Loading...
HomeMy WebLinkAbout1668 PLOVER CT; ; CB970095; PermitB U I ;:, J I N G P E R M I ~ 0 J./ 2/97 15: , S - age 1 of 1 Jlh Addre!:is: 1664 PLOVER CT Suite: Perm,L t Tyr ONDOMINTUMS p cl r C • l N () : --,,.+~C) ~.J;i._~~ ::..ot#: .1 1 Valuatl.01. 37~, 029 O cupancy Group: R3 Reference#: escr1pt1 n: SANDLING-PH$ 9-BLDG16-B,4922+ : 1423 GAR+b DfCK,1664,66,68 PLOVER CT Penni N ProJe N :ieve oprnent N Construction TypP.: VN Status: ISS F, Ai;pl1 d: 01/ 3/ Apr/Issue: 0~/22/97 Enter 3 By: RMA Appl/Owr.r: BARRETT AMERICAN 619-431-80 035 CORTE DEL NOGAL, STE 160 CARLSBAD CJ:-\ J t oe.11r c.e,~ t.l-O 3.6 "b 7 (l I 20 8 01 22197 0001 01 02 *** Pan Check Num Fe s Requ1red *** * 1:. * F,~es Cal lect,_d & Credi tS:-PRMT * i<,!,c A Fees: u ... trrent -: Total Fee : F des Ilption :l7 ,554.31 . 0 27,554. Erter #Units & Code- Bu1l<ling P•rmit Plan Check Str(ng Mot1on fee En er 'Y' to Autoca Enter# Units to Au P yoff Fee fr CF * BUILD NG TOTAL Er tei Y for Plumb1 E ch Plumbing F1xtur-• Each Building Sewer Each nstall/Repa1r W E ch Water Heat rand/or G ~ Piping System Each VQcuum 81eaker * FLUM [N, "'OTA:::. Enter "Y for Electric I "'U fee ngle Phase Per AMP > ~ ELECTRI AL TOTAL Enter 'Y' for Mech nical Issue Fee> In tal~ Furn/Duct ... /Heat Pu •P"' > Pach nstall Fir place Each Exh ust Fdn > A ME 'HANICAL TOTAL ~-------- 3 12 .00 6 . 0 b. .uo 1,050.00 26,504 .~1 Ext fee Data 7200.00 D5/8 1599,U 1 39. ~7. 0 b789.C Y 129b.OC 8844.3 2680 , 31 2 . 0( Y 336.UO 4 . 0 2 . ) 2 . 0 21.0 42. G6.00 0. y 9 . 75 1 4.0 15.00 Y 7.0C 19.5 78.00 140. FINA APPR OVAL INSPf~---DATri-µdJJ._ CLEAR NCE ~~ rz(e-'17 fUJ CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB970095 FOR 06/23/97 DESCRIPTION: SANDLING-PHS 9-BLDG16-B,4922+ 1423 GAR+62 DECK,1664,66,68 PLOVER CT TYPE: CONDO JOB ADDRESS: 1664 PLOVER CT APPLICANT: BARRETT AMERICAN CONTRACTOR: OWNER: PHONE: PHONE: PHONE: INSPECTOR AREA PY PLANCK# CB970006 OCC GRP R3 CONSTR. TYPE VN STE: LOT: 21 619-431-0800 REMARKS: R/MORGAN/930-0722 SPECIAL INSTRUCT: INSPECTOR ~?4}'-1,·~~--------- TOTAL TIME: CD 39 LVL DESCRIPTION ACT CO~ENT~ l1 n ~ /__. 0f, ~_N_,(!_j_jl_a.JJ.______;~::........!j...·· __ EL Final Electrical ------------------------------------ ***** INSPECTION HISTORY ***** DATE DESCRIPTION ACT INSP COMMENTS 061297 Final Electrical PA PY METER REL 061197 Final Electrical NS PY 053097 Gas/Test/Repairs AP PY 050697 Exterior Lath/Drywall AP TP 1964-66-68 050297 Interior Lath/Drywall AP PY 050297 Exterior Lath/Drywall AP PY 042897 Rough Combo AP PY 042597 Frame/Steel/Bolting/Welding NR PY 042597 Rough/Topout AP PY 042597 Rough Electric NR PY 042597 Rough/Ducts/Dampers NR PY 042497 Rough Combo NR PY 041697 Shear Panels/HD's AP PY 041597 Shear Panels/HD's NS PY 040497 Roof/Reroof AP PY 021497 Ftg/Foundation/Piers AP PD 021497 Underground/Under Floor AP PD 021497 Underground/Conduit-Wiring AP PD 020797 Underground/Under Floor AP PY I DEPT: BUILDING FINAL BUILDING INSPECTION ENGINEERING FIRE @ U/M PLAN CHECK#: CB970095 PERMIT#: CB970095 PROJECT NAME: SANDLING-PHS 9-BLDG16-B,4922+ 1423 GAR+62 DECK,1664,66,68 PLOVER CT WATER DATE: 06/07/97 PERMIT TYPE: CONDO ADDRESS: 1664 PLOVER CT Lot# 21 CONTACT PERSON/PHONE#: MORGAN/930-0722 SEWER DIST: CA WATER DIST: CA -===~~-==;fl= INSPE~ BY: INSPECTED BY: INSPECTED BY: DATE c.Lt. .... INSPECTED: ~ DATE INSPECTED: DATE INSPECTED : APPROVED DISAPPROVED APPROVED DISAPPROVED APPROVED DISAPPROVED ============================================================================= COMMENTS: FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING U/M @:) LAN CHECK#: CB970095 PERMIT#: CB970095 PROJECT NAME: SANDLING-PHS 9-BLDG16-B,4922+ 1423 GAR+62 DECK,1664,66,68 PLOVER CT ADDRESS: 1664 PLOVER CT Lot# CONTACT PERSON/PHONE#: MORGAN/930-0722 SEWER DIST: CA WATER DIST: CA 21 DATE: 06/07/97 PERMIT TYPE: CONDO JUN 9 ============================================================================= INSPECTED BY: INSPECTED BY: INSPECTED BY: COMMENTS: DATE INSPECTED: b-17-17 APPROVED DATE INSPECTED: t:·zP--f7 APPROVED ✓ DATE INSPECTED: APPROVED DISAPPROVED L DISAPPROVED DISAPPROVED DEPT: BUILDING FINAL BUILDING INSPECTION ~ FIRE PLANNING U/M LAN CHECK#: CB970095 PERMIT#: CB970095 PROJECT NAME: SANDLING-PHS 9-BLDG16-B,4922+ 1423 GAR+62 DECK,1664,66,68 PLOVER CT ADDRESS: 1664 PLOVER CT Lot# 21 CONTACT PERSON/PHONE#: MORGAN/930-0722 SEWER DIST: CA WATER DIST: CA DATE INSPECTED BY: INSPECTED: 6-1?-'17 APPROVED WATER DATE: 06/07/97 PERMIT TYPE: CONDO 9 DISAPPROVED ✓ INSPECTED BY: DATE INSPECTED: b·Z 0 "'77 APPROVED \/ DISAPPROVED INSPECTED BY: COMMENTS: DATE INSPECTED: APPROVED DISAPPROVED --------·-----=~- DEPT: BUILDING FINAL BUILDING INSPECTION ENGINEERING S) PLANNING U/M WATER PLAN CHECK#: CB970095 PERMIT#: CB970095 PROJECT NAME: SANDLING-PHS 9-BLDG16-B,4922+ 1423 GAR+62 DECK,1664,66,68 PLOVER CT ADDRESS: 1664 PLOVER CT Lot# CONTACT PERSON/PHONE#: MORGAN/930-0722 SEWER DIST: CA WATER DIST: CA DATE: 06/07/97 PERMIT TYPE: CONDO 2 i I ~ ~-«: r ' '\ JUN 16 1997 Ir\ I I I w I ========================================================r -·== __ = __ I==== INSPECTE~ DATE - BY: C. i3 u c.__L INSPECTED: l /97 APPROVED _K... DISAPPROVED INSPECTED BY: INSPECTED BY: DATE INSPECTED: DATE INSPECTED: I APPROVED DISAPPROVED APPROVED DISAPPROVED ==================----===-----===------================--==================== COMMENTS: FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING e) WATER PLAN CHECK#: CB970095 PERMIT#: CB970095 PROJECT NAME : SANDLING-PHS 9-BLDG16-B,4922+ 1423 GAR+62 DECK,1664,66,68 PLOVER CT ADDRESS: 1664 PLOVER CT Lot# CONTACT PERSON/PHONE#: MORGAN/930-0722 DATE: 06/07/97 PERMIT TYPE: CONDO •.114 .-g \997 SEWER DIST: CA WATER DIST: CA CARLSBAD MUNICIPAL WATER DISTRICT =================~~~ ~~7~~==~= NS~~iECTED: f~/4PPROVED ~ISAPPROVED INSPECTED BY : INSPECTED BY: COMMENTS: DATE INSPECTED: DATE INSPECTED: APPROVED DISAPPROVED APPROVED DISAPPROVED , SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 Riverdale Street, P.O. Box 600627, San Diego, CA 92160, (619) 280-l321 FIELD INSPECTION REPORT PRWECT TITLE: PROJECT LOCATION: Sanderling at Aviara See Project Summary ses&TnLENO: PERMIT NO: 9412315 I.R.NO: 21 (Pg 1 of 21 See Summary PLANJ'IU:NO: ARCHITECT, The KTGY Group ENGINEER: Gouvis Engineering GENERAL CONTRACTOR: Barratt American, Inc. suacoNTRAcroR: Mueller Lewis 2/17 /97 J. Blakely ICBOS Concrete 26916 P.T. 79299 DISTRIBUTION: PROJECT SUMMARY BUILDING ADDRESS PERMIT BUILDING ADDRESS PERMIT 15 1660 Plover Court 970096 17 1667 Plover Court 970092 15 1662 Plover Court 970096 17 1669 Plover .Court 970092 16 1 664 Plover Court 970095 17 1671 Plover Court 970092 16 1666 Plover Court 970095 18 1661 Plover Court 970097 16 1668 Plover Court 970095 18 1663 Plover Court 970097 17 1665 Plover Court 970092 REINFORCED CONCRETE Time Arrived: 0700 Time Departed: 1530 Reinforcing Steel: ASTM A615 Concrete: Mix #355PAE, 3000 psi; design 2500 psi Inspected the reinforcing steel, PA straps, hold down bolts, footings and concrete placement at the slabs-on- grade located at 1660, 1662, 1664, 1666 and 1668 Plover Court. The concrete was mechanically vibrated at the stem walls and perimeters of the structures. Obtained concrete cylinders for testing. This portion of work did not require special inspection but was for quality control purposes only. The following portion of work required special inspection: Inspected the post-tension tendons, reinforcing steel, PA straps, hold down bolts and footings at the slabs-on- grade located at 1665, 1667, 1669, 1671, 1661 and 1663 Plover court. NOTE: Building 1 8 did not have the hardware installed at the time of inspection. To the best of my knowledge, all work was in accordance with the approved plans. (2) Barratt American, Inc. (1 I City of Carlsbad REVIEWED BY: ~uL/ Michael B. Wheeler, R.C.E. #45358 SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 Riverdale Stree~ P.O. Box 600627, San Diego, CA 92160, (619) 2811--1321 FIELD INSPECTION REPORT PROJECT TITLE: PROJECT LOCATION: Sanderling at Aviara See Project Summary SC:W. T FILE NO: PERMIT NO: 9412315 I.R.NO: 21 !Pg2of2J See Summary PLAN FILE NO: ARCHITECT, The KTGY Group ENC[NEER: Gouvis Engineering GENERAL CONTRACTOR: Barratt American, Inc. suscONTRAcroR: Mueller Lewis 2/19/97 J. Blakely ICBO 79299 DISTRIBUTION: POST TENSION CONCRETE Time Arrived: 0700 Time Departed: 1530 Post-Tension Tendons: ASTM A416, 112·. 270 ksi Concrete: Mix #355PAE, 3000 psi; design 2500 psi The following portion of work required special inspection: Inspected the concrete placement at the post-tension slabs-on-grade located at 1665, 166 7, 1669, 1671 , 1661 and 1663 Plover Court. NOTE: Building 18 had all of the hardware installed, including the back-up bars, prior to concrete placement. (See Special Inspection Report dated 2/17197). The concrete was mechanically vibrated at the stem walls and perimeters of the structures. Obtained concrete cylinders for testing. To the best of my knowledge, all work was in accordance with the approved plans. (21 Barratt American, Inc. ( 1 I City of Carlsbad -r REVIEWED BY: I Michael B. Wheeler. R.C.E. #45358 SOUTHERN CALIFORNL.\ SOIL & TESTING, INC. 6280 Riverdale Street, P.O. Box 600627, San Diego, CA 92160, (619) 280-4321 FIELD INSPECTION REPORT PROJECT TITLE: PROJECT LOCATION: Sanderling at Aviara See Project Summary ses&TnLENO: PERMIT NO: 9412315 1.R.NO: 21 (Pg 1 of 2) See Summary PLAN FILE NO: AROUTECT, The KTGY Group ENGINEER: Gouvis Engineering GENERAL CONTRACTOR: Barratt American, Inc. suacoNTRACTOR: Mueller Lewis 2/17/97 J. Blakely ICBOS Concrete 26916 P.T. 79299 DISTRIBUTION: PROJECT SUMMARY BUILDING ADDRESS PERMIT BUILDING ADDRESS PERMIT 15 1660 Plover Court 970096 17 1667 Plover Court 970092 15 1662 Plover Court 970096 17 1669 Plover Court 970092 16 1664 Plover Court 970095 17 1671 Plover Court 970092 16 1666 Plover Court 970095 18 1661 Plover Court 970097 16 1668 Plover Court 970095 18 1663 Plover Court 970097 17 1665 Plover Court 970092 REINFORCED CONCRETE Time Arrived: 0700 Time Departed: 1530 Reinforcing Steel: ASTM A615 Concrete: Mix #355PAE, 3000 psi; design 2500 psi Inspected the reinforcing steel, PA straps, hold down bolts, footings and concrete placement at the slabs-on- grade located at 1660, 1662, 1664, 1666 and 1668 Plover Court. The concrete was mechanically vibrated at the stem walls and perimeters of the structures. Obtained concrete cylinders for testing. This portion of work did not require special inspection but was for quality control purposes only. The following portion of work required special inspection: Inspected the post-tension tendons, reinforcing steel, PA straps, hold down bolts and footings at the slabs-on- grade located at 1665, 1667, 1669, 1671, 1661 and 1663 Plover court. NOTE: Building 18 did not have the hardware installed at the time of inspection. To the best of my knowledge, all work was in accordance with the approved plans. (2) Barratt American, Inc. I 1) City of Carlsbad Michael B. Wheeler, R.C.E. #45358 SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 Riverdale Street, P.O. Box 600627, San Diego, CA 92160, (619) 280-4321 FIELD INSPECTION REPORT PRO.J'ECf TITLE: PROJECT LOCATION: Sanderling at Aviara See Project Summary SCS&TFILENO: "P£RMITNO: 9412315 I.R.NO: 21 (Pg2of2I See Summary PLAN FILE NO: AKCHITECT, The KTGY Group ENGINEER: Gouvis Engineering GENERAL CONTRACTOR: Barratt American, Inc. suBCONTRAcroR: Mueller Lewis 2/19/97 J. Blakely ICBO 79299 DISTRIBUTION: POST TENSION CONCRETE Time Arrived: 0700 Time Departed: 1530 Post-Tension Tendons: ASTM A416, 112·. 270 ksi Concrete: Mix #355PAE, 3000 psi; design 2500 psi The following portion of work required special inspection: Inspected the concrete placement at the post-tension slabs-on-grade located at 1665, 1667, 1669, 1671, 1661 and 1663 Plover Court. NOTE: Building 18 had all of the hardware installed, including the back-up bars, prior to concrete placement. (See Special Inspection Report dated 2/17 /971. The concrete was mechanically vibrated at the stem walls and perimeters of the structures. Obtained concrete cylinders for testing. To the best of my knowledge, all work was in accordance with the approved plans. 121 Barratt American, Inc. I 11 City of Carlsbad REVIEWED BY: Michael B. Wheeler, R.C.E. #45358 SOUTHERN CALIFORNIA. SOIL & TESTING, INC. 6180 Riverdale Street, P.O. Box 600617, San Diego, CA 91160, (619) 180-4321 FIELD INSPECTION REPORT P'RO.JECT TITLE: PROJECT LOCATION: Sanderling at Aviara See Project Summary SCSAT FlLENO: PERMIT NO: 9412315 I.R.NO: 21 (Pg 1 of 21 See Summary PLAN FILE NO: ARCHITECT, The KTGY Group ENGINEER: Gouvis EnQineering CENERAL CONTRACTOR: Barratt American, Inc. suacoNTRAcroR: Mueller Lewis 2/17 /97 J. Blakely ICBOS Concrete 26916 P.T. 79299 DISTRIBUTION: PROJECT SUMMARY BUILDING ADDRESS PERMIT BUILDING ADDRESS PERMIT 15 1660 Plover Court 970096 17 1667 Plover Court 970092 15 1662 Plover Court 970096 17 1669 Plover Court 970092 16 1664 Plover Court 970095 17 1 671 Plover Court 970092 16 1666 Plover Court 970095 18 1661 Plover Court 970097 16 1668 Plover Court 970095 18 1663 Plover Court 970097 17 1665 Plover Court 970092 REINFORCED CONCRETE Time Arrived: 0700 Time Departed: 1530 Reinforcing Steel: ASTM A615 Concrete: Mix #355PAE, 3000 psi; design 2500 psi Inspected the reinforcing steel, PA straps, hold down bolts, footings and concrete placement at the slabs-on- grade located at 1660, 1662, 1664, 1666 and 1668 Plover Court. The concrete was mechanically vibrated at the stem walls and perimeters of the structures. Obtained concrete cylinders for testing. This portion of work did not require special inspection but was for quality control purposes only. The following portion of work required special inspection: Inspected the post-tension tendons, reinforcing steel, PA straps, hold down bolts and footings at the slabs-on- grade located at 1665, 1667, 1669, 1671, 1661 and 1663 Plover court. NOTE: Building 1 8 did not have the hardware installed at the time of inspection. To the best of my knowledge, all work was in accordance with the approved plans. (21 Barratt American, Inc. (11 City of Carlsbad Michael B. Wheeler, R.C.E. #45358 SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 Riverdale Street, P.O. Box 600627, San Diego, CA 92160, (619) 280-4321 FIELD INSPECTION REPORT PROJECT TITLE: PROJECT LOCATION: Sanderling at Aviara See Project Summary SCS&.TFILENO: PERMIT NO: 9412315 I.R.NO: 21 (Pg 2 of 21 See Summary PLAN FILE NO: ARCIDTECT, The KTGY Group ENGINEER, Gouvis Engineering GENERAL CONTRACTOR: Barratt American, Inc. suBCONTRACTOR: Mueller Lewis 2/19/97 J. Blakely ICBO 79299 DISTRIBUTION: POST TENSION CONCRETE Time Arrived: 0700 Time Departed: 1530 Post-Tension Tendons: ASTM A416, 112-, 270 ksi Concrete: Mix #355PAE, 3000 psi; design 2500 psi The following portion of work required special inspection: Inspected the concrete placement at the post-tension slabs-on-grade located at 1665, 1667, 1669, 1671, 1661 and 1663 Plover Court. NOTE: Building 18 had all of the hardware installed, including the back-up bars, prior to concrete placement. (See Special Inspection Report dated 2/17 /971. The concrete was mechanically vibrated at the stem walls and perimeters of the structures. Obtained concrete cylinders for testing. To the best of my knowledge, all work was in accordance with the approved plans. 12) Barratt American, Inc. I 11 City of Carlsbad -r REVIEWED BY: ~~#«:/ Michael B. Wheeler, R.C.E. #45358