HomeMy WebLinkAbout1983-08-01; Traffic Safety Commission; MinutesMINUTES
Meeting of: TRAFFIC SAFETY COMMISSION
Time of Meeti g: Date of Meeting: August 1, 1983
Place of Meeting: Council Chambers COMMISSIONERS \
3:OO p.m.
CALL To ORDER:
The meeting was called to order by Chairman Punches at
3:04 p,m.
A. ROLL CALL:
Present: Chairman Jeff Punches, Comnissioners Robert wood, Mary Melideo, William
Harkins and Pat O'Day,
Absent: None.
Staff Members present:
Steve Tisdale, Project Manager
Roy Kackley, City Engineer
B. AppROvAL OF MINLITES:
The Minutes of the July 11, 1983, meeting were approved as as amended to delete the semnd paragraph under Goals and Objectives of Comnission on page three.
C.
D-2 - Chestnut Street Angle Parking.
request was denied. to be put in on both sides of Harding, on Palm and Jefferson on one side of the street.
REPORT ON ACTION REQUESTED AT PREVIOUS MEETING:
The anqle parking
The "T" markings have been ordered
D-1 - An agenda bill is beins prepared for Council on the
speed limit on Marron Road.
4.
bar have been work ordered. (b) La Portalada and Milano - Yield Signs and stop
D. STAFFREPORTS:
Chairman Punches announced there was no discussion on
Item 3 and 4; that the Comnissioners were in agreement with the action of the Comnittee.
1. Alga Road - Request for Speed Limit Signs
There were citizens present to speak in favor of lower
The first to speak was Mrs. speed limits on Alga Road. Trudy Meade, 2129 Alga Road, representing Mr. Barney
Meade and herself. She stated their mncerns with the excessive speeds on Alga Road and requested something be done before lives are lost to reduce the speeding.
she stressed the enforcement of any speed limit that is set,
Also,
Mr. and Mrs. Sol Collier, 1949 Alga Road, agreed with the
Meades that Something should be done about the speeding and as soon as possible. c
The City Engineer, Roy Kackley, gave a report on the speed limits and widening of Alqa Road, using a wall map to indicate the trouble areas as recognized by staff and the recomnended procedures for' mitigating the problems.
Punches Melideo
wood Harkins
O'Day
I
I, * I
MINUTES
August 1, 1983 COMMISSIONERS Page 2
Mr. Kackley indicated the widening of Alga Road will be started this fall and during that time the speed limit
will be reduced to 25 mph. conpleted, the Engineering Department will again take the
speed limit into ansideration and a determination will
be mde at that time as to the proper speed limit.
After the anstruction is
Mr. Kackley indicated there would be a U-turn at
Alicante after Alga Road is widened and the median is
built.
would be proper. At the present time, it does not warrant a signal.
He felt at that time signalization of that arner
The Comnission agreed with the remmndation of the Cornittee to &anqe the speed limit on Alga Road to 35 mph from El Camino Real to Alicante, and between Alicante and
El Fuerte to post 40 mph signs, and to enphasize the need
to enforce these speed limits.
2. Longview Drive - Request for No Parking
Comnissioner O'Day stated he would withdraw from this
discussion and abstain from voting.
Chairman Punches read the staff report on this item and
asked for public aments.
Gloria Foote, 3740 Longview Drive, addressed the
Comnission, stating her anplaint was if the no parking was all the way down the street, it would create a problem.
She felt the street should be posted from the top of the
hill past the wrbinq and another 15 or 20 feet.
Bob Nazar, 3730 bnqview Drive, addressed the Comnission, stating he was upset over the lack of notice to the people on the street. He felt the Engineering Department should have notified all property owners on the street, so they
could testify before the Comnission. Also, Mr. Nazar was concerned about the proposed development on the east side of Loncpiew.
The Comnission and City Engineer expressed regret for
notices not being sent out properly to the property mrs.
The Comnission voted to table this mtter until a pblic
meeting is held.
the action taken on this matter and have staff get
information on the planned anstruction in that area. The Comnission agreed to meet on Monday, September 12,
1983, at 6:OO p.m., to allow the property owners to be
notified regarding this item.
They would like the Comnittee to review
5. Informational Item:
Seminar for Traffic Safety Comnissioners
Steve Tisdale, Project Manager, announced there would be a letter and questionnaire sent to the Comnissioners regarding this Seminar, to determine preference as to
hours, dates, etc..
ADJOURNMENT:
By proper mtion, the meeting was adjourned at 3:48 p.m.
Respectfully submitted, -
YGSW Hakxett Babbitt, Minutes Clerk
Punches
Melideo wood Harkins O'Day