HomeMy WebLinkAbout2212 PLAZA DE LAS FLORES; ; CB091591; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
09-30-2009 Miscellaneous Permit Permit No: CB091591
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
PC#:
Project Title:
Applicant:
Building Inspection Request Line (760) 602-2725
2212 PLAZA DE LAS FLORES CBAD
MISC Subtype: REPAIR Status:
2152322048 Lot#: 0 Applied:
$2~ ~
Entered By:
Plan Approved:
Issued:
Inspect Area:
&2214 : LA COSTA VILLAGES
FOUNDATION REPAIR -CITY DOES NOT GUARANTEE FA FIX
Owner:
ISSUED
09/28/2009
JMA
09/30/2009
09/30/2009
RAD CONSTRUCTION LANDRUM SANDRA P TRUST 11-10-04
3479 CITRUS ST
LEMON GROVE CA 91945
619 698 4621
Miscelaneous Fee #1
Miscelaneous Fee #2
Additional Fees
TOTAL PERMIT FEES
Total Fees: $424.00
Inspector:
383 CYNTHIA CRES
REDLANDS CA 92373
PERMIT FEE
Total Payments To Date: $424.00 Balance Due:
Clearance:
$424.00
$0.00
$0.00
$424.00
$0.00
NOTICE: Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. FaHure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES lT APPLY to any
f . n i n . . . h' h h f i . i n I
-------.. -·-···-" ... -··-------
m· • City of Carlsbad Bldg Inspection Request
For: 05/24/2010
Permit# CB091591 Inspector Assignment:
Title: &2214: LA COSTA VILLAGES
Description: FOUNDATION REPAIR -CITY DOES NOT GUARANTEE FA
FIX
Type:MISC Sub Type: REPAIR
Job Address: 2212 PLAZA DE LAS FLORES
Suite: Lot: 0
Location:
APPLICANT RAD CONSTRUCTION
Owner: FEINBERG FAMILY TRUST 11-29-05
Remarks:
Total Time:
CD Description
19 Final Structural
~Comments
-----------
Comments/Notices/Holds
Phone: 6195723001
Inspector: ----
Requested By: CLAYTON
Entered By: JANEAN
Associated PCRs/CVs Original PC# PC090026
Inspection History
Date Description Act lnsp Comments
La Costa Village Board of Directors
c/o Ms. Sheny Winslow
2208 Plaza de las Flores
Cartsbad, California 9009
Subject: Summary of Pipe Pile Installation Observations for
La Costa Village Condominiums Repair Project
May 19, 2010
Project No. 61000268--06
2208 Plaza de las Flores, Cartsbad, California 92009
Reference: "Lim~ed Geotechnical Engineering Evaluation Report for La Costa Village Phase II Evaluation
Project, 2208 and 2212 Plaza de las Flores, Cartsbad, California 92009," 2007, Prepared by Solid
Rock Engineering, Inc., Project 61000268--02, Dated August 3, Revised August 26, 2009
Dear Ms. Winslow,
We have drafted this letter as requested regarding the recent pipe pile installations for the subject foundation repair
project. This letter has been presented to address our observations on site of the pipe pile installation.
Our services included approximately 30 visits between January 18 and March 31 2010. During that time eighty-seven
pipe piles were driven to refusal through the undocumented fill and into the undertying Santiago Formation
SILTSTONE. Refusal was encountered between 15 and 41 feet below existing grade. Following driving, the pipe
piles were load tested to check that they were driven to refusal. We have included a table summarizing the pile
driving operations, pile length, and load test data and attached sketches indicating the approximate pile locations.
Based on our experience, it is our opinion that the pipe piles were installed in general accordance with our referenced
report.
In addition to the pipe pile installation, we monoored construction of the reinforced concrete slab and foundation
improvements. It is our opinion that those improvements were also made in general accordance w~ the project
documents.
~a!<~
Principal ~=;~I Engineer
GE 2568, expires December 31, 2010
61000268-06 Ls Costa Vlfago Condomlmiums Ropair Proj8ct PipB Pile lnstalalion Repot1.doc
,-questions regarding this letter,
Souo ROCK ENGINEERING, INC.
GEOffCHlaCAl Ale NAJ'IIIUAU E#GftEIUN CDIWIUI.TA#JS
PO Box 600277, SM~ c:u.uc:MUtrA 92160
tl19.IIS1.lllill3 ,,,,., BH.251.11511 l'AX
www.sotmRoarEMmreu.a»1
AGENCY PROJECT No.:
AGENCY APPROVAL No.:
WUTHER: c;; t bc.~--Lt--,---.b .
INSPECTION SUMMARY: Locations and types of ~orlr inspecte<IJp~ rejected, ~Jin progres
remarks, etc. Include information about quantities of material placed or used, material pe and identity, etc.
lu "J
License, Registration, or Certification (e.g. ICC Concrete)
'Terms a~ll Conditions on reverse side, unless otherwise agreed upon. u t ~oV''°(
' ,l, \.
Souo ROCK ENGINEERING, INC.
G!lOTJ!CH#lCAL AND HATf!fUALS EMzNllfllUIWI C:0,,SU,.TANTS
PO Box 600277, SAIi Dlfl•o, CALZl'oltm1Zt60
6J9.Bst.Btl63 ,,,,., -.zs!I.HJ.t ,u
w-.~oRaacE#Q#nu.CCHf
Laboratory Test Report
Concrel11 ( 4x8) Compressive Strength Test Report
Ale Number: 1012027
Project Title: Solid Rock Engineering
Project Location: 2210 and 2212 Plaza De Las Flores
Architect: n/a
Engineer: Burkett and Wong Permit No:
Contractor: RAD Constructlon Plan Fife No:
Location 1ft Structure:
Material Supplier:
La Costa VUlage Foundation Repair -Perimeter Footings. Interior Tle Beams and Slab Replacement -Mix Designation: 72001
Admlxb.Jre(s): n/a
Time In Mixer:
Air Content:
Air Temp:
Truck Number:
Samples Made By:
Laboratory Number
Mark On Samples
Date Made
Date Received
Date Tested
Diameter, Inches
Area, Square Inches
Maxknum Load, Polllds
Compressive strength, psi
Age Tested
Required 28 Day Stn!ngth, psi
Fracb.Jre Type
95 minutes
62degreesF
653
Olen!
1001312
cos
2/5/2010
2/9/2010
2/12/2010
4.00
12.57
43,330
3450
]Days
4500
Slump Inches:
Unit Weight Plastk/llly, pct:
Concrete Temp:
Tldcet Nu.-:
samples Tested By:
1001313 1001314
2/5/2010 2/5/2010
2/9/2010 2/9f1JJ10
3/5/2010 3/5/2010
4.00 4.00
12.57 12.57
63,030 61,770
5010 5150
28 Days 28 Days
4500 4500
I 2
1001315
2/5/2010
2/9/2010
3/5/2010
4.00
12.57
63,480
SOSO
28 Days
4500
2
3.50
I
61degrees F
6814373
CNOH
Specimen sampling, klentfflcatlon and notations regarding field Inspection were provided by others. Onty specimen curing from the time rA receipt and
compressive stren~ testing were pe,fonned by this agency In iKXJJFdance with the applicable ASTM 09 standards. This agency makes no other
wanantles express or knplled.
Fracture Type: 1 -Reasonably well formed cones on both ends, less than 1 In. of aacklng through caps; 2 -Well formed a>ne on one end, vertical
aacks running through caps,no well defined cone on other end; 3 -Columnar vertlall cracking through both erds, no well formed cones; 4 -Diagonal
fracb.Jre with no cracking through ends; 5 -Side fracture at top or bottom (oo:ur commonly with unbonded caps); 6 -SlmHar to type 5 but end d
cylinder Is pointed.
The samples represented in this report were prepared and tested by agents of Solid Rock Engineering, Inc. A review of this data
indicates that the 28-day compressive strength of th sa sled meets or exceeds project requirements.
Respectfully,
.. -, ,,....__.~--) , ---) -r,.. I / ii --/:'.._ ;.( v---
R. 0$Juglas Prt>vins, PE, GE
Principal Geotechnical Engineer
GE 2568, expires December 31, 2010
Distribution: (1) Client, by email
661000268-D6 La OJsta Village 10 02 OS Conaete.doc
Souo ROCK ENGINEERING, INC.
G'EoffCHIUCALAIIO#AJDIAUEiMBlffluNOJ#suLTANTS
POllox600U7,••DINo,Gu.lRMfuA92160
6JIIJl51J#ill3-866.255./ISJJ FAX
www..5ouDRoorENrNttns.CON
bO;-!~'61 . .
Laboratory Test Report
Conaete ( 4x8) Compressive Strength Test Report
File Number: 1012027
Project Title: Solid Rock Engineering
Project Location: 2212, 2214 Plaza De Lds Flores, Cdrlsbad, ca
Architect: n/a
Engineer:
Contractor:
Burkett and Wong
R.A.D
Permit No:
Plan File No: City of car1sbad
Location In Structure: La Costa Village -Gracie Beams and Slab Repair for 2212 and 2214.
Material Supplier: Robertsons
Mix Designation: 72001
Admlxture{s}: Type A
Time In Mixer: SO minutes Slump Inches: 4.75
Air Content:
Air Temp: 68 deg,ees F Unit Weight Plastic/Dry, pcf: I
Truck Number: 641 Concrete Temp: 73 degrees F
Samples Made By: Client Ticket Number: 7020996
Samples Tested By: RT
Laboratory Number 1003306 1003307 1003308 1003309
Mark On Samptes L.C.V
Date Made 4/16/2010 4/16/2010 4/16/2010 4/16/2010
Date Received 4/20/2010 4/20/2010 4/20/2010 4/20/2010
Date Tested 4/23/2010 5/14/2010 5/14/2010 5/11/2010
Diameter, Inches 4.00 4.00 4.00 4.00
Area, Square Inches 12.57 12.57 12.57 12.57
Maximum Load, Pounds 55,570 84,680 83,900 80,250
Compressive Strength, psi 4420 6740 6670 6380
Age Tested 7 Days 28 Days 28 Days 28 Days
Required 28 Day Strength, psi 4500 4500 4500 4500
Fracture Type 1 1 1
Specimen sampling, identification and notations regarding field inspection were provided by others. Only specimen curing from the time of receipt and
compressive strenglh testing were performed by this agency in accordance w~ the applicable ASTM C39 standards. This agency makes no other
warranties express or implied,
Fracture Type: 1 -Reasonably wefl formed cones on both ends, less than 1 in. of cracking through caps; 2 " Well formed cone on one end, vertical
cracks running through caps,no welt defined cone on other end; 3 -Columnar vertical cracking through both ends, no weft formed cones; ◄ -Diagonal
fracture with no cracking through ends; S -Side fracture at top or bottom (occur commonly with unbonded caps); 6 -Similar to type S but end of
cylinder is pointed.
The samples represented in this report were prepared and tested by agents of Solid Rock Engineering, Inc. A review of this data
indicates that the 28-day compressive strength of th ~teskid meets or exceeds project requirements.
Respectfully,
R~IRif::E
Principal Geotechnical Engineer
GE 2568, expires December 31, 2010
Distribution: (1) Client, by email
61000268-IJ6 La Costa VIiiage 10 0416 Conc:rere.doc
Souo ROCK ENGINEERING, INC.
Gmnc::HIUCAL AIIO IIIAY'RIALI E/lltlDIEEIUIN CaiMtrn.TA#JS
PO Box MIOZ77, SAIi DJao, CU.rl'olW1A gn.llO
111g.BSJ.B61U ,,,,., adfi.255.ffll Mil
www.SOUolloatENlllffltS.COlf
2202 ~LA2A-~ LAS +]_OR,(3S
c..d 69 IS '39
La Costa Village Board of Directors
c/o Ms. Sherry Winslow
2208 Plaza Bonita
Cartsbad, California 92009
April 14, 2010
Project No. 61000268-06
Submitted via e-mail (she"Y@sherrywinslow.com and info@RADConstructionlnc.com)
Subject: Summary of Observation Services for Units 2212 and 2214
at La Costa Village Condominiums Foundation Repair Project
Plaza de las Flores, Cartsbad, California 92009
Dear Ms. Winslow,
In accordance with your request, we have been monitoring the repair operations at the subject project. The intent of
this particular letter is to state that we have monitored the installation of the pipe piles, excavation of the grade
beams, and installation of the reinforcing steel within the grade beams and slabs for units 2212 and 2214. Based on
our observations and review of our geotechnical report and the plans prepared by Burkett & Wong, It is our opinion
that the work indicated herein has been performed in general accordance with the project documents and that the
grade beam and slab excavation at the indicated units is ready for concrete placement.
We sincerely appreciate the opportunity to provide our services to you for this project. Should you have any ques-
tions regarding this letter, please feel free to contact the undersig
Respectfully submitted,
SOLID ROCK ENGINEERING, INC.
1Z.VP
R. Douglas Pr!ns, PE, GE
Principal EngiJ~r
GE 2568, Expires December 31, 2010
Distribution: Addressee
6100C/26&-06 La Costa Vllaoe Ready for Conctet& l.slt8r Patt II.doc
Souo ROCK ENGINEERING, INC.
GRmrallUcAL AIIO ,,,.JMlALS ~ CaMswTA#D
POlloxti00277,Sl#DIHo,.CALJ:Fou1Ag2160
tl:l!IJIS1.llll&S M., Mltf.2SS.ffJl MX --....