Loading...
HomeMy WebLinkAbout1375 SAPPHIRE DR; ; CB152386; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 08-25-2015 Residential Permit Permit No: CB152386 Building Inspection Request Line (760) 602-2725 Job Address: 1375 SAPPHIRE DR CBAD Permit Type: RESDNTL Sub Type: RAD Status: ISSUED Parcel No: 2122500600 Lot #: 0 Applied: 07/28/2015 Valuation: $24,880.00 Constuction Type: 513 Entered By: SLE Occupancy Group: Reference #: Plan Approved: 08/25/2015 # Dwelling Units: 0 Structure Type: Issued: 08/25/2015 Bedrooms: 0 Bathrooms: 0 Inspect Area: Orig PC #: Plan Check #: Project Title: FELDMANN RES -A 20 SF ADDITION TO KITCHEN, 318 SF DECK OFF MASTER BED WITH SPIRAL STAIRCASE Applicant: Owner: REDSTONE DEVELOP. CORP FELDMANN FAMILY TRUST 04-20-12 711 MISSION AVE. OCEANSIDE 1375 SAPPHIRE DR CA 92054 CARLSBAD CA 92011 949-795-7916 Building Permit . $246.49 Meter Size Add'I Building Permit Fee $0.00 Add'I Red. Water Con. Fee $0.00 Plan Check $172.54 Meter Fee $0.00 Add'I Plan Check Fee $0.00 SDCWA Fee $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee $3.23 PFF (3105540) $0.00 Park in Lieu Fee $0.00 PFF (4305540) $0.00 Park Fee $0.00 License Tax (3104193) $0.00 LFM Fee $0.00 License Tax (4304193) $0.00 Bridge Fee $0.00 Traffic Impact Fee (3105541) $0.00 Other Bridge Fee $0.00 Traffic Impact Fee (4305541) $0.00 BTD #2 Fee $0.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $42.00 Renewal Fee $0.00 ELECTRICAL TOTAL $45.00 Add'I Renewal Fee $0.00 MECHANICAL TOTAL $0.00 Other Building Fee $0.00 Housing Impact Fee $0.00 HMP Fee $0.00 Housing InLieu Fee $0.00 Pot. Water Con. Fee $0.00 Housing Credit Fee $0.00 Meter Size Master Drainage Fee $0.00 Add'I Pot. Water Con. Fee $0.00 Sewer Fee $0.00 Red. Water Con. Fee $0.00 Additional Fees $0.00 Green Bldg Stands (SB1473) Fee $1.00 Fire Sprinkler Fees $0.00 Green Bldg Stands Plan Chk Fee $0.00 TOTAL PERMIT FEES $510.26 Total Fees: $510.26 Total Payments to Date: $510.26 Balance Due: $0.00 Innettor 'V f'f FINAL APPROVAL I Date: 3 Clearance: I NOTICE: Please take NOTICE that approval of your project includes the Imposition of fees, dedications, reservations, or other exactions hereafter collectively referred to as 'fees/exactions. You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your fight to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any City of Carlsbad 1635 Faridáy Av àarlsbad; ÔÄ 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit 08-25-2015 Permit No:SWI50287 Job Address: 1375 SAPPHIRE DR CBAD Permit Type: SWPPP Status: ISSUED Pardel No: 2122500600 Lot #: 0 Applied: 07/28/2015 Reference #: Entered By: SLE CB#: CB152386 Issued: 08/25/2015 • Inspect Area: Project Title: FELDMANN RES - SWPPP. FOR 120SF Tier: 1 • Priority: L Applicant: • Owner: REDSTONE DEVELOP. CORP FELDMANN FAMILY TRUST 04-20-12 711 MISSION AVE. OCEANSIDE 1375 SAPPHIRE DR CA 92054 CARLSBAD CA 92011 949-795-7916 Emergency Contact: MARCOS NORTON • 949-795-7915 SWPPP Plan Check • $48.00 SWPPP Inspections $58.00 Additional Fees : • $0.00 TOTAL PERMIT FEES • $106.00 Total Fees: $106.00 Total Payments To Date: • $106.00 • Balance Due: $0.00 ANAL APPNOVAL DATE.1r4tEAjANCE SIGNATURE THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 0 PLANNING 0 ENGINEERING 0 BUILDING 0 FIRE [:]HEALTH 0 HAZMATIAPCD Building Permit Application Plan Check No. 15 13gt..D t(:7City of 1635 Faraday Ave., Carlsbad, CA 92008 Est. Value 7.4 , Carlsbad email: Ph: 760-602-2719 Fax: 760-602-8558 Plan Ck. Deposit building©carlsbadca.gov www.carlsbadca.gov Date -.jç Iswppp I 5L293J I JOB ADDRESS -:z (3i SUrTEI/SPACEC/UNIT. APN CT/PROJECT C LOT PHASE C # of UNITS BEDROOMS C BATHROOMS TENANT BUSINESS NAME OC GROUP DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) got / g;_-j- oJeI çry4 -f ii - apf 4 I 21D .Tht)r? er-k- ,'iit' i r rfr' q p;L X e0510 f 1D5S 1?JLtrJfl- D4 it x -ek iV IrJ1 tID( F) I FIREPLACE AIR CONDITIONING I FIRE SPRINKLERS EXISTING USE PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS YES#. NOE YES NO YESM NoE APPLICANT NAME PROPERTY OWNER NAME - fgiv 'dna,v Contact _______________________________________________ ADDRESS ADDRESS ADDRESS, 0-0101SW91\AD. OF CITY SJbTE ZIP ZIP 9c)I1 P40N)qç FAX PHO) FAX W. EMAIL Gvi ir EMAIL DESIGN PROFESSIONAL . - i -- - - / - CONTRACTOR BUS. NAME CITY STATE Ok 9P,.1, CITY STATE ZIP PHONE 1FAX PHONE FAX ni-\--v c?cc EMAIL STATE LIC. C (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit applicant for such permit to file a signed statement that he is licensed pursuant to the pr Business and Professions Code) or that he is exempt therefrom, and the basis for the allr civil nennitv of not more than five hundred dollars 1550011. to construct, alter, improve, demolish or ovisions of the Contractor's License Law aged exemption. Any violation of Section I)I IWU its issuance, also requires the th Section 7000 of Division 3 of the a permit subjects the applicant to a Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: R I have and will maintain a certificate of consent to self-insure for workers' ompensadoh as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maIntain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Co. Policy No. Expiration Date _Jt1 section need not be completed if the permit is torpaqhundred,ollars ($100) or less. Certificate of Exemption: I certify that in the perf9thranIe oj.fhe tork for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workersfcomph fitlonpoverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (9100,000), in addition to the cost of compensation, damages a provid for InJSection 3706 of the Labor code, Interest and attorney's fees. £ CONTRACTOR SIGNATURE NT DATE Izah 00(000 -11)(91)(1@00 ®® I hereby affirm that! am exempt from Contracto?s License Low for the Wowing reason.- F1 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner.buildèr will have the burden of proving that he did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). [] I am exempt under Section Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement Dyes [JNo 2.1(have /have not) signed an application for a building permit for the proposed work. I have contracted with the following person (firm) to provide the proposed construction (include name address I phone !contractors' license number): I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name! address phone contractors' license number): I will provide some of the work, but I have c&Grd (h' the following persons to provide the work indicated (include name/address! phone / type of work): £PROPERTY OWNER SIGNATURE AgAGENT DATE I t( ®D1O De)@ IJO?O <Z)M? Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? I] Yes CI No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? CI Yes CI No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? CI Yes CI No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. €JO1tDW?O®W J)fl{I@ CS7 I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lenders Name Lender's Address QO1? €O€Wø IcertifythatIhave reathe application and statethatthe above infonnatlon isconectand thatthe information on the plans is accurate. lagmetocomplywith all City ordinances andStateIasielatingfu buitdlngconstructlon. I hereby authorize representative of the City of Carlsbad to enter upo mentioned properly for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXP CH MAY IN ANY WAY ACCRUE AGPJN& SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA An OSHA permit is required for excavations over 60 d and titian or construction of structures over 3stories in height. - EXPIRATION: Every permit issued by the Building Official und the provisirns of this Code shall expire by Imitation and become null and void the building or work authoriced by such permit is not commenced within leo days born the date ofsuch pennitorifthe buildingorwo au permit is suspended or abandoned at any firms after the work is commenced for a period of 180 days (Section 106.4.4 Uniform Building Code). ..APPLICANT'S SIGNATURE / - . DATE Inspection List Permit#: CB152386 Type: RESDNTL RAD FELDMANN RES - 120 SF ADDITION TO KITCHEN, 318 SF DECK OFF MASTER Date Inspection Item 03/29/2016 89 Final Combo 03/29/2016 89 Final Combo 01/21/2016 17 Interior Lath/Drywall 01/15/2016 16 Insulation 01/15/2016 18 Exterior Lath/Drywall 12/01/2015 15 Roof/Reroof 12/01/2015 84 Rough Combo 11/30/2015 83 Roof Sheathing/Ext Shear 11/30/2015 84 Rough Combo 10/02/2015 11 Ftg/Foundation/Piers Inspector Act Comments - RI AM PLEASE PB AP PB AP PB AP PB AP PB AP PB AP PB CA PB CA PB AP Wednesday, March 30, 2016 Page 1 of 1 - :'H%t• Inland Engineering TechnOlogies Inc. 41655 Reaaan Way Suite E. Murrieta, CA 92562 Phone: (9511894-6464 Fax: (951) 894-6491 Project Name: ft4A M hc der c - U Date: c f'31 15 Project No.: Client General Contractor: hLS70it Superintendent: 74jcj kc5 775 7/5 Contractor: Location 75S1fitU., CALSA,(4. Building Permit #: Report No. 1f_ Field _Report D_ Notice to_Conply Type of Inspection Performed: O Concrete F1 ACI Tech 0 Batch Plant 0 Reinforcing Steel 0 Pre-Post Tensioned Tendon LI Masonry 0 Fireproofing 0 Welding Inspector 0 Metal Decking Code ç1pj 0 Bolting Hours L.1 Other E7b)?(AJCr O Lj JiLs ,ksrc X(S?7&i L) P`bp (57 Th Ukk/jOL) \_LoçcThA GoAPA LJ d I( wtrkp Arbk{4s o )LA,u l /7m 4iP4- ' 5/?)" Nt(-tc, t1c1 Ti4 7/0 U rcmL) uswc - W, PKL6 ZW/7 1fM-10cmi, 1 ) \)t 5tN ucT eA cP11#..z' oF 44 3 Lc ( iijro sr(tj 60(JaKF(sTh U jcAA UIJU iiA tt Aff,icH PO(1Jl/J 161 PA7_1b /F4 As fr((ôaJs 'f '14ca, rm 7cF EWIM -:-6 r J (P. MTAtO USu : \)JhF4 Tft4T 1* iA £ cLAv 4-az F4 6L Ais fcA tc rt Lo kJ!: UJ I At A&6W T2U Ck MA Uwjxi 6 U CERTIFICATION OF COMPLIANCE: To the best of my knowledge, all of the observed work, unless otherwise stated, is in Page ( f Conformance with the approved plans and specifications and the wo ,manship provisions of the Applicable codes. - 0 lnsPectors T Signature lns h spector's Certifications51Name:7( 7dMt' INSPECTION REPORT I Received by: ' f4 White - File Copy Pink - Field Copy Yellow - Client Copy )O2. EsGil Corporation In (Partners/lip wit/i government for(Building Safety DATE: 8/24/2015 JURISDICTION: City of Carlsbad PLAN CHECK NO.: 15-2386 PROJECT ADDRESS: 1375 Sapphire Dr. SET: II U APPLICANT iURIS. PLAN REVIEWER U FILE PROJECT NAME: Feldmann Residence Remodel & Addition The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. E The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. E The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: EsGil Corporation staff did not advise the applicant that the plan check has been completed. F-1 EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: Mail Telephone Fax In Person REMARKS: The clouded notes on sheet 3-7 and 4-7 shall be made on city II set. (at building department) By: David Yao Enclosures: EsGil Corporation 0 GA 0 EJ 0 MB 0 Pc 8/17 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 EsGil Corporation In (Partnership with government for Mudding Safety DATE: 8/6/2015 JURISDICTION: City of Carlsbad PLAN CHECK NO.: 15-2386 SET:I UPPLICANT ,d JURIS. U PLAN REVIEWER U FILE PROJECT ADDRESS: 1375 Sapphire Dr. PROJECT NAME: Feldmann Residence Remodel & Addition E The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Redstone Development Corp. 825 College Blvd. Ste 102-340 Oceanside, CA 92057 EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: ? Telephone #: 949-795-2210 D ,~; ate coniacted:/( (by:Y)- Email: ? 4arb-P-11-e'o . all TeoptFonle \ Fax In Person D REMARK _j - By: David Yao Enclosures: EsGil Corporation 0 GA LI EJ 0 MB LI PC 7/30 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 City of Carlsbad 15-2386 8/6/2015 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK NO.: 15-2386 JURISDICTION: City of Carlsbad PROJECT ADDRESS: 1375 Sapphire Dr. FLOOR AREA: Add living 120 sf Add deck 318 sf REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 8/6/2015 STORIES: 2 HEIGHT: DATE PLANS RECEIVED BY ESGIL CORPORATION: 7/30 PLAN REVIEWER: David Yao FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the California version of the International Residential Code, International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review Is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2013 edition of the California Code of Regulations (Title 24), which adopts the following model codes: 2012 IRC, 2012 IBC, 2012 UPC, 2012 UMC and 2011 NEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section. etc. Be sure to enclose the marked up list when you submit the revised plans. City of Carlsbad 15-2386 8/6/2015 Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. . PLANS 1. All sheets of plans must be signed by the person responsible for their preparation. (California Business and Professions Code). 2. Provide a statement on the Title Sheet of the plans stating that this project shall comply with the 2013 California Residential Code, which adopts the 2012 IRC, 2012 UMC, 2012 UPC and the 2011 NEC. Section R106.1. 3. Please indicate on the plans whether the existing residence has a fire sprinkler system installed. If so, then provide a note stating that any additions/alterations will be provided with an automatic residential fire sprinkler system. Section R313.2. 4. Show or note locations of permanently wired smoke alarms with battery backup, per Section R314: Inside each bedroom. Outside each separate sleeping area in the immediate vicinity of the bedrooms. On each story. NOTE: When more than one smoke alarm is required to be installed, the alarm devices shall be interconnected in such a manner that the actuation of one alarm will activate all of the alarms in the unit. 5. In existing buildings, when alterations, repairs or additions requiring a permit occur (or when one or more sleeping rooms are added), the dwelling unit shall be provided with smoke alarms located as required for new dwellings; the smoke alarms shall be interconnected and hard wired. Exception: Smoke alarms City of Carlsbad 15-2386 8/6/2015 in existing areas need not be interconnected and hard wired where the alterations or repairs do not result in the removal of interior wall or ceiling finishes exposing the structure, unless there is an attic, crawl space, or basement available which could provide access for hard wiring and interconnection without the removal of interior finishes. Section R314.3.1. 6. Specify on the plans that any existing smoke alarms that are more than 10 years old will be replaced. Section R314-3-2- 7. In dwelling units within which fuel-burning appliances are installed (and in dwelling units having attached garages), show or note the locations of permanently wired carbon monoxide alarms with battery backup, per Section R315: Outside each separate sleeping area in the immediate vicinity of the bedrooms. On each story. NOTE: When more than one carbon monoxide alarm is required to be installed, the alarm devices shall be interconnected in such a manner that the actuation of one alarm will activate all of the alarms in the unit. 8. When alterations, repairs or additions are proposed for dwelling units within which fuel-burning appliances are installed (and in dwelling units having attached garages), the dwelling unit shall be provided with carbon monoxide alarms located as required for new dwellings; the carbon monoxide alarms shall be interconnected and hard wired. Exception: Carbon monoxide alarms in existing areas need not be interconnected and hard wired where the alterations or repairs do not result in the removal of interior wall or ceiling finishes exposing the structure, unless there is an attic, crawl space, or basement available which could provide access for hard wiring and interconnection without the removal of interior finishes. Section R315.2. 9. Glazing in the following locations should be shown on the plans as safety glazing material in accordance with Section R308.4: a) Glazing in doors. EXITS, STAIRWAYS, AND RAILINGS 10. Provide spiral stairway details, per Section R311.7.10.1: Minimum run is 7-V2 inches measured at a point 12 inches from where the treads are the narrowest. Maximum rise is 944 inches. Maximum clear opening between risers is 4 inches. Minimum headroom is 6 feet 6 inches. The minimum clear width at and below the handrails shall be 26 inches. City of Carlsbad 15-2386 8/6/2015 . ROOFING 11. Specify roof/deck material and application. (Class A mm. city oolicy) 12. Specify on the plans the following information for the roof/deck materials, per Section R106.1.1: Manufacturer's name and product name/number. ICC approval number, or equal. . FRAMING 13. The foundation plan (S-2) reference detail 1, 2, 4, 6/SWSBI for the strong wall. No details were provided. 14. Provide calculation to show 4028 footing is adequate to support the strong wall. 15. Where is the support for the spiral stairway? Please reference from the plan with calculation to justify it. . MECHANICAL 16. Show on the plans the location, type and size (BTU's) of all heating and cooling appliances or systems. 17. Provide specification and installation instruction for "PATINA" fire pit. (distance to the combustible?) . ELECTRICAL 18. Show on the plan the amperage of the electrical service, the location of the service panel and the location of any sub-panels. 19. Note on the plans that receptacle outlet locations will comply with CEC Article 210.52. 20. Include on the plans the following specifications for electrical devices installed in dwellings: CEC Article 210 & 406 Tamper resistant receptacles for all locations described in 210.52 (i.e., all receptacles in a dwelling). Weather resistant type for receptacles installed in damp or wet locations (outside). Arc-fault protection for all outlets (not just receptacles) located in rooms described in NEC 210.8(A): Family, living, bedrooms, dining, halls, etc. City of Carlsbad 15-2386 8/6/2015 . PLUMBING Specify on the plans whether the existing house was built before or after 1994.- For additions or improvements to a residence built before 1994, note on the plans that existing "noncompliant" fixtures (toilets that use more than 1.6 gallons of water per flush, urinals that use more than one gallon of water per flush, showerheads that have a flow capacity of more than 2.5 gallons of water per minute, and interior faucets that emit more than 2.2 gallons of water per minute) shall be replaced. Certification of compliance shall be given to the building inspector prior to final permit approval. California SB407. . RESIDENTIAL GREEN BUILDING STANDARDS The California Building Standards Commission has adopted the Green Building Standards Code which became effective January 1, 2011 and must be enforced by the local building official. The following mandatory requirements for residential construction must be included on your plans. CGC Section 101.3. The Standards app'to newly constructed residential buildings, along with additions/alterations that increase the buDdingsiditine dare , volume or size. CGC Section 303.1.1. Provide a sheet on the plans labeled "Green Building Code Requirements" and include the following notes as applicable. Recycling. Note on the plans that a minimum of 50% of construction waste is to be recycled. CGC 4.408.1. Recycling. Note on the plans that the contractor shall submit a Construction Waste Management Plan to the jurisdiction agency that regulates waste management, per CGC 4.408.2. Operation and maintenance manual. Note on the plans that the builder is to provide an operation manual (containing information for maintaining appliances, etc.) for the owner at the time of final inspection. CGC 4.41 0.1. Pollutant control. Note on the plans that during construction, ends of duct openings are to be sealed, and mechanical equipment is to be covered. CGC 4.504.1. Pollutant control. Note on the plans that VOC's must comply with the limitations listed in Section 4.504.3 and Tables 4.504.1, 4.504.2, 4.504.3 and 4.504.5 for: Adhesives, Paints and Coatings, Carpet and Composition Wood Products. CGC 4.504.2. Interior moisture control. Note on the plans that concrete slabs will be provided with a capillary break. CGC 4.505.2.1. Interior moisture control. Note on the plans that the moisture content of wood shall not exceed 19% before it is enclosed in construction. The moisture content needs to be certified by one of 3 methods specified in Section 4.505.3. Building materials with visible signs of water damage should not be used in construction. City of Carlsbad 15-2386 8/6/2015 The moisture content must be determined by the contractor by one of the methods listed in CGC 4.505.3. Note on the plans that prior to final inspection the licensed contractor, architect or engineer in responsible charge of the overall construction must provide to the building department official written verification that all applicable provisions from the Green Building Standards Code have been implemented as part of the construction. CGC 102.3. . ENERGY CONSERVATION For plans submitted for plan check on or after 7/1/14, provide a Prescriptive or Performance energy design, demonstrating compliance with current 2013 energy efficiency standards. Information and Forms are available at: www.ener-gy.ca.gov/title24/2013standards o Current Performance energy design versions are: CBECC-Res V4, V3, V3b1 and V3c (Public Domain software) (New permits after 07/31/2015 must be V4) hftp://www.bwilcox.com/BEES/BEES.html EnergyProV66,65,64,63 (After 07/31/2015 must be V6.6) www.enerqysoft.com Right-Energy Title 24 V1.4, V1. 3, VI.2, VI.1 (After 07/31/2015 must be VI.4) www.wrightsoft.com Prior to the initial plan submittal, the energy design was required to be registered with the appropriate HERS provider data registry. Before the next plan review, please register the energy design and resubmit plans with completed forms showing the registration number. CaICERTS is the only current registry: https://www.calcerts.com (if applicable) Additions (Prescriptive): Fenestration: Additions < 400 sq. /ft.: Total glazing up to 75 sq. /ft. or 30% of conditioned floor area (whichever is greater) and up to 60 sq./ft. of west-facing glazing and RI 3 is acceptable for exterior wall insulation. It appears to the proposed addition does not comply with this requirement. Provide performance energy design. 33. Residential energy lighting requirements: ES 150.0(k) High efficacy fixtures are required for all other rooms (dining, living, retreat) or low efficacy fixtures are allowed if controlled by a dimmer or a vacancy sensor. City of Carlsbad 15-2386 8/6/2015 . MISCELLANEOUS To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly• describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes L3 No L3 36. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact David Yao at EsGil Corporation. Thank you. City of Carlsbad 15-2386 8/6/2015 [DO NOT PAY— THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLAN CHECK NO.: 15-2386 PREPARED BY: David Yao DATE: 8/6/2015 BUILDING ADDRESS: 1375 Sapphire Dr. BUILDING OCCUPANCY: R3 BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) addliving 120 add deck 380 per city 24,880 Air Conditioning Fire Sprinklers TOTAL VALUE 24,880 Jurisdiction Code 1cb IBY Ordinance I Bldg. Permit Fee by Ordinance I $246.491 Plan Check Fee by Ordinance V I $160.22 I Type of Review: Complete Review D Structural Only E1 Other i Repeats El flRepetitive Fee Hourly $138.031 d Hr.@* ____ I EsGil Fee _____ Comments: In addition tothe above fee, andditiöhaIfeeof $43 is due: 1/2 hour Cc ~C67E`r,j for-the Sheet I of I macvalue.doc + $.City of C arlsbad PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 08-03-2015 PROJECT NAME: FELDMAN RESIDENCE ADDITION/DECK PROJECT ID: CB15-2386 PLAN CHECK NO: SET#: 1 ADDRESS: 1375 SAPPHIRE DR. APN: 212-250-06 VALUATION: $24,880 SCOPE OF WORK: KITCHEN ADDITION OF 120 SQ. FT., 2ND STORY DECK OF - 318 SQ. FT. t)ebb'e. (7o3)461-4 qq I ><I This plan check review is complete and has been APPROVED by: LAND DEVELOPMENT ENGINEERING DIVISION Final Inspection by construction Management & Inspection Division is required: Yes El No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: CHARBELLE@ATT.NET To determine status by one of the divisions listed below, please contact 760-602-2719. P LAND DEVELOPMENT H 760-602-2750 - Chris Sexton Chris Glassen [' Greg Ryan J 760-602-4624 760-602-2784 -- -' 760-602-4663 Chris.Sexton@carlsbadca.gov Christopher.Glassen@carlsbadca.gov Gregory.Ryan@carlsbadca.gov '—.1 Gina Ruiz Linda Ontiveros ri Cindy Wong U 760-602-4675 760-602-2773 - —a 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov U ValRay Nelson 760-602-2741 Dominic Fier! 760-602-4664 ValRay.Marshall@carlsbadca.gov Dominic.Fieri@carlsbadca.gov Remarks: FELDMAN RESIDENCE ADDITION/DECK PLAN CHECK NO St p1YU Outstanding issues are marked with X Items that conform to permit IdSLflsk requirements are marked with 1 or have intentionally been left blank. 1. SITE PLAN Provi deafully dimensioned site plan drawn to scale. Show: / North arrow I - 'Driveway widths / Existing & proposed structures Lii Existing or proposed sewer lateral Existing street improvements - -] Existing or proposed water service _ Property lines (show all dimensions) L Submit on signed approved plans Easements DWG No. Right-of-way width & adjacent streets Show on site plan: I Drainage patterns and proposed site elevations Show all high points Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining -- - street or an approved drainage course. ADD THE FOLLOWING NOTE Finish grade will provide a minimum positive drainage of 2% to swale away from building". Existing & proposed slopes and topography Size location alignment of existing or proposed sewer and water service(s) that serves the project Each unit requires a separate service; however, second dwelling units and apartment complexes are an exception. Sewer and water laterals should not be located within proposed driveways, per standards. Include on title sheet: Site address / Assessors parcel number ii Legal description/lot number - For commercial/industrial buildings and tenant improvement projects include total building - - square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. - Show all existing use of SF and new proposed use of SF. Example: Tenant improvement for 3500 SF of warehouse to 3500 SF of office. Lot/Map No.: LOT #6, MAP #15222 Subdivision/Tract: CT 02-07 EMERALD POINTE ESTATES Reference No(s): E-36 Page 2 of 6 REV 6/01/12 FELDMAN RESIDENCE ADDITION/DECK PLAN CHECK NO # GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 15.16 of the Municipal Code. - E Jlnadequate information available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" Ei Grading Permit required. NOTE: The grading permit must be issued and rough grading approval obtained prior to issuance of a building permit. P] Graded Pad Certification required. (Note: Pad certification may be required even if a grading permit is not required.) All required documentation must be provided to your Engineering Construction Inspector The inspector will then provide the engineering counter with a release for the building permit. LZI No grading permit required. Minor Grading Permit required. See additional comments for project- specific requirements. MISCELLANEOUS PERMITS RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work adjacent to the public right-of-way. Types of work include, but are not limited to: street improvements, tree trimming, driveway construction, tying into public storm drain, sewer and water utilities. LL ED Right-of-way permit required for: NOTE: ANY WORK BEING DONE IN THE PUBLIC'S RIGHT-OF-WAY REQUIRES R.O.W. PERMIT. E-36 Page 4 of 6 REV 6/01/12 FELDMAN RESIDENCE ADDITION/DECK 7. STORM WATER Construction Compliance Project Threat Assessment Form complete. j Enclosed Project Threat Assessment Form incomplete. P71 Requires Tier I Storm Water Pollution Prevention Plan (E-29). Please complete attached form and return (SW15-287 LI]l Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMP) Compliance Storm Water Standards Questionnaire. Li LJ Project is subject to Standard Storm Water Requirements See city Standard Urban Storm Water Management Plan (SUSMP) for reference. Indicate areas of impervious surfaces (patios walkway etc ) and pervious areas (landscaping) Project needs to incorporate low impact development strategies throughout in one or more of the following ways: EI Rainwater harvesting (rain barrels or cistern) Vegetated Roof L Bio-retentions cell/rain garden Li Pervious pavement/payers Li Flow-through planter/vegetated or rock drip line Vegetated swales or rock infiltration swales LJ Downspouts disconnect and discharge over landscape EIL Other: E-36 Page 50f6 REV 6/01/12 FELDMAN RESIDENCE ADDITION/DECK PLAN CHECK NO # 8. WATER METER REVIEW Domestic (potable) Use SQUARE Ui Li What size meter is required? FOOTAGE IS [UI fl Where a residential unit is required to have an automatic fire extinguishing system, the minimum meter size shall be a 1" meter. GREATER NOTE: the connection fee, SDCWA system capacity charge and the THAN 3,500 water treatment capacity charge will be based on the size of the meter SQUARE FEET necessary to meet the water use requirements. [çJ F'V'E] For residential units the minimum size meter shall be 5/8 except where the residential unit is larger than 3,500 square feet or on a lot larger than one quarter (1/4) acre where the meter size shall be %". 9. FEES LII' I 111 Required fees have been entered in building permit. LII IJ[ Drainage fee applicable Added square feet Added square footage in last two years? Ej yes Ono Permit No. Permit No. Project built after 1980 [[yes 0 no Impervious surface> 50% fflj yes F-] no Impact unconstructed facility fl yes Dno LIII Li Fire sprinklers required jyes no (is addition over 150' from centerline) Upgrade fl yes flno LII [1111] No fees required 10. ADDITIONAL COMMENTS Attachments: Engineering Application Storm Water Form I Right-of-Way Application/ Info. Reference Documents E-36 Page 6of6 REV 6/01/12 212-250.06-00 Fee Calculation Worksheet ENGINEERING DIVISION Prepared by: CG Date: 08-03-2015 GEO DATA: LFMZ: I B&T: Address: Bldg. Permit #: Fees Update by: Date: Fees Update by: Date: EDU CALCULATIONS: List types and square footages for all uses. Types of Use: Sq.Ft./Units EDU's: Types of Use: Sq.Ft./Units EDU's: Types of Use: Sq.Ft./Units EDU's: Types of Use: Sq.Ft./Units EDU's: ADT CALCULATIONS: List types and square footages for all uses. Typesof Use: Sq.Ft./Units ADT's: Types of Use: Sq.Ft./Units ADT's: Types of Use: Sq.Ft./Units ADT's: Types of Use: Sq.Ft./Units ADT's: FEES REQUIRED: Within CFD: []YES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee) 0 NO 1. PARK-IN-LIEU FEE:ONW QUADRANT ONE QUADRANT []SE QUADRANT OW QUADRANT ADT'S/UNITS: X FEE/ADT: 23RAFFIC IMPACT FEE: ADT'S/UNITS: X FEE/ADT: BRIDGE & THOROUGHFARE FEE: M DIST. #1 EDIST.#2 EDIST.#3 (USE SANDAG)ADT'S/UNITS X FEE/ADT: I FACILITIES MANAGEMENT FEE ZONE: ADT'S/UNITS: I X FEE/SQ.FT./UNIT: I SEWER FEE S .. ' EDU's I X BENEFIT AREA: EDU's I X DRAINAGE FEES: PLDA: ACRES: I X POTABLE WATER FEES: 5/8 CREDIT UNITS I CODE I FEE/EDU: I FEE/EDU: EHIGH JMEDIUM GLOW FEE/AC: I CON N. FEE I METER FEE I SDCWA FEE I TOTAL I I D314 I $1,673 I $33 I N/A I $1,706 ***This may not represent a comprehensive list of fees due for this project. Please contact the Building division at (760) 602-719 for a complete listing of fees Project Address: 4 Assessor Parcel No. 01-5 j,iqi. @Joo, iXv-o Owner/Owner's Authod Name: • lifle:zeAgent - Owner/Ow Sig Date: City Conc:IBy: JP YES ONO Date Project ID: Ci' IS 3(o Page 1 of I Rev.03/09 CITY OF CAR LSBAD STORM WATER COMPLIANCE ASSESSMENT B-24 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov I am applying to the City of Carlsbad for the following type(s) of construction permit: Building Permit U Right-of-Way Permit U My project is categorically EXEMPT from Electrical Patio/Deck the requirement to prepare a storm water ' Fire Additional Photo Voltaic pollution prevention plan (SWPPP) because it Fire Alarm Fixed Systems Re-Roofing Sign only requires issuance of one or more of the Mechanical Spa-Factory following permit types: Mobile Home Sprinkler Plumbing Water Discharge Project Storm Water Threat Assessment Criteria* No ThatAssessment Criteria My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets the no threat' assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. Tier I - Low Threat Assessment Criteria My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project meets one or more of the following criteria: Results in some soil disturbance; and/or Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 - Moderate Threat Assessment Criteria I] My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). Tier 3 - Significant Threat Assessment Criteria O My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or O My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, O My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). I certify to the best of my knowledge that the above checked statements are true and correct I understand and acknowledge that even though this project does not require preparation of a construction SWPP, I must still adhere to, and at all times during construction activities for the permit type(s) check above comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards. The City Engineer may authorize minor variances from the Storm Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Construction SWPPP Tier Level is warranted. B-24 CITY OF CARLSBAD CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR DETERMINATION OF PROJECT'S PERCEIVED THREAT TO STORM WATER QUALITY E-33 Develooment Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov Construction • Perceived SWPPP Tier Construction Threat Assessment Criteria* Threat to Storm Water Level Quality Tier 3— High Construction Threat Assessment Criteria U Project site is 50 acres or more and grading will occur during the rainy season U Project site is I acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA High U Soil at site is moderately to highly erosive (defined as having a predominance of soils with Tier 3 USDA-NRCS Erosion factors kf greater than or equal to 0.4) U Site slope is 5 to I or steeper U Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). U Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3 - Medium Construction Threat Assessment Criteria Medium U All projects not meeting Tier 3 High Construction Threat Assessment Cnteria Tier 2 High Construction Threat Assessment Criteria U Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA U Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) High U Site slope is 5 to I or steeper Tier 2 U Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). U Owner/contractor received a Storm Water Notice of Violation within past two years U Site results in one half acre or more of soil disturbance Tier 2— Medium Construction Threat Assessment Criteria Medium Q n. All projects not meeting Tier 2 High Construction Threat Assessment Criteria Tier I - Medium Inspection Threat Assessment Criteria U Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA U Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) Medium U Site slope is 5 to I or steeper Tier 1 U Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). U Owner/contractor received a Storm Water Notice of Violation within past two years U Site results in one half acre or more of soil disturbance 1 - Low Inspection Threat Assessment Criteria Low All projects not meeting Tier I Medium Construction Threat Assessment Criteria Exempt - Not Applicable - Exempt *The city engineer may authorize minor variances from the construction threat assessment criteria in special circumstances where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of the city engineer E-33 Page 1 of 1 REV 4/30/10 T CITY OF CAR LS13 BAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov I INSTRUCTIONS: I To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carlsbadca.pov/standards. Initially this questionnaire must be completed by the äpplioant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the Joutcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectlyfilled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete: In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step I and follow the instructions. When completed, sign the form at the end and submit this with your anolication to the city. STEP I TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a priority development project, please answer the following questions: YES NO Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are designed with Green _and _constructed _in_accordance _the _USEPA_ _Streets _guidance? If you answered "yes" to one or more of the above questions, then your project is NOT a pribrity development project and therefore is NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my project does not meet POP requirements" and complete applicant information.. If you answered "no" to bath questions, then go to Step 2. E-34 . Page 1 of 3 Effective 6/27/13 Z^x CITY OF CARLSUR*/-%AD STORM WATER STANDARDS QUESTIONNAIRE E-34 Develooment Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov f. STEP2 . TO BE COMPLETEDFORALL NEWOR REDEVELOPMENT ROJECTS I To determine if your project is a priority development project, please answer the following questions: YES NO Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over th entire project site? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. Is your project creating or replacing 5,000 square feet or more of impervious surféce collectively over the entire. project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, public development projectson publicor private land. _residential, _mixed-use,_and Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption. is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a. hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot A parking lot is a land area or facility for the temporary parking or storageof motor vehiclesused personally for businessor for commerce. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. Is your project a new, or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed. overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA commingles with flows from lands).* _(i.e._not _adjacent 8.. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in, any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. ' Is your project a new development that supports a retail gasoline outlet (RGO)? This category-includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (AD?) of 100 or more vehicles per day. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11.1s your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or_(2)_ increases the. more _impervious _surface _on_ _property _by_ _than _10%? If you answered "yes" :to one or more of the above questions, you ARE a priority development project and are therefore subject to implementing structural Best Management Practices (BMP's) in addition, to implementing Standard Storm Water Requirements such as source control and loW impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this questionnaire, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no" to all of the above questions, you ARE NOT a priority development project and. are therefore subject to implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development Go to step 4 at the end of this questionnaire, check the "my project does not meet POP requirements" box and complete applicant information. E-34 Page 2 of 3 Effective 6127113 0 404 h> CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 - Develonment Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STEP3 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPEMENT PROJECTS ONLY Complete the questions below regarding your redevelopment project: YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. STEP 4 CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project Refer to SUSMP for details. J My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box Address: Accessor's Parcel Number(s): 2 c ID Applicant Name: " ) Applicant Title: Applicant Sinatu( 4 ) Date: iii-c This Box for City Use Only ncurreñce: YES NO F ID: coI5_ * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of 3 Effective 6/27/13 STORM WATER POLLUTION PREVENTION NOTES ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 314 INCH MINIMUM AGGREGATE. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES PROJECT INFORMATION Site Address: I DI21ILI1Ud W. V. Assessors Parcel Number: 12 22-21-- Project ID: I523gp Construction Permit No.: 'P%J IC50 2_ Estimated Construction Start Date Ic Project Duration I 1i II( Months Emergency Contact: Name: (1z$ r\ oitr' 24 hour Phone: q-9)7S 79 LC Perceived Threat to Storm Water Quality 0 Medium Low If medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs For City Use Only 4004k CITY OF STORM WATER COMPLIANCE FORM TIER I CONSTRUCTION SWPPP E-29 DeveloDment Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STORM WATER COMPLIANCE CERTIFICATE I My project is not in a category of permit types exempt from the Construction SWPPP requirements I My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). I My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) / My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria: located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, disturbed area is located on a slope with a grade at or exceeding 5 horizontal to I vertical; and/or disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND. (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. CITY OF CARLSBAD STANDARD TIER 1 SWPPP Approved By: C- G DA E Date: 8 3 /5 E-29 Page 1 of 3 REV 4/30/10 Erosion Control Sediment Control BMPs Tracking Non-Storm Water Waste Management and Materials BMPs BMPs Management BMPs Pollution Control BMPs 2 00 2 g E - E BestManagementPractice . . .L (BMP)0escript10n4 b i5 CM W L CL 'CL 0 0 .2 2 i! .22 Do ' 'S w.t . ' 2 , U) Cl) Cl) . 0 U. Q .bm in> Cl) CflQ. cn. u a (( a. >C c U) cl)C u x 0 0 CASQADesignatlon - 'Ir Op 9, 7 M. IT a? ? 't 11) qD o LU o w C) w 0 LU LU U) LU CO. LU Cl) W U) LU Cl) LU Cl) W Cl) • W Cl) - I— Cl) Z U) Z U) Z Cl) Z Construction Activity Grading/Soil Disturbance Trenching/Excavation _Stockpiling _Drilling/Boring - Concrete/Asphalt Saw cutting _Concreteflatwork _Paving -- _Conduit/Pipelnstaltation -- _Stucco/MortarWork -- - Waste Disposal -- Down Area _Staging/Lay - - - Equipment Maintenance -- --- -- and Fueling Hazardous Substance Use/Storage Dewatenng Site Access Across Dirt - Other (list): - Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descmbed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example - If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling' row intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the BMPReferenceHandout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 REV 4/30/10 PLANNING DIVISION Development Services 4 ^,A, 041-> BUILDING PLAN CHECK Planning Division Faraday Avenue CITY OF REVIEW CHECKLIST 1635 F(760)602-4610 CARLSBAD P28 DATE: 844-15 PROJECT NAME: PROJECT ID: PLAN CHECK NO: CB 15-2386 SET#: 2 ADDRESS: 1375 Sapphire Dr APN: 212-250-06-00 This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Final Inspection by the Planning Division is required J Yes Z No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: charbelle@att.net For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINEERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 Chris Sexton Chris Glassen Greg Ryan 760-602-4624 760-602-2784 760-602-4663 Chris.Sexton@carlsbadca.gov Christopher.Glassen@carIsbadca.gov Gregorv.Rvan@carlsbadca.gov Gina Ruiz VaiRay Marshall Cindy Wong 760-602-4675 760-602-2741 760-602-4662 Gina.Ruiz@carIsbadca.gov ValRay.Marshall@carlsbadca.gov Cvnthia.Wong@carIsbadca.gov Linda Ontiveros Dominic Fieri 760-602-2773 760-602-4664 Linda.ontiveros@carlsbadca.gov Dominic.Fieri@carlsbadca.gov Remarks: Plan Check No. CB 15-2386 Address 1375 Sapphire Dr Date 8-14-15 Review #2 Planner Chris Sexton Phone (760) 602-4624 APN: 212-250-06-00 Type of Project & Use: addition Net Project Density: 1.0 DU/AQ Zoning: R-1-10.000 General Plan: RLM Facilities Management Zone: 22 CFD (in/out) #_Date of participation: Remaining net dev acres:_____ (For non-residential development: Type of land use created by this permit: 1 2 3 Legend: Z Item Complete LI Item Incomplete - Needs your action Z LI LI Environmental Review Required: YES Li NO LI TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: Z Li Li Discretionary Action Required: YES Li NO Li TYPE APPROVAL/RESO. NO. DATE PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: Z Li LI Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES 2 NO Q CA Coastal Commission Authority? YES Q NO 0 If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego, CA 92108-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): Li Li Habitat Management Plan Data Entry Completed? YES LI NO Li If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (NP/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) I.I.I Inclusionary Housing Fee required: YES [] NO Li (Effective date of Inclusionary Housing Ordinance - May 21, 1993.) Data Entry Completed? YES LI NO Li (NP/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) Housing Tracking Form (form P-20) completed: YES LI NO E] N/A 0 P-28 Page 2 of 3 07/11 Site Plan: DOD Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of- way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). Provide legal description of property and assessor's parcel number. City Council Policy 44— Neighborhood Architectural Design Guidelines Applicability: YES D NO 0 Project complies: YES 0 NOD I.I.I Zoning: Setbacks: Front: Interior Side: Street Side: Rear: Top of slope: Required Shown Required Shown Required Shown. Required j Shown Q Required Shown offaum Accessory structure setbacks: N/A Front: Required Interior Side: Required Street Side: Required Rear: Required Structure separation: Required Shown Shown Shown Shown Shown Lot Coverage: Required <40% Shown <40% Height: Required <30' with mm. 3:12 roof pitch Shown <30' I 0 0 5. Parking: Spaces Required 2 Shown Z (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required Shown 0 Z 0 Additional Comments 1) Only a wetbar with a sink or rough-in space for a sink with a waste line drain exceeding one and a half inches in diameter, a depth of eighteen inches or an overall of two square feet is allowed in the master bedroom retreat. Please show the dimensions of the sink. 2) The refrigerator cannot exceed six cubic feet in capacity (the typical dimensions of which are depth of twenty-five inches, height of thirty five inches, and a width of twenty-five inches. Please show the dimensions of the refrigerator. 3) The cabinets or counter space cannot exceed eight lineal feet. Please show the dimension of the counter space. 4) Please show the internal access to the third floor deck as the floor plans only show the first and second floor. OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER Chris Sexton DATE 8-14-15 P-28 Page 3 of 3 07/11 Plan Review Checklist for Project: 1375 Sapphire Dr. Plan Check# CB-15-2386 Attn: Chris Sexton Sink Dimensions are: Elkay Lustertone undermount inside 18 Lx 14 W x 7 7/8 D Outside 16.5 x20 x 8.75 deep (see attached) Bar Wine Refrigerator: 32.75" H x 23.5" W x 23" D (see attached spec.) Bar Counter is 2 x 6 w/sink in middle. We have 6 Lineal feet (see plan drawn 3 of 7) This does not apply, as the.3rd deck is existing. Access is from the Master bd rm. (Chris we spoke on the phone regarding- you said just disregard)