HomeMy WebLinkAbout1989-10-18; Library Board of Trustees; MinutesMINUTES
Meeting of:
Time of Meeting: 3:OO p.m.
Date of Meeting: October 18, 1989
Place of Meetlng:
LIBRARY BOARD OF TRUSTEES
Council Conference Roan
CALL TO ORDER:
Presldent Cooper called the Meetlng to order at 1:OO p.m.
ROLL CALL:
Present - Presldent Cooper, Library Board Trustees
Grosse, Martin and Trigas. Trustee
Curtln arrived at 3:17 p.m.
Absent - None.
Also Present Were:
Cllfford Lange, Library Director
Geoff Armour, Assistant Library Director
Ray Brodthart, Collections Coordinator
APPROVAL OF MINUTES:
Minutes of the September 13, 1989, Meeting were approved as presented.
COMMITTEE REPORTS:
a. Building and Grounds
Trustee Trtgas stated she would defer to Item 4a of the
Agenda.
b. Budqet
Trustee Martin stated there was no report at thls
the.
c. Personnel
This report was deferred until later in the meeting.
d. Youth
Trustee Grosse stated there was no report at thls the.
OLD BUSINESS:
a. Library Building Revlew Cmittee - report of
meetlngs - Seena Trlgas.
L lbrary Board Trustee Tr lgas reported the Cunmittee has
met twice and she was chosen as Chairperson. The goals
were dlscussed and the needs survey was reviewed. She
said they were golng to have a sub-cmmittee to select at
least six applicants for the archltect and present those
to the full canmlttee. Director Lange has been talking
with the architects and felt there will be 30 or 40
repsonses. The Draft Library Program was revlewed and
Input was given by the Committee members.
Cooper
Grosse
Mart 1 n
Tr igas
\ \
October 18, 1989 LIBRARY BOARD OF TRUSTEES Page 2
OLD BUSINESS: (Continued)
b. South Carlsbad Public Llbrary Bullding Proqram
Draft.
Director Lange referred to the Draft contained In the
packet. He sald the document had been gone through by
an In-house plannnlng canmittee and adjustments were
made In the square footage allocations. He explained
that the flrst draft contained 61,000 square feet, so
3,000 square feet needed to be eliminated, and that has
now been done.
Director Lange explained how the 3,000 square feet was
eliminated and added that the 1.000 square feet for the
Art display Is still In the plan, but Is considered temporary and perhaps In three to five years that space wlll be needed for other thlngs. Dlrector Lange sald the
book collection space had been reduced, and Trustee
Trlgas commented that she would like to add somethlng to
the young adults section.
Director Lange said that Mr. Smlth would be at the
Library the week of November 6, and would be finalizlng
the plans for the South Carlsbad Library and also plans
for the Cole Library.
c. Information Kiosk Deslqn Report - Bebe Grosse.
Trustee Grosse referred to the model of the kiosk which
was on display for the Board and distributed plctures to the Board Members.
Nan Robertson arrlved at the meetlng and stated she was present to answer any questions about her design.
explained that thls kiosk was to be a prototype for
others to be placed at sites In the Clty.
The Library Board approved the deslgn of the klosk for
the Library, with the stipulation that it Is to be
totally safe and approved by CIty staff; further
stipulating that unless there Is a major change in the
deslgn of the kiosk itself, there would be no need to
return to thls Board for approval.
The Personnel report was given at this time.
c. Personnel
Trustee Curtln reported that the Llbrarlan II Cataloger
wll1 begln work on October 30, 1989. The new employee
wl I I be Sam Richmond.
She
NEW BUSINESS:
a. Full-Time Staff for Genealoqy Dlvislon of the
L I brary.
Director Lange called attention to the Memorandum
contained in the packet explaining the need for a full-
the staff person for the Genealogy Division.
Ray Brookhart, the new full-time staff person for the
Genealogy Dlvlslon, descrlbed the outstand Ing genealogy
cot lection In the Llbrary and sald the Genealogical
Society now has 500 members, who all pay annual dues.
Cooper Curtin
Grosse
Mart 1 n
Tr lgas
b \
October 18, 1989 LIBRARY BOARD OF TRUSTEES Page 3
NEW BUSINESS: (Continued)
Mr. Brookhart continued, statlng that there are over 22,000 volumes In the Genealogy collection, and It Is
the largest in the County.
b. Cot lection Development Planning - d Iscussion.
Director Lange stated there Is a Coordinator's posltlon
open for Collection Development Planning, and at the
present time staff has been spending time deciding how to
get all this organized.
Geoff Armour continued the report, stating that the
origlnal plan was to switch the Branch Library bwks to
the Cole Llbrary and form a nucleus for that collectlon,
and send 165,000 volumes to the new main Library. The
Spanlsh language collection would stay at the Cole
Library, the large type collection and the Genealogy
collection.
Mr. Armour sald It would be desirable to have a roan
devoted to the history of Carlsbad, as there Is already
an extensive cot lectlon of photographs.
Mr. Armour stated that one Item of lnterest in John
Quartarone's report was that he has made arrangements
with the Carlsbad School Districts to coordinate the
actlvlties with the Library to know when major
assignments wlll cane up and the books and materials can
be set aside for the students. He wlll be making presentations to the school people to keep them up-to-
date.
Trustee Trlgas suggested that a1 I School Districts In
Carlsbad be contacted.
In reply to query regarding the mount of money available
for new books, Director Lange stated It will be
approximately $400,000.
Director Lange said he wanted to stress that the Cole
Library would continue to be a full-service Library, and as much material as possible will be duplicated for both
L l brar 1 es .
Mr. Armour commented tha+ there will be fax machines and
a courier system with the ability to retrieve and
deliver materials between the two Libraries.
LIBRARY DIRECTOR'S REPORT:
Geoff Armour reported that one of the major frustrations
is not to have total control Over getting sanethlng
done, and there are a number of projects that have been
requested by the Library and which have not been done.
He sald that Chuck Walden had helped, and sane projects
are gettlng done. The carpeting for the children's area
and other areas has been a hazard, and that helps get It
done faster. Mr. Armour Ilsted the other projects that
are waltlng to be done at this time, and added that the
d lsaster ccmmlttee needs to be put back In place.
Mr. Armour
and books
said that the storage project for video tapes
s underway.
\ TRUSTEES
October 18, 1989 LIBRARY BOARD OF TRUSTEES Page 4
TRUSTEES \I
~~
FRIENDS OF THE LIBRARY:
There was no one present to give a report.
GENEALOGICAL SOCIETY:
Presldent Cooper reported that $390 was netted from the
plant and doll sale.
SERRA ADVISORY BOARD:
Presldent Cooper reported the next meetlng wl I I be at
Brawley tanorrow.
PUBLIC COMMENT:
There was no one present deslring to address the Board.
ADJOURNMENT:
By proper motion, the Meeting of October 18, 1989, was
adjourned at 4:11 p.m.
Respectfully submitted, 7/d/GE
Harrlett Babbitt
Minutes Clerk
\ \
SOUTH CARLSBAD PUBLIC LIBRARY
BUILDING PROGRAM
October 1.1989
Prepared with the input of the Library Users
Library staff, Board, and Building Review Committee
BY
David R. Smith Consulting Librarian
130 Holly Road Hopkins, MN 55343
(612) 933-0199
DISCUSSION DRAFT
- Not For General Distribution -
.
TABLF OF CONTENTS
SUMMARY ..........................
INTRODUCTION .......................... ............................
SPACE PLANNING ........................ ...... ............... 5
LIBRARY PROJECT BACKGROUND .................................
PLAZA PASEO REAL . PROJECT DESCRIPTION AND SITE PLAN .......... 8
LIBRARY SITE ...... ......................................................................... 11
TENTATIVE BUDGET ............................................................................. 12
LOCAL DESIGN REQUIREMENTS ......................................................... 13
OVERVIEW OF THE BUILDING PROGRAM ................................ 15
ENVIRONMENT. ATMOSPHERE AND AESTHETICS ............................. 16
PROCESS. COMMUNICATION. POINTS OF APPROVALS .................... 17
LiBRARY BUILDING PROGRAM SECTIONS .......................................... 19
LIBRARY SPACES PROGRAMMED ............................................ 20
........................................................................ 28
FUNCTIONAL RELATIONSHIPS ............................................................ 40
Public Entrance/Lobby ........................................................ 44
Auditorlum/Meeting/C rence Rooms ................................. 50
Circulation Services .................................................................. 57
Childrens Services .................................................................... 70
New Browsing/Paperbacks/Young Adult Collection ................ 86
Audlo Visual Collection ....................................
Adult Collection/Seating/User Assistance ............................... 96
Magazines/Newspapers ......................................................... 105
Reference Services ................................................................. 112
Administration/Buslness Offices Area ........................... 128
Technical Services ..................................................... 137
Media Production/Programs and Exhibits Area ...................... 150
General Staff Areas ................................................................. 161
Non-Public Stack and Storage Areas ...................................... 168
Building Malntenance/General Storage/Delivery ................... 172
GENERAL BUILDING DESIGN REQUIREMENTS
Aesthetics/Library Environment ......................... .................... 180
Basic Design Criteria ......... .......................... .................... 181
.................... 182 Flow Patterns - People and M
Ceiling Height ........................
Personnel Security ................
Floor load ..................................
Bay Size ......................... ............................. ................................. 183 Parking .................... ........................................................... 183
Public Plaza ............. ........................................................... 184 Sidewalks ..................................................................................... 184
Book Return .................
Roof ..................................................... ............................... 185 Landscaping ................ ............... 185
Exterior Sign@) ............................................................................ 185
Exterior Materials ................................................
Exterior Lights ..... ............................................................. 186
..
Utility Outlets ........................... ....................... 186
ARennas/Cables ................................................ ............... 186
Building Security .......................................................................... 186
Interior Design ............................................................................ 187 ........................................................... 187
Lighting ........................................................................................ 188
Electrical Service ............ ...................................................... 190
Public Access Catalog .... ...................................................... 190
Microcomputers .......................................................................... 191 Heating/Ventilatlon/Air Conditioning .......................................... 191
Plumbing/Water Control and Security ......... ....................... 191
Fire Protection ....................... .......................................... 192
Mechanical Room ........................................................................ 192
Windows ..............................................................................
Doors .......................................................................................... 192
Floor Coverings ........................................................................... 193
Telephone/lntercom/Public Address .......................................... 194
Restrooms ............ ................................................................ 194
Materials/Finishes lors ........................................................... 195
Computer/Video Distribution Systems ....................................... 195
Graphics/Slgnage ....................................................................... 196 Display Areas/Flxtures ................................................................ 196
Clocks ........................................ ....................................... 196
Shelving ..................................... ........... 197
Shelving Layout ........................................................................... 197
Millwork ..............................................................................
Furniture ...................................................................................... 198 Equipment ................................................................................... 199
Special Features .......................................................................... 199 -Alarms - Acoustics
- Energy Saving Design/Devices -Locks
APPENDICES - Supplementary Program Information
SUMMARY
SOUTH CARLSBAD LIBRARY BUILDING PROGRAM
This library building program incorporates all recent library planning information and substantial
community input and details a new public library which with the Elm Avenue Library will serve the city
comfortably through 1998. At that time the Elm Avenue Library will be expanded. The building
program provides for both physical growth of the library's collection and services as well as
anticipating the impact of technology.
A one or two page summary will be included in the final draft.
1
,
INTRODUCTION
A variety of issues, policies, and subjects provide introductory and background information for a library
building program document for the City and Community of Carlsbad.
The City of Carlsbad is situated 35 miles north of San Diego along the coast of the Gulf of Santa
Cataiina. The city is experiencing on-going explosive growth with current population estimated at
approximately 50,000. For example, from 1980 to 1985, population increased 7% per year. 2010
population is projected to be 100,000 people if there are no growth constraints in effect. Neighboring
communities are also growing at a good pace.
In addition, the city is evolving into a "bi-nodal" community as described in &&gkPhf~ci&
FacilitiB. North Carlsbad features the older, more established part of the city with newer
development occurring to the northeast. The south part is experiencing rapid development
particularly in the southeast La Costa area as well as the Interstate 5 corridor in the southwest. There is
a non-residential corridor which runs between the north and south parts that features primarily
business and light industrial development.
The same study points out two demographic characteristics of the Carlsbad area.
"Carlsbad has a somewhat higher population of senior citizens than the San Diego County
average. And the Carlsbad population has a lower percentage of ethnic minorities compared
to the County."
The Carlsbad City Library is located at 1250 Elm Avenue. Public library service is also provided
through one small 4,500 leased square foot branch library in a South Carlsbad shopping center. The
main library is a 24,600 square foot building located in the northern and longest established portion of
the city.
2
In 1988, the State Library published statistics showing the Carlsbad City Library to be the business
library per capita in California. From FY 1978-79 to FY 1984-85 circulation growth increased 75 t %.
Annual circulation of library materials in FY 1987-88 was 808,141 items. To keep pace with information needs and usage by area residents, library collections have nearly doubled since 1974. The llbrary has
been maintaining the recommended service ratio of three volumes per capita as the city has grown. Book collection size in FY 1987-88 was 194,000 items.
In addition to regular checkout and reference services, the library offers other services including
interlibrary loan, community events data, talking books, tax information assistance, homebound
service, and coin operated copying. Library materials available cover a variety of types and formats including large print items, children's collections, books on tape, college and civil service exam books,
telephone directories, consumer information, college catalogs, vehicle repair manuals, microfiche
resources, compact discs, videocassettes, maps, music scores, puppets and toys. Audiovisual equipment is available for use too. Special features of the library are children's programs and story
hours, computer access to periodical articles, online data searches, genealogy assistance, business
reference materials, the adult learning program, framed art rental, and special displays and exhibits.
The main library has become overcrowded with collections and users so that full and complete
services to the public has become difficult. The city library has been closely linked with the community
over the years and has been an important publlc amenity in the area. The community is proud of the
library and its services.
"The Carlsbad City Library contributes to the enrichment of the community by supporting
lifelong learning and the pursuit of knowledge. It provides traditional and innovative library
services in a friendly, welcoming atmosphere. Collections include resources with educational,
informational and recreational value that respond to the interests of a diverse community.
Expert staff serves the public in a courteous, helpful manner."
Administrative goal #3 states: "the llbrary provides adequate facilities to meet the needs of a growing
population.-
3
Dther I ibraries in the Area
A variety of libraries exist and cooperate in the general Carlsbad area. They are the following:
San Diego County Library System - provides branch libraries that border the City of Carlsbad.
Oceanside Public Library - adjacent to Carlsbad, a new main library is planned for this
community.
University of California at San Diego
San Diego State University - will create a north campus close or within the Carlsbad area.
School Libraries within Carlsbad - serve four different school districts within city limits.
The Carlsbad City Library belongs to the Serra Regional Library System which administers the
networking of resources and information between all member libraries in Southern California.
Developments at these various facilities indicate, according to the Strate& Plan for City Library
Facilities no lessening of public demand on the Carlsbad facility and probably an increase in local
public library usage.
The Carlsbad City Library is a well-used city service faced with continuing dramatic population growth
and demands for service. Its current main facility, long in service and located in the older part of the
city, now restricts basic library service components - collections, people, access, and staff support
spaces. To meet current and future service needs, new and added library space is required. City and
library officials have intensified planning to insure good physical space for library service in Carlsbad’s
future. The library building program is an important milestone in the planning process.
4
SPACE PLANNING
A Strategic Plan For Carlsbad City Library Facilities
Substantial study of needed library space changes first occurred in 1973 (and updated in 1978) when
Raymond Holt in the Master Plan report suggested the creation of a new main library at the city’s center
with four branch libraries located in the four quadrants. Although many of Mr. Holt’s recommendations
in the Master Plan were incorporated into library action and development, the facilities strategy has not
been implemented.
In 1988, library and city officials joined to study library space needs and eventually prepared a report A
StrateaiC Plan for Carlsbad QQ Librarv Facilities. This intensive study surveyed various factors that
would influence library development and service needs for the Carlsbad City Library. They included
ongoing changes in our society, new technologies available for libraries, the evolving Carlsbad region,
the community’s relationship to other library systems, and the library’s history of use and support.
After such review and study, the committee reached the following conclusions regarding trends and
how they would affect library services and spaces. They are:
The basic role of the library will remain essentially the same.
The region’s use of library services would continue to increase even without the population
growth that will occur.
New library technologies by themselves will not solve the increased need for library services
and space.
Other nearby library systems will continue to serve their own communities but will not reduce
the demand of use for the Carlsbad City Library.
Without more facility space, this increased demand for library facilities will put a severe strain
on the existing facilities - a strain that is already beginning to show.
From these conclusions, the following policy actions were recommended.
Provide library space now to meet the anticipated needs of the future Carlsbad community of
100,000 residents.
Approve the goal of continuing to provide three volumes of collections per capita as the city
reaches the 100,000 population level.
Provide library space for this 100,000 population level within the next five years.
Plan any new library facilities to allow future expansion as Carlsbad reaches its eventual build-
out population of 137,000 people.
Reflect the bi-nodal nature of Carlsbad’s development in the library facilities response.
Five differing options were studied as ways to physically provide city library facilities according to the
needs identified.
5
, Option 5, which calls for the renovation and expansion of the existing main library plus the construction
of a new 58,000 square feet facility in the La Costa area, the latter serving also as the administrative
offices for the library, was recommended as the best course of action.
All of this prior planning activity has set a good background and environment for the development of a
building program for a new Carlsbad facility of approximately 60,000 square feet. David R. Smith,
Consulting Librarian, has been employed to develop a building program which defines the functional
requirements of a new library and gives direction to an architect for the design stage of the building
process. It insures that pertinent data and community needs are incorporated into building planning and
design that will serve well the City of Carlsbad for several decades.
6
. . LIBRARY PROJECT BACKGROUND
The City of Carlsbad is a coastal community of Southern California approximately 10 miles long and 4
miles wide. The northern half of the city houses the existing main library of 24,600 square feet; the
southern half is served by a 4,500 square foot shopping center branch on leased space.
In 1986, the Carlsbad City Council adopted a Strategic Plan for Carlsbad City Library Facilities,
recommending two (2) library facilities for the City as the best way to respond to the City’s geography
and development.
The first step in implementing the Strategic Plan is to construct a 58,000 square foot building in the
southern half of the City. This building will become the main library, housing administration and
support services such as Technical Services. The second phase of the Strategic Plan calls for the
renovation and expansion of the existing main library, now scheduled in the City’s Capital Improvement
Plan for the five-year cycle beginning in 1998.
The proposed new 58,000 square foot library will be built on a prominent 6 acre portion of a 28 acre
shopping center located at a major intersection, and almost the geographic center of the southern half
of Carlsbad. The retail portion of the shopping center is currently under construction and scheduled
for completion in mid-1990. The 6-acre library site will be graded to an appropriate rough building pad
elevation along with established access points for all major utilities. Attached to this letter is a detailed
description of the shopping center complex.
The exterior appearance of the shopping center complex has been established to be a classical
Mediterranean architectural style. While the new library facility will be required to retain this style, it is
desirable for the building to be unique and outstanding from the rest of the complex. At the same time,
the library is to become an integral part of the shopping center complex, creating a strong relationship
with the other cultural/entertainment uses of this high quality center.
For the past 18 months, the Carlsbad City Library staff has been involved in a planning process from
which a Library Mission Statement and a set of goals and objectives have been developed. Several
community and library user surveys were also conducted. In July 1989, the City retained the services
of Mr. David R. Smith, Consulting Librarian, to produce and assemble a comprehensive library building
program identifying all present and future aspects of the Carlsbad library facilities and describing in
detail each functional area and adjacency requirements within the library. This document is scheduled for publication in November, 1989. This Building Program will be utilized as the primary document by
the architectural consultant and the City’s design committee in the design of the South Carlsbad Library.
7
PLAZA PASEO REAL - PROJECT DESCRIPTION AND SITE PLAN
Plaza Paseo Real is a 27 acre master-planned mixed use center including civic, retail and
entertainment facilities. Located at the northwest corner of El Camino Real and Alga Road, the center
will provide library, postal and retail services to the southern portion of the city.
In response to the existing topography and preferred access points from surrounding roads, the center
utilizes a two-tiered design. The lower level is access primarily from Alga Road at Manzanita Street.
This lower level will include a major grocery store anchor, a minor anchor, a family style restaurant and
"in-line" retail shops accommodating a variety of smaller tenants. An outdoor plaza at the corner of El
Camino Real and Alga Road provides access to the bus shelter and a visual focal point for motorists on
El Camino Real and Alga Road.
The upper level is accessed primarily from an extension of Dove Lane west of El Camino Real. This
upper level will include a movie theater (4 - 5 screens/l,500 seats), a drive-through restaurant, a sit-
down dinner house restaurant and in-line retail shops. The restaurant and the shops facing north which
are accessed from the upper parking area are stacked above the retail shops on the lower levels. The
focus of the upper level of the center is an outdoor plaza with public seating, areas for displays and
special events and an architectural theme tower.
On the western portion of the upper level on a raised pad is the planned 58,000 square foot southern
library. This facility has a separate employee parking and service area which is accessed from Dove
Lane. The visitor entry is on a plaza and drop-off area oriented toward the retail center.
The final component of the upper level is a future post office branch of up to 22,000 square feet. This
facility will have access from the internal loop road for lobby patrons and an automobile mail drop from
Alga Road. Screened and secured delivery vehicle parking, employee parking and truck loading areas
are located in the rear of the building.
The architectural style of all structures is classical Mediterranean and in keeping with the themes
established by the La Costa Resort and the recently approved Pacific Rim (Aviara) project. The
pedestrian arcade will be defined by true arches accented with canopies at key entries. The roof
treatment includes variegated terra-cotta and cream tile mansards interspersed with stucco parapets.
The landscape plan responds to both the City streetscape standards and the architectural design of the
project. London Plane trees are the dominant street tree along El Camino Real. The Alga Road
streetscape is dominated by various types of pines with Chir pines in the median. Entries to the project
are denoted by clusters of Queen palms and Mexican Fan palms. The interior loop road is accented by
colorful Jacarandas. Plaza areas and key architectural corners are softened by special accent trees.
Parking areas will include a variety of trees in raised planter strips or boxes. The perimeter slopes
on the western edge of the site will be planted with drought tolerant trees and ground cover to resist
erosion.
A comprehensive sign program with specific criteria regulating the number, size, type and location of
monument, tenant, directional and code required signs is included. Lighting for parking areas and
security will be controlled to preclude spillage or glare from reaching sensitive receptors.
Vehicular circulation within the center is facilitated by a loop drive which circles the entire project.
Ample vehicular stacking distance is provided at all entry points to public streets. Truck service is
provided to all uses via screened loading areas. Parking is in excess of code requirements and
arranged for convenient access to the various uses. Pedestrian circulation is enhanced by covered
arcades throughout most of the project. Both upper and lower levels of the central core of the center
can be accessed on foot without crossing a parking area. Pedestrian connections between the central
core and the other buildings, including the library and post office, are well defined by enriched paving
and other features such as a trellis leading to the library entry. A bus shelter is located on El Camino
Real near Alga Road.
8
I
U
u c
s U (D U
U U
2
I 4 0 a -I & 0 B
TENTATIVE BUDGET
The project budget will be refinging and revised through the design phases. It does not include the site
acquisition costs or provisions for renovation of the Elm Avenue Library.
Construction - 58,000 Square Feet @ $1 25
*Furnishings and Equipment 58,000 Square Feet @ $1 3.79
(includes shelving)
Library Materials - One time collection supplement
Contingency and design team costs
Contingency - 12% of construction and F/E - $1,200,000
Design Consulting Fees - 10% of Construction and F/E - $800,000
Debt Service (25 years @ 8%)
GRAND TOTAL
$7,250,000
$ 800,000
$ 200,000
$2,000,000
$1 0,250,000
$1 7,850,000
$28,100,000
* NOTE: This figure is low considering the computer, media and video production equipment required.
12
LOCAL DESIGN REQUIREMENTS - SOUTH CARLSBAD PUBLIC LIBRARY
The new library, as an information/research center and as a center for leisure time activities for a side
and diverse range of users, must provide a variety of building areas to satisfy these needs and uses.
The following local design requirements were developed as a result of interviews and discussions with
Carlsbad City Library and community representatives.
The design of this library must:
Be architecturally distinctive and expressive of the character of the library function and its
importance to the community. Compatibility with surroundings and other buildings in area is
important. The new library design must compliment the Plaza Paseo Real design.
Art must be planned for in the design of this building.
Provide a single, at-grade public entrance with easy access to parking adjacent business area and
the street.
Present a light, airy atmosphere which encourages a person to enter and make extended use of the
available resources and services.
Enticing special areas for children, art display and business materials should be included.
Provide open, flexible internal growth spaces which are easily adaptable to evolving technologies
and changing service patterns.
Give precedence to function over aesthetics in the process of creating the most effective, efficient
I i brary.
Layout of the public areas must facilitate self service and make efficient use of staff.
Function as the major support of present and future city library services.
Locate high traffic use areas (childrens, new books, fiction, paperbacks, current periodicals)
together and lower traffic areas (reference, research, non-fiction, and study) together.
Views into and from the library are important. Windows for the staff as well as public areas must be
provided.
Meeting space for a variety of library and community meetings and programs must be provided.
The building must provide for:
- High quality and sufficient light throughout the library. This includes natural light.
- Acceptable acoustlcal levels in high occupancy areas with adequate quiet areas.
13
- A comprehensive interior and exterior signage system.
- Good sight lines and interior visual control.
- Restrooms which are accessible and visible.
- Roof with proper pitch and drainage, uncomplicated and trouble free.
Many desirable building design requirements identified in public, staff, board, and building
committee meetings have been incorporated in both the descriptive narrative of the building areas
and in the final section on general building design requirements.
14
OVERVIEW LIBRARY BUILDING
PROGRAM
1 OVERVIEW OF THE BUILDING PROGRAM
This building program represents the library the architect is requested to design for the South
Carlsbad Public Library. In addition to using known statistical information regarding the
library and future population projections, input from library users, the library staff, planning
committee, building review committee, and Board of Trustees (Library) has been solicited in
the development of this document and it has been reviewed in draft by these groups. The
written building program is specific in terms of measurements and directions so that the
schematic designs and working drawings which the architect prepares will meet the library’s
functional requirements.
The building program statement is prepared with the following information included:
1. Basic functional design criteria.
2. A summary of space, shelving and seating allocations.
3. Basic information on each functional space including:
a. Area in square feet.
b. The aesthetics and general environment which should be created, special considerations and
relationships with other areas of the building.
c. The number and type of occupants that each space is designed to accommodate.
d. Type of collection materials and how they will be used and housed.
e. Specific description of equipment and furniture to be used.
4. General architectural requirements.
The building program statement makes no attempt to determine the design of the building from an
architectural point of view, but it does focus directly on the functional aspects of the building and the
architect will be held responsible for following these directions. In the event that the architect
determines desirable alternatives to the program, he or she must follow project procedures in seeking
to change it.
This library building program reflects the minimum space requirements needed to serve the
South Carlsbad area and library administration and support services for the next 20 years.
These requirements are based on formulas developed through study of libraries of comparable
size and use across the United States. From experience in other cities, it should be noted that
construction of a building of this sort is an instant generator of traffic and new activities so that
the use of this library will increase immediately after it opens and continue to Increase at a
greater rate than would be expected with the existing facilities. Therefore, there will be
substantial increases in staff work load and a need to accommodate a higher level of use. This
increase will also be felt in the need for additional operating funds for materials. From
experience, an increase in volume of service in the first year might go as high as 50% or more
over present use, particularly if the library’s collection is substantially improved and increased
in its quantity and quality.
15
ENVIRONMENT. ATMOSPHERE AND AESTHETICS
The opportunity to construct a new public library facility in the community generates a great deal of
enthusiasm on the part of the citizens, staff, local officials and the architect selected to design the
structure. It should be kept in mind that the building which they are responsible for producing is not a
monument to the past but, instead, a creation of space which must serve the community well for many
years to come. The role of the public library in the community should be kept foremost with all
concerned concentrating on the present and future objectives of the library. The new library, as an
information center and as a center for leisure time activities for a wide and diverse range of users, must
therefore provide a variety of space to satisfy these needs and uses.
The building should present a warm, attractive, and friendly atmosphere which invites a person to enter
and make use of the services and resources available. The building should be designed to be as open
as possible with a minimum of interior walls. To this end, elements within the building requiring
partitioning should be grouped together. It is necessary in the schematic design phase to actually
produce a layout of shelving and furnishings to determine how the new building will best function.
While the aesthetics of the building are the responsibility of the designing architect, the actual function
of the building must be kept in mind at all times and where the function and aesthetics are in conflict,
the function must take precedence so that an architectural detail does not become a point around
which service or use in a specific area of the building must revolve for the life of the building.
It is a fact that the modern public library is no longer the silent institution of past days and there is a
variety of noise and activity generated in the normal use of the library. Since an open design does
increase the potential for sound problems, special attention must be given to the acoustical treatment.
Within this building, the adult lounge and some seating areas should be buffered from these
distractions.
It should be recognized that the library building program is a dynamic, evolving document. The
process of discovery through detailed analysis and discussion and through the parallel architectural
schematic design will modify the capacities projected and the requirements of the program. This will
continue right through the working drawing phase.
David R. Smith
Consulting Librarian
16
I . PROCESS. CO MMUNICATION, POINTS OF APPROVAL
The library building committee, and staff and consulting librarian with appropriate response from the
architect will review and act on the following chronological steps in the completion of the building
project:
1. Preliminary draft of the Library Building Program.
2. Final Library Building Program.
3. Architect Selection.
4. Initial schematic design, site plan, building elevations, model, and project cost estimates.
5. Secure project funding - City and/or State Library Service and Construction Act funds.
6. Schematic building design and specific shelving, furniture, telephone, electrical lighting and
switching layouts.
7. Completed design development drawings and preliminary cost estimate.
8. Final building bid documents, drawings, specifications, and cost estimates.
9. Preliminary specifications and cost estimate for equipment, furnishings, carpet and shelving
(includes finishes and colors.)
10. Construction bid awards.
1 1. Construction change orders.
12. Bid awards for equipment, furnishings, carpet and shelving.
13. Final inspection and acceptance of building.
14. Revision of plans and specifications to "as built"
15. Occupancy plan.
16. Building dedication ceremonies.
17. One year inspection prior to end of warrantee period.
The Architect is requested to:
1. Review the library building program at the very beginning of the design process and suggest any
desirable changes or additions in writing. Once the design process has started, it is assumed that
the plans and specifications will meet all building program requirements and conditions.
2. Provide specific minutes of all design, construction and inspection meetings as a record for all
involved as to the progress of the design/construction project.
17
3. Provide copies of all drawings and documents for discussion to all participants at least five working
days prior to the review meetings.
4. All schematic and design development drawings will include complete layout of programmed
quantities of shelving, furniture and equipment and include a legend or summary indicating
quantities provided and any variation from the library building program.
5. Route all documents and communications with library project participants through the project
manager and Library Building Review Committee. All request approvals will come from the project
manager.
6. Provide necessary expertise in acoustic, lighting, and interior design and specifications.
7. Collect, certify as accurate, and turn over to the library "as built" drawings for all project work.
8. Collect from contractor(s), general, electrical and mechanical warrantee materials specification
sheets and operating manuals or written instructions on all equipment installed in the building. This
material is to be organized, indexed in a binder and turned over to the library with written verification
that it is complete.
18
LIBRARY BUILDING PROGRAM SECTIONS
The following three sections constitute the planning requirements which the architects, interior
designers, and engineers are to follow.
I. SUMMARY OF SPACE, SEATING, SHELVING ALLOCATIONS
This table provides the square foot areas, seating work station and shelving capacities for all
programmed areas of the building. The allocations are net, usable square foot figures. An
unassigned space allowance of at least 20% for structural, mechanical, restrooms and other
architectural requirements is provided. A space diagram and matrix chart follows.
II. DESCR IPTION pE ALLOCATED LIBRARY AREAS
The sequence of this section follows that of the preceeding summary table. The narrative describes
the activities and requirements of each area, provides specific detail on the shelving, furniture and
equipment and notes important functional relationships and unique conditions.
Ill. GENERALBUll DING DESlGN PEQU IRFME NTS
This section provides detail on the general requirements for design fixtures and equipment such as
lighting, shelving and parking.
APPENDICES
This final section will contain any necessary supplementary or illustrative material related to the
building program contents.
19
SUMMARY OF SPACE, SEATING, STAFF
AND
SHELVING ALLOCATIONS
SOUTH CARLSBAD PUBLIC LIBRARY
LIBRARY SPACES PROGRAMMED
The following list is a compilation of spaces which exist or will be included in the development of a
comprehensive allocation of functional library areas in the building program for the South Carlsbad
Library.
The list which has been compiled is based on both the present and anticipated program of services and
administrative organization of the library. It identifies any space which is 50 square feet or more and/or
has any unique function.
Proximities of related areas can be assumed from the related groupings. Example: The three major
spaces allocated below have a functional relationship and must be adjacent:
3.0 Circulation Center
3.1 Circulatlon Desk Area
3.2 Circulation Staff Work Room
3.3 Circulation Supervisor’s Office
Within a section like the Circulation Desk Area, 3.1, the spaces 3.1 1 through 3.16 must be considered
as a consolidated area in the library’s layout.
The numbers to the right of each space indicate seats, (work stations) or basic library collection
capacity.
NOTE: The allocation of all programmed building areas is based on the input of the internal library
planning committee. This results in a slight increase in gross building size to 61,300 square feet. This
includes 13,000 square feet (21.6%) of unassigned building area.
David R. Smtth
Consulting Librarian
REV1 SED
October 1,1989
20
, ’ PUBLIC SERVICES AND RELATED AREAS
1 .O Public Entrance/Lobbv/ DisDlu .
1.1 Vestibule
1.2 General Library Information
1.21 Community Bulletin Board/Kiosk
1.22 Community Notices Distribution - Free Publication
1.23 Directory of Library Areas - (Macintosh Hypercard)
1.24 Library Information/Handouts
1.3 Art/Display Area
1.4 User Seating - Bench - 4
1.5 Public Copy Machine (#1 of 4)
1.6 Book Return - 24 Hour -Drive-by/Walkup
1.7 Public Restrooms (All areas/levels)
1.8 Public Telephone
2.0 Witor ium/Meetina/Co nference Rooms
2.1 Auditorium - 200 seats
2.2 Video Production Control Room
2.3 Meeting Room - 50 Seats
2.4 Conference Room (1) - 10 seats
2.5 Storage (chairs, tables, podiums, risers, etc.)
Assigned Sauarem
200
250
1,000
50
50
50
Unassigned
Unassigned
M
2,000
300
600
250
150
21
I
I
Assigned Sauarem
3.0 Circulation Service
3.1 Circulation Desk Area
3.1 1 Check-In - (1)
3.1 2 Check-Out - (2) 3.1 3 Registration/lnquiry - (2)
3.14 Materials Shelving - Staff Access
3.15 Security System/Queuing Area
3.2 Circulation Staff Work Room
3.21 Reshelving Area - (2)
3.22 Work Stations - (6)
3.23 Collection Shelving
3.24 Storage - Supplies
3.3 Circulation Supervisor’s Office
3.4 Library Manager’s Office
4.0 Childrens Services
4.1 Public Collection Shelving - 45,000 items
4.1 1 Childrens
4.1 2 Adult
4.2 User Seating - General - 58
4.21 Children 40
4.22 Small Children 12
4.23 Adult 6
4.3 Story Hour/Activity Area/Puppet Stage Area - 40
4.4 Audio Visual Viewing and Listening Area - 12
4.5 Computer User Area - 8
4.6 Childrens Service Desk Area - 2
4.61 Staff Work Area/Room - (2)
4.62 Childrens Services Supervisor’s Office
4.7 Restrooms - Childrens (2)
200
600
200
100
Unassigned
300
450
200
100
23M
1,100
1,050
150
200
a.!xlQ
4,000
1,400
400
200
200
400
250
150
Unassigned
22
. Assigned Sauarem
13M
300
200
5.3 Young Adult Collection 300
5.0 &g!& Browsina/Paperbacks/Young Adult Collection - Friends Sales
5.1 Public Collection Shelving - 2,400
5.2 User Seating - 8
5.31 Public Collection 2,500
5.32 User Seating - 4
5.4 Friends Book Sales Area (Self Service)
5.41 Books, Magazine, etc. Sales Area
5.42 Friends Work Room
6.0 Audio ViW Collection
6.1 Public Collection Shelving - 20,000
7.0 Collection/Seatina/User Ass istance
7.1 Circulating Collection Shelving - 133,OO
7.2 General User Seating - 50
7.3 HELP - User Service Desk (2)
7.4 Study Rooms (4) - 4-8
7.5 Word Processing/Microcomputer/Typing Room 6
7.6 Copy machines - (#2 and #3 copy machines of 4 total)
8.0 mines/Ne WSDW .
8.1 Public Collection Shelving - 800 titles
8.1 1 Display Shelving
8.12 Back Issue shelving - 1 to 5 years
8.2 Microform Collection/User Area - CD Area - 16
8.3 User Seating - 10
180
120
500
300
200
400
1,000
UQ!2
1,500
13.400
11,000
1,500
300
200
300
100
u5Q
1,400
800
400
50 8.4 Copy Machine (#4 of 4 copy machines)
23
L Assigned Sauarem
9.0 Referenu Services
9.1 Reference Collection Shelving - 9,000 items
9.2 User Seating - 40 includes CD ROM/Special Purpose
rn
1,200
1,200
9.3 Public Access Catalog - PAC (Central and Distributed Locations) - 16
9.4 Carlsbad/North County History Room
800
300
9.5 Reference Desk Area 1,000
9.51 Reference Service Area - 3
9.52 Telephone Reference - 1
9.53 Database Searching Station - 2
9.54 Interlibrary Loan Office - 1
9.6 Reference Staff Workroom - 6
9.1 51 Staff Work Area - 5
9.152 Closed Stack Shelving Area
9.1 53 Storage - Supplies
9.1 54 Reference Services Supervisors Office
400
150
300
150
800
400
200
50
150
TOTAL ASSIGNED PUBLIC SERVICES AREA 38.1 50
24
ADMINISTRATIVE AND SUPPORT STAFF/NON PUBLIC AREAS .*
Assigned Sauarem
10.0 Administrative Office ArM
10.1 Reception Area
10.1 1 Visitor Seating - 2
10.2 Administrative Secretary Area
10.21 Secretary - 1
10.22 Central files - copy machine
10.23 Supply closet
10.3 Library Director’s Office - 1
10.4 Conference (Board) Room
10.5 Assistant Director’s Office - 1
10.6 Administrative Clerk’s Office - 1
10.7 Library Projects Office
10.8 Restroom
11 .O Technical Services
1 1.1 Acquisitions - 3
1 1.2 Cataloging - 4
11.3 Processing/Mending - 3
1 1.4 Collection shelving
1 1.5 Storage - Supplies
1 1.6 Technical Services Supervisor’s Office - 1
11.7 Computer Room - 1
1 1.8 Collections Coordinator’s Area
100
100
500
200
250
50
300
400
200
200
200
Unassigned
Lx!!J
500
600
500
700
200
200
300
300
25
Assigned Sauarem
12.0 Media Production/Proaram and Exhibits
12.1 Media Production Lab
12.1 1 Work Area (2)
12.12 Dark Room (1)
12.1 3 Recording Booth (1)
12.14 Preview Room (1)
12.2 Programs and Exhibits
12.21 Programs Office (1)
12.22 Graphic Artist (1)
12.23 Equipment
12.24 Supply Storage
13.0 General Staff Area
13.1 Staff Entrance
13.2 Staff Restroom(s)/Showers
13.3 Staff Lockers - 50
13.4 Staff Lounge/Break Room
13.41 Vending Machine Area
13.42 Kitchen/Food Preparation
13.43 LoungeIEating Area - 8
13.44 First Aid/Cot Room
WJ!J
600
250
150
100
100
800
150
150
300
200
14.0 Non-PubliC;waStoraaeAreslS
14.1 Closed Stack Area - General Collection Shelving
14.2 Storage - Library Display and Program Related Materials
14.3 Storage - General Furniture, Equipment, etc.
8M
Unassigned
Unassigned
150
650
100
150
350
50
13M
900
200
200
26
Assigned Sauarem
15.0 Building Maintenance/Ge neral Storaae/De livery
15.1 Mail/Shipping/Receiving Room - 1
15.2 Delivery/Loading
15.21 Dock
15.22 Refuse Collection/Storage
15.3 Maintenance Staff Work Area(s)
15.31 General Work - 2
15.32 Supplies Storage
15.4 Custodial Closet(s) - 3
15.5 Mechanical Equipment Room(s)
15.6 Library Vehicle Parking - Covered/Secure
Total Assigned Non Public Areas
PUBLIC AREA
TOTAL ASSIGNED BUILDING AREA
Plus 21.6% unassigned area for structure, mechanical
systems, restrooms, and general circulation
TOTAL GROSS BUILDING AREA
250
400
300
100
400
200
200
150
Unassigned
Unassigned
9,900
38.150
48,050
13.ooo
61,050
EXTERIOR SPACES - On the Library Site
Public Staff
16.0 Parking
Car
Motorcycle
Bicycle - racks at the entry or staff entry
Library vehicles
1 7.0 Public Entrance a
350 Total
8
15
8
2
10
2
Plaza
Landscaped Areas/Courtyard
Passenger pickup/dropoff
Access to book return
27
Octobertll, 1989
TO: LIBRARY BOARD OF TRUSTEES
FROM: Library Director
F'ULL TIME STAFF FOR GENEALOGY
Bill Richmond's appointment to the Media Services Manager position frees up his Librarian I11 A/V posi- tion. After reviewing the immediate staffing needs of the library it has been decided to reassign Ray Brook-
hart to the Genealogy Division on a full time basis.
The vacant Librarian I11 position will be used as the Collection Development position. Recruitment for that position will probably occur in November.
The need to provide quality staff for the Genealogy Division has been apparent for some time. The increas- ing use of that collection, as well as its development and growing importance, make it imperative that knowl- edgeable staff be assigned to provide quality service. Ray Brookhart, because of his background and experi- ence, is the best possible person to help the library meet the needs of the Genealogy Division.
CIRCULATION STATISTICS
STATISTICS
SeDtember 1989
Sep. Sep.
1988 1989 % Chancre
MAIN LIBRARY
Print Materials 43,391 46,113 +6 Film and Video Tapes 9,807 9,378 -4
Audio Visual Equipment 51 61 + 20
Total MAIN LIBRARY 53,249 55,552 +4
BRANCH LIBRARY
Print Materials
Film and Video Tapes
10,508 11,563
1.383 1,350
Total BRANCH LIBRARY 11,891 12,913
TOTAL CIRCULATION 65,140 69,465
.............................
REFERE NCE OU ESTIONS
MAIN LIBRARY
Adult
Children's
Online Searches
5,155 5,784
1414 1,693 2,333
Total MAIN LIBRARY 6,862 8,131
Total BRANCH LIBRARY 872892
TOTAL QUESTIONS 7,734 9,023
.............................
PEOPLE COUNTE R (Daily Average)
Main Library
Branch Library
1,647 1,538 362 385
TOTAL 2,009 1,923
+ 10
-2
+9
+5
+ 12
LUi
+ 38
+ 18
+2
+ 17
-7
+6
-4
.............................
ATTE
Adult Programs
Children's Programs
TOTAL
Sep. Sep.
igaa 1989
116 79
867 1,376
983 1,455
.............................
INTERLIBRARY LOANS
BOOKS AND REFERENCE
Requests by Carlsbad Received by Carlsbad Requests of Carlsbad Filled by Carlsbad
FILMS
149 126
85 125
350 273
77 91
Borrowed from other libraries 18 13
Loaned to other libraries 22 15
.............................
Main Library
Branch
877 726 167192
TOTAL 1,044 918
- 32 + 59
+ 48
- 15 + 47 - 22 + 18
- 28 - 32
- 17 LLs
- 12
LISRARY BOARD - ONLY -.- .A
YV --CALIFORNIA STATE LIBRARY--
I 6;?J NEWSLETTER 1 1 !
Cary E Strong. State Librarian ISSN OL76-c37?
September 1989 No. 105 ~.. - - .
LIBRARIES JOIN LITERACY CAMPAIGN
California State Librarian Gary E. Strong has announced the addition of five new libraries
to the California Literacy Campaign (CLC). They are as follows:
Madera Public Library
Mariposa Public Library
San Jose Public Library
San Leandro Coummunity Library
Upland Public Library
The CLC is in its sixth year. Grants are provided to qualifying California public libraries
for up to five years to offer instructional services to adults who speak but do not read and write
English. During the start-up period an increasing financial responsibility for ongoing literacy
services is assumed by the local library.
A total of 81 public libraries are a part of the CLC in Fiscal Year 1989-90, 57 of which
are receiving grants under the California Library Services Act. A list of grantees follows.
-4 C4LIFORU14 STATE LIBRARY P 0 BOX 942837 0 SACR4MENTO. C4 94233-0001
1989190 Cacifomia Lite-
Campaign
Establishment Grant Awards
Alameda Free Library $
Alpine County Library
Altadena Library District
AubumPlacer County Library
Benicia Public Library
Berkeley Public Library Butte County Library Chula Vista Public Library
Colton Public Library
Colusa County Free Library
Del Norte County Library
District
Downey City Library
El Dorado County Library
Glendale Public Library
Glenn Co. Joint Powers Library Authority
Hayward Public Library
Hemet Public Library
Humboldt County
Huntington Beach Library
Inglewood Public Library
Kings County Library
Lake County Library Lassen County Free Library
Livermore Public Library
Lompoc Public Library
Long Beach Public Library
Madera County Library
Marin County Free Library
Mariposa County Library
Mendocino County Library
Menlo Park Public Library
Monterey County Library
National City Public Library
Newport Beach Public Library
Palm Springs Public Library
Placentia Library District
Pomona Public Library
Redwood City Public Library
Riverside City/County Library San Bernardino Public Library
San Diego Public Library
San Jose Public Library
25,202
35,723
62,265
3,102
49,853
104,255
27,260
60,350
91,600
68,526
69,668
5 1,932
56,952
77,169
42,240
80,410
17,850
49,563
40,011
57,500
88,630
69,269
62,826
41,467
105,139
52,503
63,788
27,302 am 49,941
36,753
78,133
52,744
73,264
26,668
80,466
80,OOO
98,460 42,049
75,958
145,733
140,OOO
San Leandro Community Library
San Luis Obispo City/&. Library
San Mateo County Library San Mateo Public Library San Rafael Public Library Santa Barbara Public Library
Santa Clara County Free Library
Santa Fe Springs City Library
Santa Monica Public Library
Santa Paula (Blancbard Community)
So. San FranchDaIy City
Sonoma County Library
Stockton/San Joaquin Co. Public
Tehama County Library
Upland Public Library Wdlafid Public Library
87,982
40,953
96,818
58,699
74,905
78,333
69,553
62,067
114,788
36,490
61,636
90,800
52,158
90,410
69,449
28,800
STATEWDE REFERENCE
SERWCES
PROGRAM MOVES FORWRRD
On August 18, 1989, the California Library
Services Board directed the State Librarian to
prepare a Budget Change Proposal for $5
million to implement the new statewide reference services program under the
California Library Services Act. The design
and service priorities for that program were developed through an extensive planning process involving literally hundreds of
librarians Over the last four years. It builds
upon the strengths of BARC and SCAN, and
the third-level reference services that they
have provided so well, and it draws upon the
services and recommendations developed by
California librarians to respond to the needs
components of the new statewide reference
services program and their approximate
funding allocations are:
of ethnocultural populations. Key
1. Reference Service Enhancement and
Improvement (25% of funds), designed
to expand the capacity and capability of
-2-
local public libraries and CLSA Systems
to respond to the informational needs
of people within their service areas
through:
provision of continuing education
opportunities, institutes,
internships, training, field
consultations, etc.
development of local and System
reference collections and services
creation of reference resource
tools such as on-line information
files, publications, and directories
promotion of reference service
through publicity, public relations,
and publications
2. Ethnic Resource' and Research
CenterKentem (30% of funds), to
expand access to multilingual,
multicultural information resources for
people and for libraries and to increase
the statewide capacity to meet the
information needs of a pluralistic,
multicultural society. The
Center/Centers will:
gather data on existing resources
(library and information resources,
statewide information and referral
agencies, etc.)
subsidize access to
1ocaUregionaUstatewide library and
information sources
develop reference resource tools
such as on-line ready reference
files, directories, and databases.
disseminate resources and
information directly to Systems,
libraries, and/or people
provide training programs
coordinate publicity and public
relations activities
3. Ethnic Reference Service Enhancement
and Improvement (20% of funds), to
expand the capacity and capability of
local public libraries to respond to the
specific information needs of
multilingual, multicultural groups
through:
development of local library
reference collections and services
provision of continuing education
opportunities,institutes, internships,
training, field consultations, etc.
4. Reference Referraythird-level reference
(25% of funds), to provide access to
highly specialized or complex
information, requiring resources and
expertise beyond that possible at the
System Reference Center level. The
program will involve:
designation of a generalist
center/switching center, which
answers questions in all subject
areas as well as coordinates their
referral to specialist libraries and
information sources. This Center
monitors all question-handling
activity, including those questions
directly referred to specialist
libraries and information sources,
and analyzes statewide information
trends
designation of specialist libraries
and information sources, which
answer questions in specific fields
of expertise
designation of augmented System
reference centers, which answer
questions in all subject areas and
may have special fields of expertise
-3-
Overall, the thrust of the statewide
program is to improve the capacity and capability of local public libraries to deliver
information to all their clienteles; and to
develop, and draw upon, all the information
resources of the State to meet the
information needs of the people.
If the Budget Change Proposal is
approved by the Governor and the
Legislature, the new program Will begin in
Fiscal Year 1990-91.
LSCA CONSTRUCTION
GRANTS AWARDED
California State Librarian Gary E. Strong
has announced the award of seven library
construction grants under federal Library
Services and Construction Act (LSCA) Title
11. California received an appropriation for
the current year of $1,956,117. All available
funds from this appropriation were expended
with the award of these grants.
Priority for this year's awards was given to
libraries serving communities with high
concentrations of older people and large
numbers of ethnic minorities. Priority was
also given to general population areas with
totally inadequate library facilities.
The grantees are:
The City of Brawley, Sl90,OOO toward a
S440,OOO handicapped remodeling of and
addition to the city library in the Imperial
Valley.
The County of EI Dorado, $525,154 toward a
$1,686,186 new branch library in Cameron
Park.
The City of Escaloo, $456,250 toward a
$1,303,570 new branch of the San Joaquin
County Library.
The County of Kiogs, $154,401 toward a
$388,205 new branch library in Kettleman City.
The County of Madera, $45,000 toward a
S90,OOO addition to the Oakhurst Branch
Library.
Tbe City of Sea Marcos, $454,700 toward a
$1,974,000 new branch of the San Diego
County Library.
"he County of Trioity, $130,612 toward a
S262,OOO second phase to complete its Main Library project.
MINORITY RECRUITMENT
SCHOLARSHIPS ANNOUNCED
Recognizing the major shortage of ethnic
minority librarians to meet the needs of the
state's multicultural and multilingual
population, in 1973, the California State
Library established the Minority Recruitment
Scholarship Program. This year, 35 students
have been awarded scholarships ranging from
$1500-$5ooo. Nominations were received
from all three of California's graduate library
schools as well 8s 13 public libraries and one
academic library.
"be names of the scholarship recipients,
the schools they will attend, and their
ethnicity are listed below.
Sen Jose State University
Martha Abrams Black
Nancy Baca Hispanic
Elsie Chappell-Bailey Black
Wilford "Nicky" Baxter Black
Kathryn Contreras Hispanic
Neva West Cosby Black
Aileen Furuyama Asian/Pacific
Lillian Leon Godreau Hispanic
Edward Louis Flores Gonzalez Hispanic
-4-
Nirmala Guliani hianPacific
Eileen Kuo AsianPacific
Todd Wu Lam AsianPacific
Darlene R. Sison AsiadPacific
Valerie C. Spencer Black
Lambert Van Buuren Black
University of California at Berkeley
Myra Kitchens Borg American Indian
Alton Chinn AsianPacific
Sarah S. Saulter Black
Debra J. Slone Black
University of California, Los Aqples
Jesus Arroya
Tina Brown
Gina Carrasc~
Robert Chang Chao-yi Chuan Valerie Julius Kathleen Lmv
David Monroe
Sylvia Morales
Shirley Quan
Choonhee Rhim
Francie Schwan
Stephanie Sterling
Jerrel Thompson
Anthony Toyofuko
Katsue White
Hispanic
Black
Hispanic
AsianPacific
Asiaflacific
Black
hiadPacific
Black
Hispanic
Asiaflacific
AsianPacific
Hispanic
Black
Black
AsianPacific
AsianFacific
CLSB TARGETS YOUTH-AT-RISK
FOR PROGRAM DEVELOPMENT
At its August 17 meeting, held at the
Hunt Branch of the Fullerton Public Library,
the California Library Services Board adopted
a genera1 policy to guide the future
development of the California Library
Services Act (CLSA) Special Services
Program and chose the next target for future
program development.
The policy emphasizes the Act's primary
goal of equality of access to library services
-5-
and resources for all Californians by calling
for service programs that remove barriers to library service that currently separate library
services from underserved and special needs
populations. Other key policy points include
the promotion of partnerships with
community groups, social and government
agencies, and business and the involvement of
the targeted group in planning seMces.
The policy emerged after a year and a half
of intensive work by the CLSB Ad Hoc
Committee on the Underserved, chaired by
Board Member Effie Lee Moms. The Ad Hoc Committee also developed three program
models for consideration for further
development and implementation. The CUB
unanimously adopted the Youth-at-Risk model as the next to be developed under the
CLSA Special Services Program. The CLSA
Special Services Program currently funds the
California Literacy Campaign and the Families for Literacy Program.
Copies of the complete policy and the Ad Hoc Committee on the Underserved Final
Report, including the Youth-at-Risk model
may be obtained from the CLSA Program Office, Library Development Services Bureau,
1001 6th Street, Suite 300, Sacramento, CA
95814.
NETWORK SERIALS TASK FORCE
ISSUES PRELIMINARY
RECOMMENDATIONS
The Network Serials Task Force, charged
by the California Library Networking Task
Force and the California State Librarian to
prepare guidelines for bibliographic access to
serials in California within a multitype library
environment, drafted and issued its
preliminary recommendations in September.
The report encompassed participation,
products, bibliographic content and format,
access points, and scope.
Based upon comments from the library
community, revisions will be made in these guidelines and the Task Force will begin to
explore alternative methods and structures for
meeting the guidelines.
Persons interested in reviewing and/or
commenting on the preliminary
recommendations are invited to contact
Barbara Will, Networking Coordinator at the
State Library, at (916) 322-0371.
LITERACY RECRUITMENT TV
COMMERCLQLS TO
AIR THIS MONTH
The California Literacy Campaign (CLC)
has unveiled a dramatic new television
commercial which is set to air statewide this
month. The commercial is targeted to reach
an estimated audience of 3.1 million English-
speaking Californians who have reading and
writing difficulties. "Utilizing the broadcast
media is essential to reaching this segment of
our population," said California State
Librarian Gary E Strong.
In the past, each of the State's Literacy
projects funded their own promotions. In
order to finance statewide television
advertising, 45 of 81 public libraries
participating in the California Literacy
Campaign pooled their resources. This is the
first time CLC libraries have joined forces to
do television advertising on a scale that the
programs could not afford individually.
The spots examine the often tragic impact
reading difficulties have on job advancement,
family relationships, and health issues. The
concept for the new 30 and 15 second spots
was developed by Adam Zimmerman of the
Santa Barbara based Bradley Mansfield
Agency, and Daniel Berkowitz, an
independent director from Lm Angela.
The attention getting commercials use
stark black and white images to symbolize the
feeling of alienation experienced by many
adult readers with temporary reading and
writing deficits. Each spot holds out a
message of hope for those willing to take
advantage of the public libraries' free one-on-
one tutorial reading and writing program.
WORK AND HUMANITIES
COME TOGETHER IN NEW
LITERACY LEARNING PACKAGE
Workine in California is a collection of
stories, poems, articles, intemiewr, and songs
about the world of work designed for adult
and high school literacy students. Through
audio cassette tapes with accompanying
booklets, Workinn in California introduces
content from the humanities while developing
skills in reading, writing and critical thinking.
The package was produced by Audrey
Coleman with funds from the California
Council for the Humanities and the
MacArthur Foundation. It includes:
0 a learnerheaching guide
0 published works by acclaimed
California authors
0 selections that both involve and
inform students
0 audio cassettes featuring readings,
songs, and Visits with Writers and
workers from the Golden State
0 humanities content from the fields
of literature, journalism, history and
ethnic studies
"I have reviewed the entire package and
am very excited about the opportunities it
provides for enhancing the learning
-6-
experiences of adults," said Gary Strong,
California State Librarian. "Workine - in
California affords the listenerheader access to
a rich treasure of knowledge about people
working and writing in California."
Copies are free to library literacy programs
through October 30, 1989. To order, send
$10 to cover shipping and handling to:
Working in California
c/o California Literacy Inc.
339 Mission Drive
San Gabriel, CA 91776
For more information on how to teach
with the package, contact:
Audrey Coleman, Producer
Box 5053
Culver City, CA 90230
(2 13) 568-9765
TIPS: TRENDS AND ISSUES
FOR LIBRARY PLANNERS
This month's column contains thoughts on
planning for the two big "C's":
Communications and Computers.
"Can Men and Women Learn to
Communicate?" This article in the March
1989 issue of Successful Meetines speaks to
the fact that the gender makeup of business
meetings has changed dramatically over the
last two decades and that organizations risk
loss of valuable input if traditional male-
models of communication patterns continue
to dominate meetings. According to the
article, "Gender differences are not right or
wrong. . . but deny them and they result in
misunderstanding and conflict."
There are implications here for the library
profession where there are traditionally more
women than men in most library meetings.
Consequently, care needs to be taken to
ensure that communication patterns are not
overly of the "female model," in order to avoid losing valuable input.
The article discusses the biological differences between the ways men and
women process information, differences which ". . . make neither sex superior or inferior in business situations," but which ". . .are
magnified by our rearing, and eventually lead
to different patterns of thought and
communication ..." It includes an example of
the different ways young girls versus boys deal
with the moral question "...may a sole
provider of food steal to save his (her) family
from hunger?" It also includes a useful
"gender relations" quiz and a variety of
recommendations on improving
communication techniques.
***
Realistic Staff Support Is Essential For
Effective Public-use Microcomputer
Applications. Those planning any type of
service that depends on use of
microcomputers by the public must keep in
mind the heavy assistance commitment
entailed if these are to be used for anything
other than games. This ongoing commitment
seems often to be overlooked in library program. The need goes beyond
introductory orientation and training and must
include con tinuously-available, knowledgeable
support for equipment and software questions
and problems.
The need is even greater in Computer
Assisted Instruction applications such as ESL
and general literacy, where language and
insecurity may be as big a problem as dealing
with a new technology. Micros in libraries
can provide benefits to the public, but
realistic, ongoing staffing by dedicated
volunteers or paid staff is essential.
This has been the experience of the State
Library staff working with library applications of micros: the library's literacy staff, AI
-7-
Bennett and Paul Kiley; the library
microsystems specialist John Jewell; and
automation consultants, as well as Jackie
Siege1 of the Government Publications
Section who has worked in public library
public-use programs in Southern California.
The requirement is echoed in program
after program nationwide. For instance, the
MarcWJune issue of Librarv Outreach Rewrt
from Florida, carried an article entitled
"Computers and Literacy, Jacksonville Public
Libraries" in which Jean Brinkman reports
using three full-time paid professionals to
support 25 to 30 literacy students per week,
an average of 8 to 10 users per staff, not an
unrealistic ratio. "A word to the wise . . ."
PEOPLE AND PLACES
Carol A. Aronoflr will retire as Santa
Monica City Librarian on September 29,
1989. Acting Director is Molly Richardson.
James Boulton retired as Director of
Hemet Public Library on August 25,1989 due
to ill health. He subsequently died of cancer
September 17, 1989. Jo Daugherty is serving
as Acting Director.
John CUI&, Senior Librarian in the
California State Library's Government
Publications Section has retired after 23 years
with the Library. During that time, he
worked in many capacities. Most recently, as
the Senior Librarian for Reference Services in the Government Publications Section, he
handled much of the Section's reference and
interlibrary loan duties, scheduling, attending
workshops and staff training. Following his
retirement, Mr. Cub plans to move to Illinois
to be closer to family and friends. His last
day at the Library was September 15, 1989.
Kbthleen Low, a Senior Librarian in the
State Library's California Library Services Act
(CLSA) Program Office transferred on
August 14, 1989 to the Library's State
Information and Reference Center. One of
Ms. Low's primary responsibilities in the
CLSA Office was as Statewide Data Base
Program Manager. Her new position is that
of Library Outreach Services Manager. She
is responsible for promoting the Library's
services and resources to its clients.
Livemore Public Library's new phone
number is (415) 373-5500.
-8-
m m m
4
In
m ?
-??
h
In
W W 0 0
m h h m
‘9, H
m s 4 h
Lo
4 m W
? m
m m 4
e
‘L7
5
0
m m m
9 $1
m d h
c m