Loading...
HomeMy WebLinkAbout2017-05-01; Traffic Safety Commission; ; Pavement Management ProgramCITY OF CARLSBAD TRAFFIC SAFETY COMMISSION STAFF REPORT COMMISSION MEETING OF: May 1, 2017 ITEM NO. 6-8-1 LOCATION: City-wide INITIATED BY: Staff REQUESTED ACTION: Information only BACKGROUND: Each year the city conducts extensive work for the pavement management program. This effort not only maintains the quality of service for all roadway users (e.g., autos, bicyclists, pedestrians), it also lowers the overall cost to the city of providing and maintaining the public roads. Each year, the city conducts pavement resurfacing as part of an annual Capital Improvement Program (CIP) project. Resurfacing projects in the City apply a rubberized asphalt concrete layer that reduced road noise and is more environmentally friendly than traditional asphalt treatments. Because the existing striping must be replaced following resurfacing, these projects provide a great opportunity to review and revise lane striping and bike facilities. For example, travel lanes can be narrowed to provide buffers separating the auto and bike lanes. As part of the resurfacing work that was recently completed, bike lanes were widened and 3-foot buffers were added in each direction of travel on: • College Boulevard between Cannon Road and Oceanside city limits • Carlsbad Village Drive between College Boulevard and Tamarack Avenue Attachment 1 shows the following roadway sections and intersections scheduled to be resurfaced this calendar year: • El Camino Real: Palomar Airport Road to Gateway Road • Intersection of El Camino Real and La Costa Avenue • Intersection of Palomar Airport Road and Camino Vida Roble • El Camino Real: Gateway Road to Arena! Road • Anillo Way: Rocio Street to La Gran Via • La Gran Via: Anillo Way to Madrilena Way RECOMMENDATION: Information only. NECESSARY CITY COUNCIL ACTION: None. Attachments: 1. Proposed map of Pavement Overlay Project LOCATION MAP STREETS TO BE OVERLA YEO PROJECT NAME 2017 PAVEMENT OVERLAY PROJECT PROJECT NUMBER 6001-170L PLOTTED BY: SCOTT £VANS PLOT DATE:J/8/16 PA1H:D:\TRANSP0RTAT10N DEPAR1MENT\DES1GN Dl'AS/0N\£MAD El.JAS\2017 O',£RL.AY\2017DL..l0CAT10N AIAP.DIIG EXHIBIT \_ Pavement Management Program May 1, 2017 Annual Pavement Management Program •Improves quality of service for all users •Reduces cost to maintain roadway system •Rubberized asphalt concrete used •Opportunity to re-stripe lanes and improve bike facilities 2 Recent Improvements to Bike Facilities •Wider bike lanes and 3-foot buffers at: –College Blvd: Cannon Road-Oceanside C.L. –CVD: College Blvd.-Tamarack Ave. 3 Scheduled Improvements: 2017 •ECR: Palomar Airport Road to Gateway Road •Intersection of El Camino Real &La Costa Avenue •Intersection of PAR &Camino Vida Robles •El Camino Real: Gateway Road to Arenal Road •Anillo Way: Rocio Street to La Gran Via •La Gran Via: Anillo Way to Madrilena Way 4 Location Map STREETS TO BE OVERLA YEO