Loading...
HomeMy WebLinkAbout1967-09-08; Planning Commission; Minutes'I ! CITY OF CARLSBBD I 1 I 1 - : Minutes of: PLANNING COMMISSION (. ,ourneh i Date of Meeting. September 8, 1967 ,, I 2:OO P. M. ; Time of Meeting: * : Place of Meeting: Council Chambers I I i PRESENT were Commissioners Smith, m, : Palmateer and Jose. Also present were Planning : Director Schoell, Assistant City Planner Johnston i and City Engineer Lill. Commissioners Sutherland i Little and Voorheis were absent. 1 ~~""~"""""""""""-"""""""*~"""""-""""""""*"-~- I I i MR. D. K. SPEER, San Diego County Engineer, was : the hearing officer at the public hearing held by the County of San Diego, County Engineer Depart- ! ment to discuss the proposed improvement of El Camino Real between San Marcos Road in Encinitas i and Chestnut Avenue in Carlsbad. I MR. SPEER made a presentation of the proposed im-i i provement which will rebuild the existing road : surface and widen it to four lanes, with minor i : realignments. Construction is planned for 1969- ; 70, by which time this improvement will be needed! : It will function as the connecting link between a: reconstructed road, going north from Chestnut Ave.! I and a four-lane road on the existing San Marcos : i Road alignment connecting El Camino Real with : Interstate 5. The length of this improvement is ; approximately 10 miles. The project will be I I : financed jointly by the City of Carlsbad, the I i County, the State, and the U. S. Government. i ADJOURNMENT: i The meeting was adjourned at 3:OO P. M. i Respectfully submitted, I I I r I I I I I I I 1 I I I I I * I I I I I I 9 I I : DONALD SCHOELL i Planning Director I i b. D * * I I' I I I .a I I I I I' I I *