Summary Recommendations Report
April 2011
CARLSBAD
Community
Car Country Carlsbad Working Group
Summary Recommendations Report
TABLE OF CONTENTS
1. Background, Purpose, and Scope of the Project
• Background and Purpose
• Scope of the Project
• Working Group Process Flow Overview
2. Working Group Participants
• List of participants
3. Initiative Recommendations
• Initiative List and Sub-Committee Teams
• Initiative Summaries and Recommendations
4. Next Steps
• Timeline for implementing the initiatives
5. Appendix
• Car Country Carlsbad
o Site Plan and Info Table
• Car Dealerships on Avenida Encinas
o Site Plan and Info Table
• Off-site Car Dealership Facilities
o Site Plan and Info Table
• Paseo del Norte Concept Plan
• Paseo del Norte Traffic Calming Illustrations
• Current Car Country Carlsbad Development Activity
Page 2
Car Country Carlsbad Working Group
Summary Recommendations Report
1. BACKGROUND, PURPOSE, AND SCOPE OF THE PROJECT
Background and Purpose
Directly following on the success of the Community and Economic Development Department's work
with the development community in improving the Development Review Process, in November of 2009
the City Council directed staff to engage representatives of the city's car dealerships in a public outreach
program. The goal was to elicit and clarify input from the auto dealers about potential improvements to
Car Country Carlsbad and the car dealership area on Avenida Encinas.
In early February, the Car Country Carlsbad Working Group was formed, whose membership consisted of
city staff members directly involved in the planning, permitting, and infrastructure maintenance of the
area and business members representing the dealers in Car Country Carlsbad and along Avenida Encinas.
The business members representing the dealers in Car Country Carlsbad had been meeting on their own
initiative as the Car Country Task Force for about a year prior to this collaborative effort.
The purpose of the Working Group effort was to explore ways to improve Car Country Carlsbad and the
car dealership area on Avenida Encinas and generally to improve relations between the City and the car
dealerships. Approaches to achieving these purposes included gathering improvement suggestions from
the Car Country Carlsbad Task Force and conducting four collaboration sessions where there was a free
flow of ideas and dialogue.
Between February and mid-May 2010, the Working Group met four times. The Working Group meetings
were independently facilitated and documented by an outside consultant, Joe Sterling, of Sterling Insights,
to ensure transparency, neutrality, and active participation by all parties.
Over the four meetings, the Working Group consolidated dozens of suggestions into four topical
Initiatives. The four Initiatives are as follows:
• General Appearance;
• Sign Program;
• Traffic and Safety; and
• Minor Updates to Specific Plans.
Sub-committees were formed for each of the four initiatives, with the sub-committees tasked with
researching and drafting specific improvement recommendations in the form of Initiative Summaries for
review by the full Working Group. The Initiative Summaries include the initiative purpose, the potential
benefits of the initiative, and a completion timeline, and they identify the lead city departments
responsible for managing the work necessary to implement each Initiative.
The Initiative Summaries are presented in this Summary Recommendations Report. Following City
Council review and direction, City staff will utilize the Initiative Summaries included in the Report to
manage the work necessary to implement the specific initiatives and/or recommendations that are
authorized by the City Council.
PageS
Car Country Carlsbad Working Group
Summary Recommendations Report
Scope of the Project
In order to make the work of deciding how to improve Car Country Carlsbad efficient and effective, the Working
Group agreed that the scope of work would be focused in the following manner:
What's In Scope:
• Short-term improvements
• Permitting and review process
• Visibility - "Where we are, what we stand for, our appearance"
• Car Country Carlsbad and the car dealerships on Avenida Encinas
• Traffic and Safety
• Financial support to implement improvements and revenue sources
• Review of Specific Plans 19 and 186
What's Out of Scope:
• Adding geographic territory
• Architectural standards
• City as a "deep pocket"
• Personalities and "taking it personal"
Working Group Process Flow Overview
Each of the four Working Group meetings lasted approximately 2.5 hours and were conducted
approximately on a monthly basis from February into May 2010. The overall process was designed to
collaboratively build relationships, trust, and clarity while examining a wide range of possible
improvements. By design, the group worked both in plenary meetings at the City and during un-facilitated
sub-committee sessions.
Meeting #1 - 17 February 2010
The series began with a process to clarify scope,
mission, and a vision for success of the process.
The group began by explaining and expanding a
list of possible improvement ideas that the Car
Country Carlsbad Task Force had already
developed.
Agenda:
• Welcome
• Norms & Introductions
• Process Overview
• Improvement List
• Dialogue re: importance & urgency
• Next Steps
O > -* CLOSED THE
Q U)TS OF
Page 4
Car Country Carlsbad Working Group
Summary Recommendations Report
Meeting #2; 17 March 2010
The second meeting involved narrowing down and
more tightly defining the improvement themes and
ideas. The themes that emerged as priorities to address
were related to: general appearance, sign program
improvements, traffic and safety, and minor updates to
the two Specific Plans.
In addition to comparing the relative importance and
urgency of all ideas, the Working Group also assessed
the improvement ideas according to those that would
accelerate, amplify or generally make other
improvements easier. They also looked for those
improvements that would be "quick wins" and thereby
generate enthusiasm, momentum, learning, and free up
resources to work on other improvements.
Agenda:
Review importance and urgency rankings
Dialogue and voting on ideal sequencing
Develop specific improvement initiatives
Form sub-committees
Meeting #3; 17 April 2010
Between the second and third meetings sub-committees of the Working Group worked out the details of
the first set of specific improvement initiatives that were selected. For each initiative the sub-committee
had to define its purpose, intended benefits, rough timeline, the source for improvement leadership and
support, and specific changes that would be involved.
Agenda:
• Report Outs by Sub-Committees
• Details of most critical improvements
• Dialogue regarding collaboration with non-
auto related organizations in CCC area.
Meeting #4; 19 May 2010
Between the third and fourth meetings a sub-
committee worked out the details of a minor update to
the two Specific Plans. At the event the group
reviewed a concept for potential traffic improvements
to Paseo del Norte and Car Country Drive.
Agenda:
Sub-Committee Report Outs 1) Minor Update
to two Specific Plans; 2) Traffic & Safety
Dialogue on how to present to City Council
Reflection on the Working Group process
PageS
Car Country Carlsbad Working Group
Summary Recommendations Report
2. WORKING GROUP PARTICIPANTS
CAR COUNTRY CARLSBAD:
J. P. Paynter Hoehn Acura
Bill Hoehn Hoehn Motors
Kris Truman Hoehn Mercedes Benz
Rick Blakemore Hoehn Honda
Ted Hoehn Hoehn Audi
Gene Manganiello Toyota and Lexus of Carlsbad
Chris Murphy Rorick Buick Cadillac
Chris Baker Bob Baker Jeep Chrysler
BillKornik Bob Baker VW/Subaru
Mickey Pong North County Hyundai
Mike Weseloh Weseloh Chevrolet
Sean Crowley North County CMC
T.J. Samhouri Hoehn Audi
Dianne Brackett Hoehn Infmiti
CITY STAFF:
Sponsorship
John Coates, Assistant City Manager (current project sponsor)
Sandy Holder, (as former Assistant City Manager)
Working Group Members
John Coates, (as former Parks and Recreation Director)
Chris Hazeltine, Parks and Recreation Director
Gary Barberio, Community and Economic Development Director
Skip Hammann, Transportation Director
Barbara Kennedy, Associate Planner
Karen Chen, Senior Management Analyst (former city employee)
Support
Leticia Trevino-Reyes, Senior Office Specialist
Staff Consulted
Mark Steyaert, Parks Development Manager
Kyle Lancaster, Parks Superintendent
John Kim, Acting Senior Civil Engineer/Traffic Engineer
Doug Bilse, Senior Civil Engineer
Martie Clemens, GIS Technician
FACILITATION
Joe Sterling, Sterling Insights, Inc.
Page 6
Car Country Carlsbad Working Group
Summary Recommendations Report
3. INITIATIVE RECOMMENDATIONS
Initiative List and Sub-Committee Teams
Project Title Team
1. General Appearance John Coates
Gary Barberio
Ted Hoehn
Mike Weseloh
T.J. Samhouri
Kris Truman
2. Sign Program Barbara Kennedy
Gary Barberio
Bill Kornick
Gene Manganiello
Chris Murphy
J.P. Paynter
3. Traffic & Safety Skip Hammann
Rick Blakemore
Kris Truman
Chris Baker
4. Minor Update to
Specific Plans
Gary Barberio
Bill Hoehn (Jack Henthorn)
Chris Baker
Page?
Car Country Carlsbad Working Group
Summary Recommendations Report
Initiative Summaries
INITIATIVE 1: GENERAL APPEARANCE
TEAM: John Coates, Gary Barberio, Ted Hoehn, Mike Weseloh, T.J. Samhouri, and Kris
Truman
PURPOSE: To improve the general appearance and create more interest and visitation to Car Country
Carlsbad, make it more inviting, appealing and distinctive.
BENEFITS: Improvements to the general appearance of the Car Country Carlsbad area could create
additional sales and related activity at Car Country.
TIMELINE: Short Term
Evaluate various "short term" options 4.0 months
Preliminary Design of 'short term" options 3.0 months
Outreach/review preliminary designs w/ CC Task Force 2.0 months
Develop cost estimates and funding sources 3.0 months
Implement "short term" options 1.0 months
13.0 months
Long Term
Evaluate various "long term" options 6.0 months
Preliminary Design and cost estimates of "long term" options 3.0 months
Outreach/review of preliminary designs w/ CC Task Force 3.0 months
Develop cost estimates and funding sources 3.0 months
Final Design 6.0 months
Permitting/CEQA 6.0 months
27.0 months
PROJECT APPLICANT: CED & P&R; and/or CAR COUNTRY TASK FORCE
LEAD DEPT / AGENCY / ENTITY: CED; P&R
SUPPORT DEPT/AGENCY/ENTITY: TRAN
SPECIFIC RECOMMENDATIONS:
1. General Improvements
All improvements should be focused on the idea of incorporating art and an overall enhancement
in appearance.
Short Term
• Consider developing, programming, and bringing events similar to "Cruising the Grand" with
classic cars, music, food, etc. to Car Country Carlsbad and using defined display areas to
showcase the cars in the event.
- Page8
Car Country Carlsbad Working Group
Summary Recommendations Report
Long Term
• Consider use of accent lighting on buildings, landscaped areas and defined display areas.
• Consider developing arches or other defining icons at the entrances to Car Country Carlsbad.
2. Landscape
Short Term
• Consider improving the visibility of dealerships through renovated and enhanced landscape
on CALTRANS property along 1-5 freeway.
• Consider replacing the chain link fence along 1-5 freeway with decorative, inviting, lower
height fencing.
• Consider using seasonal color and tying planting into the flower fields season.
Long Term
• Consider enhancing plantings with use of color at the freeway interchanges at Cannon Road
and Palomar Airport Road year around on both sides of the freeway.
• Consider developing a larger benefit area such as a lighting and landscape assessment district
or business improvement district that includes Legoland, the Flower Fields, and the Carlsbad
Premium Outlets for contributing to and maintaining enhanced landscaped areas.
• Consider opening medians to allow more left hard turns.
• Consider redesigning the medians and parkways throughout Car Country Carlsbad through
the incorporation of a different mix of hardscape and landscape. *
• Consider developing landscaped traffic islands or roundabouts with elevated car displays in
the middle. *
• Consider establishing reverse diagonal parking on Paseo del Norte (i.e. back in - pull out
design). *
3. Park
Long Term
• Consider locating the Car Country Carlsbad 1-5 identification sign in the park area, with car
displays at the base. *
• Consider redesigning the park as a "car park" and developing site amenities to support the
theme. *
• Consider creating more displays for cars in the park area. *
4. Buildings
Short Term
• Consider focusing energies on shared areas versus individual areas.
* See Appendix A5: Paseo del Norte Traffic Calming Illustrations
Page 9
Car Country Carlsbad Working Group
Summary Recommendations Report
INITIATIVE 2: SIGN PROGRAM
TEAM: Barbara Kennedy, Gary Barberio, Bill Kornick, Gene Manganiello, Chris Murphy, J.P.
Paynter
PURPOSE: To develop a new sign program for Car Country Carlsbad and the car dealership area on
Avenida Encinas that includes standards that are unique and responsive to the needs of
the automotive sales industry.
BENEFITS: The new sign program would increase the motoring public's awareness of Car Country
Carlsbad, which would translate directly into increased sales. The new sign program
would establish a consistent theme for certain types of signs, identifying the auto mall as
a unique entity within the city and improving "way finding" for customers and allowing
flexibility for each dealership to comply with franchise-specific sign requirements.
TIMELINE: Draft proposed sign program 5.0 months
Circulate draft sign program for public/external review 1.5 months
Complete final draft 1.0 month
CEQA Environmental Review 1.5 months
Planning Commission hearing 1.5 months
City Council hearing 1.0 month
Submit to California Coastal Commission 0.5 month
12.0 months
PROJECT APPLICANT:
LEAD DEPT / AGENCY / ENTITY:
SUPPORT DEPT/AGENCY/ENTITY:
SPECIFIC RECOMMENDATIONS:
CED and/or CAR COUNTRY TASK FORCE
CED
FIN; TRAN; P&R; CA
1. New Sign Program & Update to Specific Plan Sign Standards
Consider developing a new sign program for both Specific Plan areas by updating the sign
standards within the two plans to allow, but not be limited to, the following:
A. Car Country Carlsbad Freeway Identification Sign (located in park)
• Up to a 50 foot high pylon sign with LED and changing message
• Potential for city to advertise for public events and community service messages
B. Decorative Banners on light standards (similar to the Village)
• To provide a unifying element for Car Country Carlsbad
C. Directional signs that are specific to the needs of each dealership
D. Monument signs
• To identify Car Country Carlsbad specifically
• To identify each individual dealership specifically
E. Car Country Carlsbad "way finding" signage (including dealership area on Avenida Encinas)
• Off-site signs on surrounding arterials
• Off-site locations in medians
2. Explore funding partnerships to finance the implementation of the new sign program
page jo
Car Country Carlsbad Working Group
Summary Recommendations Report
INITIATIVE 3: TRAFFIC & SAFETY
TEAM: Skip Hammann, Rick Blakemore. Kris Truman, Chris Baker
PURPOSE: To improve the traffic flow and traffic safety on Paseo del Norte and Car Country Drive
such that speeds are reduced, driveway egress and ingress safety is improved, access to
individual dealerships is increased, and the visibility and safety of the driving
environment in Car Country Carlsbad is enhanced.
BENEFITS: Improvements to the traffic flow and traffic safety in Car Country Carlsbad would
increase the motoring public's safety while traveling to and from Car Country Carlsbad,
which would translate directly into increased sales, increased sales tax, and a visually
enhanced and attractive streetscape environment.
TIMELINE:
Short Term
Evaluate various "soft" options
Preliminary Design of'soft" options
Outreach/review preliminary designs w/ CC Task Force
Implement "soft" options
Long Term
Evaluate various "hard" options
Preliminary Design and cost estimates of "hard" options
Outreach/review of preliminary designs w/ CC Task Force
Final Design and cost estimates
Permitting/CEQA
2.0 months
1.0 months
2.0 months
1.0 months
6.0 months
6.0 months
3.0 months
3.0 months
6.0 months
6.0 months
24.0 months
PROJECT APPLICANT: TRAN
LEAD DEPT / AGENCY / ENTITY: TRAN
SUPPORT DEPT/AGENCY/ENTITY: P&R; CED
SPECIFIC RECOMMENDATIONS:
1. Short Term
• Consider selectively extending red curbs at driveways to increase visibility and safety. *
• Consider the placement of stop signs at culd-de-sac three-way intersections (one at Paseo
del Norte/Private Street and one at Car Country Drive/Auto Center Court). *
• Consider selectively implementing "soft" traffic-calming measures such as edge
stripping, lane narrowing, temporary speed-tables etc. *
Page 11
Car Country Carlsbad Working Group
Summary Recommendations Report
2. Long Term
• Consider implementing "hard" or structural traffic-calming measures such as
roundabouts, speed tables, raised intersections, etc. *
• Consider implementing a "road diet" on Paseo del Norte, narrowing roadway from four
lanes to two lanes. *
• Consider modifying center medians to increase access to individual dealerships and
provide areas for vehicle display. *
* See Appendix A4 and A5: Paseo del Norte Concept Plan and Paseo del Norte Traffic Calming
Illustrations
Page 12
Car Country Carlsbad Working Group
Summary Recommendations Report
INITIATIVE 4: MINOR UPDATE TO SPECIFIC PLANS
TEAM: Gary Barberio, Bill Hoehn (Jack Henthorn), Chris Baker
PURPOSE: To streamline the permit and review process for improvements within Car Country
Carlsbad and the car dealerships along Avenida Encinas (Porsche and Volvo) by
reassigning approval authority to the lowest appropriate decision making authority.
BENEFITS: Currently, all improvements within both Specific Plans (SP 19(1) and SP 186(A))
generally require approval by the Planning Commission at a public hearing. This
approval process usually takes a minimum of 6 to 9 months or longer. The initiative
would consider allowing the creation of an improved, simplified, and streamlined process
for minor improvements which would result in both a savings of time and costs for the
dealerships and the City.
TIMELINE: Draft proposed specific plan amendments
Circulate draft amendments for public/external review
Complete final draft
Planning Commission hearing
City Council hearing
Submit to California Coastal Commission
6.0 months
1.0 months
1.5 months
1.5 months
1.5 months
0.5 month
12.0 months
PROJECT APPLICANT: CED
LEAD DEPT / AGENCY / ENTITY: CED
SUPPORT DEPT/AGENCY/ENTITY: CA
SPECIFIC RECOMMENDATIONS:
1. Consider amending Specific Plans SP 19(1) (Car Country) and SP 186(A) to:
A. Establish a minor administrative approval process (i.e. minor site development plan) that
would allow for administrative approvals by the Planning Director for:
• Modifications to existing facilities
• Additions to existing facilities that are in full compliance with the provisions of the
applicable Specific Plan
A. Complete miscellaneous minor changes to clean-up inconsistencies and provide clarity of
interpretation and implementation within the two specific plans.
Page 13
Car Country Carlsbad Working Group
Summary Recommendations Report
4. NEXT STEPS
1. The Summary Recommendations Report will be considered by the City Council in April, 2011.
2. Based on City Council direction, city staff will utilize the Summary Recommendations Report to
manage the work necessary to implement the specific initiatives and/or recommendations
associated with the four initiatives. The entire implementation process will be completed within
12-27 months.
3. City staff will keep the City Council updated on the progress of implementation. The Car
Country Working Group will be retained as an ongoing committee to continue the dialogue
between the car dealerships and city staff. During the implementation stage, the full Working
Group will meet as needed to assess progress, fine tune approaches, and reaffirm priorities. The
city's team will also regularly track the progress of implementation through regular meetings.
Page 14
Car Country Carlsbad Working Group
Summary Recommendations Report
5. APPENDIX
A1. Car Country Carlsbad
Site Plan and Info Table
A2. Car Dealerships on Avenida Encinas
Site Plan and Info Table
A3. Off-site Car Dealership Facilities
Site Plan and Info Table
A4. Paseo del Norte Concept Plan
A5. Paseo del Norte Traffic Calming Illustrations
A6. Current Car Country Carlsbad Development Activity
Page 15
Car Country Carlsbad Working Group
Summary Recommendations Report
Al. Car Country Carlsbad
Site Plan and Info Table
Page 16
IDA
1
2
3
4
5
6
7
&
9
10
11
12
13
14
15
16
17
IS
19
20
21
22
23
Property Owner
Cannon Road East
LLC/ Wese loh
Chevrolet Co.
Wese loh Charles
BJr& Patricia A
Carlsbad
Autopark
City of Carlsbad
Grody Properties
LLC
Stellar Properties
LLC
Aro Partners
Stellar Properties
LLC
Stellar Properties
LLC
Stellar Properties
LLC
Hoehr Associates
LLC
REKAB Properties
Sharp Family Ltd
Partnership
Brooking Doris/
Sillers Archie &
Verna M/LT
Helix Land Co Ltd
Hoehr Group LLC
Hoehn Group LLC
Townsend Family
Townsend Family
REKAB Properties
Hoehr Group LLC
Hoehn Group LLC
REKAB Properties
Dealership
USED CARS
WESELOH
CHEVROLET/KIA
NORTH COUNTY
GMC
44,000 SF PARK
KEN GROOY FORD
TOYOTA CARLSBAD
USED CARS
HOEHN
BUICK/CADILLAC
SCION
TOYOTA CARLSBAD
LEXUS CARLSBAD
HOEHN HONDA
BOB BAKER
VW/SUBARU
HOEHN JAGUAR/
LAND ROVER
HOEHN ACURA/
HOEHN HONDA
USED CARS
AUTOMOTIVE
SUPPORT USES
HOEHN AUDI
HOEHN INFINITY
NORTH COUNTY
HYUNDAI
VACANT/
CAR STORAGE
BOB BAKER MAZDA
HOEHN
MERCEDES BENZ
HOEHN
MERCEDES BENZ
BOB BAKER
CHRYSLER JEEP
DODGE RAM
Acres
2.7
L9
L6
LO
3.2
L5
2.9
4.6
4.6
3.1
2.7
5.9
1.8
3.4
3.0
1.1
4.2
3.2
3.2
2.7
3.0
6.2
3.7
J:\Requests2010Plus\ComEconDe\APIanning\4523324_11 City of Carlsbad
Car Country Carlsbad (SP 19)
Car Country Carlsbad Working Group
Summary Recommendations Report
A2. Car Dealerships on Avenida Encinas
Site Plan and Info Table
Page 18
ID*
1
2
3
Property Owner
Hoehn Group LLC
Glendora
Motorcars Co. Inc.
Glendora
Motorcars Co. Inc.
Dealership
HOEHN PORSCHE
CARLSBAD VOLVO
CARLSBAD VOLVO
Acres
1.9
1.1
2.9
J:\Requests2010Plus\ComEconDev\Planning\4523324_ 11
•^•^•••I^HMM^H^^ft—••^^^^^^^^^•^K^—•••^•^•••••^^^^^^^^^K
City of Carlsbad
Avenida Encinas Car Dealerships (SP 186)
Car Country Carlsbad Working Group
Summary Recommendations Report
A3. Off-site Car Dealership Facilities
Site Plan and Info Table
Page 20
LOCATION MAP
HOEHN NEW CAR STORAGE
(Durkin Hoehn Lot 23 LLC - 4.9 acres)BOB BAKER CANNON/AVENIDA ENCINAS
NEW CAR STORAGE
(Cannon Road LLC - 2.0 acres)
PALPMAR_AIRRQRT~RD
TOYOTA OF CARLSBAD AUTO BODY REPAIR
AND SERVICE CENTER / NEW CAR STORAGE
(Stellar Properties LLC - 9.8 acres)
LEGOLAND VEHICLE STORAGE
(Legoland California LLC - 6.7 acres)
Photos Source: Google Maps, 2011 J:\Requests2010Plus\ComEconDev\Planning\4523324_11
City of Carlsbad
Offsite Facilities
Car Country Carlsbad Working Group
Summary Recommendations Report
A4. Paseo del Norte Concept Plan
Page 22
r
\\
\
\
\
PASEO DEL NORTE
SINGLE LANE ALTERNATIVE
30 MPH DESIGN SPEED
Car Country Carlsbad Working Group
Summary Recommendations Report
A5. Paseo del Norte Traffic Calming Illustrations
Page 24
PRIVATE ROAD
pedestrian passage
reverse angle
low growing shrubs
and ground cover
single travel law
NORTH
COUNTY
CMC
existing tree»
p«rtl«l r««ov«l sculpture
i NORTH
JAGUAR CARLSBAD
gathering node
for or country specla
parallel parking
Je
al
events (wujie, food)
mini flower fields
HOEHN ACURA
existing driveway
reverse angle parking
sidewalk pedestrian passage
low growing shrubs
and ground cover
lNORTH
KEN GRODY FORD
'fsr
II
Car Country Carlsbad Working Group
Summary Recommendations Report
A6. Current Car Country Carlsbad Development Activity
Page 28
4/19/2011
Department Budgets
Council Workshop
Chuck McBride
Finance
Operating and CIP Budget
Overview
• Capital Improvement Program
— Construction of facilities, parks, infrastructure
• Operating Budget
- Operation and maintenance of facilities, parks,
infrastructure
- Personnel and related costs
• Replacement Funds
4/19/2011
Operating Budget Process
City Council's goals, visions, & priority projects
10 year forecast monitored
Budget policies set for new fiscal year
Departments submit requests to Finance
Budget reviews and recommendations
to City Council
City Council adopts budget
Major Operating Fund Groupings
• General Fund
• Special Revenue
• Enterprise
• Internal Service
• Redevelopment
4/19/2011
City of Carlsbad - FY2010-.
Combined Budgeted Expenditures
Enterprise
21%
Internal
Services
6%
Redevelopment
1%
Special
Revenue
4%General
44%
Capital
24%
$249.8 million
Operating Budget - 76%
Capital -24%
Major Service Areas
• Budget organizes departments into:
- Policy/ Leadership
— Internal Services
— Public Safety
— Community Development
- Community Services
-Public Works
. • :-M
4/19/2011
Policy and Leadership
Communications
• Manager: Kristina Ray
• Employees: 2.75
>Full-time 2.75
>Hourly FTE 0
• FY 10-11 Budget: $1,060,588
>General Fund-$691,628
>Special Revenue Fund - $368,960
4/19/2011
Policy and Leadership
Budget FTE
City Council
City Clerk
City Treasurer
City Manager
City Attorney
Records Management
373,363
274,841
196,488
1,570,323
1,312,291
863,024
4,590,330
1.00
-
0.75
8.00
7.00
8.00
24.75
Internal Services
4/19/2011
Finance Department
Director: Chuck McBride
Employees: 31.5
> Full-time 30.5
> Hourly FTE 1.0
FY 10-11 Budget: $5,474,991
> General Fund - $3,298,808
> Water Enterprise Fund - $460,858
> Wastewater Enterprise Fund - $212,704
> Solid Waste/Storm Water Enterprise Fund - $35,450
> Risk Management Fund - $1,467,171
Human Resources
• Director: Julie Clark
• Employees: 10.5
>Full-time 9.0
> Hourly FTE 1.5
• FY 10-11 Budget: $5;167,361
>General Fund - $2,374,297
>Workers' Comp Fund - $1,841,504
>Self Insured Benefits Fund - $951,560
4/19/2011
Information Technology
• Director: Gordon Peterson
• Employees: 23.5
>Full-time 22.5
> Hourly FTE 1.0
• FY 10-11 Budget: $5,900,575
> Information Technology Fund - $5,900,575
Property & Environmental Mgmt.
• Director: David Mauser
• Employees: 43.44
> Full-time 41.60
> Hourly FTE 1.84
• FY 10-11 Budget: $10,201,942
> General Fund - $4,802,415
> Solid Waste/Storm Water Enterprise Fund - $1,294,101
> Vehicle Maintenance Fund - $2,795,426
> Vehicle Replacement Fund - $1,310,000
4/19/2011
Community Development
.CARLSBAD
Community & Economic Development
• Director: Gary Barberio
• Employees: 57.0
>Full-time 54.0
> Hourly FTE 3.0
• FY 10-11 Budget: $7,635,347
>General Fund - $7,433,968
>South Carlsbad Coastal Area Redev. - $201,379
4/19/2011
Housing & Neighborhood Services
• Director: Debbie Fountain
• Employees: 11.64
> Full-time 11.00
> Hourly FTE 0.64
• FY 10-11 Budget: $10,149,535
> General Fund-$430,182
> Special Revenue Fund - $40,000
> Affordable Housing Trust Fund - $500,577
> HUD Section 8 Housing - $6,578,677
> Community Development Block Grant - $663,954
> Village Area Redevelopment-$1,875,735
> South Carlsbad Coastal Area Redevelopment - $60,410
Community Services
4/19/2011
Library & Cultural Arts
• Director: Heather Pizzuto
• Employees: 114.75
>Full-time 52.25
>HourlyFTE 62.50
• FY 10-11 Budget: $10,539,373
>General Fund - $10,418,723
>Special Revenue / Donation Funds - $120,650
Parks & Recreation
• Director: Chris Hazeltine
• Employees: 133.71
> Full-time 71.95
>HourlyFTE 61.76
• FY 10-11 Budget: $13,804,681
>General Fund - $12,428,761
>Special Revenue/Donation Funds - $83,121
>Street Tree Maintenance Fund - $612,295
> Median Maintenance Fund - $680,504
10
4/19/2011
Public Safety
Fire Department
• Chief: Kevin Crawford
• Employees: 89.92
>Full-time 88.75
>HourlyFTE 1.17
• FY 10-11 Budget: $16,228,573
>General Fund - $16,228,573
-!'•:
11
4/19/2011
Police Department
• Chief: Gary Morrison
• Employees: 164.83
> Full-time 162.00
> Hourly FTE 2.83
• FY 10-11 Budget: $28,293,365
>General Fund - $28,162,339
>Asset Forfeiture Fund - $16,530
>COPS Grant-$114,496
* i
Public Works
12
4/19/2011
Transportation
• Director: Skip Hammann
• Employees: 59.4
>Full-time 58.4
> Hourly FTE 1.0
• FY 10-11 Budget: $10,174,829
>General Fund - $9,116,428
>Street Lighting Fund - $861,248
>Lighting & Landscaping AD No. 2 - $197,153
Utilities Department
• Director: Glenn Pruim
• Employees: 70.25
- Full-time 69.55
- Hourly FTE 0.70
• FY 10-11 Budget: $50,627,852
-General Fund-$262,108
- Water Enterprise Fund - $37,835,078
- Wastewater Enterprise Fund - $10,508,223
- Solid Waste/Storm Water Enterprise Fund - $1,918,903
- Buena Vista Channel Maintenance Fund - $103,540
13
^' CJTY Qf DEPARTMENT AT A GLANCE
CARLSBAD Communications
Department
Manager: Kristina Ray
Employees: 2.75
Full-time 2.75
Hourly FTE 0
FY 10-11 Budget: $1,060,588
General Fund $ 691,628
Special Revenue Fund $ 368,960
* Community outreach and involvement
* Media relations
* - Website and social media
City messages and brand
* Newsletters, brochures, fact sheets and video
* Government cable channel
* Emergency communication
* Employee communication
2010 Accomplishments
* Consolidated city flyers and bill inserts into a unified bi-monthly newsletter to more
efficiently and effectively deliver news about city services, issues and programs to ali
city households
Taking advantage of recent changes in communication technology, launched a new
online city newsroom featuring the latest news headlines, videos and links to social
media sites
Achieved a 79 percent level of satisfaction with city-resident communication and a 74
percent level of confidence in city government, as measured by the annual resident
satisfaction survey
* Created a city welcome guide and mailed bi-monthiy to those who have recently moved
to the city, fostering an increased sense of community connection with new residents
Supported major citywide initiatives and events, including Envision Carlsbad, the Joint
First Responders Training Facility, economic development efforts and opposition to the
proposed power plant
Produced more than 150 news stories highlighting city issues, programs and services
Increasing the city's role as a direct provider of news and information, feeding new
social media channels and enabling residents to share information with their online
networks
While developing new information channels, maintaining traditional methods (media,
newsletters, printed materials) for the 30 percent of city residents who do not use the
city website
Maintaining public trust in the face of increased media "watchdog" focus on negative
news about government
DEPARTMENT AT A GLANCE
CARLSBAD Community &
Economic Development
Director: Gary Barberio
Employees: 57.0
Full-time 54.0
Hourly FTE 3.0
FY 10-11 Budget: $7,635,347
General Fund $ 7,433,968
South Carlsbad Coastal Area Redevelopment $ 201,379
• Building & Code Enforcement
• Development Services
• Economic Development
Land Development Engineering
• Planning
South Carlsbad Redevelopment Area
2010 Accomplishments
• Continued efforts to streamline & increase efficiencies:
o Development Review Process Working Group Recommendations - 2/3rds complete
o Completed outreach with Car Country Working Group (summary report pending)
o Transitioned certain Storm Water inspections to Building (eliminated contract)
o Initiated new streamlined process for retaining walls
o New expedited Fire Prevention plan review process
Greatly enhanced Economic Development outreach & communication efforts
o CBJ feature article, Development Review Team, Business Assistance Team
• Significant Pianning-reiated code amendments and documents completed:
o New General Commercial (GC) Land Use Designation
o 2005-2010 Housing Element approved and certified
o Water Efficient Landscape Ordinance adopted
o New Airport Land Use Compatibility Plan approved
o Building Height, Inclusionary Housing, & Miscellaneous Code changes approved
Completed significant work on Envision Carlsbad General Plan Update program:
o Community Vision Report accepted by City Council
o Phase II Consultant contract approved
o Working papers (4 of 7) completed by EC3
Challenges/Trends
• Continue to foster new ways to ensure a strong economic & employment base
Enhance efforts to streamline, improve efficiencies, & increase timeliness within the
city's development review process
Transition to "buildout" - Focus on infill/redevelopment; being flexible, proactive, &
responsive to change
• Continue to respond to & implement new state & federal mandates:
o New building & fire code, clean water, airport planning, climate action planning,
green house gases, housing, water efficiency, etc.
• DEPARTMENT AT A GLANCEC 1 T Y O F
CARLSBAD Finance Department
Director: Chuck McBride
Employees: 31.5
Full-time 30.5
Hourly FTE 1.0
FY 10-11 Budget: $5,474,991
General Fund $ 3,298,808
Water Enterprise Fund $ 460,858
Wastewater Enterprise Fund $ 212,704
Solid Waste/Storm Water Enterprise Fund $ 35,450
Risk Management Fund $ 1,467,171
Long-Range Financial Planning and Budget Management
General Accounting and Reporting
Assessment District/Community Facilities (CFD) Administration
* Procurement
* Receiving, Messaging and Mai! Services
Risk Management
2010 Accomplishments
Worked closely with Human Resources, Information Technology Services, and city wide
stakeholders in the development and implementation of the Human Capital
Management System (HCMS)
Provided financial support to citywide departments and the Council in the evaluation of
water and wastewater utility rates, golf course operations, and numerous other projects
that affect city residents
Managed the capita! and operating budget process to ensure that increasingly scarce
resources were effectively balance with competing needs
Finance will continue to provide support to the HCMS project, balancing limited staff
time between this project and other major functions, such as budgeting and financial
reporting
Prepare balanced operating and capital budgets in an environment that will offer
continuing economic and legislative challenges
Increase efficiencies in business processes, including paperless payroll processing for
employees and online bill paying alternatives for residents
Continue to work with citywide departments to provide financial support for decision
makers
DEPARTMENT AT A GLANCE
CARLSBAD ^re Department
Chief: Kevin Crawford
Employees: 89.92
Full-time 88.75
Hourly FTE 1.17
FY 10-11 Budget: $16,228,573
General Fund $ 16,228,573
"All Risk" Fire Department safeguarding lives, property and our environment through
24-hour fire, rescue and Emergency Medical Services
* Fire Prevention
Citywide Emergency Preparedness, including the Community Emergency Response Team
(CERT) and Hazard Mitigation Programs
Weed Abatement Program
2010 Accomplishments
Efficiency partnering with other agencies in fire operations and procurement
Regionalize Annual Fire Training Plan, including identification of Federal and State
training Mandates, developed a streamlined program to meet the mandates and
tailored the training to maximize in-district training
* Exercised the City Emergency Operations Center in statewide and local emergency drills
From FY 08 through FY 10, applied for and awarded approximately $200,000 in
Homeland Security Grant funds for Fire, Police and community emergency preparednes •.
planning and equipment
Conducted a comprehensive review of the new 2010 Federal and State Fire Codes to
identify required local amendments for FY 11 adoption
* Implemented and achieved functional consolidation of several administrative functions
between North County Dispatch JPA and Heartland Dispatch JPA
* In FY 11, applied for and awarded over $200,000 in Homeland Security Grant funds
which will be expended during FY 12 for Fire and Police emergency preparedness
planning and equipment
* Developed, and will be submitting for adoption and implementation, the 2010 edition of
the California Fire Code, which contains all required local amendments
Maintain current service delivery in light of financial impacts at state and local levels,
including funding and service reductions for CalFire, as well as funding and service
reductions for neighboring fire agencies
Expand community outreach efforts, including partnering with the community in public
education and service delivery
Successfully place into service the Joint First Responder Training Facility
' DEPARTMENT AT A GLANCEc i T Y o F
CARLSBAD Housing & Neighborhood
Services
Director: Debbie Fountain '
Employees: 11.64
Full-time 11.00
Hourly FTE 0.64
FY 10-11 Budget: $10,149,535
General Fund $ 430,182
Special Revenue Fund $ 40,000
- Affordable Housing Trust Fund $ 500,577
HUD Section 8 Housing $6,578,677
Community Development Block Grant $ 663,954
Village Area Redevelopment $1,875,735
South Carlsbad Coastal Area Redevelopment $ 60,410
Affordable Housing and Rental Assistance
• Homebuyer Assistance Programs
Village Neighborhood Enhancements
Volunteer Carlsbad
Hiring Center
Community Relations/Neighborhood Liaisons
• CDBG/HOME Programs
Community Activities Grants
2010 Accomplishments
Record breaking 105,185 hours of donated service providing net benefit of $2 million
Hosted first of two new family-friendly events in the Village - Halloween on Elm; second
event to be held in March, 2011 - Experience the World in the Village; implemented
through partnerships and use of existing resources, and in a very low cost fashion
• Initiated development of a volunteer mediation program to provide alternative
resources for resolving neighbor-to-neighbor dispute; low program cost
Concept plan to "re-purpose" Oak Maintenance Yard into cultural art/activity center
• CD8G funds assisted approximately 2400 families with needed social/housing services
ChoUencjCs/Trends
Increase in heed for services with declining or neutral resources; creative solutions
required to address need while managing citizen expectations
identification and provision of effective and cost-efficient tools to help people help
themselves; provision of services, connections, problem-solving, etc.
Expansion of involvement of volunteers with special skill sets in provision of city service-
DEPARTMENT AT A GLANCECITY OF
CARLSBAD Housing & Neighborhood
Services
More complex community problems; require collaborative problem-solving with the
community and through partnerships
Enhanced community engagement and outreach services; better connections
Building community and strong relationships
Working in partnership with those who live, work and play in Carlsbad to improve or
enhance the quality of life and sense of community for residents; neighborhood
assistance programs
Voluntary code compliance through education and self-help tools vs. code enforcement
DEPARTMENT AT A GLANCE
v, I f Y v_/ r
CARLSBAD Human Resources
Director: Julie Clark
Employees: 10.5
Full-time 9.0
Hourly FTE 1.5
FY 10-11 Budget: $5,167,361
General Fund $ 2,374,297
Workers' Comp Fund $ 1,841,504
Self Insured Benefits Fund $ 951,560
Employment and Workforce Planning
• Employee Training and Development
Compensation and Benefits
Employee and Labor Relations
2010 Accomplishments
Continued to coordinate city-wide efforts to unfund/eiiminate a total of 24.75 positions
across the organization over the last three fiscal years, resulting in overall savings of
approximately $1,855,000
Assisted City Council in efforts toward pension reform
• Worked with Finance Department to conduct review of all HR, payroll and timekeeping
procedures to streamline business processes
Began work on HCMS project, working toward August 2011 go-live date
Cliu lie nil t-.iv/ Trends
• HCMS project:
Internal staffing constraints in supporting the project
Discovery of new "issues" that need to be addressed as a result of testing new
software
Coordination of changes brought about by the HCMS system with City's affected
labor groups
• Providing the City Council with useful, impartial information for decision-making in the
labor relations arena
• Continuing to work with departments to conservatively manage staffing needs
CITY OF DEPARTMENT AT A GLANCE
CARLSBAD Information Technology
Director: Gordon Peterson
Employees: 23.5
Full-time 22.50
Hourly FTE 1.00
FY 10-11 Budget: $5,900,575
Information Technology Fund $5,900,575
Connecting Carlsbad through information and technology services
• Provide an up-to-date, reliable and secure infrastructure, delivering relevant, customer-
focused technology tools and services
Deliver technology solutions that assist in the collection, integration, accessibility and
presentation of information
Enhance the value of city information assets through mapping and analysis of spatial
relationships
2010 Accomplishments
Leverage technology to drive efficiencies and improve service delivery
o Ongoing deployment of the new Human Capital Management solution
o Enhance network performance, security and adaptability
Improve how teams collaborate and share information
o Create centralized web sites where teams share documents and capture relevant
project information. Team sites being used today include CIP budgeting, 1-5 Widening,
Carlsbad Blvd Realignment and Customer Relationship Management
* Demonstrate continued cost reduction and service level improvement through strategic
outsourcing of information technology solutions and services
Cha!lenaes/Trc!uls
Keeping up with the needs of the organization
o Finding time to spend on high value projects
o Helping staff be more connected and collaborative regardless of location
o Meeting the need for faster Internet access and additional data storage
We live in an increasingly mobile and connected world. Consumer available smartphones
and tablets are becoming viable computer platforms capable of running applications and
accessing the web and data from anywhere, anytime.
"Cloud" delivery of information technology services and solutions is gaining momentum as
agencies realize the efficiencies of a shared resource, cloud-based approach.
The volume and complexity of data needed to make decisions is continuously growing.
Business users need more information than ever, and they need it faster. Simple, easy to
access and easy to understand data promotes effective decisions.
DEPARTMENT AT A GLANCECITY OF
CARLSBAD Library & Cultural Arts
Director: Heather Pizzuto
Employees: 114.75
Full-time 52.25
Hourly FTE 62.50
FY 10-11 Budget: $10,539,373
General Fund $ 10,418,723
Special Revenue / Donation Funds $ 120,650
Provides educational, informational and recreational reading services
* Provides print and online resources and computer access
Administers lifelong literacy and bilingual services
Offers community meeting facilities and a wide range of programs
Fosters awareness, appreciation and expression of cultural arts
2010 Accomplishments
introduction of downloadable audio books and electronic communications such as text
reference service to increase efficiency, maximize resources and meet community need ;
* Enhanced community connection through e-newsletters, Twitter, website
enhancements
25th anniversary of TGiF Jazz in the Parks, celebrated with record-breaking attendance
* Merged two divisions to consolidate work product and manage increasing workload
without additional staff
Ch a lies iqes/Tren cis
Leverage technology to deliver greater efficiency and maintain high levels of service:
Optimize productivity despite reduced staffing, provide self-service options, offer
24/7 services convenient to busy families and professionals
Offer electronic formats that reduce processing, increase access and deliver
greatest value
Preserve and expand regional partnering, consortium purchasing and resource sharing
to maximize efficiency and leverage available funding
Meet continued demand for services and programs with funding challenges:
Possrble loss of all state funding for library services
New funding sources needed to support donation-dependent programs such as
TGIF, Three-Part-Art
* Continuously reinvent Library and Cultural Arts services to meet community-driven
needs, blend traditional and emerging formats (e.g. e-books)
Provide places and programs for community gathering
DEPARTMENT AT A GLANCFC ! T Y O F
CARLSBAD Parks & Recreation
Director: Chris Hazeltine
Employees: 133.71
Full-time 71.95
Hourly FTE 61.76
FY 10-11 Budget: $13,804,681
General Fund $12,428,761
Special Revenue/Donation Funds $ 83,121
Street Tree Maintenance Fund $ 612,295
Median Maintenance Fund $ 680,504
• Provides and maintains diversified open space, parks, trails, street trees, medians and
landscape services throughout Carlsbad
• Provides oversight and management responsibilities for the Crossing Golf Course
Provides a broad spectrum of recreational and sports programs
Provides enrichment classes, life-long learning programs and camps for all ages
• Provides staffing and operational support at community centers and parks
• Coordinates Community Special Events
Offers Opportunity Grants to resident low income youth
• Provides support to two Commissions and one Committee
2010 Accomplishments
Commissioned third party financial and operations assessments of Alga Norte Park and
The Crossings Golf Course
Transitioned the stewardship of approximately 600 acres of city-owned habitat
preserves and coordination with beach and lagoon stakeholder agencies
Received HMP permit; developed 1-acre mitigation site and improved upland trails on
Lake Calavera Trails
' Completed major facility repairs and enhancements at Monroe Street Pool
Funded access to 120 programs for 107 children through Opportunity Grants Program
• Conducted the first ever "Community Play Date" to showcase instructional class
programming
Facilitate public/private partnerships in parks and recreation
Examine park planning, operations and maintenance in a strategic manner
Maximize collective resources for multi-departmental special events
Continue progress on implementing cost recovery policy
DEPARTMENT AT A GLANCEC I T Y O F
CARLSBAD Police Department
Chief: Gary Morrison
Employees: 164.83
Full-time 162.00
Hourly FTE 2.83
FY 10-11 Budget: $28,293,365
General Fund $28,162,339
Asset Forfeiture Fund $ 16,530
. COPS Grant $ 114,496
Emergency Services, Preventive Patrol and Traffic Enforcement
Investigations
• Crime Prevention
Youth Explorer Program
• Senior Volunteer Program
School Resource Officer Program
2010 Accomplishments
• Carlsbad dispatchers answered 99% of incoming calls in 10 seconds or less, compared to
a national standard of 90%. Officers responded to priority one calls in an average of 5.5
minutes, compared to a national standard of 7.1 minutes.
Carlsbad Police Department cost per capita, $262, is lower than the county average for
similar agencies, $265.
Carlsbad's crime rate of 20.9 crimes per 1,000 population is one of the lowest in the
county, and lower than the countywide crime rate of 26.1.
Challenges/Trends
• Carlsbad Police Department is using new approaches, such as community oriented
policing and a more sophisticated type of crime analysis, to improve our services and
achieve better results with fewer resources
The economic downturn has caused an increased demand for services and resources at
a time when city resources are more constrained.
• Adapting police resources to meet the changing needs of a built out community.
CITY OF
CARLSBAD
DEPARTMENT AT A GLANCE
Property & Environmental
Management
$
$
$
$
4,802,415
1,294,101
2,795,426
1,310,000
Director: David Mauser
Employees: 43.44
Full-time 41.60
Hourly FTE 1.84
FY 10-11 Budget: $10,201,942
General Fund
Solid Waste/Storm Water Enterprise Fund
Vehicle Maintenance Fund
Vehicle Replacement Fund
Facilities Maintenance and Custodial Services
• Fleet Management
Real Estate Management
Civic Projects
• Environmental Management
Storm Water Protection
• Habitat Management
2010 Accomplishments
* Improved Fleet Management
Implemented New Fleet Management Software
improved Vehicle Replacement Programming
* Developed Departmental Strategic Plan
Established Strategic Goals and Objectives
Created New Organizational Structure
Addressed Employee Development Needs
Set Process Improvement and Streamlining Priorities
* Acquired Agua Hedionda Channel Dredge Project Mitigation Site
* Removed AH Lagoon and Carlsbad Beach from Federal Impaired Waters List
Finalized Acquisition of Alemir/Lennar HMP Core Area Property
Ch a lien a es/l'ren c/s
Continue Streamlining of PEM Operations and Procedures
* Generate New Revenue Sources
Maximize Utilization of City Properties
Increase Usage of Grants
Improve Sustainability of City Operations
Increase Renewable Energy Generation and Energy Efficiency Improvements
Implement Lifecyde Management Strategies for Fleet and Facilities
Implement Civic Projects Construction Program
Maintain Compliance with New/Evolving Environmental Regulations
CITV OF DEPARTMENT AT A GLANCE
CARLSBAD Transportation
Director: Skip Hammann
Employees: 59.4
Full-time 58.4
Hourly FTE 1.0
FY 10-11 Budget: $10,174,829
General Fund $ 9,116,428
Street Lighting Fund $ 861,248
Lighting & Landscaping Assessment District No. 2 $ 197,153
Traffic Circulation
Traffic Signal Maintenance
• Traffic & Transportation Engineering Design
• Construction Management and Inspection
• Street Maintenance
• Street Lighting
Construction Project Storm Water Compliance
201(i Accomplishments
Carlsbad Boulevard realignment
Completed Draft Memorandum of Understanding with city and state
Received statement of qualifications for professional services
Completed Traffic Calming Pilot Project
• Completed Traffic Management Center Pilot program
Completed Streetlight retrofit program
High-efficiency induction lamps - Energy Savings
Annual cost savings - $300,000 a year in energy and maintenance costs
Annual Reduction of 1,240 tons of greenhouse gas emissions
Challenges/Trends
Evaluate current business practices for cost savings and greater efficiency
• Manage impacts of regional traffic
1-5 Widening
Palomar Airport expansion
Vehicle capacity versus multimodal transportation and quality of life
• Manage resident expectations regarding transportation
CITY OF
CARLSBAD
Director: Glenn Pruim
Employees: 70.25
Full-time 69.55
Hourly FTE 0.70
FY 10-11 Budget: $50,627,852
General Fund
Water Enterprise Fund
Wastewater Enterprise Fund
Solid Waste/Storm Water Enterprise Fund
Buena Vista Channel Maintenance Fund
Potable Water Engineering & Operations
• Recycled Water Engineering & Operations
• Water Meter Services
Wastewater Engineering & Operations
• Storm Drain Engineering & Maintenance
Buena Vista Channel Maintenance
• Solid Waste Management
DEPARTMENT AT A GLANCE
Utilities Departm en t
$ 262,108
$37,835,078
$10,508,223
$ 1,918,903
$ 103,540
* Eliminated two sewer lift stations by installing two new gravity sewer systems.
Eliminating the lift stations will reduce power consumption, lower operating costs and
enable the Department to address system workload backlogs
Completed Phase II of the Automated Meter Reading Program. The installation of more
than 2,700 automated meters will reduce fuel consumption, increase system efficiency
and accuracy and reduce overtime costs
Implemented the "Reverse 411" customer notification system for water users. This
system uses telephone and email messages to notify customers of account status
changes, reducing the need to send personnel in the field to deploy "door hangars"
Expanded the Recycled Water system into the Bressi Ranch area, decreasing the potable
water demand in the City by more than 500 acre-feet. This is equivalent to taking over
1,000 single family homes off of the potable water system
Challenges/Trends
* Increasing cost of imported water
* increasing regulatory environment
Problems associated with an aging infrastructure
Integrating new technology into the workplace
- „>*--•
•-•• at,...