HomeMy WebLinkAbout1988-04-18; Parks & Recreation Commission; MinutesMINUTES
MEETING OF:
DATE OF MEETING:
TIME OF MEETING:
PLACE OF MEETING:
PARKS AND RECREATION COMMISSION
April 18, 1988
5:00 p.m.
City Council Chambers COMMISSIONERS
1. CALL TO ORDER;
Chairman Lawson called the Meeting to order at
5:07 p.m.
2. ROLL CALL;
Present - Chairman Lawson, Commissioners Castner,
Dahlqulst, Donovan, Popovlch and Welshons.
Absent - Commissioner Morrison.
Staff Present:
Dave Bradstreet, Director, Parks & Recreation
Frank Mannen, Assistant City Manager
Keith Beverly, Management Analyst
Doug Duncanson, Parks Superintendent
Lynn Chase, Recreation Superintendent
3. PUBLIC OPEN FORUM:
There were no requests to speak on a non-agenda
item.
APPROVAL OF MINUTES;
Minutes of the Regular Meeting held March 21, 1988,
were approved as amended.
APPOINT SCRIBE;
Commissioner Castner was appointed Scribe for this
Meeting.
PUBLIC OPEN FORUM;
There were no requests to address the Commission.
PRESENTATION;
Dave Bradstreet reported a donation of $156 had been
received from the Daughters of Utah Pioneers.
CONSENT CALENDAR;
Parks and Recreation Commission affirmed the action
of the Consent Calendar, as follows:
WAIVER OF TEXT READING;
Parks and Recreation Commission waived the reading of
Agenda Items at this Meeting.
1. AB »»88-1 - ACCEPTANCE OF DONATION.
Parks and Recreation Commission accepted the
donation of $150 from the Daughters of Utah
Pioneers.
Lawson
Castner
Dahlquist
Donovan
Popovich
Welshons
Lawson
Castner
Dahlquist
Donovan
Popovich
Welshons
MINUTES
Page 2
APril 18' 1988 COMMISSIONERS
2. AB #488-2 - CAR SHOWS WITHIN PARK FACILITIES.
Parks and Recreation Commission recommended
further staff evaluation of existing policy for
car shows at park facilities.
3. DIRECTOR'S REPORT.
Parks and Recreation Commission approved the
Monthly Report as contained in the packet.
PUBLIC HEARINGS:
4. AB #488-3 - MONROE STREET TENNIS COURTS.
Dave Braristreet gave the staff report as contained in
the Agenda Bill. He stated it is not possible to put
any more courts in Calavera Hills Park, but Council
has asked staff to re-analyze locations for a tennis
complex for the future.
Commissioner Dahlquist suggested Cannon Lake be
considered as a possible site for tennis courts and
Mr. Bradstreet added that was one of the sites that
would be analyzed, but the subterranean water from the
flower fields would have to be studied before a
recommendation could be made with regard to tennis
courts.
Frank Mannen, Assistant City Manager, reported the
Master Plan for the High School is being studied by
the Planning Department and Engineering at the present
time. The problem is how to have vehicle access and
traffic circulation around the site.
Chairman Lawson opened the public hearing at 5:33
p.m. , and issued the invitation to speak.
W. R. Beverly, 4605 La Portalada Drive, addressed the
Commission stating he played tennis at the Monroe
courts, and if the School District takes back the four
courts, there will be no place to play tennis this
summer. He told of the crowded conditions at the
other courts suggested by Commissioners.
Dave Bradstreet stated the City was aware of the need
to have more tennis facilities.
Since no one else wished to speak on this matter, the
public hearing was closed at 5:38 p.m.
Parks and Recreation Commission recommended the four
tennis courts be returned to the School District, as
requested, and a minimum of 40 parking spaces be
provided for the swimming pool.
Parks and Recreation Commission directed staff to
continue with approved application of 1986 Park Bond
Act for tennis court resurfacing at Valley Or. High
School and lighting at the high school tennis courts
(Basswood and Valley).
Lawson
Castner
Dahlquist
Donovan
Popovich
Welshons
Lawson
Castner
Dahlquist
Donovan
Popovich
Welshons
X
X
X
X
X
X
X
X
X
X
X
X
X
X
£
MINUTES
r
Page 3
April 18, 1988 COMMISSIONERS
5. AB #488-4 - AQUA HEDIONDA LAGOON - REQUEST TO
CONDUCT OET SKI RACES.
Dave Bradstreet gave the initial staff report as
contained in the Agenda Bill. Lynn Chase continued
the report, stating the time of the year was one
factor considered in asking the Commission to deny
the request to hold the races May 21-22, 1988.
Last year in October the lagoon did not have three
separate use areas as it does today. If the races
are held in a heavy-use period, that could cause
inconvenience to those people with permits who were
planning to use the lagoon during that time. Mrs.
Chase stated the other activities should be allowed
on the lagoon on those days.
Chairman Lawson opened the public hearing at 5:57
p.m., and issued the Invitation to speak.
Greg Rusing, Rusing Enterprises, 4215 Harrison
Street, stated he had made the proposal for the Jet
ski races and felt the dates requested were In the
off-season. Since the use areas are not
segregated, he felt there would be no Interference
with the other lagoon users.
Mr. Rusing stated this would not be a sanctioned
race, but would be a "fun day" that would not
attract many spectators. He also felt they could
comply with the Risk Manager's question as far as
facilities, security, parking and medical. There
will be extra restrooms supplied and the people
participating in the races will stay in the area,
bringing business to the restaurants and motels.
In answer to Commission query as to whether he would
lose the race for this year If he lost this date,
Mr. Rusing stated that would probably be true.
He reiterated this was not a sanctioned tournament.
Mr. Rusing stated the participants in the races
would not be doing any drinking of alcohol, and he
would not object to a condition of the City to sell
no alcohol at that time.
Lynn Chase stated she did not have enough facts
about the races at this time — the Insurance was not
applied for and the Risk Manager felt more time was
needed for details to be worked out and reviewed.
Mr. Rusing stated the insurance has been applied
for at this time.
Since no one else wished to speak on this matter,
the public hearing was closed at 6:11 p.m.
Commissioner Donovan stated she was in favor of the
races going forward, with Mr. Rusing to supply all
necessary Information to Mrs. Chase. Commissioner
Welshons stated she favored the Risk Manager's
recommendation. Commissioner Castner agreed with
the Risk Manager's recommendation, and added he
would like to see the races held on the lagoon, but
planned well in advance. Chairman Lawson also
agreed with the Risk Manager's recommendation to
deny the request.
b
MINUTES
Page
April 18, 1988 COMMISSIONERS
Motion was made and seconded to allow Rusing
Enterprises to conduct jet ski races at Agua Hedionda
Lagoon on May 21-22, 1988.
There was no action due to a tie vote.
Motion was made and seconded to deny Rusing
Enterprises' request to conduct Jet ski races at Agua
Hedionda lagoon on May 21-22, 1988, and recommend
conducting the event after September 15 or before
May 15.
There was no action due to a tie vote.
Parks and Recreation Commission denied Rusing
Enterprises' request to conduct jet ski races at Agua
Hedlonda Lagoon on May 21-22, 1988, and recommended
conducting the event after September 15 or before
May 15.
Commissioner Donovan stated she opposed the motion as
she felt the Risk Management was carried to extremes at
times, and the races could have been done safely and
well.
Commissioner Dahlquist stated she opposed the motion as
she felt the races could be held safely.
Lynn Chase stated the benefit to the lagoon users
should be evaluated, as those with permits expect to be
able to use the lagoon, and there would be no advantage
to the citizens other than as a spectator at this
event. There would be financial gain for Mr. Rusing
and it would provide the Jet skiers an opportunity to
have a practice on our lagoon.
DEPARTMENTAL REPORTS:
6. AB #488-5 - APPROVAL OF REQUEST FOR PROPOSAL TO
REVISE THE MACARIO CANYON MASTER PLAN.
Dave Bradstreet gave the staff report as contained in
the Agenda Bill, referring to the RFP for Macario
Canyon Park Master Plan Revision contained in the
packet.
The Commissioners questioned whether this was
premature, since funds would not be available until
1997+. Dave Bradstreet stated the plan needed to be
kept up-to-date and the golf course study needed to be
incorporated into the Master Plan to determine what
amenities could be placed in the Park.
Mr. Bradstreet stated the money had been approved to
revise the Macario Canyon Park Master Plan and he felt
the Commission wanted this done.
Concern was expressed about spending money for
consultants on this project, particularly when
recreational ideas change, and nothing could be done
about the plan at this time. The suggestion was made
to have staff do "housekeeping and updating" to save
the $30,000 to $45,000 cost estimated for the revision.
Lawson
Castner
Dahlquist
Donovan
Popovich
Welshons
Lawson
Castner
Dahlquist
Donovan
Popovich
Welshons
Lawson
Castner
Dahlquist
Donovan
Popovich
Welshons
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
>
MINUTES
Page 5
April 18, 1988 COMMISSIONERS
Frank Mannen, Assistant City Manager, stated that with all
the plans submitted and ideas expressed for amenities in
the canyon, it would take four or five times the area
available. The problem was to balance the competing needs
and interests. He felt a consultant would be able to
handle all the proposals and fit them together.
Commissioner Dahlquist left the meeting at 7:09 p.m.
Dave Bradstreet reiterated he felt there was a need to
answer all the questions as to where the best golf course
site was located, as well as all the other proposed
amenities. Staff could do a preliminary master plan,
but there is more to it — as research needs to be done.
Chairman Lawson inquired whether it was possible to scale
down the RFP to the point where it could come back before
the Commission next month as something a little less
ambitious. Dave Bradstreet answered that staff could come
back with a conceptual master plan.
Dames Smith, representing the Carlsbad Golf Association of
1,426 members, suggested that rather than bringing this
item back next month, bring it back in Dune and see what
happens to the TOT measures. If both of those measures
pass, that would make a difference. Also, he felt Macario
Canyon was a park system, and at buildout an inventory
should be taken to access what needed to be built at that
time. Mr. Smith said it seemed that Macario Canyon would
be the appropriate place for a golf course, especially
since SDG&E had said their 90 acres could be in any
configuration.
Mr. Smith read the statements of City Attorney Vincent
Biondo regarding Calavara Lake, and he questioned that the
area could ever be used for anything, for he felt it was
not available as a park or for public use.
Parks and Recreation Commission tabled the request for a
proposal to revise the Macario Canyon Master Plan until
the 3une meeting.
7. AB #488-6 - APPROVAL OF REQUEST FOR PROPOSAL FOR
RECREATIONAL DEVELOPMENT PLAN OF LAKE CALAVERA.
Dave Bradstreet gave the staff report as contained
in the Agenda Bill, stating the area is larger than
thought, and other recreational amenities were to be
included, such as hiking, .logging, overnight
camping, picnic areas, etc., on a regional basis.
Frank Mannen stated there were some legal
limitations on the use of this property, but not to
the exclusion of park use. He stated he was not
aware of the statements Mr. Smith attributed to Mr.
Biondo. Mr. Mannen added that any revenues would
accrue to the rate payers of the water system. The
land is zoned open space. If there is a legal
prohibition, the proposal would not go forward.
Lawson
Castner
Donovan
Popovich
Welshons
X
X
X
X
X
X
c
MINUTES
Page 6
April 1fi, 19fift COMMISSIONERS
Parks and Recreation Commission returned the request
for proposal for recreational development plan of Lake
Calavera to staff with a request to investigate and
clarify the statements of the City Attorney's Office
with regard to the use of this property.
8. AB -7 - PRIVATIZATION CONCEPT OF
RECREATIONAL FACILITIES.
Chairman Lawson stated this item would be continued
to the next meeting.
9. AB »»88-8 - COMMISSIONER'S HANDBOOK.
Dave Bradstreet stated this handbook was for the
Commissioners to read.
COMMITTEE REPORTS;
Chairman Lawson reported the Parks and Recreation
Element Revision Subcommittee would meet Thursday,
3:00 p.m., at the Safety Center.
AGENDA ITEMS FOR HAY 16, 1988.
Zone 5 Update
Update on Recirculating Vehicular Traffic at
Stagecoach Park
Director's Update on Alta Mira (Sammls Property)
SENIOR CENTER MODEL.
Dave Bradstreet called attention to the model of the
Senior Center and stated Council had approved hiring
the architect to go forward with that plan.
SCRIBE REPORT;
Commissioner Castner gave the Scribe Report.
ADJOURNMENT;
By proper motion, the meeting of April 18, 1988, was
adjourned at 7:51 p.m.
Respectfully submitted
Harriett Babbitt
Minutes Clerk
Lawson
Castner
Donovan
Popovich
Welshons
PARK & RECREATION COMMISSION - AGENDA BILL
AR* 588-1
MTG 5/16/88
DPPT. P & R
TITLE;
DIRECTOR'S REPORT
DEPT. HD. DB
CITY ATTY
CITY MGR.
RECOMMENDED ACTION:
Accept and file staff report
ITEM EXPLANATION:
Refer to attached Director's report.
zo
£u
zo
oo
May 4, 1988
TO: DAVID BRADSTREET, PARKS AND RECREATION DIRECTOR
FROM: HELEN L. JOHNSON, ACTING SECRETARY II
MONTHLY REPORT FOR APRIL / MAY 1988
Security lights have been installed on the outside of the rest
rooms at Laguna Riviera Park.
Gregg Rusing from Snug Harbor Marina is appealing the decision to
deny the jet ski race on Agua Hedionda Lagoon, the item is
scheduled for the May 10, 1988 City Council Meeting.
Work on Phase II of Calavera Hills Community Park is progressing
on schedule. Foundation work on Community Center and pads for
the picnic shelters are under construction.
Board sailors are having difficulty in securing insurance that
will name the City additionally insured. Staff has been directed
to review the insurance requirement and propose alternative
solutions.
Playground equipment has been installed at Cadencia Park.
On April 30, 1988 the Recreation Division in conjunction with the
Carlsbad Evening Rotary hosted its annual track meet in North
Carlsbad. Over 150 youngsters participated this year, with the
top finishers competing at the San Diego County Track Meet.
Over one hundred (100) teams are currently playing in the Parks
and Recreation Summer Softball Leagues.
Parks and Recreation Brochure will be mailed to all Carlsbad
residents May 9, 1988.
The Daytrippers just returned from a eight day adventure to the
Grand Canyon, and over forty (40) people joined in for the trip
to the Ramona Pageant on April 30, 1988.
Street tree removal and sidewalk work has begun in the village
area. Bids are being accepted for the sale of the firewood from
the removal of trees in Hosp Grove and street tree areas.
A3
PARK & RECREATION COMMISSION - AGENDA BILL
AB« 588-2
MTG. 5/16/88
DEPT. P & R
TITLE:
ACCEPTANCE OF DONATION
DEPT. HD. DB
CITY ATTY
CITY MGR.
zo
]-u<
zo
RECOMMENDED ACTION:
RECOMMENDATION
Recommend acceptance of five hundred dollars ($500) donation by
RecyCal - San Diego for the beach maintenance program.
ITEM EXPLANATION
Mr. William A. Quistgaard, President of RecyCal - San Diego has
offered a grant of five hundred dollars ($500) for the beach
maintenance program. The City of Carlsbad has gratefully accepted
this grant donation for the last two years. Beach maintenance
from Elm Avenue North to Ocean Street beach access is the
responsibility of the Parks maintenance division. The person
employed to provide the clean up services will be supervised by
parks staff and paid out of the part time salaries account.
Mr. Quistgaard would like to present the donation to the City
Council in June.
FISCAL IMPACT
The donation will increase the part time salaries account by five
hundred dollars ($500). The grant is to be placed in account
001-820-4121-1300.
EXHIBIT
Letter to William Quistgaard - April 27, 1988
Ou
1200 ELM AVENUE • )SS <? • TELEPHONE
CARLSBAD, CA 92008-1989 BWU / ^M (619) 434-2824
Olitg of Otolabafc
PARKS & RECREATION DEPARTMENT
April 27, 1988
Mr. William A. Quistgaard
President, RecyCal - San Diego
c/o Markstein Beverage Co.
505 South Pacific Street
San Marcos, California 92069
Dear William;
This correspondence serves as notification of acceptance of the
grant offered by RecyCal San Diego to the City of Carlsbad. The
five hundred dollar ($500) donation will go before the Parks and
Recreation Commission in May and then on to the City Council for
final formal acceptance. We plan to schedule this on the City
Council agenda of June 14, 1988. The Parks and Recreation
Department will be in touch with you to confirm all dates and
times.
On behalf of the City of Carlsbad, I would like to extend our
appreciation for this offer.
Thanks for your support.
Sincerely,
Doug Duncanson
Parks Superintendent
c: Frank Mannen, Assistant City Manager
D»v» Bradftti***, Pferfcs *nd Recreation Director
PARK S RECREATION COMMISSION - AGENDA BILL
AR« 588-3
MTG. 5/16/88
DPPT. P & R
TITLE:
WOMEN'S OLYMPIC VOLLEYBALL
WEST GERMANY VS. UNITED STATES "B" TEAM
DFPT HD.
r|TY ATTY
CITY MGR.
RECOMMENDED ACTION:
Endorse the U.S.A. Women's Olympic Volleyball
Activities.
ITEM EXPLANATION:
The West German Women's Olympic volleyball team will be
visiting Carlsbad June 20-24, 1988. Throughout the week
there will be scheduled activities which includes a
"Welcome to Carlsbad Dinner", sight seeing and a benefit
volleyball match against the U.S.A. Women's "B" team
The match is co-sponsored by the Carlsbad Unified School
District and will be held Thursday, June 23, 7:00 p.m.
at Carlsbad High School. Proceeds will support the
junior high and high school volleyball program.
zo
I-u
o
I/)
ou
zo
1-u
o
c/>
PARK & RECREATION COMMISSION - AGENDA BILL
AR« 588-4
MTG 5/16/88
OFPT P & R
TITLE:SOUTHWEST QUADRANT
PARK T.AND ACOUISION
DEPT. HD.
CITY ATTY
CITY MGR.
RECOMMENDED ACTION:
Accept and file staff report.
ITEM EXPLANATION:
At the April meeting the Commission requested a staff report
on the acquisition of the Sherman parcel.
The attached report from the Municipal Projects Manager
outlines the status of park land acquisition in the
southwest quadrant.
EXHIBIT
1. Memo from John Cahill - April 21, 1988
(W
Ou
APRIL 27, 1988
TO: DIRECTOR OF PARKS AND RECREATION
FROM: MUNICIPAL PROJECTS MANAGER
STATUS OF SOUTHWEST QUADRANT PARK LAND ACQUISITION
In response to your memo of April 27, 1988, formal appraisal
of the property identified for potential acquisition in the
southwest quadrant has been completed. The City will begin
negotiations with the owners concerning the acquisition in
the very near future. Additionally, acquisition financing
strategies will need to be finalized.
An agreement between the City and Sammis Properties has been
prepared and forwarded to the Sammis group for execution. In
general terms, the agreement provides for the City to take
the lead in the acquisition of the subject parcel with Sammis
funding in advance their proportionate share of the necessary
costs related to the transaction as well as the equivalent
value of their ten (10) acre obligation. To date, the City
has not received a formal response from Sammis Properties,
however, discussions are continuing.
Municipal Projects is looking forward to working with the
Parks and Recreation Department in the development of the
southwest quadrant park as soon as the acquisition is
consummated and development funds provided in the CIP.
We will keep you appraised of the developments of the
acquisition. If you have any additional questions, please
call me at 438-1161.
JOHNVT. CAHILL
MUNICIPAL PROJECTS MANAGER
JJC:mg
C: Assistant City Manager
Community Development Director
City Engineer
zo
2
O
Iu
PARK S RECREATION COMMISSION - AGENDA BILL
AR« 588-5
MTG. 5/16/88
DEPT. P & R
ZONE 5 UPDATE J^1" ^DEPT HD
CITY ATTY
CITY MGR.
RECOMMENDED ACTION:
Accept and file staff report
ITEM EXPLANATION
At the April meeting the commisssion requested a staff
report on the status of the Zone 5 Parks and Recreation
Facility Plan.
City staff have met several times with zone 5
representatives and report that no details have been
worked out to date. Phil Carter will provide a verbal
update regarding the negotiation at the May Parks and
Recreation meeting.
EXHIBIT
Letter to Mark Hughes - April 27, 1988
oob
2075 LAS PALMAS DRIVE •^TW J« TELEPHONE
CARLSBAD, CA 92009-4859 iSSM^Jm (619)438-1161
Citp of Carlabab
COMMUNITY DEVELOPMENT
April 27, 1988
Mr. Mark Hughes
Hughes & Associates
2141 Palomar Airport Road, Suite 160
Carlsbad, CA 92009
Dear Mr. Hughes:
The purpose of this letter is to request a status report on your
progress with the Zone 5 park negotiations.
It has been a month since our last meeting and I have been asked
to prepare a report for the Parks and Recreation Commission.
This status report will be presented to the Commission on May
16th.
If you need any assistance, please call me.
Sincerely,
PHILIP 0. CARTER
Growth Management Manager
bjn
c: Assistant City Manager
Parks and Recreation Director
PARK RECREATION COMMISSION - AGENDA BILL
ABft
MTQ.
DEPT.
^98-6
5/16/88
P S R
TITUE; CONTINUE PRIVITIZATION FOR
RECREATIONAL FACILITIES
DEPT. HD. DB
niTYATTY
CITY MGR.
o
o
zo
on
OU
RECOMMENDED ACTION:
After commission discussion, refer issue to Parks and Recreation
Element Revision Subcommittee for further evaluation.
ITEM EXPLANATION
Commissioner Lawson has requested to discuss the privitization
concept currently outlined in the Parks and Recreation element.
As presented, the concept refers to the attainment by local
government of private development investment, operation, and
maintenance of public recreation facilities.
The 1982 Revised Parks and Recreation Element very strongly
encourages the privitization policy. To date, the policy has not
been implemented within the department operation. The Element
Revision Subcommittee is currently discussing this issue and
would appreciate input from the commission to determine if the
policy should be continued, abandoned or modified. Attached for
reference are two articles addressing the pro's and con's of the
privitization concept.
FISCAL IMPACT
No change in current operation expenditure or revenue.
EXHIBITS
1. Productivity through Privitization
2. Pitfalls of Commercial Facilities in Public Parks
"PRODUCTIVITY THROUGH PRIVATIZATION"
A Guide Co Public Sector Contracting
by
Joseph W. Halper
President
HALPER ASSOCIATES
November 1984
EXHIBIT 1
TABLE OF CONTENTS
SECTION Page
INTRODUCTION A
I - RECOMMENDED POLICY DIRECTION 1
II - METHODOLOGY FOR SELECTION OF PROGRAMS
FOR CONTRACTING 1
III - PROCEDURES FOR EVALUATION OF SELECTED TARGETS ... 2
IV - ACTION TO bE AS A RESULT OF THE ANALYSIS 4
V - GUIDELINES ON DETERMINATION OF COST BENEFITS
FOR THE CONTRACTING DECISIONS 5
VI - GUIDELINES FOR CONTRACT PROCEDURES -LIMITATIONS OF ACTIVITIES 9
VII - TYPES OF CONTRACTS 11
VIII - NUTS AiJD BOLTS OF CONTRACTING PROCESS 12
IX - CONTRACT ADMINISTRATION 15
A - GENERAL INSURANCE REQUIREMENTS 15
XI - LABOR CODE REQUIREMENTS 16
XII - IliPLEMEUTATION STRATEGY 18
LOS ANGELES COUNTY CONTRACTING PROCEDURE .. EXHIBIT A
MODEL ORDINANCE EXHIBIT B
MODEL WORKFLOW AND CHECKSHEET EXHIBIT C
MODEL INSURANCE REQUIREMENTS AGREEMENT .... EXHIBIT D
STANDARD TERMS AND CONDITIONSFOR CONTRACTS EXHIBIT E
SAMPLE REQUEST TO SOLICIT BIDS EXHIBIT F
SAMPLE RECOMMENDATION TO AWARD CONTRACT ... EXHIBIT G
INTRODUCTION
During the past decade, a series of events has
demonstrated a growing trend toward reducing the tax base
resources available to public parks and recreation and other
human service agencies throughout the nation. In the West,
this was manifested in the Jarvis-Gann initiative and the
passage of Proposition 13 in California. In the East,
witness the near default of municipal bonds in New York City,
the financial collapse of Cleveland, Ohio. All these events
indicate that the quality of services provided by the public
sector have been and will be sunstantially diminished as we
uove into the next decade unless new strategies are adopted
for financing and controlling costs.
There has oeen a growing awareness among public
officials tnat the systems established to control the abuse
of patronage and political influence in the area of public
contracts have, in themselves, tended to impair the ability
of the public sector to perform its tasks effectively and r
efficiently. The result over the years has been a poor
cost-oenefit performance oy local government.
In view of the upsurge in taxpayer revolts, a
mechanism was needed to reduce costs and preserve the level
and quality of public services provided by local agencies.
Privatization, which is the performance by private business
of functions traditionally performed by public employees, has
emerged as a recognized means for achieving cost savings,
which can help the public sector continue to perform many of
its responsibilities.
This manual has been developed as a guide to aid
public administrators as well as potential private sector
oiaders in effectively engaging in privatization activities
by providing a "How To" overview.
In sum, recent taxpayer initiatives and legislative
action have prompted local government to find alternative and
innovative revenue sources, restrict expenditures, and be
responsive to potential private operation of government
functions when cost benefits can be achieved.
Testing of the market has indicated that significant
potential cost benefits to local government exist through
contracting out various services currently being performed by
public employees.
-A-
Af-
Privatization of public services already has a track
record in the U. S. of providing better service with fewer
resources. Privatization has also proved to be an
effective strategy for dealing with a variety of
management issues facing administrators of public policy.
A sample of results acnieved:
•Los Angeles County, CA. has achieved
a savings of over forty percent by
contracting out segments of their
security and their ground maintenance
activities.
•City of Long beach, CA. increased the
income from golf course operation by
over $1,000,OUO annually by contracting
with a private management company. In
addition, the city gained substantial
funding for capital improvements of these
facilities.
•City of Downey, CA. reported a twenty
percent savings in the upkeep of its
golf courses since it contracted out the
maintenance activities.
•New York City operated its 80 portable
pools in the inner city by contract to get
this program operational in tine for the
hot sunner. This would not have been
possible within the bureaucracy of the
municipal personnel and civil service
systems.
In addition, a number of agencies report savings when
contracting for a service previously performed in-house.
These examples come froia park and recreation agencies in
California:
•(1) East Bay Regional Park District,
garbage collection, golf course operation,
and engineering services; (2) Weaverville -
Douglas City Recreation District, accounting
and bookkeeping services; (3) City of Palos
Verdes, contract maintenance; (4) City of
Hawaiian Gardens, building maintenance; (5)
Culver City, tree trimming and island main-
tenance; and (6) Los Angeles County, grounds
maintenance, golf courses, security and
landscape maintenance.
Public managers of the future will be evaluated on their
ability to manage resources in a conplex and scarce
environment. Privatization will be an integral part of
public management in the future.
-A.2-
I. Recounended Policy Direction
Ic is recommended chat a systematic review of all the
activities of a department by function be made on a cyclical
basis identifying those areas which appear to provide the
essential elements for contractual relationships which could
be more economical or feasibly provided by independent
contract. As this process requires substantial
administrative resources, it will be important to identify
those activities which have the most promise of producing
the desired results. After identifying the target
activities for consideration, the possibilities of
developing contractual arrangements for those activities be
pursued when results indicate contracting is legal,
feasiole and would provide cost benefits.
II. Methodology for Selection of Programs for Consideration
A - Task Force Approach
It is proposed that a departmental task force oe established-
and charged with the implementation and monitoring of the
privatization program. This task force working in
coordination with the various agencies of the department
would identify those activities which appear to be feasible
and cost effective for contracting. The task force would
submit a report identifying the target programs and
prioritize then for implementation. The report would
contain specific recommendations on the activities which
should be considered for this purpose as well as identifying
the individual within a department which should bear the
lead responsibility for following through on the development
of the program for each specific recommendation.
B - Criteria for Selection of Programs to be Considered
for Contracting
The following are the recommended criteria that should be
considered when examining the activities of a department for
their suitability for consideration as possible contractual
services, the assumption being that the more of the criteria
which are met, the greater the potential of establishing a
successful contractual arrangement.
Criteria to be Considered:
1. Geographic isolation of the service.
2. Is the service of an extraordinary or technical
nature and are these services of a temporary nature.
-1-
3. The services are needed on a part-time or
intermittent basis.
4. The service cannot be performed adequately or
competently or satisfactorily by civil service
employees.
5. Personnel services are required to provide an
independent analysis evaluation, review or audit of
existing or proposed program.
6. The employees are needed to take care of temporary
projected work overloads.
7. Tine constraint requirements for the delivery of the
program which would not allow for the effective use
of in-house personnel.
a. Labor cost reduction possibilities in labor
intensive activities by providing the services
through the private sector.
9. Excessive equipment investment or replacement costs -
projected.
10. The activity is a major budget-cost itera to allow
for meaningful savings to be achieved.
11. Recruitment of the personnel in the category is
difficult under in-house personnel policies and
procedures or pay scales.
12. There are sufficient private sector vendors
currently engaged in the delivery of the services
provided.
It would be suggested that a comprehensive list of all
departmental activities be established and a matrix be
developed by which each of the activities is analyzed against
the suggested criteria. Based on the frequency of positive
identification we should be able to pick out those activities
which would be most suitable for further investigation for
"privatization" consideration.
III. Procedure for Evaluation of Selected Target Activites
Based on the establishment of a finding that an activity
should be considered for possibility as a contractual
service, it is recommended that the following procedure be
implemented:
-2-
A. Three questions must be addressed to complete this
analysis; they are feasibility, the legality, and cost
benefit of the proposal.Guidelines for responding to these
questions are as follows-.
1. Is the program feasible for contracting?
a) To ascertain the feasibility of a project, it
should be determined if there are vendors
available to perform the services desired in
the private sector.
t>) In the event the contractual relationships fail,
the analysis of the department's ability to
provide an interim emergency service by in-house
capability or by other private sector vendors
should be ascertained.
c) Would the staff which would be displaced by the
contract be able to be reassigned within the
department to other budgeted positions? Or,
are there vacancies in government in other
departments which they could be transferred to? -
d) Is there other use for the capital equipment
assigned to this activity in the department or
in other departments or use by contractor?
2. Is the contracting out of the program legal?
Legal counsel should be sought to deterraine this
in each case. As criteria will vary within each
state and local jurisdiction.
See section on legal aspects for specifics.
3. Will the proposed contractual program be of cost
benefit"?
If the project is feasible and there are no legal
inhibitions to its implementation, the key deciding
factor will be the cost benefit which would be
achieved by the contractual arrangement. To
determine this the following procedure is
recommended:
a) The affected agency will identify the direct
cost which would include personnel, supplies
and services replacement of capital equipment
which would be required for the continued
operation of the program under the department
-3-
as an in-house operation. This is to include
costs to and service charges from other
departments of government.
b) Identify those costs which are projected to be
unavoidable as a result of developing a
contractual arrangements. The unavoidable costs
will then De subtracted from the amount which
has been estimated for the in-house performance
of the function. This projected net cost will
tnen be compared with the estimated contract
costs for the performance of the service. If
the comparison indicates a savings would be
achieved by contracting this service out, the
project would then be eligible for consideration
for the development of a contractual
arrangement.
*See guidelines on determination of cost
benefits for contract decision. Section V.
IV. Action to oe Taken as a Result of the Analysis
A. Recoanended requirements for contract
No contract should be awarded unless all of tne
following requirements are met:
1) The award of the contract will be cost
effective.
2) The government's ability to respond to
emergencies will not be impaired.
3) The award of the contract will not result in
the unauthorized disclosure of confidential
information.
4) Alternative resources are available so that the
services can be obtained from another source
in the event of default by the contractor.
5) The award of the contract will not infringe upon
the proper role of government in its
relationship to its citizens.
6) The award of the contract, if financed in whole
or in part by Federal or State funds, will be in
full compliance with all applicable Federal and
State regulations.
-4-
6. Information regarding the Contractual Proposal to be
Developed for the Record and for Communication "to
Policy body
1) Those faces that support the finding that the
work can be done more economically or feasibly
by independent contractors.
2) A description of the estimated scope of the work
to oe contracted.
3) An identification of the available funding
source for the contract.
4) Information concerning the projected
employees relations implications of the
proposed contract, referring to plans for the
accommodation of personnel displaced by the
proposed contractual arrangement if such is
possible.
5) Information reflecting legal opinion regarding
the proposed contract.
6) Recommendation if the solicitation should be an
Invitation for Bids (IFB) or a Request for
Proposals (RFP). In the case of the latter, a
justification should be included as other than
cost factors will oe considered in the
evaluation process, and need to be described.
7) In the event that it is determined that the
target program under consideration is not
suitable for contracting based on the fact that
it is not feasible, legal or of cost benefit,
a letter is to be sent to the originator of the
proposal indicating this finding and the reasons
This should oe accomplished whether the proposer
is a member of the department organization or
an individual outside of government service.
Guidelines on Determination of Cost Benefits for the
V. Contracting Decision
Introduction
Puolic sector managers should consider contracting for
services when such a contract will result in less cost than
providing the service in house. While qualitative factors
-5-
30
will be of priue importance in certain situations, in most
instances the evaluation process will center around
quantitative considerations. In the final analysis, most
decisions will utlimately be based on cost comparisons.
To ensure that a valid cost comparison can be made, it will
oe important that a consistent, rational cost comparison
model be used. This will ensure that only those cost factors
relevant to a cost comparison analysis will be used. Relevant
costs are those costs that can be avoided as a result of
contracting. What are these relevant costs, and how should
they oe considered? The following definitions, concepts, and
guidelines are provided to assist managers in making the
necessary analyses. An example situation is also provided to
demonstrate the application of these cost analysis
principles.
Definitions
A full understanding of cost accounting terminology is not
necessary to making the required cost comparisons. However,
to understand the proposed evaluation process, an
understanding of certain key terms and concepts is needed.
Accordingly, key terns and concepts are defined below:
1. Costs; Include (but are not limited to) salaries and
wages; employee benefits; services and supplies; fixed
assets.
2. Avoidable Cost versus Unavoidable Cost
a. Avoidable Costs: Costs which will be changed
(reduced or eliminated) as a result of the decision
to contract for services.
b. Unavoidable Costs; Costs which will not be changed
(reduced or eliminated) as the result of contracting.
3. Direct Cost versus Indirect Cost
a. Direct Costs: Those costs which can be readily
identified to the service. (Usually these costs are
the salary and employee benefits cost of the
employee and any significant amount of supplies used
on the job.)
b. Indirect Costs: Those costs which cannot be readily
identified to the service but which are incurred in
the course of performing the service. (Usually this
includes departmental administration, divisional
administration, and jurisdiction-wide support.
-6-
3/
4. "Full" government costs: Direcc coses plus applicable
indirecc costs^ or:
a. Departmental Administration: This costs usually
includestne executive office and its clerical
support as well as the "administrative" sections
of payroll, personnel and accounting.
b. Divisional Administration (or bureau, Branch, etc.);
This cost usually includes the division chief and
assistant and any clerical support.
c. Overhead Support Costs; The costs the service
departments incur for the benefit of all the
operating departments. This also includes the cost
of rent, utilities and insurance.
5. Incremental Costs; Those costs that can be reduced or
eliminated should government contract for the same
service.
Analytical Process
The following procedures should be applied in developing the
needed cost comparison.
1. Identify tne service and level of services to be
contracted. Be specific about the services to be
performed including (but not limited to) current direct
labor positions performing the service, the number of
positions and the duties involved. Include a description
of the estimated number of units of service required.
2. Determine the "full government cost" of the service
under consideration for use in comparing against similar
outside service. The schedule of costs must present
direct costs, plus indirect costs of departmental,
divisional (etc.) and overhead support.
3. Evaluate costs on an incremental basis.
a. Identify costs determined "as full government
cost" as "avoidable" or "unavoidable".
b. Total all "avoidable" costs.
4. Summarize the quanititative results. Compare the
estimated contract cost to government against the costs
of performing the service in-house.
-7-
Example
Contracting for Services
Sample Problem
Decision: Should the municipality contract for property
planning services at an estimated contract
cost of $200,000 per year?
Analysis:
Specify the level of service to be provided, the duties
and functions currently being reviewed.
Answer: The municipality currently requires the direct
labor of five property planners and one
supervising property planner in the Facilites
Department. Duties and functions are .... etc.
Costs
Full
Cost Element Governmental Cost Incremental Cost
Direct Cost:
Salaries and Wages $125,000 $125,000
Employee Benefits 26,353 26,353
Services/Supplies 10.000 10,000
Subtotal -
Direct Costs $161,563 $161,563
Indirect Cost:
Division Overhead 71,885 10,000
Branch Overhead 10,516 (2)
Dep't. Overhead 27,824 (2)
Support Service
Overhead 17.448 5,000
TOTAL $289.236 $176,563
Decision Made;
In this example, a contract should not be let for property
planning services because the incremental costs identified did
not exceed the estimated contract price of $200,000.
-8-
u'otes
(1) One 'secretary in division administration can be
eliminated since tne position provided clerical
support exclusively to the unit to be eliminated.
All other costs are unavoidable.
(2) Unavoidable Cost - All these elements are required
to continue to provide adequate support to the
Department's other functions.
(3) Rent on the building being occupied can oe eliminated
since the government is not committed to a long tern
lease. All other costs are unavoidable.
VI. Guidelines for Contract Procedures, Language and Requirements
Unique to Governmental Contracts
I. Limitations on Contract Activities
r
A. Limitation of Indebtedness.
1. Constitutional prohibition against incurring
debts which exceed the income and revenue
for that year.
2. Purpose is to prevent creation of inordinate
debts that might be charged against taxpayers
in future years.
3. Only becomes a problem where procurement extends
into future years. Can be solved through the
use of a "funding out" clause.
Example:
"LIMITATION OF OBLIGATION FOR PAYMENT TO BE
HADE IN FUTURE YEARS."
The obligation is payable only and solely from
funds appropriated for the purpose of this
Agreement. All funds for payments after June
30th of the current fiscal year are subject to
the legislative appropriation for this purpose.
Payments during subsequent fiscal periods are
dependent upon the same action. In the event
this contract extends into succeeding fiscal
year periods, and if the governing body
appropriating the funds does not allocate
-9-
sufficient funds for the next succeeding fiscal
year's payments, then the affected equipment
and/or services shall be terminated as of June
3Uth or the then current fiscal yearlThe
government shall notify the contractor in
writing of such non-allocation at the earliest
possible date."
Civil Service Limitations
1. Civil Service System designed to protect
employees from "spoils system." Courts have
thus ruled that the government cannot hire
contractors to do government work if there are
currently public employees available to do the
work or it would be possible to hire such
employees within the time frame required.
2. however, local governments may adopt
legislation which permits contracting
notwithstanding the civil service limitations.
Check to determine local authority to contract
for purpose of attaining cost saving. If no
permissive legislation has been adopted see '
Sample - Model Ordinance. This can be adopted
after public vote authorizing contracting for
this purpose.
3. This legislative support is not required when:
(a) The service cannot be performed adequately
or competently or satisfactorily by civil
service employees and it is impossible to
recruit such personnel to perform such
service for the period of time such service
is needed.
(D) Authority to contract is expressly
provided by the statute.
(c) The service is of an extraordinary
professional or technical nature and the
services are of a temporary nature;
(d) The services are needed on a part-time
or intermittent basis; or
(e) The contract is for personal services to
provide an independent analysis,
evaluation, review and/or audit of an
existing or proposed project, function or
program and there is a need or contractual
-10-
obligation Co obtain an independent
analysis, evaluation, review and/or audit
of said project, function or program.
C. Bidders' Rights for Procurement Irregularities.
If one bidder is given unfair advantage over other
competitors, court may enjoin award and grant other
bidders damages:
1 . Cost of submitting bid.
2. Lost profits.
D. Special Requirements if State or Federal Grant
Funding is Involved.
1. Grant may require that certain provisions be
included in any contract.
2. State or Federal review and approval of the
proposed contract may be required.
3. Contractor must comply with State Labor Codes
regarding prevailing wages. See Section VIII.
VII. TYPES OF CONTRACTS
A. Fixed price
B. Time and Material
1. Time at $ per hour for various
classifications of labor.
2. Materials: Cost + %.
3. Must establish maximum amount of funds
authorized under contract. Contractor
not obligated to continue performance
once funds are exhausted. Require
contractor to notify when 85% spent.
C. Cost Plus Fixed Fee (CPFF)
Estimated Cost $
Fixed Fee $
Total $
-11-
Must establish uaxiiaun amount of funds
authorized under contract. Contractor not
obligated to continue performance once funds
are exhausted. Require contractor to notify
when 85% spent.
D. Price Considerations
Fixed Fee involves greatest risk for
contractor and usually justifies greater
r»T"r\ t* i f
1 .
profit
2. Tine and material and CPFF involve minimum
risk. Should negotiate for lower price.
VIII. NUTS AND BOLTS OF CONTRACTING PROCESS
A. Overview
1. Solicit bids.
2. Evaluate bids.
3. Negotiate price and terras.
4. Award contract.
B. Soliciting Bids
1. Prepare bid specifications (RFP/IFB) which
describe the work to be accomplished.
(a) Look at previous documents for similar
types of services.
(b) Hire consultant to assist.
(c) Strategy of including all the terms and
conditions you are interested in and
requiring bidders to indicate their
acceptance or rejection.
Bidders nore willing to accept them out
of fear of being put in competitive
disadvantage.
Once bidder knows he is tentatively
selected for the job he tends to resist
clauses which are unfavorable from the
bidder's standpoint.
-12-
37
(d) Bid specifications should set forth
evaluation criteria.
(e) Confidentiality of bids. Clause
requiring bidders to nark those
portionsof their bid that contain
proprietary/confidential information.
(f) Right to reject all bids without
incurring liability for bid preparation
costs.
2. Bidders Conference
(a) Useful procedure whereby all bidder's
questions can be handled expeditiously.
Require bidder to attend as condition
of Didding.
(b) Must keep very careful record of
questions asked and answers given.
(1) Require bidders to mail in
questions in advance.
(2) Require that all questions from
floor be written down and passed
up to Chairman.
(3) Tape record session.
(4) After conference, mail attendees
a transcript of questions and
answers.
(c) If a physical facility or equipment is
involved require attendance at a
walk-through inspection.
C. Evaluation of Bids
1. In accordance with criteria set forth in bid
specifications.
2. Draw on expertise from other departments
of government when appropriate.
-13-
3%
D. Negotiation of Price and Terns with Successful
Bidder
1. Price negotiations.
(a) Mistake to blindly accept price in
bid.
(b) Require bidders to break their prices
down. Comparison with other bids
may be tip off to padding of the
price in certain areas.
2. Negotiations of Terms and Conditions.
(a) Easiest way is to present bidder
with a draft of the proposed
contract.
(o) Consider areas of exposure arising
out of acts or omissions of the
Contractor.
(1) Unauthorized disclosure of
private information.
(2) Injury to person or property
while contractor personnel
are on public premises.
(3) Indemnification and Insurance
Requirements. See section on
insurance requirements.
(c) Consider special proolems that might
result from contractor's breach.
Design remedies to protect public.
E. Award of Contract
1. Coordinate final draft of contract with
legal counsel and obtain executive and
legislative approvals as necessary.
F. Except During Bidders Conference, Do Not Talk
to Bidders During Process
1. Opens you up to a claim of unfair
treatment. If you respond to a
communication from a bidder a copy of
correspondence fron bidder as well as a
copy of response should be sent to all
bidders.
-14-
3?
IX. CONTRACT ADI1INISTRATIQN
A. Establish periodic milestones.
B. Llonitor progress.
C. Approval of Invoice.
1. Monthly status reports from contractor.
2. Periodic meetings with contractor.
3. Develop checK lists for performance. Be sure
contractor as well as inspector knows what you
are looking at. Be sure the invoice is
approved indicating contract compliance by
field superior.
D. Keep careful records, particularly where
contractor's performance is in some manner
3ependent on the government's performance~of
related tasks.
E. Guard against unauthorized changes arising out of
the staff directing the contractor to do something
mat required by the contract. Hay constitute the
Fa's is for a claim by the contractor for additional
funds.*
X. General Insurance Requirements
To more accurately reflect the level of risk in each private
contractor presents, it is recommended that a policy be
estaDlished as follows -
All service and concession contracts require
contractor-furnished liability insurance which protects
*Legal information based on California law as researched
and developed by David L. Muir, Los Angeles County Deputy
Counsel.
-15-
Che public agency in an amount based on Che general
prograia category of che concracced accivicy, as follows:
Risk Categories
A - ($1,000,000 Coverage) Activity is inherently
high-risk, e.g. hang-gliding, horseback riding,
aircrafc operations, or involves feeding or care of
a number of individuals or minors. Damages can be
great due to severity of injury, number of persons
injured or made ill, or length of time an injured
condition can be expected to remain.
B - ($500,000 Coverage) Activity has identifiable risks,
DUC with lower probability of great governmental
damages, few persons involved, or shorter probable
injury duration.
C - ($300,000 Coverage) Activity has comparatively low
inherent risk, or slight probability of severe
injury. Usually consists primarily of office
visits by public. This is the lowest coverage
level recommended by insurance brokers. -
As these contracted operations and the attendant risks are
subject to minimal governmental control, it is important that
every contractor carry some liability insurance, (1) to
protect the governmental body, and (2) to assure that the
contractor and his insurer are involved in initial response co
claims and in the defense against them. In addition,
requiring contractors to furnish insurance make them meet
certain loss-prevention standards in their operations;
something that would be lost if government provided the total
insurance coverage.
The preuium for liability insurance is controlled chiefly by
the type, location and magnitude of the operation and the
claims/loss record of the contractor. However, as a basic
minimum premium is standard practice, some small contracts nay
have a relatively higher unit cost for insurance.
XI. Requirements for Contractor to Comply With
Prevailing Wage Scale /Employment of Apprentices
Provisions of the Labor Code
The contractor shall comply with all provisions of the state
-16-
and Federal Labor Code.
Under the provisions of said code, che Labor Department
ascertains the prevailing hourly rate in dollars and details
pertinent thereto for each craft or type of workman or
mechanic needed to execute any contract which may be
awarded, by geographic area.
The contractor must coraply with Section 1777.5* of the
Labor Code of the State of California, with respect to the
employment of apprentices.
Labor Code Section 1771 requires the payment of
prevailing wages to workmen under public works contracts:
"Except for public works projects of five hundred
dollars ($500) or less, not less than the general
prevailing rate of per diera wages for work of a
similar character in the locality in which the public
work is performed, and not less than the general
prevailing rate of per diera wages for holiday and
overtime work fixed as provided in this chapter, rshall be paid to all workmen employed on public works." -
"This section is applicable only to work performed
under contract, and is not applicable to work carried
out by a puolic agency with its own forces. This
section is applicable to contracts let for maintenance
work."
The requirement for the payment of prevailing wages is
also applicable to workmen employed by contractors or
subcontractors, pursuant to Section 1772:*
"Workmen employed by contractors or subcontractors in
the execution of any contract for public work are
deemed to be employed upon public work."
"Public works" are defined as follows, by Labor Code
Section 1720:*
"As used in this chapter "public works" means:
(a) Construction, alteration, demolition or repair
work done under contract and paid for in whole or
in part out of public funds, except work done
directly by any public utility company pursuant to
order of the Public Utilities Commission or other
public authority.
(b) Work done for irrigation, utility, reclamation
and improvement districts, and other districts of
-17-
this type. "Public work" shall not include the
operation of the irrigation or drainage system of
any-irrigation or reclamation district, except as
used in Section 1778* relating to retaining wages.
(c) Street, sewer or other improvement work done under
the direction and supervision or district thereof,
whether such political subdivision or district operates
under a freeholders's charter or not.
(d) The laying of carpet done under a building lease-
naincenance contract and paid for in whole or in part
out of public funds."
Overtime
Eight hours labor constitutes a legal day's work. Work
in excess thereof, or in excess of 40 hours during any one
week, shall be permitted only as authorized by Labor Code
Section 1815.*
Workers' Compensation
The contractor shall secure the payment of compensation
to his employees in compliance with Labor Code Section
3700*, and shall file with the government jurisdiction as a
condition precedent to the execution of the contract the
following signed certification:
"1 an aware of the provisions of Section 3700 of the
Labor Code*, which require every employer to be insured
against liability for Workers' Compensation or to undertake
self-insurance in accordance with the provisions of that
code, and I will comply with such provisions before
commencing of the work of this contract.
XII. Implementation Strategy
Following is a recommended strategy for implementation of the
contracting program including a number of key elements which
we believe will contribute to its success.
*Labor Code model for State of California.
-18-
A - Leadership from the Top
Assign che cask of developing and coordinating the
contracting program to a kcey high-level administrator, for
this activity at a high level in the organization will allow
for the diverse elements of the organization reponsible for
the development of specifications, personnel information, and
budget information to be effectively ccordinated. It is also
deemed important that authoritative direction be employed to
implement a program of this nature as resistance to its
implementation can be anticipated. It will also demonstrate
higft interest on the part of the Chief Executive Officer.
B - Task Force Approach
Effective implementation and management of this program
requires the input and cooperation of a number of key
organizational elements to succeed. These elements should be
identified and high-level representatives who have specific
responsibilities within the organization for the supervision
of these operations should be appointed to the task force. rThis technique provides a broad base for the delegation of
responsibilities for the success of the program and, in turn,
provides commitment for its success through their very
involvement. The task force should meet approximately every
ten working days, at which time the status of the various
projects can be reviewed to assure proper coordination and a
forum where new directions and programs for privatization can
be discussed.
C - Pilot Program
Develop a pilot approach to the contractual services
effort. Select examples of programs under consideration for
privatization and use them as pilots in order to lessen the
risk of substantive failure possible in large-scale programs.
This approach will also give management experience with the
various issues that arise in certain types of contracts. The
issues may then be dealt with in a more effective manner when
a program is introduced on a larger scale. Furthermore,
describing the program as a pilot program lessens resistance
because the risk of the possibility of failure is more
readily accepted.
Carefully select programs for privatization that are
easy to deliver and that can provide an early success
experience. During this initial period, avoid complex
projects.
-19-
D - Establishment of Specific Goals and Objectives
Specific goals and objectives should be established for
both short-range and long-range purposes. This provides a
better understanding of the necessity for the program and
identifies what would be expected from the various elements
of the organization for its implementation.
Achievable goals should be established within the
organization as to the number and dollar value of contracts
to be delivered to produce cost benefits. Personal
evaluation of the Departmental administrators should reflect
the degree to which they achieved the agreed-upon goals and
objectives.
E - Management by Objectives
A system should be set into place for each of the
contracts under consideration which establishes the tasks
that have to be performed, as well as the timetable for the
performance of each key element in the contracting process,
assigning the responsibility for the performance to specific*
individuals in the Department. In the event of a slippage in
the timetaole, immediate corrective action can be taken by
the appropriate task force member.
F - Motivation Efforts
Charts and visual aids can be prepared to reflect the
status of the program's goals and objectives and the
timetables. Reports can be circulated throughout the
organization on a regular basis to keep a focus on the
program and to show executive interest and concern in the
progress of the program.
A policy should be established that encourages managers
to engage in the programs by enhancing their managerial and
decision-making authority. This enhancement can be
accomplished by allowing the manager to retain the funds
saved in his or her budget for discretionary use in program
involvements, personnel promotions, or other important
organization priorities. At least the savings should be
retained by the department for use the following year as an
offset in case the department sustains a budget cut based on
an across-the-board percentage.
Adoption of a policy, such as departmental retention of
funds saved, could convince the affected managers and
employee organizations that public sector jobs which would
otherwise oe lost to forced attrition could thus be saved.
-20-
Needed funds to support promotions, deal with new public
priorities, and preserve the level of government service can
be raised by aggressively pursuing privatization.
Develop an employee recognition program to gain their
involvement and support by including the personnel who make
suggestions leading to savings through the implementation of
privatization. Rewards can be simple but meaningful, giving
recognition to the public employee. Rewards that are
meaningful to the employee's families, or "significant
other", such as tickets to a local theater or dinner out, are
valued and inexpensive.
G - Personnel Issues
Individual problems raised by employees who have been
affected by the program are to be given due consideration and
every effort made to accommodate the employee's needs without
unduly affecting the savings. In this manner, greater
acceptability will be achieved for the program and resistance
will be reduced. The problems which are most frequent are f
added travel time due to new distance to be traveled, change-
in hours, or, in cases where no vacancies are available in
prior classifications, changes in actual duties.
Sensitivity, good communication and caring are important to
the solution.
H - Affirmative Action Considerations
It can be expected that the functions being considered
for contracting out to the private sector will be for the
most part labor intensive. Being mindful of the fact that
the privatization program could adversely affect the
affirmative action commitments, as many of these position can
be expected to be filled by minority employees, an effort
should oe made to contact the various community development
contract agencies so that they might have the opportunity to
develop capabilities wnich would allow them to successfully
compete in the bidding process for the various functions
being considered for contracting. Also, contracts should
require successful bidder to give opportunity of first
refusal to displaced public employees.
I - Competition Model
An on-going element of a contract programs should be
developed. To allow measurement of in-house productivity effort
and of the cost benefits achieved by contracting. Based upon
-21-
this on-going review, decisions will be made as to the
benefits of continuing various contracts and as to areas in
which new contracting efforts should be made. A positive
incentive is provided for improving the productivity of the
various county forces, as well as the contractor's personnel,
by introducing the competitive element in assessing the
efficiency and effectiveness of parallel activities.
J - Contract Specifications. To determine savings
accurately, it is necessary to write proposals for levels of
service similar to those currently provided by public
employees. The temptation to achive optimum service levels
through contracting will increase costs and diminish savings.
Unless improvement is the goal, this temptation should be
overcome. Avoid also the temptation to write "insurance
policies" into the contract document to cover all
contingencies. This creates unnecessary expense that will
skew the results of the cost-benefit analysis.
Estaolish a format that allows for communication with
private contractors so that when various departments request
bids they can take into consideration contractors' needs, r
limitations, and problems. Prior knowledge of a contractors'-
needs can increase savings due to realistic bid requests.
In Los Angeles, for example, first bids on security services
provided no savings because the bid request required
contractors to purchase several pieces of expensive equipment
that the department already owned. Because the contract was
for only one year, bidders could not amortize those purchase
costs over several years. When the bid request was rewitten
to allow their use of existing equipment, the returned bid
assured a 45 percent savings.
It is suggested that a meeting be established with
potential bidders prior to issuing the RFP or IFB to
determine these facts to avoid problems in the bid process.
K - Federal Reimbursement Programs for Job Development
Activities.
It is proposed that the Department develop the RFP or
IFB with an additional information section advising the
prospective contractors of the possibility of their
involvement in the (JPTA) program which could provide them
with. 50 percent reimbursement of the salary which they pay to
the personnel employed in the project which are recruited
from existing local employment development pool, and advise
them of the benefits which could be derived in developing
their bid considering this subsidy as well as the possibility
of qualifying for other federal targeted assistance prograus
providing contractors hiring from this pool of unemployed.
-22-
Working.with the Employment Development Department can
enhance the bidding ability of contractors using this
resource..
-23-
ADMINISTRATORS INSTITUTE 1984
Presentation by
JAMES D. RUTH
PITFALLS OF COMMERCIAL FACILITIES IN PUBLIC PARKS
PARK & RECREATION PROFESSIONALS IN CALIFORNIA HAVE HISTORICALLY BEEN ON
THE CUTTING EDGE OF NEW AND INNOVATIVE APPROACHES TO SERVING PUBLIC
LEISURE NEEDS. WE HAVE DEMONSTRATED A TENACITY AND A RESILIENCY TO
DEALING WITH LIMITED RESOURCES AND INCREASED PUBLIC DEMANDS FOR GREATER
QUANTITY AND QUALITY OF PUBLIC SERVICES.
WE HAVE EVOLVED INTO A POSITION OF PROMINENCE AND IMPORTANCE IN A f
SOCIETY THAT HAS BEEN TRANSFORMED FROM AN AGRARIAN TO AN INDUSTRIAL TO
AN INFORMATION SOCIETY. CALIFORNIA IS REFERRED TO AS THE "SUN BELT" OR
"GROWTH" STATE AND WILL EXPERIENCE CONTINUED GROWTH IN JOBS AND HOUSING
AS OUR TECHNOLOGICAL ECONOMY FLOURISHES.
WE WILL SEE A SHIFT FROM INFRASTRUCTURE TO QUALITY-OF-LIFE EMPHASIS,
CENTRALIZATION TO DECENTRALIZATION, AND GREATER CITIZEN PARTICIPATION IN
OUR DECISION-MAKING PROCESSES, WITH OUR ROLE AS ADMINISTRATORS CHANGING
TO A FACILITATIVE ROLE.
WE WILL EXPERIENCE A CULTURAL RENAISSANCE AS TECHNOLOGY PROVIDES
OPPORTUNITIES FOR GREATER LEISURE CHOICES. CHANGE WILL BE CONSTANT, AND
COMMUNICATION WILL BE FASTER AND EASIER WITH INFORMATION TRANSMITTED AT
THE SPEED OF LIGHT.
INFORMATION IS POWER; WITH GREATER POWER GOING TO THE COMMUNITY, THERE
WILL BE LESS CENTRALIZED DECISION MAKING. OUR CITIZENRY WILL BE PLACING
GREATER EMPHASIS ON A RETURN ON THEIR INVESTMENT, PARTICULARLY IN
QUALITY-OF-LIFE ISSUES. WE WILL DEVISE NEW WAYS OF USING LAND --
EXHIBIT 2
PARTICULARLY FOR HOUSING -- CONTROLLED GROWTH, ENVIRONMENTAL AND ENERGY
ISSUES.
ECONOMIC AND SOCIAL STABILITY WILL DEPEND ON THE QUALITY OF LIFE
PROVIDED, AND IF IT IS NOT AVAILABLE, CITIZENS WILL RELOCATE WHERE THEY
CAN ACHIEVE THIS EXPERIENCE.
JOHN GALSWORTHY ONCE SAID, "IF YOU DON'T THINK ABOUT THE FUTURE, YOU
CAN'T HAVE ONE."
HOW DOES THIS RELATE TO PARKS & RECREATION?
CALIFORNIA HAS DEMONSTRATED ITS RESOURCEFULNESS AND CREATIVITY IN
DEALING WITH PROP. 13, THE RECESSION, AND OUR STATE'S FISCAL INSOLVENCY.
WE HAVE CARVED OUT NEW WAYS OF DELIVERING PUBLIC SERVICES, AND HAVE r
JOINED IN PARTNERSHIP WITH THE PRIVATE SECTOR TO SUSTAIN AND IN SOME
INSTANCES ENHANCE OUR PUBLIC PARK AND RECREATION SERVICES.
WHILE MANY OF THESE APPROACHES HAVE BEEN VERY SUCCESSFUL, PUBLIC
AGENCIES SHOULD BE MADE AWARE OF SOME OF THE PITFALLS IN THESE
ENTERPRISING RELATIONSHIPS. JOE HAS PROVIDED SOME VERY PERSUASIVE
ARGUMENTS ON PRIVATIZATION, BUT LET ME SUGGEST THE FOLLOWING PRECAUTIONS
BEFORE YOU JUMP INTO ONE OF THESE VENTURES:
THE KEY TO SUCCESSFUL JOINT VENTURES WITH THE PRIVATE SECTOR WILL BE IN
THE QUALITY AND THOROUGHNESS OF THE CONTRACT THAT YOU ENTER INTO. IT IS
AMAZING THE LACK OF SOPHISTICATION THAT MANY OF OUR AGENCIES HAVE
DEMONSTRATED IN DEVELOPING VAGUE AND AMBIGUOUS AGREEMENTS THAT OFFER
LITTLE PROTECTION AND GENERALLY FAIL TO CONSIDER LONG-RANGE
RAMIFICATIONS OF SUCH RELATIONSHIPS.
THE INSTALLATION OF COMMERCIAL FACILITIES IN OUR PARKS CAN CREATE SOME
MANAGEMENT NIGHTMARES IF PROPER CONTROLS ARE NOT CLEARLY DELINEATED IN
YOUR AGREEMENT:
- 2 -
1. THE TERM OF THE AGREEMENT SHOULD BE SUFFICIENT TO ALLOW FOR
REASONABLE AMORTIZATION, BUT NOT SO LONG AS TO BUILD IN COMPLACENCY
BY THE ENTREPRENEUR.
A. COMPETITIVE COMPETITION WILL HAVE A VERY POSITIVE IMPACT ON
THE QUANTITY AND QUALITY OF THE SERVICE PROVIDED.
B. ONE OF THE REAL PITFALLS OF COMMERCIAL VENTURES IN OUR PARKS
IS THE SIGNIFICANT AMOUNT OF CAPITAL INVESTED BY THE PRIVATE
SECTOR, WHICH MAKES IT EXTREMELY DIFFICULT TO BUY THEM OUT IF
THEY DON'T PERFORM.
2. A SECOND MAJOR DRAWBACK TO COMMERCIAL INSTALLATIONS IN OUR PARKS IS
THE PERCEPTION OF THE PUBLIC THAT THE PARKS AND ALL THEIR ENTITIES
ARE PUBLIC PROPERTY; THEREFORE, IF THE COMMERCIAL VENTURE DEVELOPS
OR CREATES PROBLEMS, THE PARK & RECREATION DEPARTMENT WILL BE HELD
ACCOUNTABLE. POLITICIANS QUICKLY FORGET THE BENEFITS OF THE -
VENTURE WHEN THERE IS A PUBLIC OUTCRY RELATIVE TO ITS
MISMANAGEMENT.
3. A THIRD AREA OF MAJOR CONCERN IS THE DEVELOPMENT OF CLEAR-CUT, EASY
TO INTERPRET STANDARDS OF PERFORMANCE FOR THE CONTRACTOR. THE
PUBLIC AGENCY MUST SET FORTH IN THE AGREEMENT THEIR EXPECTATIONS
OF:
1) MAINTENANCE - UPKEEP - PREVENTATIVE
2) QUALITY & DECOR OF CONSTRUCTION
3) SAFETY
4) SUPERVISION - QUALIFICATIONS & EXPERIENCE OF
PERSONNEL
5) DRESS STANDARDS
6) RESOLUTION OF CONFLICTS - ARBITRATION PROCEDURE
7) REPORTS - FREQUENCY - PROPER FORMAT
8) AUDITS - RIGHT TO ENTER
a) NEED TO SPELL OUT WHAT ARE ACCEPTABLE OPERATING
COSTS & WHAT EXPENSES WILL NOT BE ALLOWED
b) FREQUENCY OF AUDITS - INFORMATION REQUIRED TO
PROVIDE '
- 3 -
57
9) WHAT REPRESENTS REASONABLE WEAR AND TEAR?
10) ADVERTISING STANDARDS - PARTICULARLY AS THEY RELATE
TO SIGNS IN THE PARK, AS WELL AS DIRECTIONAL
11) WHO ,-AYS FOR UTILITIES?
12) WHO PAYS FOR VANDALISM AND POLICE PATROL?
4. A FOURTH AREA OF CONCERN RELATES TO CHANGING COMMUNITY NEEDS AND
THE POTENTIAL PROBLEM OF TYING UP A PRIME PIECE OF PUBLIC PARK
PROPERTY FOR AN EXTENDED PERIOD OF TIME FOR A FACILITY THAT MAY NOT
BE RESPONSIVE TO THESE CHANGES, WHETHER THEY BE CULTURAL OR
DEMOGRAPHIC.
5. ANOTHER MAJOR CONCERN WITH THE COMMERCIAL FACILITIES IN OUR PARKS
IS THE CONTROL OVER ANY FEES CHARGED. THE AGENCY MUST PROTECT THE
PUBLIC INTEREST, AND IN DOING SO, YOU MUST CLEARLY SPELL OUT UNDER?
WHAT TERMS AND CONDITIONS YOU WILL ALLOW A FEE INCREASE AND HOW
THESE REQUESTS ARE TO BE MADE PROCEDURALLY.
USUALLY, THESE INCREASES ARE BASED ON THE CPI OR COMPARABLE
FACILITIES OPERATED EITHER IN THE PRIVATE OR PUBLIC SECTOR.
THE CITIZENS SHOULD RECEIVE A VALUE FOR THE USE OF PUBLIC LAND, AND
THAT VALUE SHOULD BE IN REDUCED FEES COMPARED TO OTHER PRIVATE
OPERATIONS.
6. FIND OUT WHO IS MAKING THE INVESTMENT IN YOUR PARK. DO THEY HAVE
ANY SILENT PARTNERS? WHERE IS THE CAPITAL COMING FROM? DO A DUNN
& BRADSTREET ON THEM, AS WELL AS A THOROUGH BACKGROUND CHECK BY
YOUR POLICE DEPARTMENT.
MAKE SURE YOU CONTROL THE RIGHT TO APPROVE ANY SUBLETTING OF YOUR
LEASE OR AGREEMENT.
- 4 -
7. MAKE SURE THAT THE CONTRACTOR OR LESSEE IS PROPERLY BONDED AND THAT
THE BOND IS SUFFICIENT TO COVER THE WORK SHOULD YOUR INVESTOR GO
BELLY-UP!
8. MAKE SURE YOUR CONTRACTOR IS PROPERLY INSURED WITH PRESCRIBED
AMOUNTS OF LIABILITY COVERAGE DETERMINED BY YOUR CITY ATTORNEY AND
THAT THE POLICY HOLDS THE CITY HARMLESS. GET A COPY OF THE
INSURANCE CERTIFICATE AND MAKE SURE THAT ALL CONSTRUCTION CONFORMS
TO CITY CODE AND IS PROPERLY INSPECTED.
9. CONSIDER THE IMPACT OF THE COMMERCIAL DEVELOPMENT ON THE REST OF
THE PARK. WILL IT GENERATE MORE TRAFFIC? GREATER MAINTENANCE?
EXCESSIVE NOISE? WHO CONTROLS THE HOURS OF OPERATION?
BYPASSING THE VOTERS ON A MAJOR IMPROVEMENT PROJECT CAN GENERATE f
PUBLIC OPPOSITION, WHILE PRIVATE SECTOR ATTITUDES TOWARD THE PUBLIC
CAN ALSO CREATE PUBLIC-OPPOSITION TO YOUR PROJECT.
10. SUCCESS CRITERIA:
CHECK LEGAL RESTRICTIONS - ORDINANCES, DEEDS
CHECK UNION CONTRACTS OR EMPLOYEE AGREEMENTS
MAKE SURE OF POLITICAL SUPPORT
MAKE SURE PROJECT IS COST EFFECTIVE
CONSIDER THE COMMUNITY'S RECEPTIVITY
HAVE YOU CONSIDERED OTHER ALTERNATIVES?
WHEN YOU ARE COMPARING YOUR COST ANALYSIS, BE SURE YOU
ARE COMPARING APPLES WITH APPLES
THE CONTRACT MUST BE GOOD FOR BOTH PARTIES
11. PROTECTION
1) TIGHT SPECIFICATIONS
2) IDENTIFY LEVEL OF SERVICE
3) COMPETITIVE BIDDING
4) REQUIRE A CERTIFIED PAYROLL (AUDIT AUTHORIZATION)
5) REQUIRE THAT PREVAILING WAGES BE PAID
- 5 -
53)
6) REQUIRE CONTRACTOR TO CARRY WORKERS COMPENSATION
CONCLUSION
IN CONCLUSION, THERE ARE CERTAINLY SOME STRONG AND VALID REASONS FOR
INVOLVING THE PRIVATE SECTOR IN DEVELOPING COMMERCIAL RECREATION
FACILITIES IN OUR PARKS. THE PITFALLS I'VE IDENTIFIED, MANY OF WHICH
CAN BE SUPPORTED BY ACTUAL CASE STUDIES, SHOULD BE GIVEN CAREFUL REVIEW
AND CONSIDERATION BY EACH OF YOU AS YOU EXPLORE AND PURSUE THESE
COOPERATIVE VENTURES.
I WOULD CAUTION EACH OF YOU THAT, WHILE MANY OF THESE PARTNERSHIPS ARE
VERY ENTICIING, YOU SHOULD GO THROUGH A VERY THOROUGH PROCESS, EXPLORE
ALL ALTERNATIVES, AND CERTAINLY ENCOURAGE WIDE-OPEN PARTICIPATION
THROUGH COMPETITIVE BIDDING TO PROVIDE OPTIMUM ASSURANCE THAT YOU ARE !
GETTING THE MOST "BANG" FOR YOUR "BUCK" AND AFFORDING MAXIMUM PROTECTION
TO YOUR DEPARTMENT AND THE COMMUNITY.
JDR:lcv
- 6 -
5V
PARK & RECREATION COMMISSION - AGENDA BILL
h-U
(A(A
Ou
ARtf 588-7
MTG 5/16/88
nPPT P & R
TITLE:
CAR SHOWS WITHIN PARK FACILITIES
DEPT. HD.
CITY ATTY
CITY MGR.
RECOMMENDED ACTION: ^ ^ r»
Commission request staff to adopt a department policy of not allowing car
shows on any park or turfed areas.
ITEM EXPLANATION
At the April Parks and Recreation commission meeting staff was requested to
investigate the status of car shows at Holiday Park. It has been determined
that car shows have taken place at Holiday Park for the past several years.
The number of car exhibits has varied from 0 to 2 per year.
The Parks Division recommends car shows not take place at Holiday or other
turfed/picnic park sites for the following reasons:
1. The vehicles could take up a major portion of the park turf and limit
other uses.
2. Vehicles driven over turf cause maintenance problem.
A. Soil compaction
B. Rutted turf
C. Irrigation damage
D. Oil spills
3. No other cities surveyed allow car shows in city parks
4. Allowing car shows at Parks could create a large demand and set a
precedent of usage.
Alternatives
1. Allow car shows at Safety Center on D.G. parking area.
2. Allow car shows at library parking lot (with library permission) on
Sundays.
3. Allow car shows at turfed parking area adjacent to pool (with school
district approval).
4 Allow only two car shows per year at Holiday Park specifically between
the months of May and October with a deposit of five hundred dollars
($500), of which two hundred fifty dollars ($250) shall be non-
refundable.
FISCAL IMPACT
If car shows are not allowed at park sites there will be no fiscal impact.
Allowing car shows could have a maintenance impact of zero ($0) to five
hundred dollars ($500) per event depending on each situation.
PARK & RECREATION COMMISSION - AGENDA BILL
AR* 588-8
MTG 5/16/88
nFPT P & R
TITLE-M ' W TRAFFIC CIRCULATION REPORT
STAGECOACH PARK
DEPT. HD.
CITY ATTY
CITY MGR.
RECOMMENDED ACTION:
Staff recommends that the Stagecoach Community Center parking
lot circulation be left as is, however staff proposes that
pavement arrows to delineate travel direction be added.
ITEM EXPLANATION;
Parks and Recreation staff was directed to review the
Stagecoach Central parking lot for circulation. During peak
use times there has been traffic conjestion while patrons
load and unload. It was suggested that one way traffic
circulation be implemented.
The Traffic Engineer was requested to review the problems and
provide staff with options to relieve the traffic problem.
The attached Traffic Engineer Report recommends not to
incorporate unidirectional (one way) traffic flow for the
subject parking lot. He recommends to leave the parking lot
as is, but add pavement arrows to delineate travel direction.
FISCAL IMPACT
Incorporating directional arrows in the Stagecoach parking lot
is estimated to cost two hundred to five hundred dollars ($200
- $500) .
EXHIBIT
Memo from Principal Civil Engineer - April 29, 1988
Memo to Traffic Engineering - April 8, 1988
(r
. \,••-.>.t-i
Vt-
--
zo
HU
Zo
Ou
ur.v-
s,-*
WRITE IT - DON'T SAY IT!
Date April 8, 1988
To Bob Johnson, Traffic Engineer E Reply Wanted
From Dave Millikan, Recreation Supervisor DNo Reply Necessary
Request an additional survey be done on the traffic flow at Stagecoach
Community Park. Parks and Recreation Commissioner, Barbara Donovan,
recently expressed her concerns about the parking lot in front of the
Recreation Center. She strongly feels the lot should be one way, which
would eliminate most of the traffic jams during peak load time and
improve the safety for patrons. Please send a copy of your survey
results and action to be taken to Dave Bradstreet.
cc Dave Bradstreet, Parks and Recreation Director
Ken Price, Principal Recreation Supervisor
^f~f? j?"vr •' '. •
DM:sv V • ' '^
AIQNER FORM NO. 5WJ32 PRINTED IN USA
RECENEC ^: 2 2 'j3B
MEMORANDUM
April 29, 1988
TO: PARKS AND RECREATION DIRECTOR
FROM: PRINCIPAL CIVIL ENGINEER - TRAFFIC ENGINEERING DIVISION
PARKING LOT AT STAGECOACH PARK
As requested, I have reviewed the onsite circulation in the parking lot located
immediately east of the gymnasium. Per the attached memorandum, it has been suggested
that a one-way circulation pattern in the parking lot would eliminate some of the
congestion that occurs at peak use times. Unfortunately, this assumption is not
correct and staff cannot recommend a unidirectional (one-way) flow of traffic for
the parking lot.
It is my understanding that concern is centered around the passenger loading/unloading
that results at the main entrance to the gymnasium in conjunction with park users
circulating in their vehicles through the parking lot. One readily apparent disad-
vantage of a one-way circulation pattern is that it would require all vehicles to
drive past the constriction point that is the subject of this memo. As a result,
congestion would be further compounded and potential hazards to pedestrians would
remain as a greater number of vehicles would be forced to drive through the location
that is, on occasion, congested.
The parking lot as designed and constructed is not conducive to one-way travel. An
excessive number of signs and pavement markings would be necessary to convey the
message to drivers that they must adhere to a one-way travel pattern. In my opinion,
limited success in educating the park users to a one-way travel pattern would result,
the same problems would remain and frustration with the existing conditions would
further increase.
A field review was conducted to determine why this parking lot has constriction
points that result in the problems encountered. Aisle widths in the parking lot for
two-way travel vary between 24.5' and 25', a very acceptable width. However, the
landscaped islands on both ends of the east-west tending longitudinal raised median
are very poorly designed for efficient traffic circulation. There is not sufficient
width for the passenger loading/unloading zone at the white curb next to the gymnasium
and two-way travel in the driving aisle.
From observing the drivers it can be concluded that vehicles are forced to "swing-
wide" as they complete their turn around the end island. This is due to a combination
of superelevated pavement, median nose geometries, visual dynamics, ultimate desti-
nation and in some cases, excessive speed. Some of the problems can be minimized if
both medians were reconstructed. The reconstruction could result in a narrower
median to provide a slightly wider driving aisle, parabolic flared median nose to
improve the turning radius, and shorter median length so that the point of beginning
each turn is not started out of direction. Several pavement arrows to indicate
travel direction would help, but not eliminate the problems that are occurring.
Parks and Recreation Director
Parking Lot at Stagecoach Park
April 29, 1988 Page: 3
3. Add additional outdoor lighting in the parking lot at the gymnasium entrance.
This will help to provide visibility of vehicles and pedestrians in the
congested area during peak use at night.
4. Redesign the 90 degree parking at the gymnasium entrance to provide sufficient
room for a passenger loading/unloading zone adjacent to the curb and allow
two-way travel. This would require a minimum of 32' (preferably 36') of
pavement width. The island would have to be relocated and parking spaces
removed. Some additional spaces could be acquired if the trash dumpster
area were converted to parking.
5. Design a one-way parking lot with angled parking. Counter-clockwise travel
would be desirable so that passengers are unloaded at the curb on the correct
side. A "Y" shaped entrance to the parking lot would be necessary to delineate
the correct travel pattern. As stated previously, the number of available
parking spaces would be reduced from the present 125 parking spaces.
If you have any questions, please feel free to give me a call to discuss this matter.
JO. l^rH-
ROBERT T. JOHNSON, JR., P.E.
Principal Civil Engineer
RTJ:rp
c: City Manager
Community Development Director
City Engineer
Ken Price, Principal Recreation Supervisor
Dave Millikan, Recreation Supervisor
Parks and Recreation Director
Parking Lot at Stagecoach Park
April 29, 1988 Page: 2
To have a better understanding of parking lots and design, it is important to have
some knowledge of the geometries and other factors associated with the layout. As
you are aware, a parking lot serving a recreational facility is designed to maximize
the number of available parking spaces. It is also desirable to minimize motorist
travel discomfort when parking, leaving a parking space or driving within the parking
lot. Park use does not usually result in a high turnover of parking spaces. That is,
once parked, the user tends to stay at the facility for an extended period of time,
hence the need for the maximum number of parking spaces.
In general, for a rectangular shaped parking lot, the most efficient parking angle
is 90 degrees, in that this angle provides the optimum number of spaces. It is, of
course, desirable to strike a balance between maximization of parking capacity,
maneuverability, parking lot circulation and safety.
Angle parking almost always has unidirectional flow which reduces the number of
parking spaces provided. This must be weighed against the primary disadvantage of
90 degree parking with two-way travel in the aisles that are double-loaded. This
disadvantage is that only left turns into a parking space can be executed within the
associated dimension. Half of the time a motorist will encounter available spaces to
the right of the vehicle that they cannot properly enter but will attempt to anyway.
When this occurs some delay is experienced and improper entry sometimes leads to
spillover into adjacent stalls, further reducing the number of available parking
spaces.
With the understanding that parking angles other than 90 degrees at this location
will result in fewer spaces than are currently available, it appears that several
questions remain to be addressed.
1. What is the primary concern (problem) to be resolved?
Maximum number of parking spaces, motorist convenience, potential safety
conflicts, adequate circulation and maneuverability.
2. What trade-offs are acceptable?
A more efficient parking lot layout can definitely be designed with fewer
parking spaces.
In summary, the following options appear viable:
1. Leave the parking lot as is, but add pavement arrows to delineate travel
direction. This will help but not eliminate the concern expressed.
2. Redesign and rebuild the end medians to improve the turning radius. Again
this will help but will not eliminate the expressed concern.
April 18, 1988 RECEIVED APH 1 S 1988
TO: MAYOR LEWIS
MAYOR PRO TEM KULCHIN
COUNCILMEMBER LARSON
COUNCILMEMBER MAMAUX
COUNCILMEMBER PETTINE
FROM: Senior Management Analyst, R/AG
SUMMARY REPORT OF MARCH 31, 1988 SISTER CITY STEERING COMMITTEE (SCSC) MEETING
Fifteen public and private organizations were represented at the first SCSC
meeting.
1. Mayor Lewis introduced the first chairperson of the SCSC, Carman Cedola.
Mr. Cedola is the Vice President and Manager of the North San Diego
County office of Union Bank and is an active member of the Chamber of
Commerce and the Carlsbad Economic Enhancement Council.
2. The SCSC unanimously adopted the following mission statement:
Promote a greater understanding and respect between the
citizens of Carlsbad and its Sister City, Futtsu, Japan by
enriching the cultural and economic resources of each
city.
3. The SCSC unanimously adopted five strategies to fulfill the above
mission.
4. Seven standing sub-committees (executive, membership, fundraising,
finance, publicity, economic development and cultural development) were
approved and organized.
5. The sub-committees were directed to meet individually and report back to
the full SCSC at the next meeting.
The next meeting is scheduled for Thursday, April 21, 1988 at 4:00 p.m. in the
Public Safety & Service Center.
GRAfct MANUES
c: City Manager
Assistant City Manager
Department Heads
APRIL 21, 1988 c ,0«,
RECEIVED A??- - ° ^
TO: MAYOR
CITY COUNCIL
CITY MANAGER
DEPARTMENT HEADS
FROM: REDEVELOPMENT OFFICE
SUMMARY OF DESIGN REVIEW BOARD MEETING OF APRIL 20, 1988
ITEM 1: RP 88-1/CDP 88-4 - LUBIN
Board continued item to meeting of May 4, 1988,
with the exception that condition #14 be done
immediately. This condition requires that
electrical service meet current adopted codes and
needs to be done because the applicant is currently
using the building.
ITEM 2. SENIOR CITIZENS CENTER
Board commented that since Redevelopment Funds are
being used, design of the building should be given
the same architectural analysis as would be
required of a private developer.
ITEM 3. REDEVELOPMENT SUBAREAS
Item continued to meeting of May 4, 1988.
PATRICIA A. CRATTY
PAC:ec
APRIL 22, 1988
TO: MAYOR LEWIS
MAYOR PRO TEM KULCHINranivjit en\j ±c,n nu.LA.nxn Or~r^r-
COUNCILMEMBER LARSON K&CEIVEQ £pD 2 ft
COUNCILMEMBER MAMAUX
COUNCILMEMBER PETTINE
FROM: Planning Director
SUMMARY REPORT OF APRIL 20, 1988 PLANNING COMMISSION MEETING
Commissioners McFadden and Holmes were absent.
1. At staff request the Commission voted 5-0 to continue the
item concerning grading mitigation for the Batiquitos Lagoon
Educational Park to May 18.
2. CUP 88-6 for Fire Station No. 5 was approved 5-0.
Commissioners questioned the location of the driveway. The
architect explained that this location was selected because
of optimum site distance for traffic from converging
streets.
3. The Commission voted 5-0 to amend the Zoning Ordinance to
allow more than one satellite television antenna per use in
certain zones, with a CUP.
4. By a 5-0 vote the Commission approved the recommended Zone
Code Amendment to amend the Zoning Ordinance to delete
chapters which are no longer relevant, which deal with R-
3L, RD-H and C-LR Zones.
5. A request for the construction of an additional 10,070 sq.
ft. automobile showroom and sales office for Hoehn Motors on
Paseo del Norte was unanimously approved (5-0).
6. The request for an extension of CUP-246 (Western Bankers) to
allow development of a mini-warehouse adjacent to an
approved office project was continued to May 18.
MICHAEL J. HOLZMILLER
Planning Director
arb
c: City Manager
Assistant City Manager
Department Heads
April 26, 1988 DECEIVED APR 2 8 <~•Jw
TO: MAYOR
CITY COUNCIL
CITY MANAGER
DEPARTMENT HEADS
FROM: Senior Management Analyst, R/AG
SUMMARY OF SISTER CITY STEERING COMMITTEE MEETING OF APRIL 21, 1988
1. The committee elected the following officers:
Vice Chairman - Mayor Lewis
Treasurer - Chuck White (President, Pea Soup Andersen's)
Secretary - Grace Manues
The first Chairman, Carman Cedola, was appointed by Mayor Lewis.
2. La Costa Hotel & Spa will be invited to join the SCSC as they would be a
beneficial and natural addition to the committee.
3. The six sub-committees (Cultural Development, Economic Development,
Publicity, Membership, Fundraising and Finance) reported on their
progress. Near term goals of these sub-committees include: Children's
Art Exchange, Photo Contest (Day in the Life of ... genre), Booth at Fall
Village Faire, Kick-Off Fundraising Dinner, creating support network for
future economic exchanges, issuing news releases to keep the public
informed and fundraising, fundraising, fundraising.
4. The SCSC will take advantage of the Chamber/CEEC's booth at the Spring
Village Faire (May 1) and distribute hand-outs on the Sister City
Program.
5. The committee decided it would meet the third Thursday of every month for
the first six months in order to maintain the momentum of this new group.
RACE MANUES
APRIL 26, 1988
TO: COUNCIL MEMBERS
FROM: Planning Director
RECEIVED Af" 2 £ £:
SUMMARY REPORT OF APRIL 18, 1988 MEETING OF CITIZENS
COMMITTEE TO STUDY GROWTH
1. Staff made a presentation on City actions which have
been taken since the Land Use Element Review. A status
report on the Growth Management Program was also
provided. No action was taken by committee.
2. The committee elected Bud Schlehuber as chairman. It
was decided that a vice-chair would not be elected until
a full committee was present.
3. The committee decided to hold its meeting once a month
on the fourth Monday of the month from 5:00-7:00 P.M.
The next meeting would be May 23, 1988.
4. The committee discussed its charge and function. No
formal decisions were made. The committee requested
staff to make presentations on population and on
circulation at the next meeting.
arb
MICHAEL J. HOLZMILLER
cc: Dept. Heads
3, 1988 RECEIVED ; •!;:: 3 TO e
TO: MAYOR LEWIS
COUNCIL MEMBER KULCHIN
COUNCIL MEMBER LARSON
COUNCIL MEMBER MAMAUX
COUNCIL MEMBER PETTINE
FROM: Library Director
SUMMARY REPORT OF 4/27/88 LIBRARY BOARD MEETING
1. Library Board reviewed and discussed the new Boards, Commis-
sions and Committees Handbook.
2. Library Board reviewed the proposed planning calendar for
the implementation of SB181, the Library Construction and
Renovation Bond Act of 1988. The state librarian's schedule
indicates a three-year cycle for applications.
3. Library Board reviewed the proposed unattended children policy
and returned the draft to staff for further refinement.
4. Library Board reviewed and discussed the library's distribution
of state and federal tax forms.
5. Library Board reviewed the draft library mission statement
and suggested further refinement.
6. Library Board listened to a brief report on the library's
Adult Learning Program by Lynda Jones and reviewed the portion
of ABC News 20/20 program which contained a story on the
program's adult learner, John Corcoran.
7. Library Board reviewed and discussed the library's third
quarter report.
. LANGE
c: City Manager
Assistant City Manager
Department Heads
April 27, 1988 RECEIVED APi; 2
TO: MAYOR
COUNCIL MEMBERS
CITY MANAGER
DEPARTMENT HEADS
FROM: REDEVELOPMENT OFFICE
SUMMARY OF HOUSING AND REDEVELOPMENT ADVISORY COMMITTEE
MEETING HELD APRIL 25, 1988
ITEM 1: CERTIFICATES OF APPRECIATION
Certificate was presented to former Member Morales;
former Members Clark and Guilford were unable to
attend .
ITEM 2: SUB-COMMITTEES
Committee members submitted, in writing, their
choices of sub-committees. These will be reviewed
by Chairperson Hayes and the Housing and
Redevelopment Director for presentation to the full
Committee at the May 23rd meeting.
ITEM 3: INVITATION TO FORMER MEMBERS
Committee determined that former members should be
invited to attend the regular meeting of May 23,
1988. A slide show of "before and after" will be
presented.
ITEM 4: REPLACEMENT OP TREES
Committee recommended that the Parks Department use
24" box trees to replace trees removed in the
tree/sidewalk replacement program instead of the 15
gallon size normally used. The additional cost of
$4,000 for the larger size will be paid by
Redevelopment. Work will start the week of May 8.
Committee reaffirmed the Redevelopment Department
Goals with the Committee to add to and complete
their goals in no later than three (3) months.
ITEM 6: DESIGN REVIEW BOARD
Committee recommended that members Rombotis and
McCoy be re-appointed to Design Review Board.
ITEM 7: v^^fACTg I. p. SIGNS/LOCATOR MAP
Member Norby presented a sample of the proposed
sign/map stating that permanent signs will be
carved wood. Signs will be incorporated into the
Streetscape.
ITEM 8:
ITEM 9:
ITEM 10:
ITEM 11:
ITEM 12:
ITEM 13
ITEM 14
ITEM 15
ITEM 16
ITEM 17
NEW YORK SLIDE PRESENTATION
Item was continued to meeting of May 23, 1988.
STREET STANDARDS
Committee accepted street standards and design
criteria for informational purposes.
NEWS
No action
ADVISORY COMMITTEE VACANCIES
Committee noted that there are two (2) vacancies
that must be filled by participants of the Housing
Program. Three applications will go to Council in
May.
SIDEWALK ORDINANCE/TEMPORARY SIGNS
Committee requested that regulations for outside
eating establishments and signs in the right-of-way
be discussed at the May 23, meeting. Chairperson
Hayes said she had received complaints about these
items .
BOYS AN" fiTPT.fi CLUB POOL ENCLOSURE
Committee requested that the Oak Street Improvement
project be added to the current CDBG project
listing since funds were re-appropriated to the
Boys and Girls Club Pool Enclosure.
COMMISSIONERS HANDBOOK
No action
DESIGN REVIEW BOARD UPDATE
Commissioner Rombotis updated Committee on Design
Review Board activities .
MARCH ACTIVITY REPORT
No action
MCommittee agreed to hold a special meeting May 9,
1988, to review CDBG project proposals and to hold
the regular meeting on May 23. Items for May 23
meeting include: Senior Citizens Center; Maxton
Brown Park/Nature Center connection; Former
Members/Slide Presentation; New York Slide
Presentation .
TTY