HomeMy WebLinkAbout2009 PERIDOT CT; ; CB072425; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
01-07-2006 Residential Permit Permit No: CB072425
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
01/07/2008
# Dwelling Units:
Bedrooms:
Project Title:
Applicant:
Building Inspection Request Line (760) 602-2725
2009 PERIDOT CT CBAD
RESDNTL Sub Type:
Lot#: 2132911300
$276,432.00 Construction Type:
Reference #:
SFD
21
VN
CT 04-09
Structure Type: SFD
3 Bathrooms: 2
TRIESTE PL 1: PHS 4 -2448SF LV
474SF GAR/176SF DECK/173SF LOG/27SF PORCH
Owner:
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
ISSUED
09/20/2007
JMA
Plan Approved:
01/07/2008
PC 06-35
PC 07-62
WARMINGTON HOMES
701 PALOMAR AIRPORT RD
CARLSBAD CA 92011
931-4766
WARMINGTON TRIESTE ASSOCIATES LP
C/O WARMINGTON HOMES CALIFORNIA
3090 PULLMAN ST #A
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$1,190.97
$0.00
$774.13
$0.00
($61.93)
$27.64
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,423.00
D5/8
$0.00
$0.00
COSTA MESA CA 92626
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFD Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$160.00
$4,492.00
$3,618.63
$5,031.06
$0.00
$0.00
$0.00
$750.00
$0.00
$0.00
$217.00
$70.00
$67.50
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$19,760.00
Total Fees: $19,760.00 Total Payments To Date: $19,760.00 Balance Due: $0.00
Inspector: {VI, /~ Date: o Clearance: l\r-\u -o&
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
I · · h Ii
City of Carlsbad Bldg Inspection Request
For 09/15/2008
Permit# CB072425 Inspector Assignment: MC ---
Title: TRIESTE PL 1: PHS 4 -2448SF LV
Description: 474SF GAR/176SF DECK/173SF LOG/27SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
2009 PERIDOT CT
Lot
Phone: 7604271926
21
Inspector: _ _,_M __ e,_
OWNER WARMINGTON TRIESTE ASSOCIATES LP
Owner: WARMINGTON TRIESTE ASSOCIATES LP
Remarks:
Total Time.
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Act
~
t.
Comment
Requested By: KYLE
Entered By: JANEAN
N !>t-1.~ Mirr.AL.£.(.<:. f'\v"~...k:i ~L-AT :e~ oK-
6~ -tc, ~~¥ ~AS
Comments/Notices/Holds
Associated PCRs/CVs Original PC# PC 06-35
lns~ection History
Date Description Act lnsp Comments
09/10/2008 89 Final Combo co MC PROVIDE FIXTURE TAGS@ ALL FIXTURES AND PROVIDE NON-
METALLIC PIPE DECAL@ PANEL
07/17/2008 39 Final Electrical AP MC EMR ONLY, OK TO RELEASE METER
06/12/2008 17 Interior Lath/Drywall AP PC
05128/2008 82 Drywall/Ext Lath/Gas Test AP MC
05/21/2008 16 Insulation AP MC
05/19/2008 16 Insulation co MC COMPLETE FRAME PICKUP
05/15/2008 84 Rough Combo AP MC MINOR PICK UP
05/06/2008 13 Shear Panels/HD's AP MC
04/11/2008 15 Roof/Reroof AP MC ok to dry and load
03103/2008 11 Fig/Foundation/Piers AP MC RECEIVED SOILS, PT & BLDG. SETBACK REPORTS
03/03/2008 12 Steel/Bond Beam AP MC
03/03/2008 21 Underground/Under Floor AP MC
City of Carlsbad Bldg Inspection Request
For 03/03/2008
Permit# CB072425 Inspector Assignment: MC
Title: TRIESTE PL 1: PHS 4 -2448SF LV
Description: 474SF GAR/176SF DECK/173SF LOG/27SF PORCH
Type RESDNTL Sub Type: SFD
Job Address: 2009 PERIDOT CT
Suite: Lot 21
Location:
OWNER WARMINGTON TRIESTE ASSOCIATES LP
Owner: WARMINGTON TRIESTE ASSOCIATES LP
Remarks:
Total Time:
CD Description
11
12
21
31
Ftg/Foundation/Piers
Steel/Bond Beam
Underground/Under Floor
Underground/Conduit-Wiring
Act Comment
Comments/Notices/Holds
Phone: 7604271926
Inspector: -~{vt __ l __
Requested By: KYLE
Entered By: JANEAN
Associated PCRs/CVs Original PC# PC 06-35
lnsQection History
D;:l\8 Descnption Act lnsp Comments
0211212008 L1 Unde1-ground/Ur1de1· Floor AP MC WASTE ONLY
02/12/2008 22 Sewer/Water Service AP MC
02/12/2008 31 Underground/Conduit-Wiring WC MC
m CllJ 11 C1rl1111• l1l3 Final Building 1nspact101 SEP 1 2008
Dept: Building
Plan Check #:
Planning CMWD St Lite Fire
Date: 09/10/2008
Permit#: CB072425 Permit Type: RESDNTL
Project Name: TRIESTE PL 1: PHS 4 -2448SF L V Sub Type: SFD
474SF GAR/176SF DECK/173SF LOG/27SF PORCH
Address: 2009 PERIDOT CT Lot:
Contact Person: KYLE
Sewer Dist: LC
Phone: 7604271926
Water Dist: CA
21
..........................................................................................................................................................
Inspected Date GJ/1./08 By: ~-Al'3.-t11-.H.. Inspected: Approved: )( Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
II I I I II I I I tll Ill I I 11111111111 I I 1111111 I 1111 I I tit 1111 I Ill I I Ill I I 1111111 I Ill I tll l II I I I 11111 1111 I ll 11 I I I 1111 Ill I II I 11 I I 111II11 111111 I I 1 111,1 I 11111 t i t I 1 1 ····••t
Comments: ------------------------------
PLANNING
ENGINEERING
SURVEYING
IRVINE
LOS ANGELES
RIVERSIDE
SAN DIEGO
HUNSAKER
&ASSOCIATES
S A N D I E G 0, I N C
February 11, 2008
ARIZONA City of Carlsbad
Engineering Department
1635 Faraday Avenue
Carlsbad, CA 92008-7314
Re: Building Form Setback Certification
La Costa Greens Neighborhood 1.17
Carlsbad Tract 04-09/PUD 04-08A
Drawing No. 429-2C
Lots 18 through 23
Dear City Inspector:
Please be advised the building foundation forms are in conformance with the
precise grading plans as to horizontal and vertical location. The building
setbacks were measured in relation to the property lines and were found to be in
conformance with the approved precise grading plans for this property.
DAVE HAMMAR
LEX WILL\MAN
ALJSA VIALPANDO
DAN SMITH
RAY MARTIN
CHUCK CATER
9707 Waples Street
San Diego, CA 92121
(858) 558-4500 PH
(858) 558-1414 F X
www.HunsakerSD.com
lnfo@HunsakerSO.com
Sincerely,
Daniel P. Smith LS. 6854
Hunsaker & Associates San Diego, Inc.
'{/~P.
:J No. 68
Exp. 091
GM:kc k:\0107\2008\d1-4.ctoc
wo0107-268 2111120087:53AM
,:JFORNIA SOIL & . · . ,G, INC.-.,,, 1
p280RlVEROALES:rllEEIJ', SAN DIEGO, CA92l20 • Phone(6l9)280-4321 Fax(619)2804717.
83-740 CITRUS AVENUE, SUITE G, INDIO, CA 9220 I' • Phone (760) 775-5983 Fall (760) ''"75·8'.362
$~5~T FILE NO._· ...,-.... ·Q-6.,_l_-:)._,:Z_/_, ___ _
•·" '' ' ,,
P.O. NO._·----...------
C , t., PL FIX PAGE OF
FIELD INSPECTION REPORT FOR: D REl~PpRqED CONi;;RETE " . D REINF?RC~D fW\SONRY [l-wELSl~G D FIRl;PROOFING
D ROOF.ING I WATERP{lOOFINf. . _REJ'E. / STRES,S . D EPOXY ANCHORS D H.S. BOLTING D ---
DSA FILE NO.:
PllOJf:9,T ADD
lYC l Ot.,.1
ENGINEER:
·O
SUB CONIRAC! ,
uac' I hereby certlfY'thot I have l~spected 'lhe aoove reported work, Unless noted olh8!Wlte, . __ . ""
the wO!k Inspected Is to the best or my knowledge In compliance with the approved plans, ~--~ · -~ :
speclfk;atlons,ond applicable sections ot the governlRg tiulldJng laws, . r..';; . ~~~~
DSl\,'IPP. NO.: .
tJ/A
PIAN FILE NO.:
CtT1 a CAJ.t.Sl>'AD
·• TIME DEPARTED:
t cc.Jt
c;-J.187/-,-'12.,
REGISTRATION NO. Inspector lnlttals · 'fc.. . ~ -~
'DSA I her~y celtl; ~. I have lns~ted the above reported'~orl( In accbrdance wtlh1~ .. ~1:·1:"'' . ·, , . ', "'r•·'
,requlrerpe[lts of DSA approved p90uments. -SOmpllng ,and tesnng were cQnducted In
accordance With the requlrements ·ot'the DSA approved documents. The wd!k·lnspec;ted "' "'•s""'uP"'ER""IN~r"'E '"D""ENT"'. s""s"'1G""NA"'JUR""""E,----. -:::----::-
l -¼q-c~
c<;>m,plie~ )'Jifh lh,8 D~ approved1documepts ..
Yes: __ No: __ Inspector lnlttals:
\ GEOCON
INCOR.P,Qit,}TED
6960 FLANDERS DRIVE ■
0, . .. c~ GEO TECHNICAL CONSULT ANTS
SAN DIEGO, CALIFORNIA 92121-2974 ■ TEL (858) 558-6900 ■ FAX (858) 558-6 159 ~,
FOUNDATION OBSERVATION REPORT 81
PROJECT NAME : y;.., e... Gcs-~s -Wag,y\ , .,,, o-rt::>/\.../ I . I 7 PROJECT NO. ou f:?3"-SZ -Z-(.,
LOCATION : ___ ?'j=..,'-'-z..=--k"."---""e,""'-..='---'Q""-=-------------DATE : _"'2....-...,/c....L--'z,.___._/..,.,r,;,"--'-'S,'-------
L o 1'.3 I 8 f h f' ,,. l l FOUNDATION LOCATION (if not entire building)
PLAN FILE NO. PERMIT NOS : ,n LfO 7 2-'7 2 6
I '/ .. 72-'+27 D ADDITIONAL OBSERVATION REQUIRED
FOUNDATION TYPE : L-0: 72-'f3t-:,
~BST ANTIAL CONFORMANCE D CONVENTIONAL z., : 0 POST-TENSIONED 7 z_ '+ 2 .5'
• PUR~SE OF OBSERVATION
[]/Verify soil conditions exposed are similar to those anticipated
~rify footing excavations extend to minimum depth recommended in soil report
D Verify foundation reinforcement complies with minimum recommended in soil report
D ~fy slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report
ISY'verify footings have been extended to an appropriate bearing strata
D Other -------------------,--------------------
• APPLICABLE SOIL REPORT : TITLE : up.oAn, e;,.-::· ,mo-, ,.:,),'r; V,-,->F l-.-AL-cu,J GeEErn>.c
/.1/ DATE: -:S./Jc../oio
• ~OIL EPORT RECOMMENDATIONS BASED ON: , J'
~/. l<j -?. u Expansion Condition l:id' VERY LOW GY'LOW O MEDIUM 0 HIGH 0 VERY HIGH
ff Fill Geometry C.-...., r L,, r · , 3 , l(.ff, h 19 LD
D Other : C-::Z: ;:; -z,c; · ( 1~ ) , d r ar. 1--f :.. 2 ,. ··
• M~IMUM FOUNDATION RECO~ENDATIONS :
6' Footing Depth : ~12 1~c~es ~ ~lh~s D 24 Inches o;;:;HE _____________ _ tr' ,C k 1,J ••
Footing Reinforcement: D No.4 T&B D 2-No.4 T&B D 2-No.5 T&B Post-Tensioned OTHER : _____ _
Interior Slab Reinforcement : D 6x6-10/10 D 6x6-6/6 D No.3@24Inches D No.3@18Inches Gl"Post-Tensioned
Slab Bedding Material and Thickness : __ .s_· _.,_________ Vapor Barrier : v', , '--~, -~ ✓
Foundation Width : ____ __,_"'--·--=..:•..,.,,_;_;' .....:v:;__ ________________________ _
• O~RVATIONS :
~ .,9-t16stantial conformance with Soil Reports (see "Purpose of Observation")
if Substantial conformance with Foundation Plans. Identify : __ l _.,r __ ,_.,_ ...... _·-·-' __ ,_., _, __ ,..,... __ .... _, w_Jc=..,_,..c....· _.....;:;___,_ •• /_,r._, ,_(_-~e:;,.__
t:t:2-0 1.,:s
NOTE : IT IS ASSUMED THAT -'LL FOOTING EXC-'V"TIONS Will BE QE-'NED OF LOOSE M-'TERl-'l PRIOR TO PL-'CING CONCRETE AND THAT Tl-£ SOIL MOISTURE CONTENT Will BE M.tolNT-'INED
k..,t.. r---IV L ;;;:t[/,L----?tt,~rcx:..r,n_
FIELD COPIES TO GEOCON REPRESENTATIVE