HomeMy WebLinkAbout2731 PLUMERIA DR; ; CB050535; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
03-07,,2005, Residential Permit Permit No: CB050535
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
2731 PLUMERIA DR CBAD
RESDNTL Sub Type: SFD Status:
Lot#: Applied:
Valuation:
2131814900
$204,152.00 Construction Type:
501
VN
CT02-14
Entered By:
Occupancy Group:
03/07/2005
# Dwelling Units:
Reference #:
Structure Type: SFD Issued:
Bedrooms: 3 Bathrooms: 3 Inspect Area:
Project Title: PRIMROSE@BRESSI -PA 12-PHASE2 Orig PC#:
PLAN 1-2094 SF,475 SF GAR, 13 SF PORCH Plan Check#:
Applicant:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804· 7700
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$869.96
$0.00
$565.47
$0.00
($45.24)
$20.42
$2,436.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,999.00
05/8
$0.00
$0.00
Owner:
GREYSTONE HOMES INC
1525 FARADAY AVE #300
CARLSBAD CA 92008
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
ISSUED
02/07/2005
AMA
Plan Approved:
03/07/2005
PC
PC03·63
PC050008
$0.00
$160.00
$2,461.00
$2,848.90
$3,715.57
$0.00
$0.00
$0.00
$660.00
$0.00
$0.00
$140.00
$60.00
$72.00
$0.00
$0.00
$0.00
$0.00
$1,735.00
$0.00
$18,698.08
Total Fees: $18,698.08 Total Payments To Date: $0.00 Balance Due: $18,698.08
Inspector:
FINA
Date:
3207 03/07/05 0002 01
CGP
Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "lmposit1 n" of fee , dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
'hh ii Tl ·1 nh lhrwi
/"') . .},:_
18698-08
City of Carlsbad Bldg Inspection Request
For: 10/07/2005
Permit# CB050535
Title: PRIMROSE@BRESSI -PA 12-PHASE2
Description: PLAN 1·2094 SF,475 SF GAR,13 SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address: 2731 PLUMERIA DR
Suite: Lot 501
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks:
Total Time:
CD Description
19 Final Structural
29 Final Plambing
39 Final Electrical
49 Final Mechanical
Associated PCRs/CVs
lns1;1ection Histoiy
Date Description Act
10/05/2005 89 Final Combo CA
10/04/2005 89 Final Combo CA
09/26/2005 39 Final Electrical AP
08/29/2005 82 Drywall/Ext Lath/Gas Test AP
08/22/2005 16 Insulation AP
08/22/2005 84 Rough Combo AP
Comment
lnsp Comments
PC
PC
PC EMA
PC
PC
PC
Inspector Assignment: PC ---
Phone: 7606441470
Inspector: L
Requested By: ALLEN
Entered By: CHRISTINE
08/18/2005 84 Rough Combo co PC 1) DRAFT STOPS 2) 1IN CLEAR FROM CHIM & INSTALL METAL F.S.
3) ATTIC VENT TOP OUT OK
07/20/2005 83 Roof Sheathing/Ext Shear AP PC
04/22/2005 11 Ftg/Foundation/Piers AP PC
04/13/2005 21 Underground/Under Floor AP PC
04/13/2005 22 Sewer/Water Service WC PC
IUD f'\UUKt,::.,:,: ---~
OWNERS NAME, __ _
USE/OCCUPANCY
CB0505311 2731 PLUMERIA DR CBAD
PRIMROSE@BRESSI -PA 12-PHASE2
PLAN 1-2094 SF,475SFGAR,13 SF PORCH
~B~U~l~LD~l~N~G,_----,, RESDNTL SFD
-0,,-TH=E-R------4 __ LOI#: 501 GREYSTONE HOMES
APPROVED TO COVER
Type of Inspection ' Date Inspector
BUILDING
FOUNDATION ~· ,,., . ---
REINFORCED STEEL -, re -MASONRY .
□GROUT 0 WALL DRAINS
TILT PANELS
POUR STRIPS
COLUMN FOOTINGS
SUBFRAME □FLOOR 0 CEILING
ROOF SHEATHING /I _.,,,y., I\
EXT. SHEAR PANELS • 1ZL/ --""
FRAME ,.__.,,,.,, ,,~ l I) _/
INSULATION ~..,.,.. .. ... ~ J
EXTERIOR LA TH ....... _ ~ .... ., -.
INTERIOR LATH & DRYWALL ... n
FINAL
PLUMBING
0 SEWER AND Bl/CO, □Pl/CO . ,.
UNDERGROUND 'Sl,VASTE □WATER -. 71 ..-, /
TOP OUT OWAS11 □WATER -"•·1.A.-.J '
T~B AND SHOWER PAN 11• \ V ~
,:p,<,;AS TEST OGAS PIPING 'it_,. ... , av--=-1 I -
[!J WATER HEATER 0 SOLAR WATER
FINAL
ELECl'RICAL ,,,
~LECTRIC UNDERGROUND ...,_._, UFER f"-7 -F"£ ~
"croGH ELECTRIC WALLS ' ,_ ... 1/',ll?\ ·,
ROUGH ELECTRIC CEILING 11 • .• ~
p;!;LECTRIC SERVICE □TEMPORARY rJ ,#fl. ~ [/
UBONDING □POOL
FINAL
MECHANICAL
UNDERGROUND DUCTS & PIPING
0 DUCT & PlEM.O REF. PIPING • V'.Al" --HEAT -AIR COND. SYSTEMS -~· ,_:..-1#7 /
VENTILATING SYSTEMS _,.,
FINAL
____ LOT NO/SUITE, ______ _
INST. DATE 3-7--d"
CONTRACTOR
Notes
'
-
.
--CAU FOR FINAL INSPECllON WHEN ALL APl'IIO• .,,AT ,1 il$Alll VE "'VE I/IEEN APPROVED I f\ IL/
FINAL Sign When Appropriate V < CH I: ; -A-J-r' j\ ~ -
Building DepL (lnspectioas) (760) 602-2725 -I \ "\ j
Fire Department (760) 602-4660 \ U\. • ,v
Planning Department (76!)) Si 5-6708 ' rJ1 .•
Engineering Dept. <lnspec;lions) {760) 436-3891 -o· n,0< .., . ' ' '
_Build Ins_ 11151111<:tOrt (7,all\:4pm►, · <1601'602-il'oo · V ,' ' ' , ' .
·-.•·'-',: -·.-'' ··•· t761114le-:2722£~t.7'1SiiflJ1•11: ",) ..,.f ' .
,,. ' 0:~1 900l/El/0l -l0 391/d ~IINN37 lNIOd3SO~WI~d L1>6T1>0809L T