HomeMy WebLinkAbout2017-11-06; Traffic Safety Commission; ; RE-STRIPING PLANS FOR AVENIDA ENCINASCITY OF CARLSBAD
TRAFFIC SAFETY COMMISSION
STAFF REPORT
COMMISSION MEETING OF: November 6, 2017 ITEM NO. 6A
LOCATION: Avenida Encinas Avenue between Cannon Road and Palomar Airport Road
INITIATED BY: John Kim, Associate Engineer
REQUESTED ACTION: Support the implementation of striping modifications on Avenida
Encinas between Cannon Road and Palomar Airport Road in
conjunction with the construction of the Vista/Carlsbad
Interceptor Sewer project.
BACKGROUND:
DATA:
The Vista/Carlsbad Interceptor Sewer project along Avenida Encinas is currently under
construction. When underground construction of the sewer interceptor pipeline is
complete, the entire roadway will be re-surfaced. This results in an opportunity to
stripe the roadway with buffered bicycle lanes in each direction.
Avenida Encinas is classified as a Neighborhood Connector Street in the Mobility
Element. The portion of Avenida Encinas between Palomar Airport Road and Cannon
Road has a roadway width between 50 and 64 feet and is currently striped with two
vehicle lanes in each direction with no bicycle lanes. It carries between 6,000 and 9,500
vehicles per day. Surrounding land uses include light industrial, professional offices and
restaurants. The posted speed limit on this portion of the roadway is 40 miles per hour.
BASIS OF ACTION:
The Mobility Element of the Carlsbad General Plan directs staff to "evaluate methods
and transportation facility improvements to promote biking, walking, safer street
crossings, and attractive streetscapes. The City Council shall have the sole discretion to
approve any such road diet or vehicle traffic calming improvements that would reduce
vehicle capacity to or below a LOS D".
As a Neighborhood Connector Street Avenida Encinas is intended to "connect people
to different neighborhoods and land uses of the city" and to be "designed to safely
move all modes of travel while enhancing mobility for pedestrians and bicyclists." Staff
is proposing to utilize the construction of the Vista/Carlsbad Interceptor Sewer as an
opportunity to enhance bicycle mobility by striping Avenida Encinas with a buffered
bicycle lane in each direction. This proposed striping would reduce the number of
vehicular travel lanes from two to one in each direction to accommodate the proposed
buffered bicycle lanes.
In support of this proposal an operational analysis of the proposed striping changes
was conducted to evaluate the projected vehicular levels of service. Three locations
were analyzed: (1) intersection level of service at Cannon Road/ Avenida Encinas; (2)
mid-block level of service south of Cannon Road; and (3) mid-block level of service
north of Palomar Airport Road.
Intersection Level of Service Analysis
Since the proposed striping changes would reduce the number of vehicular travel lanes
on Avenida Encinas in each direction from two to one, the westbound left turn on
Cannon Road at Avenida Encinas would need to be modified from the two existing lanes
to one proposed lane. In accordance with the Carlsbad Growth Management Plan and
SANTEC/ITE guidelines, the intersection was analyzed using the Highway Capacity
Manual (HCM) methodology. Synchro 9.0 computer software was used with recent
traffic counts to calculate delay (in seconds) and the corresponding level of service as
summarized in Table 1 below.
TABLE 1: Intersection Level of Service Analysis Summary
Existing Proposed
Intersection AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour
Delay LOS Delay LOS Delay LOS Delay LOS
Cannon Rd & Avenida 15.2 B 22.2 C 17.7 B 22.5 C
Encinas
Mid-block Level of Service Analysis
Traffic counts were collected for the mid-block analysis and utilized to calculate level of
service as summarized in Table 2 below.
TABLE 2: Mid-Block Level of Service Analysis Summary
Existing Proposed
Segment Capacity Volume LOS Capacity Volume LOS
South of Cannon Rd 30,000 5,307 A 15,000 5.307 B
North of PAR 30,000 6,664 A 15,000 6,664 B
As noted above the implementation of the road diet will not reduce the vehicle capacity
to or below LOS D and therefore staff can proceed with the implementation of the
striping modifications in conjunction with the previously approved and ongoing
construction of the Vista/Carlsbad Interceptor Sewer project.
RECOMMENDATION:
Support the implementation of striping modifications on Avenida Encinas between
Cannon Road and Palomar Airport Road in conjunction with the construction of the
Vista/Carlsbad Interceptor Sewer project.
NECESSARY CITY COUNCIL ACTION:
None
ATTACHMENTS:
1. Avenida Encinas Road Diet Traffic Analysis by LSA
2. Proposed Signing and Striping Plans for Avenida Encinas
LSA
MEMORANDUM
DATE: October 3, 2017
To: John T. Kim, City of Carlsbad
FROM: Dean Arizabal, LSA
SUBJECT: Avenida Encinas Road Diet Traffic Analysis
BERKELEY
CARLSBAD
FRESNO
IRVINE
LOS ANGELES
PALM SPRINGS
POINT RICHMOND
RIVERSIDE
ROSEVILLE
SAN LUIS OBISPO
LSA is pleased to present this Traffic Analysis for the proposed Avenida Encinas road diet in Carlsbad
(City), California. As part of the project, use of Avenida Encinas within the right-of-way will be
reassigned between Cannon Road and Palomar Airport Road from two lanes in each direction to one
lane with a buffered bicycle lane in each direction. To assess the effects of the project on the
existing circulation system, LSA has conducted an analysis consistent with the requirements of the
San Diego Traffic Engineers' Council/Institute ofTransportation Engineers (SANTEC/ITE) Guidelines
for Traffic Impact Studies in the San Diego Region. The scope of this analysis has been discussed and
approved by the City Public Works Department.
PROJECT DESCRIPTION
The proposed Avenida Encinas road diet is located in the City just west of and parallel to the
Interstate 5. According to the City's General Plan Mobility Element, Avenida Encinas is classified as a
Neighborhood Connector Street. The existing roadway has four travel lanes separated by a raised
median. Along the approximately 0.9-mile segment of Avenida Encinas between Cannon Road and
Palomar Airport Road, various land uses take access from the roadway, including hotel, retail, office,
and restaurant uses. Additionally, the North County Transit District serves three bus stops along the
study area segment.
The proposed road diet includes physical changes to the roadway to reduce the two travel lanes in
each direction to one lane with a buffered bicycle lane in each direction. These physical changes
include striping two-way left-turn lanes, adding the bicycle lanes, and placing new signage. These
changes are illustrated in detail on the attached site plans (Figures lA, 18, and lC). The westbound
dual left-turn lanes at Avenida Encinas/Cannon Road will also need to be reduced to one turn lane
because there will only be one receiving lane on Avenida Encinas.
METHODOLOGY
Study Area
As defined by the City Public Works Department, the project study area consists of the Avenida
Encinas/Cannon Road intersection and two roadway segments of Avenida Encinas (one segment
south of Cannon Road and one segment north of Palomar Airport Road).
20 Executive Park, Suite 200, Irvine, California 92614 949.553.0666 www.lsa.net
LSA
Intersection Level of Service Methodology
In accordance with the Carlsbad Growth Management Plan and the SANTEC/ITE guidelines, the
study_ area intersection was analyzed using the Highway Capacity Manual (HCM) methodology for
Existing and Existing plus Project scenarios. The Synchro 9.0 computer software was used to
determine the level of service (LOS) based on the existing traffic volume and the existing and
proposed intersection geometry (with and without dual westbound left-turn lanes). The HCM
worksheets are provided as an attachment.
HCM methodology calculates the average delay experienced by all vehicles at an intersection. The
resulting calculation of average delay experienced by vehicles at the intersection is then used to
determine the LOS at that location. LOS A represents free-flow activity, and LOS F represents
overcapacity operation. LOS is a qualitative assessment of the quantitative effects of such factors as
traffic volume, roadway geometrics, speed, delay, and maneuverability on roadway and intersection
operations. The relationship between LOS and the delay (in seconds) or volume-to-capacity (v/c)
ratio at intersections is as follows:
Delay in Seconds
Level of Service (HCM Methodology)
A < 10.0
B > 10.0 and .'.S.,20.0
C > 20.0 and< 35.0
D > 35.0 and< 55.0
E > 55.0 and< 80.0
F >80.0
HCM = Highway Capacity Manual
Roadway Analysis Methodology
The study area roadway segments were assessed using the v/c analysis. The existing average daily
traffic (ADT) volumes are divided by the theoretical daily capacities determined by the SANTEC/ITE
guidelines to calculate the v/c ratio. The theoretical daily capacity of a roadway is dependent on
roadway classification. Although the City classifies Avenida Encinas as a Neighborhood Connector,
this analysis has been conducted according to San Diego County's (County) standards. The County
classifies the roadway as a Secondary Arterial/Collector with four lanes divided by a median . With
the road diet, the roadway will be classified as a Collector with two lanes and a continuous left-turn
lane. The following table shows theoretical capacities based on LOS for the SANTEC/ITE street
classifications.
Level of Service
Street Classification Lanes A B C D E
Secondary Arterial/Collector 41anes 10,000 14,000 20,000 25,000 30,000
Collector (continuous left-turn lane) 21anes 5,000 7,000 10,000 13,000 15,000
Source: Table 2 from SANTEC/ITE Guidelines for Traffic Impact Studies [TIS] in the San Diego Region
10/3/17 «P:\HCR1705\Traffic Analysis Memo.docx» 2
LSA
Performance Criteria
The City considers LOS D to be the recognized standard for all intersections and roadway segments.
Significant impacts for intersections are defined by an increase of 2 seconds of delay to an
intersection operating at LOS D, E, or F in the baseline condition. Roadway segments operating at
LOS D, E, or Fin the baseline condition are significantly impacted if the project adds 0.02 or more to
the v/c ratio. If there is a significant project impact, mitigation measures must be identified.
EXISTING AND PLUS PROJECT LEVEL OF SERVICE ANALYSIS
In order to establish existing conditions, an independent car count company (National Data &
Surveying Services) has collected traffic volumes at the study area intersection and roadway
segments. Intersection turning movement volumes for Avenida Encinas/Cannon Road were
collected on Wednesday, September 20, 2017, during the a.m. peak hour (between 7:00 a.m. and
9:00 a.m.) and the p.m. peak hour (between 4:00 p.m. and 6:00 p.m.). The 24-hour ADT volumes
were collected on Wednesday, September 20, 2017, at two mid-block segments of Avenida Encinas,
one near the intersection with Palomar Airport Road and one near the intersection with Cannon
Road. All existing traffic volumes are provided as an attachment.
Based on the existing a.m. and p.m. peak-hour LOS analysis, Avenida Encinas/Cannon Road operates
at satisfactory LOS B (15.2 seconds of delay) during the a.m. peak hour and satisfactory LOS C (22.2
seconds of delay) during the p.m. peak hour. With implementation of the road diet project (removal
of the westbound left-turn lane), the study area intersection is expected to continue to operate at
satisfactory LOS B (17.7 seconds of delay) during the a.m . peak hour and satisfactory LOS C (22.5
seconds of delay) during the p.m. peak hour.
The results of HCM analysis reflect delay of the entire intersection, which is calculated as the
average of the approach delays. Therefore, it should be noted that the westbound approach
currently operates at satisfactory LOS B (14.3 seconds of delay) during the a.m. peak hour and LOS C
(22.3 seconds of delay) during the p.m. peak hour. With the implementation of the project, the
westbound approach is expected to continue to operate at satisfactory LOS B (17.4 seconds of
delay) during the a.m. peak hour and LOS C (22.5 seconds of delay) during the p.m. peak hour. Thus,
the project would not significantly impact the intersection of Avenida Encinas/Cannon Road.
Table A presents the ADT volumes and v/c ratios for existing and plus project conditions. As this
table indicates, all study area roadway segments currently operate at satisfactory LOS A. With the
implementation of the project, the study area roadway segments are expected to operate at
satisfactory LOS B. Therefore, no significant project impacts would be created on the Avenida
Encinas roadway segments with the project.
10/3/17 «P:\HCR1705\Traffic Analysis Memo.docx» 3
LSA
Table A: Existing ADT Volumes and V/C Ratios
Roadway
Avenida Encinas
Avenida Encinas
ADT = average daily trips
LOS = level of service
Segment
South of Cannon Road
North of Palomar Airport Road
V/C = volume-to-capacity
CONCLUSION
Existing
Capacity ADT
30,000 5,307
30,000 6,664
Plus Project
LOS Capacity ADT LOS
A 15,000 5,307 B
A 15,000 6,664 B
Based on the SANTEC/ITE guidelines used in this analysis, the proposed Avenida Encinas road diet is
not expected to significantly impact the surrounding circulation system.
If you have any questions, please call me at (949) 553-0666.
Attachments: Figures lA-lC
HCM Worksheets
Existing Traffic Volumes
10/3/17 «P:\HCR1705\Traffic Analysis Memo.docx» 4
LSA
0 70 140 p---,
FEET
SOURCE: Linscott, Law & Greenspan, Engineers
l:\HCRI70S\G\Site Plan.cdr (10/2/2017)
OET,IJl,2S. 1101..F,
-;JM!lES. el
' [§~c.~?
EXISTING SIGNS :n<IS SH~CNl.:0
LEGEND (SHEETS 38 TO 4(1)
{EXISTING STRIPING
--( --(PROPOSED STRIPING
EXISTING ROADSIDE SIGN
PROPOSED ROADSIDE SIGN
EXISTING PAVEMENT ARROW
., INSTALL TYPE IV{L) PAVEMENT: ARROW AS INDICATED
fl INSTALL "A.HEAD" PAVEMENT LEGEND AS IND!CATI:0
OET/Jl19 17~LF.
PROPOSED SIGNS (TlflSSHEET ONLY)
DETAIL:!:i 3.tnL.F, 1¥1""'"' {~.
FIGURE lA
Avenida Encinas Raad Diet
Site Plan
PROPOSED SIGNS (TH1SSHEETONLY)
LSA
0 70 140 p---,
FEET
SOURCE: Linscott, Law & Greenspan, Engineers
l:\HCR1705\G\Site Plan.cdr (10/2/2017)
!':it:;'
--L -•:r.11 --o. ,x.
,. 10' ,. .-,,------
FIGURE 1B
Avenida Encinas Road Diet
Site Plan
0ET1'1l.22. l5(JL.F.
LSA
OETAll.32. 1tnLF.
~·.~~~@4:YO.C.
OETM..~. 2701..1',
Ol;TAIL:12. 1101..1'.
FIGURE lC
.d Encinas Raad Diet
Aveni a Site Plan
HCM 2010 Signalized Intersection Summary
1: Avenida Encinas & Cannon Rd 09/27/2017
/' -+ ,. f +-' "" t ;--\.. + ..;
ovement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SB
Lane Configurations "i tf+ "i"i t~ "i t r' "i"i t r'
Traffic Volume (veh/h) 9 247 41 288 227 93 8 19 65 71 24 18
Future Volume (veh/h) 9 247 41 288 227 93 8 19 65 71 24 18
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 10 268 45 313 247 101 9 21 71 77 26 20
Adj No. of Lanes 1 2 0 2 2 0 1 1 1 2 1 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy \/eh, % 2 2 2 2 ·2 2 2 2 2 2 2 2
Cap, veh/h 23 661 110 497 863 343 21 216 412 240 324 296
Arrive On Green 0.01 0.22 0.22 0.14 0.35 0.35 0.01 0.12 0.12 0.07 0.17 0.17
Sat Flow, veh/h 1774 3040 504 3442 2475 984 1774 1863 1583 3442 1863 1583
Grp Volume(v), veh/h 10 155 158 313 175 173 9 21 71 77 26 20
Grp Sat Flow(s),veh/h/ln 1774 1770 1774 1721 1770 1689 1774 1863 1583 1721 1863 1583
Q Serve(g_s), s 0.2 3.2 3.3 3.7 3.1 3.2 0.2 0.4 1.5 0.9 0.5 0.4
Cycle Q Clear(g_c), s 0.2 3.2 3.3 3.7 3.1 3.2 0.2 0.4 1.5 0.9 0.5 0.4
Prop In Lane 1.00 0.28 1.00 0.58 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 23 385 386 497 617 589 21 216 412 240 324 296
V/C Ratio(X) 0.43 0.40 0.41 0.63 0.28 0.29 0.43 0.10 0.17 0.32 0.08 0.07
Avail Cap(c_a), veh/h 206 1149 1152 1078 1498 1430 206 1685 1661 399 1720 1482
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 21 .1 14.5 14.5 17.4 10.1 10.2 21.2 17.0 12.3 19.1 14.9 14.4
Iner Delay (d2), s/veh 12.1 0.7 0.7 1.3 0.2 0.3 13.2 0.2 0.2 0.8 0.1 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 1.6 1.7 1.8 1.5 1.5 0.2 0.2 0.7 0.5 0.3 0.2
LnGrp Delay(d),s/veh 33.2 15.1 15.2 18.7 10.4 10.5 34.3 17.2 12.5 19.8 15.0 14.5
LnGre LOS C B B B B B C B B B B B
Approach Vol, veh/h 323 661 101 123
Approach Delay, s/veh 15.7 14.3 15.5 18.0
Approach LOS B B B B
imer 2 3 4 5 6 7 8
Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.5 10.4 10.7 14.5 5.0 12.9 5.1 20.1
Change Period (Y+Rc), s 4.5 5.4 4.5 5.1 4.5 • 5.4 4.5 5.1
Max Green Setting (Gmax), s 5.0 39.0 13.5 28.0 5.0 * 40 5.0 36.5
Max Q Clear Time (g_c+l1), s 2.9 3.5 5.7 5.3 2.2 2.5 2.2 5.2
Green Ext Time (p_c), s 0.0 0.5 0.7 4.1 0.0 0.5 0.0 4.4
, ntersection Summa
HCM 2010 Ctrl Delay 15.2
HCM 2010 LOS B
,Notes
Avenida Encinas Road Diet [HCR1705] 09/27/2017 01 Existing AM Synchro 9 Report
LSA Analyst, AY Page 1
HCM 2010 Signalized Intersection Summary
1 : Avenida Encinas & Cannon Rd 09/27/2017
__;. -+ ..... 'f +-' "" t I"' \. ! .;
ovement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SB
Lane Configurations "i tf. "i"'i +~ "i + '(' "i"i t '('
Traffic Volume (veh/h) 15 170 13 92 350 107 82 16 367 168 19 42
Future Volume (veh/h) 15 170 13 92 350 107 82 16 367 168 19 42
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 18 205 16 111 422 129 99 19 442 202 23 51
Adj No. of Lanes 1 2 0 2 2 0 1 1 1 2 1 1
Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 38 689 53 242 685 207 128 573 599 310 607 550
Arrive On Green 0.02 0.21 0.21 0.07 0.26 0.26 0.07 0.31 0.31 0.09 0.33 0.33
Sat Flow, veh/h 1774 3329 258 3442 2678 811 1774 1863 1583 3442 1863 1583
Grp Volume(v), veh/h 18 108 113 111 277 274 99 19 442 202 23 51
Grp Sat Flow(s),veh/h/ln 1774 1770 1817 1721 1770 1720 1774 1863 1583 1721 1863 1583
Q Serve(g_s), s 0.6 3.1 3.1 1.9 8.3 8.5 3.3 0.4 14.5 3.4 0.5 1.3
Cycle Q Clear(g_c), s 0.6 3.1 3.1 1.9 8.3 8.5 3.3 0.4 14.5 3.4 0.5 1.3
Prop In Lane 1.00 0.14 1.00 0.47 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 38 366 376 242 452 440 128 573 599 310 607 550
VIC RaUo(X) 0.47 0.30 0.30 0.46 0:61 0.62 0.77 0.03 0.74 0.65 0.04 0.09
Avail Cap(c_a), veh/h 151 876 899 487 976 948 260 1201 1132 493 1220 1071
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(!) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 29.0 20.1 20.1 26.8 19.7 19.8 27.4 14.5 16.1 26.4 13.8 13.2
Iner Delay (d2), s/veh 8.7 0.4 0.4 1.4 1.4 1.4 9.5 0.0 1.8 2.3 0.0 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 1.5 1.6 0.9 4.2 4.1 1.9 0.2 6.6 1.7 0.3 0.6
LnGrp Delay(d),s/veh 37.7 20.5 20.6 28.2 21.1 21.2 36.9 14.6 17.9 28.7 13.8 13.3
LnGr~ LOS D C C C C C D B B C B B
Approach Vol, veh/h 239 662 560 276
Approach Delay, s/veh 21.8 22.3 21.2 24.6
Approach LOS C C C C
!Timer 2 3 4 5 6 7 8
Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.9 23.9 8.7 17.5 8.8 25.0 5.8 20.4
Change Period (Y+Rc), s 4.5 5.4 4.5 5.1 4.5 * 5.4 4.5 5.1
Max Green Setting (Gmax), s 8.6 38.7 8.5 29.7 8.8 * 39 5.1 33.1
Max Q Clear Time (g_c+l1), s 5.4 16.5 3.9 5.1 5.3 3.3 2.6 10.5
Green Ext Time (p_c), s 0.2 2.0 0.1 5.0 0.1 2.1 0.0 4.9
ntersection Summa
HCM 2010 Ctrl Delay 22.2
HCM 2010 LOS C
ates
Avenida Encinas Road Diet [HCR1705] 09/27/2017 01 Existing PM Synchro 9 Report
LSA Analyst, AY Page 1
HCM 2010 Signalized Intersection Summary
1 : Avenida Encinas & Cannon Rd 09/28/2017
/' -+ t f +-' "" t I" \. + '*' ovement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SB~
Lane Configurations "i tf+ "i tf+ "i t '{' "i"i t '{'
Traffic \/olume (veh/h) 9 247 41 288 227 93 8 19 65 71 24 18
Future Volume (veh/h) 9 247 41 288 227 93 8 19 65 71 24 18
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 10 268 45 313 247 101 9 21 71 77 26 20
Adj No. of Lanes 1 2 0 1 2 0 1 1 1 2 1 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 23 623 103 380 1004 399 21 195 505 231 298 274
Arrive On Green 0.01 0.20 0.20 0.21 0.41 0.41 0.01 0.10 0.10 0.07 0.16 0.16
Sat Flow, veh/h 1774 3040 504 1774 2475 984 1774 1863 1583 3442 1863 1583
Grp Volume(v), veh/h 10 155 158 313 175 173 9 21 71 77 26 20
Grp Sat Flow(s),veh/h/ln 1774 1770 1774 1774 1770 1689 1774 1863 1583 1721 1863 1583
Q Serve(g_s), s 0.3 3.6 3.7 8.0 3.1 3.2 0.2 0.5 1.5 1.0 0.6 0.5
Cycle Q Clear(g_c), s 0.3 3.6 3.7 8.0 3.1 3.2 0.2 0.5 1.5 1.0 0.6 0.5
Prop In Lane 1.00 0.28 1.00 0.58 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 23 363 364 380 718 686 21 195 505 231 298 274
V/C Ratio(X) 0.43 0.43 0.44 0.82 0.24 0.25 0.43 0.11 0.14 0.33 0.09 0.07
Avail Cap(c_a), veh/h 186 1040 1042 503 1355 1294 186 1524 1634 361 1556 1343
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(!) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 23.3 16.5 16.5 17.9 9.3 9.4 23.4 19.3 11.6 21.2 17.0 16.5
Iner Delay (d2), s/veh 12.3 0.8 0.8 8.3 0.2 0.2 13.4 0.2 0.1 0.8 0.1 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 1.8 1.9 4.8 1.5 1.5 0.2 0.3 0.7 0.5 0.3 0.2
LnGrp Delay(d),s/veh 35.6 17.3 17.4 26.1 9.5 9.6 36.8 19.5 11.7 22.1 17.2 16.6
LnGre LOS D B B C A A D B B C B B
Approach Vol, veh/h 323 661 101 123
Approach Delay, s/veh 17.9 17.4 15.6 20.1
Approach LOS B B B C
imer 2 3 4 5 6 7 8
Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.7 10.4 14.7 14.9 5.1 13.0 5.1 24.4
Change Period (Y+Rc), s 4.5 5.4 4.5 5.1 4.5 * 5.4 4.5 5.1
Max Green Setting (Gmax), s 5.0 39.0 13.5 28.0 5.0 * 40 5.0 36.5
Max Q Clear Time (g_c+l1), s 3.0 3.5 10.0 5.7 2.2 2.6 2.3 5.2
Green Ext Time (p_c), s 0.0 0.5 0.3 4.1 0.0 0.5 0.0 4.4
Intersection Summa!}'.
HCM 2010 Ctrl Delay 17.7
HCM 2010 LOS B
ates
Avenida Encinas Road Diet [HCR1705] 09/27/2017 02 Existing Plus Project AM Synchro 9 Report
LSA Analyst, AY Page 1
HCM 2010 Signalized Intersection Summary
1: Avenida Encinas & Cannon Rd 09/28/2017
~ -+ -.. f +-' ~ t r \.. + .,,
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SB
Lane Configurations "'i t~ "'i t~ "'i t r' "'i"'i + r'
Traffic Volume (veh/h) 15 170 13 92 350 107 82 16 367 168 19 42
Future Volume (veh/h) 15 170 13 92 350 107 82 16 367 168 19 42
Number 7 4 14 3 8 18 5 2 12 1 6 16
ln_itial Q (Ob), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 18 205 16 111 422 129 99 19 442 202 23 51
Adj No. of Lanes 1 2 0 1 2 0 1 1 1 2 1 1
Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 38 657 51 143 686 208 128 568 611 310 602 546
Arrive On Green 0.02 0.20 0.20 0.08 0.26 0.26 0.07 0.31 0.31 0.09 0.32 0.32
Sat Flow, veh/h 1774 3329 258 1774 2678 811 1774 1863 1583 3442 1863 1583
Grp Volume(v), veh/h 18 108 113 111 277 274 99 19 442 202 23 51
Grp Sat Flow(s),veh/h/ln 1774 1770 1817 1774 1770 1720 1774 1863 1583 1721 1863 1583
Q Serve(g_s), s 0.6 3.1 3.2 3.7 8.3 8.4 3.3 0.4 14.2 3.4 0.5 1.3
Cycle Q Clear(g_c}, s 0.6 3.1 3.2 3.7 8.3 8.4 3.3 0.4 14.2 3.4 0.5 1.3
Prop In Lane 1.00 0.14 1.00 0.47 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 38 349 358 143 453 441 128 568 611 310 602 546
V/C Ratio(X) 0.47 0.31 0.31 0.78 0.61 0.62 0.77 0.03 0.72 0.65 0.04 0.09
Avail Cap(c_a}, veh/h 152 881 904 253 981 954 262 1208 1154 496 1227 1077
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(!) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d}, s/veh 28.9 20.5 20.5 26.9 19.6 19.6 27.2 14.6 15.6 26.2 13.8 13.2
Iner Delay (d2), s/veh 8.7 0.5 0.5 8.7 1.3 1.4 9.5 0.0 1.6 2.3 0.0 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back0fQ(50%),veh/ln 0.4 1.6 1.6 2.1 4.2 4.1 1.9 0.2 6.4 1.7 0.3 0.6
LnGrp Delay(d),s/veh 37:5 21 .0 21.0 35.6 20.9 21.1 36.8 14.6 17.3 28.5 13.9 13.3
LnGre LOS D C C D C C D B B C B B
Approach Vol, veh/h 239 662 560 276
Approach Delay, s/veh 22.2 23.4 20.6 24.5
Approach LOS C C C C
imer 1 2 3 4 5 6 7 8
Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.9 23.6 9.3 16.9 8.8 24.7 5.8 20.4
Change Period (Y+Rc), s 4.5 5.4 4.5 5.1 4.5 * 5.4 4.5 5.1
Max Green Setting (Gmax), s 8.6 38.7 8.5 29.7 8.8 * 39 5.1 33.1
Max Q Clear Time (g_c+l1), s 5.4 16.2 5.7 5.2 5.3 3.3 2.6 10.4
Green Ext Time (p_c), s 0.2 2.0 0.1 5.0 0.1 2.1 0.0 4.9
ntersection Summa!}'.
HCM 2010 Ctrl Delay 22.5
HCM 2010 LOS C
, ates
Avenida Encinas Road Diet [HCR1705] 09/27/2017 02 Existing Plus Project PM Synchro 9 Report
LSA Analyst, AY Page 1
National Data & Surveying Services
Intersection Turning Movement Count
Location: Avenida Encinas & Cannon Rd
City: Carlsbad Project ID: 17-04287-001
Control: Signalized Date: 9/20/2017
Total
Avenida Encinas Avenida Encinas Cannon Rd Cannon Rd
NORTiiBOUND S0Ul1iB0UND EASTBOUND WESTBOUND
1 1 1 0 2 1 1 0 1 2 0 0 2 2 0 0
NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 7:00 AM 3 6 11 0 15 0 0 6 38 8 0 41 59 12 0 200
7:15AM 3 4 10 0 19 2 0 4 51 5 0 34 54 18 1 207
7:30 AM 0 6 14 0 15 2 0 2 68 11 0 63 68 20 0 275
7:45 AM 2 6 14 0 25 7 0 2 62 8 0 75 61 32 0 302
8:00 AM 4 2 20 0 15 6 0 3 57 10 0 80 49 17 1 266
8:15AM 2 5 17 0 16 3 0 2 60 12 0 69 49 24 0 267
8:30 AM 2 6 20 0 16 8 0 3 56 13 0 64 44 20 1 256
8:45 AM 5 5 21 0 14 2 0 3 62 10 0 66 39 12 0 244
NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 21 40 127 0 135 35 30 0 25 454 77 0 492 423 155 3 2017
APPROACH 0/o's : 11.17% 21.28% 67.55% 0.00% 67.50% 17.50% 15.00% 0.00% 4.50% 81.65% 13.85% 0.00% 45.85% 39.42% 14.45% 0.28°/i
PEAK HR: 07:30 AM -08:30 AM TOTAL
PEAK HR VOL : 8 19 65 0 71 · 24 18 0 9 247 41 0 287 227 93 1 1110
PEAK HR FACTOR : 0.500 0.792 0.813 0.000 0.710 0.750 0.643 0.000 0.750 0.908 0.854 0.000 0.897 0.835 0.727 0.250 0.919 0.885 0.706 0.917 0.905
N0Rl1iB0UND S0Ul1iB0UND EASTBOUND WESTBOUND
1 1 1 0 2 1 1 0 1 2 0 0 2 2 0 0
NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
4:00 PM 11 4 65 0 17 8 0 0 46 4 1 19 70 23 0 272
4:15 PM 12 3 61 0 18 7 0 4 37 3 0 26 79 35 0 286
4:30 PM 14 5 73 0 33 6 0 0 42 3 0 24 59 27 0 286
4:45 PM 18 3 84 0 41 6 0 5 38 5 0 31 71 18 327
5:00 PM 19 3 117 0 75 21 0 3 54 2 1 20 BB 25 434
5:15 PM 20 5 100 0 29 9 0 3 43 2 0 21 109 32 375
5:30 P 25 5 66 0 23 6 0 3 35 4 0 18 82 32 305
5:45 PM 8 5 66 0 17 3 0 3 37 5 0 28 69 18 260
NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES 127 33 632 0 253 25 66 0 21 332 28 2 187 627 210 2 2545
APPROACH 0/o's 16.04% 4.17% 79.80% 0.00% 73.55% 7.27% 19.19% 0.00% 5.48% 86.68% 7.31% 0.52% 18.23% 61.11% 20.47% 0.19°A
PEAK HR 04:45 PM -05:45 PM TOTAL
PEAK HR VOL 82 16 367 0 168 19 42 0 14 170 13 1 90 350 107 2 1441
PEAK HR FACTOR 0.820 0.800 0.784 0.000 0.560 0.792 0.500 0.000 0.700 0.787 0.650 0.250 0.726 0.803 0.836 0.500 0.830 0.836 0.561 0.825 0.847
Day: Wednesday
Date: 9/20/2017
Prepared by NDS/ATD
VOLUME
Avenida Encinas S/0 Cannon Rd
City: Carlsbad
Project#: CA17 _ 4286_001
i DAILY TOTALS 1---*7-
I AM Period NB SB EB WB TOTAL PM Period NB SB EB WB TOTAL
0:00 1 2 3 12:00 76 39 115
0:15 4 2 6 12:15 66 46 112
0:30 6 1 7 12:30 77 55 132
0:45 2 13 0 5 2 18 12:45 63 282 50 190 113 472
1:00 1 0 1 13:00 58 66 124
1:15 0 1 1 13:15 56 58 114
1:30 0 0 0 13:30 77 43 120
1:45 1 2 0 1 1 3 13:45 54 245 39 206 93 451
2:00 3 1 4 14:00 47 56 103
2:15 1 0 1 14:15 38 48 86
2:30 1 1 2 14:30 71 42 113
2:45 0 5 0 2 0 7 14:45 50 206 44 190 94 396
3:00 0 0 0 15:00 54 35 89
3:15 1 2 3 15:15 54 39 93
3:30 0 0 0 15:30 72 39 111
3:45 1 2 1 3 2 5 15:45 69 249 32 145 101 394
4:00 0 0 0 16:00 66 26 92
4:15 0 2 2 16:15 63 24 87
4:30 2 4 6 16:30 92 24 116
4:45 3 5 7 13 10 18 16:45 88 309 40 114 128 423
5:00 5 4 9 17:00 127 27 154
5:15 2 4 6 17:15 98 24 122
5:30 2 12 14 17:30 86 34 120
5:45 7 16 18 38 25 54 17:45 58 369 26 111 84 480
6:00 9 18 27 18:00 62 27 89
6:15 11 18 29 18:15 45 17 62
6:30 8 22 30 18:30 47 17 64
6:45 12 40 62 120 74 160 18:45 48 202 18 79 66 281
7:00 15 43 58 19:00 32 22 54
7:15 17 59 76 19:15 40 12 52
7:30 19 62 81 19:30 35 11 46
7:45 21 72 79 243 100 315 19:45 21 128 14 59 35 187
8:00 22 65 87 20:00 30 10 40
8:15 25 70 95 20:15 27 11 38
8:30 31 89 120 20:30 15 8 23
8:45 21 99 65 289 86 388 20:45 12 84 8 37 20 121
9:00 26 63 89 21:00 21 6 27
9:15 19 51 70 21:15 18 6 24
9:30 27 57 84 21:30 16 8 24
9:45 29 101 46 217 75 318 21:45 16 71 3 23 19 94
10:00 30 44 74 22:00 10 1 11
10:15 18 29 47 22:15 7 6 13
10:30 38 30 68 22:30 13 3 16
10:45 31 117 52 155 83 272 22:45 10 40 2 12 12 52
11:00 35 49 84 23:00 14 2 16
11:15 55 38 93 23:15 4 1 5
11:30 55 33 88 23:30 3 1 4
11:45 46 191 57 177 103 368 23:45 2 23 3 7 5 30
TOTALS 663 1263 1926 TOTALS 2208 1173 3381
SPLIT% 34.4% 65.6% 36.3% SPLIT% 65.3% 34.7% 63.7%
DAILY TOTALS 1---*7-
AM Peak Hour 11:45 7:45 11:45 PM Peak Hour 16:30 12:30 16:45
AM Pk Volume 265 303 462 PM Pk Volume 405 229 524
Pk Hr Factor 0.860 0.851 0.875 Pk Hr Factor 0.797 0.867 0.851
7 • 9Volume 171 532 0 0 703 4-6Volume 678 225 0 0 903
7 • 9 Peak Hour 7:45 7:45 7:45 4 • 6 Peak Hour 16:30 16:45 16:45
7 • 9 Pk Volume 99 303 0 0 402 4 - 6 Pk Volume 405 125 0 0 524
Pk Hr Factor 0.798 0.851 0.000 0.000 0.838 Pk Hr Factor 0.797 0.781 0.000 0..000 0.851
Day: Wednesday
Date: 9/20/2017
Prepared by NDS/ATD
VOLUME
Avenida Encinas N/0 Palomar Airport Rd
City: Carlsbad
Project #: CAl 7 _ 4286 _ 002
! DAILY TOTALS ~
AM Period NB SB EB WB TOTAL PM Period NB SB EB WB TOTAL
0:00 5 4 9 12:00 90 85 175
0:15 6 9 15 12:15 80 67 147
0:30 6 2 8 12:30 90 84 174
0:45 4 21 11 26 15 47 12:45 98 358 73 309 171 667
1:00 0 1 1 13:00 73 65 138
1:15 0 1 1 13:15 81 69 150
1:30 1 2 3 13:30 87 75 162
1:45 2 3 2 6 4 9 13:45 79 320 68 277 147 597
2:00 2 2 4 14:00 57 51 108
2:15 0 1 1 14:15 56 57 113
2:30 1 1 2 14:30 66 43 109
2:45 1 4 3 7 4 11 14:45 46 225 68 219 114 444
3:00 0 0 0 15:00 61 59 120
3:15 1 1 2 15:15 61 57 118
3:30 0 0 0 15:30 53 59 112
3:45 0 1 0 1 0 2 15:45 70 245 57 232 127 477
4:00 0 0 0 16:00 66 70 136
4:15 1 2 3 16:15 47 53 100
4:30 5 0 5 16:30 78 74 152
4:45 8 14 1 3 9 17 16:45 67 258 85 282 152 540
5:00 6 1 7 17:00 78 118 196
5:15 2 3 5 17:15 80 67 147
5:30 5 5 10 17:30 76 67 143
5:45 15 28 5 14 20 42 17:45 44 278 58 310 102 588
6:00 22 6 28 18:00 51 52 103
6:15 23 9 32 18:15 34 39 73
6:30 11 14 25 18:30 so 52 102
6:45 34 90 23 52 57 142 18:45 51 186 44 187 95 373
7:00 34 45 79 19:00 49 43 92
7:15 39 44 83 19:15 40 33 73
7:30 32 36 68 19:30 40 33 73
7:45 68 173 46 171 114 344 19:45 32 161 38 147 70 308
8:00 69 28 97 20:00 32 28 60
8:15 66 29 95 20:15 24 25 49
8:30 65 41 106 20:30 20 17 37
8:45 83 283 22 120 105 403 20:45 20 96 16 86 36 182
9:00 65 33 98 21:00 30 18 48
9:15 60 31 91 21:15 23 15 38
9:30 44 48 92 21:30 10 16 26
9:45 54 223 33 145 87 368 21:45 23 86 13 62 36 148
10:00 39 31 70 22:00 14 18 32
10:15 48 32 80 22:15 11 19 30
10:30 57 42 99 22:30 13 10 23
10:45 49 193 38 143 87 336 22:45 12 50 4 51 16 101
11:00 53 41 94 23:00 6 7 13
11:15 76 51 127 23:15 3 7 10
11:30 63 56 119 23:30 4 8 12
11:45 64 256 71 219 135 475 23:45 5 18 3 25 8 43
TOTALS 1289 907 2196 TOTALS 2281 2187 4468
SPLIT% 58.7% 41.3% 33.0% SPLIT% 51.1% 48.9% 67.0%
DAILY TOTALS ~
AM Peak Hour 11:45 11:45 11:45 PM Peak Hour 12:00 16:30 12:00
AM Pk Volume 324 307 631 PM Pk Volume 358 344 667
Pk Hr Factor 0.900 0.903 0.901 Pk Hr Factor 0.913 0.729 0.953
7 • 9Volume 456 291 0 0 747 4-6Volume 536 592 (\ J 1128
7 • 9 Peak Hour 8:00 7:00 7:45 4 • 6 Peak Hour 16:30 16:30 16:30
7 • 9 Pk Volume 283 171 0 0 412 4 • 6 Pk Volume 303 344 C 0 647
Pk Hr Factor 0.852 0.929 O.O{•r. G.000 0.904 Pk Hr Factor 0.947 0.729 0 . .JCO v.00.., 0.825
SIGNING AND STRIPING GENERAL NOTES (SHEETS3BT040)
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL SIGNING AND STRIPING.
2. SIGNING, STRIPING AND PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST CAL TRANS TRAFFIC MANUAL,
CAL TRANS STANDARD SPECIFICATIONS (LATEST VERSION), THESE PLANS AND THE SPECIAL PROVISIONS.
3. ALL SIGNING AND STRIPING IS SUBJECT TO THE APPROVAL OF THE TRANSPORTATION DIRECTOR OR HIS
REPRESENTATIVE, PRIOR TO INSTALLATION.
4. ANY DEVIATION FROM THIS SIGNING AND STRIPING PLAN SHALL BE APPROVED BY THE ENGINEER OF WORK
AND TRANSPORTATION DIRECTOR PRIOR TO ANY CHANGE IN THE FIELD.
5. ALL SIGNING AND STRIPING SHALL BE REFLECTIVE PER ASTM DESIGNATION D4956. STRIPING SHALL BE
REPAINTED TWO WEEKS AFTER INITIAL PAINTING. SIGNING SHALL USE TYPE IV EN CAP SULA TED LENS REFLECTIVE
SHEETING (HIGH INTENSITY OR EQUAL).
6. PRIOR TO FINAL ACCEPTANCE OF STREET IMPROVEMENTS, ALL STREET STRIPING AND MARKINGS WITHIN A
500' PERIMETER OF THE CONSTRUCTION PROJECT WILL BE RESTORED TO A "LIKE NEW" CONDITION, IN A
MANNER MEETING THE APPROVAL OF THE CITY INSPECTOR.
··--R7-9aJ
§jR26(CA)/
R7-9a
~RB1B(CA)
11'
11'
5'
~R26(CA)
-\-··-~"'"'
DETAIL 39A,
75 L.F.
C
:,
D (3
~ ; :g
~ i:j
.,; DECLARATION OF RESPONSIBLE CHARGE
I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS I PROJECT, THAT I HAVE EXERCISED RESPONSIBLE CHARGE OVER
£ ~~~ ~0~:~~gAT:i ::i~:i~i~i~~~:.DAl~Dsii;ioTNH~7g~~~N
IS CONSISTENT WITH CURRENT STANDARDS.
·g_ I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND
~' SPECIFICATIONS BY THE CITY OF CARLSBAD IS CONFINED TO A
~ ~ig'~~~o~N~~ ~~f p~~~tB~3+i:i~~~~~c3J:~:~~~~i~R OF " ,;;
i IT:
WARNING
0 1/2
L...
IF THIS BAR DOES
NOT MEASURE 1"
THEN DRAWING IS
NOT TO SCALE.
10/6/17
R.C.E. 43595 DATE
LINSCOTT, LAW & GREENSPAN, ENGINEERS 4542 Ruffner Street, Suite 100
San Diego, Ca 92111
(B5B)300-8800 (~)300-8510 (FX)
S1-13'49157.J)Pl10N1JlWC 10 6/17
HORIZONTAL 11t=40' SCALE
VERTICAL #### 40 40 60
SIGNING AND STRIPING NOTES CONTINUED
7. EXACT LOCATION OF STRIPING AND STOP LIMIT LINES SHALL BE APPROVED BY THE TRANSPORTATION DIRECTOR
OR HIS REPRESENTATIVE PRIOR TO INSTALLATION.
B. CONTRACTOR SHALL REMOVE ALL CONFLICTING PAINTED LINES, MARKINGS ANVE PAVEMENT LEGENDS BY GRINDING.
DEBRIS SHALL BE PROMPTLY REMOVED BY THE CONTRACTOR.
9. ALL PAVEMENT LEGENDS SHALL BE THE LATEST VERSION OF THE CAL TRANS METRIC STENCILS.
10. LIMIT LINES AND CROSSWALKS SHALL BE FIELD LOCATED. CROSSWALKS SHALL HAVE 10' -INSIDE DIMENSION
UNLESS OTHERWISE SPECIFIED.
11. ALL CROSSWALKS, LIMIT LINES, STOP BARS, PAVEMENT ARROWS AND PAVEMENT LEGENDS SHALL BE THERMOPLASTIC
UNLESS OTHERWISE SPECIFIED. BIKE LANE LEGENDS SHALL BE PAINTED.
12. FIRE HYDRANT PAVEMENT MARKERS SHALL CONFORM TO THE LATEST CAL TRANS TRAFFIC MANUAL AND SAN DIEGO
REGIONAL STANDARD DRAWING M-19.
13. ALL RAISED MEDIAN NOSES SHALL BE PAINTED YELLOW.
DETAIL 29,
110 L.F.
LEGEND (SHEETS 38 TO 40)
{EXISTING STRIPING
=-= f RO POSED STRIPING
EXISTING ROADSIDE SIGN
-r PROPOSED ROADSIDE SIGN
EXISTING PAVEMENT ARROW
., INSTALL TYPE IV(L) PAVEMENT ARROW AS INDICATED
IIJ INSTALL "AHEAD" PAVEMENT LEGEND AS INDICATED
DETAIL29
170 L.F. rR26(CA)
I.
t
I.JI
II!
@)
§]
INSTALL "SIGNAL" PAVEMENT LEGEND AS INDICATED
INSTALL BIKE LANE PAVEMENT ARROW AS INDICATED
INSTALL "LANE" PAVEMENT LEGEND AS INDICATED
INSTALL "BIKE" PAVEMENT LEGEND AS INDICATED
TRAFFIC SIGNAL
REMOVE CONFLICTING EXISTING STRIPING BY GRINDING.
ALL DEBRIS SHALL BE REMOVED BY THE END OF EACH
WORKDAY.
~R26(CA)
~709a
(/)s:
g:\~
.5' ro
11' ~::r:
DETAIL 22,
420 L.F.
DETAIL 39,
965 L.F. iS R26(CA)
AVEN\DA ENCINAS mr 10' ,,_
rZ 11' !:1im
BO 100
DETAIL39/
515 L.F. §jR26(CA)/
DETAIL 39A,~ -
~m. _\ ".
5'
11'
11'
51
DETAIL 29,
20 L.F.
DETAIL39:/
45L.F.
VARIES -5:
12'
~ 10'
11' Ii ~
5'
11'
11'
-.. -5'
DETAIL 39,
225 L.F.
~=,,.:; --/I;
DETAIL39A,
215 L.F.
OOM1-3
(§vRH
R2-1(45)
R3-7(RT)
[!l]R4-7
~R26(CA) 00
DETAIL 22,
230 L.F.
OPTION 1-SINGLE LANE & BIKE LANE
§JR26(CA)/
DETAIL 38,
230 L.F.
DETAIL39A/
35 L.F.
'@R26(CA) DETAIL 39,
250l.F.
REPAINT
DETAIL 29,
25 L.F:
R7-9aj
§jR26(CA)/
6.5'. _, )>
DETAIL 38A,
105 L.F.
"AS BUILT"
P.E. ___ EXP. ----DATE
REVIEWED BY:
INSPECTOR DATE
t---+---+--------------+--+--+---+--< ~ Cl~r,S?,~~f:'R~~~BAD ~
V/C INTERCEPTOR RELIEF SEWER IN AVENIDA ENCINAS
SIGNING AND STRIPING
AVENIDA ENCINAS
APPROVED: Marshall K. Plantz
t---+--t---------------+--+---+--+---< ENGINEERING MANAGER PE42790 EXPIRES 3/31/18 DATE
DATE IN!TIAL DATE tNlTIAL
ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL
DWN BY: .QY§__ I
CHKDBY: ~ RVWD BY; :!..E!L._
PROJECT NO.
3949
I DRAWING NO.
467-9
VISTA CIP NO. 8130
....
.... .... ....
9a 'a•
DETAIL 39A, R3-5(RT\ 50 L.F.
RS R26(CA)
PROPOSED SIGNS (THIS SHEET ONLY)
r,i R3-5(RT) ~
EXISTING SIGNS (THIS SHEET ONLY)
DETAIL 9, /"'
~ 13' Eli
~-12'ei
10'
12'
8'
DETAIL 38, I 70L.F.
~R26(CA).
OOM1-3 RIGHT LANE
MUST R3-7(RT)
TURN RIGHT
WR26(CA) <®>· 00 ~ W3-3
@R1-1
~R3-4 W1-3(LT)
R2-1(40)
0·'~"' [!Z]R4-7
• ONE M$ > R6-1(RT)
DETAIL 39A,
A5L.F.
·~
0
C ~ :,
0 cl
11' ~ :g
~ ~ '° DECLARATION OF RESPONSIBLE CHARGE
I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS ! PROJECT, THAT I HAVE EXERCISED RESPONSIBLE CHARGE OVER
n.] THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF
THE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN
IS CONSISTENT WITH CURRENT STANDARDS.
:g_
~I
;l;
~ • ~ .,,
C:
I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND
SPECIFICATIONS BY THE CITY OF CARLSBAD IS CONFINED TO A
REVIEW ONLY AND DOES NOT RELIEVE ME, AS ENGINEER OF
WORK, OF MY RESPONSIBILITIES FOR PROJECT DESIGN.
WARNING
0 1/2
I....
IF THIS BAR DOES
NOT MEASURE 1"
THEN DRAWING !S
NOT TO SCALE.
t0/6/17
R.C.E. 43595 DATE
UNSCOTI, lAW & GREENSPAN, ENGINEERS
4542 Ruffner Street, Suite 100 San Diego, Ca 92111
(~)300-8800 (558)300-8810 (FX)
S2-1349117JlPIION1.DWG 10/8/17
n.lgr\ldBy:HQL
HORIZONTAL 1"=40' SCALE
VERTICAL -f###t.
~W13-1(25) ~
Mw13-1(30) ~
40 40
R4-11 I
DETAIL 39A, DETAIL 39,
/
;~~c,a J~Le~(SD
~R7-9a _,.,.
13'_ =
12'
~ ,FIO'
12'
~-~.-~8'
R7-9a~
AVENIDA ENCINAS
4" WHITE LINE @ 40' O.C. & 45°, TYPICAL
4" WHITEUNE @40' O.C.
DETAIL 39A, & 45'; TYPICAL DETAIL 39A,
8. A110 L.F A· . ·_· ·6-5 L.F.
IR7-9a
s·:--••• li' : ::::t::::::::.::::t.::::.::z::::::::==::'.liz:::=:::::::z
12 12
10',.
12'
8'
DETAIL 39,
395 L.F.
4" WHITE LIINE @40' O.C. & 45', TYPICAL
4" WHITE LINE @40' 0.C.
& 45°, TYPICAL
\l'3-5(RT)
.. .. DETAIL 39A,
~-50L.F.
........
R7-97f
~R26(CA) . _.·.
DETAIL 39A,
40 L.F.
"AS BUILT"
SHEET NAME
SS-2
P.E. ---EXP. ----DATE
REVIEWED BY:
INSPECTOR DATE
OPTION 1-SINGLE LANE & BIKE LANE 1----+---+--------------+-----<--1----+-----< ~ CITrn~,fs £;:R~~~BAD ~
NOTE
FOR SIGNING AND STRIPING GENERAL
60 80 100 NOTES AND LEGEND, SEE SHEET 38.
V/C INTERCEPTOR RELIEF SEWER IN AVENIDA ENCINAS
SIGNING AND STRIPING
AVENI DA ENCINAS
APPROVED: Marshall K. Plantz
f----+--f----------------+--+---+---+---i ENGINEERING MANAGER PE42790 EXPIRES 3/31/18 DATE
ENGINEER OF WORK OTHERAPPROVAL CITY APPROVAL
DATE INITIAL DATE OWN BY: ...QYL_ I PROJECT NO. I DRAWING ND. ~~~ ~~: ~~~ 3949 _ 467-9 REVISION DESCRIPTION
VISTA CIP NO. 8130
OOM1-3 R18-1(CA)
@R1-1 [!l]R4-7 rfr]R26(CA)
R2-1(25) 'ONE WAY> R6-1(RT}
~-
al
m DECLARATION OF RESPONSIBLE CHARGE
8 I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS I PROJECT, THAT I HAVE EXERCISED RESPONSIBLE CHARGE OVER
£ i~~ ~5~:~~sC: :NHJ ::i~:rJi~~r~~~:.DAl~D8i~~;+oT~~
7
g~~~N
§ IS CONSISTENT WITH CURRENT STANDARDS.
15.
~I
~ ;;;
"' ~ ~ EE
I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND
SPECIFICATIONS BY THE CITY OF CARLSBAD IS CONFINED TO A
REVIEW ONLY AND DOES NOT RELIEVE ME, AS ENGINEER OF
WORK, OF MY RESPONSIBILITIES FOR PROJECT DESIGN.
WARNING
0 1/2 L...;
IF THIS BAR DOES
NOT MEASURE 1"
THEN DRAWING IS
NOT TO SCALE.
10/6/17
R.C.E. 43595 DATE
LINSCOTT, LAW & GREENSPAN, ENGINEERS
4542 Ruffner Street, Suite 100 San Diego, Ca 92111
(858)J00-8800 (65a)JOCHIB10 (FX)
SJ-1349!7JlP'IION1.11111G 10/6/17
HORIZONTAL 1"=40' SCALE VERTICAL fl###.
DETAIL39A, 1l''
4" WHITE LINE @ 40' O.C.
& 45°, TYPICAL
40
PROPOSED SIGNS (THIS SHEET ONLY)
r,i R3-5(RT) ~
RIGHT LANE
MUST R3-7(RT)
~R4-11 ~
4" WHITE LINE@ 40' O.C.
& 45°, TYPICAL
4" WHITE LINE @ 40' 0.C.
& 45°, TYPICAL
DETAIL 29,
270 L.F.
OPTION 1 -SINGLE LANE & BIKE LANE
40 60 80 100
NOTE
FOR SIGNING AND STRIPING GENERAL
NOTES AND LEGEND, SEE SHEET 38.
DETAIL22
200 L.F.
R7-9a I
DETAIL 29,
175 L.F.
12" YELLOW LINE @ 25' 0.C.
& 45°, TYPICAL
MATCH EXISTING
STRIPING
~R4-7
OM1-3
DETAIL 22,
50 L.F.
"AS BUILT"
SHEET NAME
SS-3
P.E. ___ EXP. ----DATE
REVIEWED BY:
INSPECTOR DATE
r---+---+--------------+---r--+---+----i ~ c1rrTgl~£!R~M~~BAD ~
DATE INITIAL DATE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL
V/C INTERCEPTOR RELIEF SEWER IN AVENIDA ENCINAS
SIGNING AND STRIPING
AVENIDA ENCINAS
APPROVED: Marshall K. Plantz
ENGINEERING MANAGER PE 42790 EXPIRES 3/31/18 DATE
OWN BY: ...Q:::'.§__ I PROJECT NO. I DRAWING NO. ~~~~~: ~~~ 3949 . 467-9
VISTA GIP NO. 8130