The Carlsbad Beach Erosion Committee was called to order at 6:00 p.m., Thursday, February 28,
1991, in the City Council Chambers, 1200 Elm Avenue, Carlsbad, California.
Members in Attendance: Members Absent:
Gary Nessim None
Donald Jackson
Bailey Noble Others in Attendance:
R. David Copley
Sally Vigil Joe Vigil
Anna Leeds Paul O'Neil, SDG&E Representative
Pearl Johnson
City Staff in Attendance:
John Cahill, Municipal Projects Manager
Gary Kellison, Associate Engineer
Pat Entezari, Associate Engineer
AGENDA TOPICS
1. Committee Chairman Gary Nessim opened the meeting by welcoming the Committee
members.
2. The minutes of the December 13, 1990, Beach Erosion Committee meeting were read
and approved.
3. Paul O'Neil, governmental and public affairs representative with San Diego Gas & Electric,
gave the committee an update on his company's dredging of the Agua Hedionda Lagoon.
The previous days' heavy storms has forced SDG&E to remove the dredge equipment,
and it is unlikely that dredging will be able to be completed as originally planned before
the dredging permit's cutoff date.
4. John Cahill reported on the progress of the Batiquitos Lagoon Enhancement Project. On
March 12, the California Coastal Commission will consider the project's permit. All other
State and Federal agencies support the project. The Coastal Commission staff report
recommends approval with a number of conditions. Some of the draft conditions were
quite onerous to the Port of Los Angeles, and potentially could have killed the project had
they remained as originally proposed by the Commission staff.
CARLSBAD BEACH EROSION COMMITTEE MINUTES
MEETING DATE: FEBRUARY 28, 1991
Page 2
It was requested to the Committee how the material dredged from the Batiquitos Lagoon
would be used. A portion would be used to build least tern nesting sites. About 500,000
cubic yards of dredged sand would be needed to support small two small jetties at the
lagoon entrance. The remaining 3,000,000 cubic yards will be placed on Carlsbad
beaches south of Terramar Point near Palomar Airport Road.
It was moved, seconded, and approved by the Committee that Chairman Gary Nessim
would write a letter of behalf of the Beach Erosion Committee expressing support for the
Batiquitos Lagoon Enhancement Project.
6. John Cahill reported on the effort to obtain funding for the Carlsbad Boulevard Shore
Protection Project. Funding was deleted from the last two State budgets by the
Governor. Money for the wall may be submitted with the 1991 -92 budget, but it may be
removed at some point because of State budget difficulties.
Pat Entezari described the technical details of the proposed shore protection wall. The
seawall consists of sheet piling that is capped with concrete and anchored with rock on
the seaward side. The wall rises only 42" above the sidewalk, but extends 30 feet into
the sand to protect the Carlsbad Boulevard roadbed from being undercut during storms.
7. Committee Reports
Sally Vigil investigated the possibility of the Oceanside Sand Bypass passing material
south of Wisconsin Street, and found out that a booster pump would be required to force
the material the extra distance.
Donald Jackson said that he plans to invite Ron Wooton, representing the Buena Vista
Lagoon Foundation, to speak to the Beach Erosion Committee in the future. The
Committee also expressed an interest in inviting Dana Whitson to speak on the
Oceanside Harbor Sand Bypass project status.
Anna Leeds reported that two more small lengths of seawall were built in Encinitas, one
at Swami's and one at 'D' Street.
Bailey Noble announced that Assembly Bill #72 will provide $25 million for shoreline
protection according to a representative of Senator Craven. Bailey will get a copy of the
bill in order to study it further. It is likely that the Committee will want to write a letter in
support of this legislation.
Pearl Johnson accepted the assignment of covering the topic of sand retention in inland
dams and structures.
CARLSBAD BEACH EROSION COMMITTEE MINUTES
MEETING DATE: FEBRUARY 28, 1991
Page 3
8. Announcements and Closing
It was announced that the SAN DAG Shoreline Committee meets tomorrow, March 1.
The next meeting of the Beach Erosion Committee is scheduled for Thursday, April 11.
The meetingwas adjourned by Chairman Nessim at 8:43pm.
Municipal Projects Manager
Secretary, Beach Erosion Committee
JJC:jkb
Distribution:Beach Erosion Committee Members
Mayor and City Council Members
City Manager
Assistant City Manager
Community Development Director
City Engineer
Research Manager
Assistant Director of Planning