0064) – HARDING & PALM TOWNHOUSE September 4, 2019 Page 7 TABLE E – COMPLIANCE WITH THE VILLAGE AND BARRIO MASTER PLAN BARRIO CENTER (BC) DISTRICT Standard Required/Allowed Proposed Comply? Front Yard Setback Minimum of 15 feet (Harding Street) with allowable intrusions up to six feet into the front yard. The proposed front yard setback measures 15 feet with a fireplace intrusion of a permittable two feet. Yes Side Yard Setback Minimum of five feet (Palm Avenue and interior side). Proposed side yard setbacks 10 feet from residences, and 8 feet from second story balconies. Yes Rear Yard Setback Minimum of 10 feet. The project proposes a 10 foot rear yard setback. Yes Lot Coverage 70 percent maximum. 52 percent proposed. Yes Density 8 minimum and 15 maximum du/ac. 13.6 du/ac. Yes Open Space Open Space Property Open Space: minimum of 30 percent of lot area must be maintained as open space, which may be public or private and may be dedicated to landscape planters, open space pockets and/or connections, roof decks, balconies, other patios. Residential Private Open Space shall be provided at a minimum of 100 square feet per unit with a minimum dimension of 6 feet in any direction. Residential common open space shall be provided at a minimum of 25 square feet per unit with a minimum dimension of 10 feet in any direction. Common open space shall be purposefully designed as active or passive recreational facilities. The proposed project includes landscaped areas, balconies, and private and common open space that totals approximately 55 percent of the lot area. Each unit contains ground level porches and second and third story balconies and decks ranging from 304 to 490 square feet of residential private open space while meeting the minimum private open space required dimensions. Residential common open space is provided as passive space throughout the project site, between the detached duplexes, the side yard along Palm Avenue, and the rear yard which is landscaped. Each of these areas contributes to the common open space which easily exceeds the required 150 square foot minimum area and 10-foot minimum dimension requirements. Yes Building Height Maximum 35 feet. 34 feet two inches maximum. Yes CT 2017-0008/SDP 2019-0006 (DEV2017-0064) – HARDING & PALM TOWNHOUSE September 4, 2019 Page 8 TABLE F – COMPLIANCE WITH THE VILLAGE AND BARRIO MASTER PLAN AREA-WIDE STANDARDS Standard Required/Allowed Proposed Comply? Ingress and Egress Development shall permit one access point from a public street. A clear zone shall be provided at the intersection of a driveway and a street or alley to maintain a free line of sight. a. The clear zone shall consist of an isosceles right triangle with 7.5 feet on the driveway and street/alley sides. b. The clear zone shall not be occupied by ground floor building footprint site features, or landscaping that is taller than 3.5 feet. One vehicular access point is proposed off of Harding Street. The proposed driveway shall have a clear zone of 12 feet on the driveway and street side. No landscaping over 3.5 feet or structure shall be located in the clear zone. Yes Property Line Walls/Fences Maximum height in front yard setback is 3.5 feet and 6 feet along the side and rear setbacks. Wall/fence height shall be measured from the lowest side of finished grade. Proposed stucco walls along Palm Avenue measuring 30- inches tall are within the permitted height. Yes Building Orientation Buildings shall be oriented toward primary street frontage. The entrances to all units, which include front porches, are oriented towards Palm Avenue. Yes Parking Two on-site garage spaces per unit are required as well as 0.3 visitor parking space permit for developments with 10 or fewer units, or two spaces (1.8 rounded up). Each unit proposes an attached two-car garage with a direct entrance into the unit. Three accessible visitor parking spaces are provided. Yes C. Subdivision Ordinance (CMC Title 20) The Land Development Engineering Division has reviewed the proposed Tentative Tract Map and has found that the subdivision complies with all applicable requirements of the Subdivision Map Act and the City’s Subdivision Ordinance (Title 20) for Major Subdivisions. The subdivision is considered major because it involves the division of land into five or more condominiums (six residential condominiums). The project has been conditioned to install all infrastructure-related improvements and the necessary easements for these improvements concurrent with the development. D. Inclusionary Housing (CMC Chapter 21.85) Per CMC Section 21.85.110, the inclusionary housing requirement may be satisfied through the payment of inclusionary housing in-lieu fees when residential development is less than seven units. The proposal CT 2017-0008/SDP 2019-0006 (DEV2017-0064) – HARDING & PALM TOWNHOUSE September 4, 2019 Page 9 to construct six residential condominium units has been conditioned to pay the applicable housing in-lieu fee for five (5) units. However, the project is conditioned to pay the applicable housing in-lieu fees for the additional residence, a total of six (6), if building permits have not been applied for within two years of demolition of the existing single-family residence. E. Growth Management (CMC Chapter 21.90) The proposed project is located within Local Facilities Management Zone 1 in the Northwest Quadrant of the city. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table G below. TABLE G – GROWTH MANAGEMENT COMPLIANCE Standard Impacts Compliance City Administration 17.69 sq. ft. Yes Library 9.43 sq. ft. Yes Waste Water Treatment 6 EDU Yes Parks 0.06 acre Yes Drainage Basin A; 0.84 CFS Yes Circulation 48 ADT Yes Fire Station 1 Yes Open Space N/A N/A Schools Carlsbad (E:1.26, M:0.407, H:0.52) Yes Sewer Collection System 6 EDU Yes Water 3,300 GPD Yes Properties located within the boundaries of the BC District of the VBMP have a GMCP of 11.5 du/ac. One dwelling unit will be allocated from the city’s Excess Dwelling Unit Bank as Section 2.5 in the VBMP states that excess dwelling unit allocation may be approved through the findings made within City Council Policy 43. Pursuant to Planning Commission Resolution No. 7346, the allocation from the EDUB can be supported since 129 units are available for allocation outside the Village according to the City’s quadrant dwelling unit report dated June 30, 2019. IV. ENVIRONMENTAL REVIEW The City Planner has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and it is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15332 (In-Fill Development Projects) Class 32 Categorical Exemption of the State CEQA Guidelines. The project is consistent with the General Plan as well as with the Zoning Ordinance. The project site is within the city limits, is less than five acres in size, and is surrounded by urban uses. There is no evidence that the site has value as habitat for endangered, rare, or threatened species. Approval of the project will not result in significant effects relating to traffic, noise, air quality, or water quality. The site can be adequately served by all required utilities and public services. In making this determination, the City Planner has found that the exceptions listed in Section 15300.2 of the state CEQA Guidelines do not apply to this project, including historical resources. Specifically, the 77-year-old home and garage proposed to be demolished are not identified on a local register of historical resources and a qualified professional has CT 2017-0008/SDP 2019-0006 (DEV2017-0064) – HARDING & PALM TOWNHOUSE September 4, 2019 Page 10 determined that the structure does not meet the criteria for listing on the California Register of Historical Resources. A Notice of Exemption will be filed by the City Planner upon final project approval. The six-unit residential condominium project will be required to comply with the recently adopted Climate Action Plan Ordinances, including energy efficiency measures (Ordinance No. CS-347), and electric vehicle charging infrastructure (Ordinance No. CS-349). If building permits are not issued by January 1, 2020, the project will also be subject to the new residential standards for water heating and solar photovoltaic systems. ATTACHMENTS: 1. Planning Commission Resolution No. 7346 2. Location Map 3. Disclosure Statement 4. Village and Barrio Master Plan Design Guidelines Analysis 5. Reduced Exhibits 6. Full Size Exhibits “A” – “P” dated September 4, 2019 MAGNOLIA AVMAGNOLIA AV CC HH EE SS TT NN UU TT AA VV VV IILL LLAAGGEECCRRHHAARRDDII NNGGSSTTROOSEV E L T S T ROO S E V E L T S T WALN U T A V WALN U T A V ADAMS STADAMS STPPII OOPPII CCOODDRRMAD I SO N S TMAD ISON S T PALM A V PALM A V CAME L LI A P L CAME L LI A P L AVOC A D O L N AVOC A D O L N J E F FER SON S T J E F F ER SON S T VILLA G E D R VILLA G E D R CT 2017-0008 / PUD 2017-0007 Harding & Palm Townhouse Project SITE MAP JPALOMARAIRPORTRD E LCAMREALLA COST A AVCARLSBADBLCARLSBADVILLAGEDRELCAMINOREAL MELR O SED RAVIARAPY RAN CHO S A NTAFERDCOLL EGEBL!"^SITE dd,DEdϮ dd,DEdϯ 1 VILLAGE AND BARRIO MASTER PLAN DESIGN GUIDELINES CT 2017-0008/SDP 2019-0006 (DEV2017-0064) – HARDING & PALM TOWNHOUSE INTENT The Design Guidelines (guidelines) intend to implement and enhance the existing character within the Village and Barrio as new development and property improvements occur. Together, the Village and Barrio are a unique, mixed-use environment. They serve as both a shopping and entertainment destination as well as a place to live and work. The guidelines aim to improve the character of the Village and Barrio while improving livability. Guidelines address many components of building style and orientation, including site layout, building massing, roof form, building façades, and appurtenances. Images are intended to provide a visual example of a targeted topic described in the caption and may not represent all aspects and direction provided within this document. Through these areas of focus, the guidelines strive to foster authentic designs with straightforward and functional construction. All development should align with the spirit and intent of the design guidelines presented in this chapter. Designers and developers should consider at a minimum that these guidelines are a starting point for quality development, and do not comprise every possible strategy for achieving high quality design. Therefore, it is prudent that designers use their own techniques for achieving authentic, high quality design. The following guidelines apply to all new and remodeled development within the entire Master Plan Area unless exempt as determined by Section 6.3.2. 2.8.2 SITE PLANNING GUIDELINES CONSISTENCY STATEMENT A.Site layout 1.Place buildings adjacent to, and oriented towards, the street. Locate prominent architectural features near corners and intersections. 2.Orient storefronts and major building entries towards major streets, courtyards, or plazas. 3.Minimize gaps between buildings in order to create a continuous, pedestrian- oriented environment. 4.Place parking lots so as not to interrupt commercial street frontages. 5.Incorporate functional and aesthetic vehicular and pedestrian connections to adjacent sites. 6.Create small pedestrian plazas along the street wall through th e use of recesses in building form. 7.Provide easily identifiable pedestrian access from the street and/or sidewalk to key areas within the site. 8.Incorporate plazas, landscaped areas, fountains, public art, textured pavement, and vertical building features to create focal points that enhance a pedestrian’s experience. 9.Utilize atriums and outdoor courtyards to increase the variety and number of views and to bring additional sunlight into large developments. 10.Give careful design consideration to corner lots, as they are typically a focal point in the urban fabric. 11.Utilize courtyards or other methods to break up the building mass and provide natural ventilation, wherever possible. The proposed site layout for the six- unit residential air-space condominium project takes advantage of the configuration of the lot by placing the front doors of every unit along Palm Avenue. All units are accessed via the public sidewalk. The entrances to the units feature walled patios and a second story balcony. The architecture of the buildings provide articulation along Palm Avenue street frontage providing varied façades while incorporating private and common open space along the street frontage as well as landscaping throughout the site. Vehicular access to each unit is provided by a 24-foot-wide private drive-aisle off Harding Street. B.Parking and access 1.Locate parking behind buildings and away from the street, wherever possible. 2.Use pervious paving materials, whenever possible. 3.Buffer residential uses from commercial parking lots by landscaping, fencing, and/or walls. The parking garages are located in the rear of the residences placing the structures towards the street. This type of design complements pedestrian walking community character. Likewise, paved entryways dd,DEdϰ 2 4. When walls or fences are utilized to screen parking, provide breaks to allow for pedestrian circulation and limit height for safety and security purposes. 5. Divide large parking lots into smaller areas with landscaping and clearly marked pedestrian paths. 6. Highlight primary pedestrian access paths within parking areas with decorative paving, trellises, canopies, lighting, and similar improvements. 7. Create pedestrian paseos to parking lots of buildings. 8. Locate parking below grade or in structures, where feasible. 9. Design parking structures so their height and bulk are consistent with adjacent buildings. 10. Provide bicycle parking at convenient locations such as entrances or other visible and accessible areas. 11. Provide electric vehicle charging stations and equipment where feasible and as otherwise required. are proposed to every residence, adding to the character of the Barrio Center. One vehicular access point is proposed off Harding Street. The proposed drive aisle is deep enough to avoid vehicles blocking access. Each unit proposes an attached two- car garage with a direct entrance into the unit. Likewise, the project proposes three onsite guest parking spaces. Electric vehicle charging stations are not required. However, the circuiting necessary to allow vehicle charging within the private garages will be required so that an owner may install a charging station in the future. C. Plazas and open space 1. Provide private or common open space and pedestrian connections to such spaces to enhance the living environment and contribute to a walkable neighborhood character. 2. Semi-public outdoor spaces, such as small plazas and courtyards are encouraged between private and public spaces to support pedestrian activity and connectivity. 3. Design plazas and building entries to maximize circulation opportunities between adjacent uses. 4. Provide landscaping and high-quality paving materials, such as stone, concrete or tile, for plazas and open spaces. 5. Place outdoor furniture, such as seating, low walls, trash receptacles, bike racks and other elements, in outdoor pedestrian spaces. 6. Site buildings to define open space areas. Ensure that outdoor areas are visible from public streets and accessible from buildings, as well as, streets and pedestrian and bicycle networks. The proposed six-unit condominium project complies with the private open space requirements of the Barrio Center (BC) District of the Village and Barrio Master Plan (VBMP), which requires a minimum of 25 percent of the lot area to be maintained as open space. Additionally, each unit must contain a minimum of 300 square feet of private open space. The project requires a minimum of 150 square feet of common open space (25 square feet per unit). The detached duplex style of the condominiums creates pockets of small landscaped courtyards between the structures. This design supports pedestrian connectivity throughout the property and community design of the area. The proposed project includes landscaped areas, balconies, private and common areas that totals approximately 55 percent of the total lot area. Each unit ground level offers a porch and second story balcony ranging from 304 to 490 square feet of residential private open space. 3 Residential common open space is provided throughout the project site, between the detached duplexes, the side yard along Palm Avenue, the rear yard which is landscaped. Each of these pocketed areas contributes to the common open space which easily exceeds the required 150 square foot minimum area requirement. F. Mechanical Equipment and Service Areas 1. Carefully design, locate, and integrate service, utility, and loading areas into the site plan. These critical functional elements should not detract from the public view shed area or create a nuisance for adjacent property owners, pedestrian circulation, or vehicle traffic. 2. Locate loading areas in the rear of a site where possible. 3. Locate mechanical equipment and service areas along and accessed from alleys or the rear of properties, wherever possible. 4. Place public utility equipment, meter pedestals, and transformers underground or away from sidewalks and pedestrian areas, where feasible. 5. Screen all mechanical equipment from public view. 6. Ensure roof mounted mechanical equipment and screening do not interfere with required solar zones or installed solar photovoltaic or solar water heating systems. 7. Design trash and recycling enclosures to be consistent with the project and building architecture, and site and screen them to minimize visual impact. All utilities and HVAC systems will be located out of public views, and not protruding from rooftops. Not only does this assist with the screening but also with maintaining low noise levels. Each unit will have its own trash and recycling bins within the private garages. Roof plans demonstrate adequate solar zones for future photovoltaic systems. G. Landscaping Landscaping shall meet the policies and requirements set forth in the City of Carlsbad Landscape Manual. 1. Utilize landscaping to define building entrances, parking lots, and the edge of various land uses. 2. Utilize landscaping to buffer and screen properties. 3. Consider safety, environmental impacts, and accent elements when selecting and locating landscaping elements. 4. Landscaping, between the front property line and the building creates a visually interesting transitional space. Select and place plants to enhance and soften architectural elevations, screen undesirable building features and contribute to the overall quality of the streetscape. 5. Select species that are compatible with Carlsbad’s semi-arid Mediterranean climate, and that will grow to an appropriate size at maturity. 6. When there are minimal landscape areas between the building and the street, incorporate planters onto porches, recessed building entrances, and planters on decks and balconies. 7. Minimize paved vehicle areas such as driveways and parking areas. Design driveways to be no wider than necessary to provide access. Incorporate permeable surfaces, such as interlocking pavers, porous asphalt, power blocks, and lattice blocks/ grass-crete or ribbon driveways where feasible. 8. Utilize planting to screen less desirable areas from public view, i.e., trash, enclosures, parking areas, storage areas, loading areas, and public utilities. The proposed landscape plan complies with the city’s Landscape Manual. Landscaping is provided throughout the project site and adjacent to Palm Avenue and Harding Street. 4 9. Provide landscaping between any parking lot and adjacent sidewalks or other paved pedestrian areas, as well as, within surface parking lots. 10. Incorporate native and drought tolerant vegetation whenever possible. Avoid use of invasive or noxious plants. 11. Incorporate lattice work and landscaping onto existing blank walls to support flowering vines growing out of planters placed at their base. 12. Plant trees and fast growing and flowering vines along fences and walls to soften the appearance of the fencing and screen views to functional on-site work and storage areas. 13. Utilize vines, espaliers, and potted plants to provide wall, column, and post texture and color and to accentuate entryways, courtyards, and sidewalks. 14. Incorporate large planters into seating areas. Planters should be open to the soil below and should incorporate permanent irrigation systems. 15. Maintain landscaping and yard areas regularly to keep a desirable, healthy appearance, eliminate trash, and control vermin. 16. Incorporate Low Impact Development (LID) strategies, site design, and source control measures into projects. Examples include rain gardens, rain barrels, grassy swales, soil amendments, and native plants. 17. Utilize seasonal shading from trees and shrubs when developing planting schemes for courtyards and streetscapes on south and west facing facades. H. Fences and walls 1. Construct fences of quality and durable materials, such as, wood, vinyl or wrought iron. 2. Architecturally treat all site walls to complement the building design. 3. Chain link fences and other “see-through” fences are not appropriate for screening. 4. Fences and walls directly adjacent to sidewalks and pedestrian plazas in commercial and mixed-use areas should be avoided unless designed as a pedestrian amenity or a low wall landscape feature. The project proposes stucco walls along Palm Avenue, buffering the entryways from the public sidewalks. This design offers some privacy, yet still complements the building design and public space since the wall is only 30 inches in height which is permitted. 2.8.3 BUILDING FORM AND MASSING GUIDELINES CONSISTENCY STATEMENT A. Building Form and Articulation 1. Reduce the imposing appearance of tall buildings by stepping back from street level on elevations above the ground floor. 2. Utilize horizontal and vertical articulation to break up monolithic street walls and facades. 3. Utilize techniques to reduce massing, such as variation in wall plane and height and variation in roof form and levels. 4. Surface detailing may be used, but does not serve as a substitute for distinctive massing. 5. Consider adjacent low density uses when designing and orienting a building. For example, avoid balconies overlooking rear yards. 6. Minimize the vertical emphasis of architectural design elements by incorporating features such as horizontal bands, reveals, trims, awnings, eaves, and overhangs or other ornamentation, along different levels of the wall surface. 7. Minimize blank walls by: a. Adding window openings and/or entrances and other relief. The buildings are designed with varied horizontal alternating planes. The rooflines are also appropriately varied in pitch and height. Doors, windows, and balconies as well as adequately weighted architectural projections minimize potentially blank walls. The buildings use a variety of materials that complement the design and provide architectural interest such as incorporating Hardie plank lap siding with corner boards, large windows, wood railings, varied roof planes. 5 b. Providing recessed glazing and storefronts. c. Adding vertical pilasters which may reflect internal building structure. d. Changing color and texture along the wall surface. e. Varying the planes of the exterior walls in depth and/or direction. f. Adding trims, projections, and reveals along different wall surfaces. 8. Articulate the building façade by varying building elements to create contrast. Integrate all architectural elements into the building design to avoid the look of “tacked on” architectural features. 9. Utilize facade projections and recesses such as bay windows, planter boxes, roof overhangs, and entry way recesses. 10. Arrange columns such that they appear to support the weight of the building or feature above and are balanced in height, weight, and depth. Spindly columns can appear out of proportion with the element it is supporting. 11. Size shutters appropriately, when used to cover the window opening. 12. Avoid exterior sliding or fixed security grilles over windows along street frontages. 13. Discourage and avoid “chain” corporate architecture and generic designs. Each project should strive to achieve the unique architectural style or character. 14. Design roofs to accommodate a solar photo-voltaic system and/or solar water heating system, as required by California Building Code. 15. Utilize details such as wall surfaces constructed with patterns, changes in materials, building pop-outs, columns, and recessed areas to create shadow patterns and depth on the wall surfaces. 16. Ensure that proportions are consistent with selected architectural styles. 17. Incorporate the characteristic proportions of traditional facades in new infill development. 18. Balance the ratio of height, width, and depth of arches and columns to emphasize strength and balance. 19. Ensure consistency between the height of a column and its mass or thickness with the weight of the overhead structure the column supports. 20. Infill buildings that are much wider than the existing facades should be broken down into a series of appropriately proportioned structural bays or components. 21. Consider transitions between the height of new development and the height of adjacent existing development. 22. Utilize vertical building focal elements. Towers, spires, or domes may foster community identity and serve as landmarks. 23. Utilize windows and open wrought iron balconies to provide oppo rtunities for residents to passively observe and report suspicious activity. 24. Utilize accent materials to highlight building features and provide visual interest. Accent materials may include any of the following: a. Wood b. Glass c. Glass block (transom) d. Tile e. Brick 6 f. Concrete g. Stone h. Awnings i. Plaster (smooth or textured) 25. Use building materials and finishes that are true to the structure’s architectural style. 26. Windows, doors, and entries should be designed to capture the desired architectural style of the building. 27. Generally, use no more than three different materials on exterior wall surfaces. While certain styles may successfully incorporate multiple surface materials, caution must be used as too many materials can result in a less than aesthetically pleasing building. 28. Ensure material changes occur at intersecting planes, preferably at inside corners of changing wall planes or where architectural elements intersect, such as a chimney, pilaster, or projection. 29. Utilize light and neutral base colors. Generally muted color schemes will promote visual unity and allow awnings, window displays, signs and landscaping to be given proper emphasis. 30. Ensure lighting is architecturally compatible with the building. 31. Articulate storefronts with carefully arranged doors, windows, arches, trellises, or awnings, rather than blank walls. 32. Ensure that the main entrance to a building is clearly identifiable and unique, as it is the primary point of arrival and should be treated with significance. 33. Window type, material, shape, and proportion should complement the architectural style of the building. 34. Utilize recessed windows where appropriate to the architectural style, to provide depth. C. Balconies 1. Place balconies adjacent to operable doorways. Faux balconies or those that do not appear usable are discouraged. 2. Visually support all balconies, either from below by decorative beams and/or brackets, from above by cables, or by other parts of the building. 3. On corners, balconies may wrap around the side of the building. Usable second floor balconies are provided for each unit. The balconies feature wooden rails and visually appear supported. D. Roof Forms 1. Ensure that roof materials and colors are consistent with the desired architecture or style of the building. 2. Utilize multi-roof forms, hips, gables, shed roof combinations, and sufficiently articulated flat roofs to create interesting and varying roof forms that will reduce building mass, add visual appeal, and enhance existing Village and Barrio character and massing. 3. Avoid long, unbroken, horizontal roof lines. 4. Avoid flat roofs unless sufficient articulation of detail is provided, such as precast treatments, continuous banding or projecting cornices, lentils, caps, corner details, or variety in pitch (sculpted), height, and roofline. 5. Avoid the “tacked on” appearance of parapets, and ensure their appearance conveys a sense of permanence. If the interior side of a parapet is visible from the The proposed rooflines are appropriately varied in pitch and height, breaking up the design yet offering consistency between all six units. 7 pedestrian and/or motorist area of the project, utilize appropriate detail and properly apply materials. E. Lighting 1. Provide exterior building lighting, particularly in commercial and high- pedestrian areas. 2. Design or select light fixtures that are architecturally compatible with the building. 3. Integrate light fixtures that are downcast or low cut-off fixtures to prevent glare and light pollution. 4. Design lighting in such a way as to prevent the direct view of the light source from adjacent properties or uses, particularly residential properties or uses. 5. Utilize lighting on architectural details, focal points, and parking areas to increase safety, help with orientation, and highlight and site attributes and the identity of an area. 6. Use energy-efficient lamps such as LED lights for all exterior lighting along with adaptive lighting controls to contribute to energy conservation and potentially reduce long-term costs. Exterior lighting fixtures will be located throughout the building and consistent with other typical residential lighting. F. Residential Design 1. Design with architectural features such as porches, balconies, chimneys, door placement, window proportions, dormers, wood detailing, fencing, siding, and color scheme to complement the overall building design, site and neighborhood context. 2. Incorporate porches, trellises, landscaping, and other features to extend the living area toward the street, soften the transition between the street and the dwelling, and encourage community. 3. Design and site units as much as possible to front primary streets to provide “eyes on the street,” create pedestrian environments, and support the walkable, connected character of the Village and Barrio. 4. Articulate windows with accent trim, sills, kickers, shutters, window flower boxes, balconies, awnings, or trellises authentic to the architectural style of the building. 5. Incorporate safe, efficient, and convenient access to usable open space within multifamily developments. 6. Locate garages and parking areas to have the least amount of visual impact on the street. 7. Design garages so that they are subordinate to the main living area, when viewed from the street. Where possible, recess the garage behind the dwelling unit and do not locate it between the main living area and the street. 8. Recess garage doors into the exterior wall, rather than keeping them flush. 9. Design detached garages and accessory structures to be an integral part of the architecture of the project. They should be similar in materials, color, and detail to the principal structures of a development. The six-unit residential air-space condominium project has been designed with porches and balconies. The exterior siding and trim materials and colors complement the overall building design. All units front on a public sidewalk. Landscaping is provided consistent with the City’s Landscape Manual and designed appropriately for the residential site. Private and common open space is provided for every unit. Garages are located off a drive-aisle and do not face directly onto the street. dd,DEdϱ