Loading...
HomeMy WebLinkAbout2875 POINSETTIA LN; ; WM990041; PermitCity of Carlsbad 05/19/1999 Water Meter Permit Permit No:WM990041 Building Inspection Request Line (760) 438-3101 Job Address: Permit Type: Parcel No: 2875 POINSETTIA LN CBAD WMETER Lot#: 0 Construction Type: NEW Reference #: Project Title: CARRILLO ELEMENTARY SCHOOL IMPACT FEES-3 METERS- Applicant: LUSARDI CONSTRUCTION COMPANY 1570 LINDA VISTA DRIVE SAN MARCOS, CA 92069 619-744-3133 _Owner; Status: ISSUED Applied: 05/19/1999 Entered By: RMA Plan Approv&g:5' _Q_5/19/1999 lssuW. IM/li'&l'998001 01 Inspect Area: C-PRHT Total Fees: $39,960.00 'T!)tal Payments To Dale: $0.00 .. " BIIIJUice Due: $39,960.00 Units Meter Size. Potable 1 1 0 Add'I Connection Fee Reclaim D~, , ~ * D1 1 T2 0 0 Add'I Connection Fee TOTAL PERMIT FEES Inspector: FINAL APPROVAL Date: Clearance: $15,360.00 $5,400.00 $0.00 $0.00 $19,200.00 $0.00 $0.00 $0.00 $39,960.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition• of fees, dedications, reseivations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Ca~sbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which vou have nrevious1v been aiven a NOTICE similar to this or as to which the statute of limitations has oreviousl" otherwise ex"ired. CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 02 39960-00 05/19/99 09:50 FAX 7607449064 ;~3/31199 11:42 FAI 7607449064 LUSARDI CONSTRUCTION LUSARDICO ll!004 Ill 001 ·. TO: FROM: DATE: RB: TRANSMISSION OK TIIIU NO CONl'il!Cl'ION TEL SUBADPRESS CONNECTION ID ST. TIME USAGE T l'GS. Sl!Nl' RESULT ••******************* ••• Tl REPORT ••• ••••••••••••*****•s•• 3948 03/31 11:39 02·43 3 OK 471'928 LUSARDI CONSTRUCTION COMPANY JS70 LiPda VislaDrivc Saa Marcos, Califomia !12Dli9-3880 PHONE (760} 744-3133 l' AX (760)-744-9064 Thom Clark and Jim Poltl -SMUSD Boyd Suemnick March 31, l 9!19 Water Meter Fees for Carlsbad Waiitt District-For :Reference This llMIIIIO is to infonn you that it is imperative dud we lo.stall the water IDCtcrs as soon as possible so we can start Wll.lerillg 1be baseball field wilbin 1be next two weeks. We have contacted Carlsbad Municipal WaterDistric:fartbe.fees on tbe watermetms (Pepper-760/438-2722 x7153). The total cost for the water m.etcJ?: ,IIO as ibllowa: Ctt, · ,>f Cartlbad Olmmualty Denlopmcnt -Polllhle and Rcolaimed Connection Fees l. 2" Jnigatlon w-:Mc:ter 2. 2" Domestic Wmr Mela 3. 1" Domestic Water Meter TOTAL ca,U,ad Mualdpal Water District-Meter and SDCWA Fees I. 2" Tmbo for llrlpticm line -Capacity Charge 2. 2" Turbo for Jniption line -Meter Charge 3. 2" Dl&placanent for Dmnestic lino-Capacity Chatgc 4. 2" Disp!acem=t for Domestic line -Meler Chaige . -~~.... .. .. -·---.:-,.. ... _ $19,200 lS,360 5,400 $39,960 $8,242 670 8,242 350 ? ~~,;