HomeMy WebLinkAbout2725 PLUMERIA DR; ; CB050536; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
03-07•2005 Residential Permit Permit No: CB050536
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
2725 PLUMERIA DR CBAD
RESDNTL Sub Type: SFD Status:
Lot#: Applied:
Valuation:
2131814100
$204,152.00 Construction Type:
493
VN
CT02-14
Entered By:
Occupancy Group:
03/07/2005
ii Dwelling Units:
Reference ii:
Structure Type: SFD Issued:
Bedrooms: 3 Bathrooms: 3 Inspect Area:
Project Title: PRIMROSE@BRESSI -PA 12-PHASE2 Orig PC#:
PLAN 1-2094 SF,475 SF GAR, 13 SF PORCH Plan Check#:
Applicant:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
STD #2 Fee
STD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$869.96
$0.00
$565.47
$0.00
($45.24)
$20.42
$2,436.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,999.00
D5/8
$0.00
$0.00
Owner:
GREYSTONE HOMES INC
1525 FARADAY A VE #300
CARLSBAD CA 92008
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
ISSUED
02/07/2005
RMA
Plan Approved:
03/07/2005
PC
PC03-63
PC050008
$0.00
$160.00
$2,461.00
$2,848.90
$3,715.57
$0.00
$0.00
$0.00
$660.00
$0.00
$0.00
$140.00
$60.00
$72.00
$0.00
$0.00
$0.00
$0.00
$1,735.00
$0.00
$18,698.08
Total Fees: $18,698.08 Total Payments To Date: $0.00 Balance Due: $18,698.08
3207 03/07 /05 0002 01.
Inspector:
FIN~A~L
Date: ,,. Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Ca~sbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
f fwhi h h v . I . NT . . hi i f ... n . I . i
O') '-
1El698-08
City of Carlsbad Bldg Inspection Request
For: 09/14/2005
Permit# CB050536 Inspector Assignment: PC ---
Title: PRIMROSE@BRESSI -PA 12-PHASE2
Description: PLAN 1-2094 SF,475 SF GAR,13 SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address: 2725 PLUMERIA DR
Suite: Lot 493
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks:
Total Time:
Phone: 7606441604
Inspector: -----
Requested By: TREVOR PETERSON
Entered By: CHRISTINE
CD Description Act Comment
39 Final Electrical llfl--___.E...____,_. ~&le..:_• 2.--/2..=--------
&J c(lf 9/f!
Associated PCRs/CVs
lns11ection Histo[Y
Date Description Act lnsp Comments
08/05/2005 17 Interior Lath/Drywall AP PC
08/05/2005 18 Exterior Lath/Drywall AP PC
08/05/2005 23 Gas/T esU'Repairs AP PC
08/05/2005 84 Rough Combo AP PC
08/04/2005 17 Interior Lath/Drywall co PC CORRECTIONS NOT SIGNED OFF WORK COVERED
08/04/2005 18 Exterior Lath/Drywall co PC
07/25/2005 84 Rough Combo co PC CORRECTIONS NOT COMPLETE OK TO INSULATE TOPOUT OK
07/21/2005 84 Rough Combo co PC 1) NO TOPOUT NO WATER IN PANS 2) D.S. NOT COMPLETE@ F.P.
CHASE 1 ST AND 2ND FLOOR 3) D.S. NOT COMPLETE @ DUCT
CHASES. 4) HOLE IN LATH PAPER
07/20/2005 84 Rough Combo NR PC
07/18/2005 84 Rough Combo CA PC PER KAUB
07/12/2005 84 Rough Combo NR PC
06/27/2005 15 Roof/Reroof AP BN BY P.C. 6/2212005
06/22/2005 13 Shear Panels/HD's AP PC
06/21/2005 13 Shear Panels/HD's NS PC
04/21/2005 11 Ftg/Foundation/Piers AP PC
04/08/2005 21 Underground/Under Floor AP PC
Sep 2 7 05 03:23p
BWWlNG
OTHER
----.. ---·---------·----
CB050536 2n5 PLUMERlA OR CBAD
PRIMROSE@BRESSI -PA 12-PHASE2
PLAN 1-2094 SF,475 SF GAR, 13 SF PORCH
RESDNTL SFO
Loi#: 493 GREYSTONE HOMES
APPROVED TO COVER
Type of Inspection Date. inspector
BUILD/NC ~
FOUNDATION 1\ ;7J~ .,.I \) I
~
REINFORCED STEEL ·g_:::----V'--"'
MASONRY
□GROUT D WALL DRAINS
TllTPANELS
POUR STRIPS
COLUMN FOOTINGS
SUBFRAME □FLOOR 0 Cf.JUNG . ,,,,,.... -ROOF Sl:-IEATHING I A. //;i.,,-U ·~ ---
EXT. SHEAR PANELS .:;---re
-FR/\ME 1/-i. "TIY 1-; "7./ .-...
INSULATION ., I\. i. ,.------
EXTERIOR u\ TH if") :=.--.II ,)
lNTERIOR·lATH & DRYWALL ~ J
FlNAl
PLUMBING
D SEWER ANO BUCO f □PUCO -A•-4
UNDERGROUND ~ASTE □WATER it..f -l)"V) V -
TOP OUT □WASTc. □ WATER IA ."J 'C--0 ! . ~
TUB ANO SHOWER PAN . ~ ... .1 .L
~AS TEST □GASPWING . V' ..-\. tH\ . rL/
0 WATER HEATER .0 S0lAR WATfR ¥ I
FINAt
-EJ.ECTRICAI. ,1 _
'j(!JLECTRIC UNDERGROUND ll-iJF€R tJ, ...-'v'[,..-(/\ V7 ~
( ROUGH ELECTRIC WAUS ' ;./'...:( """tr(· . ·.--
ROUGH ELECTRIC Cl:lllNG ~ lf
0 ELECTRIC SERVICE □TEMPORARY
□BONDING □ POOL
FINAL ,_ 1,J_,.,.;(' ~I
MECHANICAi. ,___
UNDERGROUND DUCTS & PIPING
0 DUCT & Pl.EM.□ Rff. PIPING /..I)'\ ~
HF.AT-AIR CON0. SYSTEMS '\ ,I~ \11 ../
VENTILATING SYSTEMS ~
FINAL
t
CAU FOR FINAL INSPECTION WH'EN ALL APPROPRIATE ITEMS ABOV~ \!E BEEN APPROVE[)
FINAL Sign When Appropriate f,{~/~1~\. f -
Building Dept. (Inspections) (760) 602-2725 ~
Fire Department [760) 602-4&60
Planning Department (760) 815-6708
Engineering Dept. {Inspections) (760) 438<389l t¥t\il.,\~ ~
Building Inspectors (7am-4pm) {760) 602-2700 \. '
CMWO 1760} 438-2722 Ext 7151 m \ ?--,\o <. ~
'
p .2
Notes