Loading...
HomeMy WebLinkAbout2725 PLUMERIA DR; ; CB050536; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 03-07•2005 Residential Permit Permit No: CB050536 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: 2725 PLUMERIA DR CBAD RESDNTL Sub Type: SFD Status: Lot#: Applied: Valuation: 2131814100 $204,152.00 Construction Type: 493 VN CT02-14 Entered By: Occupancy Group: 03/07/2005 ii Dwelling Units: Reference ii: Structure Type: SFD Issued: Bedrooms: 3 Bathrooms: 3 Inspect Area: Project Title: PRIMROSE@BRESSI -PA 12-PHASE2 Orig PC#: PLAN 1-2094 SF,475 SF GAR, 13 SF PORCH Plan Check#: Applicant: GREYSTONE HOMES 101 5973 AVENIDA ENCINAS CARLSBAD CA 92009 760-804-7700 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee STD #2 Fee STD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee $869.96 $0.00 $565.47 $0.00 ($45.24) $20.42 $2,436.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,999.00 D5/8 $0.00 $0.00 Owner: GREYSTONE HOMES INC 1525 FARADAY A VE #300 CARLSBAD CA 92008 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWAFee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund) Traffic Impact Fee Traffic Impact (CFD Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnLieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES ISSUED 02/07/2005 RMA Plan Approved: 03/07/2005 PC PC03-63 PC050008 $0.00 $160.00 $2,461.00 $2,848.90 $3,715.57 $0.00 $0.00 $0.00 $660.00 $0.00 $0.00 $140.00 $60.00 $72.00 $0.00 $0.00 $0.00 $0.00 $1,735.00 $0.00 $18,698.08 Total Fees: $18,698.08 Total Payments To Date: $0.00 Balance Due: $18,698.08 3207 03/07 /05 0002 01. Inspector: FIN~A~L Date: ,,. Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Ca~sbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any f fwhi h h v . I . NT . . hi i f ... n . I . i O') '- 1El698-08 City of Carlsbad Bldg Inspection Request For: 09/14/2005 Permit# CB050536 Inspector Assignment: PC --- Title: PRIMROSE@BRESSI -PA 12-PHASE2 Description: PLAN 1-2094 SF,475 SF GAR,13 SF PORCH Type: RESDNTL Sub Type: SFD Job Address: 2725 PLUMERIA DR Suite: Lot 493 Location: APPLICANT GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: Total Time: Phone: 7606441604 Inspector: ----- Requested By: TREVOR PETERSON Entered By: CHRISTINE CD Description Act Comment 39 Final Electrical llfl--___.E...____,_. ~&le..:_• 2.--/2..=-------- &J c(lf 9/f! Associated PCRs/CVs lns11ection Histo[Y Date Description Act lnsp Comments 08/05/2005 17 Interior Lath/Drywall AP PC 08/05/2005 18 Exterior Lath/Drywall AP PC 08/05/2005 23 Gas/T esU'Repairs AP PC 08/05/2005 84 Rough Combo AP PC 08/04/2005 17 Interior Lath/Drywall co PC CORRECTIONS NOT SIGNED OFF WORK COVERED 08/04/2005 18 Exterior Lath/Drywall co PC 07/25/2005 84 Rough Combo co PC CORRECTIONS NOT COMPLETE OK TO INSULATE TOPOUT OK 07/21/2005 84 Rough Combo co PC 1) NO TOPOUT NO WATER IN PANS 2) D.S. NOT COMPLETE@ F.P. CHASE 1 ST AND 2ND FLOOR 3) D.S. NOT COMPLETE @ DUCT CHASES. 4) HOLE IN LATH PAPER 07/20/2005 84 Rough Combo NR PC 07/18/2005 84 Rough Combo CA PC PER KAUB 07/12/2005 84 Rough Combo NR PC 06/27/2005 15 Roof/Reroof AP BN BY P.C. 6/2212005 06/22/2005 13 Shear Panels/HD's AP PC 06/21/2005 13 Shear Panels/HD's NS PC 04/21/2005 11 Ftg/Foundation/Piers AP PC 04/08/2005 21 Underground/Under Floor AP PC Sep 2 7 05 03:23p BWWlNG OTHER ----.. ---·---------·---- CB050536 2n5 PLUMERlA OR CBAD PRIMROSE@BRESSI -PA 12-PHASE2 PLAN 1-2094 SF,475 SF GAR, 13 SF PORCH RESDNTL SFO Loi#: 493 GREYSTONE HOMES APPROVED TO COVER Type of Inspection Date. inspector BUILD/NC ~ FOUNDATION 1\ ;7J~ .,.I \) I ~ REINFORCED STEEL ·g_:::----V'--"' MASONRY □GROUT D WALL DRAINS TllTPANELS POUR STRIPS COLUMN FOOTINGS SUBFRAME □FLOOR 0 Cf.JUNG . ,,,,,.... -ROOF Sl:-IEATHING I A. //;i.,,-U ·~ --- EXT. SHEAR PANELS .:;---re -FR/\ME 1/-i. "TIY 1-; "7./ .-... INSULATION ., I\. i. ,.------ EXTERIOR u\ TH if") :=.--.II ,) lNTERIOR·lATH & DRYWALL ~ J FlNAl PLUMBING D SEWER ANO BUCO f □PUCO -A•-4 UNDERGROUND ~ASTE □WATER it..f -l)"V) V - TOP OUT □WASTc. □ WATER IA ."J 'C--0 ! . ~ TUB ANO SHOWER PAN . ~ ... .1 .L ~AS TEST □GASPWING . V' ..-\. tH\ . rL/ 0 WATER HEATER .0 S0lAR WATfR ¥ I FINAt -EJ.ECTRICAI. ,1 _ 'j(!JLECTRIC UNDERGROUND ll-iJF€R tJ, ...-'v'[,..-(/\ V7 ~ ( ROUGH ELECTRIC WAUS ' ;./'...:( """tr(· . ·.-- ROUGH ELECTRIC Cl:lllNG ~ lf 0 ELECTRIC SERVICE □TEMPORARY □BONDING □ POOL FINAL ,_ 1,J_,.,.;(' ~I MECHANICAi. ,___ UNDERGROUND DUCTS & PIPING 0 DUCT & Pl.EM.□ Rff. PIPING /..I)'\ ~ HF.AT-AIR CON0. SYSTEMS '\ ,I~ \11 ../ VENTILATING SYSTEMS ~ FINAL t CAU FOR FINAL INSPECTION WH'EN ALL APPROPRIATE ITEMS ABOV~ \!E BEEN APPROVE[) FINAL Sign When Appropriate f,{~/~1~\. f - Building Dept. (Inspections) (760) 602-2725 ~ Fire Department [760) 602-4&60 Planning Department (760) 815-6708 Engineering Dept. {Inspections) (760) 438<389l t¥t\il.,\~ ~ Building Inspectors (7am-4pm) {760) 602-2700 \. ' CMWO 1760} 438-2722 Ext 7151 m \ ?--,\o <. ~ ' p .2 Notes