Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2810 CARIBOU CT; 100; CBC2020-0131; Permit
PERMIT REPORT (ity of Cdrlsb.ad- Print Date: 07/21/2020 Permit No: CBC2020-0131 Job Address: 2810 CARIBOU Cr, # 100, CARLSBAD, CA 92010 Status: Closed - Finaled., Permit Type: BLDG-Commercial Work Class: Tenant Improvement Parcel #: 2091200300 Valuation: $ 270,688.20 Occupancy Group: #of Dwelling Units: Bedrooms: Bathrooms: Track #: Lot #: Project #: Plan #: Construction Type: Orig. Plan Check #: Plan Check #: Applied: 04/07/2020 Issued: 06/16/2020 Finaled Close Out: 07/20/2020 Inspector: PBurn Final Inspection: 07/20/2020 Project Title: Description: ZENSE: 5,280 SF REMODEL & 875 SF TI FOR CLEAN ROOM & CONDENSER ON ROOF Applicant: Property Owner: Contractor: ZENSE-LIFE INC VICTORY CARLSBAD OAKS INNOVATION S P WHITE CONSTRUCTION INC LEIF BOWMAN CENTER LP 2524 GATEWAY RD 2810 CARIBOU CT, # 100 1261 PROSPECT ST. # 9 CARLSBAD, CA 92009-1742 CARLSBAD, CA 92010 LA JOLLA, CA 92037 (760) 931-1130 (858) 888-5289 FEE AMOUNT BUILDING PERMIT FEE ($2000+) $1,233.05 BUILDING PLAN CHECK FEE (BLDG) $863.14 ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL $89.00 FIRE S Occupancies < 50,000sq. ft. TI $373.00 GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION $175.00 MECHANICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL $55.00 5B1473 GREEN BUILDING STATE STANDARDS FEE $11.00 STRONG MOTION-COMMERCIAL $75.79 Total Fees: $ 2,874.98 Total Payments To Date: $ 2,874.98 Balance Due: $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest impositipn of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees /exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-2700 1 760-602-8560 f I www.carlsbadca.gov (City o f Carlsbad COMMERCIAL BUILDING PERMIT APPLICATION B-2 Plan Check ___________ Est. Value AjiJ3l1 PC Deposit Date 04.02020 Job Address 2810 Caribou Court, Carlsbad, CA 92010 Suite: 100 APN: 2091200300 CT/Project#: Lot #: Fire Sprinklers: ® YES 0 NO Air Conditioning: $ YES 0 NO Electrical Panel Upgrade: 0 YES 0 NO BRIEF DESCRIPTION OF WORK: Installation of prefabricated clean room and condenser on roof. El Addition/New: Living SF, Deck SF, Patio SF, Garage SF Is this to create an Accessory Dwelling Unit? 0 V O N New Fireplace? 0 V 0 N, if yes how many? Remodel-4ô T5 SF of affected area Is the area a conversion or change of use ? 0 Y 0 N El Pool/Spa: ___________ SF Additional Gas or Electrical Features? flSolar: KW, ______ Modules, Mounted:0Roof OGround, Tilt:O YO N, RMA:OYON, Battery:OY ON, Panel Upgrade: OY ON U Reroof: U Plumbing/Mechanical/Electrical Only: U Other: APPLICANT (PRIMARY CONTACT) PROPERTY OWNER Name: Leif Bowman Name: Casey Gluey - Victory Carlsbad Oaks Address: 2810 Caribou Court, Suite 100 Address: 1261 Prospect St., Suite 9 City: Carlsbad State: CA Zip: 92010 City: La Jolla State: _CA Zip: 92008 Phone: 8588885289 Phone: 8888158886 Email: lbowman@zense-life.com Email: casey©badieedevelopment.com DESIGN PROFESSIONAL CONTRACTOR BUSINESS Name: Trevor Wells Name: White Construction - Travis Sham Address: 3911 Sorrento Valley Blvd., Suite 120 Address: 2524 Gateway Rd. City: San Diego State:CA Zip: 92121 City: Carlsbad State:CA Zip: 92009 Phone: 619.564.3696 Phone: 760.802.9707 Email: twells@waremalcomb.com Email: travis@whiteconstructioninc.com Architect State License: C30270 State License: 1023856 Bus. License:6LNR000431022017 (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he/she is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500}). 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: BuiIding@JCarlsbadCa.gov B-I Page 1 of 2 Rev. 06/18 (OPTION A): WORKERS'COMPENSATION DECLARATION: I hearby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the work which this permit is issued. Jl have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Company Name: State Compensation Ins. Fend Policy No. 9243036-20 Expiration Date: 11112021 11 Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to be come subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3705 of the Labor Code, interest and attorney's fees. CONTRACTOR SIGNATURE: DAGENT DATE: -- (OPTION B ): OWNER-BUILDER DECLARATION: I hereby affirm that! am exempt from Contractor's License Law for the following reason: E] I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). 111, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). F-11 am exempt under Section ___Business and Professions Code for this reason: I personally plan to provide the major labor and materials for construction of the proposed property improvement. OYES J NO I (have / have not) signed an application for a building permit for the proposed work. I have contracted with the following person (firm) to provide the proposed construction (include name address / phone / contractors' license number): I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone / contractors' license number): I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work): OWNER SIGNATURE: LJAGENT DATE: CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name: Lender's Address: ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY: Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. APPLICANT CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. thereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.OSHA: An OSHA permit is required for excavations over 5,0' deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 106.4.4 Uniform Building Code). APPLICANT SIGNATURE: 17 2U1I\iStSVQ DATE: °°°° 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: BuiIdingCarIsbadca.gov B-I Page 2 of 2 Rev. 06/18 Permit Type: BLDG-Commercial Application Date: 04/07/2020 Owner: VICTORY CARLSBAD OAKS INNOVATION CENTER LP Work Class: Tenant Improvement Issue Date: 06/16/2020 Subdivision: Status: Closed - Finaled Expiration Date: 01/06/2021 Address: 2810 Caribou Ct, 100 IVR Number: 25780 Carlsbad, CA 92010 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reunspection Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready. See card. No BLDG-14 July 7, 2020: Yes Frame-Steel-Bolting-Welding Rough mechanical and duct sealant (Decks) approved per plan. Rough electrical and sub-panel for new clean room prefab unit-approved. Structural framing roof framing members reinforcement and curb for new rooftop mechanical unit approved for engineers detail. Addressed #1 #2, #3, corrections comments from Mike Collins on back of inspection record card - approved. 0711012020 07I1012020 BLDG-85 T-Bar, 132491-2020 Partial Pass Tony Alvarado Reinspection Incomplete Ceiling Grids, Overhead Checklist Item COMMENTS Passed BLDG-Building Deficiency July 10, 2020: Yes Rough combination overhead inspection and T-bar grid ceiling and approved. Overhead inspection approval pending fire department rough fire sprinkler inspection. BLDG-Building Deficiency Not ready. Lights, T- grid and Fire Dept. No .07/2012020 07/20/2020 BLDG-Final 133254-2020. Passed Tony Alvarado . Complete Inspection . . Checklist Item COMMENTS . Passed BLDG-Mechanical Final July-20, 2020: Yes New engineered pre-fabricated clean room" with new mechanical HVAC venting system, and with new electrical subpanel-approved per engineered plans and specifications. Final fire department inspection and documentation verified and field.. BLDG-Structural Final July 20, 2020: Yes New engineered pre-fabricated "clean room" with new mechanical HVAC venting system, and with new electrical subpanel-approved per engineered plans and specifications. Final fire department inspection and documentation verified and field. BLDG-Electrical Final July 20, 2020: . Yes New engineered pre-fabricated "clean room" with newmechanical HVAC venting system, and with new electrical subpanel-approved per engineered plans and specifications. Final fire department inspection and documentation verified and field. July 21,2020 . Page 2of3 Permit Type: BLDG-Commercial Application Date: 04/07/2020 Owner: VICTORY CARLSBAD OAKS INNOVATION CENTER LP Work Class: Tenant Improvement Issue Date: 06/16/2020 Subdivision: Status: Closed - Finaled Expiration Date: 01/06/2021 Address: 2810 Caribou Ct, 100 Carlsbad, CA 92010 IVR Number: 25780 Scheduled Actual Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date 0612912020 06I2912020 BLDG-84 Rough 131352.2020 Cancelled Pau! Burnette Reinspection Complete Combo(14,24,34,44) Checklist Item COMMENTS Passed BLDG-Building Deficiency. No BLDG-14 No Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout * No BLDG-34 Rough Electrical No BLDG-44 No Rough-Ducts-Dampers BLDG-85 T-Bar, 131353-2020 Cancelled Paul Burnette Reinspection Complete Ceiling Grids, Overhead Checklist Item COMMENTS Passed BLDG-Building Deficiency No BLDG-14 No Frame-Steel-Bolting-Welding (Decks) • BLDG-24 Rough-Topout • No BLDG-34 Rough Electrical No BLDG-44 No Rough-Ducts-Dampers 06I30!2020 0613012020 BLDG-84 Rough 131424-2020. • Failed Michael Collins Reinspection Complete Combo(14,24,34,44) Checklist Item COMMENTS Passed. BLDG-Building Deficiency Not ready. See card. No BLDG-85 1-Bar, 131425.2020 Failed Michael Collins Reinspection Complete Ceiling Grids, Overhead Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready. Lights, T- grid and Fire Dept.n No 0710712020 07I0712020 BLDG-84 Rough 131974-2020 Passed Tony Alvarado Complete Combo(14,24,34,44) July 21, 2020 • • .• • Page 1 of 3 EsGil A SAFEbuitt'Company DATE: 6/3/2020 JURISDICTION: Carlsbad PLAN CHECK #.: CBC2020-0131.E SET: II PROJECT ADDRESS: PROJECT NAME: TI - 5280 St remodel 875 sf Clean room APPLICANT JURIS. The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. El The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. El The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. El The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. El The applicant's copy of the check list is enclosed for the jurisdiction to forvvard to the applicant contact person. El The applicant's copy of the check list has been sent to: EsGil staff did not advise the applicant that the plan check has been completed. El EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted:j5I2.0 (byçfll) Email: Mail Telephone Fax In Person LI REMARKS: By: I.W. Enclosures: EsGil 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 EtGH A SAFEbuiLt'Company DATE: 4/28/2020 JURISDICTION: Carlsbad PLAN CHECK#.: C11 öóiIIJ SET:I PROJECT ADDRESS: PROJECT NAME: TI - 5280 St remodel 875 sf Clean room O APPLICANT L3 JURIS. LII The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. LI The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Leif Bowman EsGil staff did not advise the applicant that the plan check has been completed. EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Leif Bowman Telephone #: (858) 888-5289 Date contacted: (by: ) Email: lbowman@zense-life.com Mail Telephone . Fax In Person REMARKS: By: I.W. Enclosures: EsGil 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad CBC2020-0 13 i.E 4/28/2020 PLAN REVIEW CORRECTION LIST COMMERCIAL PLAN CHECK#.: CBC2020-0131 JURISDICTION: Carlsbad OCCUPANCY: B/S-I USE: Office I Warehouse TYPE OF CONSTRUCTION: Ill-B ACTUAL AREA: 5820 sq. ft. ALLOWABLE FLOOR AREA: STORIES: One HEIGHT: SPRINKLERS?: Yes REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 3/13/2020 DATE INITIAL PLAN REVIEW COMPLETED: 4/27/2020 FOREWORD (PLEASE READ): OCCUPANT LOAD: 107 DATE PLANS RECEIVED BY ESGIL CORPORATION: 4/9/2020 PLAN REVIEWER: Interwest Consulting Group This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2019 CBC, which adopts the 2018 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2018 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad CBC2020-0 13 i.E 4/28/2020 Please make all corrections, as requested in the correction list. For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602- 2700. The City will route the plans to EsGil and the Carlsbad Planning, Engineering and Fire Departments. Bring TWO corrected set of plans and calculations/reports to EsGil, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil is complete. Sheet AO.11: Please clarify the scope of work to clarify if this is a new tenant to occupy this suite or if there is an existing tenant that is adding a clean room to their space. The scope shows work for the clean room, but this is also listed as deferred. 2. Please provide a list of hazardous materials (and their classifications) to be used in this space and in the clean room. Please provide the use of the room- what is work being done in the space? Provide details of the clean room Manufacturer's data Construction Anchorage/bracing , Exit system details Fire sprinklers Lighting Insulation HVAC/plumbing Listing info Provide a City of Carlsbad Hardship form to clarify the accessibility scope of work: https://www.carlsbadca .gov/civicax/filebank/blobd load.aspx?Blobl D25001 Show the scope of accessibility work/upgrades, consistent with CBC 11 B-204 and hardship form. Carlsbad CBC2020-0 13 i.E 4/28/2020 Provide a wall legend. Different wall types ke shown, but not defined on architectural and E5.0 sheets Show the width of the new corridor to be created adjacent to the clean room and show that the door does not infringe on exit width. STRUCTURAL Per Sheet A4.2, a suspended .ceiling system will be provided. Please provide details showing how the splay wires and compression struts are supported or attached to the upper floor or roof framing elements. The details should be specific and not generic and must specify the type of floor or roof they are attaching to (wood, steel, concrete?) Please provide details for the construction of the new interior partition walls and provide details showing how the walls are supported at the base and at the top against out of plane MECHANICAL I PLUMBING Provide mechanical plans showing the scope and substantial compliance of new work and connections to existing work. 12 Provide mechanical plans showing make and model numbers, ducts, cfm to new clean room space. Provide mechanical plans showing mechanical work at the rest of the suite. Provide plumbing plans showing the scope and substantial compliance of new work and connections to existing work. ELECTRICAL Please clarify the clean room scope along with the rest of the plan sheets. Coordinate the number and location of exit lights in the clean room with the. architectural plan. ENERGY Provide Title 24 documentation, per the 20191 Building Energy Efficiency Standards section 10-103(a)2; the certificates of compliance must be incorporated into the plans and also must be submitted in 8.5" x 11" loose leaf format. Provide energy compliance for new HVAC, Carlsbad CBC2020-0131.E 4/28/2020 Provide energy compliance for new envelope- It appears that this new conditioned space is being built in an unconditioned portion of the building. CALGREEN No comments. MISCELLANEOUS To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes L3 No L3 22. The jurisdiction has contracted with EsGil, located at 9320 Chesapeake. Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact - Thomas Trimberger, ttrimberqer(interwestqrp.corn. 916/761-9021 at Esjj 916-277-9043 Thank you. Carlsbad CBC2020-0131.E 4/28/2020 (DO NOT PAY— THIS IS NOT AN INVOICE) VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK #.: CBC2020-0131.E PREPARED BY:I.W. DATE: 4/28/2020 BUILDING ADDRESS: 2810 Carubou Ct. Ste 100 BUILDING OCCUPANCY: BUILDING PORTION AREA (Sq. Ft) Valuation Multiplier Reg. Mod. VALUE ($) T.I 5820 46.51 270,688 Air Conditioning Fire Sprinklers TOTAL VALUE 270,688 Jurisdiction Code Icb IBY Ordiflancó I 1997 UBC Building Permit Fee 1997 UBC Plan Check Fee jVJ "Al Type of Review: 21 Complete Review El Structural Only El Other 0 Repetitive Fee Repeats o Hourly EsGil Fee Comments: In addition to the above $ /hr.) for the CalGreen review. $801.521 - isauei not Sheet 1 of 1 STRUCTURAL CALCULATIONS PROJECT: Z i"15t L U'J I T r po - I N-TK STRUCTURAL ENGINEERS, LLP DESIGN ASSUMPTIONS: CONCRETE STRENGTH AT TWENTY EIGHT DAYS: PSi MASONRY: GRADE AN" CONCRETE BLOCK F M = PSI 0 MORTAR: TYPE S 1,800 PSI T M. GROUT: 2000 PSI No. 43ML REINFORCING STEEL: A-615 GRADE 40: #4 AND LESS (U.O.N.) E* 101all GRADE 60: #5 AND LARGER STRUCTURAL STEEL A-36 LUMBER: DOUGLAS FIR-LARCH 'ITt ii. JOISTS #2 BEAMS AND POSTS #2 STUDS STUD OR BETTER SEISMIC FORCE: 't OW -AC BY: WIND FORCE: REPORT NO.: SOIL PRESSURE:____________ DESIGN LOADS: ROOF DEAD LOAD FLOOR DEAD LOAD WALL DEAD LOAD SLOPING ELM C !tL EXTERIOR 16 PSF ROOFING FLOORING INTERIOR 10 PSF PLYWOOD PLYWOOD JOISTS JOISTS 1NSUL. & CLG. INSUL. & CLG. MISC. MISC. 4 TOTAL TOTAL - ROOF LIVE LOAD FLOOR LIVE LOAD SLOPING = - INTERIOR 40 PSF FLAT = I BALCONY 60 PSF (U.O.N.) EXIT WALKWAY 100 PSF These calculations are limited only to the items included herein, sele c t e d b y t h e c l i e n t a n d d o n o t i m p l y a p p r o v a l o f a n y other portion of the structure by this office. These calculations are not vali d I f a l t e r e d i n a n y w a y , o r n o t a c c o m p a n i e d b y a stamp and signature of the Engineer of Record. - MWA San Clean . 14204 D,nelaon Striet, Suite 4 39 Pow.V, CA 9 2 0 5 4 ( 5 5 $ ) 6 7 9 - 5 9 5 9 , Fen (555) 5790959 jet-- hat;.. pgle Cleveland, ' Vista National Forest 355 - ft Ahza-Borrei Càr1sba. . Deert Stéte Pan San Diego '- ''-0 o Chute - ,Map data 02020 Google, INEGI C(rC Hazards by Location 'V Search Information Address: Caribou Ct, San Diego, CA 92129, USA Coordinates: 32.9602486,-117.1638856 Elevation: 355 ft Tlmestamp: 2020-04-01 T22:58:55.306Z Hazard Type: Seismic Reference ASCE7-16 Document; Risk Category: ii Site Class: D-default Basic Parameters Name Value S5 0.888 S1 0.324 SMS 1.066 SM1 * null SDS 0.71 SM * null * See Section 11.4.8 Description MCER ground motion (peri0d0.2s) MCER ground motion (perlod=1 .0s) Site-modified spectral acceleration value Site-modified spectral acceleration value Numeric seismic design value at 0.2s SA Numeric seismic design value at 1.0s SA -Additional Information Name Value Description SDC * null Seismic design category Fa 1.2 Site amplification factor at 0.2s F * null Site amplification factor at I .Os CRS 0.906 Coefficient of risk (0.2s) CR1 0.916 Coefficient of risk (1.0s) PGA 0.385 MCEG peak ground acceleration FPGA 1.215 Site amplification factor at PGA PGAM 0468 Site modified peak ground acceleration ((31Lç . 22 (c,( Lohi Px-& Ooir~ cfi (. e2x 57 rA ((4- +- z) r 71 K-7 1w .- 12- ('fi' '000 0 - 731 ((,s. I SAN DIEGO REGIONAL OFFICE USE ONLY HAZARDOUS MATERIALSPLAN RECORD ID 0 CHECK # OCCC QUESTIONNAIRE BP DATE I I Business Name Business Contact Telephone # Zense-Life Inc. Leif Bowman 858-888-5289 Project Address City State Zip Code APN# 2810 Caribou Court, Suite 100, Carlsbad, CA 92010 Mailing Address City State Zip Code Plan File# 2810 Caribou Court, Suite 100, Carlsbad, CA 92010 Project Contact Applicant E-mail Telephone # Leif Bowman lbowman@zense-li.com 858-888-5289 The following questions represent the facility's activities, NOT the specific project description. PART I: FIRE DEPARTMENT -HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for orolects within the City of San Diego): Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal. Occupancy Rating: Facility's Square Footage (including proposed project): Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives Compressed Gases 6. Oxidizers 10. C 14. Other Health Hazards lammable/Combustible Liqui s 7. Pyrophorics . Highly R ives~~~ 15. None of These. 4. 8. Unstable Reactives 12. Ra ioa Call (858) 505-6700 prior to the issuance of a building permit FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: YES NO (for new construction or remodeling projects) 0 0 Is your business listed on the reverse side of this form? (check all that apply). 0 0 Will your business dispose of Hazardous Substances or Medical Waste in any amount? 0 0 Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500 pounds and/or 200 cubic feet? 0 0 Will your business store or handle carcinogens/reproductive toxins in any quantity? 0 El Will your business use an existing or install an underground storage tank? 0 9 Will your business store or handle Regulated Substances (CalARP)? 0 9 Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)? 0 9 Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act). If the answer to any of the n Diego, CA 92123. CalARP Exempt Date Initials CalARP Required Date Initials 0 CalARP Complete Date Initials PART III: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (APCD): Any YES* answer requires a stamp from APCD 10124 Old Grove Road, San Diego, CA 92131 acdcomotsdcounty.ca.ov (858) 586-2650). [*No stamp required if Qi Yes and 03 Yes and 0446 No]. The following questions are intended to identify the majority of air pollution issues at the planning stage. Projects may require additional measures not identified by these questions. For comprehensive requirements contact APCD. Residences are typically exempt, except - those with more than one building on the property; single buildings with more than four dwelling units; townhomes; condos; mixed-commercial use; deliberate burns; residences forming part of a larger project. [Excludes garages & small outbuildings.] YES NO 0 9 Will the project disturb 160 square feet or more of existing building materials? 0 6 Will any load supporting structural members be removed? Notification may be required 10 working days prior to commencing demolition. 0 0 (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by a Certified Asbestos Consultant or Site Surveillance Technician? 0 0 (ANSWER ONLY IF QUESTION 3 IS YES) Based on the survey results, will the project disturb any asbestos containing material? Notification may be required 10 working days prior to commencing asbestos removal. 0 9 Will the project or associated construction equipment emit air contaminants? See the reverse side of this form or APCD factsheet (www.sdapcd.org/info/facts/permits.odfl for typical equipment requiring an APCD permit. 0 0 (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school boundary Briefly describe business activities: Briefly describe proposed project: Medical device R&D Installation of prefabricated clean room and condenser on roof. Ideclare under penalty of perjury that to the best of my knowledge and bé P(PbQ,nes made herein are true and correct. 04 / 02 1 2020 Name of Owner or Authorized Acent Sianature of Owner or Authorized Aaent Date FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: FOR OFFICAL USE ONLY: DATE: I / BY: EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR occucv RELEASED FOR OCCUPANCY COUNTYHMD* APCD COUNTY-HMD APCD COUNTY-HMD APCD A stamp in this box Only exempts businesses from completing or updating a Hazardous Materials Business Plan. Other permitting requirements may still apply. HM-9171 (08/15) County of San Diego - DEH - Hazardous Materials Division ENCINA WASTEWATER AUTHORITY INDUSTRIAL WASTEWATER DISCHARGE PERMIT ENUM SCREENING SURVEY AUMMM 6200 Avenida Encinas, Carlsbad, CA 92011 -' Phone: 760-438-3941 Fax: 760-476-9852 SourceControl@encinajpa.com Date: 03.03.2020 Business Name: Zense-Life Inc. Street Address: 2810 Caribou Court Email Address:Ibowman@zense-Iife.com PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT: (ON REVERSE SIDE CHECK TYPE OF BUSINESS) Check all below that are present at your facility: Acid Cleaning o Food Processing Assembly o Glass Manufacturing Automotive Repair o Industrial Laundry Battery Manufacturing o Ink Manufacturing Biofuel Manufacturing o Laboratory atory Biotech~ emlca o Machining/Milling Bulk C Storage o Membrane manufacturing Car Wash (i.e. water filter membranes) Chemical Manufacturing o Metal Casting/Forming Chemical Purification o Metal Fabrication Dental Offices o Metal Finishing Dental Schools Electroplating Dental Clinics Electroless Plating Dry Cleaning Anodizing Electrical Component Coating (i.e. phosphating) Manufacturing Chemical Etching/Milling Fertilizer Manufacturing Printed Circuit Board Film/X-ray Processing Manufacturing Metal Powders Forming Nutritional Supplement/Vitamin Manufacturing Painting/Finishing Paint Manufacturing Personal Care Products Manufacturing Pesticide Manufacturing/ Packaging Pharmaceutical Manufacturing (including precursors) Porcelain Enameling Power Generation Print Shop Research and Development Rubber Manufacturing Semiconductor Manufacturing Soap/Detergent Manufacturing Waste Treatment/Storage New Business? YesNoI SIC Code(s) if known: Date operation began/will begin:_________________ Tenant Improvement? YestINoIJ If yes, briefly describe improvement:___________________________________________ Installation of I OOA I PH 30 Circuit Sub Panel for prefabricated cleanroom branch circuits and roofto Description of operations generating wastewater (discharged to sewer, hauled or evaporated): Estimated volume of industrial wastewater to be discharged (gal/ day): List hazardous wastes generated (type/volume): Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority? YestI Date: NoE Page 1of 2 ENCINA WASTEWATER AUTHORITY INDUSTRIAL WASTEWATER DISCHARGE PERMIT ( IRMIA SCREENING SURVEY WASTMATFIt 6200 Avenida Encinas, Carlsbad, CA 92011 -. Phone: 760-438-3941 Fax: 760-476-9852 SourceControl@encinajpa.com The commercial enterprises listed below are a partial listing of businesses that are exempt from industrial wastewater discharge permitting under normal operating conditions. They are exempt because (a) they discharge no process wastewater (i.e., they only discharge sanitary wastewater with no pollutants exceeding any local limits), and (b) they have no potential to negatively impact the EWPCF or other wastewater treatment plants in the ESS. Any questions regarding exemptions should be referred to EWA Source Control staff. o Automobile Detailers o Hotels/Motels (no laundry) o Barber/Beauty Shops o Laundromats o Business/Sales Offices o Libraries o Cleaning Services o Medical Offices (no x-ray developing) o Carpet/Upholstery o Mortuaries o Childcare Facilities o Museums o Churches o Nail Salons o Community Centers o Nursing Homes o Consulting Services o Office Buildings (no process flow) o Contractors o Optical Services o Counseling Services o Pest Control Services (no pesticide repackaging for sale) o Educational Services (no auto repair/film developing) o Pet Boarding/Grooming Facilities o Financial Institutions/Services o Postal Services (no carwash/auto repair) o Fitness Centers o Public Storage Facilities o Gas Stations (no car wash/auto repair) o Restaurants/Bars o Grocery Stores (no film developing) o Retail/Wholesale Stores (no auto repair/film developing) o Residential based Businesses o Theaters (Movie/Live) CERTIFICATION STATEMENT I certify that the information above is true and correct to the best of my knowledge. Signature: 4_ff~~Print Name: Leif Bowman DATE: 04022020 Facility Contact: Leif Bowman Title: CEO ENCINA WASTEWATER AUTHORITY 6200 AVENIDA ENCINAS, CARLSBAD, CA Phone: 760-438-3941 Fax: 760-476-9852 SourceControltencinaiDa .com Page 2 of 2 cr`City of Carlsbad CLIMATE ACTION PLAN CONSISTENCY CHECKLIST B-50 Development Services Building Division 1635 Faraday Avenue (760) 602-2719 www.carlsbadca.gov PURPOSE This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance requirements apply to their projects. The completed checklist must be included in the building permit application. It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. NOTE: The following type of permits are not required to fill out this form + Patio Decks 1 •• PME (w/o panel upgrade) + Pool . If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, an explanation must be provided to the satisfaction of the Building Official. .4 Details on CAP ordinance requirements are available on the city's website. .4 A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webpape and download the latest form. Project Name/Building Permit No.: Zense-Life Suite 100 BP No.: 02.4 2 Property Address/APN: 2810 Caribou Court, Suite 100, Carlsbad, CA 92010 209-120-03-00 Applicant Name/Co.: Zense-Life Inc. - Leif Bowman Applicant Address: 2810 Caribou Court, Suite 100, Carlsbad, CA 92010 Contact Phone: 858-888-5289 Contact Email: lbowman@zense-life.com Contact information of person completing this checklist (if different than above): Name: Heather Moore Contact Phone: 619-569-5633 Company name/address: Ware Malcomb Contact Email: hmoore@waremalcomb.com 3911 Sorrento Valley Blvd., Ste, 120 Applicant Signature: MLWA Date: 03.03.2020 r4 B-50 Page 1 of 6 Revised 08/19 - City of Carlsbad Climate Action Plan Consistency Checklist Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. For alterations and additions to existing buildings, attach Building Permit Valuation worksheet. Building Permit Valuation (BPV) from worksheet: $ 10O 5U,UB10 Construction Type Complete Section(s) Notes: A high-rise residential building is 4 or more stories, including a fl Residential Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use 0 New construction 2A, 3A, 1B,2B, 4A 3B 4A 0 Additions and alterations: BPV < $60,000 N/A N/A All residential additions and alterations BPV 2t $60,000 1A 4A 4A 1-2 family dwellings and townhouses with attached garages Electrical service panel upgrade only ' only *Multi-family dwellings only where interior finishes are removed BPV 2:$200,000 1A, 4A* 1 B, 4A* and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed E1 Nonresidential 0 New construction IB, 2B, 3B, 4B and 5 IZI Alterations: III BPV 21200,000 or additions 2t 1,000 18 ,5 square feet BPV a $1,000,000 16, 2B, 5 a 2,000 sq. ft. new roof addition 2B, 5 Building alterations of 2t 75% existing gross floor area I B also applies if BPV 2! $200,000 CAP Ordinance Compliance Checklist Item Check the appropriate boxes, explain all not applicable and exception items, and provide supporting calculations and documentation as necessary. 1. Energy Efficiency Please refer to Carlsbad Municipal Code (CMC) sections 18.21.155 and 18.30.190, and the California Green Building Standards Code (CALGreen) for more information when completing this section. A. D Residential addition or alteration? $60,000 building permit valuation. 0 N/A___________________________ See CMC section 18.30.190. 0 Exception: Home energy score 2:7 (attach certification) Year Built Single-family Requirements Multi-family Requirements Before 1978 Select one: Duct sealing 0 Attic insulation 0 Cool roof 0 Attic insulation 1978 and later Select one: Lighting package 0 Water heating Package Between 1978 and 1991 Select one: Duct sealing 0 Attic insulation 0 Cool roof 1992 and later Select one: Lighting package 0 Water heating package B. (Zj Nonresidential* new construction or alterations? $200,000 building permit valuation, or additions? 1,000 square feet. 0 N/A_____________________________ Updated 8/15/2019 2 - City of Carlsbad Climate Action Plan Consistency Checklist See CMC 18.21.155 and CALGreen Appendix AS, Division A5.2 - Energy Efficiency. A5.203.1.1 Choose one: 0.1 Outdoor lighting 0.2 Warehouse dock seal doors 0.3 Restaurant service water heating (comply with California Energy Code section 140.5, as amended) 0 N/A_____________________________ A Daylight design PAFs 0.5 Exhaust air heat recovery A5.203.1.2.1 Choose one as applicable: 0.95 Energy budget 0.90 Energy budget 0 N/A_____________________________ A5.211.1 On-site renewable energy 0 N/A_____________________________ A5.211.3 Green power (if offered by local utility provider, 50% minimum renewable sources) 0 N/A_____________________________ A5.212.1 Elevators and escalators 0 N/A___________________________ A5.213.1 Steel framing 0 N/A_______________________ * Includes hotels/motels and high-nse residential buildings For alterations? $1,000,000 BPV and affecting >75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with CMC 18.30.130 instead. 2. Photovoltaic Systems [J Residential new construction (for low-rise residential building permit applications submitted after 111/20). Refer to 2019 California Energy Code section 150.1(c)14 for requirements. Notes: 1) High-rise residential buildings are subject to nonresidential photovoltaic requirement (2B below) instead. 2) If project includes installation of an electric heat pump water heater pursuant to CMC 18.30.150(B) (high-rise residential) or 18.30.170(B) (low-rise residential), increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional sheets if necessary) CFA #d.u. Calculated kWdc* Exception 0 0 Total System Size: kWdc kWdc = (CFAx.572) /1,000 + (1.15 x #d.u.) *Formula calculation where CFA = conditional floor area, #du = number of dwellings per plan type If proposed system size is less than calculated size, please explain. [] Nonresidential new construction or alterations a$1,000,000 BPV and affecting ~75% existing floor area, or addition that increases roof area by a2,000 square feet. Please refer to CMC section 18.30.130 when completing this section. Note: This section also applies to high-rise residential and hotel/motel buildings. Choose one of the following methods: 0 Gross Floor Area (GFA) Method GFA: Mm. System Size: kWdc 0 If < 10,000s.f. Enter: 5 kWdc 0 If? 10,000s.f. calculate: 15 kWdc x (GFNI0,000) ** **Round building size factor to nearest tenth, and round system size to nearest whole number. 0 Time- Dependent Valuation Method Updated 8/15/2019 3 City of Carlsbad Climate Action Plan Consistency Checklist Annual TDV Energy use:*** x.80= Mm. system size: kWdc ***Attach calculation documentation using modeling software approved by the California Energy Commission. 3. Water Heating A Residential and hotel/motel new construction Please refer to CMC sections 18.30.150 and 18.30.170 when completing this section. El For systems serving individual dwelling units choose one: El Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise residential only) Heat pump water heater AND PV system .3 kWdc larger than required in CMC section 18.30.130 (high rise residential hotel/motel) or CA Energy Code section 150.1(c) 14 (low-rise residential) El Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher El Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors El Exception: El For systems serving multiple dwelling units, install a central water-heating system with all of the following: El Gas or propane water heating system El Recirculation system per CMC 18.30.150(B) (high-rise residential, hotel/motel) or CMC 18.30.170(B) (low- rise residential) El Solar water heating system that is either: E1.20 solar savings fraction [:]. 15 solar savings fraction, plus drain water heat recovery El Exception: B. F1 Nonresidential new construction Please refer to Carlsbad Ordinance CMC section 18.30.150 when completing this section. Water heating system derives at least 40% of its energy from one of the following (attach documentation): El Solar-thermal El Photovoltaics El Recovered energy ElWater heating system is (choose one): El Heat pump water heater El Electric resistance water heater(s) ElSolar water heating system with .40 solar savings fraction El Exception: Updated 8/15/2019 4 City of Carlsbad Climate Action Plan Consistency Checklist 4. : :.' . M Residential New construction and major alterations* Please refer to Carlsbad Ordinance CMC section 18.21.140 when completing this section. []One and two-family residential dwelling or townhouse with attached garage: []One EVSE Ready parking space required IJ Exception: U Multi-family residential: 0 Exception: Total Parking Spaces Proposed IEVSE Spaces Capable Ready Installed Total Calculations: Total EVSE spaces =10 x Total parking (rounded up to nearest whole number) EVSE Installed = Total EVSE Spaces x.50 (rounded up to nearest whole number) EVSE other= Total EVSE spaces - EVSE Installed (EVSE other may be "Capable," "Ready" or "Installed.") "Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation 2160,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation 21200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. [] Nonresidential new construction (includes hotelsimotels) O Exception: Total Parking Spaces EVSE SD Proposed I Capable Ready Installed Total 10 1 2 5 1 8 Calculation: Refer to the table below: Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces o 0-9 1 1 10-25 2 1 0 26-50 4 2 0 51-75 6 3 0 76-100 9 5 9 101-150 12 6 151-200 17 9 9 201 and over 10 percent of total 50 percent of Required EV Spaces Updated 8/15/2019 City of Carlsbad Climate Action Plan Consistency Checklist S. fl Transportation Demand Management (TDM): Nonresidential ONLY 1 An approved Transportation Demand Management (TDM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT. City staff will use the table below based on your submitted plans to determine whether or nor your permit requires a TDM plan. If TDM is applicable to your permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details. Employee ADT Estimation for Various Commercial Uses Emp ADTI Use first 1, 000 s. f 1000 Office (afl)2 20 13 11 11 Restaurant Retail3 8 4.5 Midustrial 4 3 Manufacturing 4 1 Warehousing i Unless otherwise noted, rates estimated from ITE Trip Generation Manual, lOthEdition 2 For all office uses, use SANDAG rate of 20 ADT/1 ,000 Sf to calculate employee ADT Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration Sample calculations: Office: 20,450 sf 1. 20,450 sf11000 x 20 = 409 Employee ADT Retail: 9,334 Sf First 1,000 sf= 8ADT 9,334 sf- 1,000 sf= 8,334sf (8,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT Acknowledgment: I acknowledge that the plans submitted may be subject to the City of Casbad's Transportation Demand Management Ordinance. I agree to be contacted should my permit require a TOM plan and understand that an approved TOM plan is a condition of permit issuance. Applicant Signature: 1A?(IV\1.$('Q Date: 04.02.2020 Person other than Applicant lobe contacted for TDM compliance (if applicable): Name (Printed): Heather Moore Phone Number: 619-569-5633 Email Address: hm00re@warem0mbc0m Updated 8/15/2019 PERMIT REPORT (rcity of Carlsbad Print Date: 07/21/2020 Permit No: PREV2020-0091 Job Address: 2810 CARIBOU Cr, # 100, CARLSBAD, CA 92010 Status: Closed - Finaled Permit Type: BLDG-Permit Revision Work Class: Commercial Permit Revisi Parcel #: 2091200300 Track #: Applied: 06/24/2020 Valuation: $0.00 Lot #: Issued: 07/01/2020 Occupancy Group: - Project #: Finaled Close Out: 07/21/2020 #of Dwelling Units: Plan #: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check #: CBC2020-0131 Inspector: Plan Check #: Final Inspection: - Project Title: Description: ZENSE: ELECTRICAL AND STRUCTURAL CHANGES Applicant: Property Owner: Contractor: ZENSE-LIFE INC VICTORY CARLSBAD OAKS INNOVATION S P WHITE CONSTRUCTION INC LEIF BOWMAN CENTER LP 2524 GATEWAY RD 2810 CARIBOU CT, # 100 1261 PROSPECT ST, # 9 CARLSBAD, CA 92009-1742 CARLSBAD, CA 92010 LA JOLLA, CA 92037 (760) 931-1130 (858) 888-5289 FEE AMOUNT BUILDING PLAN CHECK REVISION ADMIN FEE $35.00 MANUAL BLDG PLAN CHECK FEE $131.25 Total Fees: $ 166.25 Total Payments To Date: $ 166.25 Balance Due: $0.00 BUilding Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-2700 1 760-602-8560 f I www.carlsbadca.gov PLAN CHECK REVISION OR Development Services cr Pty of DEFERRED SUBMITTAL Building Division Carlsbad APPLICATION 1635 Faraday Avenue 760-602-2719 B-15 www.carlsbadca.gov Original Plan Check Number CBC2020-01 31 Plan Revision Number NJJ0Q03n—Cx^A-I Project Address 2810 Caribou Court, Suite 100 Carlsbad, CA 92010 General Scope of Revision/Deferred Submittal: Sets delivered for review and stamping as they were not included in perforated set. CONTACT INFORMATION: Name Heather Moore Phone 619-569-5633 Fax Address 3587 Accomac Ave city San Diego Zip 92111 Email Address hmoore@waremalcomb.com Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1. Elements revised: • Plans U Calculations U Soils U Energy U Other 2. 3. Describe revisions in detail List page(s) where each - revision is shown Electrical and structural plans were provided to Carlsbad Bldg. Dept. as the original approved sets were not in the perforated set. Please I send to Esgil for review and stamping. I I Does this revision, in any way, alter the exterior of the project? U Yes [N No Does this revision add ANY new floor area(s)? U Yes U No Does this revision affect any fire related issues? U Yes UI No 7e is this a complete set? U Yes It No LD0y s.gnod by Heather Mowe DN: C'US. E0macee@w n, aeealeemb.com. O'Ware Malomb. CNHea0,er Moore £Signature_Heather Moore Dit 2020.06.22 20:32 57.07w Date 06/22/2020 1635 Faraday Avenue, Carlsbad, CA 92008 fh: 760-602- 2719 E: 760-602-8558 Email: building@carlsbadcagov www.carsbadca.gov DATE: 6/3/2020 JURISDICTION: Carlsbad PLAN CHECK #.: CBC2020-0131.E EsGil A SArEbuitrCompany SET: II /APPLICANT RIS. fli02dô *061 PROJECT ADDRESS: 2810 Carubou Ct. Ste 100 PROJECT NAME: TI - 5280 St remodel 875 sf Clean room The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. El The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. LI The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. Li The applicant's copy of the check list has been sent to: EsGil staff did not advise the applicant that the plan check has been completed. Li EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: 4AN (b')) Mail Telephone Fax In Person LI REMARKS: Telephone #: Email: By: I.W. Enclosures: EsGil 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 DATE: 6-26-2020 JURISDICTION: Carlsbad EsGil- A SAFEbuILL' Company /APPLICANT URIS. PLAN CHECK #.: CBC2020-0131 (PREV2020-0091) SET:I PROJECT ADDRESS: 2810 Caribou Court PROJECT NAME: Zense Suite 100 The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. El The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. El The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. El The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. El The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. El The applicant's copy of the check list has been sent to: EsGil staff did not advise the applicant that the plan check has been completed. El EsGil staff did advise the applicant that the plan check has been completed. Person contacted: \ Date contacted :7//f2.O (b) Mail Telephone Fax In Person El REMARKS: Telephone #: Email: By: Erich A. Kuchar, P.E. Enclosures: Approved Set EsGil 6-20-2020 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad CBC2020-0 131 (PREV2020-009 1) 6-26-2020 (DO NOT PAY— THIS IS NOTAN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK #.: CBC2020-0131 (PREV2020-0091) PREPARED BY: Erich A. Kuchar, P.E. DATE: 6-26-2020 BUILDING ADDRESS: 2810 Caribou Court BUILDING OCCUPANCY: B/ S-i BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code Icb ]By Ordinance 1997 UBC Building Permit Fee [j 1997 IJ6C !Ian iCheck Fee. Type of Review: r Complete Review r Structural Only r Repetitive Fee pIj Repeats * Based on hourly rate F Other F_Hourly EsGil Fee 11Hr.@* $105.00 I $105.001 Sheet 1 of 1 >. WALL DEAD LOAD tsm oxm If DESIGN LOADS: ROOF DEAD LOAD SLOPING ELATI FLOOR DEAD LOAD INT. STRUCTURAL CALCULATIONS LHTK RU ENGINEERS, LLP PROJECT: C1 IT ~uepoP-i DESIGN ASSUMPTIONS CONCRETE STRENGTH AT TWENTY EIGHT DAYS: PSI MASONRY: GRADE "N" CONCRETE BLOCK F' M = DCI MORTAR: TYPE S 1,800 PSI GROUT: 2000 PSI REINFORCING STEEL: A-615 GRADE 40: #4 AND LESS (U.( GRADE 60: #5 AND LARGER STRUCTURAL STEEL A-36 LUMBER: DOUGLAS FIR-LARCH JOISTS #2 BEAMS AND POSTS #2 STUDS STUD OR BETTER SEISMIC FORCE: 't 1146t 4$ REPORT BY: WIND FORCE: REPORT NO.: SOIL PRESSURE:____________ ROOFING FLOORING INTERIOR 10 PSF PLYWOOD PLYWOOD EXTERIOR 16 PSF JOISTS JOISTS INSUL & CLG. INSUL & QG. MISc iiL f MISC. TOTAL = - TOTAL R_QOF LIVE LOAD FLOOR LIVE LOAD SLOPING 'J 5 f INTERIOR 40 PSF FLAT = P - BALCONY 60 PSF (U.O.N.) EXIT WALKWAY 100 PSF These calculations are limited only to the items included herei n , s e l e c t e d b y t h e c l i e n t a n d d o n o t i m p l y a p p r o v a l o f a n y other portion of the structure by this office. These calculations are not v a l i d I f a l t e r e d i n a n y w a y , o r n o t a c c o m p a n i e d b y a stamp and signature of the Engineer of Record. lee DIeo . 14204 Danielson Street. Suite I SOD. Pwep, C A 0 5 0 6 4 . 1 5 1 ) 6 7 9 8 9 8 9 . F e e ( I S O ) 0 7 9 - 0 0 5 9 CflC Hazards by Location 'V Search Information Address Caribou CL, San Diego, CA 92129, USA Coordinates: 32.9602486, -117.1638856 Elevation: 355 ft Ilmestamp: 2020-04-01 T22:58:55.306Z Hazard Type: Seismic Reference ASCE7-16 Document Risk Category: II Site Class: D-default tat. - W Ôleveland - Vista: National forest 355 ft AhzaBorre Carlsba. . Desert 'State Pan v - Sari Diegb •. -•r• - .•o .,.-. . Chura Vista - ,lb ____.-. . r'5 Map data 02020 Google, INEGI Basic Parameters Name Value Description ss 0.888 MCER ground motion (per1od029) S1 0.324 MCER ground motion (perlod1.0s) SMS 1.086 Site-modIfied spectral acceleration value SM1 * null Site-modified spectral acceleration value SDS 0.71 Numeric seismic design value at 0.2s SA SD, null Numeric seismic design value at lOs SA * See Section 11.4.8 -Additional Information Name Value Description SDC * null Seismic design category Fa 12 Site amplification factor at 02s F, * null Site amplification factor at lOs CRS 0.906 Coefficient of risk (0.2s) CR1 0.916 CoefficIent of risk (lOs) PGA 0.385 MCE0 peak ground acceleration FPGA 1.215 Site amplification factor at PGA PGAM 0.468 Site modified peak ground acceleration ___• --j__ I ± 1 IF .. 42.j : 11It;; r4(f) - — ---iL2 (,5p Iasi ti Cl lop/ 4IF1H1 1T 71 27H I II i . -- - -- - I — - --— i - — : - - ' -- — - -.. . -. •,_—:I .— T - . .. - -- - ; -- --- I L:LI tJIriT1±f ............... ........ il.1 rfi S`f f c)"W' . 2.2k ('( L c)jsi P=YL Ove 24g ((3S 71 (7(, F 17- &6p o ((L r I+'i - 12- i" I ,, , j r% -4- fl to t. x i'Yh' 4 - 731 ,9fo fk 2'.b