HomeMy WebLinkAbout2875 POINSETTIA LN; ; WM990041; PermitCity of Carlsbad
05/19/1999 Water Meter Permit Permit No:WM990041
Building Inspection Request Line (760) 438-3101
Job Address:
Permit Type:
Parcel No:
2875 POINSETTIA LN CBAD
WMETER
Lot#: 0
Construction Type: NEW
Reference #:
Project Title: CARRILLO ELEMENTARY SCHOOL
IMPACT FEES-3 METERS-
Applicant:
LUSARDI CONSTRUCTION COMPANY
1570 LINDA VISTA DRIVE
SAN MARCOS, CA 92069
619-744-3133
_Owner;
Status: ISSUED
Applied: 05/19/1999
Entered By: RMA
Plan Approv&g:5' _Q_5/19/1999
lssuW. IM/li'&l'998001 01
Inspect Area: C-PRHT
Total Fees: $39,960.00 'T!)tal Payments To Dale: $0.00 .. " BIIIJUice Due: $39,960.00
Units Meter Size.
Potable
1
1
0
Add'I Connection Fee
Reclaim
D~, , ~ *
D1
1 T2
0
0
Add'I Connection Fee
TOTAL PERMIT FEES
Inspector:
FINAL APPROVAL
Date: Clearance:
$15,360.00
$5,400.00
$0.00
$0.00
$19,200.00
$0.00
$0.00
$0.00
$39,960.00
NOTICE: Please take NOTICE that approval of your project includes the "Imposition• of fees, dedications, reseivations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Ca~sbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which vou have nrevious1v been aiven a NOTICE similar to this or as to which the statute of limitations has oreviousl" otherwise ex"ired.
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
02
39960-00
05/19/99 09:50 FAX 7607449064
;~3/31199 11:42 FAI 7607449064
LUSARDI CONSTRUCTION
LUSARDICO
ll!004
Ill 001 ·.
TO:
FROM:
DATE:
RB:
TRANSMISSION OK
TIIIU NO
CONl'il!Cl'ION TEL
SUBADPRESS
CONNECTION ID
ST. TIME
USAGE T
l'GS. Sl!Nl'
RESULT
••*******************
••• Tl REPORT ••• ••••••••••••*****•s••
3948
03/31 11:39
02·43
3
OK
471'928
LUSARDI CONSTRUCTION COMPANY
JS70 LiPda VislaDrivc
Saa Marcos, Califomia !12Dli9-3880
PHONE (760} 744-3133
l' AX (760)-744-9064
Thom Clark and Jim Poltl -SMUSD
Boyd Suemnick
March 31, l 9!19
Water Meter Fees for Carlsbad Waiitt District-For :Reference
This llMIIIIO is to infonn you that it is imperative dud we lo.stall the water IDCtcrs as soon as possible so we
can start Wll.lerillg 1be baseball field wilbin 1be next two weeks. We have contacted Carlsbad Municipal
WaterDistric:fartbe.fees on tbe watermetms (Pepper-760/438-2722 x7153). The total cost for the
water m.etcJ?: ,IIO as ibllowa:
Ctt, · ,>f Cartlbad Olmmualty Denlopmcnt -Polllhle and Rcolaimed Connection Fees
l. 2" Jnigatlon w-:Mc:ter
2. 2" Domestic Wmr Mela
3. 1" Domestic Water Meter
TOTAL
ca,U,ad Mualdpal Water District-Meter and SDCWA Fees
I. 2" Tmbo for llrlpticm line -Capacity Charge
2. 2" Turbo for Jniption line -Meter Charge
3. 2" Dl&placanent for Dmnestic lino-Capacity Chatgc
4. 2" Disp!acem=t for Domestic line -Meler Chaige . -~~.... .. .. -·---.:-,.. ... _
$19,200
lS,360
5,400
$39,960
$8,242
670
8,242
350
? ~~,;